Nuclear
Powerin Pakistan
ď‚· Pakistanhasa smallnuclearpower
program,with725MWe capacity,but is
movingto increasethissubstantially.
ď‚· Pakistan'snuclearweaponscapabilities
of has arisenindependentlyof the civil
nuclearfuelcycle,usingindigenous
uranium.
ď‚· BecausePakistanis outsidethe Nuclear
Non-ProliferationTreaty,due to its
weaponsprogram,it is largelyexcluded
fromtradein nuclearplantormaterials,
whichhindersits developmentof civil
nuclearenergy.However,Chinais
positiveaboutnuclearcooperationwith
Pakistan.
Pakistan in 2012 produced 96 billion kWh
of electricity, 35 TWh of this from oil, 27
from natural gas and 30 from hydro.
Nuclear power makes a small contribution
to total energy production and
requirements, supplying only 4.6 TWh
(4.7% of total electricity generated in
2012). Consumption in 2012 was about 77
billion kWh after 16% transmission losses.
There was virtually no import or export.
Total installed capacity is about 20 GWe,
but often only about 12 GWe is operable.
In 2005 an Energy Security Plan was
adopted by the government, calling for a
huge increase in generating capacity to
more than 160 GWe by 2030. Significant
power shortages are reported, and load
shedding is common.
In July 2013 the Executive Committee of
the National Economic Council (ECNEC)
approved 3.5 GWe of new power projects
totalling Rs 1303 billion ($13 billion),
comprising 2200 MWe nuclear, 425 MWe
gas combined cycle, and 969 MWe hydro.
These are designed to reduce the high
reliance on oil and to reduce power costs.
All depend on Chinese support.
Nuclearpower:-
The Pakistan Atomic Energy Commission
(PAEC) is responsible for all nuclear energy
and research applications in the
country. The PAEC is reported to have two
divisions which are responsible for nuclear
power programs: Nuclear Power
Generation (NUPG) and Nuclear Power
Projects (NUPP). The NUPG directorate
oversees the operational units, and the
NUPP directorate is concerned with design
and construction of planned units, and is
closely aligned with the Nuclear Regulatory
Authority (PNRA).
PAEC's first nuclear power reactor is a small
137 MWe (125 MWe net) Canadian
pressurized heavy water reactor (PHWR)
which started up in 1971 and which is
under international safeguards – KANUPP
at Paradise Point in Sindh province, about
25 km west of Karachi. It is operated at
reduced power, and is under review by
PAEC because of its age.
The second unit is Chashma 1 in Punjab
province in the north, a 325 MWe (300
MWe net) two-loop pressurised water
reactor (PWR) supplied by China's CNNC
under safeguards. The main part of the
plant was designed by Shanghai Nuclear
Engineering Research and Design Institute
(SNERDI), based on Qinshan 1. It started up
in May 2000 and is also known as
CHASNUPP 1. Designed life span is 40
years. It, and the following 3 units, were
built using international design codes and
standards.
Construction of its twin, Chashma 2,
started in December 2005. It was reported
to cost PKR 51.46 billion (US$ 860 million,
with $350 million of this financed by
China). A safeguards agreement with IAEA
was signed in 2006 and grid connection
was in March 2011, with commercial
operation in May. Upgrades have added 5
MWe since (to 330 MWe gross).
At KANUPP a 4800 m3
/day MED
desalination plant was commissioned in
2012, though in 2014 it was reported as
1600 m3
/day.
Operating
Reactorsin Pakistan
Reac
tor
Provi
nce
Typ
e
MWe
net
Constr
uction
start
Comm
ercial
operat
ion
Plan
ned
clos
e
Kara
chi1
Sind
h
PH
WR
125 1966 12/72
201
9
Chas
hma
1
Punj
ab
PW
R
300
June
2000
204
0
Chas
hma
2
Punj
ab
PW
R
300 2005
May
2011
205
1
Total
(3)
725
oper
ating
Karachi is also known as KANUPP, Chashma
as CHASNUPP.
Enriched fuel for the PWRs is imported
from China.
The 2005 Energy Security Plan included
intention of lifting nuclear capacity to 8800
MWe, 900 MWe of this by 2015 and a
further 1500 MWe by 2020. Projections
included four further Chinese reactors of
300 MWe each and seven of 1000 MWe,
all PWR. There were tentative plans for
China to build two 1000 MWe PWR units at
Karachi as KANUPP 2&3, but China then in
2007 deferred development of its CNP-
1000 type which would have been the only
one of that size able to be exported.
Pakistan then turned its attention to
building smaller units with higher local
content. However, in 2013 China revived its
1000 MWe designs with export intent, and
made overtures to Pakistan for the
ACP1000 design.
Chashma3&4:-
In June 2008 the
government announced plans to build
units 3&4 at Chashma, each 320 MWe
gross and largely financed by China. A
further agreement for China's help with the
project was signed in October 2008, and
given prominence as a counter to the US-
India agreement shortly preceding it.
In March 2009 China's SNERDI announced
that it was proceeding with design of
Chashma 3&4, with China Zhongyuan
Engineering Corp (CZEC) as the general
contractor and China Nuclear Industry No.5
Construction Company as installer. In April
2009, a design contract with SNERDI was
signed, and the government said that it had
approved the project at a cost of $2.37
billion, with $1.75 billion of this involving "a
foreign exchange component". In March
2010 Pakistan announced that it had
agreed the terms for Chashma 3&4,
whereby China would provide 82% of the
total US$ 1.912 billion financing as three
20-year low-interest loans. It would also
provide fuel for the reactors’ lifetime
nominally of 40 years.
The main construction contract was signed
in June 2010, and the two 340 MWe CNP-
300 (315 MWe net) units are to be
completed in eight years. They will have a
design life of 40 years and be under IAEA
safeguards. Construction of unit 3 officially
started at the end of May 2011, and unit 4
in December 2011. The dome of unit 3 was
fitted in March 2013. Early in 2014 PAEC
said they were several months ahead of
schedule.
In April 2013 it was reported that the PAEC
would receive a significant increase in
budget appropriation to expedite
construction of Chashma 3&4.
However, the Nuclear Suppliers Group
(NSG) raised some questions about China's
supply of Chasma 3&4. Contracts for units
1&2 were signed in 1990 and 2000
respectively, before 2004 when China
joined the NSG, which maintains an
embargo on sales of nuclear equipment to
Pakistan. China argued that units 3&4 are
similarly "grandfathered", and
arrangements are consistent with those for
units 1&2.
Chashma5:-
In November 2010 the PAEC
is reported to have signed a construction
agreement with China National Nuclear
Corporation (CNNC) for a fifth unit at
Chashma. In February 2013 a further
agreement was signed by PAEC with CNNC
for a 1000 MWe unit at Chashma. It was
reported that China expected that this deal
would be controversial under the NPT and
guidelines of the NSG. Early in 2013 CNNC
confirmed its intention to build a 1000
MWe class reactor, and said it would be an
ACP1000 unit, though not necessarily at
Chashma. The status of any continuing plan
for Chashma 5 is very uncertain, and it may
have been displaced by plans for a plant
near Multan in southwest Punjab.
Karachicoastalpowerproject:-
In June
2013 the Planning Commission said that
two CNNC 1000 MWe class reactors would
be used for Karachi 2 and 3 (KANUPP 2&3)
near Karachi unit 1. Two coastal sites had
been under consideration for the twin
1100 MWe units. CNNC in April 2013
announced an export agreement for the
ACP1000, nominally 1100 MWe,
apparently for Pakistan. This was confirmed
in June by the PAEC which said that the
next nuclear project would be 1100 MWe
class units which it would build, the Karachi
Coastal Power station, costing $9.5 billion.
In July 2013 ECNEC approved two units of
the Karachi Costal Power Project with net
generation capacity of 2,117 MWe. The
total cost of this was estimated at Rs 959
billion ($9.595 billion), with $6.5 billion
(68%) being vendor finance. PAEC also said
that 82% of the total cost would be
financed by China. At the end of August
contracts were signed in Shanghai with
CNNC, China Zhongyuan Engineering Co.
Ltd. (CZEC), China Nuclear Power
Engineering Co. Ltd. (CNPE), Nuclear Power
Institute of China (NPIC), and East China
Electric Power Designing Institute (ECEPDI).
Ground breaking at the site near Paradise
Point, 25 km west of Karachi, took place in
November 2013, and first concrete was
envisaged by the end of 2014. However in
October 2014 the Sindh high court ruling
stopped site work following a challenge on
environmental grounds, and the restraining
order was extended to early December. In
April 2015 China Energy Engineering Group
Co (CEEC) won the tender for civil
engineering construction and installation
work for the conventional island of the
plant, which it said would use Hualong One
reactors. Construction is expected to start
at the end of 2015 and take 72 months (52
months for conventional island).
In the light of its inability to buy uranium on
the open market, PAEC says that Pakistan
has agreed with China to provide lifetime
fuel supply for the reactors, this being
specified as 60 years.
The Pakistan Nuclear Regulatory Authority
has received the safety analysis of China’s
ACP1000 reactor from CNNC and is
expected to take at least a year to
complete the review before granting a
construction licence.
NuclearPowerReactorsUnder
Constructionand Planned
React
or
Provi
nce
Type
M
We
gro
ss
Construc
tion
Start
Planned
Comme
rcial
Operati
on
Chash
ma 3
Punja
b
CNP-
300
340
May
2011
Dec
2016
Chash
ma 4
Punja
b
CNP-
300
340
Dec
2011
October
2017
Karac
hi
Coast
al 1
Sindh
Hualo
ng
One
115
0
late
2015
React
or
Provi
nce
Type
M
We
gro
ss
Construc
tion
Start
Planned
Comme
rcial
Operati
on
Karac
hi
coasta
l 2
Sindh
Hualo
ng
One
115
0
late
2016?
Total
(4)
298
0
Karachi Coastal is also known as KANUPP
