SlideShare a Scribd company logo
Presented by:
Arpit(16284)
Sachil (16280)
Anuj Parmar(16275)
•Livguard batteries Pvt. Lmt. SAR group company
•Manufactures lead acid storage batteries.
•Supplies and trades inverter batteries, automotive batteries
etc.
BERFOR START WITH BATTERY MAKING PROCESS,
LETS US DISCUSS WHAT ARE THE MAIN Construction of Lead Acid
Battery
 POSITIVE PLATE
 NEGATIVE PLATE
 POLYMER SEPARATER
 SULFURIC ACID
 CONTAINER & Battery Terminals
1) OXIDE PROCESS
Lead oxide is obtained by masses of lead from melting furnaces either by Milling or
Barton Pot process methods. In the milling process, the tumbling action generated by
the rotating mill on solid lead generates heat and then the surface of the lead gets
oxidized. The surface layers of the oxide are removed while the lead particles roll in
the drum. In Barton Pot process a fine stream of lead droplets is produced by
blowing air on molten lead. These droplets are reacted with oxygen and produce lead
oxide.
Grid production and parts casting involves book casting,
continuous casting, and strip casting. In all of these
processes, lead pigs are melted down and the molten
lead is poured into molds or continuously cast into grids,
strips, or parts.
60% GREY OXIDE(PbO)
40%RED LED
SUFLURIC ACID
WATER
• Positive plates need much more time to form than
negatives. The reason for this is the dielectric
behavior of the cured positive paste.
• Oxidation of the bivalent lead compounds in the paste
and formation of the PbO2-positive active mass
passes through a number of chemical reactions, some
of which proceed at a low rate, which retards the
technological process of formation of the positive
plate.
Manufacturers consider the pasting material as a
trade secret,and therefore not reveal this to public
However, this paste material in general is made with
oxide of lead, red lead, litharge, water and dilutes
sulphuric acid.
Negative plate reaction
Pb(s) + HSO−
4(aq) → PbSO4(s) + H+(aq) + 2e−
GREY OXIDE(PbO)
ACRYLIC FIBER
SUFLURIC ACID
CARBON BLACK
BARIUM SULFATE
expander materials
The separators are thin sheets of non-conducting material
made up of chemically treated leadwood, porous rubbers, or
mats of glass fibre and are placed between the positive and
negative to insulate them from each other. Separators are
grooved vertically on one side and are smooth on the other
side.
The container of the lead acid battery is made of glass,
lead lined wood, ebonite, the hard rubber of bituminous
compound, ceramic materials or moulded plastics and
are seated at the top to avoid the discharge of electrolyte.
 Terminal Casting Machine
In this process, all the parts are assembled into a battery case and covered
with the plastic moulds plastic molding plant. This step involves the
formation of positive and negative plate stacks, insertion of separators, inter-
cell connector and plate burning. In this step positive and negative plates are
formed like groups which are strapped to a suitable rack, slipped together
and a separator is inserted in-between them. This separator is made up of
non-conductive material such as paper, plastic or a glass fiber.
SUFURIC ACID
 ELCTROLYTE
 Dilute Sulfuric Acid (H2SO4) – It is used as an electrolyte. It
contains 31% of sulfuric acid.
Filling and Formation
 After the assembling, battery jar is filled with required
amount of electrolyte through a filling or vent tube. Then, it
is ready for initial charging, which may require several hours
of charging depending on the battery size. Low charging rate
is generally employed that may be nearly one day to several
days. This charge formation may either be dry or wet. In a
