SlideShare a Scribd company logo
PERFORMANCE EVALUATION
OF 830kWWINDTURBINE &
ANALYSIS OFVARIOUS
PARAMETER EFFECT
Presented by
RAFIK AHMED 2GI11ME055
RAJESH TALAWAR 2GI11ME058
ROHAN RAIBAGKAR 2GI11ME064
MOHIT BENADIKAR 2GI08ME048
Under the guidance of
Prof. S.H.KULKARNI
Batch No. 05
INTRODUCTION
 The world primary energy demand projections
according to International Energy Agency (IEA) Report,
world primary energy demand increases by 1.6 percent
per year on an average between 2006 and 2030,
registering a growth of 45 percent.The demand for oil
may rise to 106mb/d in 2030.
 Renewable resources are growing faster, overtaking oil
and gas and have become the largest source of energy. It
is assumed that India and China may account for nearly
half of incremental energy demand by 2030.
LITERATURE SURVEY
 The utilization of wind energy for power generation
purposes is occupying a great share in the electricity
market worldwide and becoming increasingly attractive
 With the increasing shortage in fossil fuels, and
pollution problems renewable energy has become an
important energy source.Among the other renewable
energy sources wind energy has proven to be one of
the most economical one.
S No. Districts Total wind
power in
MW
Capacity
allocated in
MW
No. of wind
farm developer
Capacity
commissioned
in MW
No. of
independent
power producer
1 Bagalkot 643.8 293.2 9 0 0
2 Bangaluru (Rural) 205.4 180.13 5 0 0
3 Belagavi 1414 1118.95 58 153.2 17
4 Bellary 700.9 573.45 34 141.1 37
5 Bidar 80.85 79.5 6 0 0
6 Bijapur 795 521.6 18 0 0
7 Chamrajnaar 67.58 92.5 8 0 0
8 Chikmagalur 702.4 666.4 27 0 0
9 Chitradurga 1300 1289.01 84 510.2 265
10 Mangaluru 221.1 107.75 7 0 0
11 Davanagere 544.4 613.4 36 298 66
12 Dharwad 450.7 321.85 17 0 0
13 Gadag 1102 981.985 57 468 236
14 Gulburga 400.2 200.6 10 0 0
15 Hasan 650.5 577.42 19 98.75 50
16 Haveri 685.3 199.26 8 0 0
17 Kolar 300.6 297.46 8 0 0
18 Koppal 474.7 93.35 11 14.17 9
19 Madikere 101 96.95 6 0.55 1
20 Mandya 70.6 65.8 4 0 0
21 Mysore 300.7 254.3 13 0 0
22 Raichur 408.4 236.5 12 7.5 5
23 Shimoga 700.4 593.98 23 27 16
24 Tumkur 500.5 428.5 20 60.8 24
25 Udupi 47.38 0 0 0 0
26 Karwar 367.8 29.9 3 0 0
Total 13236 9913.745 503 1779 726
OBJECTIVES OFTHE PROJECT
 To understand the performance of the wind power project.
 To determine system reliability (Grid, Machine & System
Availability) of the wind energy conversion system
 To analyze the effect of various parameters like velocity, blade
length, temperature, pressure, air density on the power
generation of a wind turbine.
 To forecast or predict the performance of the wind turbine
generators based on the above parameters.
Mathematical Model
We know that kinetic energy of a mass in motions is:
E =
1
2
× 𝑚 × 𝑣2
Also,
m = 𝜌 × 𝑉
As
V = 𝐴 × 𝑙
∴ m = 𝜌 × 𝐴 × 𝑙
Hence Energy becomes, E =
1
2
× 𝜌 × 𝐴 × 𝑙 × 𝑣2
As,
Pw =
𝐸
𝑡
∴ Pw =
1
2
×𝜌×𝐴×𝑙×𝑣2
𝑡
as, v =
𝑙
𝑡
∴ 𝑊𝑖𝑛𝑑 𝑃𝑜𝑤𝑒𝑟, Pw =
1
2
× 𝜌 × 𝐴 × 𝑣3
∴ 𝑀𝑒𝑐ℎ𝑎𝑛𝑖𝑐𝑎𝑙 𝑃𝑜𝑤𝑒𝑟, P =
1
2
× 𝜌 × 𝐴 × 𝑣3
× 𝐶 𝑝
Betz Limit
Out of 59.3% of wind energy extracted only 41% is actually
converted into electricity.
Technical specification of wind turbine
Rated Power 830kW
Cut-in power 4 m/s
Rated wind speed 12 m/s
Cut-out power 28 m/s
Blade Length 26.5 m
Swept Area 2206.18 m2
No. of blades 3
Power generation for the 830kW wind turbine
Month Wind
Speed
(m/s)
T
(K)
P
(Pa)
Air Density
(Kg/m3)
Swept Area
(m2)
Power
(with Betz Limit)
(KW)
Power
(KW)
Jan 5 295 101300 1.20 2206.18 97.32 64.33
Feb 4 296 101000 1.19 2206.18 49.51 25.18
Mar 4 299 101000 1.18 2206.18 49.02 24.92
Apr 5 301 100800 1.17 2206.18 94.91 62.74
May 6 300 100700 1.17 2206.18 164.39 118.41
June 11 299 100600 1.17 2206.18 1015.34 619.53
July 15 296 100600 1.18 2206.18 2600.67 925.66
Aug 11 296 100700 1.19 2206.18 1026.65 626.43
Sept 8 297 100800 1.18 2206.18 393.98 280.46
Oct 5 297 101000 1.18 2206.18 96.38 63.71
Nov 5 295 101200 1.20 2206.18 97.22 64.27
Dec 5 294 101200 1.20 2206.18 97.55 64.49
 The power generation report containing energy generation, generation
hours, grid OK hours was collected fromWind World India Pvt Ltd.,
Saundatti, Belagavi. Machine shutdown / break down and various were also
considered.
Capacity Factor, CF =
Energy Generated
Energy Available
Machine availability (percent) =
Operating Hours
Grid OK hours
Grid availability (percent) =
Grid OK hours
Total available hours
System Availability (percent) = Machine availability × Grid availability
Annual energy generation, machine availability and grid availability with capacity
factor of the wind power project at wind site (CLPSN-01) - 2014
Month
Energy
Generated
(kWh)
Capacity
Factor
Generation
Hours
Operating
Hours
Grid OK
Hours
Machine
Availability
Grid
Availability
System
Availability
Jan 96351 16.18 668 730 743.15 98.23 99.89 98.12
Feb 52766 9.82 562 670.95 671.42 99.93 99.92 99.85
Mar 67381 11.32 624 742.26 742.26 100 99.77 99.77
Apr 53452 9.28 591 693.62 701.62 98.86 97.47 96.36
May 82236 13.82 673 737.92 737.92 100 99.18 99.18
June 178708 31.02 691 702.42 703.40 99.86 97.7 97.56
July 218711 36.74 729 729.52 738.23 98.82 99.23 98.06
Aug 121617 20.43 675 719.97 733.09 98.21 98.56 96.80
Sept 119286 20.71 692 717.15 717.29 99.98 99.63 99.61
Oct 57621 9.68 664 723.78 744.02 97.28 100 97.28
Nov 75359 13.08 688 718.43 718.43 100 99.78 99.78
Dec 68954 11.58 677 731.43 731.43 100 98.31 98.31
Total 1192442 7934 8617.45 8682.27
Avg 16.97 99.26 99.12 98.39
Annual energy generation, machine availability and grid availability with
