International Burch university               Course : Building Construction Technology I
Architecture department                                              Date : xx / xx / xxxx
Sarajevo




                   LECTURE NO.4
           OFFER – TENDRING – PLANNING

                         Building Construction Technology I


  Professor : Prof.dr.Nerman Rustempasic
  Assistant : M.Sc. Ahmed El Sayed
INTRODUCTION
   Offer – tendering and construction site are very important
    themes for every engineer. Without understanding these
    terms and process, a lot of problems will occur such as :
    why we didn’t get this project? Why the other company or
    designers are getting the jobs and not us?

   This kind of questions can be answered if the designer (
    engineer ) learns the realtion between designing and
    winning in tender.

   Without the tenderation there are no projects, which means
    that designers will have no jobs to do.
TENDER OFFER FROM THE CLIENT'S AND
ARCHITECT'S PERSPECTIVE

   Perception of the stages of a construction project often
    varies between the client/architect and the contractor.


   Client and architect are involved in the project for months
    before the actual construction work commences, for a
    contractor however stages of the project include only the
    tender      offer       and       construction       stages.


   Tender procedure, from client’s and architect’s point of view,
    is regulated by NJCC (National Joint Consultative
    Committee for Building).
TENDER OFFER FROM THE CLIENT'S AND
ARCHITECT'S PERSPECTIVE

   Most small projects apply the "Single Stage Selective
    Tendering” which can be characterized in the following way:

       Invitation to tender – the contractors are contacted if they would be
        willing to tender. The enquiry is issued in writing 4-6 weeks before
        the tender and it should contain a brief description of the investment
        and the commencement date.

       Number of contractors tendering – recommended maximum
        number of contractors is 6, with additional in reserve. The limitation
        is due to the fact, that the tenders tend to be expensive and it is
        irresponsible to unnecessarily inflate prices in the construction
                                       industry.
TENDER OFFER FROM THE CLIENT'S AND
ARCHITECT'S PERSPECTIVE

    Tender documentation – the aim of tender documentation all offers
     will be presented on the same basis, so the competition may only be
     about the price. It is assumed that each contractor will complete
     works       in    a     way     specified     in     documentation.

    Time to prepare tender offer – in smaller projects it is usually 3-4
     weeks, in bigger and more complex investments it can take longer.

    Changes in tender documentation – contractors should not make any
     changes. They should instead send an enquiry min. 10 days before
     the tender date. Architect should send a reply to all contractors to
     provide them all the same chances.
TENDER OFFER FROM THE CLIENT'S AND
ARCHITECT'S PERSPECTIVE

   It is often disregarded in practice, due to the short time
    allowed to prepare an estimate or vagueness.

       Withdrawal of the offer – tender offer can be withdrawn by the
        contractor at all times, as long as it has not been chosen by the
        investor. Acceptance of an offer constitutes an agreement between
        the investor and contractor.

       Tender offers analysis – tender offers should be analyzed soon after
        they were returned. After the contract is awarded architect should
        inform all participants about the offers received, without naming the
        companies, which put them forward. Even though it gives contractors
        an insight into competitor’s pricing policy, it is often disregarded.
TENDER OFFER FROM THE CLIENT'S AND
ARCHITECT'S PERSPECTIVE
     Error check – the winning estimate is checked and the erroneous
      calculations are sent back to the contractor. There are two
      procedures to resolve those: "Alternative 1" – where the contractor
      can confirm or withdraw the offer and "Alternative 2" - where the
      contractor can confirm the offer or correct mistakes.

     Price negotiation – procedures allow pricing negotiations leading to
      lowering the prices if the lowest offer exceeds investor’s budget.
BASICS OF COST ESTIMATE PREPARATION

   Preparation of tender offer requires various documentation
    types, as specified by an architect or an investor. They
    involve different terms of settlement and risk.



   Regardless of the type of documentation one should take
    into account costs not directly connected with corresponding
    construction works, e.g. cost of the toilet, on-site safety,
    company standing costs etc. Those costs are usually
    included in the "Preliminaries", at the beginning of the
    estimate.
SPECIFICATION & DRAWINGS

   This type of documentation contains drawings and
    specification; it can also contain a separate scope of works
    to clarify the full costs.

