 This session covers the aspects of project
implementation and management from
activation onwards, including factors that affect
project implementation.
 Project management as a concept is
considered.
 The characteristic of a good project manager
are discussed.
Contents
 Introduction to Project Implementation
 Project Activation
 Project Operation
 Approaches to Project Implementation
 Project Implementation Plan
 Factors Affecting Project Implementation
 Project Management Defined
 Aspects of Project Management
 Characteristics of a good Project Manager
Project Implementation
 Process whereby “project inputs are
converted to project outputs”. May be looked
at as:
 Putting in action the activities of the project.
 Putting into practice what was proposed in
the project document (i.e. transforming the
project proposal into the actual project.)
 Management of the project or executing the
project intentions.
Project Implementation (cont.)
 Implementation usually done by implementing
agency (organization) that prepared the project
and received funding for it.
 Other organizations that participate in the
implementation of the project
 by way of collaboration, say by according good
working relationship, extending technical advice or
seconding their staff to the project
are referred to as co-operating agencies.
Project Implementation phase
involves:
 Project activation, and
 Project operation
Project activation
 This means making arrangements to have the
project started. It involves coordination and
allocation of resources to make project operational.
Project operation
 This is practical management of a project. Here,
project inputs are transformed into outputs to
achieve immediate objectives.
Project operation and
maintenance
Operation and maintenance
 To attain value and maximum returns, the
district/municipality or the beneficiaries organize
for the facility to have the project properly
managed and maintained regularly.
 An operation and maintenance manual is
prepared by the contractor and handed to the
district / beneficiaries.
Approaches to project
implementation
Top-down approach
 Implementation mainly done by agencies from
outside the community with limited involvement by
the beneficiaries.
Bottom-up approach
 Beneficiaries implement the project. Outside
agencies may provide the financial resources and
technical assistance.
Collaborative participatory approach
 Both top-down and bottom-up approaches to
project implementation are applied in the process.
Project implementation plan
(PIP)
 If PIP not carried out during the project
design process and embodied in the
project documents, it is carried out at the
project activation stage.
Project implementation plan
includes:
a) The project implementation schedule
This is concerned with:
 What activities can produce expected
project outputs?
 What is the sequence of these activities?
 What is the time frame for these activities?
 Who will be responsible for carrying out
each activity?
Project implementation plan
includes:
 The following methods may be used to
answer the above questions:
 Gantt chart
 Critical Path Method (CPM) or Net work
analysis
 Project Evaluation and Review Techniques
(PERT)
 Simple formats
What is a GANTT Chart?
 The Gantt chart is also referred to as the
progress chart.
 It is a chart showing the timing of project
activities using horizontal bars.
 It is one of the techniques of project
scheduling, which depicts the frequency of
activities and determines the period of time
for implementation.
How to determine a GANTT chart
 Determine the parts or implementation
phases of the project and the sequence in
which the associated activities shall be
carried out
 Then estimate the amount of time required
for each activity
 List the activities that can be carried out at
the same time and identify those to be carried
out sequentially
How to construct a GANTT chart
 Time represented on the horizontal axis, and
activities on the vertical axis.
 Bars are entered to indicate the time period
allocated for each activity and the state of
progress at any particular point in time.
Example: Maize farming project
Activity
 Marketing
 Threshing
 Harvesting
 Weeding
 Planting
 Preparing seedbed
J F M A M J J A S O N D
Time period/ months
The Simple Format
ACTIVITY STARTING
DATE
ENDING
DATE
COST RESPONSIBLE
PERSON
REMARKS
- Preparing seed bed
- Planning
- Weeding
- Harvesting
- Storage
- Threshing
- Marketing
Practical
Develop
 a Gantt chart
 Simple Format
project implementation schedules in relation
to the identified projects in the project
identification session.
Project implementation plan
(cont.)
b) The role of the implementing agency
 The specific responsibilities of the key staff
during project implementation and
monitoring are outlined.
c) Beneficiary participation
 The involvement of the beneficiaries in
planning and implementation and what is
expected of them is spelt out.