capacity factor of the wind power project at wind site (CLPSN-05) - 2014
Month
Energy
Generated
(kWh)
Capacity
Factor
Generation
Hours
Operating
Hours
Grid OK
Hours
Machine
Availability
Grid
Availability
System
Availability
Jan 120347 20.21 682 734.88 740.13 99.29 99.48 98.77
Feb 77499 14.41 555 647.5 670.29 96.6 99.75 96.36
Mar 91579 15.38 635 470.75 471.69 99.8 99.77 99.57
Apr 73833 12.81 613 709.87 709.87 100 98.59 98.59
May 103572 17.4 670 731.38 734.83 99.53 98.78 98.32
June 242859 42.16 688 694.93 695.35 99.94 96.58 96.52
July 308970 51.91 737 738.37 742.83 99.4 99.8 99.20
Aug 190422 31.99 703 738.77 738.84 99.99 99.31 99.30
Sept 160276 27.82 689 711.33 717.07 99.2 99.59 98.79
Oct 73745 12.38 677 727.33 738.93 98.43 99.33 97.77
Nov 93897 16.3 687 712.7 712.70 100 98.99 98.99
Dec 72828 12.23 567 615.67 729.38 84.41 98.34 83.01
Total 1609827 7903 8233.48 8401.92
Avg 22.92 98.05 99.03 97.09
v=4:1:30;
cp=[0, 0.39, 0.425, 0.425, 0.425, 0.42, 0.4, 0.385, 0.355,.32 , 0.275, 0.223,
0.182, 0.15, 0.125, 0.105, 0.089, .076, 0.0656, 0.057, 0.05, 0.044, 0.038, 0.033,
0.028, 0.024, 0.02];
vq=v.^3;
k=cp.*vq;
p1=753.98*0.593*k;
p2=1178.09*0.593*k;
p3=1696.46*0.593*k;
%p1=753.98*0.593.*cp*v.^3;
%p2=1178.09*0.593.*cp*64;
%p3=1696.46*0.593.*cp*64;
plot(v,p1,v,p2,v,p3);
xlabel('Wind speed(m/s)');
ylabel('power(watt)');
title('Blade length effect of mechanical power');
MATLAB Program
Power coefficient as a function with wind speed
Power Coefficient,
Cp=
Power output of turbine
Power available in the wind
The effect of blade length on mechanical power
From this figure it can be seen that as the blade length is increased from 20m to
30m, the mechanical power increased from approximately 178.844KW to
402.4KW at wind speed of 10m/s
Mechanical power versus the blade length
(wind speed=10m/sec)
The effect of air density on mechanical power
From figure its clear that as air density increases from 1kg/m3 to 1.3kg/m3 the
available power also increases from 261.652KW to 340.147KW at wind speed of
10m/s
The effect of air pressure on mechanical power
As pressure increases from 0.8bar to 1.1bar, power increases from 243.336KW
to 334.914KW at wind speed 10m/s.
The effect of temperature on mechanical power
As the temperature increases from 250C to 450C, power decreases from
303.516KW to 285.199KW at wind speed of 10m/s.
Pollutant Avoided due to Installation of WECS in Belagavi Cluster
(Saundatti Site)
Emissions avoided
compared to (coal power
plant)
Quantum of emission
avoided per day
Total emission avoided during 20
years life of WECS (considering
seven month working of WECS in a
year)
CO2
(19 ton/day/MW)
1368 ton 5.74 million ton
SO2
(136 kg/day/MW)
9.79 ton 0.0411 million ton
Fly ash
(7 ton/day/MW)
504 ton 2.11 million ton
Particulate matter
(60 kg/day/MW)
4.32 ton 0.0181 million ton
Outcome & Conclusion
0
50000
100000
150000
200000
250000
70
75
80
85
90
95
100
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
MachineAvailability%
GridAvailabity%
Month
Energy(kWh)
Energy Generated
Machine
Grid
CLPSN-01
0
50000
100000
150000
200000
250000
300000
350000
70
75
80
85
90
95
100
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
MachineAvailability%
GridAvailability%
Month
Energy(kWh)
Energy Generated
Machine Availability
Grid Availability
CLPSN-05
0.00
100.00
200.00
300.00
400.00
500.00
600.00
700.00
800.00
900.00
1000.00
0
2
4
6
8
10
12
14
16
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
WindSpeed(m/s)
Month
ActualPower(kW)
Wind Speed
Actual Power
Effect of Wind Speed in Power Output
0.00
100.00
200.00
300.00
400.00
500.00
600.00
700.00
800.00
900.00
1000.00
1.15
1.16
1.17
1.18
1.19
1.20
1.21
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
AirDensity(kg/m3)
Month
ActualPower(kW)
Air Density
Actual Power
Effect of Air Density in Power Output
 This analysis was undertaken to understand the
performance of the wind power project. Complete
one year data was used for the analysis of the wind
power project.
 This analysis mainly emphasizes on the system energy
generation, system reliability of the wind energy
conversion system.
 Energy generation of the system was also affected due
to the availability of the operation.These are mainly
machine availability, grid availability and the system
availability.
 The capacity factor for CLPSN-01 Machine was found
to be 16.97 percent.
 The capacity factor for CLPSN-05 Machine was
found to be 22.92 percent.
 According to the results, there is a high effect of
air characteristics on the mechanical power.
 The environment’s parameter has a massive
effect on the generated power, which will lead the
researchers to concentrate on it with highest
priority.
REFERENCES
 Salih Mohammed Salih, Mohammed QasimTaha, Mohammed K Alawsaj,
“International Journal of ENERGY AND ENVIRONMENT” volume 3, Issue
6, 2012 pp.895-904.
 V P Khambalkar, D S Karale, S R Gadge,“Performance evaluation of a 2 MW
wind power project” volume 17, no. 4
 C. Marimuthu,V. Kirubakaran,“A critical review of factors affecting wind
turbine and solar cell system power production” E-ISSN2249–8974
 kidwind science snack,“Understanding Coefficient of Power (Cp) and Betz
Limit”
 International journal of renewable energy research, IJRER.Vol. 5 2015.
 India Renewable Energy Status Report, Green Summit, May 2014.
Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Parameters Affecting its Performance

