Architectural Report
Former Cinema Airone/Stellarium - Via Lidia 44, Rome
Land registry information: fg. 900, partt. 169-170
Introduction
The site of the former movie theater “Cinema Airone/Stellarium” has been assigned to
The Actors Center-Roma, a non-profit cultural organization, by the City of Rome's
Patrimony and Housing Department, via a Temporary Assignment Memo dated June 1,
2010.
The site has been abandoned since 1998. Immediately preceding that date, it was being
used as a discotheque.
The report outlining the historical and artistic significance of the site, compiled by the
City of Rome's Soprintendenza per i Beni Architettonici e il Paesaggio on December 15,
2009, featured a) the intrinsic value of the building's architecture, an original creation by
architect Adalberto Libera, one of the leaders of Italy’s rationalism movement, and b) the
presence of a large mural painted by Giuseppe Capogrossi spanning the ceiling of the
main entrance, hidden from view by successive decorations.
The current administration has made no explicit guarantee they will take on the
costs and responsibilities for cleaning, extraordinary maintenance and meeting legal
safety requirements for the building.
The cultural organization The Actors Center-Roma requires the space for mixed
artistic purposes and currently possesses a limited ability to cover costs for initial
restructuring and regular maintenance. Therefore, before any discussion takes place
on future usage, we will limit our current observations to a brief description of the
basic features needed to make the building safe and usable.
The following is a brief work schedule, prioritized according to safety, usage and
economic requirements. Features are listed alongside suggested work and
corresponding estimates that may be used to create a future detailed cost
breakdown.
General state of the building
Despite having been abandoned for an extended period of time, the former Cinema
Airone/Stellarium appears integral. Formal usage came to an abrupt end, as the
building is littered with chairs, seats, magazines, pamphlets, decorations, all sorts of
perishable items, including food and beverages, with items still lying in storage areas
and lockers. The building requires both regular and extraordinary maintenance. It was
last used as a discotheque and therefore features: a) several large metallic structures
that served to create VIP-areas and provide support for lighting fixtures - some
spanning the entire roof of the theater (without contact with the actual roof); b) an
extension of the original stage, created in steel and brick, with an additional structure in
glass and steel added on at a later date; c) the Capogrossi mural, currently covered by
a layer of blue paint, spanning the entire ceiling of the entrance stairwell; c) theater
lights subsequently substituted by plastic globes used to reflect nightclub-type lighting.
The building’s electrical system is generally in good condition, with current-generation
circuit breakers, switchboards and control boxes that meet legal standards. Some of the
wiring has been altered and requires modification to match modern standards.
The plumbing system has been altered, with some substitution of the original pipes and
valves. In a closet located on the lower level, condensation has rusted a mainpipe but,
generally speaking, the plumbing systems works well and presents no significant leaks.
Below, please find a detailed description of several of the building’s features, followed by
suggested actions:
1. An outdoor neon sign right outside the front entrance features the name Cinema
Stellarium (and refers to a subsequent renaming of the building).
We suggest keeping this structure as a feature, even if the site changes its name.
2. The front entrance stairwell featuring the mural by Capogrossi. Today the mural is
covered by a layer of blue acrylic paint.
For a complete and correct refurbishment of the theater, the hidden mural should be
restored, ideally with the help of art restoration education programs or the creation of
a tender or contest to restore the mural in line with the original philosophy of the
theater. The surface area that requires restoration is 88 square meters.