   Contractor is responsible for surveying the works. Any errors
    in measurements and cost estimates will not be taken into
    consideration and the contractor will be required to conduct
    all the works indicated in the documentation, regardless of
    whether they are specified by the scope of work. It means
    that contractor needs to check all documentation carefully,
    since each its element included in any part of
    documentation constitutes part of contract and needs to be
    completed.
BILL OF QUANTITIES

   In case of bigger projects, tender documents often consist of
    "Bill of Quantities" (BoQ). It is a list of all required works
    (with all measurements already made) – the contractor
    needs to provide their rates for each of the works.

   BoQ is prepared by "Quantity Surveyor" employed by the
    investor, according to Standard Method of Measurement -
    SMM.

   The latest version is SMM7, but the smaller project still often
    use.
BILL OF QUANTITIES

   The rates given in BoQ will be used to calculate the cost
    of additional works of the same type during the project,
    it is therefore worth to try to foresee potential additional
    works and raise the rate for the corresponding type of
    works.

   The errors in the BoQ are the liability of the investor – the
    contractor needs to be paid for all works required, even if
    they are erroneous or if some works are omitted. Because
    of that BoQ is not used often anymore.

   If the investor cannot state exact measurements, the
    approximate quantities are applied.
SCHEDULE OF RATES

   "Schedule of Rates" is the list of the rates and it’s used very
    rarely, only in case if the scope of work is impossible to define.

   The contractor is accountable for completed works according to
    the time and agreed hourly or daily rates.

   It is of course an ideal basis for cooperation from contractor's
    point of view, because they are not at any risk and all the
    materials and employees working time is being paid for.

   In case of such cooperation form it is crucial to keep a detailed
    record of time and resources spent during the project. Those are
    necessary to establish the payment and eliminate potential
    conflicts between contractor and investor.
SCHEDULING AND PLANNING CONSTRUCTION
WORKS
   Without proper planning it is difficult to make a construction
    project run smoothly and be completed on time and within
    budget. Of course, smaller and less complex projects very often
    do not have a formulated formal plan or schedule, since all
    planning takes place in manager’s head.

   It is an acceptable solution, however everyone’s perception has
    its limits, and in most cases it is impossible to manage all aspects
    of a months-long project without the use of additional tools. The
    main reasons for planning in construction works can be summed
    up as:
       Improved management of works and resources, their sequence and
        consequences of any changes that may take place
       Ability to establish a realistic completion date
       Improved efficiency control
       Facilitated risk assessment process of the project
       Basis for solving contractual claims resulting from delays
SCHEDULING AND PLANNING CONSTRUCTION
WORKS

   Appropriate schedule of works allows to establish
    completion dates for all stages and elements of works, e.g.
    when will the electrician be needed, when will the garden
    door be installed, floor panels delivered etc. Of course,
    scheduling is not about planning works a week in advance –
    this can be done by every skilled worker.

   A correctly designed work schedule allows such information
    to be provided months in advance. Such information often
    proves crucial, especially when orders have to be made
    long before the delivery.
PLANNING TECHNIQUES

   The only technique commonly applied in small and middle
    sized projects is “Gantt chart" or "Bar chart” (both names
    refer to the same method).

   Other techniques (arrow diagrams, precedence diagrams,
    line of balance, time-chainage diagrams) are only applied to
    large projects, often involving infrastructural works. Please
    contact us for further information about these methods.
GANTT CHART

   Gantt or Bar chart is the easiest available planning
    technique, and probably the only one commonly understood
    without prior training. Despite its simplicity, a correctly
    designed chart will provide a lot of information necessary to
    complete the project.

   Each line on the chart indicates a task or group of tasks
    necessary in the project. The length of a bar is relative to
    the time necessary to carry out a task.

   Individual tasks stand in dynamic dependency relationships
    that reflect the order of completion. This allows for a fast
    check of how, e.g. a delay of task A will influence the
    completion of task C, taking place 2 months later.
GANTT CHART

   Appropriately prepared chart indicates the critical tasks, i.e.
    the ones that determine the timely completion of the entire
    project. These form a "critical path". This allows for more
    attention to be given to the most important tasks.

   Each task can be assigned necessary resources, workers,
    equipment and material, which facilitates the procedures of
    placing orders and workforce management.

