A quantity surveyor is a professional in the construction industry responsible for building costs. They prepare cost estimates, bills of quantities, evaluate tenders, and monitor costs throughout a project. A quantity surveyor's main roles include cost planning, procurement, measuring quantities of materials, and preparing payment applications for contractors and clients. They work closely with architects, engineers, contractors, and suppliers on a project. A quantity surveyor uses drawings and specifications to take off quantities and compile the bill of quantities using software like Revit.
For our first ICI (Introduction to Industry) and ITD (Introduction to Drawing), in a group of six, we were to carry out a research on quantity surveyors and give a presentation about what is their job about and what they do.
For our first ICI (Introduction to Industry) and ITD (Introduction to Drawing), in a group of six, we were to carry out a research on quantity surveyors and give a presentation about what is their job about and what they do.
Quantity Surveying Course
1. -> A quantity surveying Course (QSC) is a construction industry professional with expert knowledge on construction costs and contracts.
-> Qualified professional quantity surveyors are known as Chartered Surveyors.
-> Quantity surveyors provide expert advice on construction costs.
2. RESPONSIBILITY & ROLE
-> Quantity Surveying Course help to ensure that proposed projects are affordable and offer good value for money, helping the client and the design team assess and compare different options, and then track variations, ensuring that costs remain under control as the project progresses.
-> Quantity surveyors can specialise in a specific aspect of construction costs, or in a particular type of construction.
3. Cost Planning
-> Quantity Surveying Course the cost plans evolve through the life of the project, developing in detail and accuracy as more information becomes available about the nature of the design, and then actual prices are provided by contractors and suppliers.
-> Initial cost appraisal, Elemental cost plan, Approximate quantities cost plan, Pre-tender estimate, Tender pricing document, Contract sum, Contract sum analysis, Final account
4. Green Figure Technique ()
-> Quantity Surveying Course Service Quantity Take-Off and BOQ Preparation for all the items related to Civil and MEP Works based on the Drawings and Specification for any type of projects in GCC
-> GFT company started in 2005 intending to serve the market with the latest technologies.
-> GFT is a team of IT and Construction experts, and with their diverse capabilities, they are here to offer you the best construction software and service in the Middle East.
Quantity Surveying Course
1. -> A quantity surveying Course (QSC) is a construction industry professional with expert knowledge on construction costs and contracts.
-> Qualified professional quantity surveyors are known as Chartered Surveyors.
-> Quantity surveyors provide expert advice on construction costs.
2. RESPONSIBILITY & ROLE
-> Quantity Surveying Course help to ensure that proposed projects are affordable and offer good value for money, helping the client and the design team assess and compare different options, and then track variations, ensuring that costs remain under control as the project progresses.
-> Quantity surveyors can specialise in a specific aspect of construction costs, or in a particular type of construction.
3. Cost Planning
-> Quantity Surveying Course the cost plans evolve through the life of the project, developing in detail and accuracy as more information becomes available about the nature of the design, and then actual prices are provided by contractors and suppliers.
-> Initial cost appraisal, Elemental cost plan, Approximate quantities cost plan, Pre-tender estimate, Tender pricing document, Contract sum, Contract sum analysis, Final account
4. Green Figure Technique ()
-> Quantity Surveying Course Service Quantity Take-Off and BOQ Preparation for all the items related to Civil and MEP Works based on the Drawings and Specification for any type of projects in GCC
-> GFT company started in 2005 intending to serve the market with the latest technologies.
-> GFT is a team of IT and Construction experts, and with their diverse capabilities, they are here to offer you the best construction software and service in the Middle East.
Biodiversity and Ecosystem Services in the Tourism SectorChristina Beckmann
The tourism sector operates at the intersection of environment and big business. As the industry has matured, it has had to face difficult realities with respect to its environmental impacts. Tourism businesses are looking for ways to mitigate environmental impact and positively influence environmental issues.
Project Management Project 1 Report: Defining & Documenting A Project
Ft. Tamarind Square, Kuala Lumpur ,Malaysia (A project from Castmet Sdn. Bhd. and etc.)
The RIBA Plan of Work 2013 organises the process of briefing, designing, constructing, maintaining, operating and using building projects into eight Work Stages. The plan of work has always been about organising the design process.
What it not is a schedule of services document and it is not intended to be contractual.