dry-formation method, batteries are shipped as dry after the
positive and negative elements are fully charged or formed
and dried in tanks or as an individual plates and are
connected to positive and negative terminals of the battery.
 HEAT SEAL WITH PRESSURE
TEST
 SHORT CIRCUIT TEST
AIR LEAKAGE TEST
Charging and Discharging
Electric power is generated ,transmitted and distributed in
form of AC . Electric power is produced at substation .
Substation transform voltage from high to low , or reverse , or
perform other important functions. A substation include
transformers to change voltage levels between high
transmission voltages and lower distribution voltages or at
interconnection of two different transmission voltages.
Livguard batteries pvt. Lmt.has its own substation. The company
has 5 transformers of 33MVA rating.It receives a supply of 66kV
from Akkanwali Sub-station. The transformer reduces the voltage
from 66kV to 440V and 220V and is distributed amongst various
departments of the company.
Company gets its supply from Akkanwali substation. The
coming 3 phases do not get directly connected to transformer
but first are connected to protection devices , which are as
follows lightning arrester. Then 66kV line enters energy meter
which measures the amount of energy consumed. After this ,3
phase are connected to isolators through insulators.
• Lightning arrester-first 66kV line gets connected to
lightning arrester which protects the conductors of system
from damaging effects of lightning.
• Energy meter-it measures the amount of energy consumed
• Isolator –after energy meter 3 phases are connected to
isolator through insulator. If fault occurs in the system then
isolator can be used to isolate the faults to protect the
system . It is operated manually.
• PT(potential transformer)-these are connected in parallel. It
measures the voltage.
• AB switch(Air break switch)-used to isolate faulty line from
healthy line. 3 phases have their own AB switch.
• VCB-if a fault occurs in the system VCB isolate the fault
from the system.3 phases have their own VCB.It is
operated through relay.
•CT(current transformer)-it is used to measure current coming
through VCB. It operates relay . It has some definite output
which can be 1A or 5A , generally depends on C.T. If fault
occurs output of current transformer increases and operates
relay , which in turn trips VCB.
•Transformer-the 3 phases are fed to the transformer which
step downs the voltage to desired voltage . Output of
transformer is again fed to lightning arrester through isolator.
Then phases are connected to VCB, current transformer,
isolator, P.T,AB switch,feeder VCB,C.T
•PCC is an important part in distribution of power . It receives
stepped down voltage through transformer LT line and then
redistributes to other power distribution centres .
•PCC are controlling power which is going to utilize in industry
,PCC are primary type of control centres.
•These are distribution boards where electrical power reaches
from PCC and from here poweris further distributed to the
machines in the plant and to other connected loads.
•Battery making process
•Company s’ electrical structure
•Protection devices
•PCC
•Power distribution boards
Objective of the study
To determine the customer satisfaction level about
home service and after sales service.
To know consumer behavior for purchase of UPS
battery. To identify the factor which influence on
consumer’s decision.
To identify the loopholes in service process.
To know which service process play important role in
providing after sales service.
To know the possible area of improvement
Presentation on industrial training ( BATTERIES MANUACTURING))