3. The ceiling of the Cinema Airone consists entirely of a large metallic structure. The
inside of the dome is covered in welded steel cement-coated netting. The outside of
the dome is covered with rectangular bricks and sealing panels coated with a
waterproof bituminous sealant. The interior of the ceiling, originally covered by a
textured material, currently features acrylic paint and a smattering of rhombus-
shaped soundproofing panels. The type of acrylic paint adopted did not permit an
appropriate exchange of air, which has caused the paint to peel off in several areas.
Almost all of the sooundproofing panels have begun to detach from the oval roof.
The original lighting was mounted using holes found in the dome itself and have
been replaced by plastic mirrored globes designed to reflect the (discotheque)
strobelights. These have been tied to the ceiling’s holes with steel wire.
The entire interior surface of the domed ceiling requires a thorough scraping,
followed by removal of all the paint and soundproofing panels, and an appropriate
number of coats of new paint or, ideally, a wood-panel covering.
4. The outside of the dome has been covered with waterproofing panels and a layer of
bituminous sealant and tar. The brush strokes become thinner as one moves to the
western sloped ceiling, thinning out completely at the end of the surface. In this area,
the sealing panels have risen and curled up. Here and in other areas, vegetation has
begun to take root. This has created a series of conspicuous leaks with water
dripping down to the theater floor below.
Work must begin as soon as possible to limit any future damage that may affect the
statics of the building. A general cleaning, including replacing the roof panels that
have curled up, and a tarring of the entire surface along with the addition of a
waterproof epoxy resin covering, is required.
ESTIMATED COST approx. 25,000.00 Euro
5. The orchestra/spectator area features an iron-tube structure originally used to
support the discotheque’s lights. Despite some minor rust, it is structurally sound.
The raised platforms at the sides are in an advanced state of erosion due to water
damage from the water leaking in through the roof. The aesthetics of the domed roof
are currently compromised by the large metal mounting racks.
Due to the cumbersome size and advanced state of erosion of the metal structures
fixing them would prove useless and costly, besides the fact that they don’t
correspond to the original state of the unique dome. Disassembly requires
cutting/sectioning of the tubing and transport to a local dump.
ESTIMATED COST approx. 1,000.00 Euro
6. The stage has been widened by adding steel pipes supporting a transparent
plexiglass flooring welded onto a brick structure. Currently the stage lacks any
lighting. Switchboards, circuit breakers, boxes and outlets meet legal requirements.
Electrical features must be secured and some rewiring is required. Lighting must be
reactivated by purchasing appropriate custom lighting fixtures. The size and shape of
the stage is currently not fit for the intended use, though a later restructuring (not
urgent) can easily be implemented.
ESTIMATED COST approx. 6,000.00 Euro
7. The foyer bar is modern and may be used. Just above it is a series of metal-pipe
structures designed to support areas once used as VIP-sections. These are in good
shape. Service areas, bathrooms, changerooms, closets, technical booths, the
kitchen, offices and ticket booth are not in bad shape. To be used, they require
some ordinary maintenance. The plumbing system is in working order, some piping
has already been replaced, a limited amount of piping features advanced rust due to
condensation. A general painting and stucco is suggested, along with fixing the
deteriorated plumbing. 820 square meters require whitewashing.
ESTIMATED COST OF PAINTING 7,000.00 Euro
Surface areas (in square meters)
Stage 100
Orchestra/seating area (max. horiz. 9.4m) 668
Domed roof 1000
Atrium/entrance 90
Stairwell 88
Offices and ticket booth 21
Warehouse Area 1 23
Foyer 42
Bar 51
Coat Check Area 30
Washroom 1 10
Washroom 2 10
Warehouse Area 2 7
Kitchen approx 60
Technical, warehouses and hallways approx 100
Changerooms 16
Sincerely,
laboratory architecture nomade
Architect Alexander Valentino