   Additionally, the chart may include, or be the basis for a
    detailed analysis of financial flow in the project and risk
    management.
GANTT CHART
TYPES OF SCHEDULES

   Schedules can be classified depending on the type and precision of
    information provided.

   Master program : It is a general project plan, which does not include
    any details, and only shows the main stages of works. It is mainly useful
    for the clients and architects supervising the completion time. The
    master program must be provided to architect by the contractor.

   Detailed program : It is an expansion of a master program, which
    includes all activities and details of works completion. It is used by the
    contractor to manage works and resources. Usually it is not passed on
    to client or architect. Due to the large amount of information it contains,
    the detailed program is often prepared to only embrace a specific period
    of time (e.g. 1 or 2 weeks of works).
TYPES OF SCHEDULES

   Purchase Schedule : Additional schedules are created as
    necessary by filtering the data included in “Detailed
    program”. The most popular is "the purchase schedule",
    which indicates the deadlines for making orders. All data is
    dynamically related, and therefore if the installation of
    windows, which have to be ordered 4 weeks in advance, is
    delayed, the schedule will automatically suggest new order
    date.

   Using schedules greatly facilitates site management and
    reduces risk of making a mistake or missing out important
    tasks.
SOFTWARE

   The development of computers and scheduling software has made
    preparing and updating of schedules much easier. There are many
    programs      available, differing in functions advancement, user-
    friendliness and price.

   Probably the most popular tools available for MS Windows are:
      MS Project
      Asta PowerProject
      Primavera


   Choosing appropriate planning software depends on individual needs
    and preferences. It’s worth to have a look around and choose among
    many available additional options. One very useful additional feature is
    the possibility to synchronize tasks with calendar, or sharing the plan
    among several employees.
RISK MANAGEMENT

   Using planning software makes it possible to expand the
    functions of schedules to include project risk management. Easy
    scenarios analysis processes allow preparation of many variants
    of project, e.g. what will the consequences of a delay for a
    particular task be and how to deal with them. This kind of
    theoretical analysis allows better understanding the mechanisms
    behind the project and preparing alternative plans, should
    problems emerge.

   Risk analysis can be summed up with the following:
       Hazard identification ( Identification of dangerous things )
       Probability and consequences estimate
       Deciding on risk management method (avoidance, reduction, sharing
        and retention)
       Management and supervision
       Conclusion and report
PROBLEMS WITH SCHEDULES

   Planning and schedules are not problem-free and, as it happens, their
    benefits are not fully used.

    One must bear in mind that schedule is a dynamical tool which needs to
    be regularly updated in order to serve us most efficiently. Every
    construction plan is appropriate only until the project has started. It can
    be often seen, that our plans do not reflect reality, in which case the plan
    must be updated, otherwise it will lose its adequacy.

   Plan is only as good as the person who created it. Software is only a
    tool, not a magical solution to all our problems. If the project deadline we
    set is not realistic, there is no plan which will make completion on time
    possible.
THANK YOU

More Related Content

What's hot

Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedureayushida
 
Good Contract Management;A municipality perspective
Good Contract Management;A municipality perspectiveGood Contract Management;A municipality perspective
Good Contract Management;A municipality perspectiveJB Nartey
 
CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub ContractArunkumar Shirawalmath
 
J.S. Daniel paper for presentation cost management
J.S. Daniel paper for presentation cost managementJ.S. Daniel paper for presentation cost management
J.S. Daniel paper for presentation cost managementJ.S. Daniel
 
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessPlanning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessAlberto Sanchez
 
Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)Lee Maserian R.D.I.
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015Ismail Shaikh
 
Quantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AMQuantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AMMohamed Riyaz
 
Advanced training for construction management: CONTRACTS MANAGEMENT part 2 (...
Advanced training for  construction management: CONTRACTS MANAGEMENT part 2 (...Advanced training for  construction management: CONTRACTS MANAGEMENT part 2 (...
Advanced training for construction management: CONTRACTS MANAGEMENT part 2 (...Antonio Coladarce
 
Construction Management Services
Construction Management ServicesConstruction Management Services
Construction Management ServicesDavid Rosacker
 
Ahmed Faheem Resume 17-04-2016
Ahmed Faheem Resume 17-04-2016Ahmed Faheem Resume 17-04-2016
Ahmed Faheem Resume 17-04-2016Ahmed Faheem
 