Project implementation plan
(cont.)
d) Organizational structure and staffing
Here the following are sought:
 Project structure for purposes of management
 Qualifications and skills for the staff
 Job descriptions and specifications for the staff
 Technical assistance if needed
e) Financial management
This looks at funds management, accounting
period, financial reports and statements and how
often they will be made?
Project implementation plan
(cont.)
f) Reporting system
This looks at who will be reporting to whom and
how often. There is need to design standard
reporting formats.
g) Sustainability
The concept of sustainability is based on belief that
project should result in benefits that have lasting
effect. Project should be sustained beyond the life
of funding - especially if it is a grant.
Project should not exhaust the available resources
like raw materials and labor.
Project implementation plan
(cont.)
Time control and remedial action
Time taken to implement project activities is one
measure of successfulness of supervision or
monitoring of project implementation.
Supervisor pays particular attention to time
control measures, time scheduling and its
supervision, time extension and postponement,
damages for non-completion and defect or
warranty period.
Project implementation plan
(cont.)
Supervision of implementation of project
schedule
This involves a set of checks and balances to
ensure that the schedule is being adhered to.
To ensure that the time schedule is being
adhered to, the project activity time listing can be
of great importance.
Project Activity Time Listing
Activity
earliest time
Activity
latest time
Activity
code
Activity
Description
Activity
duration
Start Finish Start Finish
Progress
remark
Practical
 Using the Project Activity Time Listing,
develop a Project Activity Time Listing table
in relation to the Identified project in project
identification session, and fill it in.
Factors affecting project
implementation
 Factors that lead to
success of projects
 Political Commitment
 Simplicity of Design
 Careful preparation
 Good management
 Involvement of
beneficiaries/community
 Factors and problems
that lead to failure of
projects
 Financial Problems
 Management problems
 Technical problems
 Political problems
Factors affecting project
implementation
Other typical implementation problems
 Poor scheduling of projects leading to delays in
 Poor scheduling of projects leading to delays in
implementation.
 Misallocation of funds
 Delay and sometimes lack of counterpart funding
 Lack of accountability and transparency
 Bureaucracy in decision-making.
 Selfishness/nepotism/favoritism by some project
managers.
Factors affecting project
implementation
Other typical implementation problems (cont.)
 Weak monitoring systems
 Natural calamities like drought, earthquakes,
landslides, and hailstorms.
 Policy changes
 Migration of beneficiaries
 Lack of team work
 Lack of incentives for implementers.
 etc.
Project management
Management may be defined as;
 Getting things done from the available
resources, the way you want them to be done.
Project management defined
 Project Management is an all-embracing term
covering the management of every detail of a
project (Project cycle) and may be defined as,
“the process of planning and directing a project
from its inception to its final completion”.
Project management (cont.)
Project management decisions - a necessary
function for setting up a project. It is concerned with:
 Forecasting
 Setting objectives
 Policy making
Planning - determines success/failure of project. It
has three (3) main aspects:
 Programming
 Scheduling and
 Budgeting
Project management (cont.)
Project control - To control is to compare
actual with planned achievements and take action
to correct any adverse deviations. It involves:
 Plans of Operation
These are the result of the planning process of Project
management.
 Review and Updating
Review is necessary to determine whether the project is
proceeding according to plan or not. Updating is
recording the state of the project as shown by the
reviews, or of making amendments.
Project management (cont.)
Project Action - When review has shown a
project to be deviating from plan, action is
required to restore the operation to its planned
characteristics.
A good project manager should:
 have working knowledge in several fields
 be able to understand general managerial
problems
 have active interest in training and
developing subordinates
 be able to delegate some tasks to
subordinates
Characteristics of a good
project manager
A good project manager should:
 know the project and understand its objectives
 know the systematic process for managing
projects
 be able to answer the following questions:
 What is the project for?
 Why is it required?
 Whom does it serve?
 How is it justified?
 How is it going to be used?
Characteristics of a good
project manager