More Related Content

What's hot

King Street Station 7.13.10 website update
King Street Station 7.13.10 website updateKing Street Station 7.13.10 website update
King Street Station 7.13.10 website updateallieger
 
Condition report Orleans House
Condition report Orleans House Condition report Orleans House
Condition report Orleans House Mark Percival
 
Olympiapark, munich
Olympiapark, munichOlympiapark, munich
Olympiapark, munich
jigarramani1
 
Farnsworth house
Farnsworth houseFarnsworth house
Farnsworth house
Anjali Reghu
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSSin Byrne
 
Mies van der rohe
Mies van der roheMies van der rohe
Mies van der rohe
anjali s
 
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANSMill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANSSin Byrne
 
Architecture portfolio_EN
Architecture portfolio_ENArchitecture portfolio_EN
Architecture portfolio_EN
Enrico Manias
 
Literature review exhibtion center
Literature review exhibtion centerLiterature review exhibtion center
Literature review exhibtion center
kaleabsenay
 
Audiology House Sales brochure
Audiology House Sales brochureAudiology House Sales brochure
Audiology House Sales brochureGeorge Marcou
 
Southeast Asia Construction Magazine Jan-Feb 2015 ft. Victoria Theatre
Southeast Asia Construction Magazine Jan-Feb 2015 ft. Victoria TheatreSoutheast Asia Construction Magazine Jan-Feb 2015 ft. Victoria Theatre
Southeast Asia Construction Magazine Jan-Feb 2015 ft. Victoria Theatre
T.Y. Lin International
 
Architecture Loadup
Architecture LoadupArchitecture Loadup
Architecture Loadupbassmanb
 
James Primmer Further Portfolio
James Primmer Further PortfolioJames Primmer Further Portfolio
James Primmer Further PortfolioJames Primmer
 
Hearst Tower LEED Overview
Hearst Tower LEED OverviewHearst Tower LEED Overview
Hearst Tower LEED Overview
carlosvalverderojo
 
City of the wine complex
City of the wine complexCity of the wine complex
City of the wine complex
Rajat Nainwal
 
Norman foster
Norman foster Norman foster
Norman foster
Vishvendu pandey
 
Farnsworth house and S.R Crown hall by Mies Van der Rohe- Case study
Farnsworth house and S.R Crown hall by Mies Van der Rohe- Case studyFarnsworth house and S.R Crown hall by Mies Van der Rohe- Case study
Farnsworth house and S.R Crown hall by Mies Van der Rohe- Case study
AnqaParvez
 

What's hot (20)

King Street Station 7.13.10 website update
King Street Station 7.13.10 website updateKing Street Station 7.13.10 website update
King Street Station 7.13.10 website update
 
Piano pompid
Piano pompidPiano pompid
Piano pompid
 
Condition report Orleans House
Condition report Orleans House Condition report Orleans House
Condition report Orleans House
 
Olympiapark, munich
Olympiapark, munichOlympiapark, munich
Olympiapark, munich
 
Green Architecture
Green ArchitectureGreen Architecture
Green Architecture
 
Farnsworth house
Farnsworth houseFarnsworth house
Farnsworth house
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
 
Mies van der rohe
Mies van der roheMies van der rohe
Mies van der rohe
 
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANSMill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
 
Architecture portfolio_EN
Architecture portfolio_ENArchitecture portfolio_EN
Architecture portfolio_EN
 
Literature review exhibtion center
Literature review exhibtion centerLiterature review exhibtion center
Literature review exhibtion center
 
Audiology House Sales brochure
Audiology House Sales brochureAudiology House Sales brochure
Audiology House Sales brochure
 
Southeast Asia Construction Magazine Jan-Feb 2015 ft. Victoria Theatre
Southeast Asia Construction Magazine Jan-Feb 2015 ft. Victoria TheatreSoutheast Asia Construction Magazine Jan-Feb 2015 ft. Victoria Theatre
Southeast Asia Construction Magazine Jan-Feb 2015 ft. Victoria Theatre
 
Architecture Loadup
Architecture LoadupArchitecture Loadup
Architecture Loadup
 
James Primmer Further Portfolio
James Primmer Further PortfolioJames Primmer Further Portfolio
James Primmer Further Portfolio
 
Hearst Tower LEED Overview
Hearst Tower LEED OverviewHearst Tower LEED Overview
Hearst Tower LEED Overview
 
3 external work
3 external work3 external work
3 external work
 
City of the wine complex
City of the wine complexCity of the wine complex
City of the wine complex
 
Norman foster
Norman foster Norman foster
Norman foster
 
Farnsworth house and S.R Crown hall by Mies Van der Rohe- Case study
Farnsworth house and S.R Crown hall by Mies Van der Rohe- Case studyFarnsworth house and S.R Crown hall by Mies Van der Rohe- Case study
Farnsworth house and S.R Crown hall by Mies Van der Rohe- Case study
 

Viewers also liked

IWCE 2013: Ways Wireless is Changing the World
IWCE 2013: Ways Wireless is Changing the WorldIWCE 2013: Ways Wireless is Changing the World
IWCE 2013: Ways Wireless is Changing the World
Drew Lentz
 
