Topics

       • Introduction

       • Organization Design Framework

       • Examples

       • Success Factors

       • Overview of Five Design Areas

       • References
Rick Walters © 2010                      2
Organization Design . . .

       • Alignment
         . . . is guided by business strategy which changes to some 
               is g ided b b siness strateg hich changes to some
         degree from year to year.  Org design must be reviewed.

       • H li ti
         Holistic
         . . . is more than the structure.       Don’t stop at the 
         organization chart.

       • Engaging
         . . . releases or inhibits human potential. 
         . . . releases or inhibits human potential.        Your choice.
                                                            Your choice.

       • Responsibility
         . . . is a responsibility of leaders at all levels. 
               i           ibilit f l d        t ll l l         Effective 
                                                                Eff ti
         design and change won’t happen by itself.
Rick Walters © 2010                                                          3
Engaging . . . Release human potential

       • The seed wants to grow, move the rock.
                      – “Don't Push Growth; Remove the Factors Limiting Growth ”
                         Don t Push Growth; Remove the Factors Limiting Growth.
                                                              Peter Senge, 5th Discipline


       • Beliefs about people
              – People are naturally active; they set goals and enjoy striving
              – People who understand and care about what they are doing can 
                devise and improve their own methods of doing work
                                                           Two of the beliefs listed by
                                       Douglas McGregor, The Human Side of Enterprise


       • P i i l of Whole S t
         Principle f Wh l System A hit t
                                 Architecture
              – Design work systems to customer’s needs and for business 
                results.
                                                              One of twelve principles by 
                                                              One of twelve principles by
                                                Larry Miller, Whole System Architecture

Rick Walters © 2010                                                                     4
Organization Effectiveness Frameworks

       • People Systems
              –       Performance Management
              –       Training & Development
              –       Recognition and Reward
              –       Individual and Team Dynamics


       • Process Focused
         Process Focused
              – Business Process Improvement
              – Six Sigma
              – Reengineering


       • Whole Systems
         Whole Systems
              – Comprehensive Organization Design Models
Rick Walters © 2010                                        5
Organization Design Concepts Progression and 
                      Some Representative Resource Books
                      Some Representative Resource Books



                                                                               Process
                                                                             Improvement
                                                            Strategic
                                                            Planning

Tavistock        Socio-       Self-          Dynamic
 Institute      Technical   Directed           Org.
Research        Systems      Teams            Design

                                                                        Rethinking and
                                                                        Reengineering




                                                       Effective
                                       Holistic View    Teams
                                             of
                                       Performance
      Rick Walters © 2010                                                                6
Organization Design Framework: Star Model
         Designing Dynamic Organizations: A Hands-On Guide for Leaders at All Levels
         2002. Jay Galbraith, Diane Downey, Amy Kates




Rick Walters © 2010                                                                    7
Organization Design Enablers

             Structure                                          People
•   Function                                      •   Assessment and selection
•   Geography
    G        h                                    •   Performance feedback
•   Product                                       •   Learning and development
•   Customer                                      •   Culture, norms, habits
•   Role definition                               •   Written, unwritten rules
•   Interfaces
                                 Strategy
                                 Strateg
•   Boundaries
                                 • Vision
•   Governance
                                 • Mission




                                 •   Priorities
                                 •   Strategy                 Rewards
             Processes           •   Values
•   Networks                                      •   Metrics
                                 •   Goals        •   Values and Behaviors
•   Processes
•   Teams                                         •   Compensation
•   Integrative roles                             •   Rewards and recognition
•   Matrix structures
•   Lateral capability


                                                                                 8
Focus Question

       • Is the organization designed to achieve the desired 
         outcomes (defined by market/customer) and results 
                    (d fi d b       k /           ) d      l
         of the business strategy?

              – What gaps in results exist now or will exist if no changes to 
                design or capability are made?

              – What capabilities and changes are needed to capture 
                opportunities or move in a new direction?




Rick Walters © 2010                                                              9
Organizational Development Approaches

•   Targeted, narrow focus              •   Complex interventions         •   Comprehensive, detailed, 
    interventions                            –   Governance  by key              g       ,     g
                                                                              large scale, design and 
      –    One or small team of                  sponsors or                  implementation programs
           sponsors                              leadership team               –    Governance by hierarchy  
      –    One or a few                      –   Several organization               of steering teams
           organization design                   design components             –    Dedicated design teams
           components involved                   involved                      –    Comprehensive 
                                                                                    transition planning and 
                                                                                    implementation
                                            Targeted Process
      Individual / Manager                   Improvements
         or Work Group                                                    Mergers and
                                                                          M          d
      Performance Issues                                                  Acquisitions


                    Problem Solving /                                      ERP System
                    Decision Making                                      Implementations


                                                                                   New Business or
                                                                                     Unit Startup



    Rick Walters © 2010                                                                                    10
OD/HR/Consultant Role in Organization 
                                Effectiveness
       •     Responsibility
             . . . is a responsibility of leaders at all levels.



