Career Summary
I learned from my 19 years professional experience the four major aspects Time, Budget& Cost Variations,
Coordination with stake holders and Quality Assurance which play a very important role in Projects. I want
to work, implement, learn & prosper with dedication & commitment, in an environment where my
performance reflects my effort. A dedicated and enthusiastic professional with a broad working knowledge in
the field of Civil Engineering and Project Management especially in offshore EPC projects. Solid background
in management and coordination skills, possess leadership qualities and good communication skills and
ability to manage, motivate and work individually as well as part of a team. Well aware and successful in
cross cultural working environment.
Experience Summary
Total 19 Years experience in Civil Engineering and Infrastructure Development Projects(Buildings; Roads; Bridges;
R.O &GWTS; Recreation; Duct Banks etc).
May 2014 to Till date: Project Manager [DAR Engineering – Saudi Arabia: 4 Stories 50 Buildings & Infrastructure
Dev.Project]:
 August 2012 to April 2014: A. Resident Engineer-Structure Concrete Lining Tunnels [NDC – Hydropower
969MW Project Pakistan]JV-MWH Global, NDC, NORPLAN, NESPAK, ACE:
 August 2011 to July 2012: Senior Civil Engineer [B.L Harbert International New U.S Embassy Project –
Islamabad Pak]:
 September 2009 to July 2011: Construction Manager [Redco International – Doha Qatar: Lusail Development
Project]:
 October 2005 to July 2009: Project Manager [Crescent Builders – Works & Services Organization Islamabad
Pakistan]:
 July 2001 to September 2005: Project Engineer [Al-Jabelein Construction- Hail, Saudi Arabia]:
 June 1999 to May 2001: Site Engineer Structure-Indus River Bridge[ Bayindir Insaat Turkish Co.- Motorway
Project Pakistan]
 March 1996 to April 1999: Site Engineer-Roads & Minor Structures[SKB National Highway- Pakistan]:
KHALID JARRAR HASHMI
PROJECT MANAGER
johnsonnadar@yahoo.co.in
Engineering Manager
Email: Khalidhashmi735@gmail.com
Mobile: +966500489631
2/9
Personal Details
Age : 45 YEARS
Marital Status : Married
Nationality : Pakistan
Skill Set
Software Skills : M.S Office; Autocad;
Communication : Excellent
Managerial : Excellent
Achievements
DAR Engineering – Saudi Arabia: Established Evaluation and Tendering procedure system
parallel with the execution of the Project; To control the
Budget and minimize the variation orders contractually.
Quality Assurance System
Articles Published
 Statistical Analysis for the Factors Affecting the Productivity in the Construction Industry (1996).
 The Importance of Pile Load Test in Bridge Construction (2001).
 Modern Technique for Water Proofing of Underground Structures.(2010)
 Report on Dewatering System-Concept of French Drain.(2011)
Education Summary
B.E/B.Sc in Civil Engineering from University of Engineering & Technology Lahore Pakistan 1996. PEC Civil/17619
3/9
AT DAR Engineering – Saudi Arabia
Nature of Project: AlFanar Residential Project for Employees Exit12 Riyadh
Position: Project Manager-(PMC)
Period: May 2014 to till date
Responsibilities:
• Project Management Consultant Supervision for the Construction of 50 Nos of Residential Blocks,
Underground services, Infrastructure development (Road Network, Reverse Osmosis Plant output
2000m3
/day& Grey water treatment plant 800m3
/day, Fire Fighting System, Central Laundry,
Pedestrian Walkways) Utility Building, Recreation & Restaurant and Supports complex. Total covered
area is 65000 Sq.M to accommodate 6,500 people.
Responsible in coordination of my team members for the technical & commercial evaluation and
shortlisting of Suppliers/installers of R.O & Grey Water Treatment plant, Turnstile & Central Laundry.
• PC Hollow Core &Solid Slabs are being installed/fixed for Residential Blocks along with Precast Load