More Related Content

What's hot

Project management
Project managementProject management
Project managementJay Raval
 
11. Project Communication Management
11. Project Communication Management11. Project Communication Management
11. Project Communication ManagementBhuWan Khadka
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesMohamed Loey
 
An Introduction to Project Management
An Introduction to Project Management An Introduction to Project Management
An Introduction to Project Management Krishna Kant
 
Project communications management
Project communications managementProject communications management
Project communications managementYogender Singh Rana
 
Project implimentation
Project implimentationProject implimentation
Project implimentationMazhar Poohlah
 
Project communication management
Project communication managementProject communication management
Project communication managementTakudzwa Chatora
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycleSAJID ALI RUK
 
Project management cycle
Project management  cycleProject management  cycle
Project management cycleMegha BHardwaj
 
Project life cycle
Project life cycleProject life cycle
Project life cycleAbhishek Raj
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-managementSavaş Şakar
 
Project Planning and Management Notes
Project Planning and Management NotesProject Planning and Management Notes
Project Planning and Management NotesHaris Hassan
 
How to Implement a Project Management Information System
How to Implement a Project Management Information SystemHow to Implement a Project Management Information System
How to Implement a Project Management Information SystemPMA Consultants
 
Monitoring and Evaluation of Plan
Monitoring and Evaluation of PlanMonitoring and Evaluation of Plan
Monitoring and Evaluation of PlanRuth Senorin
 
Project Management Methodology
Project Management MethodologyProject Management Methodology
Project Management MethodologyC.Y Wong
 

What's hot (20)

Project management
Project managementProject management
Project management
 
11. Project Communication Management
11. Project Communication Management11. Project Communication Management
11. Project Communication Management
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
 
An Introduction to Project Management
An Introduction to Project Management An Introduction to Project Management
An Introduction to Project Management
 
Project communications management
Project communications managementProject communications management
Project communications management
 
Project implimentation
Project implimentationProject implimentation
Project implimentation
 
Project communication management
Project communication managementProject communication management
Project communication management
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycle
 
Project management cycle
Project management  cycleProject management  cycle
Project management cycle
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-management
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
Project termination
Project terminationProject termination
Project termination
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Project Planning and Management Notes
Project Planning and Management NotesProject Planning and Management Notes
Project Planning and Management Notes
 
How to Implement a Project Management Information System
How to Implement a Project Management Information SystemHow to Implement a Project Management Information System
How to Implement a Project Management Information System
 
Monitoring and Evaluation of Plan
Monitoring and Evaluation of PlanMonitoring and Evaluation of Plan
Monitoring and Evaluation of Plan
 
Project formulation
Project formulationProject formulation
Project formulation
 
Project Management Methodology
Project Management MethodologyProject Management Methodology
Project Management Methodology
 
Project Termination
Project TerminationProject Termination
Project Termination
 

Viewers also liked

My Project Implementation Plan UNILEAD 2014-2015 - Germany
My Project Implementation Plan UNILEAD 2014-2015 - GermanyMy Project Implementation Plan UNILEAD 2014-2015 - Germany
My Project Implementation Plan UNILEAD 2014-2015 - GermanyMohamed EL Zayat
 
How to Create an Undisputable Service Management Business Case
How to Create an Undisputable Service Management Business CaseHow to Create an Undisputable Service Management Business Case
How to Create an Undisputable Service Management Business CaseNina Segura
 
Sr of busi. stakeholders
Sr of busi. stakeholdersSr of busi. stakeholders
Sr of busi. stakeholdersLalit Pawar
 
Project Appraisal chapter 1
Project Appraisal chapter 1Project Appraisal chapter 1
Project Appraisal chapter 1Mazhar Poohlah
 
Research Methods CH1
Research Methods CH1Research Methods CH1
Research Methods CH1Stephanie
 
Research Method for Business chapter 6
Research Method for Business chapter  6Research Method for Business chapter  6
Research Method for Business chapter 6Mazhar Poohlah
 
Research Method for Business chapter 7
Research Method for Business chapter  7Research Method for Business chapter  7
Research Method for Business chapter 7Mazhar Poohlah
 
Research Method for Business chapter 5
Research Method for Business chapter 5Research Method for Business chapter 5
Research Method for Business chapter 5Mazhar Poohlah
 
Project Identification in Strategic Planning
Project Identification in Strategic Planning Project Identification in Strategic Planning
Project Identification in Strategic Planning Alexandra Tranmer
 
5 project management project planning
5 project management  project planning5 project management  project planning
5 project management project planningYasirHamour
 
Building Construction, Project Planning and Project Management (Level 100 Pro...
Building Construction, Project Planning and Project Management (Level 100 Pro...Building Construction, Project Planning and Project Management (Level 100 Pro...
Building Construction, Project Planning and Project Management (Level 100 Pro...Akhona Siyabulela Stuurman
 
SE_Lec 12_ Project Planning
SE_Lec 12_ Project PlanningSE_Lec 12_ Project Planning
SE_Lec 12_ Project PlanningAmr E. Mohamed
 