More Related Content

What's hot

UPS
UPSUPS
Presentation on battery
Presentation on batteryPresentation on battery
Presentation on battery
Sheikh Aves
 
Battery Concept
Battery ConceptBattery Concept
Battery Concept
Pradeep Chandra Pant
 
Eee ppt
Eee pptEee ppt
Eee ppt
Devi Murugan
 
Switchyard design overview
Switchyard design overviewSwitchyard design overview
Switchyard design overview
Milind Punj
 
Inverter battery presentation
Inverter battery presentationInverter battery presentation
Inverter battery presentation
krishna batterymela
 
power system analysis lecture 1
power system analysis lecture 1power system analysis lecture 1
power system analysis lecture 1
Audih Alfaoury
 
Introduction to electrical engineering
Introduction to electrical engineeringIntroduction to electrical engineering
Introduction to electrical engineering
Rajneesh Budania
 
How to Start Assembling of Lithium Ion Battery (Battery Assembly)
How to Start Assembling of Lithium Ion Battery (Battery Assembly)How to Start Assembling of Lithium Ion Battery (Battery Assembly)
How to Start Assembling of Lithium Ion Battery (Battery Assembly)
Ajjay Kumar Gupta
 
INDUSTRIAL TRAINING REPORT ON BATTERIES & INVERTERS
INDUSTRIAL TRAINING REPORT ON BATTERIES & INVERTERSINDUSTRIAL TRAINING REPORT ON BATTERIES & INVERTERS
INDUSTRIAL TRAINING REPORT ON BATTERIES & INVERTERS
Arpit Kurel
 
Mcb, rccb, elcb
Mcb, rccb, elcbMcb, rccb, elcb
Mcb, rccb, elcb
Akash Patel
 
Battery
Battery Battery
Report on Electrical Safety
Report on Electrical SafetyReport on Electrical Safety
Report on Electrical Safety
son_nikhil
 
Fuel cell
Fuel cellFuel cell
Fuel cell
Dhrupal Patel
 
UPS (Uninterrupted Power Supply)
UPS (Uninterrupted Power Supply)UPS (Uninterrupted Power Supply)
UPS (Uninterrupted Power Supply)
Gautam Mishra
 
presentation on UPs
presentation on UPspresentation on UPs
presentation on UPs
Bipin Choudhary
 
Principles Of Cable Manufacturing Followed By Electric Cable Manufacturers
Principles Of Cable Manufacturing Followed By Electric Cable ManufacturersPrinciples Of Cable Manufacturing Followed By Electric Cable Manufacturers
Principles Of Cable Manufacturing Followed By Electric Cable Manufacturers
neskkebcables
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a Substation
Md. Atiqur Rahman
 
Ac machines-lab-manual
Ac machines-lab-manualAc machines-lab-manual
Ac machines-lab-manual
Rao Umar
 
220kv substation
220kv substation220kv substation
220kv substation
Anbarasu Balakrishnan
 

What's hot (20)

UPS
UPSUPS
UPS
 
Presentation on battery
Presentation on batteryPresentation on battery
Presentation on battery
 
Battery Concept
Battery ConceptBattery Concept
Battery Concept
 
Eee ppt
Eee pptEee ppt
Eee ppt
 
Switchyard design overview
Switchyard design overviewSwitchyard design overview
Switchyard design overview
 
Inverter battery presentation
Inverter battery presentationInverter battery presentation
Inverter battery presentation
 
power system analysis lecture 1
power system analysis lecture 1power system analysis lecture 1
power system analysis lecture 1
 
Introduction to electrical engineering
Introduction to electrical engineeringIntroduction to electrical engineering
Introduction to electrical engineering
 
How to Start Assembling of Lithium Ion Battery (Battery Assembly)
How to Start Assembling of Lithium Ion Battery (Battery Assembly)How to Start Assembling of Lithium Ion Battery (Battery Assembly)
How to Start Assembling of Lithium Ion Battery (Battery Assembly)
 
INDUSTRIAL TRAINING REPORT ON BATTERIES & INVERTERS
INDUSTRIAL TRAINING REPORT ON BATTERIES & INVERTERSINDUSTRIAL TRAINING REPORT ON BATTERIES & INVERTERS
INDUSTRIAL TRAINING REPORT ON BATTERIES & INVERTERS
 
Mcb, rccb, elcb
Mcb, rccb, elcbMcb, rccb, elcb
Mcb, rccb, elcb
 
Battery
Battery Battery
Battery
 
Report on Electrical Safety
Report on Electrical SafetyReport on Electrical Safety
Report on Electrical Safety
 
Fuel cell
Fuel cellFuel cell
Fuel cell
 
UPS (Uninterrupted Power Supply)
UPS (Uninterrupted Power Supply)UPS (Uninterrupted Power Supply)
UPS (Uninterrupted Power Supply)
 
presentation on UPs
presentation on UPspresentation on UPs
presentation on UPs
 
Principles Of Cable Manufacturing Followed By Electric Cable Manufacturers
Principles Of Cable Manufacturing Followed By Electric Cable ManufacturersPrinciples Of Cable Manufacturing Followed By Electric Cable Manufacturers
Principles Of Cable Manufacturing Followed By Electric Cable Manufacturers
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a Substation
 
Ac machines-lab-manual
Ac machines-lab-manualAc machines-lab-manual
Ac machines-lab-manual
 
