the trending new model of the computer technology the 5 pen pc the personal computer which is made up of the 5 pens which is light to carry and so efficent to use...
the trending new model of the computer technology the 5 pen pc the personal computer which is made up of the 5 pens which is light to carry and so efficent to use...
[Revit] kết cấu nhà phố Trương Thị Như NgọcHuytraining
Học Viên: Trương Thị Như Ngọc
Hướng dẫn: Nguyễn Hoàng Anh
Home: www.facebook.com\hoanganhtraining
Company: www.huytraining.com
Các bạn xem các bài của các học viên khác tại đây
http://www.huytraining.com/thu-vien/revit-tong-hop-bai-tap-cua-cac-hoc-vien-tai-huytraining.html
Link tham gia khóa học tại đây
http://www.huytraining.com/khoa-hoc-offline/khoa-hoc-revit-structure-revit-ket-cau-tai-huy-training.html
[Revit] kết cấu nhà phố Trương Thị Như NgọcHuytraining
Học Viên: Trương Thị Như Ngọc
Hướng dẫn: Nguyễn Hoàng Anh
Home: www.facebook.com\hoanganhtraining
Company: www.huytraining.com
Các bạn xem các bài của các học viên khác tại đây
http://www.huytraining.com/thu-vien/revit-tong-hop-bai-tap-cua-cac-hoc-vien-tai-huytraining.html
Link tham gia khóa học tại đây
http://www.huytraining.com/khoa-hoc-offline/khoa-hoc-revit-structure-revit-ket-cau-tai-huy-training.html
This is drawing, This is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawingThis is drawing
Design of Kalinga Film Studio at Bhubaneswaralwayslogo
The development of Kalinga Film Studio is envisaged area of 30 Ac and project is under execution which consists of various buildings like Film Studio, Tech zone, Movie Magic, Village sets , Mandap, Entrance Plaza etc.
Similar to Measure Drawing Old state museum kedah (11)
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.
Honest Reviews of Tim Han LMA Course Program.pptxtimhan337
Personal development courses are widely available today, with each one promising life-changing outcomes. Tim Han’s Life Mastery Achievers (LMA) Course has drawn a lot of interest. In addition to offering my frank assessment of Success Insider’s LMA Course, this piece examines the course’s effects via a variety of Tim Han LMA course reviews and Success Insider comments.
Francesca Gottschalk - How can education support child empowerment.pptxEduSkills OECD
Francesca Gottschalk from the OECD’s Centre for Educational Research and Innovation presents at the Ask an Expert Webinar: How can education support child empowerment?
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...Levi Shapiro
Letter from the Congress of the United States regarding Anti-Semitism sent June 3rd to MIT President Sally Kornbluth, MIT Corp Chair, Mark Gorenberg
Dear Dr. Kornbluth and Mr. Gorenberg,
The US House of Representatives is deeply concerned by ongoing and pervasive acts of antisemitic
harassment and intimidation at the Massachusetts Institute of Technology (MIT). Failing to act decisively to ensure a safe learning environment for all students would be a grave dereliction of your responsibilities as President of MIT and Chair of the MIT Corporation.
This Congress will not stand idly by and allow an environment hostile to Jewish students to persist. The House believes that your institution is in violation of Title VI of the Civil Rights Act, and the inability or
unwillingness to rectify this violation through action requires accountability.
Postsecondary education is a unique opportunity for students to learn and have their ideas and beliefs challenged. However, universities receiving hundreds of millions of federal funds annually have denied
students that opportunity and have been hijacked to become venues for the promotion of terrorism, antisemitic harassment and intimidation, unlawful encampments, and in some cases, assaults and riots.
The House of Representatives will not countenance the use of federal funds to indoctrinate students into hateful, antisemitic, anti-American supporters of terrorism. Investigations into campus antisemitism by the Committee on Education and the Workforce and the Committee on Ways and Means have been expanded into a Congress-wide probe across all relevant jurisdictions to address this national crisis. The undersigned Committees will conduct oversight into the use of federal funds at MIT and its learning environment under authorities granted to each Committee.
• The Committee on Education and the Workforce has been investigating your institution since December 7, 2023. The Committee has broad jurisdiction over postsecondary education, including its compliance with Title VI of the Civil Rights Act, campus safety concerns over disruptions to the learning environment, and the awarding of federal student aid under the Higher Education Act.
• The Committee on Oversight and Accountability is investigating the sources of funding and other support flowing to groups espousing pro-Hamas propaganda and engaged in antisemitic harassment and intimidation of students. The Committee on Oversight and Accountability is the principal oversight committee of the US House of Representatives and has broad authority to investigate “any matter” at “any time” under House Rule X.
• The Committee on Ways and Means has been investigating several universities since November 15, 2023, when the Committee held a hearing entitled From Ivory Towers to Dark Corners: Investigating the Nexus Between Antisemitism, Tax-Exempt Universities, and Terror Financing. The Committee followed the hearing with letters to those institutions on January 10, 202
Synthetic Fiber Construction in lab .pptxPavel ( NSTU)
Synthetic fiber production is a fascinating and complex field that blends chemistry, engineering, and environmental science. By understanding these aspects, students can gain a comprehensive view of synthetic fiber production, its impact on society and the environment, and the potential for future innovations. Synthetic fibers play a crucial role in modern society, impacting various aspects of daily life, industry, and the environment. ynthetic fibers are integral to modern life, offering a range of benefits from cost-effectiveness and versatility to innovative applications and performance characteristics. While they pose environmental challenges, ongoing research and development aim to create more sustainable and eco-friendly alternatives. Understanding the importance of synthetic fibers helps in appreciating their role in the economy, industry, and daily life, while also emphasizing the need for sustainable practices and innovation.