Rio Grande City, Texas Wi-Fi for EDC Workshop
Rio Grande City, Texas Wi-Fi for EDC WorkshopRio Grande City, Texas Wi-Fi for EDC Workshop
Rio Grande City, Texas Wi-Fi for EDC Workshop
Drew Lentz
 
Parijs gecompromeerd
Parijs gecompromeerdParijs gecompromeerd
Parijs gecompromeerdelsios
 
Parijs gecompromeerd
Parijs gecompromeerdParijs gecompromeerd
Parijs gecompromeerdelsios
 
Everything I Had...
Everything I Had...Everything I Had...
Everything I Had...
Ilana Golan
 
Relazione tecnica Airone
Relazione tecnica AironeRelazione tecnica Airone
Relazione tecnica Airone
Om Theater
 
IDEC
IDEC IDEC
שלושה ברווזונים
שלושה ברווזוניםשלושה ברווזונים
שלושה ברווזוניםIlana Golan
 
Sole 24 - articoli
Sole 24 - articoliSole 24 - articoli
Sole 24 - articoli
Om Theater
 
To Live
To LiveTo Live
To Live
Ilana Golan
 
Wireless Field Day 7: Enchantment is The New Black #WFD7
Wireless Field Day 7: Enchantment is The New Black #WFD7Wireless Field Day 7: Enchantment is The New Black #WFD7
Wireless Field Day 7: Enchantment is The New Black #WFD7
Drew Lentz
 
Equipment Field Testing: Carlson Wireless TVWS
Equipment Field Testing: Carlson Wireless TVWSEquipment Field Testing: Carlson Wireless TVWS
Equipment Field Testing: Carlson Wireless TVWS
Drew Lentz
 
ASIS 2013: Extending Surveillance Through Wireless Communications
ASIS 2013: Extending Surveillance Through Wireless CommunicationsASIS 2013: Extending Surveillance Through Wireless Communications
ASIS 2013: Extending Surveillance Through Wireless Communications
Drew Lentz
 
Signals and system notes
Signals and system notesSignals and system notes
Signals and system notes
Ayush Mittal
 

Viewers also liked (17)

IWCE 2013: Ways Wireless is Changing the World
IWCE 2013: Ways Wireless is Changing the WorldIWCE 2013: Ways Wireless is Changing the World
IWCE 2013: Ways Wireless is Changing the World
 
Rio Grande City, Texas Wi-Fi for EDC Workshop
Rio Grande City, Texas Wi-Fi for EDC WorkshopRio Grande City, Texas Wi-Fi for EDC Workshop
Rio Grande City, Texas Wi-Fi for EDC Workshop
 
Parijs gecompromeerd
Parijs gecompromeerdParijs gecompromeerd
Parijs gecompromeerd
 
Parijs gecompromeerd
Parijs gecompromeerdParijs gecompromeerd
Parijs gecompromeerd
 
Everything I Had...
Everything I Had...Everything I Had...
Everything I Had...
 
Relazione tecnica Airone
Relazione tecnica AironeRelazione tecnica Airone
Relazione tecnica Airone
 
IDEC
IDEC IDEC
IDEC
 
Diapositivas
DiapositivasDiapositivas
Diapositivas
 
שלושה ברווזונים
שלושה ברווזוניםשלושה ברווזונים
שלושה ברווזונים
 
Sole 24 - articoli
Sole 24 - articoliSole 24 - articoli
Sole 24 - articoli
 
To Live
To LiveTo Live
To Live
 
B
BB
B
 
Wireless Field Day 7: Enchantment is The New Black #WFD7
Wireless Field Day 7: Enchantment is The New Black #WFD7Wireless Field Day 7: Enchantment is The New Black #WFD7
Wireless Field Day 7: Enchantment is The New Black #WFD7
 
Equipment Field Testing: Carlson Wireless TVWS
Equipment Field Testing: Carlson Wireless TVWSEquipment Field Testing: Carlson Wireless TVWS
Equipment Field Testing: Carlson Wireless TVWS
 
