SlideShare a Scribd company logo
1 of 8
Download to read offline
Dominic Holder
Personal Details
Nationality British/Barbadian
Profession Consulting
Specialisation Structural Engineering
Years of Experience 4
Key Qualifications A structural engineer with 4 years experience in structural
steel/concrete/timber design and precast concrete design and detailing for
fabrication.
Education / Professional
Status
Post-graduate advanced concrete courses
BSc. (Hons. - 1st) Civil Engineering
Graduate member of IStructE / ICE / PEO / B.A.P.E.
Key Relevant Experience
Nile Street, United Kingdom - This is a £60m mixed-use development based in Hackney, London. The scheme
involved a 23-storey high rise building with 200+ units plus an alternative educational facility accommodating 150+
pupils. Pell Frischmann were appointed as the Civil and Structural Engineers for the scheme. I conducted preliminary
calculations and sizing of structural elements for the RIBA Stage 3 report submission.
18 Blackfriars Road, United Kingdom - This is a £360m project based in Southwark, London. I was responsible for
the preliminary ETABS FE model for one of the two (2) towers which dominate the site. This was a 45-storey residential
tower with 3 basement levels. I performed the initial wind analysis and sensibility check on the core walls for stability. I
also performed a modal analysis on the structure in order to assess human comfort due to horizontal wind accelerations.
Centre Point, United Kingdom - Centre Point is a substantial concrete and glass office building in central London,
almost directly above Tottenham Court Road tube station. Centre Point achieved Grade II listed status for being a
model example of 60’s architecture. It surpassed and furthered the engineering of its day and still, even now, is a
landmark in the city as well as a benchmark for modular construction methods. Pell Frischmann provided structural
engineering design and construction supervision services for this refurbishment project with a value of £150m. I was
responsible for design review and amendment if necessary of new steelworks throughout the Tower and Maisonette
Block.
The Grotto, Barbados – Precast engineer and fabrication detailer for a cluster of five, five-storey fully precast concrete
buildings as affordable housing for the National Housing Corporation.
Prince Arthur’s Landing, Canada – Structural designer for the following two (2) public buildings that are part of a
$130m public-private development, transforming Thunder Bay’s waterfront and promoting year-round mixed-use and
recreational activities in this critical region adjacent to the historic downtown.
The Water Garden Pavilion is a completely new, 8,000-square-foot building that provides support services for some
of the Landing’s outdoor activities, notably skating in the winter and a splash pad during the summer. I was
responsible for the design of various structural elements comprising this 2-storey building. Steel was chosen as the
structural material for the frame with concrete composite deck for the floor plates. Synthetic polymer fibres were
specified as reinforcement for the composite slab as an alternative to mesh reinforcement. This building had an
unusual complexity about it since the soil beneath it was peat, which was assumed to have no bearing capacity. The
columns were each supported by a tripod of proprietary pull-down helical grouted micropiles that went down to
bedrock. There was a double-height hallway with exposed glulam beams that formed the top chord of a series of
inverted king trusses complete with steel rods and square Hollow Structural Sections at their centres. Skaters can
enjoy an outdoor fireplace and a full-service restaurant that will spill out onto the patio during the warmer season.
Inside, the building’s Mariner’s Hall is designed to echo the shape of a ship’s hull, one of the many metaphorical
references to water and shipping found across the site.
The Baggage Building was originally constructed in the early 1900s, and has now been expanded with a new 2-
storey addition that includes exhibition and teaching spaces, artisan studios and retail. The studios house activities
that include painting, printmaking, pottery, jewellery design, video art production and other media. A second-floor
mezzanine, suspended from the roof above, overlooks other double-height interior spaces, offering an enriched
spatial dynamic. This structure utilised three different structural materials; reinforced concrete, steel and timber. One
complexity of the site was the existence of a 900mm diameter water main that ran through the site. This was critical
city infrastructure and piling/boring was not allowed within 6m of the centreline of the water main path due to the
potential damage to the pipe due to excessive vibrations. Using a complementary material palette of timber and glass
for the new arts centre, the historic Baggage Building is connected to the CN Railway Station, thereby establishing a
strong image for a facility that will successfully anchor a gateway leading from downtown to the waterfront.
Breithaupt Block, Canada – Structural designer for a $36m renovation into high quality office space designed for
Waterloo’s technology sector. The former rubber, then car-parts factory stretches over a block of Kitchener’s old
warehouse district. The building housed mammoth machinery and desperately needed an environmental clean-up. No
original structural plans of the building existed. Several alterations had been made over the years and only some of
those more recent structural plans existed and could be sourced. This was done manually, over the course of several
site visits and inspections. All visible structure was physically measured and recorded, except in inaccessible areas or
where it was unsafe to do so. One difficulty with this project was the removal of around 1,200 tonnes of assembly line
machinery. Another was that two sections of the building were demolished to create modern courtyards. The
developer was convinced that the nearby rail line and the technology sector’s appetite for interesting spaces would
define the potential value of the vacant plant. This is due to a growing appreciation for repurposing dormant factories in
downtown locations, a concept that appeals to tech-sector workers who want to be close to amenities. The rail line that
once shipped its goods now carries commuters to white-collar jobs in the city. The Region of Waterloo purchased three
acres of land across the tracks from the site to build a transit hub for Via Rail, GO Transit and inter-city buses which
has added to the lustre of the location. This trend of revitalising and restoring defunct industrial buildings has added
cachet to a once-overlooked downtown city centres. The Breithaupt’s interior now features large windows, high ceilings,
brick walls, Oak floors, foot-square beams of Oak, Douglas Fir and Hemlock and the window replacements are
consistent with the original 1900s style. Some historic features have been restored and two old large factory iron gears
feature in one of the newly created courtyards.
CFB Borden, Canada - The overall goal of the Department of National Defence (DND) was to consolidate facilities in
order to create a training environment that would allow students to walk no more than 500m to all facilities. The design
strategy for this new prototype kitchen and dining facility focused on providing a pleasant, efficient and enduring building
with plenty of natural light and optimized interior traffic flows. The exterior forms were kept deliberately orthogonal,
streamline and understated in order to produce an elegant, timeless building which fits in with the existing built
environment at the base. As you enter the facility the aesthetic changes remind one of the history of the pine forests
that were once dominant in the landscape of the site in the form of the dramatic glue laminated curved structure of the
columns and beams. The interior design focuses on achieving a pleasant, easily maintained space optimized for clear
and instinctive wayfinding – achieved through use of forms, materials and colours inspired by the military ribbon graphic.
The most complex feature of this facility was its curved glulam arch beams and associated columns in the dining hall.
Their end conditions and geometry required particular attention to ensure that they only carried axial load.
Dominic Holder Portfolio
Dominic Holder Portfolio