Bearing wall Panels (Grouting& Screed) and only Partitioning to be done by Block Masonry.
• Responsible to ensure the completion of the project within stipulated time frame and within Budget
along with Quality and also responsible to handle the Variation Orders on contract basis.
• Project comprises of two types of Structures: Substructure is Cast In Place while Super Structure is
Precast. All Precast Load bearing panels embedded with MEPs. So Strict Coordination between MEP
section and PC carrying out.
• Key Persons in my team: One Architect Engineer, Two Civil Engineers, 2 Civil Site Inspectors,2MEP
Engineers(1E+1M), One QS Engineer ,2 MEP Inspectors, One Office Secretary.
Estimated Cost of this Project is 350 Million SAR.
ProfessionalWorkSummary–ProjectManagement&Engineering
4/9
AT NEELUM JHELUM CONSULTANT (JV-MWH Global,NDC,…) –Pakistan
Nature of Project: Hydropower Project 969MW (Tunneling D&B and TBM)
Position: A. Resident Engineer-Structure (Concrete Lining Tunnels &
HFO Power Plant MAN Gens.& Housing/Residential Colony)PMC
Period: August 2012 to April 2014 Responsibilities:
• Reporting to Chief Resident Engineer
• Fully responsible of Reviewing Variation Orders/B.O.Q submitted by Contractor and approval.
• Construction Supervision of Tunnel Lining and Needle Beam Formwork erection/installation.
• Construction supervision for complete civil work of HFO Power Plant.
• Construction supervision of 115 Housing Units and Monitor Works compliance to applicable codes.
• Review Shop Drawings for Concrete Lining of Tunnel, HFO Power Plant &Housing Units.
• Preparation of Daily Progress Report; Weekly Progress Report; Monthly Progress Report; Quarterly
Progress Report; Annual Progress Report
• Coordination With Herrenkneckt for Tunnel Boring Machine.
• Preparation Agenda/Minutes of Weekly Meetings for Tunneling Quality Issues (Shotcreting, Overbreaks, Rock
Grouting, Wire mesh, Probing) Drill & Blast and TBM.
• Supervising the Technical Correspondence (emails & letters) with Client and Contractor.
ProfessionalWorkSummary–ProjectManagement&Engineering
5/9
AT B.L HARBERT International. New U.S Embassy Islamabad – Pakistan
Nature of Job: CONSTRUCTION OF NEW U.S EMBASSY Islamabad
Position: SENIOR CIVIL ENGINEER (N.O.B & N.O.X)
Period: August 2011 to July 2012
Consultant: O.B.O WASHINGTON USA
Responsibilities:
• Reporting to Project Manager.
• Responsible for technical evaluation and coordination with Design team head employed by Owner.
• Responsible for the Construction of Main Buildings from Raft/Strip Foundation to L-7 and Main RCC
Duct Bank.
• Coordination of all technical activities on assigned projects.
• Responsible for Planning, Scheduling, Conducting and coordinating the technical management
aspects of main buildings (NOB & NOX) and Electric High Voltage and Low Voltage man holes.
• Decision making for resolving the problems on site by using governing Specs and Standards.
• Monitors work for compliance to applicable codes.
• Monthly project status reports and weekly accomplishments along with change orders.
• Assist in the preparation of engineering project proposals.
ProfessionalWorkSummary–PowerSystemStudy/ProtectionEngineering
6/9
Professional Work Summary – Power System Study /
Protection Engineering
AT REDCO International, Doha – Qatar
Nature of Job: SUBSTAIONS 66KV / SW PUMPING STATION (Lusail Development Project)
Position: CONSTRUCTION MANAGER
Period: August 2009 to July 2011
Consultant: HALCROW Qatar
Responsibilities:
• Planning and achieving daily / weekly targets of scheduled activities.
• Monitor and evaluate daily and weekly activities and update as required.
• Coordination with Steel Division and Form work Division In charge, specialist sub-contractor to ensure smooth
implementation of all jobs.
• To organize the required work force for the execution of all activities.