2&3
Furthernuclearcapacity:-
In August
2011 it was reported that Pakistan aimed
for 8000 MWe nuclear at ten sites by 2030.
PAEC has apparently selected six new sites
on the basis of the Pakistan Nuclear
Regulatory Authority (PNRA) and the
International Atomic Energy Agency (IAEA)
advice. These are Qadirabad-Bulloki (QB)
link canal near Qadirabad Headworks; Dera
Ghazi Khan canal near Taunsa Barrage;
Taunsa-Panjnad canal near Multan; Nara
canal near Sukkur; Pat Feeder canal near
Guddu and Kabul River near Nowshera.
Early in 2012 PAEC said that four reactors
were planned for the Taunsa-Panjnad canal
near Multan in Punjab.
In January 2014 PAEC announced its
intention to build five further 1100 MWe
nuclear plants to meet anticipated
electricity demand, and have 8.9 GWe of
nuclear capacity on line by 2030. "With
more than 55 reactor-years of successful
operating experience to its credit, the PAEC
can confidently move from technology
acquisition status to actually starting
contributing sizable electrical energy to the
system." Then PAEC was quoted as saying
that eight sites would be chosen for a
further 32 units, four 1100 MWe units at
each, so that nuclear power supplied one
quarter of the country’s electricity from 40
GWe of capacity, this evidently
presupposing more than a tenfold increase
in electricity demand by a future date well
beyond 2030.
PAEC said an initial 1100 MWe plant would
be built at Muzaffargarh, on the Taunsa-
Panjnad canal near Multan in southwest
Punjab. It was also reported that
discussions with China were under way to
supply three nuclear power plants for
about $13 billion.
Fuelcycle:-
The government has set a
target of producing 350 tonnes U3O8 per
year from 2015 to meet one-third of
anticipated requirements then. Low-grade
ore is known in central Punjab at Bannu
Basin and Suleman Range.
A small (15,000 SWU/yr) uranium
centrifuge enrichment plant at Kahuta has
been operated since 1984 and does not
have any apparent civil use. It was
expanded threefold about 1991. A newer
plant is reported to be at Gadwal. It is not
under safeguards. It is not clear whether
PAEC has any involvement with these
plants.
Enriched fuel for the PWRs is imported
from China.
In 2006 the PAEC announced that it was
preparing to set up separate and purely
civil conversion, enrichment and fuel
fabrication plants as a new US$ 1.2 billion
Pakistan Nuclear Power Fuel Complex
(NPFC) for PWR-type reactors which would
be under IAEA safeguards and managed
separately from existing facilities. At least
the enrichment plant would be built at
Chak Jhumra, Faisalabad, in the Punjab and
have a 150,000 SWU/yr capacity in five
years – about 2013, then be expanded in
150,000 SWU increments to be able to
supply one third of the enrichment
requirements for a planned 8800 MWe
generating capacity by 2030.
However, constraints imposed on Pakistan
by the Nuclear Suppliers Group may mean
that all civil nuclear development is tied to
China, and there may be no point in
proceeding with this civil Fuel Complex.
Wastes:-
The PAEC has responsibility for
radioactive waste management. A
Radioactive Waste Management Fund is
proposed in a new policy. Waste
Management Centres are proposed for
Karachi and Chashma.
Used fuel is currently stored at each
reactor in pools. Longer-term dry storage at
each site is proposed. The question of
future reprocessing remains open.
A National Repository for low- and
intermediate-level wastes is due to be
commissioned by 2015.
Regulation:-
The Pakistan Nuclear
Regulatory Authority (PNRA) is responsible
for licensing and supervision, and regulates
the safety and security of all civil nuclear
materials and facilities. In respect to the
Chashma reactors, and presumably also
the Karachi Coastal Power project, it works
closely with China's NNSA. It was formed in
2001, superseding the Pakistan Nuclear
Regulatory Board (set up by PAEC) and the
Directorate of Nuclear Safety and Radiation
Protection.
Pakistan is party to the convention on
nuclear safety and two international
conventions for early notification and
assistance.
R&Dand otheractivities:-
The Pakistan
Institute of Nuclear Science & Technology
(PINSTECH) at Rawalpindi near Islamabad is
managed by the PAEC and is one of the
largest science and technology research
establishments in the country. It has
conducted research into reprocessing used
nuclear fuel, though today it claims to be
focused on research in medicine, biology,
materials and physics, including production
of medical radioisotopes.
Pakistan has a 10 MW pool-type research
reactor, PARR-1, of 1965 vintage, supplied
by the USA under the Atoms for Peace
program. It was converted to use low-
enriched uranium fuel in 1991, and
upgraded from 5 to 10 MW. PARR-2 is an
indigenous 30 kW miniature neutron
source reactor (MNSR) based on Chinese
design and using high-enriched fuel
operating since 1974. Both are located at
the PINSTECH Laboratory, Nilore, near
Islamabad. They are under IAEA
safeguards. One of them produces some
Mo-99 from HEU targets.
New Labs at PINSTECH at Rawalpindi is
reported to be a reprocessing plant for
weapons-grade plutonium production, and
not under safeguards. It is run by PAEC and
operational since 1981. This was
apparently the culmination of a plutonium
weapons program predating the Kahuta
HEU weapons program, and replaced an
unfinished much larger reprocessing plant
(100 t/yr) being built at Chashma by
France, but cancelled in 1978.
A larger "multipurpose" reactor, a 50 MWt
PHWR near Khushab, 200 km south of
Islamabad, started operating in 1998 and is
evidently for producing weapons-grade
plutonium. A larger heavy water reactor
was built at Khushab from about 2002, and
appeared to be operational at the end of
2009. In 2006 building of a third reactor,
similar to and adjacent to the second,
started, with construction proceeding
rapidly. This appeared to be operational by
the end of 2013. A similar, fourth reactor
was then built a few hundred metres away,
and appeared operational in January 2015.
These seem to add up to a substantial
plutonium production capacity. Khushab is
reported to be making demands upon the
country's limited uranium resources. A
small heavy water plant is nearby.
Reprocessing of military material is
reported to take place at Chashma, 80 km
west, and the original French reprocessing
plant is apparently under renewed
construction there, a couple of kilometres
southwest of Chashma 1-4 power reactors.
The Khan Research Laboratories (KRL) at
Kahuta in Punjab is described as a weapons
engineering R&D institute and research
laboratory, focused on producing high-
enriched uranium using centrifuge
technology originally stolen from Urenco
by Dr Abdul Q Khan. Set up about 1976 as
the Engineering Research Laboratories it
was a key part of Pakistan's weapons
program, supported by the Army Corps of
Engineers in competition with the
plutonium program being pursued by PAEC.
It was renamed in honour of Dr Khan 1981.
Non-proliferation:-
Pakistan is not party
to the Nuclear Non-Proliferation Treaty but
does have its civil power reactors and two
research reactors (PARR 1&2) under item-
specific IAEA safeguards. An agreement for
two further 340 MWe reactors came into
force in April 2011. Pakistan has refused
calls for international inspections of its
enrichment activities.
Pakistan's Kahuta project (incorporating
Project-706) to produce a uranium bomb
was launched in 1972, following a
disastrous war with India. It was partly
financed by Libya to 1979. In May 1974
India exploded a nuclear test close to the
Pakistan border, galvanising Pakistani
efforts. The project was disbanded in 1983
after a successful cold test of weapon
components.
In May 1998 Pakistan exploded five atomic
devices in Baluchistan. At least one was
evidently made from enriched uranium,
but the Chagai II test in Kharan desert used
plutonium produced by New Labs.
Pakistan is reported to be the sole nation
blocking agreement of the Fissile Material
Cutoff Treaty (FMCT) in Geneva
negotiations.
Through the activities of Abdul Q.Khan, a
centrifuge plant and nuclear weapons
designs were supplied clandestinely to
Libya from the late 1990s to 2003 to
furbish a weapons program there. He also
transferred centrifuge technology to North
Korea in the 1990s, and to Iran. This is the
main basis for the Nuclear Suppliers’ Group
(NSG) refusing to ease nuclear trade
sanctions for Pakistan, as it has for India.
China is the only country to act in defiance
of trade sanctions, and has deepened
cooperation since the international US-led
concessions to India in 2008.
Addressing at the 3rd Nuclear Security
Summit at The Hague in March 2014, the
Prime Minister said that Pakistan had been
running a safe and secure nuclear program
for over four decades with the expertise,
manpower and infrastructure to produce
civil nuclear energy. He called for Pakistan’s
inclusion in all international export control
regimes, especially the Nuclear Suppliers
Group. He pointed out that international
treaties and forums would supplement
Pakistan’s national actions to fortify nuclear
security.
Domestically, he said that today the
country’s nuclear security is supported by
five pillars – a strong command and control
system led by the National Command
Authority (NCA); an integrated intelligence
system; a rigorous regulatory regime; a
comprehensive export control regime; and
active international cooperation. The
security regime covers physical protection,
material control and accounting, border
controls and radiological emergencies, he
said.
Pakistan is a major recipient of technical
cooperation from the IAEA, and is one of
35 members of the IAEA Board of
Governors, though it remains outside the
NPT.