More Related Content

What's hot

BUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTBUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTJoyeeLee0131
 
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS Mohammed Naeem Darwish
 
Audiology House Sales brochure
Audiology House Sales brochureAudiology House Sales brochure
Audiology House Sales brochureGeorge Marcou
 
James Elser Project List 2009
James Elser Project List 2009James Elser Project List 2009
James Elser Project List 2009jelser4228
 
DETROIT HOUSING SPREADS 8.5 x 10
DETROIT HOUSING SPREADS 8.5 x 10 DETROIT HOUSING SPREADS 8.5 x 10
DETROIT HOUSING SPREADS 8.5 x 10 Dillon Clarke
 
Metropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design ReportMetropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design ReportKelvin Ng
 
What makes Peterborough City Centre a ‘conservation area'?
What makes Peterborough City Centre a ‘conservation area'? What makes Peterborough City Centre a ‘conservation area'?
What makes Peterborough City Centre a ‘conservation area'? heritageregeneration
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian Akl
 
Heydar Aliyev Cultural Centre
Heydar Aliyev Cultural CentreHeydar Aliyev Cultural Centre
Heydar Aliyev Cultural CentreTanisha Agarwal
 
dispensary theory
dispensary theory dispensary theory
dispensary theory HugoCopire1
 
Building Technology I - Project 2
Building Technology I - Project 2Building Technology I - Project 2
Building Technology I - Project 2jernjack
 
Architecture eNews #1 - #5
Architecture eNews #1 - #5Architecture eNews #1 - #5
Architecture eNews #1 - #5unionsquare
 
Kirk Gleeson - Portfolio Low Res
Kirk Gleeson - Portfolio Low ResKirk Gleeson - Portfolio Low Res
Kirk Gleeson - Portfolio Low ResKirk Gleeson
 
Acm project presentation
Acm  project presentationAcm  project presentation
Acm project presentationJr Rob
 
Transformation of Warehouse to The King's Centre
Transformation of Warehouse to The King's CentreTransformation of Warehouse to The King's Centre
Transformation of Warehouse to The King's CentreBob Harrison
 

What's hot (20)

DRT Portfolio Works
DRT Portfolio WorksDRT Portfolio Works
DRT Portfolio Works
 
BUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTBUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORT
 