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
Chapter 3 - Islamic Banking Products and Services.pptx
Measure Drawing Old state museum kedah
1. Bachelor of Science (Honours) in Architecture
METHODS OF DOCUMENTATION AND MEASURED DRAWINGS
(ARC 60305 / ARC 2323 / ARC 1215)
PROJECT 3: Measured Drawings & Model
BUILDING: OLD STATE MUSEUM OF KEDAH
Group member:
1. Teo Kuo Chien 0320 195
2. Chong Jia Yi 0320 869
3. Nik Ahmad Munawwar bin Nik Din 0325 167
4. Chang May Chen 0322 636
5. Chia Keh Chian 0322 063
6. Chloe Teh Shu Ern 0324 101
7. Shum Li Sze 0322 822
8. Benjamin Tan Zi Hern 0324 857
9. Chong Wen Bin 0327 442
10. Loong Bo Lin 0321 469
11. Muhammad Zaim bin Azmi 0325 930
12. Tg Nabilah Diyana bt. Tg Mohd Amran 0325 657
13. Loo Yee Pei 0329 148
14. Low Chi Yin 0329 147
15. Vincentia Mutiara Kartika 0303 496
16. Wee Sue Wen 0322 633
Tutor: Mr. Mohd Adib bin Ramli
2. PERLIS
SINTOK
UUM
LANGKAWI
ISLAND
THAILAND
PERAK
BUKIT KAYU
HITAM
JITRAGUNUNG
KERIANG
KEPALA
BATAS
PERLIS
POKOK
SENA
NAKA
PEDA
LAKE
MUDA
LAKE
GUBIR
GULAU
PENDANG
GUAR
CHEMPEDAK
SIK
BALING
SUNGAI
PETANI
BETTERWORTH
GEORGETOWN
KULIM
BANDAR
BAHARU
YAN
GURUN
KUALA
PERLIS
ALOR
SETAR
GUNUNG
JERAL
PENANG
Kedah River
Jalan Tambang Badak
LorongLiku
LorongPeringgi
Jalan Kelompang
muidatSnalaJ
JalanTunkuHalim
Jalan W
aja 5
LorongTitiSiam
siloPtabajePubI
hadeKnejnitnoK
etatShadeK
muesuM
namAluraD
muidatS
Kedah OldMuseum
namaT
akedreM
Lorong Sena
LorongSukaramai
Jalan Kolam Renang
LebuhrayaDarulAman
LebuhrayaDarulAman
LebuhrayaDarulAman
Jalan Stadium
JalanStadium
JalanStadium
iregeNBDIC
hadeK
Jalan Mahkota
JalanTunkuAbdullah
Taman Tunku Habsah
Jalan Tunku Abdul Halim
VOID VOID
1
5 4
3
2
C3C3
C1
C
C1
C4
LLAF
BB
C2
C
A
C2
A
D
C4
E
C5
D
C5
E
FALL
FALL
FALL
LLAF
FALLLLAF
FALL
FALL
FALL
1
4
3
2
MAIN ROAD
MAJOR TOWN
INTERNATIONAL BORDER
NORTH-SOUTH EXPRESSWAY
LEGEND
STATE BORDER
MOUNTAIN
RIVER
A
01
KEY PLAN
SCALE: NOT TO SCALE
DRAWING NO.:
SHEET NO.:
A/01
2017 / ARC1215 / MLNKEDAH
A/02
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- KEY PLAN
- LOCATION PLAN
- SITE PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
02.03.2017
AS SHOWN
A/03
A
02
LOCATION PLAN
SCALE: NOT TO SCALE
Measured Drawing
A
04
SITE SECTION
SCALE: 1:200
A
04
SITE PLAN
SCALE: 1:200
Site
N
00 200 400
A/04
CHONG WEN BIN (0327 442) , CHONG JIA YI (0320 869) , CHANG MAY CHEN (0322 636 ) , WEE SUE WEN (0322 633) , CHIA KEH CHIAN (0322 063) , LOW CHI YIN (0329 149)
03
01
23
3. 1
17
16
14
13
12
11
10
9
8
6
5
2
7
15
3
D
CEFGH
BJ
KLMNQ
P
A
4
01
DN10DN10
DN75
UP75
OPEN OFFICE AREA A
F.F.L. ± 0.230m
MANAGER OFFICE B
F.F.L. ± 0.230m
VERANDAH WAY
F.F.L. ± 0.155m
MANAGER OFFICE A
F.F.L. ± 0.230m
OFFICE AREA A
F.F.L. ± 0.230m
DOCUMENTS
STORAGE ROOM
F.F.L. ± 0.230m
FEMALE WASHROOM
F.F.L. ± 0.165m
MALE WASHROOM
F.F.L. ± 0.165m
STORAGE
ROOM
F.F.L. ± 0.155m
W12
01
W13
01
W14
02
W15
01
W18
01
W21
01
W20
01
W1
01
W2
01
W3
01
W4
01
W5
01
W6
01
W7
01
W8
01
W8
02 W19
01
D1
01
VERANDAH WAY
F.F.L. ± 0.155m
01
D7
D3
01
D2
01
D6
01
D5
02
D4
02
D5
D4
01
1
2
3
5
4
6
7
8
10
9
11
12
13
14
15
17
16
18
19
20
21
22
23
24
2
1
3
4
5
6
8
7
9
11
10
12
13
14
W9
01
W10
01
W10
02
W10
03
W10
04
W9
02
W11
01
W22
01
W23
01
D10
01
D12
01
D11
01
D13
01
D9
01
D8
01
W16
01
W17
01
Double swing timber casement window
to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Ø115MM timber column to
eng's details
Double swing casement louvered
window with timber framing to
manuf's details
Glass louvered window with timber
framing to manuf's details
Double swing casement louvered window
with timber framing to manuf's details
Single swing casement louver window
with timber framing to manuf's details
150mm brick wall with
plastering on both side
Ø115MM timber column
to eng's details
Single swing timber casement
door to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Glass louvered window with timber
framing to manuf's details
250mm(tread) x 170mm(riser)
concrete staircase
100mm thick partition wall to
manuf's details
B
C
A
C3
C2
C1
C
C2
C1
A
D
C4
C5
E
B
C3
C5
E
D
C4
UP 170
UP 170
A
05
GROUND FLOOR PLAN
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
A/05
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- GROUND FLOOR PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
04.03.2017
1:50
LOW CHI YIN (0329 147)
NIK AHMAD MUNAWWAR (0325 167) , MR.MOHD ADIB
LOW CHI YIN (0329 147), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
02
23
4. 1
17
16
14
13
12
11
10
9
8
6
5
2
7
15
3
D
CEFGH
BJ
KLMNQ
P
A
4
DN 155
DN10
B
C
A
OFFICE AREA B
F.F.L. ± 3.620m
W24
01
W24
02W24W24
W24
11
W24 W24
13
W24 W24
04
W8
02
W26
W27
02
W27
W25
02
01
DN 155
DN10
C3
C2
C1
C
C2
C1
A
D
C4
C5
E
UTILITY ROOM A
F.F.L. ± 3.465m
UTILITY ROOM B
F.F.L. ± 3.465m
PANTRY
F.F.L. ± 3.610m
MANAGER OFFICE C
F.F.L. ± 3.620m
UTILITY ROOM C
F.F.L. ± 3.610m
08
W24W24
03
W24
04
W24
050607
W24
09 10 12 14
W26
01
01
W25
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1
2
3
4
5
6
7
8
9
10
11
12
13
14
03
W8
01
W30
01
W29
01
W31
01
D16
01
D18
01
D20
01
D17
01
D19
W28
01
D22
01
01
D15
01
D14
225mm x 225mm timber
columns to eng's details
Ø115MM timber column to
eng's details
Glass louvered window with timber
framing to manuf's details
Double swing timber casement
door to manuf's details
Glass louvered window with timber
framing to manuf's details300mm (W) timber flooring
115mm (Radius) timber
column to eng's details
Single swing timber casement
door to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Glass louvered window with aluminum
steel framing to manuf's details
250mm(tread) x 170mm(riser)
concrete staircase
Double swing timber
casement door to manuf's
details
Double swing timber
casement door to manuf's
details
100mm thick partition wall to
manuf's details
Double swing casement
window with aluminum frame to
manuf's details
D21
01
B
C3
C5
E
D
C4
DN199
NON-ACCESSIBLE
NON-ACCESSIBLE
A
06
FIRST FLOOR PLAN
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
A/06
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- FIRST FLOOR PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
04.03.2017
1:50
LOW CHI YIN (0329 147)
LOW CHI YIN (0329 147), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
NIK AHMAD MUNAWWAR (0325 167) , MR.MOHD ADIB
03
23
7. GROUND FLOOR REFLECTIVE CEILING PLAN
1
17
16
14
13
12
11
