MANUFACTURING PROCESS OF 660 MW
TURBO GENERTOR STATOR WINDING
BAR
ABHISHEK SINGH
12ERDME004
AT BHEL HARIDWAR
INTRODUCTION
In 1956 India took a major step towards the establishment of its
heavy engineering industry when BHEL, the first heavy electrical
Manufacturing unit of the country was set up at Bhopal.
BHEL's Heavy Electrical Equipment Plant (HEEP) was set up
in technical collaboration with USSR, for the manufacturing of
power plant equipment.
In 1976, BHEL entered into a collaboration agreement with
M/s Kraftwerk Union, AG of Germany for design,
manufacturing, erection and commissioning of large size
steam turbines.
More than 40 percent of the country's electrical energy is
generated from the power equipment supplied by BHEL,
Haridwar.
MANUFACTURING BLOCKS:
.
BLOCK I: ELECTRICAL MACHINE BLOCK, IS DESIGNED TO
MANUFACTURING OF TURBOGENERATORS
BLOCK II: FABRICATION BLOCK
BLOCK III: TURBINE BLADE BLOCK
BLOCK IV: COIL & INSULATION MANUFACTURING &
APPARATUS & CONTROL GEAR MANUFACTURING
BLOCK
BLOCK V: FEEDER BLOCK AND KNOWN AS FABRICATION
AND FORGE BLOCK
BLOCK VI: STAMPING AND DIES MANUFACTURING BLOCK
BLOCK VII: WOODWORKING BLOCK
BLOCK VIII: HEAT EXCHANGER BLOCK, IS DESIGNED TO
MANUFACTURE HEAT EXCHANGER UNIT FOR
STEAM TURBINES.
COIL & INSULATION MANUFACTURING
SHOP (BLOCK-IV)
Block-4 is designed to manufacture stator winding
bars of Turbo & Hydro generator and coil like DC
Armature coil ,main pole coil , equalizer coil etc.
There are three BAYS in this block each bay
manufactures stator bars and coils for different
machines
BAY-I: Bar winding shop: manufacturing of stator winding
bars of generator
BAY-II: Manufacturing of heavy duty generator stator bars
with New CNC M/c
BAY-III: Insulation detail shop: Manufacturing of hard
insulation & machining of hares insulation part (Glass Textolite)
such as packing, washer, insulation box, wedges etc
Bar Shop: This shop is meant for manufacturing of stator
winding coils of turbo-generator and hydro generator
Layout of CIM, Block-IV
It is quite difficult (rather impossible) to manufacture, handle
and wind in the stator slot of generator of higher generation
capacity because of its bigger size and heavy weight. That is
why we make coil in two parts. One part its bottom part of coil
called bottom or lower bar and other part of coil is called top
bar or upper bar.
Why do we call it bar?
Manufacturing Process
• For the manufacturing of stator bars insulated
copper conductors are brought from Bangalore,
it’s of two type’s i.e. solid copper conductor &
hollow copper conductors which are used in
water cooled stator layer glass insulation.
• solid bar for 600/660/700 MW
volume - 9.5X1.2
• Hollow copper for 600/660/700
Volume – 8.0x 4.6x1.3
Cutting
This process is done by automatic 3-444CNC machine. In
this process the pre insulated copper conductor is cut into
number of required length. Insulation is removed from both
ends of the conductor cut.
Transposition
Transposition means changing/shifting of position of
each conductor in active core (slot) part.
After cutting the required number of conductors, the
conductors are arranged on the comb in staggered
manner and then bends are given to the conductors with
the help of bending die at required distance.
Then the conductor are taken out from the comb & die
and placed with their ends in a line and transposition is
carried out.
Need of transposition.
1. To reduce eddy current losses.
2. Equalize the voltage generator.
3. To minimize skin effect of ac current
Cross Over Insulation
• The pre insulation of the copper conductor may get damaged
due to mechanical bending in die during transposition, hence
the insulating spacers are provided at the crossover portion
of the conductors. A filler material (insulating putty or
moulding micanite) is provided along the height of the bar to
maintain the rectangular shape and to cover the difference of
level of conductors.
Stack Pressing
• The core part of bar stack is pressed in under the pressure b/w
70kg to 80 kg and Temperature b/w 90 C to160 C for given
period. Four bar is pressed in one time and six to eight plate
are used for pressing .after that the consolidated stack is
withdraw from the press.
Inter Stand Short Test
The consolidated stack is tested for the short between any
two conductors in the bar, if found then it has to be
rectified.This is done to ensure that no local current is flowing
due to short circuit between conductors.(300 A/C supply)
Forming
• This process of forming is very important as in this process the