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
 
Audiology House Sales brochure
Audiology House Sales brochureAudiology House Sales brochure
Audiology House Sales brochure
 
Ulx0908
Ulx0908Ulx0908
Ulx0908
 
Aqua towers
Aqua towersAqua towers
Aqua towers
 
James Elser Project List 2009
James Elser Project List 2009James Elser Project List 2009
James Elser Project List 2009
 
DETROIT HOUSING SPREADS 8.5 x 10
DETROIT HOUSING SPREADS 8.5 x 10 DETROIT HOUSING SPREADS 8.5 x 10
DETROIT HOUSING SPREADS 8.5 x 10
 
Metropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design ReportMetropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design Report
 
What makes Peterborough City Centre a ‘conservation area'?
What makes Peterborough City Centre a ‘conservation area'? What makes Peterborough City Centre a ‘conservation area'?
What makes Peterborough City Centre a ‘conservation area'?
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOC
 
Heydar Aliyev Cultural Centre
Heydar Aliyev Cultural CentreHeydar Aliyev Cultural Centre
Heydar Aliyev Cultural Centre
 
dispensary theory
dispensary theory dispensary theory
dispensary theory
 
Building Technology I - Project 2
Building Technology I - Project 2Building Technology I - Project 2
Building Technology I - Project 2
 
Architecture eNews #1 - #5
Architecture eNews #1 - #5Architecture eNews #1 - #5
Architecture eNews #1 - #5
 
Kirk Gleeson - Portfolio Low Res
Kirk Gleeson - Portfolio Low ResKirk Gleeson - Portfolio Low Res
Kirk Gleeson - Portfolio Low Res
 
Vcc canada
Vcc canadaVcc canada
Vcc canada
 
Acm project presentation
Acm  project presentationAcm  project presentation
Acm project presentation
 
Motel online case study
Motel online case studyMotel online case study
Motel online case study
 
Transformation of Warehouse to The King's Centre
Transformation of Warehouse to The King's CentreTransformation of Warehouse to The King's Centre
Transformation of Warehouse to The King's Centre
 

Similar to Dominic Holder Portfolio

Sensitive Conversion of Fortifications presentation Oct17
Sensitive Conversion of Fortifications presentation Oct17Sensitive Conversion of Fortifications presentation Oct17
Sensitive Conversion of Fortifications presentation Oct17denizbeck
 
MHA Brochure 2013
MHA Brochure 2013MHA Brochure 2013
MHA Brochure 2013Katie Frost
 
HEARST PPT.pptx
HEARST PPT.pptxHEARST PPT.pptx
HEARST PPT.pptxKvmRaju
 
Literature Study on sports pavilion
Literature Study on sports pavilionLiterature Study on sports pavilion
Literature Study on sports pavilionSakshi Singh
 
Ar.Norman Foster by Shrikant
Ar.Norman Foster by ShrikantAr.Norman Foster by Shrikant
Ar.Norman Foster by ShrikantShriKant49
 
Spitbank f presentation nov11
Spitbank f presentation nov11Spitbank f presentation nov11
Spitbank f presentation nov11denizbeck
 
Worcester library Post Tensioned Concrete Case Study
Worcester library Post Tensioned Concrete Case StudyWorcester library Post Tensioned Concrete Case Study
Worcester library Post Tensioned Concrete Case StudyCCL Concrete
 
Building Technology project 02
Building Technology project 02Building Technology project 02
Building Technology project 02Jy Chong
 
Southeast Asia Construction Magazine Jan-Feb 2015 ft. Victoria Theatre
Southeast Asia Construction Magazine Jan-Feb 2015 ft. Victoria TheatreSoutheast Asia Construction Magazine Jan-Feb 2015 ft. Victoria Theatre
Southeast Asia Construction Magazine Jan-Feb 2015 ft. Victoria TheatreT.Y. Lin International
 
Mike Hart Curriculum Vitae 2015 Linkedin
Mike Hart Curriculum Vitae 2015 LinkedinMike Hart Curriculum Vitae 2015 Linkedin
Mike Hart Curriculum Vitae 2015 LinkedinMike Hart
 

Similar to Dominic Holder Portfolio (20)

Sensitive Conversion of Fortifications presentation Oct17
Sensitive Conversion of Fortifications presentation Oct17Sensitive Conversion of Fortifications presentation Oct17
Sensitive Conversion of Fortifications presentation Oct17
 