• To monitor safety practice at site.
• Coordination with Project Manager regarding progress of the project.
• To evaluate daily, weekly and monthly demands of materials and forwarding to Project Manager.
• To maintain quality of works in coordination with QA/QC Manager and fulfilling requirements.
• Full authority and overall responsibility to manage, supervise the construction works.
• To coordinate with the Engineer’s representative for the execution of works
• Monitor timely delivery of materials and feedback Project Manager
• To ensure safety measures are implemented all times as required by HSE Management
ProfessionalWorkSummary–PowerSystemStudy/ProtectionEngineering
7/9
AT Crescent Builders – Works & Services Org. Pakistan
Nature of Job: Building & Highway Projects( Cancer Hospital, School, Mosque,Highway)
Position: Project Manager (Crescent Builders)
Period: October 2005 to July 2009
Responsibilities:
• To manage & finalize Tendering, Contractual matters, Rates analysis till contract agreements
• Responsible to manage with team for the construction of Highway Project 45 KM I/C Underpass
CPC DG khan.
• Fully Responsible for Stages from Pre-Construction to Complete Construction & Handing over the
Project of 5 Stories Cancer Hospital Minar Multan(Multan Institute of Nuclear Medicine &
Radiotherapy).
• Responsible for the Construction of PAEC Model School, Mosque and Water Supply project PIEAS
(Pakistan Institute of Engineering & Applied Sciences) Islamabad.
• Procurement of material(Short term and Long term) and hiring subcontractors for supply in coordination with
• Manage the Finance matters and preparation/adjustment of cash flow.
ProfessionalWorkSummary–PowerSystemStudy/ProtectionEngineering
8/9
AT Al-Jabelein Construction –Hail, Saudi Arabia
Nature of Job: Roads & Buildings Project
Position: Project Engineer
Period: July 2001 to September2005
Responsibilities:
• Responsible for Pre-Construction stage and Construction Supervision of Desert Ring road including
laying of Asphlat Jubbah, Hail KSA.
• Planning, Designing & Construction Supervision of Urban Roads, Hail KSA.
• Construction Supervision of Executive Villas, Hail KSA.
• Responsible for hiring the Sub-Contractors for heavy equipment/vehicles.
• Preparation and finalize the Variation Orders on contractual basis.
• Preparation of Monthly Invoices (Interim Payment Certificates).
ProfessionalWorkSummary–PowerSystemStudy/ProtectionEngineering
9/9
Signature:
AT BAYINDIR Insaat(Turkish Co)Motorway Project –Islamabad Pakistan
Nature of Job: Islamabad Peshawar 6-Lane Motorway Project(165KM) Pakistan (M- 1)
Position: Site Engineer Structure
Period: June 1999 to May 2001
Responsibilities:
 Construction Supervision of Major Structures Indus River Bridge(1200m), Interchange Bridge from
Piling Foundation to Deck Slab. 2.0m Dia Working Piles for Indus River Bridge (1200m Length) and
1.20m dia for Swabi Interchange Bridge.
 Responsible for Pouring of Class-D concrete and stressing(Freyssinet System) of Post-Tensioned 40
m Long Girders for Indus River Bridge and 30m for Interchange bridge.
 Supervision of Pile Load Test for Indus Bridge.
 Preparation of weekly and monthly progress report as per the schedule
AT SKB Pakistan N-5 National Highway Project – Pakistan
Nature of job: Roads & Bridge Projects
Position: Site Engineer
Period: March 1996 to April 1999
Responsibilities:
• Supervision of Construction of Culverts & Cattle creep.
• Supervision of Construction of roads. (Sub grade, Sub Base & Base Course) and laying of Asphalt.
• Preparation of bill of quantities carried out as actual and make comparison with original BOQ.
• Preparation of Bar bending schedule.
• Weekly accomplishment reports and monthly progress reports.
ProfessionalWorkSummary–PowerSystemStudy/ProtectionEngineering