10
9
8
6
5
2
7
15
3
D
CEFGH
BJ
KLMNQ
P
A
4
01
DN10DN10
DN75
UP75
OPEN OFFICE AREA A
F.F.L. ± 0.230m
MANAGER OFFICE B
F.F.L. ± 0.230m
VERANDAH WAY
F.F.L. ± 0.155m
MANAGER OFFICE A
F.F.L. ± 0.230m
OFFICE AREA A
F.F.L. ± 0.230m
DOCUMENTS
STORAGE ROOM
F.F.L. ± 0.230m
FEMALE WASHROOM
F.F.L. ± 0.165m
MALE WASHROOM
F.F.L. ± 0.165m
STORAGE
ROOM
F.F.L. ± 0.155m
W12
01
W13
01
W14
02
W15
01
W18
01
W21
01
W20
01
W1
01
W2
01
W3
01
W4
01W5
01
W6
01
W7
01
W8
01
W8
02 W19
01
D1
01
VERANDAH WAY
F.F.L. ± 0.155m
01
D7
D3
01
D2
01
D6
01
D5
02
D4
02
D5
D4
01
1
2
3
5
4
6
7
8
10
9
11
12
13
14
15
17
16
18
19
20
21
22
23
24
2
1
3
4
5
6
8
7
9
11
10
12
13
14
W9
01
W10
01
W10
02
W10
03
W10
04
W9
02
W11
01
W22
01
W23
01
D10
01
D12
01
D11
01
D13
01
D9
01
D8
01
W16
01
W17
01
Double swing timber casement window
to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Ø115MM timber column to
eng's details
Double swing casement louvered
window with timber framing to
manuf's details
Glass louvered window with timber
framing to manuf's details
Double swing casement louvered window
with timber framing to manuf's details
Single swing casement louver window
with timber framing to manuf's details
150mm brick wall with
plastering on both side
Ø115MM timber column
to eng's details
Single swing timber casement
door to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Glass louvered window with timber
framing to manuf's details
250mm(tread) x 170mm(riser)
concrete staircase
100mm thick partition wall to
manuf's details
B
C
A
C3
C2
C1
C
C2
C1
A
D
C4
C5
E
B
C3
C5
E
D
C4
UP 170
UP 170
A
09
GROUND FLOOR REFLECTIVE CEILING PLAN
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
A/09
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- GROUND FLOOR REFLECTIVE CEILING PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
04.03.2017
1:50
LOW CHI YIN (0329 147)
LOW CHI YIN (0329 147), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
NIK AHMAD MUNAWWAR (0325 167) , MR.MOHD ADIB
06
23
8. 1
17
16
14
13
12
11
10
9
8
6
5
2
7
15
3
D
CEFGH
BJ
KLMNQ
P
A
4
DN 155
DN10
B
C
A
OFFICE AREA B
F.F.L. ± 3.620m
W24
01
W24
02W24W24
W24
11
W24 W24
13
W24 W24
04
W8
02
W26
W27
02
W27
W25
02
01
DN 155
DN10
C3
C2
C1
C
C2
C1
A
D
C4
C5
E
UTILITY ROOM A
F.F.L. ± 3.465m
UTILITY ROOM B
F.F.L. ± 3.465m
PANTRY
F.F.L. ± 3.610m
MANAGER OFFICE C
F.F.L. ± 3.620m
UTILITY ROOM C
F.F.L. ± 3.610m
08
W24W24
03
W24
04
W24
050607
W24
09 10 12 14
W26
01
01
W25
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1
2
3
4
5
6
7
8
9
10
11
12
13
14
03
W8
01
W30
01
W29
01
W31
01
D16
01
D18
01
D20
01
D17
01
D19
W28
01
D22
01
01
D15
01
D14
225mm x 225mm timber
columns to eng's details
Ø115MM timber column to
eng's details
Glass louvered window with timber
framing to manuf's details
Double swing timber casement
door to manuf's details
Glass louvered window with timber
framing to manuf's details300mm (W) timber flooring
115mm (Radius) timber
column to eng's details
Single swing timber casement
door to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Glass louvered window with aluminum
steel framing to manuf's details
250mm(tread) x 170mm(riser)
concrete staircase
Double swing timber
casement door to manuf's
details
Double swing timber
casement door to manuf's
details
100mm thick partition wall to
manuf's details
Double swing casement
window with aluminum frame to
manuf's details
D21
01
B
C3
C5
E
D
C4
DN199
NON-ACCESSIBLE
NON-ACCESSIBLE
A
10
FIRST FLOOR REFLECTIVE CEILING PLAN
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
A/10
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- FIRST FLOOR REFLECTIVE CEILING PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
04.03.2017
1:50
LOW CHI YIN (0329 147)
LOW CHI YIN (0329 147), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
NIK AHMAD MUNAWWAR (0325 167) , MR.MOHD ADIB
07
23
9. VOID
VOID
F.F.L
(Toilet Tower)
G.F.L
R.L
R.L
C.L
F.F.C.L
(Toilet Tower)
R.L
G.F.C.L
F.F.L
EGKLMNP J H F D C B AQ
02
W8
01
W8
01
W10
02
W10
03
W10
04
W10
02
W27
01
W27
03
W8
04
W801
W28
01
D06
VOID VOID
KA C D E F G H J L M N P Q
F.F.L
(Toilet Tower)
G.F.L
R.L
R.L
C.L
F.F.C.L
(Toilet Tower)
R.L
G.F.C.L
F.F.L
B
W21
01
W20
01
W19
01
W37
01
W36
01
W35
01
W30
01
W29
01
D14
01
B
01
EAST ELEVATION
SCALE: 1:50
WEST ELEVATIONB
02 SCALE: 1:50
DRAWING NO.:
SHEET NO.:
B/01
2017 / ARC1215 / MLNKEDAH
B/02
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- EAST ELEVATION
- WEST ELEVATION
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
26.02.2017
1:50
LOO YEE PEI (0329 148) , SHUM LI SZE (0322 822) , NIK AHMAD MUNAWWAR (0325 167)
LOO YEE PEI (0329 148)
LOO YEE PEI (0329 148) , SHUM LI SZE (0322 822)
LOO YEE PEI (0329 148) , SHUM LI SZE (0322 822)
LEGEND
G.F.L - Ground Floor Level
F.F.L - First Floor level
G.F.C.L - Ground Floor Ceiling Level
F.F.C.L - First Floor Ceiling Level
C.L - Ceiling Level
R.L - Roof Level
08
23
10. VOID
F.F.L
(Toilet Tower)
G.F.L
R.L
R.L
C.L
F.F.C.L
(Toilet Tower)
R.L
G.F.C.L
F.F.L
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
01
W7
01
W6
01
W5
01
W4
01
W3
01
W2
01
W1
W9
01
01
W24
02
W24
03
W24
04
W24
05
W24
06
W24
07
W24
01
W23
01
W26
01
W34
05
W33
04
W33
03
W33
02
W33
01
W33
01
W32
VOID
F.F.L
(Toilet Tower)
G.F.L
R.L
R.L
C.L
F.F.C.L
(Toilet Tower)
R.L
G.F.C.L
F.F.L
16 15 14 13 12 11 10 9 8 7 5 4 23 16
01
W18
01
W15 W14
01
W13
01
W12
01
W11
01
W9
02
14
W24
13
W24
12
W24
11
W24
10
W24
09
W24
08
W24
02
W32
10
W33
09
W33
08
W33
07
W33
06
W33
02
W34
02
W25
02
W26
01
W16
01
W17 01
D07
B
03
SOUTH ELEVATION
SCALE: 1:50
NORTH ELEVATIONB
04 SCALE: 1:50
DRAWING NO.:
SHEET NO.:
B/03
2017 / ARC1215 / MLNKEDAH
B/04
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- NORTH ELEVATION
- SOUTH ELEVATION
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR MR. MOHD ADIB
REMARK:
21.01.2017
26.02.2017
1:50
BENJAMIN TAN.Z.H (0324 857) , VINCENTIA MUTIARA.K (0303 496) , NIK AHMAD MUNAWWAR (0325 167)
LOO YEE PEI (0329 148)
BENJAMIN T.Z.H , VNCENTIA.M.K , MUHAMMAD ZAIM B. AZMI (0325 930) , LOONG BO LIN (0321 469)
BENJAMIN T.Z.H , VINCENTIA.M.K , MUHAMMAD ZAIM B. AZMI (0325 930) , LOONG BO LIN (0321 469)
00 50 100
N
LEGEND
G.F.L - Ground Floor Level
F.F.L - First Floor level
G.F.C.L - Ground Floor Ceiling Level
F.F.C.L - First Floor Ceiling Level
C.L - Ceiling Level
R.L - Roof Level
09
23
11. 01