More Related Content

What's hot

Pak iran relations
Pak iran relationsPak iran relations
Pak iran relationsMinhaj Hussain
 
Pak US relations Report
Pak US relations ReportPak US relations Report
Pak US relations ReportAreej Fatima
 
Pak China Political, Economic and Strategic Partnership
Pak China Political, Economic and Strategic Partnership Pak China Political, Economic and Strategic Partnership
Pak China Political, Economic and Strategic Partnership Bahria University Islamabad
 
Foreign Policy of Pakistan Part 2
Foreign Policy of Pakistan Part 2Foreign Policy of Pakistan Part 2
Foreign Policy of Pakistan Part 2Shahid Hussain Raja
 
Pak US relations
Pak US relationsPak US relations
Pak US relationsAreej Fatima
 
Foreign Policy of Pakistan - Pakistan
Foreign Policy of Pakistan - PakistanForeign Policy of Pakistan - Pakistan
Foreign Policy of Pakistan - PakistanFaHaD .H. NooR
 
Pak china relations
Pak china relationsPak china relations
Pak china relationsQasim Azeem
 
Geo strategic importance of pakistan by Shafiq -UR-Rehman
Geo strategic importance of pakistan by Shafiq -UR-Rehman Geo strategic importance of pakistan by Shafiq -UR-Rehman
Geo strategic importance of pakistan by Shafiq -UR-Rehman Sohail Ahmed Solangi
 
Pak china relations
Pak china relationsPak china relations
Pak china relationsAreej Fatima
 
Pakistan Iran Relations
Pakistan Iran RelationsPakistan Iran Relations
Pakistan Iran RelationsMubashar
 