However, it does set the scene for any given project
Synthetic Fiber Construction in lab .pptxPavel ( NSTU)
Synthetic fiber production is a fascinating and complex field that blends chemistry, engineering, and environmental science. By understanding these aspects, students can gain a comprehensive view of synthetic fiber production, its impact on society and the environment, and the potential for future innovations. Synthetic fibers play a crucial role in modern society, impacting various aspects of daily life, industry, and the environment. ynthetic fibers are integral to modern life, offering a range of benefits from cost-effectiveness and versatility to innovative applications and performance characteristics. While they pose environmental challenges, ongoing research and development aim to create more sustainable and eco-friendly alternatives. Understanding the importance of synthetic fibers helps in appreciating their role in the economy, industry, and daily life, while also emphasizing the need for sustainable practices and innovation.
Read| The latest issue of The Challenger is here! We are thrilled to announce that our school paper has qualified for the NATIONAL SCHOOLS PRESS CONFERENCE (NSPC) 2024. Thank you for your unwavering support and trust. Dive into the stories that made us stand out!
Operation “Blue Star” is the only event in the history of Independent India where the state went into war with its own people. Even after about 40 years it is not clear if it was culmination of states anger over people of the region, a political game of power or start of dictatorial chapter in the democratic setup.
The people of Punjab felt alienated from main stream due to denial of their just demands during a long democratic struggle since independence. As it happen all over the word, it led to militant struggle with great loss of lives of military, police and civilian personnel. Killing of Indira Gandhi and massacre of innocent Sikhs in Delhi and other India cities was also associated with this movement.
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
The Indian economy is classified into different sectors to simplify the analysis and understanding of economic activities. For Class 10, it's essential to grasp the sectors of the Indian economy, understand their characteristics, and recognize their importance. This guide will provide detailed notes on the Sectors of the Indian Economy Class 10, using specific long-tail keywords to enhance comprehension.
For more information, visit-www.vavaclasses.com
This is a presentation by Dada Robert in a Your Skill Boost masterclass organised by the Excellence Foundation for South Sudan (EFSS) on Saturday, the 25th and Sunday, the 26th of May 2024.
He discussed the concept of quality improvement, emphasizing its applicability to various aspects of life, including personal, project, and program improvements. He defined quality as doing the right thing at the right time in the right way to achieve the best possible results and discussed the concept of the "gap" between what we know and what we do, and how this gap represents the areas we need to improve. He explained the scientific approach to quality improvement, which involves systematic performance analysis, testing and learning, and implementing change ideas. He also highlighted the importance of client focus and a team approach to quality improvement.
The French Revolution, which began in 1789, was a period of radical social and political upheaval in France. It marked the decline of absolute monarchies, the rise of secular and democratic republics, and the eventual rise of Napoleon Bonaparte. This revolutionary period is crucial in understanding the transition from feudalism to modernity in Europe.
For more information, visit-www.vavaclasses.com
Palestine last event orientationfvgnh .pptxRaedMohamed3
An EFL lesson about the current events in Palestine. It is intended to be for intermediate students who wish to increase their listening skills through a short lesson in power point.
How to Make a Field invisible in Odoo 17Celine George
It is possible to hide or invisible some fields in odoo. Commonly using “invisible” attribute in the field definition to invisible the fields. This slide will show how to make a field invisible in odoo 17.
1. Introduction to Construction industry(ICI)
&
Introduction to drawing(ITD)
Group name : Beauties and the Beasts.
Tutor ICI/ITD: Mdm.Has/Ms.Suffina
Members : Abdul Qayyum Shahmie
Allester Shaun
Atiqah Syasya Janatan
Chong Kit Yee
Chong Jia Yi
Cheok Jian Shuang
5. A Quantity Surveyor
is..
A professional working
within the construction
industry concerned with
building costs.
6. Roles of a Quantity Surveyor
Basic Services
1. Prepare preliminary cost estimates and plans of development projects.
2. Prepare financial statement of regular intervals during construction period.
3. Prepare & execute formal contract.
4. Prepare Bill of Quantity or Specification document for tendering.
5. Advice on cost estimates regarding design development project.
6. Advice on procurement, tendering, contract procedures & arrangement.
7. Organise calling of tenders.
8. Evaluate tenders received in form of tender reports.
9. Interim valuate work progress on site for interim payments.
10. Settle final project accounts.
7. Supplementary
Services
1. Prepare feasibility project studies
2. Estimate project or development expenditure & foresee income cash flows
3. Evaluate contractors registered for prequalification.
4. Compare cost studies on economics of project during design stage.
5. Manage construction project.
6. Look into costing and studies on economics of alternative design.
7. Negotiate and agree/disagree on Schedule Rates.
8. Evaluate or audit contract claims for arbitrations litigation cases.
9. Evaluate or audit insurance claims for fire damaged buildings.
10. Audit contracts & related budgets & expenditure.
9. Pre-Contract Phase
● Scrutinize
tender
drawings &
documents
● Liaise with
consultant to
determine
working scope
● Costing,
● Compiling
pricing and
analysis BOQ
items cost.
the Tender
Bill of
Quantities
(BOQ) with
description
● Analyze and
compare
quotations
received at bid
stage
● Compilation of
tender & bid
offer
submissions.