W20
01
W22
01
W23 01
D7
01
W3
01
W3
01
W3
01
D1
01
D9
01
D2
01
D5
01
D21
01
W25
01
D14
01
W26
01
W27
01
W34
05
W33
04
W33
03
W33
02
W33
01
W33
01
W32
01
D17
01
D11
01
D10
01
W36
115mm (Radius) timber column to
eng's details
250mm(tread) x 170mm(riser)
concrete staircase to eng's details
Double swing casement louvered
window with timber framing to
manuf's details
225mm x 225mm timber columns to
eng's details
84mm (Radius) timber column to
eng's details
Double swing timber casement door
to manuf's details
Single swing timber casement door
to manuf's details
30mm thick timber flooring to
manuf's details
225mm x 225mm timber columns to
eng's details
Double swing timber casement door
to manuf's details
Exhibited wallFixed glass window with aluminium
frame to manuf's details
Sliding door with aluminum frame to
manuf's details
NON-ACCESSIBLE
F.F.L
(Toilet Tower)
G.F.L
R.L
R.L
C.L
F.F.C.L
(Toilet Tower)
R.L
G.F.C.L
F.F.L
16 15 14 13 12 11 10 9 8 7 5 4 23 16
NON-ACCESSIBLE
02
W23
02
W27
02
W25
04
W10
02
D4
01
D3
01
D1
02
D9
03
D9
01
D5
01
D22
01
D13
02
W34
06
W33
07
W33
08
W33
09
W33
10
W33
02
W32
01
W36
01
W13
01
D12
01
W20
01
W18
01
W17
01
W16
01
W15
02
W14
01
W13
01
D8
01
D18
01
D11
01
D10
Single swing timber casement door
to manuf's details
Double swing timber casement door
to manuf's details
225mm x 225mm timber columns to
eng's details
225mm x 225mm timber columns to
eng's details
Double swing timber casement door
to manuf's details
250mm(tread) x 170mm(riser)
concrete staircase to eng's details
115mm (Radius) timber column to
eng's details
150mm brick wall with plastering on
both side
155mm thick concrete apron Single swing timber casement
window to manuf's details
Single swing timber casement
window to manuf's details
Glass louvered window with
aluminum framing to manuf's details
F.F.L
(Toilet Tower)
G.F.L
R.L
R.L
C.L
F.F.C.L
(Toilet Tower)
R.L
G.F.C.L
F.F.L
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
C
01
SECTION A-A
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
C/01
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- SECTION A-A
- SECTION C-C
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
05.03.2017
1:50
CHONG JIA YI (0320 869) , CHONG WEN BIN (0327 442) , LOW CHI YIN (0329 147)
LOW CHI YIN (0329 147)
LOW CHI YIN (0329 147), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
C/03
C
03
SECTION C-C
SCALE: 1:50
10
23
12. NON-ACCESSIBLE
02
W8
01
W8
03
W8
04
W8
01
W26
01
W13
01
D1
Double swing timber casement door
to manuf's details
155mm thick concrete apron
Glass louvered window with
aluminum framing to manuf's details
115mm (Radius) timber column to
eng's details
Timber ornamentation to manuf's
details
Double swing timber casement door
to manuf's details
Glass louvered window with
aluminum framing to manuf's details
Timber ornamentation to manuf's
details
Timber ornamentation to manuf's
details
F.F.L
(Toilet Tower)
G.F.L
R.L
R.L
C.L
F.F.C.L
(Toilet Tower)
R.L
G.F.C.L
F.F.L
EGKLMNP J H F D C B AQ
VOID VOID
01
D12
01
D6
01
D11
01
D10
01
W19
01
W20
01
W13
01
W5
01
W29
01
W3701
W36
01
W35
04
W33
07
W33
01
W30
Roof trusses
Glass louvered window with timber
framing to manuf's details
Double swing timber casement door
to manuf's details
Glass louvered window with timber
framing to manuf's details
115mm (Radius) timber column to
eng's details
30mm thick timber flooring to
manuf's details
Double swing casement louvered
window with timber framing to
manuf's details
Glass louvered window with
aluminium framing to manuf's details
150mm brick wall with plastering on
both side
KA C D E F G H J L M N P Q
F.F.L
(Toilet Tower)
G.F.L
R.L
R.L
C.L
F.F.C.L
(Toilet Tower)
R.L
G.F.C.L
F.F.L
B
03
D2
04
D2
01
D2
02
D2
150mm brick wall with plastering on
both side
Double swing casement window with
aluminum frame to manuf's details
207mm thick timber flooring
225mm x 225mm timber columns to
eng's details
225mm x 225mm timber columns to
eng's details
NON-ACCESSIBLE
KA C D E F G H J L M N P Q
F.F.L
(Toilet Tower)
G.F.L
R.L
R.L
C.L
F.F.C.L
(Toilet Tower)
R.L
G.F.C.L
F.F.L
B
C
02
SECTION B-B
SCALE: 1:50
C
04
SECTION D-D
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
C/02
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- SECTION B-B
- SECTION D-D
- SECTION E-E
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
05.03.2017
1:50
CHONG JIA YI (0320 869) , CHONG WEN BIN (0327 442) , LOW CHI YIN (0329 147)
LOW CHI YIN (0329 147)
LOW CHI YIN (0329 147), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
C/04
C
05
SECTION E-E
SCALE: 1:50
C/05
11
23
13. D
01
EXPLODED AXONOMETRIC
SCALE: 1:75
DRAWING NO.:
SHEET NO.:
D/01
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- EXPLODED AXONOMETRIC
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR MR. MOHD ADIB
REMARK:
21.01.2017
05.03.2017
1:75
LOO YEE PEI (0329 148) , CHONG JIA YI (0320 869), CHONG WEN BIN (0327 442), TEO KUO CHIEN (0320 195)
LOO YEE PEI (0329 148)
-
- 12
23
14. 2405.0
2405.0
1925.0
1010.0
2405.0
582.0 571.0 578.0 573.0
1153.0 1151.0
1925.0
1735.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
90.0100.0
F.F.L
1010.01925.0
590.0
550.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
100.01725.0100.0
40.0
F.F.L
590.0
1925.0
590.0585.0
585.0
1925.0
1925.0
585.0
545.0
1010.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
1735.0100.090.0
40.0
F.F.L
1010.0
2436.0
590.0 576.0 595.0 570.0
1925.0
1166.0 1165.0
1725.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
100.0100.0
35.0
F.F.L
2436.0
2436.0
1925.0
2418.0
1925.0
2418.0
1010.0
2418.0
585.0 573.0 587.0 575.0
1925.0
1158.0 1162.0
1725.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
100.0100.0
35.0
F.F.L
1010.0
2446.0
583.0 572.0 607.0 577.0
1155.0 1184.0
1925.0
1721.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
104.0100.0
39.0
F.F.L
2446.0
2446.0
1925.0
1836.9
1237.0
1836.9
980.0
1828.0
1237.0
544.0 543.0 543.0
20mm thick steel frame
to manuf's details
16mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
123.0145.0EQEQEQEQEQEQEQ
20.0 31.0 31.0 20.0
F.F.L
980.01237.0
1825.0
543.0 541.0 543.0
23mm thick steel frame
to manuf's details
16mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
145.0EQEQEQEQEQEQEQ123.0
20.0 31.0 31.0 20.0
F.F.L
1825.0
1825.0
1237.0
600.0
410.0
1237.0
600.0
2569.0410.0