bars are bending from both the ends of the bar i.e. at exciter
side and turbine side at specific angles and shape as per
design. This process is done manually. First the former is set
according to the design making different angles at different
positions. The straight bar stack is formed as per overhang
profile (as per design), The overhang portion is consolidated
after forming.
. Pickling process
After the forming and cutting process of the bar and due to the
transportation of the bar, there accumulate very minute particles
of dust on the ends of the bar. These particles may cause at
the time of brazing and may create some air gaps. So, in order
to remove these unwanted particles, basically the oil particles
pickling process is performed.
Contact Sleeve Mounting
• After the pickling process is complete, contact
sleeve and water box bottom parts are mounted on
both the ends of the bar. it is a rectangular sleeve
which is used to make contact between upper and
lower bars . All the solid conductors are cut from
the ends of the bar after the contact sleeve except
the outer solid conductors. The water box is
mounted in two halves; first the water box bottom
part is mounted after the contact sleeve keeping
some distance between them.
• Brazing is basically the process of fixation of
both the contact sleeve and water box.
• Brazing is suitable for small parts , when high
joint strength is required.In brazing alloy is
mixed with water.
Brazing
• Nitrogen gas is the main constituent of the test. This test is
similar to puncture test that is inflated tube is dipped in water for
any leakage, the air bubbles gives us the exact position of the
puncture.
Nitrogen test
Thermal Shock Test
Thermal shock test is performed to check whether the bar can
withstand extreme conditions i.e. when the generator is
working or running at about 3000 Rpm. This is achieved by
thermal shock test. Thermal shock test consist of series of hot
water & cold water cycles alternatively. So firstly hot water at
temperature of about 90ºC is passed through the bar and then
cold water at about room temperature 27ºC approx. is flowed
inside the bar alternatively. This process is repeated again and
again.
Helium Leakage Test
• After thermal shock test bar is tested for any leakage with
help of Helium gas. Helium test is the most important test of
all, because helium test is performed to check any minute
leakage within the bar and at the brazed portion. because
helium is one of the lightest gases.
Reforming
• After all the previous processes which had undergone on the
bar. That the shape of the bar is deformed from its original
shape due to handling of the bar from one place to another for
different processes. So to keep the shape of the bar as per
design, the bar is checked if it is found distorted then it is
reformed in the previous former machine by placing the bar on
the former .
Insulation
• The stator bars are insulated with Micalastic (trade name)
insulation.
• Insulation is basically done to prevent any kind of short circuit
between the bar and the stator core when the bar is assembled
in the stator of the machine
Impregnation and Baking
• Micalastic System : In case of poor resin system the
insulated bars are heated under vacuum and the
impregnated (dipped) in heated resin so that all the air
gaps are filled, layer by layer, with resin.
• After impregnation the bars are pressed to bring them
back to the original dimensions.
HIGH VOLTAGE TEST
•When the bar is dried it is wrapped with aluminum sheet to make
outer surface of the bar conducting so that H.V. (High voltage
test) can be performed. After this tests the coating of red gel is
applied at both the ends of the bar.
•In this test the bar which is already wrapped with aluminum is
used.
•High voltage is applied to the bar using auto-transformer and it is
increased in steps according to the working voltage of the
generator. If the insulation is weak the bar will puncture at the
place of weaker insulation.
•If any of the bar fails this test i.e. bar is punctured at any point
then the bar is sent back for re-insulation and all the processes
are repeated again
Finishing
• The baked and dimensionally correct bars are
sanded-off to smoothen the edges and the
surface is calibrated, if required, for the
dimension.
Dispatched for winding
• The bars preserved with polythene sleeves to
protect from dust, dirt, oil, rain etc are send to Block-I
(Electric Machines Production Block - I, Turbo
Generators and Hydro Generators) for winding
Picture Of Bars
THANK YOU