More Related Content

What's hot

NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNshaat Hafez
 
CV-MAMOON template Jan 2016 & Roles final
CV-MAMOON template Jan 2016 & Roles finalCV-MAMOON template Jan 2016 & Roles final
CV-MAMOON template Jan 2016 & Roles finalMamoon Hawwash
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Syed mohammed project manager civil
Syed mohammed project manager civilSyed mohammed project manager civil
Syed mohammed project manager civilsyedmohd77
 
Nabil Noshey Sadek -1
Nabil Noshey Sadek -1Nabil Noshey Sadek -1
Nabil Noshey Sadek -1Nabil Sadek
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016belal alrwadieh
 
Pic Profile
Pic ProfilePic Profile
Pic ProfileDebbout
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEankush kumar
 
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTINGNATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTINGNationalLaboratory
 
Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume robbert1806
 

What's hot (19)

Adly CV111
Adly CV111Adly CV111
Adly CV111
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
 
CV-MAMOON template Jan 2016 & Roles final
CV-MAMOON template Jan 2016 & Roles finalCV-MAMOON template Jan 2016 & Roles final
CV-MAMOON template Jan 2016 & Roles final
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Syed mohammed project manager civil
Syed mohammed project manager civilSyed mohammed project manager civil
Syed mohammed project manager civil
 
Nabil Noshey Sadek -1
Nabil Noshey Sadek -1Nabil Noshey Sadek -1
Nabil Noshey Sadek -1
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
 
Pic Profile
Pic ProfilePic Profile
Pic Profile
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAE
 
Engr._Fahad_CV[1]
Engr._Fahad_CV[1]Engr._Fahad_CV[1]
Engr._Fahad_CV[1]
 
Resume (final cv)
Resume (final cv)Resume (final cv)
Resume (final cv)
 
Infrastructure engineer. CV
Infrastructure engineer. CVInfrastructure engineer. CV
Infrastructure engineer. CV
 
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTINGNATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
 
Arshad Jan CV
Arshad Jan CVArshad Jan CV
Arshad Jan CV
 
CV Kamran Haider
CV Kamran HaiderCV Kamran Haider
CV Kamran Haider
 
Ankur Parmar Jan 17
Ankur Parmar Jan 17Ankur Parmar Jan 17
Ankur Parmar Jan 17
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume
 

Similar to CV Resume for Civil Engineer (20)

CV (2)
CV (2)CV (2)
CV (2)
 
Rehman cv
Rehman cvRehman cv
Rehman cv
 
CV Rev(4)
CV Rev(4)CV Rev(4)
CV Rev(4)
 
Aqib Rana CV Revised
Aqib Rana CV RevisedAqib Rana CV Revised
Aqib Rana CV Revised
 
Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
FAHD_CV
FAHD_CVFAHD_CV
FAHD_CV
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
 
Basheer Ahmed Senior Infrastructure
Basheer Ahmed Senior InfrastructureBasheer Ahmed Senior Infrastructure
Basheer Ahmed Senior Infrastructure
 
KhaledAlnajada 01-July-2015
KhaledAlnajada 01-July-2015KhaledAlnajada 01-July-2015
KhaledAlnajada 01-July-2015
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
mathy 2015
mathy 2015mathy 2015
mathy 2015
 
CV Engr Saad Ahmed Khan(Wapda)
CV Engr Saad Ahmed Khan(Wapda)CV Engr Saad Ahmed Khan(Wapda)
CV Engr Saad Ahmed Khan(Wapda)
 
Resume HNP Updated
Resume HNP UpdatedResume HNP Updated
Resume HNP Updated
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
CV
CVCV
CV
 