Pakistan Foreign Policy...Its objectives and Principles
Pakistan Foreign Policy...Its objectives and PrinciplesPakistan Foreign Policy...Its objectives and Principles
Pakistan Foreign Policy...Its objectives and PrinciplesShefa Idrees
 
Nuclear Power and Its Conflict
Nuclear Power and Its ConflictNuclear Power and Its Conflict
Nuclear Power and Its ConflictS Mahroosh Mazhar
 
Foreign policy of Pakistan
Foreign policy of PakistanForeign policy of Pakistan
Foreign policy of PakistanWaqar Haq
 
SAARC and Role of Pakistan in SAARC
SAARC and Role of Pakistan in SAARCSAARC and Role of Pakistan in SAARC
SAARC and Role of Pakistan in SAARCM Umar
 
Shanghai cooperation organization And Pakistan
Shanghai cooperation organization And Pakistan Shanghai cooperation organization And Pakistan
Shanghai cooperation organization And Pakistan Hans Raj
 
Pakistan and USSR relations: 1947-1999
Pakistan and USSR relations: 1947-1999Pakistan and USSR relations: 1947-1999
Pakistan and USSR relations: 1947-1999Syed Hasan Bari
 
Final slides pak usa relations.
Final slides  pak usa relations.Final slides  pak usa relations.
Final slides pak usa relations.Muhammad Abdur Rehman
 
Civil military relations
Civil military relationsCivil military relations
Civil military relationsDr Tahir Jamil
 
Presentation on China Pakistan Economic Corridor Project
Presentation on China Pakistan Economic Corridor ProjectPresentation on China Pakistan Economic Corridor Project
Presentation on China Pakistan Economic Corridor ProjectAamir Gill
 
Pakistan relation with japan (by Advocate Raja Aleem)
Pakistan relation with japan (by Advocate Raja Aleem)Pakistan relation with japan (by Advocate Raja Aleem)
Pakistan relation with japan (by Advocate Raja Aleem)Raja Aleem
 

What's hot (20)

Pak iran relations
Pak iran relationsPak iran relations
Pak iran relations
 
Pak US relations Report
Pak US relations ReportPak US relations Report
Pak US relations Report
 
Pak China Political, Economic and Strategic Partnership
Pak China Political, Economic and Strategic Partnership Pak China Political, Economic and Strategic Partnership
Pak China Political, Economic and Strategic Partnership
 
Foreign Policy of Pakistan Part 2
Foreign Policy of Pakistan Part 2Foreign Policy of Pakistan Part 2
Foreign Policy of Pakistan Part 2
 
Pak US relations
Pak US relationsPak US relations
Pak US relations
 
Foreign Policy of Pakistan - Pakistan
Foreign Policy of Pakistan - PakistanForeign Policy of Pakistan - Pakistan
Foreign Policy of Pakistan - Pakistan
 
Pak china relations
Pak china relationsPak china relations
Pak china relations
 
Geo strategic importance of pakistan by Shafiq -UR-Rehman
Geo strategic importance of pakistan by Shafiq -UR-Rehman Geo strategic importance of pakistan by Shafiq -UR-Rehman
Geo strategic importance of pakistan by Shafiq -UR-Rehman
 
Pak china relations
Pak china relationsPak china relations
Pak china relations
 
Pakistan Iran Relations
Pakistan Iran RelationsPakistan Iran Relations
Pakistan Iran Relations
 
Pakistan Foreign Policy...Its objectives and Principles
Pakistan Foreign Policy...Its objectives and PrinciplesPakistan Foreign Policy...Its objectives and Principles
Pakistan Foreign Policy...Its objectives and Principles
 
Nuclear Power and Its Conflict
Nuclear Power and Its ConflictNuclear Power and Its Conflict
Nuclear Power and Its Conflict
 
Foreign policy of Pakistan
Foreign policy of PakistanForeign policy of Pakistan
Foreign policy of Pakistan
 
SAARC and Role of Pakistan in SAARC
SAARC and Role of Pakistan in SAARCSAARC and Role of Pakistan in SAARC
SAARC and Role of Pakistan in SAARC
 
Shanghai cooperation organization And Pakistan
Shanghai cooperation organization And Pakistan Shanghai cooperation organization And Pakistan
Shanghai cooperation organization And Pakistan
 
Pakistan and USSR relations: 1947-1999
Pakistan and USSR relations: 1947-1999Pakistan and USSR relations: 1947-1999
Pakistan and USSR relations: 1947-1999
 
Final slides pak usa relations.
Final slides  pak usa relations.Final slides  pak usa relations.
Final slides pak usa relations.
 
Civil military relations
Civil military relationsCivil military relations
Civil military relations
 
Presentation on China Pakistan Economic Corridor Project
Presentation on China Pakistan Economic Corridor ProjectPresentation on China Pakistan Economic Corridor Project
Presentation on China Pakistan Economic Corridor Project
 
Pakistan relation with japan (by Advocate Raja Aleem)
Pakistan relation with japan (by Advocate Raja Aleem)Pakistan relation with japan (by Advocate Raja Aleem)
Pakistan relation with japan (by Advocate Raja Aleem)
 

Viewers also liked

Pakistani Nuclear Foreign Policy; Past, Present, and Future
Pakistani Nuclear Foreign Policy; Past, Present, and FuturePakistani Nuclear Foreign Policy; Past, Present, and Future
Pakistani Nuclear Foreign Policy; Past, Present, and FutureBranden Ryan
 
9 nuclear learning mujaddid
9 nuclear learning mujaddid9 nuclear learning mujaddid
9 nuclear learning mujaddidGhulam Mujaddid
 
Nuclear energy powerpoint.
Nuclear energy powerpoint.Nuclear energy powerpoint.
Nuclear energy powerpoint.Enigmatic You
 
Pakistan nuclear energy vs electricity by noman javed
Pakistan nuclear energy vs electricity by noman javed Pakistan nuclear energy vs electricity by noman javed
Pakistan nuclear energy vs electricity by noman javed noman
 
C:\Documents And Settings\Bb093005\Desktop\Dr Munir Ahmed Khan
C:\Documents And Settings\Bb093005\Desktop\Dr Munir Ahmed KhanC:\Documents And Settings\Bb093005\Desktop\Dr Munir Ahmed Khan
C:\Documents And Settings\Bb093005\Desktop\Dr Munir Ahmed KhanDanish Khan
 
nuclear energy of pakistan
nuclear energy of pakistan nuclear energy of pakistan
nuclear energy of pakistan Prince Shakeeb Khan
 
Pakistan and nuclear terrorism
Pakistan and nuclear terrorismPakistan and nuclear terrorism
Pakistan and nuclear terrorismFateema Bercha
 
Pakistan defense presentation
Pakistan defense presentationPakistan defense presentation
Pakistan defense presentationSher Ahmed
 
Nuclear power resources in pakistan
Nuclear power resources in pakistanNuclear power resources in pakistan
Nuclear power resources in pakistanfauzia samreen
 
Pakistan A Feel Good Presentation
Pakistan   A Feel Good PresentationPakistan   A Feel Good Presentation
Pakistan A Feel Good PresentationHassan Rizwan
 