600.0
15mm thick steel frame
to manuf's details
322.030.0
530.0
steel alloy adj. friction stay
4mm thick glass panel
to manuf's details
F.F.L
DRAWING NO.:
SHEET NO.:
E / 01
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- WINDOW SCHEDULE
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
03.03.2017
1:20
LOO YEE PEI (0329 148) , CHONG WEN BIN (0327 442), CHANG MAY CHEN (0322 636) , CHONG JIA YI (0320 869)
LOO YEE PEI (0329 148)
-
-
Top hung window with powder coated black
aluminum frame
W10 Location: Male & female washroom
Quantity: 04
Size: (H)410mm x (W)600mm
ELEVATION
PLAN
ISO VIEW
W11
ELEVATION
PLAN
ISO VIEW
Semi transparent louvered window with
aluminum frame
Location: Office area B
Quantity: 01
Size: (H)1237mm x (W)1825mm
ELEVATION
PLAN
ISO VIEW
W12
Semi transparent louvered window with
aluminum frame
Location: Office area B
Quantity: 01
Size: (H)1937mm x (W)1828mm
4 panels casement louvered window with
timber frame
W13 Location: Open office area
Quantity: 01
Size: (H)1925mm x (W)2446mm
4 panels casement louvered window with
timber frame
W14 Location: Open office area
Quantity: 01
Size: (H)1925mm x (W)2418mm
Semi transparent louvered window with aluminum frame
W15 Location: Documents storage room
Quantity: 01
Size: (H)1925mm x (W)2436mm
Single swing casement louvered window with timber frame
W16 Location: Main entrance to the admin office
Quantity: 01
Size: (H)1925mm x (W)585mm
Single swing casement louvered window with timber frame
W17 Location: Open Office A
Quantity: 01
Size: (H)1925mm x (W)590mm
W18 Location: Open office area A
Quantity: 01
Size: (H)1925mm x (W)2405mm
ELEVATION
ELEVATION ELEVATION
ELEVATION ELEVATION
ELEVATION
ISO VIEW
ISO VIEW
ISO VIEW
ISO VIEW
ISO VIEW
PLAN PLAN
4 panels casement louvered window with
timber frame
PLAN
PLANPLANPLAN
ISO VIEW
14
23
15. 1064.0
1222.0
1829.0
1161.0
576.0 585.0
1635.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
34.0
110.084.0
F.F.L
1222.0
1222.0
1829.0
2410.0
1829.0
2410.0
1064.0
1160.0 1157.0
587.0 573.0 587.0 570.0
2410.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
1829.0
1624.085.0120.0
32.0
F.F.L
1064.01830.0
2443.0
1174.0 1174.0
587.0 587.0 587.0 587.0
512.01318.0
35.0
37.0
4mm black tinted thick
glass panel to manuf's
details
37mm thick aluminum
F.F.L
2443.0
2443.0
1830.0
1011.01086.0
2376.0
1138.0 1138.0 25.0
1034.027.0
4mm thick glass panel
to manuf's details
25mm thick aluminum frame to
manuf's details
frame to manuf's details
F.F.L
2376.0
2376.0
1086.0
1188.0
1086.0
1011.01086.0
1188.0
1144.0
1012.022.0
22.0
4mm thick glass panel
to manuf's details
25mm thick aluminum frame to
manuf's details
F.F.L
1188.1 2748.9
661.11123.0
633.9 629.0 629.0
43.0 43.0 46.0
2748.9
13mm thick steel frame
to manuf's details
12mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
132.5EQEQEQEQEQEQ119.5
626.0
12.015.0
F.F.L
2748.9
1123.0
1945.0
2669.0
1215.0715.1
667.3 667.3 667.3 667.3
307.1
23.5
15mm thick aluminum
frame to manuf's details
4mm black tinted thick glass
panel to manuf's details
fastener with security locks
4mm black tinted thick glass
panel to manuf's details
25mm thick aluminum frame to
manuf's details
F.F.L
2669.0
2669.0
1945.0
1160.0
2800.0
611.0 611.0 611.0 623.0
50.0 50.0 50.0
50.0
50.0
1381.9
15mm thick steel frame
to manuf's details
10mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
140.0EQEQEQEQEQEQ140.0
F.F.L
2800.0
1160.0
2800.0
1203.0
576.0 576.0 576.0 576.0
45.0 45.0 45.0
1437.3
2785.0
16mm thick steel frame
to manuf's details
16mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
142.0EQEQEQEQEQEQ121.0
45.0 45.0
F.F.L
2785.0
2785.0
1203.0
DRAWING NO.:
SHEET NO.:
E / 01
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- WINDOW SCHEDULE
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
03.03.2017
1:20
LOO YEE PEI (0329 148) , CHONG WEN BIN (0327 442), CHANG MAY CHEN (0322 636) , CHONG JIA YI (0320 869)
LOO YEE PEI (0329 148)
-
-
Double swing casement louvered window
with timber frame
W19 Location: Open Office A
Quantity: 01
Size: (H)1829mm x (W)1222mm
ELEVATION
PLAN
ISO VIEW
W20
ELEVATION
PLAN
ISO VIEW
Location: Open office area A & Manager office A
Quantity: 01
Size: (H)1829mm x (W)2410mm
ELEVATION
PLAN
ISO VIEW
W21
Aluminum framed casement window with four black tinted glass
panels and fixed windows on top
Location: Manager Office A
Quantity: 01
Size: (H)1830mm x (W)2443mm
Fixed glass with aluminum frame
W22 Location: Manager office A
Quantity: 01
Size: (H)1086mm x (W)2376mm
Fixed glass with aluminum frame
W23 Location: Manager office B
Quantity: 01
Size: (H)1086mm x (W)2418mm
Clear glass louvered window with aluminum frame
W24 Location: Utility room A
Quantity: 14
Size: (H)1123mm x (W)2748.9mm
Aluminum framed casement window with four black tinted
glass panels and fixed windows on top
W25 Location: Linked bridge to the toilet tower
Quantity: 02
Size: (H)1945mm x (W)2669mm
Semi transparent louvered window with aluminum frame
W26 Location: Utility room C & Pantry room
Quantity: 02
Size: (H)1160mm x (W)2800mm
W27 Location: Utility room C & Pantry room
Quantity: 02
Size: (H)1203mm x (W)2785mm
ELEVATION
ELEVATION ELEVATION
ELEVATION ELEVATION
ELEVATION
ISO VIEW
ISO VIEW ISO VIEW
ISO VIEW
ISO VIEW
PLAN PLAN PLAN
PLANPLANPLAN
ISO VIEW
4 panels casement louvered window with
timber frame
Semi transparent louvered window with aluminum frame
15
23
16. 3741.9686.0
2825.0
920.0 890.0 900.0
35.0 25.0 25.0 30.0
10mm thick louvered blade
holder to manuf's details
glass panel
F.F.L
1198.0
1086.0
1198.0
1086.0
1198.0
1154.0
1166.0
22.0
22mm thick aluminum
frame to manuf's details
4mm thick glass panel
to manuf's details
F.F.L
2010.0
1245.0
2010.0
667.61245.0
2010.0
608.0 596.0 606.0
50.0
50.0
50.0 50.0
15mm thick steel frame
to manuf's details
15mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
151.0EQEQEQEQEQEQ142.0
F.F.L
663.81245.0
2014.1
608.0 606.0 606.0
50.0 50.0 50.0
44.2
15mm thick steel frame
to manuf's details
15mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
151.0EQEQEQEQEQEQ142.0
F.F.L
2014.1
1245.0
2014.1
667.61245.0
2020.0
608.0 606.0 606.0
50.0
50.0
50.0 50.0
15mm thick steel frame
to manuf's details
15mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
151.0EQEQEQEQEQEQEQ142.0
F.F.L
2020.0
2020.0
1245.0
2825.0
2825.0
686.0