Aspects of Project Feasibility Preparations and Analysis
Aspects of Project Feasibility Preparations and AnalysisAspects of Project Feasibility Preparations and Analysis
Aspects of Project Feasibility Preparations and AnalysisLena Argosino
 
Creative Project Planning ideas
Creative Project Planning ideasCreative Project Planning ideas
Creative Project Planning ideasJoanna Maxwell
 
Business research methods
Business research methodsBusiness research methods
Business research methodskhan-uk
 
3 Project Cycle and Planning (4-6 hours)
3 Project Cycle and Planning (4-6 hours)3 Project Cycle and Planning (4-6 hours)
3 Project Cycle and Planning (4-6 hours)Tony
 

Viewers also liked (20)

My Project Implementation Plan UNILEAD 2014-2015 - Germany
My Project Implementation Plan UNILEAD 2014-2015 - GermanyMy Project Implementation Plan UNILEAD 2014-2015 - Germany
My Project Implementation Plan UNILEAD 2014-2015 - Germany
 
How to Create an Undisputable Service Management Business Case
How to Create an Undisputable Service Management Business CaseHow to Create an Undisputable Service Management Business Case
How to Create an Undisputable Service Management Business Case
 
Sr of busi. stakeholders
Sr of busi. stakeholdersSr of busi. stakeholders
Sr of busi. stakeholders
 
Project Appraisal chapter 1
Project Appraisal chapter 1Project Appraisal chapter 1
Project Appraisal chapter 1
 
Research Methods CH1
Research Methods CH1Research Methods CH1
Research Methods CH1
 
Market analysis
Market analysisMarket analysis
Market analysis
 
Summary
SummarySummary
Summary
 
Research Method for Business chapter 6
Research Method for Business chapter  6Research Method for Business chapter  6
Research Method for Business chapter 6
 
Research Method for Business chapter 7
Research Method for Business chapter  7Research Method for Business chapter  7
Research Method for Business chapter 7
 
Research Method for Business chapter 5
Research Method for Business chapter 5Research Method for Business chapter 5
Research Method for Business chapter 5
 
Project Identification in Strategic Planning
Project Identification in Strategic Planning Project Identification in Strategic Planning
Project Identification in Strategic Planning
 
5 project management project planning
5 project management  project planning5 project management  project planning
5 project management project planning
 
Building Construction, Project Planning and Project Management (Level 100 Pro...
Building Construction, Project Planning and Project Management (Level 100 Pro...Building Construction, Project Planning and Project Management (Level 100 Pro...
Building Construction, Project Planning and Project Management (Level 100 Pro...
 
Project Planning, Design and Management
Project Planning, Design and ManagementProject Planning, Design and Management
Project Planning, Design and Management
 
SE_Lec 12_ Project Planning
SE_Lec 12_ Project PlanningSE_Lec 12_ Project Planning
SE_Lec 12_ Project Planning
 
Aspects of Project Feasibility Preparations and Analysis
Aspects of Project Feasibility Preparations and AnalysisAspects of Project Feasibility Preparations and Analysis
Aspects of Project Feasibility Preparations and Analysis
 
Creative Project Planning ideas
Creative Project Planning ideasCreative Project Planning ideas
Creative Project Planning ideas
 
Business research methods
Business research methodsBusiness research methods
Business research methods
 
Ch23 project planning
Ch23 project planningCh23 project planning
Ch23 project planning
 
3 Project Cycle and Planning (4-6 hours)
3 Project Cycle and Planning (4-6 hours)3 Project Cycle and Planning (4-6 hours)
3 Project Cycle and Planning (4-6 hours)
 

Similar to Project implimentation

ASSIGNMENT-1 PROFESSIONAL PRACTICE
ASSIGNMENT-1 PROFESSIONAL PRACTICEASSIGNMENT-1 PROFESSIONAL PRACTICE
ASSIGNMENT-1 PROFESSIONAL PRACTICEMichele Thomas
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
It Project Management
It Project ManagementIt Project Management
It Project ManagementTJ Rains
 
Project Management
Project ManagementProject Management
Project Managementirfan ali
 
Project integration management
Project integration managementProject integration management
Project integration managementEhsan Ullah
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementAhsan Rahim
 