Pakistan's relations with Muslim world
Pakistan's relations with Muslim worldPakistan's relations with Muslim world
Pakistan's relations with Muslim worldSaad Afridi
 
Educational standard in pakistan
Educational standard in pakistanEducational standard in pakistan
Educational standard in pakistanTalha Khan
 
Pakistan - Armed Forces
Pakistan - Armed ForcesPakistan - Armed Forces
Pakistan - Armed Forcesironmankho
 
Operation Zarb-e-Azb
Operation Zarb-e-AzbOperation Zarb-e-Azb
Operation Zarb-e-Azbosama122
 
Presentation on Pakistan
Presentation on PakistanPresentation on Pakistan
Presentation on PakistanKhaleeq Rehman
 
Blast 1998 sept_2001_pak
Blast 1998 sept_2001_pakBlast 1998 sept_2001_pak
Blast 1998 sept_2001_pakMalik Saif
 
Kashmir Separatist Movement
Kashmir Separatist MovementKashmir Separatist Movement
Kashmir Separatist MovementRupendra Rajpoot
 

Viewers also liked (20)

Pakistani Nuclear Foreign Policy; Past, Present, and Future
Pakistani Nuclear Foreign Policy; Past, Present, and FuturePakistani Nuclear Foreign Policy; Past, Present, and Future
Pakistani Nuclear Foreign Policy; Past, Present, and Future
 
9 nuclear learning mujaddid
9 nuclear learning mujaddid9 nuclear learning mujaddid
9 nuclear learning mujaddid
 
Nuclear energy powerpoint.
Nuclear energy powerpoint.Nuclear energy powerpoint.
Nuclear energy powerpoint.
 
Pakistan nuclear energy vs electricity by noman javed
Pakistan nuclear energy vs electricity by noman javed Pakistan nuclear energy vs electricity by noman javed
Pakistan nuclear energy vs electricity by noman javed
 
C:\Documents And Settings\Bb093005\Desktop\Dr Munir Ahmed Khan
C:\Documents And Settings\Bb093005\Desktop\Dr Munir Ahmed KhanC:\Documents And Settings\Bb093005\Desktop\Dr Munir Ahmed Khan
C:\Documents And Settings\Bb093005\Desktop\Dr Munir Ahmed Khan
 
nuclear energy of pakistan
nuclear energy of pakistan nuclear energy of pakistan
nuclear energy of pakistan
 
Pakistan and nuclear terrorism
Pakistan and nuclear terrorismPakistan and nuclear terrorism
Pakistan and nuclear terrorism
 
Pakistan defense presentation
Pakistan defense presentationPakistan defense presentation
Pakistan defense presentation
 
Nuclear power resources in pakistan
Nuclear power resources in pakistanNuclear power resources in pakistan
Nuclear power resources in pakistan
 
Zarb-e-Azb
Zarb-e-AzbZarb-e-Azb
Zarb-e-Azb
 
The kashmir conflict
The kashmir conflictThe kashmir conflict
The kashmir conflict
 
Pakistan A Feel Good Presentation
Pakistan   A Feel Good PresentationPakistan   A Feel Good Presentation
Pakistan A Feel Good Presentation
 
Pakistan's relations with Muslim world
Pakistan's relations with Muslim worldPakistan's relations with Muslim world
Pakistan's relations with Muslim world
 
Educational standard in pakistan
Educational standard in pakistanEducational standard in pakistan
Educational standard in pakistan
 
Pakistan - Armed Forces
Pakistan - Armed ForcesPakistan - Armed Forces
Pakistan - Armed Forces
 
Operation Zarb-e-Azb
Operation Zarb-e-AzbOperation Zarb-e-Azb
Operation Zarb-e-Azb
 
Presentation on Pakistan
Presentation on PakistanPresentation on Pakistan
Presentation on Pakistan
 
CV PM-KJH
CV PM-KJHCV PM-KJH
CV PM-KJH
 
Blast 1998 sept_2001_pak
Blast 1998 sept_2001_pakBlast 1998 sept_2001_pak
Blast 1998 sept_2001_pak
 
Kashmir Separatist Movement
Kashmir Separatist MovementKashmir Separatist Movement
Kashmir Separatist Movement
 

Similar to Pakistan Nuclear

China-Pakistan economic Corridor
China-Pakistan economic CorridorChina-Pakistan economic Corridor
China-Pakistan economic CorridorSaad Naseem
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanIBRAR AHMAD
 
China nuclear power: From Importing to exporting technology
China nuclear power: From Importing to exporting technologyChina nuclear power: From Importing to exporting technology
China nuclear power: From Importing to exporting technologyYannick Perez
 
Pak China economic corridor
Pak China economic corridorPak China economic corridor
Pak China economic corridorTalha Saleem
 
Final report
Final reportFinal report
Final report91avijit
 
China Pakistan Economic Corridor
China Pakistan Economic CorridorChina Pakistan Economic Corridor
China Pakistan Economic CorridorMubshir Hussain
 
China pakistan economic corridor Project
China pakistan economic corridor ProjectChina pakistan economic corridor Project
China pakistan economic corridor Projectanwaar azad
 
Chashma Neuclear Power Plant CHASHNUPP and its Economical Effect
Chashma Neuclear Power Plant CHASHNUPP and its Economical EffectChashma Neuclear Power Plant CHASHNUPP and its Economical Effect
Chashma Neuclear Power Plant CHASHNUPP and its Economical EffectZeeshan Rafiq
 
Comparison of Nuclear Energy of Bangladesh with India & Pakistan
Comparison of Nuclear Energy of Bangladesh with India & PakistanComparison of Nuclear Energy of Bangladesh with India & Pakistan
Comparison of Nuclear Energy of Bangladesh with India & PakistanIOSR Journals
 
Bangladesh nuclear power facts
Bangladesh nuclear power factsBangladesh nuclear power facts
Bangladesh nuclear power factsProbir Bidhan
 
China Pakistan Economic Corridor
China Pakistan Economic CorridorChina Pakistan Economic Corridor
China Pakistan Economic CorridorMalik Younis
 
Wind power in pakistan by tahir
Wind power in pakistan by tahirWind power in pakistan by tahir
Wind power in pakistan by tahirfauzia samreen
 
Newbase 19 february 2020 energynewsissue 1318 by khaledalawadi compressed
Newbase 19 february 2020 energynewsissue   1318 by khaledalawadi compressedNewbase 19 february 2020 energynewsissue   1318 by khaledalawadi compressed
Newbase 19 february 2020 energynewsissue 1318 by khaledalawadi compressedKhaled Al Awadi
 
PSAG - August 2014 (13Th Edition)
PSAG - August 2014 (13Th Edition)PSAG - August 2014 (13Th Edition)
PSAG - August 2014 (13Th Edition)UPES Dehradun
 