       •     When Quality Circles, Total Quality Management, Business Process 
             Reengineering or other business improvement frameworks were emerging, 
             many organizations had dedicated groups of experts to lead organizations in 
             application of these complex approaches.

       •     To a large degree, these dedicated functions no longer exist. However, from 
             T l        d       th     d di t d f ti          l       it H          f
             the momentum of the initial programs and with additions to management 
             curricula, managers are taking ownership of organization design (whether 
             they know it or not). Although not necessarily in a methodical or 
             comprehensive fashion.
                 p

       •     The role of the consultant can be to maintain an eye on the principles and 
             methods available for organization design and to bring just the right amount 
             of relevant process to leaders and leadership teams when needed. 



Rick Walters © 2010                                                                     11
Examples from division and department level transformations.

  ORGANIZATION DESIGN INTERVENTION 
  EXAMPLES


Rick Walters © 2010                                              12
Case for Action & Accomplishments

                         2000                              Accomplishments
       Diminished credibility                        Credibility up – seat at the table

       Decreased customer satisfaction               High customer satisfaction

       Cost overruns                                 Cost goals being met – predictable outcomes

                                                     Ability to deliver strategic and tactical
       “Fire-fighting”
                                                     solutions

       Not taking full advantage of investments in   Increasing entitlement and leveraging of IT
       IT solutions                                  investments

       Poor project execution                        Projects meeting expectations

                                                     Positive impact on morale – higher than
                                                                p                  g
       Negative impact on morale
                                                     benchmark on industry surveys

       Poor global coordination                      Global coordination & cooperation

       Minimal business integration
                            g                        Increasing integration across business units
                                                              g     g




Rick Walters © 2010                                                                                 13
Example – Drivers: Shift in Products and Services

                             Structure                                           People




Corporate Priorities

 Improve Customer                                     Strategy
   Relationships
                                         •   There is and will be a change in
                                             the make up of projects to
Increase Market Share                        include more, larger system
                                             integration projects.
                                             i t     ti      j t
Improve Organization
                Processes                •   Common platforms will need to
    Performance                              support diverse business unit
                                             needs. (e.g. commodity and
                                                                                Rewards
                                             differentiated, low and high
                                                        volume)




       Rick Walters © 2010                                                                14
Structure

       • Initially a Major Program box and manager was added 
         to the org chart with the implication that:
             h        h      i h h i li i       h
              – The other functions continue with the ongoing work.
              – The Program Manager manages the large program.




                                                Enterprise
                                               Applications
                                                   V.P.



            Order to                   Purchase to                  Application    Major
                       Plan to Start                          B2B
             Cash                       Booking                      Support      Program




Rick Walters © 2010                                                                    15
Adding the role to the org chart addresses one 
                              component (partially).
                                  p       (p       y)

                      Structure                                                   People
        •   Add Major Programs function and
            leader.




                                                       Strategy

                                       •      There is and will be a change in
                                              the make up of projects to
                                              include more, larger system
                                              integration projects.
                                              i t     ti      j t
            Processes                  •      Common platforms will need to
                                              support diverse business unit
                                              needs. (e.g. commodity and
                                                                                 Rewards
                                              differentiated, low and high
                                                         volume)




Rick Walters © 2010                                                                        16
Challenge

•   The leadership team 
    recognized there were many  
         g                      y
    implications for how the 
    organization would operate 
    going forward. For example, 
    all managers will have 
    challenges with priority and 
     h ll        ith i it      d
    resource limitations with 
    the addition of the new 
    large program. The program 
    was to be 3 4 years in 
    was to be 3‐4 years in
    duration.
•   A workshop was held with the leadership team with the following objectives:

     – What are the common goals across the functions in the group, including the 
       new large program?

     – How do we work, communicate and support one another to implement our 
                        ,                     pp                      p
       combined priorities (continuing with existing functions and successful 
       execution of the new large program)?
    Rick Walters © 2010                                                           17
Areas to address identified in the workshop,  
            mapped to the organization design framework.
            mapped to the organization design framework
                      Structure                                                               People
        •   Internal Customer interfaces and                                  •    SME’s on business processes
            relationship management                                           •    Cross-training
                                                                                   Cross training for fle ibilit
                                                                                                      flexibility
        •   Restructure customer teams                                        •    Need appropriate knowledge per
        •   Internal and external suppliers                                        system
            interfaces and relationships
            management

                                                          Strategy
                                           •    Business      Internal Customer
                                                priorities, short and long-term.