What's hot (20)

Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
 
Van herrera cv
Van herrera   cvVan herrera   cv
Van herrera cv
 
COMPANY PORTFOLIO
COMPANY PORTFOLIOCOMPANY PORTFOLIO
COMPANY PORTFOLIO
 
Good Contract Management;A municipality perspective
Good Contract Management;A municipality perspectiveGood Contract Management;A municipality perspective
Good Contract Management;A municipality perspective
 
CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub Contract
 
J.S. Daniel paper for presentation cost management
J.S. Daniel paper for presentation cost managementJ.S. Daniel paper for presentation cost management
J.S. Daniel paper for presentation cost management
 
Preparation of boq
Preparation of boqPreparation of boq
Preparation of boq
 
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessPlanning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning Process
 
ALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAHALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAH
 
Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)
 
Amol-KulkarniResume
Amol-KulkarniResumeAmol-KulkarniResume
Amol-KulkarniResume
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
Sachin parab
Sachin parabSachin parab
Sachin parab
 
Quantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AMQuantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AM
 
Advanced training for construction management: CONTRACTS MANAGEMENT part 2 (...
Advanced training for  construction management: CONTRACTS MANAGEMENT part 2 (...Advanced training for  construction management: CONTRACTS MANAGEMENT part 2 (...
Advanced training for construction management: CONTRACTS MANAGEMENT part 2 (...
 
CV
CVCV
CV
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
 
Construction Management Services
Construction Management ServicesConstruction Management Services
Construction Management Services
 
Ahmed Faheem Resume 17-04-2016
Ahmed Faheem Resume 17-04-2016Ahmed Faheem Resume 17-04-2016
Ahmed Faheem Resume 17-04-2016
 
P.M
P.MP.M
P.M
 

Viewers also liked

Lecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningLecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningJB Nartey
 
Struktur dan asas bangunan
Struktur dan asas bangunanStruktur dan asas bangunan
Struktur dan asas bangunanElmi Hamid
 
Merancang tanda tapak, asas bangunan dan binaan
Merancang tanda tapak, asas bangunan dan binaanMerancang tanda tapak, asas bangunan dan binaan
Merancang tanda tapak, asas bangunan dan binaanElmi Hamid
 
Kaedah-dan-bahan-binaan
 Kaedah-dan-bahan-binaan Kaedah-dan-bahan-binaan
Kaedah-dan-bahan-binaanshahrun
 
Pembinaan
PembinaanPembinaan
Pembinaananis
 

Viewers also liked (7)

Lecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningLecture slides4; Construction Project Planning
Lecture slides4; Construction Project Planning
 
Konkrit
KonkritKonkrit
Konkrit
 
Struktur dan asas bangunan
Struktur dan asas bangunanStruktur dan asas bangunan
Struktur dan asas bangunan
 
Merancang tanda tapak, asas bangunan dan binaan
Merancang tanda tapak, asas bangunan dan binaanMerancang tanda tapak, asas bangunan dan binaan
Merancang tanda tapak, asas bangunan dan binaan
 
Kaedah-dan-bahan-binaan
 Kaedah-dan-bahan-binaan Kaedah-dan-bahan-binaan
Kaedah-dan-bahan-binaan
 
Kejuruteraan struktur
Kejuruteraan strukturKejuruteraan struktur
Kejuruteraan struktur
 
Pembinaan
PembinaanPembinaan
Pembinaan
 

Similar to 4. offer tendering - site

Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - siteHamdija Velagic
 
Lec.1 Introduction to Estimation
Lec.1   Introduction to EstimationLec.1   Introduction to Estimation
Lec.1 Introduction to EstimationMuthanna Abbu
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportArissa Loh
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Gregoire Lesecq
 
Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureHASMANIRA
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Processarpantripathi2
 
Yam yih hwan pp1 assignment aug 14
Yam yih hwan   pp1 assignment aug 14Yam yih hwan   pp1 assignment aug 14
Yam yih hwan pp1 assignment aug 14마 이환
 
Assignment - Management Contracting
Assignment - Management ContractingAssignment - Management Contracting
Assignment - Management ContractingKai Yun Pang
 