More Related Content

What's hot

2012 deep research report on cost and price of china wind power equipment
2012 deep research report on cost and price of china wind power equipment2012 deep research report on cost and price of china wind power equipment
2012 deep research report on cost and price of china wind power equipment
smarter2011
 
CEA's Monthly Review of Indian Power Sector
CEA's Monthly Review of Indian Power SectorCEA's Monthly Review of Indian Power Sector
CEA's Monthly Review of Indian Power Sector
Spark Network
 
2011 deep research report on cost and price of china wind power equipment
2011 deep research report on cost and price of china wind power equipment2011 deep research report on cost and price of china wind power equipment
2011 deep research report on cost and price of china wind power equipment
smarter2011
 
Comparing the thermal power plant performance at variou 2
Comparing the thermal power plant performance at variou 2Comparing the thermal power plant performance at variou 2
Comparing the thermal power plant performance at variou 2
IAEME Publication
 

What's hot (19)

Presentation N14
Presentation N14Presentation N14
Presentation N14
 
2012 deep research report on cost and price of china wind power equipment
2012 deep research report on cost and price of china wind power equipment2012 deep research report on cost and price of china wind power equipment
2012 deep research report on cost and price of china wind power equipment
 
CEA's Monthly Review of Indian Power Sector
CEA's Monthly Review of Indian Power SectorCEA's Monthly Review of Indian Power Sector
CEA's Monthly Review of Indian Power Sector
 