More Related Content

What's hot

power transformer and its usage
power transformer and its usage power transformer and its usage
power transformer and its usage gourav1245
 
PPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclPPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclVISHAL VERMA
 
Electrical HT/LT Motor protection
Electrical HT/LT Motor protectionElectrical HT/LT Motor protection
Electrical HT/LT Motor protectionNischal Popat
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationraiamitesh8
 
BHEL steam turbine manufacturing
BHEL steam turbine manufacturingBHEL steam turbine manufacturing
BHEL steam turbine manufacturingSakshyam Rai
 
LV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptxLV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptxshivendra68
 
practical training report on turbogenerator
practical training report on turbogeneratorpractical training report on turbogenerator
practical training report on turbogeneratorPriyank Bisht
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentationNikhil Kachare
 
500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction report500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction reportSumit Singh
 
PPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONPPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONRavi Phadtare
 
Generator Protection
Generator ProtectionGenerator Protection
Generator ProtectionPriten Vasa
 

What's hot (20)

Ehv substation
Ehv substationEhv substation
Ehv substation
 
power transformer and its usage
power transformer and its usage power transformer and its usage
power transformer and its usage
 
BHEL Trainning Report
BHEL Trainning ReportBHEL Trainning Report
BHEL Trainning Report
 
TURBO GENERATOR
TURBO GENERATORTURBO GENERATOR
TURBO GENERATOR
 
PPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclPPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppcl
 
Electrical HT/LT Motor protection
Electrical HT/LT Motor protectionElectrical HT/LT Motor protection
Electrical HT/LT Motor protection
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
Turbo generator
Turbo generator Turbo generator
Turbo generator
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substation
 
BHEL steam turbine manufacturing
BHEL steam turbine manufacturingBHEL steam turbine manufacturing
BHEL steam turbine manufacturing
 
Vacuum circuit breaker
Vacuum circuit breakerVacuum circuit breaker
Vacuum circuit breaker
 
Bhel presentation
 Bhel presentation Bhel presentation
Bhel presentation
 
ALTERNATOR DESIGN
ALTERNATOR DESIGNALTERNATOR DESIGN
ALTERNATOR DESIGN
 
LV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptxLV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptx
 
practical training report on turbogenerator
practical training report on turbogeneratorpractical training report on turbogenerator
practical training report on turbogenerator
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction report500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction report
 
PPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONPPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATION
 
Generator Protection
Generator ProtectionGenerator Protection
Generator Protection
 
Battery Charger Basics
Battery Charger BasicsBattery Charger Basics
Battery Charger Basics
 

Viewers also liked

BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...
BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...
BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...Nawneet Thakur
 
ELB044 Lecture 18. Introduction to Induction Machines
ELB044 Lecture 18. Introduction to Induction MachinesELB044 Lecture 18. Introduction to Induction Machines
ELB044 Lecture 18. Introduction to Induction MachinesFrancisco Gonzalez-Longatt
 
Manufacturing process of 500/600MW stator winding bar
Manufacturing process of 500/600MW stator winding barManufacturing process of 500/600MW stator winding bar
Manufacturing process of 500/600MW stator winding barAvinash Kumar
 
MANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATOR
MANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATORMANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATOR
MANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATORAnurag Verma
 
Mechanical Vibrations all slides
Mechanical Vibrations all slidesMechanical Vibrations all slides
Mechanical Vibrations all slidesEbrahim Hanash
 

Viewers also liked (11)

Design of wind generator
Design of wind generatorDesign of wind generator
Design of wind generator
 
Harshit agarwal
Harshit agarwalHarshit agarwal
Harshit agarwal
 
Seminar report
Seminar reportSeminar report
Seminar report
 
BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...
BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...
BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...
 