3741.9686.0
2820.0
920.0 890.0 900.0
30.0 25.0 25.0 30.0
10mm thick louvered blade
holder to manuf's details
glass panel
F.F.L
2820.0
2820.0
686.0
3742.1690.2
2845.0
920.0 890.0 900.0
30.0 25.0 25.0 55.0
10mm thick louvered blade
holder to manuf's details
glass panel
F.F.L
2845.0
2845.0
690.2
2335.12058.0
2781.3
486.8 503.0 503.0 503.0 525.5
45.0 45.0 45.0 45.0 25.0
15mm thick steel frame
to manuf's details
15mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
135.0EQEQEQEQEQEQEQEQEQ135.0
1500.0
493.050.0
25.0
F.F.L
2781.3
2781.3
2058.0
DRAWING NO.:
SHEET NO.:
E / 01
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- WINDOW SCHEDULE
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
03.03.2017
1:20
LOO YEE PEI (0329 148) , CHONG WEN BIN (0327 442), CHANG MAY CHEN (0322 636) , CHONG JIA YI (0320 869)
LOO YEE PEI (0329 148)
-
-
Clear glass louvered window with aluminum
frame
W28 Location: Utility room B
Quantity: 01
Size: (H)1245mm x (W)2014.1mm
ELEVATION
PLAN
ISO VIEW
W29
ELEVATION
PLAN
ISO VIEW
Location: Utility room B
Quantity: 01
Size: (H)1245mm x (W)2020mm
ELEVATION
PLAN
ISO VIEW
W30 Location: Utility room A
Quantity: 01
Size: (H)1245mm x (W)2010mm
Fixed glass with aluminum frame
W31 Location: Manager office C
Quantity: 01
Size: (H)1086mm x (W)2376mm
Fixed glass with aluminum frame
W32 Location: Utility room A&B
Quantity: 02
Size: (H)686mm x (W)2825mm
ELEVATION
ELEVATION
ISO VIEW
PLAN
PLAN
Clear glass louvered window with aluminum
frame
Clear glass louvered window with aluminum
frame
ISO VIEW
Fixed glass with aluminum frame
W33 Location: Utility room A&B
Quantity: 10
Size: (H)1086mm x (W)2820mm
ELEVATION
PLAN
ISO VIEW
ELEVATION
PLAN
ISO VIEW
Fixed glass with aluminum frame
W34 Location: Utility room A&B
Quantity: 02
Size: (H)690.2mm x (W)2845mm
Fixed glass with aluminum frame
W35 Location: Utility room A&B
Quantity: 01
Size: (H)2058mm x (W)2781.3mm
ELEVATION
PLAN
16
23
17. 2335.12058.0
2828.9
525.5 503.0 503.0 503.0 525.5
45.043.9 45.0 45.0 45.0 45.0
15mm thick steel frame
to manuf's details
15mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
1515.0493.050.0
135.0EQEQEQEQEQEQEQEQEQ135.0
F.F.L
2828.9
2828.9
2058.0
3420.0
495.0 520.0 520.0 520.0 520.0 495.0
50.0 50.0 50.0 50.0 50.0 50.0
2043.0
15mm thick steel frame
to manuf's details
15mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
1485.0493.0
50.0
F.F.L
2335.1
3420.0
3420.0
2043.0
DRAWING NO.:
SHEET NO.:
E / 01
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- WINDOW SCHEDULE
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
03.03.2017
1:20
LOO YEE PEI (0329 148) , CHONG WEN BIN (0327 442), CHANG MAY CHEN (0322 636) , CHONG JIA YI (0320 869)
LOO YEE PEI (0329 148)
-
-
Fixed glass with aluminum frame
W36 Location: Office area
Quantity: 01
Size: (H)686mm x (W)2825mm
ELEVATION
PLAN
ISO VIEW
Fixed glass with aluminum frame
W37 Location: Office area
Quantity: 01
Size: (H)686mm x (W)2825mm
ELEVATION
PLAN
ISO VIEW
17
23
18. 1510.0
701.1 45.0 693.9 35.035.0
720.0 720.0
2749.0
2144.0560.0
45.069.0325.0325.0325.0520.0215.0
60.0
170.0
door hinge to manuf's
details
35mm thick timber window
frame to manuf's details
4mm thick fixed glass
panel to manuf's details
door lock to manuf's
details
door knob to manuf's
details
door hinge to manuf's
details
fixed louvered window to
manuf's details
69mm thick timber door
frame to manuf's details
DN 75
1510.0
2144.0605.0
1510.0
965.0
2047.0
DN 10
965.0
2047.0
30.0
965.0
30.0905.0
door hinge to manuf's
details
30mm thick timber
door frame to manuf's
details
door knob to manuf's
details
30.0 905.0 30.0
965.0
2047.0
30.0
door knob to manuf's
details
30mm thick timber
door frame to manuf's
details
door hinge to manuf's
details
DN 10
965.0
965.0
2047.0
890.0
2097.0
890.0
50.0 790.0 50.0
890.0
2097.0
50mm thick timber
door frame to manuf's
details
door knob to manuf's
details
door hinge to manuf's
details
890.0
50.0 790.0 50.0
2097.0
door knob to manuf's
details
50mm thick timber
door frame to manuf's
details
door hinge to manuf's
details
890.0
890.0
2097.0
1830.0
1633.0
1830.0
25.0 915.0 865.0 25.0
1830.0
1633.0
25mm thick steel door
frame to manuf's details
door lock to manuf's
detail
UP 75
1280.0
40.0 560.0 560.0 60.0
1280.0
730.0 465.02870.0
238.7370.0370.0370.0370.0232.0
65.065.065.0
560.094.0
door hinge to manuf's
details
4mm thick fixed glass
panel to manuf's details
4mm thick fixed glass
panel to manuf's details
100mm thick timber window
frame to manuf's details
50mm thick timber door
frame to manuf's details
door lock to manuf's
detail
door knob to manuf's
detail
1280.0
724.0
2145.7
935.0
2118.3
935.0
24.9 885.1 25.0
935.0
777.0
112.51905.8
2118.3
door knob to manuf's
detail
25mm thick alum. door
frame to manuf's details
fixed glass panel to
manuf's detail
door hinge to manuf's
detail
22.0
851.0 22.0
719.0
895.0
75.0936.0914.075.0
2097.0
door knob to manuf's
detail
door hinge to manuf's
detail
fixed glass panel to
manuf's detail
22mm thick alum. door
frame to manuf's details
895.0
895.0
2097.0
790.0
2127.0
790.0
45.0 700.0 45.0
790.0
2082.0
2127.0
door knob to manuf's
detail
door hinge to manuf's
detail
45mm thick timber door
frame to manuf's details
56.0 845.0 56.0
957.0
2068.0
2124.0
door knob to manuf's
detail
door hinge to manuf's
detail
45mm thick timber door
frame to manuf's details
957.0
957.0
2124.0
957.0
2124.0
56.0 845.0 56.0
957.0
2068.0
2124.0
door knob to manuf's
detail
door hinge to manuf's
detail
56mm thick timber door
frame to manuf's details
957.0
957.0
2124.0
957.0
56.0 845.0 56.0
2121.7
2065.7
957.0
door knob to manuf's
detail
door hinge to manuf's
detail
56mm thick timber door
frame to manuf's details
48.0 2470.0 45.0
2563.0
25.0135.0
1420.0690.0
10mm thick steel structure
to manuf's details
45mm thick timber door
frame to manuf's details
door lock to manuf's
detail
2160.0
2563.0
2563.0
2160.0
DRAWING NO.:
SHEET NO.:
E / 02
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- DOOR SCHEDULE
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
02.03.2017
1:20
LOO YEE PEI (0329 148) , BENJAMIN TAN ZI HERN (0324 857)
LOO YEE PEI (0329 148)
-
-
Timber framed and glass paneled door with
fixed glass on top
D1 Location: Corridor A
Quantity: 01
Size: (H)2749mm x (W)1510mm
Timber / Wooden door with timber frame
