QUANTITY 
SURVEYOR 
World of Numbers 
Discover Role 
of Quantity 
Surveyor 
! 
! 
✓ Procurement 
✓Contractual 
✓Project Cost Management
Interviewee Personal Profile 
Madam Thong Siew Yuk 
Nationality: Malaysian 
! 
Tertiary Education 
1891-1991 
• Heriot-watt University, 
Edinburgh, United 
Kingdom Qualification ! 
Qualification 
1995 
• Member of Board of 
Quantity Surveyors, 
Malaysia (Registration 
no. 1049) 
• Member of Institution 
of Surveyors, Malaysia 
(MISM No. M1917) ! 
Madam Tang has 12years of varied 
experience in all aspect of Quantity 
Surveying and Contract Administration 
in both pre and post contract phases 
on Building 
Company Profile 
Perunding Ukur Bahan TSY (2003/FS00341) 
No.2 Jalan Tasik 3 , Taman tasik Damai, 
Sungai Besi, 57000 Kuala Lumpur 
Email: perundingtsy@gmail.com 
! 
Perunding Ukur Bahan TSY, a sole proprietor 
Quantity Surveying and Construction Cost 
Consultant Firm began its operation in April 
2003 with a team of energetic dynamic and 
enthusiastic professionals.
VERAM SUPRA 
Spatium quaeque DELAPSUS MAJORQUE 
Obfirmata quibusnam AC INQUIRERE Spatium quaeque HOMINEM HOC Mea faciliorem Completed Project 
10 
Project Title Client Value 
Phase 1 (Shoplot) 
Perniagaan Usaha 
at Bandar Baru 
Jalih Sdn Bhd 
Seberang Jelai, 
Kuala Lipis, Pahang 
RM 6M !! 
6 Unit Banglo at 
Kenny Hill, KL 
Dermaga Hayatt 
Sdn Bhd 
RM 13M 
Refurbishment , 
Restoration & 
Renovation of the 
89 units Apartment 
at Ukay Height, KL 
Medallion Venture 
Sdn Bhd 
RM 23M 
Mixed Development 
at Ulu Kelang 
Panorama Skyline 
SdnBhd 
RM 350M ! 
Lutheran Church at 
Jalan Duta Kiara 
Letheran Church at 
Malaysia and 
Singapore 
RM 7M
QUANTITY 
SURVEYOR 
INTRODUCTION 
Quantity surveyor (QS) represents 
important role in the construction, 
project management and estimate the 
total cost. It’s importance is not less 
than architect or civil. 
QS’s works depend on 
calculate the quantities of 
materials, contraction cost 
estimating and project 
management until the end. QS will study drawing that 
provided by architect. Through 
the information, QS can 
calculate the quantities of 
materials needed to build.
Overview of QS Work 
QS play a role of undertake to accurately forecast the 
economic implications of very design decisions, closely 
monitoring the agreed budget and guiding the project 
through the financial complexities to steer an important 
project toward successful completion. 
Inception Stage 
Feasibility Study and Economic Analysis 
Preliminary Estimates 
Cost Planing 
Pre- Contract Stage 
Preparation of Bills of Quantity 
Conditions of Contract 
Tender Evaluation/ Appraisal 
Post Contract Stage 
Contract Administration 
Cost Control 
Valuation for Interim Payment
For those who wanted to become aQS, they need a 
degree or professional qualification from university or 
college that is accredited by Royal Institude of Chartered 
Surveyors(RICS) and for Malaysian, they must be a Malaysia, 
holds a qualification in quantity surveying recognised by the 
Board, passed the required elective subject (if required) and 
fulfills any condition that are set up by Board of Quantity 
HOW TO 
BECOME A 
SUCCESS 
QUANTITY 
SURVEYOR 
Who need the quantity surveyor? 
A quantity surveyor 
works with contractor 
or client, they need to 
work in the office and 
contraction site.
Pre-Contact Stage 
i. Verify and review tender 
drawings and documentations 
ii. Liaise with consultant 
iii. Prepare quantities 
(BOQ)based on the pricing of 
tender with description 
iv. Analysis and evaluate the 
preliminary appraisal of labours, 
materials and others (Fixed and 
Variable)
v. Help project manager (PM) to 
provide cost plan for main 
contractor 
vi. Receive, Compare and 
analysis the tenders 
based on budget 
vii. Prepare report and 
recommendations for 
client to approve
Roles of Quantity Surveyor 
during Post- Contract Stage 
Meeting with project team and 
clients of the projects 
Progress on site 
Preparing and compiling variation 
claims documents according to the 
satisfaction of clients
Prepare financial statement 
Visit the site to prepare the final 
accounts and updated to the clients 
with projection of cost as required
CONTRACT AND 
CONSTRACT LAW OF 
A QUANTITY 
SURVEYOR 
• A contract law is legally binding 
agreement between two parties 
which includes specific details of the service provided, acceptance, 
consideration (in terms of time quality and cost) and the objective 
• Quantity surveyor makes 4 main contracts during the process 
of a project. During the contract, the QS advice the client on 
the type of project, quality, speed, risk and price certainly which 
will be the most appropriate form of building procurement. 
• The four main contracts are: 
I. 
They plain the contract coast 
II. 
Creates BOQ to reduce waste material 
III. 
They manage the contracts 
IV. 
Keeps projects on time and budget 
• Bill of Quantity is the type of drawing they use in order to 
produce accurate and detailed tender documents 
• Quantity surveyors use quantity surveying and 
estimating software in order to make the BOQ smooth 
and accurate
EDITOR: CHONG CHIN PIN 
0319595 
INTERVIEWER: TANG CHIA LOO 
0321414 
GROUP MEMBERS: AUDREY TING MING FANG 
0320247 
AISHATH HUSSAIN 
0320429 
NUR IMAN BIN MOHD ZAHARI 
0321736 
CHAREL FERNANDO 
0320106 
AHMED ALI KARAMA SENAN 
0320478 
REFERENCE: 
Special thanks for Madam Thong Siew Yuk 
(interviewee)that she allowed us to make an 
interview so we can make a magazine about 
Quantity Surveyor successfully. Thank You!!! 
http://www.mnpcqs.com/assets/mainmenu/4/editor/ 
SERVICES_English.pdf! !h 
ttp://www.bayt.com/en/job/quantity-surveyor-estimator- 
pre-%26-post-contract-in-qatar-1791085/! !h 
ttp://www.apuc-scot.ac.uk/uploads/Docs/pdf/Guide 
%20to%20Procuring%20Construction%20Projects 
%2029-6-11.pdf! !http://www.multiproject.org/multiproject_guides/ 
multiproject_guides/multiproject_guides/no_5.html! !h 
ttp://rachaeltate.hubpages.com/hub/Quantity- 
Surveying-Practice-and-Procedure#slide9220582! !h 
ttps://community.dynamics.com/nav/b/