220kv substation
220kv substation220kv substation
220kv substation
 

Similar to Presentation on industrial training ( BATTERIES MANUACTURING))

3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
Asif682330
 
Relay and switchgear protection
Relay and switchgear protectionRelay and switchgear protection
Relay and switchgear protection
Binit Das
 
Automobile 2 and 11 marks unit v
Automobile 2 and 11 marks unit vAutomobile 2 and 11 marks unit v
Automobile 2 and 11 marks unit v
Dasarathan Thandapani
 
PPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWARPPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWAR
ABHISHEK SINGH
 
Circuit breakers
Circuit breakersCircuit breakers
Circuit breakers
AjayRamakrishnan
 
Sub Station Training Program
Sub Station Training ProgramSub Station Training Program
Sub Station Training Program
Arul Balan
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
Himansu Pradhan
 
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
Rishabhlko
 
Lecture 2 ic fabrication processing & wafer preparation
Lecture 2 ic fabrication processing & wafer preparationLecture 2 ic fabrication processing & wafer preparation
Lecture 2 ic fabrication processing & wafer preparation
Dr. Ghanshyam Singh
 
ic-notes-ppt (1).ppt
ic-notes-ppt (1).pptic-notes-ppt (1).ppt
ic-notes-ppt (1).ppt
DEPTEEE2
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Sudhir Cement Industries Pvt. Ltd. Meerut
 
A vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power LimitedA vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power Limited
Kishan Gabel
 
Presentation on KESCO sub-station, kanpur
Presentation on KESCO sub-station, kanpurPresentation on KESCO sub-station, kanpur
Presentation on KESCO sub-station, kanpur
Shubham Sachan
 
Lead Acid Battery II
Lead Acid Battery IILead Acid Battery II
Lead Acid Battery II
Bahtiar Yulianto
 
Electrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCBElectrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCB
MANOJ964697
 
LIC ppt-all.ppt
LIC ppt-all.pptLIC ppt-all.ppt
LIC ppt-all.ppt
saravanaprasath846
 
Transformer ppt
Transformer pptTransformer ppt
Transformer ppt
Rakesh Gurjar
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
Sunny Daksh
 
Srijan tripathi(220kv gss) ppt
Srijan tripathi(220kv gss) pptSrijan tripathi(220kv gss) ppt
Srijan tripathi(220kv gss) ppt
srijan tripathi
 
400 kv nelmangala
400 kv nelmangala400 kv nelmangala
400 kv nelmangala
Mayur Dhanaji Rane
 

Similar to Presentation on industrial training ( BATTERIES MANUACTURING)) (20)

3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
 
Relay and switchgear protection
Relay and switchgear protectionRelay and switchgear protection
Relay and switchgear protection
 
Automobile 2 and 11 marks unit v
Automobile 2 and 11 marks unit vAutomobile 2 and 11 marks unit v
Automobile 2 and 11 marks unit v
 
PPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWARPPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWAR
 
Circuit breakers
Circuit breakersCircuit breakers
Circuit breakers
 
Sub Station Training Program
Sub Station Training ProgramSub Station Training Program
Sub Station Training Program
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
 
Lecture 2 ic fabrication processing & wafer preparation
Lecture 2 ic fabrication processing & wafer preparationLecture 2 ic fabrication processing & wafer preparation
Lecture 2 ic fabrication processing & wafer preparation
 
ic-notes-ppt (1).ppt
ic-notes-ppt (1).pptic-notes-ppt (1).ppt
ic-notes-ppt (1).ppt
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
 
A vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power LimitedA vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power Limited
 
Presentation on KESCO sub-station, kanpur
Presentation on KESCO sub-station, kanpurPresentation on KESCO sub-station, kanpur
Presentation on KESCO sub-station, kanpur
 
Lead Acid Battery II
Lead Acid Battery IILead Acid Battery II
Lead Acid Battery II
 
Electrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCBElectrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCB
 