Download China nuclear power sector opportunity analysis
Download China nuclear power sector opportunity analysisDownload China nuclear power sector opportunity analysis
Download China nuclear power sector opportunity analysisKuicK Research
 
China nuclear power sector opportunity analysis
China nuclear power sector opportunity analysisChina nuclear power sector opportunity analysis
China nuclear power sector opportunity analysisKuicK Research
 

Similar to Pakistan Nuclear (20)

Pakistan Project 2013-2015
Pakistan Project 2013-2015Pakistan Project 2013-2015
Pakistan Project 2013-2015
 
China-Pakistan economic Corridor
China-Pakistan economic CorridorChina-Pakistan economic Corridor
China-Pakistan economic Corridor
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistan
 
China nuclear power: From Importing to exporting technology
China nuclear power: From Importing to exporting technologyChina nuclear power: From Importing to exporting technology
China nuclear power: From Importing to exporting technology
 
Pak China economic corridor
Pak China economic corridorPak China economic corridor
Pak China economic corridor
 
Final report
Final reportFinal report
Final report
 
China Pakistan Economic Corridor
China Pakistan Economic CorridorChina Pakistan Economic Corridor
China Pakistan Economic Corridor
 
China pakistan economic corridor Project
China pakistan economic corridor ProjectChina pakistan economic corridor Project
China pakistan economic corridor Project
 
Nl energy sep 26 - oct 2, 2015
Nl energy sep 26 - oct 2, 2015Nl energy sep 26 - oct 2, 2015
Nl energy sep 26 - oct 2, 2015
 
Chashma Neuclear Power Plant CHASHNUPP and its Economical Effect
Chashma Neuclear Power Plant CHASHNUPP and its Economical EffectChashma Neuclear Power Plant CHASHNUPP and its Economical Effect
Chashma Neuclear Power Plant CHASHNUPP and its Economical Effect
 
Comparison of Nuclear Energy of Bangladesh with India & Pakistan
Comparison of Nuclear Energy of Bangladesh with India & PakistanComparison of Nuclear Energy of Bangladesh with India & Pakistan
Comparison of Nuclear Energy of Bangladesh with India & Pakistan
 
Thar coal hurdle&solution
Thar coal hurdle&solutionThar coal hurdle&solution
Thar coal hurdle&solution
 
Bangladesh nuclear power facts
Bangladesh nuclear power factsBangladesh nuclear power facts
Bangladesh nuclear power facts
 
China Pakistan Economic Corridor
China Pakistan Economic CorridorChina Pakistan Economic Corridor
China Pakistan Economic Corridor
 
Cpec(salman's group)
Cpec(salman's group)Cpec(salman's group)
Cpec(salman's group)
 
Wind power in pakistan by tahir
Wind power in pakistan by tahirWind power in pakistan by tahir
Wind power in pakistan by tahir
 
Newbase 19 february 2020 energynewsissue 1318 by khaledalawadi compressed
Newbase 19 february 2020 energynewsissue   1318 by khaledalawadi compressedNewbase 19 february 2020 energynewsissue   1318 by khaledalawadi compressed
Newbase 19 february 2020 energynewsissue 1318 by khaledalawadi compressed
 
PSAG - August 2014 (13Th Edition)
PSAG - August 2014 (13Th Edition)PSAG - August 2014 (13Th Edition)
PSAG - August 2014 (13Th Edition)
 
Download China nuclear power sector opportunity analysis
Download China nuclear power sector opportunity analysisDownload China nuclear power sector opportunity analysis
Download China nuclear power sector opportunity analysis
 
China nuclear power sector opportunity analysis
China nuclear power sector opportunity analysisChina nuclear power sector opportunity analysis
China nuclear power sector opportunity analysis
 

Recently uploaded

Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 

Recently uploaded (20)

Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 

Pakistan Nuclear

  • 1. Nuclear Powerin Pakistan ď‚· Pakistanhasa smallnuclearpower program,with725MWe capacity,but is movingto increasethissubstantially. ď‚· Pakistan'snuclearweaponscapabilities of has arisenindependentlyof the civil nuclearfuelcycle,usingindigenous uranium. ď‚· BecausePakistanis outsidethe Nuclear Non-ProliferationTreaty,due to its weaponsprogram,it is largelyexcluded fromtradein nuclearplantormaterials, whichhindersits developmentof civil
  • 2. nuclearenergy.However,Chinais positiveaboutnuclearcooperationwith Pakistan. Pakistan in 2012 produced 96 billion kWh of electricity, 35 TWh of this from oil, 27 from natural gas and 30 from hydro. Nuclear power makes a small contribution to total energy production and requirements, supplying only 4.6 TWh (4.7% of total electricity generated in 2012). Consumption in 2012 was about 77 billion kWh after 16% transmission losses. There was virtually no import or export. Total installed capacity is about 20 GWe, but often only about 12 GWe is operable. In 2005 an Energy Security Plan was adopted by the government, calling for a
  • 3. huge increase in generating capacity to more than 160 GWe by 2030. Significant power shortages are reported, and load shedding is common. In July 2013 the Executive Committee of the National Economic Council (ECNEC) approved 3.5 GWe of new power projects totalling Rs 1303 billion ($13 billion), comprising 2200 MWe nuclear, 425 MWe gas combined cycle, and 969 MWe hydro. These are designed to reduce the high reliance on oil and to reduce power costs. All depend on Chinese support. Nuclearpower:- The Pakistan Atomic Energy Commission (PAEC) is responsible for all nuclear energy
  • 4. and research applications in the country. The PAEC is reported to have two divisions which are responsible for nuclear power programs: Nuclear Power Generation (NUPG) and Nuclear Power Projects (NUPP). The NUPG directorate oversees the operational units, and the NUPP directorate is concerned with design and construction of planned units, and is closely aligned with the Nuclear Regulatory Authority (PNRA). PAEC's first nuclear power reactor is a small 137 MWe (125 MWe net) Canadian pressurized heavy water reactor (PHWR) which started up in 1971 and which is under international safeguards – KANUPP at Paradise Point in Sindh province, about
  • 5. 25 km west of Karachi. It is operated at reduced power, and is under review by PAEC because of its age. The second unit is Chashma 1 in Punjab province in the north, a 325 MWe (300 MWe net) two-loop pressurised water reactor (PWR) supplied by China's CNNC under safeguards. The main part of the plant was designed by Shanghai Nuclear Engineering Research and Design Institute (SNERDI), based on Qinshan 1. It started up in May 2000 and is also known as CHASNUPP 1. Designed life span is 40 years. It, and the following 3 units, were built using international design codes and standards.
  • 6. Construction of its twin, Chashma 2, started in December 2005. It was reported to cost PKR 51.46 billion (US$ 860 million, with $350 million of this financed by China). A safeguards agreement with IAEA was signed in 2006 and grid connection was in March 2011, with commercial operation in May. Upgrades have added 5 MWe since (to 330 MWe gross). At KANUPP a 4800 m3 /day MED desalination plant was commissioned in 2012, though in 2014 it was reported as 1600 m3 /day. Operating Reactorsin Pakistan
  • 8. Karachi is also known as KANUPP, Chashma as CHASNUPP. Enriched fuel for the PWRs is imported from China. The 2005 Energy Security Plan included intention of lifting nuclear capacity to 8800 MWe, 900 MWe of this by 2015 and a further 1500 MWe by 2020. Projections included four further Chinese reactors of 300 MWe each and seven of 1000 MWe, all PWR. There were tentative plans for China to build two 1000 MWe PWR units at Karachi as KANUPP 2&3, but China then in 2007 deferred development of its CNP- 1000 type which would have been the only one of that size able to be exported. Pakistan then turned its attention to
  • 9. building smaller units with higher local content. However, in 2013 China revived its 1000 MWe designs with export intent, and made overtures to Pakistan for the ACP1000 design. Chashma3&4:- In June 2008 the government announced plans to build units 3&4 at Chashma, each 320 MWe gross and largely financed by China. A further agreement for China's help with the project was signed in October 2008, and given prominence as a counter to the US- India agreement shortly preceding it. In March 2009 China's SNERDI announced that it was proceeding with design of
  • 10. Chashma 3&4, with China Zhongyuan Engineering Corp (CZEC) as the general contractor and China Nuclear Industry No.5 Construction Company as installer. In April 2009, a design contract with SNERDI was signed, and the government said that it had approved the project at a cost of $2.37 billion, with $1.75 billion of this involving "a foreign exchange component". In March 2010 Pakistan announced that it had agreed the terms for Chashma 3&4, whereby China would provide 82% of the total US$ 1.912 billion financing as three 20-year low-interest loans. It would also provide fuel for the reactors’ lifetime nominally of 40 years.
  • 11. The main construction contract was signed in June 2010, and the two 340 MWe CNP- 300 (315 MWe net) units are to be completed in eight years. They will have a design life of 40 years and be under IAEA safeguards. Construction of unit 3 officially started at the end of May 2011, and unit 4 in December 2011. The dome of unit 3 was fitted in March 2013. Early in 2014 PAEC said they were several months ahead of schedule. In April 2013 it was reported that the PAEC would receive a significant increase in budget appropriation to expedite construction of Chashma 3&4. However, the Nuclear Suppliers Group (NSG) raised some questions about China's
  • 12. supply of Chasma 3&4. Contracts for units 1&2 were signed in 1990 and 2000 respectively, before 2004 when China joined the NSG, which maintains an embargo on sales of nuclear equipment to Pakistan. China argued that units 3&4 are similarly "grandfathered", and arrangements are consistent with those for units 1&2. Chashma5:- In November 2010 the PAEC is reported to have signed a construction agreement with China National Nuclear Corporation (CNNC) for a fifth unit at Chashma. In February 2013 a further agreement was signed by PAEC with CNNC for a 1000 MWe unit at Chashma. It was
  • 13. reported that China expected that this deal would be controversial under the NPT and guidelines of the NSG. Early in 2013 CNNC confirmed its intention to build a 1000 MWe class reactor, and said it would be an ACP1000 unit, though not necessarily at Chashma. The status of any continuing plan for Chashma 5 is very uncertain, and it may have been displaced by plans for a plant near Multan in southwest Punjab. Karachicoastalpowerproject:- In June 2013 the Planning Commission said that two CNNC 1000 MWe class reactors would be used for Karachi 2 and 3 (KANUPP 2&3) near Karachi unit 1. Two coastal sites had been under consideration for the twin
  • 14. 1100 MWe units. CNNC in April 2013 announced an export agreement for the ACP1000, nominally 1100 MWe, apparently for Pakistan. This was confirmed in June by the PAEC which said that the next nuclear project would be 1100 MWe class units which it would build, the Karachi Coastal Power station, costing $9.5 billion. In July 2013 ECNEC approved two units of the Karachi Costal Power Project with net generation capacity of 2,117 MWe. The total cost of this was estimated at Rs 959 billion ($9.595 billion), with $6.5 billion (68%) being vendor finance. PAEC also said that 82% of the total cost would be financed by China. At the end of August contracts were signed in Shanghai with
  • 15. CNNC, China Zhongyuan Engineering Co. Ltd. (CZEC), China Nuclear Power Engineering Co. Ltd. (CNPE), Nuclear Power Institute of China (NPIC), and East China Electric Power Designing Institute (ECEPDI). Ground breaking at the site near Paradise Point, 25 km west of Karachi, took place in November 2013, and first concrete was envisaged by the end of 2014. However in October 2014 the Sindh high court ruling stopped site work following a challenge on environmental grounds, and the restraining order was extended to early December. In April 2015 China Energy Engineering Group Co (CEEC) won the tender for civil engineering construction and installation work for the conventional island of the
  • 16. plant, which it said would use Hualong One reactors. Construction is expected to start at the end of 2015 and take 72 months (52 months for conventional island). In the light of its inability to buy uranium on the open market, PAEC says that Pakistan has agreed with China to provide lifetime fuel supply for the reactors, this being specified as 60 years. The Pakistan Nuclear Regulatory Authority has received the safety analysis of China’s ACP1000 reactor from CNNC and is expected to take at least a year to complete the review before granting a construction licence.
  • 19. In August 2011 it was reported that Pakistan aimed for 8000 MWe nuclear at ten sites by 2030. PAEC has apparently selected six new sites on the basis of the Pakistan Nuclear Regulatory Authority (PNRA) and the International Atomic Energy Agency (IAEA) advice. These are Qadirabad-Bulloki (QB) link canal near Qadirabad Headworks; Dera Ghazi Khan canal near Taunsa Barrage; Taunsa-Panjnad canal near Multan; Nara canal near Sukkur; Pat Feeder canal near Guddu and Kabul River near Nowshera. Early in 2012 PAEC said that four reactors were planned for the Taunsa-Panjnad canal near Multan in Punjab.