More Related Content

What's hot

Quantity surveying course
Quantity surveying courseQuantity surveying course
Quantity surveying course
TalhaMalik58
 
Quantity surveying practise
Quantity surveying practiseQuantity surveying practise
Quantity surveying practise
Sasi Cool
 
Pp2 final report
Pp2 final reportPp2 final report
Pp2 final report
Pui Chun Shian
 
PP1 report
PP1 reportPP1 report
PP1 report
Doreen Yeo
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
ayushida
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
Vj NiroSh
 
The architect as contract administrator a legal perspective - presentation ...
The architect as contract administrator   a legal perspective - presentation ...The architect as contract administrator   a legal perspective - presentation ...
The architect as contract administrator a legal perspective - presentation ...Zainab Zainordin
 
Quantity take off
Quantity take offQuantity take off
Quantity take off
Jawad Ahmad Baig
 
Quantity Surveyors (Practice)
Quantity Surveyors (Practice)Quantity Surveyors (Practice)
Quantity Surveyors (Practice)
Unais Mohamed Aliyar
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
lizwi nyandu
 
Payments in the construction industry
Payments in the construction industryPayments in the construction industry
Payments in the construction industry
Kheng Hoe Advocates
 
Quantity surveying course
Quantity surveying courseQuantity surveying course
Quantity surveying course
Javid Hussain
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveyingAwanish Shukla
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1
Timun Loh
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
Timun Loh
 
An introduction to taking off building quantities
An introduction to taking off building quantities An introduction to taking off building quantities
An introduction to taking off building quantities
Arshad Mohanut
 
Practice for Quantity Surveyors
Practice for Quantity SurveyorsPractice for Quantity Surveyors
Practice for Quantity Surveyors
Dar Al Riyadh Consultancy
 
Site engineer duties
Site engineer dutiesSite engineer duties
Site engineer duties
getmar2
 

What's hot (20)

Quantity surveying course
Quantity surveying courseQuantity surveying course
Quantity surveying course
 
Quantity surveying practise
Quantity surveying practiseQuantity surveying practise
Quantity surveying practise
 
Pp2 final report
Pp2 final reportPp2 final report
Pp2 final report
 
PP1 report
PP1 reportPP1 report
PP1 report
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
 
The architect as contract administrator a legal perspective - presentation ...
The architect as contract administrator   a legal perspective - presentation ...The architect as contract administrator   a legal perspective - presentation ...
The architect as contract administrator a legal perspective - presentation ...
 