                      Processes
       •    Scope management (assistance
            from internal customers)
       •    People resources allocation                                                  Reinforcement
       •    Requirements gathering and                                        •    Alignment within the organization,
            priority setting with customers                                        across functional groups and
       •    Contracting and on-boarding of                                         individuals
            supplemental labor (short lead
            time, expertise requirements)
       •    Simplified work design to make it
            easier to bring in contractors



Rick Walters © 2010                                                                                                 18
Four initiatives defined with leadership team 
                      members assigned to each.
                      members assigned to each
       •     Communication Across Functions
              – Action: Project Coordination Team.
       •     Communicate with Customers
             C     i      i hC
              – Action: Stakeholder communications and planning.
              – Action: Restructure business unit stakeholder teams.
       •     Resource Management
              esou ce a age e t
              – Action: Develop plan / approach.
       •     Internal / External Supplier Management / Relationships
              – Action: Continue with existing efforts and mechanisms.

       •     In addition a process was developed and implemented to manage the 
             life cycle of the initiatives so that organization capability was improved 
             year over year.
                                      Initiative Life-cycle
                  Definition and   Identification of     Planning to       Final Report,
                  Consensus on       Org Change        Institutionalize   Celebration and
                     Scope           Implications       the Changes         Next Steps

                 January                                                     December
Rick Walters © 2010                                                                         19
Structure & Lateral Functions

       • Viewing the additional structure and lateral 
         mechanisms overlaid with the functional organization 
             h i          l id i h h f      i    l     i i
         chart.
               Restructure business stakeholder
               decision making teams.
                                           Enterprise            Resource Management &
               Proactive relationship     Applications
               management.                    V.P.             External Supplier Relationships



    Order to                          Purchase to                Application      Major
                      Plan to Start                      B2B
     Cash                              Booking                    Support        Program


Cross-functional Projects Team: Review projects, staffing, forecasts and interdependencies.




Rick Walters © 2010                                                                              20
Other Implications

       • A shift in the organization characteristics from highly 
         technical emphasis to a business analyst role and skill 
            h i l        h i       b i         l        l  d kill
         set.
       • Reconfiguring the organization to a functional model:
         Reconfiguring the organization to a functional model: 
         PMO structure, Level 2 Support Function and 
         Technical Applications support.
       • Developing and using tools for resource allocation and 
              l          d          l f              ll          d
         management.
       • Development of career maps for business analysts and
         Development of career maps for business analysts and 
         project managers.



Rick Walters © 2010                                             21
Success Factors for Sustainable Change

       • Clear understanding of business drivers and strategy.

       • Engagement of leadership team in process to identify
              –       Common goals / vision
              –       Challenges and gaps
                      Challenges and gaps
              –       Implications for organization culture / mindset
              –       Initiatives to develop organization capability

       • Structured process to implement organization design 
         changes: Awareness  Adoption, Institutionalization
              – Typically, the organization design changes that are needed to 
                execute strategy are new and often do not fit in to the current 
                execute strategy are new and often do not fit in to the current
                charter of any existing functional area.
              – To create new capability, the leadership team must define a 
                charter for the initiatives, take the lead and make time to 
                develop and implement them in parallel with existing 
                develop and implement them in parallel with existing
                operations. 

Rick Walters © 2010                                                                22
OVERVIEW OF FIVE ORGANIZATION 
DESIGN AREAS


                                 23
Organization Design Enablers

              Structure                                                                                               People
•    Function                                                                                          •    Assessment and selection
•    Geography
     G        h                                                                                        •    Performance feedback
•    Product                                                                                           •    Learning and development
•    Customer                                                                                          •    Culture, norms, habits
•    Role definition                                                                                   •    Written, unwritten rules
•    Interfaces
                                                                       Strategy
                                                                       Strateg
•    Boundaries
                                                                       • Vision
•    Governance
                                                                       • Mission




                                                                       •    Priorities
                                                                       •    Strategy                                           Rewards
             Processes                                                 •    Values
•   Networks                                                                                           •    Metrics
                                                                       •    Goals                      •    Values and Behaviors
•   Processes
•   Teams                                                                                              •    Compensation
•   Integrative roles                                                                                  •    Rewards and recognition
•   Matrix structures
•   Lateral capability

Created from concepts in : Designing Dynamic Organizations: A Hands-On Guide for Leaders at All Levels. Jay Galbraith, Diane
Downey, Amy Kates. (New York: AMACOM, 2002).                                                                                             24
Strategy

       • Strategy guides decisions in the face of infinite 
         possibilities for organization design choices.
         possibilities for organization design choices

       • Clarity on drivers for change, vision and direction is 
         key for creating a foundation for consensus building 
         k f         ti     f    d ti f                b ildi
         across leadership teams and key stakeholders.