Professional practice 1 report
Professional practice 1 reportProfessional practice 1 report
Professional practice 1 reportNgo Jia Haur
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBESahl Buhary
 
Professional practice 1 (1)
Professional practice 1 (1)Professional practice 1 (1)
Professional practice 1 (1)tfkc1212
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignmentLwj Welson
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignmentLwj Welson
 
Suvarna consultancy services
Suvarna consultancy services Suvarna consultancy services
Suvarna consultancy services Ashok Tundare
 
Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916George Wilkinson
 

Similar to 4. offer tendering - site (20)

Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - site
 
ESTIMATING.pdf
ESTIMATING.pdfESTIMATING.pdf
ESTIMATING.pdf
 
Lec.1 Introduction to Estimation
Lec.1   Introduction to EstimationLec.1   Introduction to Estimation
Lec.1 Introduction to Estimation
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal Report
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016
 
TOPIC2.pdf
TOPIC2.pdfTOPIC2.pdf
TOPIC2.pdf
 
Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment Structure
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
 
Yam yih hwan pp1 assignment aug 14
Yam yih hwan   pp1 assignment aug 14Yam yih hwan   pp1 assignment aug 14
Yam yih hwan pp1 assignment aug 14
 
Assignment - Management Contracting
Assignment - Management ContractingAssignment - Management Contracting
Assignment - Management Contracting
 
Professional practice 1 report
Professional practice 1 reportProfessional practice 1 report
Professional practice 1 report
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBE
 
Professional practice 1 (1)
Professional practice 1 (1)Professional practice 1 (1)
Professional practice 1 (1)
 
Pp1 group assignment
Pp1 group assignmentPp1 group assignment
Pp1 group assignment
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
uap doc 207-208
uap doc 207-208uap doc 207-208
uap doc 207-208
 
MODULE 5.pptx
MODULE 5.pptxMODULE 5.pptx
MODULE 5.pptx
 
Suvarna consultancy services
Suvarna consultancy services Suvarna consultancy services
Suvarna consultancy services
 
Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916
 

Recently uploaded

Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........LeaCamillePacle
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayMakMakNepo
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 

Recently uploaded (20)

Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up Friday
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 