IRJET - Thermoelectric Power Generation by Bike Silencer
IRJET - Thermoelectric Power Generation by Bike SilencerIRJET - Thermoelectric Power Generation by Bike Silencer
IRJET - Thermoelectric Power Generation by Bike Silencer
 
Design Construction, Simulation and Testing of A 300W Wind-Powered Battery Ch...
Design Construction, Simulation and Testing of A 300W Wind-Powered Battery Ch...Design Construction, Simulation and Testing of A 300W Wind-Powered Battery Ch...
Design Construction, Simulation and Testing of A 300W Wind-Powered Battery Ch...
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
 
Experimental Investigation of Multi Aerofoil Configurations Using Propeller T...
Experimental Investigation of Multi Aerofoil Configurations Using Propeller T...Experimental Investigation of Multi Aerofoil Configurations Using Propeller T...
Experimental Investigation of Multi Aerofoil Configurations Using Propeller T...
 
2011 deep research report on cost and price of china wind power equipment
2011 deep research report on cost and price of china wind power equipment2011 deep research report on cost and price of china wind power equipment
2011 deep research report on cost and price of china wind power equipment
 
Renewable energy in india
Renewable energy in india Renewable energy in india
Renewable energy in india
 
Comparing the thermal power plant performance at variou 2
Comparing the thermal power plant performance at variou 2Comparing the thermal power plant performance at variou 2
Comparing the thermal power plant performance at variou 2
 
IRJET- Using Thermoelectric Generators to Utilize Heat Generated in Disc Brakes
IRJET- Using Thermoelectric Generators to Utilize Heat Generated in Disc BrakesIRJET- Using Thermoelectric Generators to Utilize Heat Generated in Disc Brakes
IRJET- Using Thermoelectric Generators to Utilize Heat Generated in Disc Brakes
 
Seminar presentation on dual (twin) spark ignition system
Seminar presentation on dual (twin) spark ignition systemSeminar presentation on dual (twin) spark ignition system
Seminar presentation on dual (twin) spark ignition system
 
Design and Experimental Analysis of Solar air Conditioner
Design and Experimental Analysis of Solar air ConditionerDesign and Experimental Analysis of Solar air Conditioner
Design and Experimental Analysis of Solar air Conditioner
 
Assessment of wind resource and
Assessment of wind resource andAssessment of wind resource and
Assessment of wind resource and
 
Final report
Final reportFinal report
Final report
 
Using position control to improve the efficiency of wind turbine
Using position control to improve the efficiency of wind turbineUsing position control to improve the efficiency of wind turbine
Using position control to improve the efficiency of wind turbine
 
IRJET- Effect of Permanent Magnet on Fuel in 4-Stroke Engine
IRJET-  	  Effect of Permanent Magnet on Fuel in 4-Stroke EngineIRJET-  	  Effect of Permanent Magnet on Fuel in 4-Stroke Engine
IRJET- Effect of Permanent Magnet on Fuel in 4-Stroke Engine
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
 
Ntpc badarpur training ppt
Ntpc badarpur training pptNtpc badarpur training ppt
Ntpc badarpur training ppt
 

Viewers also liked

Wind turbine reliability
Wind turbine reliabilityWind turbine reliability
Wind turbine reliability
karthik451
 
Design small scale wind turbine for home electricity generation
Design small scale wind turbine for home electricity generationDesign small scale wind turbine for home electricity generation
Design small scale wind turbine for home electricity generation
Maheemal Thilakarathna
 
Ocean Thermal energy conversion (OTEC)
Ocean Thermal energy conversion (OTEC)Ocean Thermal energy conversion (OTEC)
Ocean Thermal energy conversion (OTEC)
Patnam Shruthi
 

Viewers also liked (20)

Typmarvn_Vertical and Herizontal Axis Wind Turbine
Typmarvn_Vertical and Herizontal Axis Wind TurbineTypmarvn_Vertical and Herizontal Axis Wind Turbine
Typmarvn_Vertical and Herizontal Axis Wind Turbine
 
Basic Info regarding making a RC aeroplane
Basic Info regarding making a RC aeroplaneBasic Info regarding making a RC aeroplane
Basic Info regarding making a RC aeroplane
 
OCEAN THERMAL ENERGY CONVERSION
OCEAN THERMAL ENERGY CONVERSION OCEAN THERMAL ENERGY CONVERSION
OCEAN THERMAL ENERGY CONVERSION
 
Wind turbine reliability
Wind turbine reliabilityWind turbine reliability
Wind turbine reliability
 
Ocean Thermal Energy Conversion Systems
Ocean Thermal Energy Conversion SystemsOcean Thermal Energy Conversion Systems
Ocean Thermal Energy Conversion Systems
 
Performance investigation and blade analysis of a small horizontal axis wind ...
Performance investigation and blade analysis of a small horizontal axis wind ...Performance investigation and blade analysis of a small horizontal axis wind ...
Performance investigation and blade analysis of a small horizontal axis wind ...
 