LIC ppt-all.ppt
LIC ppt-all.pptLIC ppt-all.ppt
LIC ppt-all.ppt
 
Transformer ppt
Transformer pptTransformer ppt
Transformer ppt
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
 
Srijan tripathi(220kv gss) ppt
Srijan tripathi(220kv gss) pptSrijan tripathi(220kv gss) ppt
Srijan tripathi(220kv gss) ppt
 
400 kv nelmangala
400 kv nelmangala400 kv nelmangala
400 kv nelmangala
 

More from Arpit Kurel

Storing Solar Power: An Insight into Batteries
Storing Solar Power: An  Insight into BatteriesStoring Solar Power: An  Insight into Batteries
Storing Solar Power: An Insight into Batteries
Arpit Kurel
 
Solar Policy in India (Article)
Solar Policy in India (Article) Solar Policy in India (Article)
Solar Policy in India (Article)
Arpit Kurel
 
Electric vehicles in India (Report)
Electric vehicles in India (Report) Electric vehicles in India (Report)
Electric vehicles in India (Report)
Arpit Kurel
 
Seminar Report on Smart charging strategy for an electric vehicle fleet to r...
Seminar Report  on Smart charging strategy for an electric vehicle fleet to r...Seminar Report  on Smart charging strategy for an electric vehicle fleet to r...
Seminar Report on Smart charging strategy for an electric vehicle fleet to r...
Arpit Kurel
 
Advance Cooling techniques of PV module. (Seminar report)
Advance Cooling techniques of PV module. (Seminar report) Advance Cooling techniques of PV module. (Seminar report)
Advance Cooling techniques of PV module. (Seminar report)
Arpit Kurel
 
BIOMASS AS RENEWABLE ENERGY.pdf
BIOMASS AS RENEWABLE ENERGY.pdfBIOMASS AS RENEWABLE ENERGY.pdf
BIOMASS AS RENEWABLE ENERGY.pdf
Arpit Kurel
 
tidal energy.pdf
tidal energy.pdftidal energy.pdf
tidal energy.pdf
Arpit Kurel
 
RURAL ELECTRIFICATION IN INDIA DECENTRALISED RENEWABLE ENERGY MICROGRIDS
RURAL ELECTRIFICATION IN INDIA  DECENTRALISED RENEWABLE ENERGY MICROGRIDSRURAL ELECTRIFICATION IN INDIA  DECENTRALISED RENEWABLE ENERGY MICROGRIDS
RURAL ELECTRIFICATION IN INDIA DECENTRALISED RENEWABLE ENERGY MICROGRIDS
Arpit Kurel
 
Presentation on ONE SUN ONE WORLD ONE GRID (OSOWOG) policy making
Presentation on ONE SUN ONE WORLD ONE GRID (OSOWOG) policy makingPresentation on ONE SUN ONE WORLD ONE GRID (OSOWOG) policy making
Presentation on ONE SUN ONE WORLD ONE GRID (OSOWOG) policy making
Arpit Kurel
 
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT)
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT) ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT)
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT)
Arpit Kurel
 
Presentation on Industrial Training( DISTRIBUTION LOSSES )
Presentation on Industrial Training( DISTRIBUTION LOSSES )Presentation on Industrial Training( DISTRIBUTION LOSSES )
Presentation on Industrial Training( DISTRIBUTION LOSSES )
Arpit Kurel
 
TERM PAPER On WALKING CHARGER USING PIEZO-ELECTRIC MATERIAL
TERM PAPER On  WALKING CHARGER USING  PIEZO-ELECTRIC MATERIALTERM PAPER On  WALKING CHARGER USING  PIEZO-ELECTRIC MATERIAL
TERM PAPER On WALKING CHARGER USING PIEZO-ELECTRIC MATERIAL
Arpit Kurel
 
SIMULATION AND STUDY OF MULTILEVEL INVERTER (ppt)
SIMULATION AND STUDY OF MULTILEVEL INVERTER (ppt)SIMULATION AND STUDY OF MULTILEVEL INVERTER (ppt)
SIMULATION AND STUDY OF MULTILEVEL INVERTER (ppt)
Arpit Kurel
 