4. offer tendering - site

  • 1. International Burch university Course : Building Construction Technology I Architecture department Date : xx / xx / xxxx Sarajevo LECTURE NO.4 OFFER – TENDRING – PLANNING Building Construction Technology I Professor : Prof.dr.Nerman Rustempasic Assistant : M.Sc. Ahmed El Sayed
  • 2. INTRODUCTION  Offer – tendering and construction site are very important themes for every engineer. Without understanding these terms and process, a lot of problems will occur such as : why we didn’t get this project? Why the other company or designers are getting the jobs and not us?  This kind of questions can be answered if the designer ( engineer ) learns the realtion between designing and winning in tender.  Without the tenderation there are no projects, which means that designers will have no jobs to do.
  • 3. TENDER OFFER FROM THE CLIENT'S AND ARCHITECT'S PERSPECTIVE  Perception of the stages of a construction project often varies between the client/architect and the contractor.  Client and architect are involved in the project for months before the actual construction work commences, for a contractor however stages of the project include only the tender offer and construction stages.  Tender procedure, from client’s and architect’s point of view, is regulated by NJCC (National Joint Consultative Committee for Building).
  • 4. TENDER OFFER FROM THE CLIENT'S AND ARCHITECT'S PERSPECTIVE  Most small projects apply the "Single Stage Selective Tendering” which can be characterized in the following way:  Invitation to tender – the contractors are contacted if they would be willing to tender. The enquiry is issued in writing 4-6 weeks before the tender and it should contain a brief description of the investment and the commencement date.  Number of contractors tendering – recommended maximum number of contractors is 6, with additional in reserve. The limitation is due to the fact, that the tenders tend to be expensive and it is irresponsible to unnecessarily inflate prices in the construction industry.
  • 5. TENDER OFFER FROM THE CLIENT'S AND ARCHITECT'S PERSPECTIVE  Tender documentation – the aim of tender documentation all offers will be presented on the same basis, so the competition may only be about the price. It is assumed that each contractor will complete works in a way specified in documentation.  Time to prepare tender offer – in smaller projects it is usually 3-4 weeks, in bigger and more complex investments it can take longer.  Changes in tender documentation – contractors should not make any changes. They should instead send an enquiry min. 10 days before the tender date. Architect should send a reply to all contractors to provide them all the same chances.
  • 6. TENDER OFFER FROM THE CLIENT'S AND ARCHITECT'S PERSPECTIVE  It is often disregarded in practice, due to the short time allowed to prepare an estimate or vagueness.  Withdrawal of the offer – tender offer can be withdrawn by the contractor at all times, as long as it has not been chosen by the investor. Acceptance of an offer constitutes an agreement between the investor and contractor.  Tender offers analysis – tender offers should be analyzed soon after they were returned. After the contract is awarded architect should inform all participants about the offers received, without naming the companies, which put them forward. Even though it gives contractors an insight into competitor’s pricing policy, it is often disregarded.
  • 7. TENDER OFFER FROM THE CLIENT'S AND ARCHITECT'S PERSPECTIVE  Error check – the winning estimate is checked and the erroneous calculations are sent back to the contractor. There are two procedures to resolve those: "Alternative 1" – where the contractor can confirm or withdraw the offer and "Alternative 2" - where the contractor can confirm the offer or correct mistakes.  Price negotiation – procedures allow pricing negotiations leading to lowering the prices if the lowest offer exceeds investor’s budget.
  • 8. BASICS OF COST ESTIMATE PREPARATION  Preparation of tender offer requires various documentation types, as specified by an architect or an investor. They involve different terms of settlement and risk.  Regardless of the type of documentation one should take into account costs not directly connected with corresponding construction works, e.g. cost of the toilet, on-site safety, company standing costs etc. Those costs are usually included in the "Preliminaries", at the beginning of the estimate.
  • 9. SPECIFICATION & DRAWINGS  This type of documentation contains drawings and specification; it can also contain a separate scope of works to clarify the full costs.  Contractor is responsible for surveying the works. Any errors in measurements and cost estimates will not be taken into consideration and the contractor will be required to conduct all the works indicated in the documentation, regardless of whether they are specified by the scope of work. It means that contractor needs to check all documentation carefully, since each its element included in any part of documentation constitutes part of contract and needs to be completed.
  • 10. BILL OF QUANTITIES  In case of bigger projects, tender documents often consist of "Bill of Quantities" (BoQ). It is a list of all required works (with all measurements already made) – the contractor needs to provide their rates for each of the works.  BoQ is prepared by "Quantity Surveyor" employed by the investor, according to Standard Method of Measurement - SMM.  The latest version is SMM7, but the smaller project still often use.
  • 11. BILL OF QUANTITIES  The rates given in BoQ will be used to calculate the cost of additional works of the same type during the project, it is therefore worth to try to foresee potential additional works and raise the rate for the corresponding type of works.  The errors in the BoQ are the liability of the investor – the contractor needs to be paid for all works required, even if they are erroneous or if some works are omitted. Because of that BoQ is not used often anymore.  If the investor cannot state exact measurements, the approximate quantities are applied.
  • 12. SCHEDULE OF RATES  "Schedule of Rates" is the list of the rates and it’s used very rarely, only in case if the scope of work is impossible to define.  The contractor is accountable for completed works according to the time and agreed hourly or daily rates.  It is of course an ideal basis for cooperation from contractor's point of view, because they are not at any risk and all the materials and employees working time is being paid for.  In case of such cooperation form it is crucial to keep a detailed record of time and resources spent during the project. Those are necessary to establish the payment and eliminate potential conflicts between contractor and investor.