Verticalwind
VerticalwindVerticalwind
Verticalwind
 
Wind turbine
Wind turbineWind turbine
Wind turbine
 
OTEC
OTECOTEC
OTEC
 
Advancement in wind energy
Advancement in wind energyAdvancement in wind energy
Advancement in wind energy
 
Power from wind in india
Power from wind in indiaPower from wind in india
Power from wind in india
 
Ocean Thermal Energy Conversion
Ocean Thermal Energy ConversionOcean Thermal Energy Conversion
Ocean Thermal Energy Conversion
 
FINAL PROJECT VAWT
FINAL PROJECT VAWTFINAL PROJECT VAWT
FINAL PROJECT VAWT
 
VERTICAL AXIS WIND TURBINE
VERTICAL AXIS WIND TURBINEVERTICAL AXIS WIND TURBINE
VERTICAL AXIS WIND TURBINE
 
vertical axis wind turbine
vertical axis wind turbinevertical axis wind turbine
vertical axis wind turbine
 
Design small scale wind turbine for home electricity generation
Design small scale wind turbine for home electricity generationDesign small scale wind turbine for home electricity generation
Design small scale wind turbine for home electricity generation
 
Ocean thermal energy conversion
Ocean thermal energy conversionOcean thermal energy conversion
Ocean thermal energy conversion
 
Ocean Thermal Energy Conversion
Ocean Thermal Energy ConversionOcean Thermal Energy Conversion
Ocean Thermal Energy Conversion
 
Horizontal Axis Wind Turbine
Horizontal Axis Wind TurbineHorizontal Axis Wind Turbine
Horizontal Axis Wind Turbine
 
Ocean Thermal energy conversion (OTEC)
Ocean Thermal energy conversion (OTEC)Ocean Thermal energy conversion (OTEC)
Ocean Thermal energy conversion (OTEC)
 

Similar to Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Parameters Affecting its Performance

Renewable energy course#00
Renewable energy course#00Renewable energy course#00
Renewable energy course#00
Syed_Sajjad_Raza
 
Alumni14 - Presentation by Prof.Rangan Banerjee, Global Perspective on Consum...
Alumni14 - Presentation by Prof.Rangan Banerjee, Global Perspective on Consum...Alumni14 - Presentation by Prof.Rangan Banerjee, Global Perspective on Consum...
Alumni14 - Presentation by Prof.Rangan Banerjee, Global Perspective on Consum...
IITBAA
 
Flywheel Energy Storage
Flywheel Energy StorageFlywheel Energy Storage
Flywheel Energy Storage
michaeljmack
 
Project report-TATA Power
Project report-TATA PowerProject report-TATA Power
Project report-TATA Power
SHIVAM DWIVEDI
 
2011 deep research report on global and china wind turbine tower industry
2011 deep research report on global and china wind turbine tower industry2011 deep research report on global and china wind turbine tower industry
2011 deep research report on global and china wind turbine tower industry
smarter2011
 
EUREC-NTUA Projects - Carlos Silva
EUREC-NTUA Projects - Carlos SilvaEUREC-NTUA Projects - Carlos Silva
EUREC-NTUA Projects - Carlos Silva
Carlos Silva
 
Comparing the thermal power plant performance at variou 2
Comparing the thermal power plant performance at variou 2Comparing the thermal power plant performance at variou 2
Comparing the thermal power plant performance at variou 2
IAEME Publication
 
2012 deep research report on china wind power equipment industry
2012 deep research report on china wind power equipment industry2012 deep research report on china wind power equipment industry
2012 deep research report on china wind power equipment industry
smarter2011
 
2012 deep research report on china wind power equipment industry
2012 deep research report on china wind power equipment industry2012 deep research report on china wind power equipment industry
2012 deep research report on china wind power equipment industry
smarter2011
 

Similar to Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Parameters Affecting its Performance (20)

1 145-143444129513-18
1 145-143444129513-181 145-143444129513-18
1 145-143444129513-18
 
Renewable energy course#00
Renewable energy course#00Renewable energy course#00
Renewable energy course#00
 
Ministry electric power_myanmar_2_27_13
Ministry electric power_myanmar_2_27_13Ministry electric power_myanmar_2_27_13
Ministry electric power_myanmar_2_27_13
 
Alumni14 - Presentation by Prof.Rangan Banerjee, Global Perspective on Consum...
Alumni14 - Presentation by Prof.Rangan Banerjee, Global Perspective on Consum...Alumni14 - Presentation by Prof.Rangan Banerjee, Global Perspective on Consum...
Alumni14 - Presentation by Prof.Rangan Banerjee, Global Perspective on Consum...
 
michaux-ppt.pptx
michaux-ppt.pptxmichaux-ppt.pptx
michaux-ppt.pptx
 
Power extraction from wind energy..pptx
Power extraction from wind energy..pptxPower extraction from wind energy..pptx
Power extraction from wind energy..pptx
 
Power extraction from wind energy..pptx
Power extraction from wind energy..pptxPower extraction from wind energy..pptx
Power extraction from wind energy..pptx
 
Flywheel Energy Storage
Flywheel Energy StorageFlywheel Energy Storage
Flywheel Energy Storage
 
Environment and energy sustainability
Environment and energy sustainabilityEnvironment and energy sustainability
Environment and energy sustainability
 