D2 Location: Male washroom
Quantity: 01
Size: (H)2047mm x (W)965mm
Timber / Wooden door with timber frame
D3 Location: Female washroom
Quantity: 01
Size: (H)2047mm x (W)965mm
Plastic door with timber frame
D4 Location: Male washroom
Quantity: 02
Size: (H)2097mm x (W)890mm
Plastic door with timber frame
D5 Location: Female Washroom
Quantity: 02
Size: (H)2097mm x (W)890mm
Steel door with aluminum steel frame
D6 Location: Storage room
Quantity: 01
Size: (H)1633mm x (W)1830mm
D7 Location: Main entrance to admin office
Quantity: 01
Size: (H)2870mm x (W)1280mm
Timber framed and glass paneled door
with fixed glass on top Glass door with aluminum frame
D8 Location: Manager office A
Quantity: 01
Size: (H)2118.3mm x (W)935mm
Glass door with aluminum frame
D9 Location: Manager office B
Quantity: 01
Size: (H)2097mm x (W)895mm
Timber door with timber frame
D10 Location: Open office Area
Quantity: 01
Size: (H)2127mm x (W)790mm
Timber door with timber frame
D11 Location: Office Area B
Quantity: 01
Size: (H)2124mm x (W)957mm
D12 Location: Documents storage room
Quantity: 01
Size: (H)2124mm x (W)957mm
Timber door with timber frame
D13 Location: Office area B
Quantity: 01
Size: (H)2121.7mm x (W)957mm
Timber door with timber frame
D14 Location: Main entrance to the old museum
Quantity: 01
Size: (H)2160mm x (W)2563mm
Steel sliding door with timber frame
ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION
ELEVATION
ELEVATION
ELEVATION ELEVATION ELEVATION
ELEVATION ELEVATION ELEVATION ELEVATION
PLAN PLAN PLAN PLAN PLAN
PLAN PLAN PLAN PLAN PLAN
PLAN PLAN PLAN PLAN
ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW
ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW
ISO VIEW ISO VIEW ISO VIEW ISO VIEW
18
23
19. 2563.0
821.0 821.0 821.0 50.0
2563.0
50.02010.050.0
2160.0
door lock to manuf's
detail
black tinted fixed glass
door panel to manuf's
detail
50mm thick alum. door
frame to manuf's details
2563.0
2160.0
1000.0
2097.0
50.0 900.0 50.0
1000.0
2072.0
2097.0
door knob to manuf's
detail
door hinge to manuf's
detail
50mm thick timber
frame to manuf's details
1000.0 1829.2
30.3 899.7 869.2 30.0
1829.2
30.02280.0
2350.0
door knob to manuf's
detail
door lock to manuf's
detail
30mm thick timber door
frame to manuf's details
door hinge to manuf's
details
door lock to manuf's
details 1829.2
2350.0
1829.2
2350.0
1291.0
40.0 758.0 453.0 40.0
1211.0
1291.0
239.0370.0370.0370.0370.0204.3
2118.3
2158.3
door hinge to manuf's
details
40mm thick timber door
frame to manuf's details
door lock to manuf's
detail
1291.0
2158.3
1215.0
2660.0
45.0 540.5 539.5 45.0
1215.0
593.01415.0575.0
2051.0
2660.0
door hinge to manuf's
details
fixed louvered window
to manuf's details
45mm thick timber window
frame to manuf's details
4mm thick fixed glass panel
with wire mesh protection
to manuf's details
door lock to manuf's detail
door lock to manuf's detail
30mm thick timber door
frame to manuf's details
1215.0
965.0
2110.0
DN 10
965.0
30.0 905.0 30.0
965.0
2070.0
2110.0
door knob to manuf's
detail
door hinge to manuf's
detail
30mm thick timber
frame to manuf's details
29.7 905.0 30.0
965.0
2070.0
2110.0
door knob to manuf's
detail
door hinge to manuf's
detail
30mm thick timber
frame to manuf's details
DN 10
965.0
965.0
2110.0
1829.2
30.0 869.2 899.7 30.3
1768.9
1829.2
30.02280.0
2350.0
door knob to manuf's
detail
door lock to manuf's
detail
30.3mm thick timber door
frame to manuf's details
door hinge to manuf's
details
door lock to manuf's
details
DRAWING NO.:
SHEET NO.:
E / 02
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- DOOR SCHEDULE
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
02.03.2017
1:20
LOO YEE PEI (0329 148) , BENJAMIN TAN ZI HERN (0324 857)
LOO YEE PEI (0329 148)
-
-
Glass sliding door with aluminum frame
D15 Location: Main entrance to the old museum
Quantity: 01
Size: (H)2160mm x (W)2563mm
ELEVATION
PLAN
ISO VIEW
ELEVATION
PLAN
ISO VIEW
Glass sliding door with aluminum frame
D16 Location: Manager office C
Quantity: 01
Size: (H)2097mm x (W)1000mm
ELEVATION
PLAN
ISO VIEW
Timber door with timber frame
D17 Location: Utility room A
Quantity: 01
Size: (H)2350mm x (W)1829.2mm
Timber door with timber frame
D18 Location: Utility room B
Quantity: 01
Size: (H)2350mm x (W)1829.2mm
Timber door with timber frame
D19 Location: Utility room A
Quantity: 01
Size: (H)2158.3mm x (W)1291mm
ISO VIEW
ELEVATION
PLAN
ELEVATION
PLAN
ISO VIEW
ELEVATION
PLAN
ISO VIEW
Timber door with timber frame
D20
Location: Linked bridge to the
toilet tower
Quantity: 01
Size: (H)2660mm x (W)1215mm
ELEVATION
PLAN
ISO VIEW
Timber door with timber frame
D21 Location: Utility room C
Quantity: 01
Size: (H)2110mm x (W)965mm
Timber door with timber frame
D22 Location: Pantry room
Quantity: 01
Size: (H)2110mm x (W)965mm
ELEVATION
PLAN
ISO VIEW
19
23
20. MANAGER OFFICE B
F.F.L. ± 0.230m
W18
01
W21
01
W20
01
W1
01
W19
01
1
2
3
5
4
6
7
8
9
13
14
15
17
16
18
19
20
21
22
23
24
2
1
3
4
5
6
8
7
9
13
14
W22
01
OPEN OFFICE AREA
UPUP
9470.4
2730.4
258.0
148.0
2006.0
1490.0
2183.4
3370.03370.0
01
W24
MANAGER OFFICE C
F.F.L. ± 3.620mW24
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1
2
3
4
5
6
7
8
9
10
11
12
13
14
01
W30
01
W29
01
W31
01
W10
LIVING AREA
DN DN
Detail B
1568.8
2006.0
1070.0484.0
250.0
150.0
3193.8
2149.5
298.7
Detail A
10mm x 10mm ceramic tiles
r.c concrete
steel ornaments structure
timber railing
r.c concrete
577.1386.6102.2
DRAWING NO.:
SHEET NO.:
E / 03
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- STAIRCASE DETAILS
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
03.03.2017
AS SHOWN
LOO YEE PEI (0329 148) , CHONG JIA YI (0320 869) , CHANG MAY CHEN (0322 636)
LOO YEE PEI (0329 148)
-
-
STAIRCASE ISOMETRIC VIEWE
03 SCALE: 1:25
GROUND FLOOR PLANE
03 SCALE: 1:50
FIRST FLOOR PLANE
03 SCALE: 1:50
Staircase sectionE
03 SCALE: 1:25
E
03 SCALE: 1:5
Detail A
E
03 SCALE: 1:10
Detail BE
03 SCALE: 1:10
Railing Detail
20
23
21. Detail B
Detail A
ridge tiles
ridge board
collar tie
100mm thick post
70mm thick rafter
50mm x 50mm thick batten
clay roof tiles to manuf's detail
rafter
50mm x 50mm thick batten
clay roof tiles to manus'f detail
metal connector
rafter tie
ceiling joist
beam
fascia board
DRAWING NO.:
SHEET NO.:
E / 04
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- ROOF DETAILS