  • 13. SCHEDULING AND PLANNING CONSTRUCTION WORKS  Without proper planning it is difficult to make a construction project run smoothly and be completed on time and within budget. Of course, smaller and less complex projects very often do not have a formulated formal plan or schedule, since all planning takes place in manager’s head.  It is an acceptable solution, however everyone’s perception has its limits, and in most cases it is impossible to manage all aspects of a months-long project without the use of additional tools. The main reasons for planning in construction works can be summed up as:  Improved management of works and resources, their sequence and consequences of any changes that may take place  Ability to establish a realistic completion date  Improved efficiency control  Facilitated risk assessment process of the project  Basis for solving contractual claims resulting from delays
  • 14. SCHEDULING AND PLANNING CONSTRUCTION WORKS  Appropriate schedule of works allows to establish completion dates for all stages and elements of works, e.g. when will the electrician be needed, when will the garden door be installed, floor panels delivered etc. Of course, scheduling is not about planning works a week in advance – this can be done by every skilled worker.  A correctly designed work schedule allows such information to be provided months in advance. Such information often proves crucial, especially when orders have to be made long before the delivery.
  • 15. PLANNING TECHNIQUES  The only technique commonly applied in small and middle sized projects is “Gantt chart" or "Bar chart” (both names refer to the same method).  Other techniques (arrow diagrams, precedence diagrams, line of balance, time-chainage diagrams) are only applied to large projects, often involving infrastructural works. Please contact us for further information about these methods.
  • 16. GANTT CHART  Gantt or Bar chart is the easiest available planning technique, and probably the only one commonly understood without prior training. Despite its simplicity, a correctly designed chart will provide a lot of information necessary to complete the project.  Each line on the chart indicates a task or group of tasks necessary in the project. The length of a bar is relative to the time necessary to carry out a task.  Individual tasks stand in dynamic dependency relationships that reflect the order of completion. This allows for a fast check of how, e.g. a delay of task A will influence the completion of task C, taking place 2 months later.
  • 17. GANTT CHART  Appropriately prepared chart indicates the critical tasks, i.e. the ones that determine the timely completion of the entire project. These form a "critical path". This allows for more attention to be given to the most important tasks.  Each task can be assigned necessary resources, workers, equipment and material, which facilitates the procedures of placing orders and workforce management.  Additionally, the chart may include, or be the basis for a detailed analysis of financial flow in the project and risk management.
  • 19. TYPES OF SCHEDULES  Schedules can be classified depending on the type and precision of information provided.  Master program : It is a general project plan, which does not include any details, and only shows the main stages of works. It is mainly useful for the clients and architects supervising the completion time. The master program must be provided to architect by the contractor.  Detailed program : It is an expansion of a master program, which includes all activities and details of works completion. It is used by the contractor to manage works and resources. Usually it is not passed on to client or architect. Due to the large amount of information it contains, the detailed program is often prepared to only embrace a specific period of time (e.g. 1 or 2 weeks of works).
  • 20. TYPES OF SCHEDULES  Purchase Schedule : Additional schedules are created as necessary by filtering the data included in “Detailed program”. The most popular is "the purchase schedule", which indicates the deadlines for making orders. All data is dynamically related, and therefore if the installation of windows, which have to be ordered 4 weeks in advance, is delayed, the schedule will automatically suggest new order date.  Using schedules greatly facilitates site management and reduces risk of making a mistake or missing out important tasks.
  • 21. SOFTWARE  The development of computers and scheduling software has made preparing and updating of schedules much easier. There are many programs available, differing in functions advancement, user- friendliness and price.  Probably the most popular tools available for MS Windows are:  MS Project  Asta PowerProject  Primavera  Choosing appropriate planning software depends on individual needs and preferences. It’s worth to have a look around and choose among many available additional options. One very useful additional feature is the possibility to synchronize tasks with calendar, or sharing the plan among several employees.
  • 22. RISK MANAGEMENT  Using planning software makes it possible to expand the functions of schedules to include project risk management. Easy scenarios analysis processes allow preparation of many variants of project, e.g. what will the consequences of a delay for a particular task be and how to deal with them. This kind of theoretical analysis allows better understanding the mechanisms behind the project and preparing alternative plans, should problems emerge.  Risk analysis can be summed up with the following:  Hazard identification ( Identification of dangerous things )  Probability and consequences estimate  Deciding on risk management method (avoidance, reduction, sharing and retention)  Management and supervision  Conclusion and report
  • 23. PROBLEMS WITH SCHEDULES  Planning and schedules are not problem-free and, as it happens, their benefits are not fully used.  One must bear in mind that schedule is a dynamical tool which needs to be regularly updated in order to serve us most efficiently. Every construction plan is appropriate only until the project has started. It can be often seen, that our plans do not reflect reality, in which case the plan must be updated, otherwise it will lose its adequacy.  Plan is only as good as the person who created it. Software is only a tool, not a magical solution to all our problems. If the project deadline we set is not realistic, there is no plan which will make completion on time possible.