Cogeneration power plant
Cogeneration power plantCogeneration power plant
Cogeneration power plant
 
R110304112121
R110304112121R110304112121
R110304112121
 
Project report-TATA Power
Project report-TATA PowerProject report-TATA Power
Project report-TATA Power
 
Wind solar energy_modeling_analysis
Wind solar energy_modeling_analysisWind solar energy_modeling_analysis
Wind solar energy_modeling_analysis
 
Analysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mineAnalysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mine
 
PPT 1 UNIT.pdf
PPT 1 UNIT.pdfPPT 1 UNIT.pdf
PPT 1 UNIT.pdf
 
2011 deep research report on global and china wind turbine tower industry
2011 deep research report on global and china wind turbine tower industry2011 deep research report on global and china wind turbine tower industry
2011 deep research report on global and china wind turbine tower industry
 
EUREC-NTUA Projects - Carlos Silva
EUREC-NTUA Projects - Carlos SilvaEUREC-NTUA Projects - Carlos Silva
EUREC-NTUA Projects - Carlos Silva
 
Comparing the thermal power plant performance at variou 2
Comparing the thermal power plant performance at variou 2Comparing the thermal power plant performance at variou 2
Comparing the thermal power plant performance at variou 2
 
2012 deep research report on china wind power equipment industry
2012 deep research report on china wind power equipment industry2012 deep research report on china wind power equipment industry
2012 deep research report on china wind power equipment industry
 
2012 deep research report on china wind power equipment industry
2012 deep research report on china wind power equipment industry2012 deep research report on china wind power equipment industry
2012 deep research report on china wind power equipment industry
 

Recently uploaded

ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
Kamal Acharya
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
AbrahamGadissa
 

Recently uploaded (20)

RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answer
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 

Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Parameters Affecting its Performance