CV
CVCV
CV
 
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
 
imran syed
imran syed imran syed
imran syed
 

CV Resume for Civil Engineer

  • 1. CURRICULLAM VITAE 1/9 J THOMAI NADAR Career Summary I learned from my 19 years professional experience the four major aspects Time, Budget& Cost Variations, Coordination with stake holders and Quality Assurance which play a very important role in Projects. I want to work, implement, learn & prosper with dedication & commitment, in an environment where my performance reflects my effort. A dedicated and enthusiastic professional with a broad working knowledge in the field of Civil Engineering and Project Management especially in offshore EPC projects. Solid background in management and coordination skills, possess leadership qualities and good communication skills and ability to manage, motivate and work individually as well as part of a team. Well aware and successful in cross cultural working environment. Experience Summary Total 19 Years experience in Civil Engineering and Infrastructure Development Projects(Buildings; Roads; Bridges; R.O &GWTS; Recreation; Duct Banks etc). May 2014 to Till date: Project Manager [DAR Engineering – Saudi Arabia: 4 Stories 50 Buildings & Infrastructure Dev.Project]:  August 2012 to April 2014: A. Resident Engineer-Structure Concrete Lining Tunnels [NDC – Hydropower 969MW Project Pakistan]JV-MWH Global, NDC, NORPLAN, NESPAK, ACE:  August 2011 to July 2012: Senior Civil Engineer [B.L Harbert International New U.S Embassy Project – Islamabad Pak]:  September 2009 to July 2011: Construction Manager [Redco International – Doha Qatar: Lusail Development Project]:  October 2005 to July 2009: Project Manager [Crescent Builders – Works & Services Organization Islamabad Pakistan]:  July 2001 to September 2005: Project Engineer [Al-Jabelein Construction- Hail, Saudi Arabia]:  June 1999 to May 2001: Site Engineer Structure-Indus River Bridge[ Bayindir Insaat Turkish Co.- Motorway Project Pakistan]  March 1996 to April 1999: Site Engineer-Roads & Minor Structures[SKB National Highway- Pakistan]: KHALID JARRAR HASHMI PROJECT MANAGER johnsonnadar@yahoo.co.in Engineering Manager Email: Khalidhashmi735@gmail.com Mobile: +966500489631
  • 2. 2/9 Personal Details Age : 45 YEARS Marital Status : Married Nationality : Pakistan Skill Set Software Skills : M.S Office; Autocad; Communication : Excellent Managerial : Excellent Achievements DAR Engineering – Saudi Arabia: Established Evaluation and Tendering procedure system parallel with the execution of the Project; To control the Budget and minimize the variation orders contractually. Quality Assurance System Articles Published  Statistical Analysis for the Factors Affecting the Productivity in the Construction Industry (1996).  The Importance of Pile Load Test in Bridge Construction (2001).  Modern Technique for Water Proofing of Underground Structures.(2010)  Report on Dewatering System-Concept of French Drain.(2011) Education Summary B.E/B.Sc in Civil Engineering from University of Engineering & Technology Lahore Pakistan 1996. PEC Civil/17619
  • 3. 3/9 AT DAR Engineering – Saudi Arabia Nature of Project: AlFanar Residential Project for Employees Exit12 Riyadh Position: Project Manager-(PMC) Period: May 2014 to till date Responsibilities: • Project Management Consultant Supervision for the Construction of 50 Nos of Residential Blocks, Underground services, Infrastructure development (Road Network, Reverse Osmosis Plant output 2000m3 /day& Grey water treatment plant 800m3 /day, Fire Fighting System, Central Laundry, Pedestrian Walkways) Utility Building, Recreation & Restaurant and Supports complex. Total covered area is 65000 Sq.M to accommodate 6,500 people. Responsible in coordination of my team members for the technical & commercial evaluation and shortlisting of Suppliers/installers of R.O & Grey Water Treatment plant, Turnstile & Central Laundry. • PC Hollow Core &Solid Slabs are being installed/fixed for Residential Blocks along with Precast Load Bearing wall Panels (Grouting& Screed) and only Partitioning to be done by Block Masonry. • Responsible to ensure the completion of the project within stipulated time frame and within Budget along with Quality and also responsible to handle the Variation Orders on contract basis. • Project comprises of two types of Structures: Substructure is Cast In Place while Super Structure is Precast. All Precast Load bearing panels embedded with MEPs. So Strict Coordination between MEP section and PC carrying out. • Key Persons in my team: One Architect Engineer, Two Civil Engineers, 2 Civil Site Inspectors,2MEP Engineers(1E+1M), One QS Engineer ,2 MEP Inspectors, One Office Secretary. Estimated Cost of this Project is 350 Million SAR. ProfessionalWorkSummary–ProjectManagement&Engineering
  • 4. 4/9 AT NEELUM JHELUM CONSULTANT (JV-MWH Global,NDC,…) –Pakistan Nature of Project: Hydropower Project 969MW (Tunneling D&B and TBM) Position: A. Resident Engineer-Structure (Concrete Lining Tunnels & HFO Power Plant MAN Gens.& Housing/Residential Colony)PMC Period: August 2012 to April 2014 Responsibilities: • Reporting to Chief Resident Engineer • Fully responsible of Reviewing Variation Orders/B.O.Q submitted by Contractor and approval. • Construction Supervision of Tunnel Lining and Needle Beam Formwork erection/installation. • Construction supervision for complete civil work of HFO Power Plant. • Construction supervision of 115 Housing Units and Monitor Works compliance to applicable codes. • Review Shop Drawings for Concrete Lining of Tunnel, HFO Power Plant &Housing Units. • Preparation of Daily Progress Report; Weekly Progress Report; Monthly Progress Report; Quarterly Progress Report; Annual Progress Report • Coordination With Herrenkneckt for Tunnel Boring Machine. • Preparation Agenda/Minutes of Weekly Meetings for Tunneling Quality Issues (Shotcreting, Overbreaks, Rock Grouting, Wire mesh, Probing) Drill & Blast and TBM. • Supervising the Technical Correspondence (emails & letters) with Client and Contractor. ProfessionalWorkSummary–ProjectManagement&Engineering
  • 5. 5/9 AT B.L HARBERT International. New U.S Embassy Islamabad – Pakistan Nature of Job: CONSTRUCTION OF NEW U.S EMBASSY Islamabad Position: SENIOR CIVIL ENGINEER (N.O.B & N.O.X) Period: August 2011 to July 2012 Consultant: O.B.O WASHINGTON USA Responsibilities: • Reporting to Project Manager. • Responsible for technical evaluation and coordination with Design team head employed by Owner. • Responsible for the Construction of Main Buildings from Raft/Strip Foundation to L-7 and Main RCC Duct Bank. • Coordination of all technical activities on assigned projects. • Responsible for Planning, Scheduling, Conducting and coordinating the technical management aspects of main buildings (NOB & NOX) and Electric High Voltage and Low Voltage man holes. • Decision making for resolving the problems on site by using governing Specs and Standards. • Monitors work for compliance to applicable codes. • Monthly project status reports and weekly accomplishments along with change orders. • Assist in the preparation of engineering project proposals. ProfessionalWorkSummary–PowerSystemStudy/ProtectionEngineering