Program or project management process report
Program or project management process report Program or project management process report
Program or project management process report Danes Ganancial
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800PRIYANSHU KUMAR
 
Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slidesdotesch
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration managementIrefuser1
 

Similar to Project implimentation (20)

Project implementation
Project implementationProject implementation
Project implementation
 
Project Management
Project ManagementProject Management
Project Management
 
Project Implementation
Project ImplementationProject Implementation
Project Implementation
 
ASSIGNMENT-1 PROFESSIONAL PRACTICE
ASSIGNMENT-1 PROFESSIONAL PRACTICEASSIGNMENT-1 PROFESSIONAL PRACTICE
ASSIGNMENT-1 PROFESSIONAL PRACTICE
 
Project Management
Project ManagementProject Management
Project Management
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project management revised
Project management revisedProject management revised
Project management revised
 
Project management
Project managementProject management
Project management
 
It Project Management
It Project ManagementIt Project Management
It Project Management
 
Project Management
Project ManagementProject Management
Project Management
 
Project integration management
Project integration managementProject integration management
Project integration management
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project Management
 
Project management – standard for today´s modern company
Project management – standard for today´s modern companyProject management – standard for today´s modern company
Project management – standard for today´s modern company
 
Program or project management process report
Program or project management process report Program or project management process report
Program or project management process report
 
Assignment
Assignment Assignment
Assignment
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
PME- CH 1.pptx
PME- CH 1.pptxPME- CH 1.pptx
PME- CH 1.pptx
 
Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slides
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration management
 

More from Mazhar Poohlah

Orgnaization and controlling
Orgnaization and controllingOrgnaization and controlling
Orgnaization and controllingMazhar Poohlah
 
Research Method EMBA chapter 14
Research Method EMBA chapter 14Research Method EMBA chapter 14
Research Method EMBA chapter 14Mazhar Poohlah
 
Research Method EMBA chapter 12
Research Method EMBA chapter 12Research Method EMBA chapter 12
Research Method EMBA chapter 12Mazhar Poohlah
 
Research Method EMBA chapter 11
Research Method EMBA chapter 11Research Method EMBA chapter 11
Research Method EMBA chapter 11Mazhar Poohlah
 
Research Method EMBA chapter 10
Research Method EMBA chapter 10Research Method EMBA chapter 10
Research Method EMBA chapter 10Mazhar Poohlah
 
Research Method EMBA chapter 6
Research Method EMBA chapter 6Research Method EMBA chapter 6
Research Method EMBA chapter 6Mazhar Poohlah
 
Research Method EMBA chapter 5
Research Method EMBA chapter 5Research Method EMBA chapter 5
Research Method EMBA chapter 5Mazhar Poohlah
 
Research Method EMBA chapter 4
Research Method EMBA chapter 4Research Method EMBA chapter 4
Research Method EMBA chapter 4Mazhar Poohlah
 
Research method EMBA chapter 3
Research method EMBA chapter 3Research method EMBA chapter 3
Research method EMBA chapter 3Mazhar Poohlah
 
Research method EMBA chapter 2
Research method EMBA chapter 2Research method EMBA chapter 2
Research method EMBA chapter 2Mazhar Poohlah
 
Research method EMBA chapter 1
Research method EMBA  chapter 1Research method EMBA  chapter 1
Research method EMBA chapter 1Mazhar Poohlah
 
3. traditional project management - ch3
3. traditional project management - ch33. traditional project management - ch3
3. traditional project management - ch3Mazhar Poohlah
 
2. traditional project management -ch2
2. traditional project management -ch22. traditional project management -ch2
2. traditional project management -ch2Mazhar Poohlah
 
Project Appraisal chapter 3
Project Appraisal chapter 3Project Appraisal chapter 3
Project Appraisal chapter 3Mazhar Poohlah
 
Project Appraisal chapter 2
Project Appraisal chapter 2Project Appraisal chapter 2
Project Appraisal chapter 2Mazhar Poohlah
 
project management fundamentals Chapter 1
project management fundamentals Chapter 1project management fundamentals Chapter 1
project management fundamentals Chapter 1Mazhar Poohlah
 

More from Mazhar Poohlah (20)

Orgnaization and controlling
Orgnaization and controllingOrgnaization and controlling
Orgnaization and controlling
 