Prueba
PruebaPrueba
Prueba
 
ASIS 2013: Extending Surveillance Through Wireless Communications
ASIS 2013: Extending Surveillance Through Wireless CommunicationsASIS 2013: Extending Surveillance Through Wireless Communications
ASIS 2013: Extending Surveillance Through Wireless Communications
 
Signals and system notes
Signals and system notesSignals and system notes
Signals and system notes
 

Similar to Relazione tecnica Airone (inglese)

Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)
Prasad Thanthratey
 
PROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONSPROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONS
Nik Ahmad Munawwar Nik Din
 
High Tech Building Materials: ETFE
High Tech Building Materials: ETFEHigh Tech Building Materials: ETFE
High Tech Building Materials: ETFE
Sneha Nagarajan
 
Building Technology project 02
Building Technology project 02Building Technology project 02
Building Technology project 02
Jy Chong
 
Structural estimateROOF SAILSPODIUMUNDER GROUN.docx
Structural estimateROOF SAILSPODIUMUNDER GROUN.docxStructural estimateROOF SAILSPODIUMUNDER GROUN.docx
Structural estimateROOF SAILSPODIUMUNDER GROUN.docx
cpatriciarpatricia
 
Portfolio Light Version
Portfolio Light VersionPortfolio Light Version
Portfolio Light Versionmnociforo
 
King Street Station 7 13 10 Website Update
King Street Station 7 13 10 Website UpdateKing Street Station 7 13 10 Website Update
King Street Station 7 13 10 Website Updateallieger
 
University of exeter, forum building
University of exeter, forum  buildingUniversity of exeter, forum  building
University of exeter, forum building
Mehari Melaku
 
Kolkata science city
Kolkata science cityKolkata science city
Kolkata science city
Archistudent Portal
 
High tech architecture
High tech architectureHigh tech architecture
High tech architecture
JowelshaBajracharya
 
Long span structures case study.pptx
Long span structures case study.pptxLong span structures case study.pptx
Long span structures case study.pptx
PrituJadhav1
 
Roof final
Roof finalRoof final
Roof final
HetviPatel58
 
HEARST PPT.pptx
HEARST PPT.pptxHEARST PPT.pptx
HEARST PPT.pptx
KvmRaju
 
Facades and envelopes
Facades and envelopesFacades and envelopes
Facades and envelopes
DanishPathan7
 
Centre of pompidou
Centre of pompidouCentre of pompidou
Centre of pompidou
bruktigistu
 
Grid/ Waffle Slabs
Grid/ Waffle SlabsGrid/ Waffle Slabs
Grid/ Waffle Slabs
Husen Khorajiya
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder PortfolioDominic Holder
 
maxxi construction
maxxi constructionmaxxi construction
maxxi construction
kedai hantu
 
Calatrava audi
Calatrava audiCalatrava audi
Calatrava audi
Jyoti Rautela
 

Similar to Relazione tecnica Airone (inglese) (20)

Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)
 
PROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONSPROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONS
 
High Tech Building Materials: ETFE
High Tech Building Materials: ETFEHigh Tech Building Materials: ETFE
High Tech Building Materials: ETFE
 
Building Technology project 02
Building Technology project 02Building Technology project 02
Building Technology project 02
 
Structural estimateROOF SAILSPODIUMUNDER GROUN.docx
Structural estimateROOF SAILSPODIUMUNDER GROUN.docxStructural estimateROOF SAILSPODIUMUNDER GROUN.docx
Structural estimateROOF SAILSPODIUMUNDER GROUN.docx
 
Portfolio Light Version
Portfolio Light VersionPortfolio Light Version
Portfolio Light Version
 
King Street Station 7 13 10 Website Update
King Street Station 7 13 10 Website UpdateKing Street Station 7 13 10 Website Update
King Street Station 7 13 10 Website Update
 
Kimbell report
Kimbell reportKimbell report
Kimbell report
 
University of exeter, forum building
University of exeter, forum  buildingUniversity of exeter, forum  building
University of exeter, forum building
 
Kolkata science city
Kolkata science cityKolkata science city
Kolkata science city
 
High tech architecture
High tech architectureHigh tech architecture
High tech architecture
 
Long span structures case study.pptx
Long span structures case study.pptxLong span structures case study.pptx
Long span structures case study.pptx
 