Walk n charge (ppt)
Walk n charge (ppt)Walk n charge (ppt)
Walk n charge (ppt)
Arpit Kurel
 
Walk n charge (report)
Walk n charge (report)Walk n charge (report)
Walk n charge (report)
Arpit Kurel
 
SMART ELECTRIC GEYSER (report)
SMART ELECTRIC GEYSER (report)SMART ELECTRIC GEYSER (report)
SMART ELECTRIC GEYSER (report)
Arpit Kurel
 
Simulation and study of multilevel inverter (report)
Simulation and study of multilevel inverter (report)Simulation and study of multilevel inverter (report)
Simulation and study of multilevel inverter (report)
Arpit Kurel
 
Global Positioning System (GPS)
Global Positioning System (GPS)Global Positioning System (GPS)
Global Positioning System (GPS)
Arpit Kurel
 
Human Development(factors) ppt
Human Development(factors) pptHuman Development(factors) ppt
Human Development(factors) ppt
Arpit Kurel
 

More from Arpit Kurel (19)

Storing Solar Power: An Insight into Batteries
Storing Solar Power: An  Insight into BatteriesStoring Solar Power: An  Insight into Batteries
Storing Solar Power: An Insight into Batteries
 
Solar Policy in India (Article)
Solar Policy in India (Article) Solar Policy in India (Article)
Solar Policy in India (Article)
 
Electric vehicles in India (Report)
Electric vehicles in India (Report) Electric vehicles in India (Report)
Electric vehicles in India (Report)
 
Seminar Report on Smart charging strategy for an electric vehicle fleet to r...
Seminar Report  on Smart charging strategy for an electric vehicle fleet to r...Seminar Report  on Smart charging strategy for an electric vehicle fleet to r...
Seminar Report on Smart charging strategy for an electric vehicle fleet to r...
 
Advance Cooling techniques of PV module. (Seminar report)
Advance Cooling techniques of PV module. (Seminar report) Advance Cooling techniques of PV module. (Seminar report)
Advance Cooling techniques of PV module. (Seminar report)
 
BIOMASS AS RENEWABLE ENERGY.pdf
BIOMASS AS RENEWABLE ENERGY.pdfBIOMASS AS RENEWABLE ENERGY.pdf
BIOMASS AS RENEWABLE ENERGY.pdf
 
tidal energy.pdf
tidal energy.pdftidal energy.pdf
tidal energy.pdf
 
RURAL ELECTRIFICATION IN INDIA DECENTRALISED RENEWABLE ENERGY MICROGRIDS
RURAL ELECTRIFICATION IN INDIA  DECENTRALISED RENEWABLE ENERGY MICROGRIDSRURAL ELECTRIFICATION IN INDIA  DECENTRALISED RENEWABLE ENERGY MICROGRIDS
RURAL ELECTRIFICATION IN INDIA DECENTRALISED RENEWABLE ENERGY MICROGRIDS
 
Presentation on ONE SUN ONE WORLD ONE GRID (OSOWOG) policy making
Presentation on ONE SUN ONE WORLD ONE GRID (OSOWOG) policy makingPresentation on ONE SUN ONE WORLD ONE GRID (OSOWOG) policy making
Presentation on ONE SUN ONE WORLD ONE GRID (OSOWOG) policy making
 
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT)
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT) ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT)
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT)
 
Presentation on Industrial Training( DISTRIBUTION LOSSES )
Presentation on Industrial Training( DISTRIBUTION LOSSES )Presentation on Industrial Training( DISTRIBUTION LOSSES )
Presentation on Industrial Training( DISTRIBUTION LOSSES )
 
TERM PAPER On WALKING CHARGER USING PIEZO-ELECTRIC MATERIAL
TERM PAPER On  WALKING CHARGER USING  PIEZO-ELECTRIC MATERIALTERM PAPER On  WALKING CHARGER USING  PIEZO-ELECTRIC MATERIAL
TERM PAPER On WALKING CHARGER USING PIEZO-ELECTRIC MATERIAL
 