  • 20. In January 2014 PAEC announced its intention to build five further 1100 MWe nuclear plants to meet anticipated electricity demand, and have 8.9 GWe of nuclear capacity on line by 2030. "With more than 55 reactor-years of successful operating experience to its credit, the PAEC can confidently move from technology acquisition status to actually starting contributing sizable electrical energy to the system." Then PAEC was quoted as saying that eight sites would be chosen for a further 32 units, four 1100 MWe units at each, so that nuclear power supplied one quarter of the country’s electricity from 40 GWe of capacity, this evidently presupposing more than a tenfold increase
  • 21. in electricity demand by a future date well beyond 2030. PAEC said an initial 1100 MWe plant would be built at Muzaffargarh, on the Taunsa- Panjnad canal near Multan in southwest Punjab. It was also reported that discussions with China were under way to supply three nuclear power plants for about $13 billion. Fuelcycle:- The government has set a target of producing 350 tonnes U3O8 per year from 2015 to meet one-third of anticipated requirements then. Low-grade ore is known in central Punjab at Bannu Basin and Suleman Range.
  • 22. A small (15,000 SWU/yr) uranium centrifuge enrichment plant at Kahuta has been operated since 1984 and does not have any apparent civil use. It was expanded threefold about 1991. A newer plant is reported to be at Gadwal. It is not under safeguards. It is not clear whether PAEC has any involvement with these plants. Enriched fuel for the PWRs is imported from China. In 2006 the PAEC announced that it was preparing to set up separate and purely civil conversion, enrichment and fuel fabrication plants as a new US$ 1.2 billion Pakistan Nuclear Power Fuel Complex (NPFC) for PWR-type reactors which would
  • 23. be under IAEA safeguards and managed separately from existing facilities. At least the enrichment plant would be built at Chak Jhumra, Faisalabad, in the Punjab and have a 150,000 SWU/yr capacity in five years – about 2013, then be expanded in 150,000 SWU increments to be able to supply one third of the enrichment requirements for a planned 8800 MWe generating capacity by 2030. However, constraints imposed on Pakistan by the Nuclear Suppliers Group may mean that all civil nuclear development is tied to China, and there may be no point in proceeding with this civil Fuel Complex. Wastes:-
  • 24. The PAEC has responsibility for radioactive waste management. A Radioactive Waste Management Fund is proposed in a new policy. Waste Management Centres are proposed for Karachi and Chashma. Used fuel is currently stored at each reactor in pools. Longer-term dry storage at each site is proposed. The question of future reprocessing remains open. A National Repository for low- and intermediate-level wastes is due to be commissioned by 2015. Regulation:- The Pakistan Nuclear Regulatory Authority (PNRA) is responsible
  • 25. for licensing and supervision, and regulates the safety and security of all civil nuclear materials and facilities. In respect to the Chashma reactors, and presumably also the Karachi Coastal Power project, it works closely with China's NNSA. It was formed in 2001, superseding the Pakistan Nuclear Regulatory Board (set up by PAEC) and the Directorate of Nuclear Safety and Radiation Protection. Pakistan is party to the convention on nuclear safety and two international conventions for early notification and assistance. R&Dand otheractivities:-
  • 26. The Pakistan Institute of Nuclear Science & Technology (PINSTECH) at Rawalpindi near Islamabad is managed by the PAEC and is one of the largest science and technology research establishments in the country. It has conducted research into reprocessing used nuclear fuel, though today it claims to be focused on research in medicine, biology, materials and physics, including production of medical radioisotopes. Pakistan has a 10 MW pool-type research reactor, PARR-1, of 1965 vintage, supplied by the USA under the Atoms for Peace program. It was converted to use low- enriched uranium fuel in 1991, and upgraded from 5 to 10 MW. PARR-2 is an
  • 27. indigenous 30 kW miniature neutron source reactor (MNSR) based on Chinese design and using high-enriched fuel operating since 1974. Both are located at the PINSTECH Laboratory, Nilore, near Islamabad. They are under IAEA safeguards. One of them produces some Mo-99 from HEU targets. New Labs at PINSTECH at Rawalpindi is reported to be a reprocessing plant for weapons-grade plutonium production, and not under safeguards. It is run by PAEC and operational since 1981. This was apparently the culmination of a plutonium weapons program predating the Kahuta HEU weapons program, and replaced an unfinished much larger reprocessing plant
  • 28. (100 t/yr) being built at Chashma by France, but cancelled in 1978. A larger "multipurpose" reactor, a 50 MWt PHWR near Khushab, 200 km south of Islamabad, started operating in 1998 and is evidently for producing weapons-grade plutonium. A larger heavy water reactor was built at Khushab from about 2002, and appeared to be operational at the end of 2009. In 2006 building of a third reactor, similar to and adjacent to the second, started, with construction proceeding rapidly. This appeared to be operational by the end of 2013. A similar, fourth reactor was then built a few hundred metres away, and appeared operational in January 2015. These seem to add up to a substantial
  • 29. plutonium production capacity. Khushab is reported to be making demands upon the country's limited uranium resources. A small heavy water plant is nearby. Reprocessing of military material is reported to take place at Chashma, 80 km west, and the original French reprocessing plant is apparently under renewed construction there, a couple of kilometres southwest of Chashma 1-4 power reactors. The Khan Research Laboratories (KRL) at Kahuta in Punjab is described as a weapons engineering R&D institute and research laboratory, focused on producing high- enriched uranium using centrifuge technology originally stolen from Urenco by Dr Abdul Q Khan. Set up about 1976 as
  • 30. the Engineering Research Laboratories it was a key part of Pakistan's weapons program, supported by the Army Corps of Engineers in competition with the plutonium program being pursued by PAEC. It was renamed in honour of Dr Khan 1981. Non-proliferation:- Pakistan is not party to the Nuclear Non-Proliferation Treaty but does have its civil power reactors and two research reactors (PARR 1&2) under item- specific IAEA safeguards. An agreement for two further 340 MWe reactors came into force in April 2011. Pakistan has refused calls for international inspections of its enrichment activities.
  • 31. Pakistan's Kahuta project (incorporating Project-706) to produce a uranium bomb was launched in 1972, following a disastrous war with India. It was partly financed by Libya to 1979. In May 1974 India exploded a nuclear test close to the Pakistan border, galvanising Pakistani efforts. The project was disbanded in 1983 after a successful cold test of weapon components. In May 1998 Pakistan exploded five atomic devices in Baluchistan. At least one was evidently made from enriched uranium, but the Chagai II test in Kharan desert used plutonium produced by New Labs. Pakistan is reported to be the sole nation blocking agreement of the Fissile Material
  • 32. Cutoff Treaty (FMCT) in Geneva negotiations. Through the activities of Abdul Q.Khan, a centrifuge plant and nuclear weapons designs were supplied clandestinely to Libya from the late 1990s to 2003 to furbish a weapons program there. He also transferred centrifuge technology to North Korea in the 1990s, and to Iran. This is the main basis for the Nuclear Suppliers’ Group (NSG) refusing to ease nuclear trade sanctions for Pakistan, as it has for India. China is the only country to act in defiance of trade sanctions, and has deepened cooperation since the international US-led concessions to India in 2008.
  • 33. Addressing at the 3rd Nuclear Security Summit at The Hague in March 2014, the Prime Minister said that Pakistan had been running a safe and secure nuclear program for over four decades with the expertise, manpower and infrastructure to produce civil nuclear energy. He called for Pakistan’s inclusion in all international export control regimes, especially the Nuclear Suppliers Group. He pointed out that international treaties and forums would supplement Pakistan’s national actions to fortify nuclear security. Domestically, he said that today the country’s nuclear security is supported by five pillars – a strong command and control
  • 34. system led by the National Command Authority (NCA); an integrated intelligence system; a rigorous regulatory regime; a comprehensive export control regime; and active international cooperation. The security regime covers physical protection, material control and accounting, border controls and radiological emergencies, he said. Pakistan is a major recipient of technical cooperation from the IAEA, and is one of 35 members of the IAEA Board of Governors, though it remains outside the NPT.