Quantity take off
Quantity take offQuantity take off
Quantity take off
 
Quantity Surveyors (Practice)
Quantity Surveyors (Practice)Quantity Surveyors (Practice)
Quantity Surveyors (Practice)
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
Payments in the construction industry
Payments in the construction industryPayments in the construction industry
Payments in the construction industry
 
Quantity surveying course
Quantity surveying courseQuantity surveying course
Quantity surveying course
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 
An introduction to taking off building quantities
An introduction to taking off building quantities An introduction to taking off building quantities
An introduction to taking off building quantities
 
Practice for Quantity Surveyors
Practice for Quantity SurveyorsPractice for Quantity Surveyors
Practice for Quantity Surveyors
 
5.1 quantity take-off
5.1 quantity take-off5.1 quantity take-off
5.1 quantity take-off
 
Site engineer duties
Site engineer dutiesSite engineer duties
Site engineer duties
 

Viewers also liked

50639312 roll-of-quantity-surveyor
50639312 roll-of-quantity-surveyor50639312 roll-of-quantity-surveyor
50639312 roll-of-quantity-surveyor
hlksd
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing bookThomas Britto
 
Godrej MEP Design Consultancy Services
Godrej MEP Design Consultancy ServicesGodrej MEP Design Consultancy Services
Godrej MEP Design Consultancy Services
Godrej Green Building Consultancy
 
Ibe quantity surveyor 2013
Ibe quantity surveyor 2013Ibe quantity surveyor 2013
Ibe quantity surveyor 2013nurun2010
 
Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014
Felix Vong
 
MEP- Building services
MEP- Building servicesMEP- Building services
MEP- Building services
Aniket Khandelwal
 
Building Services Electrical (MEP)
Building Services Electrical (MEP)Building Services Electrical (MEP)
Building Services Electrical (MEP)
Manoj Mawle
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction Work
Daniel Ross
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantitiesBt Lee
 
Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement Guide
Tender Process
 
Ici itd qs project 1
Ici itd qs project 1Ici itd qs project 1
Ici itd qs project 1
Daniel Tan
 
Ici project 1b
Ici project 1bIci project 1b
Ici project 1b
Cherilyn Chia
 
FNBE 0414 ICI Project 2 Magazine
FNBE 0414 ICI Project 2 MagazineFNBE 0414 ICI Project 2 Magazine
FNBE 0414 ICI Project 2 Magazine
Tan Jaden
 
Presentation1
Presentation1Presentation1
Presentation1iManySusu
 
Ici magazine
Ici magazineIci magazine
Ici magazine
Cherilyn Chia
 
Catherine Barnard
Catherine Barnard Catherine Barnard
Catherine Barnard
Arenagruppen
 
Tuladhar
TuladharTuladhar
Tuladharhlksd
 
Costestimating 110323025231-phpapp02
Costestimating 110323025231-phpapp02Costestimating 110323025231-phpapp02
Costestimating 110323025231-phpapp02
hlksd
 

Viewers also liked (20)

50639312 roll-of-quantity-surveyor
50639312 roll-of-quantity-surveyor50639312 roll-of-quantity-surveyor
50639312 roll-of-quantity-surveyor
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
 
Godrej MEP Design Consultancy Services
Godrej MEP Design Consultancy ServicesGodrej MEP Design Consultancy Services
Godrej MEP Design Consultancy Services
 
Ibe quantity surveyor 2013
Ibe quantity surveyor 2013Ibe quantity surveyor 2013
Ibe quantity surveyor 2013
 
Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014
 
MEP- Building services
MEP- Building servicesMEP- Building services
MEP- Building services
 
Building Services Electrical (MEP)
Building Services Electrical (MEP)Building Services Electrical (MEP)
Building Services Electrical (MEP)
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction Work
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 
Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement Guide
 