SIMULATION AND STUDY OF MULTILEVEL INVERTER (ppt)
SIMULATION AND STUDY OF MULTILEVEL INVERTER (ppt)SIMULATION AND STUDY OF MULTILEVEL INVERTER (ppt)
SIMULATION AND STUDY OF MULTILEVEL INVERTER (ppt)
 
Walk n charge (ppt)
Walk n charge (ppt)Walk n charge (ppt)
Walk n charge (ppt)
 
Walk n charge (report)
Walk n charge (report)Walk n charge (report)
Walk n charge (report)
 
SMART ELECTRIC GEYSER (report)
SMART ELECTRIC GEYSER (report)SMART ELECTRIC GEYSER (report)
SMART ELECTRIC GEYSER (report)
 
Simulation and study of multilevel inverter (report)
Simulation and study of multilevel inverter (report)Simulation and study of multilevel inverter (report)
Simulation and study of multilevel inverter (report)
 
Global Positioning System (GPS)
Global Positioning System (GPS)Global Positioning System (GPS)
Global Positioning System (GPS)
 
Human Development(factors) ppt
Human Development(factors) pptHuman Development(factors) ppt
Human Development(factors) ppt
 

Recently uploaded

Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
Madhumitha Jayaram
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
Ratnakar Mikkili
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 

Recently uploaded (20)

Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 

Presentation on industrial training ( BATTERIES MANUACTURING))