  • 1. PERFORMANCE EVALUATION OF 830kWWINDTURBINE & ANALYSIS OFVARIOUS PARAMETER EFFECT Presented by RAFIK AHMED 2GI11ME055 RAJESH TALAWAR 2GI11ME058 ROHAN RAIBAGKAR 2GI11ME064 MOHIT BENADIKAR 2GI08ME048 Under the guidance of Prof. S.H.KULKARNI Batch No. 05
  • 2. INTRODUCTION  The world primary energy demand projections according to International Energy Agency (IEA) Report, world primary energy demand increases by 1.6 percent per year on an average between 2006 and 2030, registering a growth of 45 percent.The demand for oil may rise to 106mb/d in 2030.  Renewable resources are growing faster, overtaking oil and gas and have become the largest source of energy. It is assumed that India and China may account for nearly half of incremental energy demand by 2030.
  • 3. LITERATURE SURVEY  The utilization of wind energy for power generation purposes is occupying a great share in the electricity market worldwide and becoming increasingly attractive  With the increasing shortage in fossil fuels, and pollution problems renewable energy has become an important energy source.Among the other renewable energy sources wind energy has proven to be one of the most economical one.
  • 4. S No. Districts Total wind power in MW Capacity allocated in MW No. of wind farm developer Capacity commissioned in MW No. of independent power producer 1 Bagalkot 643.8 293.2 9 0 0 2 Bangaluru (Rural) 205.4 180.13 5 0 0 3 Belagavi 1414 1118.95 58 153.2 17 4 Bellary 700.9 573.45 34 141.1 37 5 Bidar 80.85 79.5 6 0 0 6 Bijapur 795 521.6 18 0 0 7 Chamrajnaar 67.58 92.5 8 0 0 8 Chikmagalur 702.4 666.4 27 0 0 9 Chitradurga 1300 1289.01 84 510.2 265 10 Mangaluru 221.1 107.75 7 0 0 11 Davanagere 544.4 613.4 36 298 66 12 Dharwad 450.7 321.85 17 0 0 13 Gadag 1102 981.985 57 468 236 14 Gulburga 400.2 200.6 10 0 0 15 Hasan 650.5 577.42 19 98.75 50 16 Haveri 685.3 199.26 8 0 0 17 Kolar 300.6 297.46 8 0 0 18 Koppal 474.7 93.35 11 14.17 9 19 Madikere 101 96.95 6 0.55 1 20 Mandya 70.6 65.8 4 0 0 21 Mysore 300.7 254.3 13 0 0 22 Raichur 408.4 236.5 12 7.5 5 23 Shimoga 700.4 593.98 23 27 16 24 Tumkur 500.5 428.5 20 60.8 24 25 Udupi 47.38 0 0 0 0 26 Karwar 367.8 29.9 3 0 0 Total 13236 9913.745 503 1779 726
  • 5. OBJECTIVES OFTHE PROJECT  To understand the performance of the wind power project.  To determine system reliability (Grid, Machine & System Availability) of the wind energy conversion system  To analyze the effect of various parameters like velocity, blade length, temperature, pressure, air density on the power generation of a wind turbine.  To forecast or predict the performance of the wind turbine generators based on the above parameters.
  • 6. Mathematical Model We know that kinetic energy of a mass in motions is: E = 1 2 × 𝑚 × 𝑣2 Also, m = 𝜌 × 𝑉 As V = 𝐴 × 𝑙 ∴ m = 𝜌 × 𝐴 × 𝑙 Hence Energy becomes, E = 1 2 × 𝜌 × 𝐴 × 𝑙 × 𝑣2 As, Pw = 𝐸 𝑡 ∴ Pw = 1 2 ×𝜌×𝐴×𝑙×𝑣2 𝑡 as, v = 𝑙 𝑡 ∴ 𝑊𝑖𝑛𝑑 𝑃𝑜𝑤𝑒𝑟, Pw = 1 2 × 𝜌 × 𝐴 × 𝑣3 ∴ 𝑀𝑒𝑐ℎ𝑎𝑛𝑖𝑐𝑎𝑙 𝑃𝑜𝑤𝑒𝑟, P = 1 2 × 𝜌 × 𝐴 × 𝑣3 × 𝐶 𝑝
  • 7. Betz Limit Out of 59.3% of wind energy extracted only 41% is actually converted into electricity.
  • 8. Technical specification of wind turbine Rated Power 830kW Cut-in power 4 m/s Rated wind speed 12 m/s Cut-out power 28 m/s Blade Length 26.5 m Swept Area 2206.18 m2 No. of blades 3
  • 9. Power generation for the 830kW wind turbine Month Wind Speed (m/s) T (K) P (Pa) Air Density (Kg/m3) Swept Area (m2) Power (with Betz Limit) (KW) Power (KW) Jan 5 295 101300 1.20 2206.18 97.32 64.33 Feb 4 296 101000 1.19 2206.18 49.51 25.18 Mar 4 299 101000 1.18 2206.18 49.02 24.92 Apr 5 301 100800 1.17 2206.18 94.91 62.74 May 6 300 100700 1.17 2206.18 164.39 118.41 June 11 299 100600 1.17 2206.18 1015.34 619.53 July 15 296 100600 1.18 2206.18 2600.67 925.66 Aug 11 296 100700 1.19 2206.18 1026.65 626.43 Sept 8 297 100800 1.18 2206.18 393.98 280.46 Oct 5 297 101000 1.18 2206.18 96.38 63.71 Nov 5 295 101200 1.20 2206.18 97.22 64.27 Dec 5 294 101200 1.20 2206.18 97.55 64.49
  • 10.  The power generation report containing energy generation, generation hours, grid OK hours was collected fromWind World India Pvt Ltd., Saundatti, Belagavi. Machine shutdown / break down and various were also considered. Capacity Factor, CF = Energy Generated Energy Available Machine availability (percent) = Operating Hours Grid OK hours Grid availability (percent) = Grid OK hours Total available hours System Availability (percent) = Machine availability × Grid availability
  • 11. Annual energy generation, machine availability and grid availability with capacity factor of the wind power project at wind site (CLPSN-01) - 2014 Month Energy Generated (kWh) Capacity Factor Generation Hours Operating Hours Grid OK Hours Machine Availability Grid Availability System Availability Jan 96351 16.18 668 730 743.15 98.23 99.89 98.12 Feb 52766 9.82 562 670.95 671.42 99.93 99.92 99.85 Mar 67381 11.32 624 742.26 742.26 100 99.77 99.77 Apr 53452 9.28 591 693.62 701.62 98.86 97.47 96.36 May 82236 13.82 673 737.92 737.92 100 99.18 99.18 June 178708 31.02 691 702.42 703.40 99.86 97.7 97.56 July 218711 36.74 729 729.52 738.23 98.82 99.23 98.06 Aug 121617 20.43 675 719.97 733.09 98.21 98.56 96.80 Sept 119286 20.71 692 717.15 717.29 99.98 99.63 99.61 Oct 57621 9.68 664 723.78 744.02 97.28 100 97.28 Nov 75359 13.08 688 718.43 718.43 100 99.78 99.78 Dec 68954 11.58 677 731.43 731.43 100 98.31 98.31 Total 1192442 7934 8617.45 8682.27 Avg 16.97 99.26 99.12 98.39