  • 6. 6/9 Professional Work Summary – Power System Study / Protection Engineering AT REDCO International, Doha – Qatar Nature of Job: SUBSTAIONS 66KV / SW PUMPING STATION (Lusail Development Project) Position: CONSTRUCTION MANAGER Period: August 2009 to July 2011 Consultant: HALCROW Qatar Responsibilities: • Planning and achieving daily / weekly targets of scheduled activities. • Monitor and evaluate daily and weekly activities and update as required. • Coordination with Steel Division and Form work Division In charge, specialist sub-contractor to ensure smooth implementation of all jobs. • To organize the required work force for the execution of all activities. • To monitor safety practice at site. • Coordination with Project Manager regarding progress of the project. • To evaluate daily, weekly and monthly demands of materials and forwarding to Project Manager. • To maintain quality of works in coordination with QA/QC Manager and fulfilling requirements. • Full authority and overall responsibility to manage, supervise the construction works. • To coordinate with the Engineer’s representative for the execution of works • Monitor timely delivery of materials and feedback Project Manager • To ensure safety measures are implemented all times as required by HSE Management ProfessionalWorkSummary–PowerSystemStudy/ProtectionEngineering
  • 7. 7/9 AT Crescent Builders – Works & Services Org. Pakistan Nature of Job: Building & Highway Projects( Cancer Hospital, School, Mosque,Highway) Position: Project Manager (Crescent Builders) Period: October 2005 to July 2009 Responsibilities: • To manage & finalize Tendering, Contractual matters, Rates analysis till contract agreements • Responsible to manage with team for the construction of Highway Project 45 KM I/C Underpass CPC DG khan. • Fully Responsible for Stages from Pre-Construction to Complete Construction & Handing over the Project of 5 Stories Cancer Hospital Minar Multan(Multan Institute of Nuclear Medicine & Radiotherapy). • Responsible for the Construction of PAEC Model School, Mosque and Water Supply project PIEAS (Pakistan Institute of Engineering & Applied Sciences) Islamabad. • Procurement of material(Short term and Long term) and hiring subcontractors for supply in coordination with • Manage the Finance matters and preparation/adjustment of cash flow. ProfessionalWorkSummary–PowerSystemStudy/ProtectionEngineering
  • 8. 8/9 AT Al-Jabelein Construction –Hail, Saudi Arabia Nature of Job: Roads & Buildings Project Position: Project Engineer Period: July 2001 to September2005 Responsibilities: • Responsible for Pre-Construction stage and Construction Supervision of Desert Ring road including laying of Asphlat Jubbah, Hail KSA. • Planning, Designing & Construction Supervision of Urban Roads, Hail KSA. • Construction Supervision of Executive Villas, Hail KSA. • Responsible for hiring the Sub-Contractors for heavy equipment/vehicles. • Preparation and finalize the Variation Orders on contractual basis. • Preparation of Monthly Invoices (Interim Payment Certificates). ProfessionalWorkSummary–PowerSystemStudy/ProtectionEngineering
  • 9. 9/9 Signature: AT BAYINDIR Insaat(Turkish Co)Motorway Project –Islamabad Pakistan Nature of Job: Islamabad Peshawar 6-Lane Motorway Project(165KM) Pakistan (M- 1) Position: Site Engineer Structure Period: June 1999 to May 2001 Responsibilities:  Construction Supervision of Major Structures Indus River Bridge(1200m), Interchange Bridge from Piling Foundation to Deck Slab. 2.0m Dia Working Piles for Indus River Bridge (1200m Length) and 1.20m dia for Swabi Interchange Bridge.  Responsible for Pouring of Class-D concrete and stressing(Freyssinet System) of Post-Tensioned 40 m Long Girders for Indus River Bridge and 30m for Interchange bridge.  Supervision of Pile Load Test for Indus Bridge.  Preparation of weekly and monthly progress report as per the schedule AT SKB Pakistan N-5 National Highway Project – Pakistan Nature of job: Roads & Bridge Projects Position: Site Engineer Period: March 1996 to April 1999 Responsibilities: • Supervision of Construction of Culverts & Cattle creep. • Supervision of Construction of roads. (Sub grade, Sub Base & Base Course) and laying of Asphalt. • Preparation of bill of quantities carried out as actual and make comparison with original BOQ. • Preparation of Bar bending schedule. • Weekly accomplishment reports and monthly progress reports. ProfessionalWorkSummary–PowerSystemStudy/ProtectionEngineering