MHA Brochure 2013
MHA Brochure 2013MHA Brochure 2013
MHA Brochure 2013
 
high tech building
high tech buildinghigh tech building
high tech building
 
HEARST PPT.pptx
HEARST PPT.pptxHEARST PPT.pptx
HEARST PPT.pptx
 
Literature Study on sports pavilion
Literature Study on sports pavilionLiterature Study on sports pavilion
Literature Study on sports pavilion
 
Ar.Norman Foster by Shrikant
Ar.Norman Foster by ShrikantAr.Norman Foster by Shrikant
Ar.Norman Foster by Shrikant
 
PROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONSPROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONS
 
Gherkin london
Gherkin londonGherkin london
Gherkin london
 
Spitbank f presentation nov11
Spitbank f presentation nov11Spitbank f presentation nov11
Spitbank f presentation nov11
 
Projects MeerkatII Copy
Projects MeerkatII CopyProjects MeerkatII Copy
Projects MeerkatII Copy
 
Worcester library Post Tensioned Concrete Case Study
Worcester library Post Tensioned Concrete Case StudyWorcester library Post Tensioned Concrete Case Study
Worcester library Post Tensioned Concrete Case Study
 
Building Technology project 02
Building Technology project 02Building Technology project 02
Building Technology project 02
 
Refurbishment
RefurbishmentRefurbishment
Refurbishment
 
072014_Bunker Mentality
072014_Bunker Mentality072014_Bunker Mentality
072014_Bunker Mentality
 
Resume sol_2016
Resume sol_2016Resume sol_2016
Resume sol_2016
 
Resume_SOl_2016
Resume_SOl_2016Resume_SOl_2016
Resume_SOl_2016
 
Resume_SOl_2016
Resume_SOl_2016Resume_SOl_2016
Resume_SOl_2016
 
Southeast Asia Construction Magazine Jan-Feb 2015 ft. Victoria Theatre
Southeast Asia Construction Magazine Jan-Feb 2015 ft. Victoria TheatreSoutheast Asia Construction Magazine Jan-Feb 2015 ft. Victoria Theatre
Southeast Asia Construction Magazine Jan-Feb 2015 ft. Victoria Theatre
 
The Shard
The ShardThe Shard
The Shard
 
Mike Hart Curriculum Vitae 2015 Linkedin
Mike Hart Curriculum Vitae 2015 LinkedinMike Hart Curriculum Vitae 2015 Linkedin
Mike Hart Curriculum Vitae 2015 Linkedin
 