Marketing concept
Marketing conceptMarketing concept
Marketing concept
 
Business enviornment
Business enviornmentBusiness enviornment
Business enviornment
 
Business enviornment
Business enviornmentBusiness enviornment
Business enviornment
 
Business enviornment
Business enviornmentBusiness enviornment
Business enviornment
 
Research Method EMBA chapter 14
Research Method EMBA chapter 14Research Method EMBA chapter 14
Research Method EMBA chapter 14
 
Research Method EMBA chapter 12
Research Method EMBA chapter 12Research Method EMBA chapter 12
Research Method EMBA chapter 12
 
Research Method EMBA chapter 11
Research Method EMBA chapter 11Research Method EMBA chapter 11
Research Method EMBA chapter 11
 
Research Method EMBA chapter 10
Research Method EMBA chapter 10Research Method EMBA chapter 10
Research Method EMBA chapter 10
 
Research Method EMBA chapter 6
Research Method EMBA chapter 6Research Method EMBA chapter 6
Research Method EMBA chapter 6
 
Research Method EMBA chapter 5
Research Method EMBA chapter 5Research Method EMBA chapter 5
Research Method EMBA chapter 5
 
Research Method EMBA chapter 4
Research Method EMBA chapter 4Research Method EMBA chapter 4
Research Method EMBA chapter 4
 
Research method EMBA chapter 3
Research method EMBA chapter 3Research method EMBA chapter 3
Research method EMBA chapter 3
 
Research method EMBA chapter 2
Research method EMBA chapter 2Research method EMBA chapter 2
Research method EMBA chapter 2
 
Research method EMBA chapter 1
Research method EMBA  chapter 1Research method EMBA  chapter 1
Research method EMBA chapter 1
 
3. traditional project management - ch3
3. traditional project management - ch33. traditional project management - ch3
3. traditional project management - ch3
 
2. traditional project management -ch2
2. traditional project management -ch22. traditional project management -ch2
2. traditional project management -ch2
 
Project Appraisal chapter 3
Project Appraisal chapter 3Project Appraisal chapter 3
Project Appraisal chapter 3
 
Project Appraisal chapter 2
Project Appraisal chapter 2Project Appraisal chapter 2
Project Appraisal chapter 2
 
project management fundamentals Chapter 1
project management fundamentals Chapter 1project management fundamentals Chapter 1
project management fundamentals Chapter 1
 

Recently uploaded

Keeping Your Information Safe with Centralized Security Services
Keeping Your Information Safe with Centralized Security ServicesKeeping Your Information Safe with Centralized Security Services
Keeping Your Information Safe with Centralized Security ServicesTechSoup
 
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxslides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxCapitolTechU
 
The Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational ResourcesThe Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational Resourcesaileywriter
 
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxJose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxricssacare
 
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...Nguyen Thanh Tu Collection
 
The impact of social media on mental health and well-being has been a topic o...
The impact of social media on mental health and well-being has been a topic o...The impact of social media on mental health and well-being has been a topic o...
The impact of social media on mental health and well-being has been a topic o...sanghavirahi2
 
[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online PresentationGDSCYCCE
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleCeline George
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPCeline George
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePedroFerreira53928
 
Research Methods in Psychology | Cambridge AS Level | Cambridge Assessment In...
Research Methods in Psychology | Cambridge AS Level | Cambridge Assessment In...Research Methods in Psychology | Cambridge AS Level | Cambridge Assessment In...
Research Methods in Psychology | Cambridge AS Level | Cambridge Assessment In...Abhinav Gaur Kaptaan
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaasiemaillard
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsCol Mukteshwar Prasad
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxJheel Barad
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxbennyroshan06
 
Benefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational ResourcesBenefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational Resourcesdimpy50
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportAvinash Rai
 

Recently uploaded (20)

Keeping Your Information Safe with Centralized Security Services
Keeping Your Information Safe with Centralized Security ServicesKeeping Your Information Safe with Centralized Security Services
Keeping Your Information Safe with Centralized Security Services
 
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxslides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
 
The Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational ResourcesThe Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational Resources
 
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxJose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
 
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
 
The impact of social media on mental health and well-being has been a topic o...
The impact of social media on mental health and well-being has been a topic o...The impact of social media on mental health and well-being has been a topic o...
The impact of social media on mental health and well-being has been a topic o...
 