       • Key steps:
              – “Identifying Success Indicators: What business results must 
                the design achieve? 
              – Understanding the Value Proposition: What are the 
                organizational implications of our strategic focus? 
              – Determining the Design Criteria: What are the organizational 
                capabilities that the design must help our organization 
                     biliti th t th d i          th l            i ti
                build?“*
                 *Source: Designing Dynamic Organizations: A Hands-On Guide for Leaders at All Levels. Jay Galbraith, Diane Downey, Amy Kates. (New
                 York: AMACOM, 2002).
Rick Walters © 2010                                                                                                                                   25
Structure
                                  Two of five steps from Designing Dynamic Organizations.

 • “Step 1. Selecting a                                                                      • “Step 2. Defining the new 
   structure that is most likely 
              h i         lik l                                                                organizational roles in the 
                                                                                                     i i     l l i h
   to support development of                                                                   structure and clarifying the 
   required organizational                                                                     points of interface among 
   capabilities*
   capabilities*”                                                                              them.*
                                                                                               them *”
       – A new organization structure                                                                  – A cross‐functional resource 
         was implemented: From                                                                           management team was 
         Product to Function focus.                                                                      established.
                                                                                                       – Roles were defined for 
                       Enterprise                                                                        relationship managers for key 
                      Applications                                                                       business functions.
                         V.P.


                                                                                     Resource planning
                User                 Technical                 Major
PMO                                                                              and management team.
               Support                Support                Programs




                         * Source: Designing Dynamic Organizations: A Hands-On Guide for Leaders at All Levels. Jay Galbraith, Diane Downey, Amy Kates. (New
                         York: AMACOM, 2002).

      Rick Walters © 2010                                                                                                                                      26
Processes

       Key Concepts

       • Organization Structure provides a starting point for 
         organization design. There is not a perfect or ‘right’ 
         structure that accommodates all needs. 

       • Lateral organization components can fill the gaps or
         Lateral organization components can fill the gaps or 
         ‘white spaces’ in the organization structure.

       • Designing Dynamic Organizations emphasizes and 
         provides more information about lateral capability. 
         There are many other references for basic process 
         design, improvement or reengineering.

Rick Walters © 2010                                                27
Five Types of Lateral Capability


                       •       Matrix Structures: Dual reporting relationships in 
                               order to manage the conflicting needs of 
                               functional, customer, product or geographic 
                               forces.
Elective
                       •       Integrative Roles: Managerial, coordinator or 
                               Integrative Roles: Managerial coordinator or
                               boundary‐spanning positions charged with 




                                                                                     Managem
                               orchestrating work across units.
                       •       Teams: Cross‐business structures that bring 




                                                                                                                  Complexity
                                                                                           ment Time and Energy
                               people together to work independently and 
                               share collective responsibility for outcomes.
  Can                  •       Lateral Processes: Move decisions and 
                               information through the organization in a 
                               information through the organization in a




                                                                                                                           y
                                                                                                       d
 Occur
 O
                               formalized flow.
Naturally
                       •       Networks: The interpersonal relationships and 
                               communities of practice that underlie all other 
                               types of lateral capability and serve to 
                               coordinate work informally.
         Rick Walters © 2010                                                                                                   28
Examples of Lateral Capabilities Augmenting 
                   Organization Structure Design
                   Organization Structure Design

        Cross-functional     Cross-functional       Cross-functional
        Networks             Processes              Teams

        • Project            • Cross-business       • IT Leadership Team
          Management
          M          t         Funding Model
                               F di M d l           • Regional P t
                                                      R i      l Partners
        • Business Analyst   • Business Readiness   • Global Initiatives
        • Architects         • Standards Board      • Cross-functional
        • Diversity
             es y            • Job Rotations
                                    oa o s            Projects
                                                        ojec s
        • Others…            • Others…              • Others…




Rick Walters © 2010                                                    29
Example of Integrative Role for the CTO to facilitate communications 
            and sharing across technical roles in the organization. 


       Prior to 2000 2001                         2006     2007 +


                                Customer                 Enterprise
        Centralized
                                 Facing
                                      g                     View
         Function
                                 Focus                   Perspective




             IT
        Architecture




    Centralized decision     Separate customer       Separate customer
   making and governance      focused technical    focused functions with
      for architecture.           functions.       CTO in integrative role.
Rick Walters © 2010                                                           30
Excerpt from Chapter Five: 
                Defining and Rewarding Success
                Defining and Rewarding Success*
  Reward systems define expected behaviors and influence the 
                  p p
  likelihood that people will demonstrate those behaviors. They  y
  ensure that everyone is pulling in the same direction. An aligned 
  reward system reduces internal competition and the frustration 
  and diffusion of energy that comes when people are given 
       p   gg
  competing goals. 