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
04.03.2017
AS SHOWN
LOO YEE PEI (0329 148) , CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633) , TEO KUO CHIEN (0320 195)
LOO YEE PEI (0329 148)
-
-
Roof Exploded Isometric View AE
04 SCALE: 1:75
Roof Exploded Isometric View BE
04 SCALE: 1:50
Roof Exploded Isometric View CE
04 SCALE: 1:25
DETAIL AE
04 SCALE: 1:10
DETAIL BE
04 SCALE: 1:10
21
23
22. 460mm x 460mm x 120mm
r.c column
Ø206.4mm r.c column
Ø114.6mm timber column
460.0 460.0
120.0
4419.6909.0
50mm thk. timber panel
to engr. details
30mm thk. timber panel
to engr. details
semi transparent louvered
window with aluminum frame
210.0EQEQ
50.050.0
650.0
2789.03410.42717.8
EQEQ210.0
650.0
1465.32717.81206.4
50.050.0
2538.6
1006.1
2538.6
1006.1
2529.3
1002.4
2538.6
1006.1
2538.6
1006.1
2553.8
1006.1
1829.0
1183.4
460.0
460.0
R114.6
R206.4
2815.8
1157.9
747.9
2815.8
1158.2
750.0
1565.3
535.0
2371.0
403.6
464.6
2815.8
303.7
409.4
492.4
2020.0
740.0
810.0
1750.0
540.0
2047.0
100.0100.0
2815.9
768.0
4865.0
43°
2298.5
DRAWING NO.:
SHEET NO.:
E / 05
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- COLUMN AND ORNAMENTS DETAILS
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
03.03.2017
AS SHOWN
LOO YEE PEI, CHONG WEN BIN, CHONG JIA YI, CHANG MAY CHEN, WEE SUE WEN, CHIA KEH CHIAN, NIK AHMAD MUNAWWAR, CHLOE TEH.SHU ERN, SHUM LI SZE
LOO YEE PEI (0329 148)
-
-
EXPLODED ISOMETRIC VIEWE
05 SCALE: 1:25
ORNAMENTATION ELEVATION (EAST ELEVATION)E
05 SCALE: 1:20
ORNAMENTATION ELEVATION (NORTH & SOUTH ELEVATION)E
05 SCALE: 1:20
INTERIOR ORNAMENTATIONE
05 SCALE: 1:20
WINDOW ORNAMENTATIONE
05 SCALE: 1:10
COLUMN TOP VIEWE
05 SCALE: 1:10
EXTERIOR ORNAMENTATION AE
05 SCALE: 1:20
EXPLODED ISOMETRIC VIEWE
05 SCALE: 1:10
EXTERIOR ORNAMENTATION BE
05 SCALE: 1:20
EXTERIOR ORNAMENTATION BE
05 SCALE: 1:20
ROOF ORNAMENTATIONE
05 SCALE: 1:25
EXPLODED ROOF ORNAMENTATIONE
05 SCALE: 1:25
22
23
23. 02
DN 10DN 10
FEMALE WASHROOM
F.F.L. ± 0.165m
MALE WASHROOM
F.F.L. ± 0.165m
D3
02
D2
01
D5
04
D5
03
D4D4
01W9
01
W10
01
W10
02
W10
03
W10
04
W9
02
E1
A
E3
C
E3
C
B
E2
B
E2
E1
A
SECTION A-A
150mm thick brick
wall with plastering
on both side
410mm (H) x 610mm
(W) top hang window
with timber frame to
manuf's details
2092mm (H) plastic
door with timber
frame to manuf's
details
02
D4
01
W9
SECTION D-D
150mm thick brick
wall with plastering
on both side
108mm (H) x
108mm (W) ceramic
tiles
01
D4
02
D4
01
D5
02
D5
225mm x 225mm
timber column to
eng's details
150mm thick brick
wall with plastering
on both side
2047mm (H) timber
door to manuf's
details
02
D3
01
D2
E
06
LAYPUT PLAN
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
E/06
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- TOILET SCHEDULE
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
05.03.2017
1:50
LOW CHI YIN (0329 147)
NIK AHMAD MUNAWWAR BIN NIK DIN (0325167)
LOW CHI YIN (0329 147), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
E
06
SECTION A-A
SCALE: 1:20
E
06
SECTION B-B
SCALE: 1:20
E
06
SECTION C-C
SCALE: 1:20
23
23
24. 50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
915.01925.0
100.01735.090.0
586.0 596.0 583.0 580.0 30.0
1182.0 1163.0
F.F.L
2434.0
0.4342
2434.0
1925.0
2427.0
1925.0
2427.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
587.0 581.0 584.0 583.0 30.0
32.0 1168.0 1167.0
2427.0
90.01735.0100.0
1925.0915.0
F.F.L
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
36.0
585.0 583.0 585.0 585.0 29.0
1168.0 1170.0
2432.0
915.01925.0
100.01735.090.0
F.F.L
2432.0
2432.0
1925.0
2417.0
1925.0
2417.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
37.0
626.0 545.5 586.0 561.0 30.0
1171.5 1147.0
2417.0
100.01735.090.0
1925.0915.0
F.F.L
37.0
583.0 582.0 582.0 583.0 35.0
1165.0 1165.0
2437.0
90.01735.0100.0
915.01925.0
F.F.L
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
2437.0
2437.0
1925.0
1837.0
1305.0
1837.0
1020.01305.0
133.0133.0EQEQEQEQEQEQEQ
545.0 572.0 545.0
1837.0
32.0 32.0
35.0
F.F.L
23mm thick steel frame
to manuf's details
12mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
23mm thick steel frame
to manuf's details
12mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
545.0 572.0 545.0
32.0 32.0
29.0
1831.0
133.0133.0EQEQEQEQEQEQEQ
1020.01305.0
F.F.L
1831.0
1305.0
1831.0
1934.6
2054.6
60.0
1831.0
1305.0
1061.31305.0
EQ12.0EQEQEQEQEQEQEQ145.0
567.0 604.9 571.9
1934.6
23mm thick steel frame
to manuf's details
12mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
F.F.L
410.0
1800.0
2414.0
15mm thick steel frame
to manuf's details
15.0570.0570.0570.0
322.020.030.0
steel alloy adj. friction stay
fastener with security locks
F.F.L
1800.0
410.0
1800.0
DRAWING NO.:
SHEET NO.:
E / 01
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- WINDOW SCHEDULE
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
03.03.2017
1:20
LOO YEE PEI (0329 148) , CHONG WEN BIN (0327 442), CHANG MAY CHEN (0322 636) , CHONG JIA YI (0320 869)
LOO YEE PEI (0329 148)
-
-
4 panels casement louvered window with
timber frame
W1 Location: Manager office A
Quantity: 01
Size: (H)1925mm x (W)2434mm
ELEVATION
PLAN
ISO VIEW
W2
ELEVATION
PLAN
ISO VIEW
4 panels casement louvered window with
timber frame
Location: Manager office A-B
Quantity: 01
Size: (H)1925mm x (W)2427mm
ELEVATION
PLAN
ISO VIEW
W3
4 panels casement louvered window with
timber frame
Location: Manager office B
Quantity: 01
Size: (H)1925mm x (W)2432mm
4 panels casement louvered window with
timber frame
W4 Location: Open office area
Quantity: 01
Size: (H)1925mm x (W)2417mm
4 panels casement louvered window with
timber frame
W5 Location: Open office area
Quantity: 01
Size: (H)1925mm x (W)2437mm
Semi transparent louvered window with aluminum frame
W6 Location: Documents storage room
Quantity: 01
Size: (H)1305mm x (W)1837mm
Semi transparent louvered window with aluminum frame
W7 Location: Documents storage room
Quantity: 01
Size: (H)1305mm x (W)1831mm
Semi transparent louvered window with aluminum frame
W8 Location: Documents storage room & Office C
Quantity: 04
Size: (H)1305mm x (W)1934.6mm
Top hung window with powder coated black aluminum frame
W9 Location: Male & female washroom
Quantity: 02
Size: (H)410mm x (W)1800mm
ELEVATION
ELEVATION ELEVATION
ELEVATION ELEVATION
ELEVATION
ISO VIEW
ISO VIEW
ISO VIEW
ISO VIEW
ISO VIEW
ISO VIEW
13