10. Post Contract
Phase
Preparing and
agreeing
payments
applications /
valuations
Maintain logs
for claims and
thereby
agreeing
variations/
change orders.
Prepare and compile
claim documents to
the
Engineer/Employer.
Prepare & Compile
“Final Accounts
Payment
application”
Analyze and
Recommend
Subcontract
payment
application
Visit Site to
monitor progress
Preparing
Payment
Application
Attend progress
meetings and
provide updates
of costs to
Client
12. ● Architect will design the building.
● A QS will be cost adviser and monitor all financial
matters to architect.
● QS has experience on the type of work envisaged and
usually the architect will be able to recommend a
number of appropriate QSs to interview.
The
Relationship
between
Quantity
Surveyor and
Architect
13. The
Relationship
between
Quantity
Surveyor and
Engineers.
● Engineers design the
structures and foundations.
● They also supervise the work
on site on behalf of the client.
● After the designs are all
done, the QS calculate the
quantity of the materials to be
used and prepare tenders
and also supervise the
monthly submission for
payments.
Types of Engineer in
Construction Industry:
1. Civil Engineer
2. Electrical Engineer
3. Mechanical Engineer
14. The
Relationship
Between
Quantity
Surveyors
and
Contractors
Quantity
Surveyor
● Quantity Surveyors would be representing their
employer’s interest either the client or the
contractor.
● They always look after contractors’ commercial
and financial interests to make their employer in
the more controversial contractual areas
● Evaluate and monitor payment to contractors
at various points of construction
15. The
Relationship
between
Quantity
Surveyor
and the
Suppliers.
● As a part of a project, a contractor
must endeavour to procure a
supply chain in a timely manner.
● The QS plays a vital role in this
process because it requires a
commercially-aware person to
drive activities and ensure awards
are placed on time and within the
budget.
17. Typical Quantity Surveyor will be like:
● Basically, Quantity Surveyors
don’t draw. They READ
drawings instead.
● a Quantity Surveyor will study
drawings and specifications
about a new building normally
provided by architects or
engineers.
18. QS Read &
Refer :
Architectural
Drawing
Construction
Drawing
Contract
Drawing
To
Produce
Bill Of
Quantity
(BQ)
Tender
Drawing
19. Architectural Drawings
● Sketch /
Diagram / Plan
use to design
& construct
● Show building
elements &
form for
construction
works
20. QSes use them for the estimation of
cost and materials.
21. Construction Drawings: ● Contract documents
that give
representation of
work
● To work on the actual
building of the design
● Provide all
information require in
construction activities
in writing & drawing
form
22. QSes use them as a basis for cost control during
the construction process.
23. Tender Drawings:
● A formal invitation to
suppliers to make an offer
to the buyer for the supply
of goods and services.
● Sufficient details are
described
● Use for estimating &
pricing the cost
24. Quantity surveyors check them to see that no substantial errors had
been made. They then submit the detailed reports on the tenders to the
client.
25.
26. ● A cross section drawing of a path
showing width & specification
detail for each construction layer
● Include general arrangement
drawings showing site location, the
position on the site, means of
access to the site, floor plan,
elevation and section.
Contract Drawings
Formal agreement between the buying
organisation and the supplier setting out what
services and products the supplier is contracted
to deliver and within the timeline and contract
price.
28. 4 Stages of BQ Preparation:
Taking
Off
Squaring Abstracting Billing
Billing Direct
29. BQ Preparation Development
Drawing Dimension
Paper
Billing
Paper
Bill Of
Quantity
Taking Off
Squaring
Direct
Billing
Measurement of Quantities
30. When a 3D model is complete with
specifications, the bill of Quantities is
able to be compiled instantaneously.
Bills of Quantity:
The bill of Quantity is a report ready by the expense
expert (frequently an quantity surveyor)
● gives particular measured amounts of the things of work
recognized by the tender drawings and particulars in the
delicate documents.
● The amounts is measured in number, length, zone,
volume, weight or time.
● Requires the specific design and specifications that has
been completely prepared.
31. Revit : BIM
● BIM(Building information model)
● Software used by QS to count and
calculate the material directly by using
example of design/build firm that uses an
API(application programming interface)
from Revit Autodesk.
● Time, expense, and sustainability are
crucial in today's construction industry.
Books
● Malaysia Standard Method of
Measurement 2nd edition(SMM 2)
● Contains specification, measurement,
and describing the materials.