• Reward systems have four components: 
   1.      Metrics: The systems that identify measures and targets for enterprise, 
           business unit, team, and individual performance 
           business unit team and individual performance
   2.      Desired Values and Behaviors: The actions that are most likely both to 
           produce desired business results and to reflect the organizational 
           values 
   3.      Compensation: The monetary means intended to recognize a person s 
           Compensation: The monetary means intended to recognize a person’s
           past contribution as well as motivate continued or improved 
           performance
   4.      Reward and Recognition: The nonmonetary components that 
           complement compensation systems to let people know that they are 
           valued 
             l d
     * Source: Designing Dynamic Organizations: A Hands-On Guide for Leaders at All Levels. Jay Galbraith, Diane Downey, Amy Kates. (New
     York: AMACOM, 2002).

                                                                                                                                           31
Leadership Team Process –
                      Defining a Recognition Program to Drive Desired 
                                   Behaviors and Values
                                   B h i        dV l
•       Definition ‐ Defining the program helps    Alignment
        build consensus among the leadership       • Consider how the department level 
                                  y
        team members and clarify what values           recognition program fits with other 
                                                       recognition program fits with other
        and behaviors are needed to meet               programs.
        business and organizational culture 
        goals                                      •   To get the most from each, in what 
                                                       ways do the recognition programs align 
•       Process – The winner selection                 to reinforce behaviors. 
                                                              f     b h
        process has value in asking the                 –   Consistency of message (what is 
        questions on a recurring basis, serving             valued, desired)
        as a reminder of what is important,             –   Emphasis – what is needed to succeed 
        driving discussion about what it looks 
        d i i di        i    b t h t it l k                 in the current business environment or 
                                                            in the current business environment or
                                                            achieve this year’s priorities
        like in action and providing feedback 
                                                        –   Different levels or perspectives –
        and reinforcement.
                                                            ensure programs are aligned but not 
                                                            redundant
•       Results – T ibl
                   Tangible and intangible 
                                d i t ibl          End f Y
                                                   E d of Year Reflection
                                                               R fl i
        results should be positively impacted      • Are we getting maximum benefits from 
        by the change in behaviors driven by          the program?
        the program. This includes business             –   Effectively communicating expected 
        g
        goals  as well as the quality of the 
                              q      y                      values and behaviors
                                                            values and behaviors
        working environment and                         –   Demonstrating and observing people 
        relationships.                                      exhibiting, behaving 
                                                        –   Reinforcing other programs
    Rick Walters © 2010                                                                         32
People Practices*

• Staffing the New Organization presents principles and tools to 
  guide the process of placing people into new roles and positions. 
  guide the process of placing people into new roles and positions

• Assessing for Learning Aptitude presents a way to select for 
  learning‐agile candidates. 
  l    i      il    did t

• Performance Feedback reviews the ways in which multidirectional 
  feed‐back can support building lateral capability. 

• From Training to Learning provides a checklist of the best 
  practices that many organizations are utilizing to create a 
  learning organization.


   Source: Designing Dynamic Organizations: A Hands-On Guide for Leaders at All Levels. Jay Galbraith, Diane Downey, Amy Kates. (New
   York: AMACOM, 2002).


                                                                                                                                       33
Next Steps / Topics




Rick Walters © 2010                         34
What level of capability would you like to achieve?

                                         Capability Levels


                                                 Mentor

                                                  Teach
                                                  T   h
                            Practicing
                              act c g

                 Learning
                                                   Lead
                                                   L d

Reading                                              Do

                                                  Speak
Rick Walters © 2010                                                 35
Rick Walters © 2010   36
References