Roof final
Roof finalRoof final
Roof final
 
HEARST PPT.pptx
HEARST PPT.pptxHEARST PPT.pptx
HEARST PPT.pptx
 
Facades and envelopes
Facades and envelopesFacades and envelopes
Facades and envelopes
 
Centre of pompidou
Centre of pompidouCentre of pompidou
Centre of pompidou
 
Grid/ Waffle Slabs
Grid/ Waffle SlabsGrid/ Waffle Slabs
Grid/ Waffle Slabs
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
maxxi construction
maxxi constructionmaxxi construction
maxxi construction
 
Calatrava audi
Calatrava audiCalatrava audi
Calatrava audi
 

Recently uploaded

Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
Multithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race conditionMultithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race condition
Mohammed Sikander
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
Best Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDABest Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDA
deeptiverma2406
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBCSTRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
kimdan468
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
tarandeep35
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
Academy of Science of South Africa
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 

Recently uploaded (20)

Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Multithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race conditionMultithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race condition
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
Best Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDABest Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDA
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBCSTRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 

Relazione tecnica Airone (inglese)

  • 1. c.f. 95077670636 Climb Moiariello 6 bis 80134 Naples tel + 39–081 0330293 tel + 39–081 2110073 mob + 39 - 3474669733 info@lanhub.org www.lahub.org Architectural Report Former Cinema Airone/Stellarium - Via Lidia 44, Rome Land registry information: fg. 900, partt. 169-170 Introduction The site of the former movie theater “Cinema Airone/Stellarium” has been assigned to The Actors Center-Roma, a non-profit cultural organization, by the City of Rome's Patrimony and Housing Department, via a Temporary Assignment Memo dated June 1, 2010. The site has been abandoned since 1998. Immediately preceding that date, it was being used as a discotheque. The report outlining the historical and artistic significance of the site, compiled by the City of Rome's Soprintendenza per i Beni Architettonici e il Paesaggio on December 15, 2009, featured a) the intrinsic value of the building's architecture, an original creation by architect Adalberto Libera, one of the leaders of Italy’s rationalism movement, and b) the presence of a large mural painted by Giuseppe Capogrossi spanning the ceiling of the main entrance, hidden from view by successive decorations. The current administration has made no explicit guarantee they will take on the costs and responsibilities for cleaning, extraordinary maintenance and meeting legal safety requirements for the building. The cultural organization The Actors Center-Roma requires the space for mixed artistic purposes and currently possesses a limited ability to cover costs for initial restructuring and regular maintenance. Therefore, before any discussion takes place on future usage, we will limit our current observations to a brief description of the basic features needed to make the building safe and usable. The following is a brief work schedule, prioritized according to safety, usage and economic requirements. Features are listed alongside suggested work and corresponding estimates that may be used to create a future detailed cost breakdown.
  • 2. General state of the building Despite having been abandoned for an extended period of time, the former Cinema Airone/Stellarium appears integral. Formal usage came to an abrupt end, as the building is littered with chairs, seats, magazines, pamphlets, decorations, all sorts of perishable items, including food and beverages, with items still lying in storage areas and lockers. The building requires both regular and extraordinary maintenance. It was last used as a discotheque and therefore features: a) several large metallic structures that served to create VIP-areas and provide support for lighting fixtures - some spanning the entire roof of the theater (without contact with the actual roof); b) an extension of the original stage, created in steel and brick, with an additional structure in glass and steel added on at a later date; c) the Capogrossi mural, currently covered by a layer of blue paint, spanning the entire ceiling of the entrance stairwell; c) theater lights subsequently substituted by plastic globes used to reflect nightclub-type lighting. The building’s electrical system is generally in good condition, with current-generation circuit breakers, switchboards and control boxes that meet legal standards. Some of the wiring has been altered and requires modification to match modern standards. The plumbing system has been altered, with some substitution