[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
Research Methods in Psychology | Cambridge AS Level | Cambridge Assessment In...
Research Methods in Psychology | Cambridge AS Level | Cambridge Assessment In...Research Methods in Psychology | Cambridge AS Level | Cambridge Assessment In...
Research Methods in Psychology | Cambridge AS Level | Cambridge Assessment In...
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
Benefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational ResourcesBenefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational Resources
 
Mattingly "AI & Prompt Design: Limitations and Solutions with LLMs"
Mattingly "AI & Prompt Design: Limitations and Solutions with LLMs"Mattingly "AI & Prompt Design: Limitations and Solutions with LLMs"
Mattingly "AI & Prompt Design: Limitations and Solutions with LLMs"
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training Report
 
Operations Management - Book1.p - Dr. Abdulfatah A. Salem
Operations Management - Book1.p  - Dr. Abdulfatah A. SalemOperations Management - Book1.p  - Dr. Abdulfatah A. Salem
Operations Management - Book1.p - Dr. Abdulfatah A. Salem
 

Project implimentation

  • 2. Summary  This session covers the aspects of project implementation and management from activation onwards, including factors that affect project implementation.  Project management as a concept is considered.  The characteristic of a good project manager are discussed.
  • 3. Contents  Introduction to Project Implementation  Project Activation  Project Operation  Approaches to Project Implementation  Project Implementation Plan  Factors Affecting Project Implementation  Project Management Defined  Aspects of Project Management  Characteristics of a good Project Manager
  • 4. Project Implementation  Process whereby “project inputs are converted to project outputs”. May be looked at as:  Putting in action the activities of the project.  Putting into practice what was proposed in the project document (i.e. transforming the project proposal into the actual project.)  Management of the project or executing the project intentions.
  • 5. Project Implementation (cont.)  Implementation usually done by implementing agency (organization) that prepared the project and received funding for it.  Other organizations that participate in the implementation of the project  by way of collaboration, say by according good working relationship, extending technical advice or seconding their staff to the project are referred to as co-operating agencies.
  • 6. Project Implementation phase involves:  Project activation, and  Project operation Project activation  This means making arrangements to have the project started. It involves coordination and allocation of resources to make project operational. Project operation  This is practical management of a project. Here, project inputs are transformed into outputs to achieve immediate objectives.
  • 7. Project operation and maintenance Operation and maintenance  To attain value and maximum returns, the district/municipality or the beneficiaries organize for the facility to have the project properly managed and maintained regularly.  An operation and maintenance manual is prepared by the contractor and handed to the district / beneficiaries.
  • 8. Approaches to project implementation Top-down approach  Implementation mainly done by agencies from outside the community with limited involvement by the beneficiaries. Bottom-up approach  Beneficiaries implement the project. Outside agencies may provide the financial resources and technical assistance. Collaborative participatory approach  Both top-down and bottom-up approaches to project implementation are applied in the process.
  • 9. Project implementation plan (PIP)  If PIP not carried out during the project design process and embodied in the project documents, it is carried out at the project activation stage.
  • 10. Project implementation plan includes: a) The project implementation schedule This is concerned with:  What activities can produce expected project outputs?  What is the sequence of these activities?  What is the time frame for these activities?  Who will be responsible for carrying out each activity?
  • 11. Project implementation plan includes:  The following methods may be used to answer the above questions:  Gantt chart  Critical Path Method (CPM) or Net work analysis  Project Evaluation and Review Techniques (PERT)  Simple formats
  • 12. What is a GANTT Chart?  The Gantt chart is also referred to as the progress chart.  It is a chart showing the timing of project activities using horizontal bars.  It is one of the techniques of project scheduling, which depicts the frequency of activities and determines the period of time for implementation.
  • 13. How to determine a GANTT chart  Determine the parts or implementation phases of the project and the sequence in which the associated activities shall be carried out  Then estimate the amount of time required for each activity  List the activities that can be carried out at the same time and identify those to be carried out sequentially
  • 14. How to construct a GANTT chart  Time represented on the horizontal axis, and activities on the vertical axis.  Bars are entered to indicate the time period allocated for each activity and the state of progress at any particular point in time.
  • 15. Example: Maize farming project Activity  Marketing  Threshing  Harvesting  Weeding  Planting  Preparing seedbed J F M A M J J A S O N D Time period/ months