  • 2. •Livguard batteries Pvt. Lmt. SAR group company •Manufactures lead acid storage batteries. •Supplies and trades inverter batteries, automotive batteries etc.
  • 3. BERFOR START WITH BATTERY MAKING PROCESS, LETS US DISCUSS WHAT ARE THE MAIN Construction of Lead Acid Battery  POSITIVE PLATE  NEGATIVE PLATE  POLYMER SEPARATER  SULFURIC ACID  CONTAINER & Battery Terminals
  • 4. 1) OXIDE PROCESS Lead oxide is obtained by masses of lead from melting furnaces either by Milling or Barton Pot process methods. In the milling process, the tumbling action generated by the rotating mill on solid lead generates heat and then the surface of the lead gets oxidized. The surface layers of the oxide are removed while the lead particles roll in the drum. In Barton Pot process a fine stream of lead droplets is produced by blowing air on molten lead. These droplets are reacted with oxygen and produce lead oxide.
  • 5. Grid production and parts casting involves book casting, continuous casting, and strip casting. In all of these processes, lead pigs are melted down and the molten lead is poured into molds or continuously cast into grids, strips, or parts.
  • 6.
  • 7.
  • 8.
  • 9. 60% GREY OXIDE(PbO) 40%RED LED SUFLURIC ACID WATER
  • 10. • Positive plates need much more time to form than negatives. The reason for this is the dielectric behavior of the cured positive paste. • Oxidation of the bivalent lead compounds in the paste and formation of the PbO2-positive active mass passes through a number of chemical reactions, some of which proceed at a low rate, which retards the technological process of formation of the positive plate.
  • 11. Manufacturers consider the pasting material as a trade secret,and therefore not reveal this to public However, this paste material in general is made with oxide of lead, red lead, litharge, water and dilutes sulphuric acid.
  • 12. Negative plate reaction Pb(s) + HSO− 4(aq) → PbSO4(s) + H+(aq) + 2e−
  • 13. GREY OXIDE(PbO) ACRYLIC FIBER SUFLURIC ACID CARBON BLACK BARIUM SULFATE expander materials
  • 14. The separators are thin sheets of non-conducting material made up of chemically treated leadwood, porous rubbers, or mats of glass fibre and are placed between the positive and negative to insulate them from each other. Separators are grooved vertically on one side and are smooth on the other side.
  • 15.
  • 16. The container of the lead acid battery is made of glass, lead lined wood, ebonite, the hard rubber of bituminous compound, ceramic materials or moulded plastics and are seated at the top to avoid the discharge of electrolyte.
  • 18. In this process, all the parts are assembled into a battery case and covered with the plastic moulds plastic molding plant. This step involves the formation of positive and negative plate stacks, insertion of separators, inter- cell connector and plate burning. In this step positive and negative plates are formed like groups which are strapped to a suitable rack, slipped together and a separator is inserted in-between them. This separator is made up of non-conductive material such as paper, plastic or a glass fiber.
  • 19.
  • 20. SUFURIC ACID  ELCTROLYTE  Dilute Sulfuric Acid (H2SO4) – It is used as an electrolyte. It contains 31% of sulfuric acid.
  • 21. Filling and Formation  After the assembling, battery jar is filled with required amount of electrolyte through a filling or vent tube. Then, it is ready for initial charging, which may require several hours of charging depending on the battery size. Low charging rate is generally employed that may be nearly one day to several days. This charge formation may either be dry or wet. In a dry-formation method, batteries are shipped as dry after the positive and negative elements are fully charged or formed and dried in tanks or as an individual plates and are connected to positive and negative terminals of the battery.
  • 22.
  • 23.  HEAT SEAL WITH PRESSURE TEST  SHORT CIRCUIT TEST AIR LEAKAGE TEST
  • 25. Electric power is generated ,transmitted and distributed in form of AC . Electric power is produced at substation . Substation transform voltage from high to low , or reverse , or perform other important functions. A substation include transformers to change voltage levels between high transmission voltages and lower distribution voltages or at interconnection of two different transmission voltages.
  • 26. Livguard batteries pvt. Lmt.has its own substation. The company has 5 transformers of 33MVA rating.It receives a supply of 66kV from Akkanwali Sub-station. The transformer reduces the voltage from 66kV to 440V and 220V and is distributed amongst various departments of the company.
  • 27. Company gets its supply from Akkanwali substation. The coming 3 phases do not get directly connected to transformer but first are connected to protection devices , which are as follows lightning arrester. Then 66kV line enters energy meter which measures the amount of energy consumed. After this ,3 phase are connected to isolators through insulators. • Lightning arrester-first 66kV line gets connected to lightning arrester which protects the conductors of system from damaging effects of lightning.
  • 28. • Energy meter-it measures the amount of energy consumed • Isolator –after energy meter 3 phases are connected to isolator through insulator. If fault occurs in the system then isolator can be used to isolate the faults to protect the system . It is operated manually. • PT(potential transformer)-these are connected in parallel. It measures the voltage. • AB switch(Air break switch)-used to isolate faulty line from healthy line. 3 phases have their own AB switch. • VCB-if a fault occurs in the system VCB isolate the fault from the system.3 phases have their own VCB.It is operated through relay.
  • 29. •CT(current transformer)-it is used to measure current coming through VCB. It operates relay . It has some definite output which can be 1A or 5A , generally depends on C.T. If fault occurs output of current transformer increases and operates relay , which in turn trips VCB. •Transformer-the 3 phases are fed to the transformer which step downs the voltage to desired voltage . Output of transformer is again fed to lightning arrester through isolator. Then phases are connected to VCB, current transformer, isolator, P.T,AB switch,feeder VCB,C.T
  • 30. •PCC is an important part in distribution of power . It receives stepped down voltage through transformer LT line and then redistributes to other power distribution centres . •PCC are controlling power which is going to utilize in industry ,PCC are primary type of control centres.
  • 31. •These are distribution boards where electrical power reaches from PCC and from here poweris further distributed to the machines in the plant and to other connected loads.
  • 32. •Battery making process •Company s’ electrical structure •Protection devices •PCC •Power distribution boards
  • 33. Objective of the study To determine the customer satisfaction level about home service and after sales service. To know consumer behavior for purchase of UPS battery. To identify the factor which influence on consumer’s decision. To identify the loopholes in service process. To know which service process play important role in providing after sales service. To know the possible area of improvement