of the original pipes and valves. In a closet located on the lower level, condensation has rusted a mainpipe but, generally speaking, the plumbing systems works well and presents no significant leaks. Below, please find a detailed description of several of the building’s features, followed by suggested actions: 1. An outdoor neon sign right outside the front entrance features the name Cinema Stellarium (and refers to a subsequent renaming of the building). We suggest keeping this structure as a feature, even if the site changes its name. 2. The front entrance stairwell featuring the mural by Capogrossi. Today the mural is covered by a layer of blue acrylic paint. For a complete and correct refurbishment of the theater, the hidden mural should be restored, ideally with the help of art restoration education programs or the creation of a tender or contest to restore the mural in line with the original philosophy of the theater. The surface area that requires restoration is 88 square meters. 3. The ceiling of the Cinema Airone consists entirely of a large metallic structure. The inside of the dome is covered in welded steel cement-coated netting. The outside of the dome is covered with rectangular bricks and sealing panels coated with a waterproof bituminous sealant. The interior of the ceiling, originally covered by a textured material, currently features acrylic paint and a smattering of rhombus- shaped soundproofing panels. The type of acrylic paint adopted did not permit an appropriate exchange of air, which has caused the paint to peel off in several areas. Almost all of the sooundproofing panels have begun to detach from the oval roof. The original lighting was mounted using holes found in the dome itself and have been replaced by plastic mirrored globes designed to reflect the (discotheque) strobelights. These have been tied to the ceiling’s holes with steel wire. The entire interior surface of the domed ceiling requires a thorough scraping, followed by removal of all the paint and soundproofing panels, and an appropriate number of coats of new paint or, ideally, a wood-panel covering. 4. The outside of the dome has been covered with waterproofing panels and a layer of bituminous sealant and tar. The brush strokes become thinner as one moves to the western sloped ceiling, thinning out completely at the end of the surface. In this area, the sealing panels have risen and curled up. Here and in other areas, vegetation has begun to take root. This has created a series of conspicuous leaks with water dripping down to the theater floor below.
  • 3. Work must begin as soon as possible to limit any future damage that may affect the statics of the building. A general cleaning, including replacing the roof panels that have curled up, and a tarring of the entire surface along with the addition of a waterproof epoxy resin covering, is required. ESTIMATED COST approx. 25,000.00 Euro 5. The orchestra/spectator area features an iron-tube structure originally used to support the discotheque’s lights. Despite some minor rust, it is structurally sound. The raised platforms at the sides are in an advanced state of erosion due to water damage from the water leaking in through the roof. The aesthetics of the domed roof are currently compromised by the large metal mounting racks. Due to the cumbersome size and advanced state of erosion of the metal structures fixing them would prove useless and costly, besides the fact that they don’t correspond to the original state of the unique dome. Disassembly requires cutting/sectioning of the tubing and transport to a local dump. ESTIMATED COST approx. 1,000.00 Euro 6. The stage has been widened by adding steel pipes supporting a transparent plexiglass flooring welded onto a brick structure. Currently the stage lacks any lighting. Switchboards, circuit breakers, boxes and outlets meet legal requirements. Electrical features must be secured and some rewiring is required. Lighting must be reactivated by purchasing appropriate custom lighting fixtures. The size and shape of the stage is currently not fit for the intended use, though a later restructuring (not urgent) can easily be implemented. ESTIMATED COST approx. 6,000.00 Euro 7. The foyer bar is modern and may be used. Just above it is a series of metal-pipe structures designed to support areas once used as VIP-sections. These are in good shape. Service areas, bathrooms, changerooms, closets, technical booths, the kitchen, offices and ticket booth are not in bad shape. To be used, they require some ordinary maintenance. The plumbing system is in working order, some piping has already been replaced, a limited amount of piping features advanced rust due to condensation. A general painting and stucco is suggested, along with fixing the deteriorated plumbing. 820 square meters require whitewashing. ESTIMATED COST OF PAINTING 7,000.00 Euro Surface areas (in square meters) Stage 100 Orchestra/seating area (max. horiz. 9.4m) 668 Domed roof 1000 Atrium/entrance 90 Stairwell 88 Offices and ticket booth 21 Warehouse Area 1 23 Foyer 42 Bar 51 Coat Check Area 30 Washroom 1 10 Washroom 2 10 Warehouse Area 2 7 Kitchen approx 60 Technical, warehouses and hallways approx 100 Changerooms 16