       •     The Social Engagement of Social Science: A Tavistock Anthology : The Socio‐Ecological 
             Perspective. Eric L. Trist, Fred E. Emery, Hugh Murray, Beulah Trist  (1997)
       •     Designing Effective Organizations: The Sociotechnical Systems Perspective
             William A. Pasmore (Apr 1988)
       •     Whole System Architecture: Beyond Reengineering : Designing the High Performance 
             Organization
             Lawrence M. Miller (1994)
             Lawrence M. Miller (1994)
       •     Designing Dynamic Organizations: A Hands‐On Guide for Leaders at All Levels. 
             Jay Galbraith, Diane Downey, Amy Kates. (2002).
       •     Applied Strategic Planning, An Introduction
             Timothy N. Nolan, eonard . Goodstein, and Pfeiffer ( 008)
             Timothy N. Nolan, Leonard D. Goodstein, and Pfeiffer (2008)
       •     Business Process Improvement: The Breakthrough Strategy for Total Quality, 
             Productivity, and Competitiveness
             H. J. Harrington (1991)
       •     Reengineering the Corporation: A Manifesto for Business Revolution  
                 g       g        p
             Michael Hammer, James Champy. (1993)
       •     Work Teams That Work: Skills for Managing Across the Organization 
             Anthony R. Montebello (1994)
       •     Analyzing Performance Problems: Or, You Really Oughta Wanna‐‐How to Figure out 
             Why People Aren't Doing What They Should Be, and What to do About It
             Robert Frank Mager (1997)

Rick Walters © 2010                                                                               37
Organization Design Worksheet




                                38
Organization Design Framework




Created from concepts in : Designing Dynamic Organizations: A Hands-On Guide for Leaders at All Levels. Jay Galbraith, Diane Downey, Amy Kates. (New York: AMACOM, 2002).   39