Ici itd qs project 1
Ici itd qs project 1Ici itd qs project 1
Ici itd qs project 1
 
Ici project 1b
Ici project 1bIci project 1b
Ici project 1b
 
FNBE 0414 ICI Project 2 Magazine
FNBE 0414 ICI Project 2 MagazineFNBE 0414 ICI Project 2 Magazine
FNBE 0414 ICI Project 2 Magazine
 
Name card
Name cardName card
Name card
 
Presentation1
Presentation1Presentation1
Presentation1
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 
Catherine Barnard
Catherine Barnard Catherine Barnard
Catherine Barnard
 
Letter head
Letter headLetter head
Letter head
 
Tuladhar
TuladharTuladhar
Tuladhar
 
Costestimating 110323025231-phpapp02
Costestimating 110323025231-phpapp02Costestimating 110323025231-phpapp02
Costestimating 110323025231-phpapp02
 

Similar to QUANTITY SURVEYOR magazine

00. Presentation QS0005.pptx
00. Presentation QS0005.pptx00. Presentation QS0005.pptx
00. Presentation QS0005.pptx
BimsaraRotaract
 
Company profile
Company profileCompany profile
Company profileZIyeeTan
 
Curriculum vitae h.a.p.k.hettiarachchi
Curriculum vitae h.a.p.k.hettiarachchiCurriculum vitae h.a.p.k.hettiarachchi
Curriculum vitae h.a.p.k.hettiarachchi
pradeep hettiarachchi
 
Curriculum vitae-H.A.P.K.Hettiarachchi
Curriculum vitae-H.A.P.K.HettiarachchiCurriculum vitae-H.A.P.K.Hettiarachchi
Curriculum vitae-H.A.P.K.Hettiarachchipradeep hettiarachchi
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi tttDhana Lakshmi
 
Peter W. Kigo - Drilling Cost Engineer - CV1
Peter W. Kigo - Drilling Cost Engineer - CV1Peter W. Kigo - Drilling Cost Engineer - CV1
Peter W. Kigo - Drilling Cost Engineer - CV1Waweru Kigo
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi tttDhana Lakshmi
 
CV Herry Bachruddin - 07 February 2015
CV Herry Bachruddin - 07 February 2015CV Herry Bachruddin - 07 February 2015
CV Herry Bachruddin - 07 February 2015Herry Bachruddin
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiMd Mehadi Hasan
 
RESUME ZAWIAHTUL AKMA BT ZULKIFLI
RESUME ZAWIAHTUL AKMA BT ZULKIFLIRESUME ZAWIAHTUL AKMA BT ZULKIFLI
RESUME ZAWIAHTUL AKMA BT ZULKIFLIZAWIAHTUL AKMA
 
Jocelyn E Macasieb1 March 2015
Jocelyn E Macasieb1 March 2015Jocelyn E Macasieb1 March 2015
Jocelyn E Macasieb1 March 2015Jocelyn Macasieb
 
Ici magazine
Ici magazineIci magazine
Ici magazine
Chan Yifung
 

Similar to QUANTITY SURVEYOR magazine (20)

CV Kamal (terkini) apply Pr1ma
CV Kamal (terkini) apply Pr1maCV Kamal (terkini) apply Pr1ma
CV Kamal (terkini) apply Pr1ma
 
Munsif CV
Munsif CVMunsif CV
Munsif CV
 
00. Presentation QS0005.pptx
00. Presentation QS0005.pptx00. Presentation QS0005.pptx
00. Presentation QS0005.pptx
 
Company profile
Company profileCompany profile
Company profile
 
Curriculum vitae h.a.p.k.hettiarachchi
Curriculum vitae h.a.p.k.hettiarachchiCurriculum vitae h.a.p.k.hettiarachchi
Curriculum vitae h.a.p.k.hettiarachchi
 
Curriculum vitae-H.A.P.K.Hettiarachchi
Curriculum vitae-H.A.P.K.HettiarachchiCurriculum vitae-H.A.P.K.Hettiarachchi
Curriculum vitae-H.A.P.K.Hettiarachchi
 
Safnas_QS_Resume
Safnas_QS_ResumeSafnas_QS_Resume
Safnas_QS_Resume
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
 