  • 12. Annual energy generation, machine availability and grid availability with capacity factor of the wind power project at wind site (CLPSN-05) - 2014 Month Energy Generated (kWh) Capacity Factor Generation Hours Operating Hours Grid OK Hours Machine Availability Grid Availability System Availability Jan 120347 20.21 682 734.88 740.13 99.29 99.48 98.77 Feb 77499 14.41 555 647.5 670.29 96.6 99.75 96.36 Mar 91579 15.38 635 470.75 471.69 99.8 99.77 99.57 Apr 73833 12.81 613 709.87 709.87 100 98.59 98.59 May 103572 17.4 670 731.38 734.83 99.53 98.78 98.32 June 242859 42.16 688 694.93 695.35 99.94 96.58 96.52 July 308970 51.91 737 738.37 742.83 99.4 99.8 99.20 Aug 190422 31.99 703 738.77 738.84 99.99 99.31 99.30 Sept 160276 27.82 689 711.33 717.07 99.2 99.59 98.79 Oct 73745 12.38 677 727.33 738.93 98.43 99.33 97.77 Nov 93897 16.3 687 712.7 712.70 100 98.99 98.99 Dec 72828 12.23 567 615.67 729.38 84.41 98.34 83.01 Total 1609827 7903 8233.48 8401.92 Avg 22.92 98.05 99.03 97.09
  • 13. v=4:1:30; cp=[0, 0.39, 0.425, 0.425, 0.425, 0.42, 0.4, 0.385, 0.355,.32 , 0.275, 0.223, 0.182, 0.15, 0.125, 0.105, 0.089, .076, 0.0656, 0.057, 0.05, 0.044, 0.038, 0.033, 0.028, 0.024, 0.02]; vq=v.^3; k=cp.*vq; p1=753.98*0.593*k; p2=1178.09*0.593*k; p3=1696.46*0.593*k; %p1=753.98*0.593.*cp*v.^3; %p2=1178.09*0.593.*cp*64; %p3=1696.46*0.593.*cp*64; plot(v,p1,v,p2,v,p3); xlabel('Wind speed(m/s)'); ylabel('power(watt)'); title('Blade length effect of mechanical power'); MATLAB Program
  • 14. Power coefficient as a function with wind speed Power Coefficient, Cp= Power output of turbine Power available in the wind
  • 15. The effect of blade length on mechanical power From this figure it can be seen that as the blade length is increased from 20m to 30m, the mechanical power increased from approximately 178.844KW to 402.4KW at wind speed of 10m/s
  • 16. Mechanical power versus the blade length (wind speed=10m/sec)
  • 17. The effect of air density on mechanical power From figure its clear that as air density increases from 1kg/m3 to 1.3kg/m3 the available power also increases from 261.652KW to 340.147KW at wind speed of 10m/s
  • 18. The effect of air pressure on mechanical power As pressure increases from 0.8bar to 1.1bar, power increases from 243.336KW to 334.914KW at wind speed 10m/s.
  • 19. The effect of temperature on mechanical power As the temperature increases from 250C to 450C, power decreases from 303.516KW to 285.199KW at wind speed of 10m/s.
  • 20. Pollutant Avoided due to Installation of WECS in Belagavi Cluster (Saundatti Site) Emissions avoided compared to (coal power plant) Quantum of emission avoided per day Total emission avoided during 20 years life of WECS (considering seven month working of WECS in a year) CO2 (19 ton/day/MW) 1368 ton 5.74 million ton SO2 (136 kg/day/MW) 9.79 ton 0.0411 million ton Fly ash (7 ton/day/MW) 504 ton 2.11 million ton Particulate matter (60 kg/day/MW) 4.32 ton 0.0181 million ton
  • 21. Outcome & Conclusion 0 50000 100000 150000 200000 250000 70 75 80 85 90 95 100 Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec MachineAvailability% GridAvailabity% Month Energy(kWh) Energy Generated Machine Grid CLPSN-01
  • 22. 0 50000 100000 150000 200000 250000 300000 350000 70 75 80 85 90 95 100 Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec MachineAvailability% GridAvailability% Month Energy(kWh) Energy Generated Machine Availability Grid Availability CLPSN-05
  • 23. 0.00 100.00 200.00 300.00 400.00 500.00 600.00 700.00 800.00 900.00 1000.00 0 2 4 6 8 10 12 14 16 Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec WindSpeed(m/s) Month ActualPower(kW) Wind Speed Actual Power Effect of Wind Speed in Power Output
  • 24. 0.00 100.00 200.00 300.00 400.00 500.00 600.00 700.00 800.00 900.00 1000.00 1.15 1.16 1.17 1.18 1.19 1.20 1.21 Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec AirDensity(kg/m3) Month ActualPower(kW) Air Density Actual Power Effect of Air Density in Power Output
  • 25.  This analysis was undertaken to understand the performance of the wind power project. Complete one year data was used for the analysis of the wind power project.  This analysis mainly emphasizes on the system energy generation, system reliability of the wind energy conversion system.  Energy generation of the system was also affected due to the availability of the operation.These are mainly machine availability, grid availability and the system availability.  The capacity factor for CLPSN-01 Machine was found to be 16.97 percent.
  • 26.  The capacity factor for CLPSN-05 Machine was found to be 22.92 percent.  According to the results, there is a high effect of air characteristics on the mechanical power.  The environment’s parameter has a massive effect on the generated power, which will lead the researchers to concentrate on it with highest priority.
  • 27. REFERENCES  Salih Mohammed Salih, Mohammed QasimTaha, Mohammed K Alawsaj, “International Journal of ENERGY AND ENVIRONMENT” volume 3, Issue 6, 2012 pp.895-904.  V P Khambalkar, D S Karale, S R Gadge,“Performance evaluation of a 2 MW wind power project” volume 17, no. 4  C. Marimuthu,V. Kirubakaran,“A critical review of factors affecting wind turbine and solar cell system power production” E-ISSN2249–8974  kidwind science snack,“Understanding Coefficient of Power (Cp) and Betz Limit”  International journal of renewable energy research, IJRER.Vol. 5 2015.  India Renewable Energy Status Report, Green Summit, May 2014.