Stator design
Stator designStator design
Stator design
 
ELB044 Lecture 18. Introduction to Induction Machines
ELB044 Lecture 18. Introduction to Induction MachinesELB044 Lecture 18. Introduction to Induction Machines
ELB044 Lecture 18. Introduction to Induction Machines
 
Ac motor winding
Ac motor windingAc motor winding
Ac motor winding
 
Manufacturing process of 500/600MW stator winding bar
Manufacturing process of 500/600MW stator winding barManufacturing process of 500/600MW stator winding bar
Manufacturing process of 500/600MW stator winding bar
 
MANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATOR
MANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATORMANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATOR
MANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATOR
 
Mechanical Vibrations all slides
Mechanical Vibrations all slidesMechanical Vibrations all slides
Mechanical Vibrations all slides
 
Build Features, Not Apps
Build Features, Not AppsBuild Features, Not Apps
Build Features, Not Apps
 

Similar to PPT ON CIM ,BHEL HARIDWAR

MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR Shubham Kulshreshtha
 
Manufacturing of Large Electrical Machine
Manufacturing of Large Electrical MachineManufacturing of Large Electrical Machine
Manufacturing of Large Electrical MachineVAIBHAV SINGH
 
Manfacturing of turbo generators at BHEL
Manfacturing of turbo generators at BHELManfacturing of turbo generators at BHEL
Manfacturing of turbo generators at BHELPrabhu Raj
 
Gurtej bhel electrical report-at-bhel-haridwar-1
Gurtej bhel electrical report-at-bhel-haridwar-1Gurtej bhel electrical report-at-bhel-haridwar-1
Gurtej bhel electrical report-at-bhel-haridwar-1Gurtej Rai
 
PROJECT ON STUDY OF COMMUNICATION PROBLEM IN ABB DRIVE - Copy
PROJECT ON  STUDY OF COMMUNICATION PROBLEM IN ABB DRIVE - CopyPROJECT ON  STUDY OF COMMUNICATION PROBLEM IN ABB DRIVE - Copy
PROJECT ON STUDY OF COMMUNICATION PROBLEM IN ABB DRIVE - CopyAmanraj Singh Padan
 
Welding of Joints.pdf
Welding of Joints.pdfWelding of Joints.pdf
Welding of Joints.pdfTVijayaGowri
 
GEMCO(general electric manufacturing company),chittagong,bd
GEMCO(general electric manufacturing company),chittagong,bdGEMCO(general electric manufacturing company),chittagong,bd
GEMCO(general electric manufacturing company),chittagong,bdTanvir Shihan
 
500MW presentation - 11102006.PPT
500MW presentation - 11102006.PPT500MW presentation - 11102006.PPT
500MW presentation - 11102006.PPTMahadev Kovalli
 
Circuit Breaker: Part 2
Circuit Breaker: Part 2Circuit Breaker: Part 2
Circuit Breaker: Part 2Dr. Rohit Babu
 
Industrial training ppt bhel bhopal
Industrial training ppt bhel bhopalIndustrial training ppt bhel bhopal
Industrial training ppt bhel bhopalPRAVEENKUMARSINGH87
 
Repairing of kiln shell crack
Repairing of kiln shell crackRepairing of kiln shell crack
Repairing of kiln shell crackmkpq pasha
 
Repairing of kiln shell crack
Repairing of kiln shell crackRepairing of kiln shell crack
Repairing of kiln shell crackmkpq pasha
 
Bus Ducts or Hollow conductors
Bus Ducts or Hollow conductorsBus Ducts or Hollow conductors
Bus Ducts or Hollow conductorsAjay Meena
 