Peter W. Kigo - Drilling Cost Engineer - CV1
Peter W. Kigo - Drilling Cost Engineer - CV1Peter W. Kigo - Drilling Cost Engineer - CV1
Peter W. Kigo - Drilling Cost Engineer - CV1
 
mohamed munsif
mohamed munsifmohamed munsif
mohamed munsif
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
 
111
111111
111
 
CV Herry Bachruddin - 07 February 2015
CV Herry Bachruddin - 07 February 2015CV Herry Bachruddin - 07 February 2015
CV Herry Bachruddin - 07 February 2015
 
PROFILE BALAKRISHNAN
PROFILE BALAKRISHNANPROFILE BALAKRISHNAN
PROFILE BALAKRISHNAN
 
Resume Mohan
Resume MohanResume Mohan
Resume Mohan
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
 
CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015
 
RESUME ZAWIAHTUL AKMA BT ZULKIFLI
RESUME ZAWIAHTUL AKMA BT ZULKIFLIRESUME ZAWIAHTUL AKMA BT ZULKIFLI
RESUME ZAWIAHTUL AKMA BT ZULKIFLI
 
Jocelyn E Macasieb1 March 2015
Jocelyn E Macasieb1 March 2015Jocelyn E Macasieb1 March 2015
Jocelyn E Macasieb1 March 2015
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 

More from Chong Chin Pin

Studio 6 site analysis
Studio 6 site analysisStudio 6 site analysis
Studio 6 site analysis
Chong Chin Pin
 
Sem 6 studio report
Sem  6 studio reportSem  6 studio report
Sem 6 studio report
Chong Chin Pin
 
Theories
TheoriesTheories
Theories
Chong Chin Pin
 
B. science
B. scienceB. science
B. science
Chong Chin Pin
 
Building Science Auditorium Report
Building Science Auditorium ReportBuilding Science Auditorium Report
Building Science Auditorium Report
Chong Chin Pin
 
B. tech
B. tech B. tech
B. tech
Chong Chin Pin
 
Btech report
Btech reportBtech report
Btech report
Chong Chin Pin
 
Case Study of Building Service in Public buildings
Case Study of Building Service in Public buildingsCase Study of Building Service in Public buildings
Case Study of Building Service in Public buildings
Chong Chin Pin
 
Diary Report
Diary ReportDiary Report
Diary Report
Chong Chin Pin
 
2.3, 3(2) print 2 copies
2.3, 3(2) print 2 copies2.3, 3(2) print 2 copies
2.3, 3(2) print 2 copies
Chong Chin Pin
 
4.5 (2) print 1 copy
4.5 (2) print 1 copy4.5 (2) print 1 copy
4.5 (2) print 1 copy
Chong Chin Pin
 
4.7.1 (2)
4.7.1 (2)4.7.1 (2)
4.7.1 (2)
Chong Chin Pin
 
Page separateor
Page separateorPage separateor
Page separateor
Chong Chin Pin
 
6.0, 5.1 (2) print 2 copies copy
6.0, 5.1 (2) print 2 copies   copy6.0, 5.1 (2) print 2 copies   copy
6.0, 5.1 (2) print 2 copies copy
Chong Chin Pin
 
Lof, contents (2)
Lof, contents (2)Lof, contents (2)
Lof, contents (2)
Chong Chin Pin
 
4.2 4.3 (2)
4.2 4.3 (2)4.2 4.3 (2)
4.2 4.3 (2)
Chong Chin Pin
 
4.8 (2)
4.8 (2)4.8 (2)
5.2 (2)
5.2 (2)5.2 (2)
4.6 4.7
4.6 4.74.6 4.7
4.1 (2)
4.1 (2)4.1 (2)

More from Chong Chin Pin (20)

Studio 6 site analysis
Studio 6 site analysisStudio 6 site analysis
Studio 6 site analysis
 
Sem 6 studio report
Sem  6 studio reportSem  6 studio report
Sem 6 studio report
 
Theories
TheoriesTheories
Theories
 
B. science
B. scienceB. science
B. science
 
Building Science Auditorium Report
Building Science Auditorium ReportBuilding Science Auditorium Report
Building Science Auditorium Report
 
B. tech
B. tech B. tech
B. tech
 
Btech report
Btech reportBtech report
Btech report
 
Case Study of Building Service in Public buildings
Case Study of Building Service in Public buildingsCase Study of Building Service in Public buildings
Case Study of Building Service in Public buildings
 