Organization Design Rick Walters

  • 1.
    Organization Design: Strategy Driven  and a Whole System Perspective and a Whole System Perspective Presented for the  Dallas Human Resource Management Association OD Professional Emphasis Group By Rick Walters Rick Walters © 2010 September 16, 2010 1
  • 2.
    Topics • Introduction • Organization Design Framework • Examples • Success Factors • Overview of Five Design Areas • References Rick Walters © 2010 2
  • 3.
    Organization Design . . . • Alignment . . . is guided by business strategy which changes to some  is g ided b b siness strateg hich changes to some degree from year to year.  Org design must be reviewed. • H li ti Holistic . . . is more than the structure.  Don’t stop at the  organization chart. • Engaging . . . releases or inhibits human potential.  . . . releases or inhibits human potential. Your choice. Your choice. • Responsibility . . . is a responsibility of leaders at all levels.  i ibilit f l d t ll l l Effective  Eff ti design and change won’t happen by itself. Rick Walters © 2010 3
  • 4.
    Engaging . . . Release human potential • The seed wants to grow, move the rock. – “Don't Push Growth; Remove the Factors Limiting Growth ” Don t Push Growth; Remove the Factors Limiting Growth. Peter Senge, 5th Discipline • Beliefs about people – People are naturally active; they set goals and enjoy striving – People who understand and care about what they are doing can  devise and improve their own methods of doing work Two of the beliefs listed by Douglas McGregor, The Human Side of Enterprise • P i i l of Whole S t Principle f Wh l System A hit t Architecture – Design work systems to customer’s needs and for business  results. One of twelve principles by  One of twelve principles by Larry Miller, Whole System Architecture Rick Walters © 2010 4
  • 5.
    Organization Effectiveness Frameworks • People Systems – Performance Management – Training & Development – Recognition and Reward – Individual and Team Dynamics • Process Focused Process Focused – Business Process Improvement – Six Sigma – Reengineering • Whole Systems Whole Systems – Comprehensive Organization Design Models Rick Walters © 2010 5
  • 6.
    Organization Design Concepts Progression and  Some Representative Resource Books Some Representative Resource Books Process Improvement Strategic Planning Tavistock Socio- Self- Dynamic Institute Technical Directed Org. Research Systems Teams Design Rethinking and Reengineering Effective Holistic View Teams of Performance Rick Walters © 2010 6
  • 7.
    Organization Design Framework: Star Model Designing Dynamic Organizations: A Hands-On Guide for Leaders at All Levels 2002. Jay Galbraith, Diane Downey, Amy Kates Rick Walters © 2010 7
  • 8.
    Organization Design Enablers Structure People • Function • Assessment and selection • Geography G h • Performance feedback • Product • Learning and development • Customer • Culture, norms, habits • Role definition • Written, unwritten rules • Interfaces Strategy Strateg • Boundaries • Vision • Governance • Mission • Priorities • Strategy Rewards Processes • Values • Networks • Metrics • Goals • Values and Behaviors • Processes • Teams • Compensation • Integrative roles • Rewards and recognition • Matrix structures • Lateral capability 8
  • 9.
    Focus Question • Is the organization designed to achieve the desired  outcomes (defined by market/customer) and results  (d fi d b k / ) d l of the business strategy? – What gaps in results exist now or will exist if no changes to  design or capability are made? – What capabilities and changes are needed to capture  opportunities or move in a new direction? Rick Walters © 2010 9
  • 10.
    Organizational Development Approaches • Targeted, narrow focus  • Complex interventions • Comprehensive, detailed,  interventions – Governance  by key   g , g large scale, design and  – One or small team of  sponsors or  implementation programs sponsors leadership team – Governance by hierarchy   – One or a few  – Several organization  of steering teams organization design  design components  – Dedicated design teams components involved involved – Comprehensive  transition planning and  implementation Targeted Process Individual / Manager Improvements or Work Group Mergers and M d Performance Issues Acquisitions Problem Solving / ERP System Decision Making Implementations New Business or Unit Startup Rick Walters © 2010 10
  • 11.
    OD/HR/Consultant Role in Organization  Effectiveness • Responsibility . . . is a responsibility of leaders at all levels. • When Quality Circles, Total Quality Management, Business Process  Reengineering or other business improvement frameworks were emerging,  many organizations had dedicated groups of experts to lead organizations in  application of these complex approaches. • To a large degree, these dedicated functions no longer exist. However, from  T l d th d di t d f ti l it H f the momentum of the initial programs and with additions to management  curricula, managers are taking ownership of organization design (whether  they know it or not). Although not necessarily in a methodical or  comprehensive fashion. p • The role of the consultant can be to maintain an eye on the principles and  methods available for organization design and to bring just the right amount  of relevant process to leaders and leadership teams when needed.  Rick Walters © 2010 11
  • 12.
  • 13.
    Case for Action & Accomplishments 2000 Accomplishments Diminished credibility Credibility up – seat at the table Decreased customer satisfaction High customer satisfaction Cost overruns Cost goals being met – predictable outcomes Ability to deliver strategic and tactical “Fire-fighting” solutions Not taking full advantage of investments in Increasing entitlement and leveraging of IT IT solutions investments Poor project execution Projects meeting expectations Positive impact on morale – higher than p g Negative impact on morale benchmark on industry surveys Poor global coordination Global coordination & cooperation Minimal business integration g Increasing integration across business units g g Rick Walters © 2010 13
  • 14.
    Example – Drivers: Shift in Products and Services Structure People Corporate Priorities Improve Customer Strategy Relationships • There is and will be a change in the make up of projects to Increase Market Share include more, larger system integration projects. i t ti j t Improve Organization Processes • Common platforms will need to Performance support diverse business unit needs. (e.g. commodity and Rewards differentiated, low and high volume) Rick Walters © 2010 14
  • 15.
    Structure • Initially a Major Program box and manager was added  to the org chart with the implication that: h h i h h i li i h – The other functions continue with the ongoing work. – The Program Manager manages the large program. Enterprise Applications V.P. Order to Purchase to Application Major Plan to Start B2B Cash Booking Support Program Rick Walters © 2010 15
  • 16.
    Adding the role to the org chart addresses one  component (partially). p (p y) Structure People • Add Major Programs function and leader. Strategy • There is and will be a change in the make up of projects to include more, larger system integration projects. i t ti j t Processes • Common platforms will need to support diverse business unit needs. (e.g. commodity and Rewards differentiated, low and high volume) Rick Walters © 2010 16
  • 17.