Tube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptTube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptssuserea7ebc
 
Presentation-GEMCO
Presentation-GEMCOPresentation-GEMCO
Presentation-GEMCODipen Shome
 
Tbea vocatinal training
Tbea vocatinal trainingTbea vocatinal training
Tbea vocatinal trainingDeep Shah
 

Similar to PPT ON CIM ,BHEL HARIDWAR (20)

Harshitagarwal 111109034529-phpapp02
Harshitagarwal 111109034529-phpapp02Harshitagarwal 111109034529-phpapp02
Harshitagarwal 111109034529-phpapp02
 
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
 
Manufacturing of Large Electrical Machine
Manufacturing of Large Electrical MachineManufacturing of Large Electrical Machine
Manufacturing of Large Electrical Machine
 
Manfacturing of turbo generators at BHEL
Manfacturing of turbo generators at BHELManfacturing of turbo generators at BHEL
Manfacturing of turbo generators at BHEL
 
Gurtej bhel electrical report-at-bhel-haridwar-1
Gurtej bhel electrical report-at-bhel-haridwar-1Gurtej bhel electrical report-at-bhel-haridwar-1
Gurtej bhel electrical report-at-bhel-haridwar-1
 
REPORT (1)
REPORT (1)REPORT (1)
REPORT (1)
 
PROJECT ON STUDY OF COMMUNICATION PROBLEM IN ABB DRIVE - Copy
PROJECT ON  STUDY OF COMMUNICATION PROBLEM IN ABB DRIVE - CopyPROJECT ON  STUDY OF COMMUNICATION PROBLEM IN ABB DRIVE - Copy
PROJECT ON STUDY OF COMMUNICATION PROBLEM IN ABB DRIVE - Copy
 
Welding of Joints.pdf
Welding of Joints.pdfWelding of Joints.pdf
Welding of Joints.pdf
 
GEMCO(general electric manufacturing company),chittagong,bd
GEMCO(general electric manufacturing company),chittagong,bdGEMCO(general electric manufacturing company),chittagong,bd
GEMCO(general electric manufacturing company),chittagong,bd
 
500MW presentation - 11102006.PPT
500MW presentation - 11102006.PPT500MW presentation - 11102006.PPT
500MW presentation - 11102006.PPT
 
Shashi
ShashiShashi
Shashi
 
Circuit Breaker: Part 2
Circuit Breaker: Part 2Circuit Breaker: Part 2
Circuit Breaker: Part 2
 
TELK Industrial Visit Report
TELK Industrial Visit ReportTELK Industrial Visit Report
TELK Industrial Visit Report
 
Industrial training ppt bhel bhopal
Industrial training ppt bhel bhopalIndustrial training ppt bhel bhopal
Industrial training ppt bhel bhopal
 
Repairing of kiln shell crack
Repairing of kiln shell crackRepairing of kiln shell crack
Repairing of kiln shell crack
 
Repairing of kiln shell crack
Repairing of kiln shell crackRepairing of kiln shell crack
Repairing of kiln shell crack
 
Bus Ducts or Hollow conductors
Bus Ducts or Hollow conductorsBus Ducts or Hollow conductors
Bus Ducts or Hollow conductors
 
Tube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptTube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.ppt
 
Presentation-GEMCO
Presentation-GEMCOPresentation-GEMCO
Presentation-GEMCO
 
Tbea vocatinal training
Tbea vocatinal trainingTbea vocatinal training
Tbea vocatinal training
 