Diary Report
Diary ReportDiary Report
Diary Report
 
2.3, 3(2) print 2 copies
2.3, 3(2) print 2 copies2.3, 3(2) print 2 copies
2.3, 3(2) print 2 copies
 
4.5 (2) print 1 copy
4.5 (2) print 1 copy4.5 (2) print 1 copy
4.5 (2) print 1 copy
 
4.7.1 (2)
4.7.1 (2)4.7.1 (2)
4.7.1 (2)
 
Page separateor
Page separateorPage separateor
Page separateor
 
6.0, 5.1 (2) print 2 copies copy
6.0, 5.1 (2) print 2 copies   copy6.0, 5.1 (2) print 2 copies   copy
6.0, 5.1 (2) print 2 copies copy
 
Lof, contents (2)
Lof, contents (2)Lof, contents (2)
Lof, contents (2)
 
4.2 4.3 (2)
4.2 4.3 (2)4.2 4.3 (2)
4.2 4.3 (2)
 
4.8 (2)
4.8 (2)4.8 (2)
4.8 (2)
 
5.2 (2)
5.2 (2)5.2 (2)
5.2 (2)
 
4.6 4.7
4.6 4.74.6 4.7
4.6 4.7
 
4.1 (2)
4.1 (2)4.1 (2)
4.1 (2)
 

Recently uploaded

Announcement of 18th IEEE International Conference on Software Testing, Verif...
Announcement of 18th IEEE International Conference on Software Testing, Verif...Announcement of 18th IEEE International Conference on Software Testing, Verif...
Announcement of 18th IEEE International Conference on Software Testing, Verif...
Sebastiano Panichella
 
0x01 - Newton's Third Law: Static vs. Dynamic Abusers
0x01 - Newton's Third Law:  Static vs. Dynamic Abusers0x01 - Newton's Third Law:  Static vs. Dynamic Abusers
0x01 - Newton's Third Law: Static vs. Dynamic Abusers
OWASP Beja
 
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
OECD Directorate for Financial and Enterprise Affairs
 
Doctoral Symposium at the 17th IEEE International Conference on Software Test...
Doctoral Symposium at the 17th IEEE International Conference on Software Test...Doctoral Symposium at the 17th IEEE International Conference on Software Test...
Doctoral Symposium at the 17th IEEE International Conference on Software Test...
Sebastiano Panichella
 
somanykidsbutsofewfathers-140705000023-phpapp02.pptx
somanykidsbutsofewfathers-140705000023-phpapp02.pptxsomanykidsbutsofewfathers-140705000023-phpapp02.pptx
somanykidsbutsofewfathers-140705000023-phpapp02.pptx
Howard Spence
 
International Workshop on Artificial Intelligence in Software Testing
International Workshop on Artificial Intelligence in Software TestingInternational Workshop on Artificial Intelligence in Software Testing
International Workshop on Artificial Intelligence in Software Testing
Sebastiano Panichella
 
Obesity causes and management and associated medical conditions
Obesity causes and management and associated medical conditionsObesity causes and management and associated medical conditions
Obesity causes and management and associated medical conditions
Faculty of Medicine And Health Sciences
 
Eureka, I found it! - Special Libraries Association 2021 Presentation
Eureka, I found it! - Special Libraries Association 2021 PresentationEureka, I found it! - Special Libraries Association 2021 Presentation
Eureka, I found it! - Special Libraries Association 2021 Presentation
Access Innovations, Inc.
 
Acorn Recovery: Restore IT infra within minutes
Acorn Recovery: Restore IT infra within minutesAcorn Recovery: Restore IT infra within minutes
Acorn Recovery: Restore IT infra within minutes
IP ServerOne
 
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
Orkestra
 
Getting started with Amazon Bedrock Studio and Control Tower
Getting started with Amazon Bedrock Studio and Control TowerGetting started with Amazon Bedrock Studio and Control Tower
Getting started with Amazon Bedrock Studio and Control Tower
Vladimir Samoylov
 
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdfBonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
khadija278284
 
Bitcoin Lightning wallet and tic-tac-toe game XOXO
Bitcoin Lightning wallet and tic-tac-toe game XOXOBitcoin Lightning wallet and tic-tac-toe game XOXO
Bitcoin Lightning wallet and tic-tac-toe game XOXO
Matjaž Lipuš
 

Recently uploaded (13)

Announcement of 18th IEEE International Conference on Software Testing, Verif...
Announcement of 18th IEEE International Conference on Software Testing, Verif...Announcement of 18th IEEE International Conference on Software Testing, Verif...
Announcement of 18th IEEE International Conference on Software Testing, Verif...
 