  • 16. The Simple Format ACTIVITY STARTING DATE ENDING DATE COST RESPONSIBLE PERSON REMARKS - Preparing seed bed - Planning - Weeding - Harvesting - Storage - Threshing - Marketing
  • 17. Practical Develop  a Gantt chart  Simple Format project implementation schedules in relation to the identified projects in the project identification session.
  • 18. Project implementation plan (cont.) b) The role of the implementing agency  The specific responsibilities of the key staff during project implementation and monitoring are outlined. c) Beneficiary participation  The involvement of the beneficiaries in planning and implementation and what is expected of them is spelt out.
  • 19. Project implementation plan (cont.) d) Organizational structure and staffing Here the following are sought:  Project structure for purposes of management  Qualifications and skills for the staff  Job descriptions and specifications for the staff  Technical assistance if needed e) Financial management This looks at funds management, accounting period, financial reports and statements and how often they will be made?
  • 20. Project implementation plan (cont.) f) Reporting system This looks at who will be reporting to whom and how often. There is need to design standard reporting formats. g) Sustainability The concept of sustainability is based on belief that project should result in benefits that have lasting effect. Project should be sustained beyond the life of funding - especially if it is a grant. Project should not exhaust the available resources like raw materials and labor.
  • 21. Project implementation plan (cont.) Time control and remedial action Time taken to implement project activities is one measure of successfulness of supervision or monitoring of project implementation. Supervisor pays particular attention to time control measures, time scheduling and its supervision, time extension and postponement, damages for non-completion and defect or warranty period.
  • 22. Project implementation plan (cont.) Supervision of implementation of project schedule This involves a set of checks and balances to ensure that the schedule is being adhered to. To ensure that the time schedule is being adhered to, the project activity time listing can be of great importance.
  • 23. Project Activity Time Listing Activity earliest time Activity latest time Activity code Activity Description Activity duration Start Finish Start Finish Progress remark
  • 24. Practical  Using the Project Activity Time Listing, develop a Project Activity Time Listing table in relation to the Identified project in project identification session, and fill it in.
  • 25. Factors affecting project implementation  Factors that lead to success of projects  Political Commitment  Simplicity of Design  Careful preparation  Good management  Involvement of beneficiaries/community  Factors and problems that lead to failure of projects  Financial Problems  Management problems  Technical problems  Political problems
  • 26. Factors affecting project implementation Other typical implementation problems  Poor scheduling of projects leading to delays in  Poor scheduling of projects leading to delays in implementation.  Misallocation of funds  Delay and sometimes lack of counterpart funding  Lack of accountability and transparency  Bureaucracy in decision-making.  Selfishness/nepotism/favoritism by some project managers.
  • 27. Factors affecting project implementation Other typical implementation problems (cont.)  Weak monitoring systems  Natural calamities like drought, earthquakes, landslides, and hailstorms.  Policy changes  Migration of beneficiaries  Lack of team work  Lack of incentives for implementers.  etc.
  • 28. Project management Management may be defined as;  Getting things done from the available resources, the way you want them to be done. Project management defined  Project Management is an all-embracing term covering the management of every detail of a project (Project cycle) and may be defined as, “the process of planning and directing a project from its inception to its final completion”.
  • 29. Project management (cont.) Project management decisions - a necessary function for setting up a project. It is concerned with:  Forecasting  Setting objectives  Policy making Planning - determines success/failure of project. It has three (3) main aspects:  Programming  Scheduling and  Budgeting
  • 30. Project management (cont.) Project control - To control is to compare actual with planned achievements and take action to correct any adverse deviations. It involves:  Plans of Operation These are the result of the planning process of Project management.  Review and Updating Review is necessary to determine whether the project is proceeding according to plan or not. Updating is recording the state of the project as shown by the reviews, or of making amendments.
  • 31. Project management (cont.) Project Action - When review has shown a project to be deviating from plan, action is required to restore the operation to its planned characteristics.
  • 32. A good project manager should:  have working knowledge in several fields  be able to understand general managerial problems  have active interest in training and developing subordinates  be able to delegate some tasks to subordinates Characteristics of a good project manager
  • 33. A good project manager should:  know the project and understand its objectives  know the systematic process for managing projects  be able to answer the following questions:  What is the project for?  Why is it required?  Whom does it serve?  How is it justified?  How is it going to be used? Characteristics of a good project manager