Recently uploaded

the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 

Recently uploaded (20)

the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 

PPT ON CIM ,BHEL HARIDWAR

  • 1. MANUFACTURING PROCESS OF 660 MW TURBO GENERTOR STATOR WINDING BAR ABHISHEK SINGH 12ERDME004 AT BHEL HARIDWAR
  • 2. INTRODUCTION In 1956 India took a major step towards the establishment of its heavy engineering industry when BHEL, the first heavy electrical Manufacturing unit of the country was set up at Bhopal. BHEL's Heavy Electrical Equipment Plant (HEEP) was set up in technical collaboration with USSR, for the manufacturing of power plant equipment. In 1976, BHEL entered into a collaboration agreement with M/s Kraftwerk Union, AG of Germany for design, manufacturing, erection and commissioning of large size steam turbines. More than 40 percent of the country's electrical energy is generated from the power equipment supplied by BHEL, Haridwar.
  • 3. MANUFACTURING BLOCKS: . BLOCK I: ELECTRICAL MACHINE BLOCK, IS DESIGNED TO MANUFACTURING OF TURBOGENERATORS BLOCK II: FABRICATION BLOCK BLOCK III: TURBINE BLADE BLOCK BLOCK IV: COIL & INSULATION MANUFACTURING & APPARATUS & CONTROL GEAR MANUFACTURING BLOCK BLOCK V: FEEDER BLOCK AND KNOWN AS FABRICATION AND FORGE BLOCK BLOCK VI: STAMPING AND DIES MANUFACTURING BLOCK BLOCK VII: WOODWORKING BLOCK BLOCK VIII: HEAT EXCHANGER BLOCK, IS DESIGNED TO MANUFACTURE HEAT EXCHANGER UNIT FOR STEAM TURBINES.
  • 4. COIL & INSULATION MANUFACTURING SHOP (BLOCK-IV) Block-4 is designed to manufacture stator winding bars of Turbo & Hydro generator and coil like DC Armature coil ,main pole coil , equalizer coil etc. There are three BAYS in this block each bay manufactures stator bars and coils for different machines
  • 5. BAY-I: Bar winding shop: manufacturing of stator winding bars of generator BAY-II: Manufacturing of heavy duty generator stator bars with New CNC M/c BAY-III: Insulation detail shop: Manufacturing of hard insulation & machining of hares insulation part (Glass Textolite) such as packing, washer, insulation box, wedges etc Bar Shop: This shop is meant for manufacturing of stator winding coils of turbo-generator and hydro generator
  • 6. Layout of CIM, Block-IV
  • 7. It is quite difficult (rather impossible) to manufacture, handle and wind in the stator slot of generator of higher generation capacity because of its bigger size and heavy weight. That is why we make coil in two parts. One part its bottom part of coil called bottom or lower bar and other part of coil is called top bar or upper bar. Why do we call it bar?
  • 8. Manufacturing Process • For the manufacturing of stator bars insulated copper conductors are brought from Bangalore, it’s of two type’s i.e. solid copper conductor & hollow copper conductors which are used in water cooled stator layer glass insulation. • solid bar for 600/660/700 MW volume - 9.5X1.2 • Hollow copper for 600/660/700 Volume – 8.0x 4.6x1.3
  • 9. Cutting This process is done by automatic 3-444CNC machine. In this process the pre insulated copper conductor is cut into number of required length. Insulation is removed from both ends of the conductor cut.
  • 10. Transposition Transposition means changing/shifting of position of each conductor in active core (slot) part. After cutting the required number of conductors, the conductors are arranged on the comb in staggered manner and then bends are given to the conductors with the help of bending die at required distance. Then the conductor are taken out from the comb & die and placed with their ends in a line and transposition is carried out. Need of transposition. 1. To reduce eddy current losses. 2. Equalize the voltage generator. 3. To minimize skin effect of ac current
  • 11. Cross Over Insulation • The pre insulation of the copper conductor may get damaged due to mechanical bending in die during transposition, hence the insulating spacers are provided at the crossover portion of the conductors. A filler material (insulating putty or moulding micanite) is provided along the height of the bar to maintain the rectangular shape and to cover the difference of level of conductors.
  • 12. Stack Pressing • The core part of bar stack is pressed in under the pressure b/w 70kg to 80 kg and Temperature b/w 90 C to160 C for given period. Four bar is pressed in one time and six to eight plate are used for pressing .after that the consolidated stack is withdraw from the press. Inter Stand Short Test The consolidated stack is tested for the short between any two conductors in the bar, if found then it has to be rectified.This is done to ensure that no local current is flowing due to short circuit between conductors.(300 A/C supply)