0x01 - Newton's Third Law: Static vs. Dynamic Abusers
0x01 - Newton's Third Law:  Static vs. Dynamic Abusers0x01 - Newton's Third Law:  Static vs. Dynamic Abusers
0x01 - Newton's Third Law: Static vs. Dynamic Abusers
 
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
 
Doctoral Symposium at the 17th IEEE International Conference on Software Test...
Doctoral Symposium at the 17th IEEE International Conference on Software Test...Doctoral Symposium at the 17th IEEE International Conference on Software Test...
Doctoral Symposium at the 17th IEEE International Conference on Software Test...
 
somanykidsbutsofewfathers-140705000023-phpapp02.pptx
somanykidsbutsofewfathers-140705000023-phpapp02.pptxsomanykidsbutsofewfathers-140705000023-phpapp02.pptx
somanykidsbutsofewfathers-140705000023-phpapp02.pptx
 
International Workshop on Artificial Intelligence in Software Testing
International Workshop on Artificial Intelligence in Software TestingInternational Workshop on Artificial Intelligence in Software Testing
International Workshop on Artificial Intelligence in Software Testing
 
Obesity causes and management and associated medical conditions
Obesity causes and management and associated medical conditionsObesity causes and management and associated medical conditions
Obesity causes and management and associated medical conditions
 
Eureka, I found it! - Special Libraries Association 2021 Presentation
Eureka, I found it! - Special Libraries Association 2021 PresentationEureka, I found it! - Special Libraries Association 2021 Presentation
Eureka, I found it! - Special Libraries Association 2021 Presentation
 
Acorn Recovery: Restore IT infra within minutes
Acorn Recovery: Restore IT infra within minutesAcorn Recovery: Restore IT infra within minutes
Acorn Recovery: Restore IT infra within minutes
 
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
 
Getting started with Amazon Bedrock Studio and Control Tower
Getting started with Amazon Bedrock Studio and Control TowerGetting started with Amazon Bedrock Studio and Control Tower
Getting started with Amazon Bedrock Studio and Control Tower
 
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdfBonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
 
Bitcoin Lightning wallet and tic-tac-toe game XOXO
Bitcoin Lightning wallet and tic-tac-toe game XOXOBitcoin Lightning wallet and tic-tac-toe game XOXO
Bitcoin Lightning wallet and tic-tac-toe game XOXO
 