Dominic Holder Portfolio

  • 1. Dominic Holder Personal Details Nationality British/Barbadian Profession Consulting Specialisation Structural Engineering Years of Experience 4 Key Qualifications A structural engineer with 4 years experience in structural steel/concrete/timber design and precast concrete design and detailing for fabrication. Education / Professional Status Post-graduate advanced concrete courses BSc. (Hons. - 1st) Civil Engineering Graduate member of IStructE / ICE / PEO / B.A.P.E. Key Relevant Experience Nile Street, United Kingdom - This is a £60m mixed-use development based in Hackney, London. The scheme involved a 23-storey high rise building with 200+ units plus an alternative educational facility accommodating 150+ pupils. Pell Frischmann were appointed as the Civil and Structural Engineers for the scheme. I conducted preliminary calculations and sizing of structural elements for the RIBA Stage 3 report submission. 18 Blackfriars Road, United Kingdom - This is a £360m project based in Southwark, London. I was responsible for the preliminary ETABS FE model for one of the two (2) towers which dominate the site. This was a 45-storey residential tower with 3 basement levels. I performed the initial wind analysis and sensibility check on the core walls for stability. I also performed a modal analysis on the structure in order to assess human comfort due to horizontal wind accelerations.
  • 2. Centre Point, United Kingdom - Centre Point is a substantial concrete and glass office building in central London, almost directly above Tottenham Court Road tube station. Centre Point achieved Grade II listed status for being a model example of 60’s architecture. It surpassed and furthered the engineering of its day and still, even now, is a landmark in the city as well as a benchmark for modular construction methods. Pell Frischmann provided structural engineering design and construction supervision services for this refurbishment project with a value of £150m. I was responsible for design review and amendment if necessary of new steelworks throughout the Tower and Maisonette Block.
  • 3. The Grotto, Barbados – Precast engineer and fabrication detailer for a cluster of five, five-storey fully precast concrete buildings as affordable housing for the National Housing Corporation. Prince Arthur’s Landing, Canada – Structural designer for the following two (2) public buildings that are part of a $130m public-private development, transforming Thunder Bay’s waterfront and promoting year-round mixed-use and recreational activities in this critical region adjacent to the historic downtown. The Water Garden Pavilion is a completely new, 8,000-square-foot building that provides support services for some of the Landing’s outdoor activities, notably skating in the winter and a splash pad during the summer. I was responsible for the design of various structural elements comprising this 2-storey building. Steel was chosen as the structural material for the frame with concrete composite deck for the floor plates. Synthetic polymer fibres were specified as reinforcement for the composite slab as an alternative to mesh reinforcement. This building had an unusual complexity about it since the soil beneath it was peat, which was assumed to have no bearing capacity. The columns were each supported by a tripod of proprietary pull-down helical grouted micropiles that went down to bedrock. There was a double-height hallway with exposed glulam beams that formed the top chord of a series of inverted king trusses complete with steel rods and square Hollow Structural Sections at their centres. Skaters can enjoy an outdoor fireplace and a full-service restaurant that will spill out onto the patio during the warmer season. Inside, the building’s Mariner’s Hall is designed to echo the shape of a ship’s hull, one of the many metaphorical references to water and shipping found across the site.
  • 4. The Baggage Building was originally constructed in the early 1900s, and has now been expanded with a new 2- storey addition that includes exhibition and teaching spaces, artisan studios and retail. The studios house activities that include painting, printmaking, pottery, jewellery design, video art production and other media. A second-floor mezzanine, suspended from the roof above, overlooks other double-height interior spaces, offering an enriched spatial dynamic. This structure utilised three different structural materials; reinforced concrete, steel and timber. One complexity of the site was the existence of a 900mm diameter water main that ran through the site. This was critical city infrastructure and piling/boring was not allowed within 6m of the centreline of the water main path due to the potential damage to the pipe due to excessive vibrations. Using a complementary material palette of timber and glass for the new arts centre, the historic Baggage Building is connected to the CN Railway Station, thereby establishing a strong image for a facility that will successfully anchor a gateway leading from downtown to the waterfront.
  • 5. Breithaupt Block, Canada – Structural designer for a $36m renovation into high quality office space designed for Waterloo’s technology sector. The former rubber, then car-parts factory stretches over a block of Kitchener’s old warehouse district. The building housed mammoth machinery and desperately needed an environmental clean-up. No original structural plans of the building existed. Several alterations had been made over the years and only some of those more recent structural plans existed and could be sourced. This was done manually, over the course of several site visits and inspections. All visible structure was physically measured and recorded, except in inaccessible areas or where it was unsafe to do so. One difficulty with this project was the removal of around 1,200 tonnes of assembly line machinery. Another was that two sections of the building were demolished to create modern courtyards. The developer was convinced that the nearby rail line and the technology sector’s appetite for interesting spaces would define the potential value of the vacant plant. This is due to a growing appreciation for repurposing dormant factories in downtown locations, a concept that appeals to tech-sector workers who want to be close to amenities. The rail line that once shipped its goods now carries commuters to white-collar jobs in the city. The Region of Waterloo purchased three acres of land across the tracks from the site to build a transit hub for Via Rail, GO Transit and inter-city buses which has added to the lustre of the location. This trend of revitalising and restoring defunct industrial buildings has added cachet to a once-overlooked downtown city centres. The Breithaupt’s interior now features large windows, high ceilings, brick walls, Oak floors, foot-square beams of Oak, Douglas Fir and Hemlock and the window replacements are consistent with the original 1900s style. Some historic features have been restored and two old large factory iron gears feature in one of the newly created courtyards.
  • 6. CFB Borden, Canada - The overall goal of the Department of National Defence (DND) was to consolidate facilities in order to create a training environment that would allow students to walk no more than 500m to all facilities. The design strategy for this new prototype kitchen and dining facility focused on providing a pleasant, efficient and enduring building with plenty of natural light and optimized interior traffic flows. The exterior forms were kept deliberately orthogonal, streamline and understated in order to produce an elegant, timeless building which fits in with the existing built environment at the base. As you enter the facility the aesthetic changes remind one of the history of the pine forests that were once dominant in the landscape of the site in the form of the dramatic glue laminated curved structure of the columns and beams. The interior design focuses on achieving a pleasant, easily maintained space optimized for clear and instinctive wayfinding – achieved through use of forms, materials and colours inspired by the military ribbon graphic. The most complex feature of this facility was its curved glulam arch beams and associated columns in the dining hall. Their end conditions and geometry required particular attention to ensure that they only carried axial load.