  • 13. Forming • This process of forming is very important as in this process the bars are bending from both the ends of the bar i.e. at exciter side and turbine side at specific angles and shape as per design. This process is done manually. First the former is set according to the design making different angles at different positions. The straight bar stack is formed as per overhang profile (as per design), The overhang portion is consolidated after forming. . Pickling process After the forming and cutting process of the bar and due to the transportation of the bar, there accumulate very minute particles of dust on the ends of the bar. These particles may cause at the time of brazing and may create some air gaps. So, in order to remove these unwanted particles, basically the oil particles pickling process is performed.
  • 14. Contact Sleeve Mounting • After the pickling process is complete, contact sleeve and water box bottom parts are mounted on both the ends of the bar. it is a rectangular sleeve which is used to make contact between upper and lower bars . All the solid conductors are cut from the ends of the bar after the contact sleeve except the outer solid conductors. The water box is mounted in two halves; first the water box bottom part is mounted after the contact sleeve keeping some distance between them.
  • 15. • Brazing is basically the process of fixation of both the contact sleeve and water box. • Brazing is suitable for small parts , when high joint strength is required.In brazing alloy is mixed with water. Brazing
  • 16. • Nitrogen gas is the main constituent of the test. This test is similar to puncture test that is inflated tube is dipped in water for any leakage, the air bubbles gives us the exact position of the puncture. Nitrogen test
  • 17. Thermal Shock Test Thermal shock test is performed to check whether the bar can withstand extreme conditions i.e. when the generator is working or running at about 3000 Rpm. This is achieved by thermal shock test. Thermal shock test consist of series of hot water & cold water cycles alternatively. So firstly hot water at temperature of about 90ºC is passed through the bar and then cold water at about room temperature 27ºC approx. is flowed inside the bar alternatively. This process is repeated again and again.
  • 18. Helium Leakage Test • After thermal shock test bar is tested for any leakage with help of Helium gas. Helium test is the most important test of all, because helium test is performed to check any minute leakage within the bar and at the brazed portion. because helium is one of the lightest gases.
  • 19. Reforming • After all the previous processes which had undergone on the bar. That the shape of the bar is deformed from its original shape due to handling of the bar from one place to another for different processes. So to keep the shape of the bar as per design, the bar is checked if it is found distorted then it is reformed in the previous former machine by placing the bar on the former . Insulation • The stator bars are insulated with Micalastic (trade name) insulation. • Insulation is basically done to prevent any kind of short circuit between the bar and the stator core when the bar is assembled in the stator of the machine
  • 20. Impregnation and Baking • Micalastic System : In case of poor resin system the insulated bars are heated under vacuum and the impregnated (dipped) in heated resin so that all the air gaps are filled, layer by layer, with resin. • After impregnation the bars are pressed to bring them back to the original dimensions.
  • 21. HIGH VOLTAGE TEST •When the bar is dried it is wrapped with aluminum sheet to make outer surface of the bar conducting so that H.V. (High voltage test) can be performed. After this tests the coating of red gel is applied at both the ends of the bar. •In this test the bar which is already wrapped with aluminum is used. •High voltage is applied to the bar using auto-transformer and it is increased in steps according to the working voltage of the generator. If the insulation is weak the bar will puncture at the place of weaker insulation. •If any of the bar fails this test i.e. bar is punctured at any point then the bar is sent back for re-insulation and all the processes are repeated again
  • 22. Finishing • The baked and dimensionally correct bars are sanded-off to smoothen the edges and the surface is calibrated, if required, for the dimension. Dispatched for winding • The bars preserved with polythene sleeves to protect from dust, dirt, oil, rain etc are send to Block-I (Electric Machines Production Block - I, Turbo Generators and Hydro Generators) for winding