QUANTITY SURVEYOR magazine

  • 1. October 20, 2014 ISSUE 1RM 5 QUANTITY SURVEYOR World of Numbers Discover Role of Quantity Surveyor ! ! ✓ Procurement ✓Contractual ✓Project Cost Management
  • 2. Interviewee Personal Profile Madam Thong Siew Yuk Nationality: Malaysian ! Tertiary Education 1891-1991 • Heriot-watt University, Edinburgh, United Kingdom Qualification ! Qualification 1995 • Member of Board of Quantity Surveyors, Malaysia (Registration no. 1049) • Member of Institution of Surveyors, Malaysia (MISM No. M1917) ! Madam Tang has 12years of varied experience in all aspect of Quantity Surveying and Contract Administration in both pre and post contract phases on Building Company Profile Perunding Ukur Bahan TSY (2003/FS00341) No.2 Jalan Tasik 3 , Taman tasik Damai, Sungai Besi, 57000 Kuala Lumpur Email: perundingtsy@gmail.com ! Perunding Ukur Bahan TSY, a sole proprietor Quantity Surveying and Construction Cost Consultant Firm began its operation in April 2003 with a team of energetic dynamic and enthusiastic professionals.
  • 3. VERAM SUPRA Spatium quaeque DELAPSUS MAJORQUE Obfirmata quibusnam AC INQUIRERE Spatium quaeque HOMINEM HOC Mea faciliorem Completed Project 10 Project Title Client Value Phase 1 (Shoplot) Perniagaan Usaha at Bandar Baru Jalih Sdn Bhd Seberang Jelai, Kuala Lipis, Pahang RM 6M !! 6 Unit Banglo at Kenny Hill, KL Dermaga Hayatt Sdn Bhd RM 13M Refurbishment , Restoration & Renovation of the 89 units Apartment at Ukay Height, KL Medallion Venture Sdn Bhd RM 23M Mixed Development at Ulu Kelang Panorama Skyline SdnBhd RM 350M ! Lutheran Church at Jalan Duta Kiara Letheran Church at Malaysia and Singapore RM 7M
  • 4. QUANTITY SURVEYOR INTRODUCTION Quantity surveyor (QS) represents important role in the construction, project management and estimate the total cost. It’s importance is not less than architect or civil. QS’s works depend on calculate the quantities of materials, contraction cost estimating and project management until the end. QS will study drawing that provided by architect. Through the information, QS can calculate the quantities of materials needed to build.
  • 5. Overview of QS Work QS play a role of undertake to accurately forecast the economic implications of very design decisions, closely monitoring the agreed budget and guiding the project through the financial complexities to steer an important project toward successful completion. Inception Stage Feasibility Study and Economic Analysis Preliminary Estimates Cost Planing Pre- Contract Stage Preparation of Bills of Quantity Conditions of Contract Tender Evaluation/ Appraisal Post Contract Stage Contract Administration Cost Control Valuation for Interim Payment
  • 6. For those who wanted to become aQS, they need a degree or professional qualification from university or college that is accredited by Royal Institude of Chartered Surveyors(RICS) and for Malaysian, they must be a Malaysia, holds a qualification in quantity surveying recognised by the Board, passed the required elective subject (if required) and fulfills any condition that are set up by Board of Quantity HOW TO BECOME A SUCCESS QUANTITY SURVEYOR Who need the quantity surveyor? A quantity surveyor works with contractor or client, they need to work in the office and contraction site.
  • 7. Pre-Contact Stage i. Verify and review tender drawings and documentations ii. Liaise with consultant iii. Prepare quantities (BOQ)based on the pricing of tender with description iv. Analysis and evaluate the preliminary appraisal of labours, materials and others (Fixed and Variable)
  • 8. v. Help project manager (PM) to provide cost plan for main contractor vi. Receive, Compare and analysis the tenders based on budget vii. Prepare report and recommendations for client to approve
  • 9. Roles of Quantity Surveyor during Post- Contract Stage Meeting with project team and clients of the projects Progress on site Preparing and compiling variation claims documents according to the satisfaction of clients
  • 10. Prepare financial statement Visit the site to prepare the final accounts and updated to the clients with projection of cost as required
  • 11. CONTRACT AND CONSTRACT LAW OF A QUANTITY SURVEYOR • A contract law is legally binding agreement between two parties which includes specific details of the service provided, acceptance, consideration (in terms of time quality and cost) and the objective • Quantity surveyor makes 4 main contracts during the process of a project. During the contract, the QS advice the client on the type of project, quality, speed, risk and price certainly which will be the most appropriate form of building procurement. • The four main contracts are: I. They plain the contract coast II. Creates BOQ to reduce waste material III. They manage the contracts IV. Keeps projects on time and budget • Bill of Quantity is the type of drawing they use in order to produce accurate and detailed tender documents • Quantity surveyors use quantity surveying and estimating software in order to make the BOQ smooth and accurate
  • 12. EDITOR: CHONG CHIN PIN 0319595 INTERVIEWER: TANG CHIA LOO 0321414 GROUP MEMBERS: AUDREY TING MING FANG 0320247 AISHATH HUSSAIN 0320429 NUR IMAN BIN MOHD ZAHARI 0321736 CHAREL FERNANDO 0320106 AHMED ALI KARAMA SENAN 0320478 REFERENCE: Special thanks for Madam Thong Siew Yuk (interviewee)that she allowed us to make an interview so we can make a magazine about Quantity Surveyor successfully. Thank You!!! http://www.mnpcqs.com/assets/mainmenu/4/editor/ SERVICES_English.pdf! !h ttp://www.bayt.com/en/job/quantity-surveyor-estimator- pre-%26-post-contract-in-qatar-1791085/! !h ttp://www.apuc-scot.ac.uk/uploads/Docs/pdf/Guide %20to%20Procuring%20Construction%20Projects %2029-6-11.pdf! !http://www.multiproject.org/multiproject_guides/ multiproject_guides/multiproject_guides/no_5.html! !h ttp://rachaeltate.hubpages.com/hub/Quantity- Surveying-Practice-and-Procedure#slide9220582! !h ttps://community.dynamics.com/nav/b/