    Challenge • The leadership team  recognized there were many   g y implications for how the  organization would operate  going forward. For example,  all managers will have  challenges with priority and  h ll ith i it d resource limitations with  the addition of the new  large program. The program  was to be 3 4 years in  was to be 3‐4 years in duration. • A workshop was held with the leadership team with the following objectives: – What are the common goals across the functions in the group, including the  new large program? – How do we work, communicate and support one another to implement our  , pp p combined priorities (continuing with existing functions and successful  execution of the new large program)? Rick Walters © 2010 17
  • 18.
    Areas to address identified in the workshop,   mapped to the organization design framework. mapped to the organization design framework Structure People • Internal Customer interfaces and • SME’s on business processes relationship management • Cross-training Cross training for fle ibilit flexibility • Restructure customer teams • Need appropriate knowledge per • Internal and external suppliers system interfaces and relationships management Strategy • Business Internal Customer priorities, short and long-term. Processes • Scope management (assistance from internal customers) • People resources allocation Reinforcement • Requirements gathering and • Alignment within the organization, priority setting with customers across functional groups and • Contracting and on-boarding of individuals supplemental labor (short lead time, expertise requirements) • Simplified work design to make it easier to bring in contractors Rick Walters © 2010 18
  • 19.
    Four initiatives defined with leadership team  members assigned to each. members assigned to each • Communication Across Functions – Action: Project Coordination Team. • Communicate with Customers C i i hC – Action: Stakeholder communications and planning. – Action: Restructure business unit stakeholder teams. • Resource Management esou ce a age e t – Action: Develop plan / approach. • Internal / External Supplier Management / Relationships – Action: Continue with existing efforts and mechanisms. • In addition a process was developed and implemented to manage the  life cycle of the initiatives so that organization capability was improved  year over year. Initiative Life-cycle Definition and Identification of Planning to Final Report, Consensus on Org Change Institutionalize Celebration and Scope Implications the Changes Next Steps January December Rick Walters © 2010 19
  • 20.
    Structure & Lateral Functions • Viewing the additional structure and lateral  mechanisms overlaid with the functional organization  h i l id i h h f i l i i chart. Restructure business stakeholder decision making teams. Enterprise Resource Management & Proactive relationship Applications management. V.P. External Supplier Relationships Order to Purchase to Application Major Plan to Start B2B Cash Booking Support Program Cross-functional Projects Team: Review projects, staffing, forecasts and interdependencies. Rick Walters © 2010 20
  • 21.
    Other Implications • A shift in the organization characteristics from highly  technical emphasis to a business analyst role and skill  h i l h i b i l l d kill set. • Reconfiguring the organization to a functional model: Reconfiguring the organization to a functional model:  PMO structure, Level 2 Support Function and  Technical Applications support. • Developing and using tools for resource allocation and  l d l f ll d management. • Development of career maps for business analysts and Development of career maps for business analysts and  project managers. Rick Walters © 2010 21
  • 22.
    Success Factors for Sustainable Change • Clear understanding of business drivers and strategy. • Engagement of leadership team in process to identify – Common goals / vision – Challenges and gaps Challenges and gaps – Implications for organization culture / mindset – Initiatives to develop organization capability • Structured process to implement organization design  changes: Awareness  Adoption, Institutionalization – Typically, the organization design changes that are needed to  execute strategy are new and often do not fit in to the current  execute strategy are new and often do not fit in to the current charter of any existing functional area. – To create new capability, the leadership team must define a  charter for the initiatives, take the lead and make time to  develop and implement them in parallel with existing  develop and implement them in parallel with existing operations.  Rick Walters © 2010 22
  • 23.
  • 24.
    Organization Design Enablers Structure People • Function • Assessment and selection • Geography G h • Performance feedback • Product • Learning and development • Customer • Culture, norms, habits • Role definition • Written, unwritten rules • Interfaces Strategy Strateg • Boundaries • Vision • Governance • Mission • Priorities • Strategy Rewards Processes • Values • Networks • Metrics • Goals • Values and Behaviors • Processes • Teams • Compensation • Integrative roles • Rewards and recognition • Matrix structures • Lateral capability Created from concepts in : Designing Dynamic Organizations: A Hands-On Guide for Leaders at All Levels. Jay Galbraith, Diane Downey, Amy Kates. (New York: AMACOM, 2002). 24
  • 25.
    Strategy • Strategy guides decisions in the face of infinite  possibilities for organization design choices. possibilities for organization design choices • Clarity on drivers for change, vision and direction is  key for creating a foundation for consensus building  k f ti f d ti f b ildi across leadership teams and key stakeholders. • Key steps: – “Identifying Success Indicators: What business results must  the design achieve?  – Understanding the Value Proposition: What are the  organizational implications of our strategic focus?  – Determining the Design Criteria: What are the organizational  capabilities that the design must help our organization  biliti th t th d i th l i ti build?“* *Source: Designing Dynamic Organizations: A Hands-On Guide for Leaders at All Levels. Jay Galbraith, Diane Downey, Amy Kates. (New York: AMACOM, 2002). Rick Walters © 2010 25
  • 26.
    Structure Two of five steps from Designing Dynamic Organizations. • “Step 1. Selecting a  • “Step 2. Defining the new  structure that is most likely  h i lik l organizational roles in the  i i l l i h to support development of  structure and clarifying the  required organizational  points of interface among  capabilities* capabilities*” them.* them *” – A new organization structure  – A cross‐functional resource  was implemented: From  management team was  Product to Function focus. established. – Roles were defined for  Enterprise relationship managers for key  Applications business functions. V.P. Resource planning User Technical Major PMO and management team. Support Support Programs * Source: Designing Dynamic Organizations: A Hands-On Guide for Leaders at All Levels. Jay Galbraith, Diane Downey, Amy Kates. (New York: AMACOM, 2002). Rick Walters © 2010 26
  • 27.
    Processes Key Concepts • Organization Structure provides a starting point for  organization design. There is not a perfect or ‘right’  structure that accommodates all needs.  • Lateral organization components can fill the gaps or Lateral organization components can fill the gaps or  ‘white spaces’ in the organization structure. • Designing Dynamic Organizations emphasizes and  provides more information about lateral capability.  There are many other references for basic process  design, improvement or reengineering. Rick Walters © 2010 27
  • 28.
    Five Types of Lateral Capability • Matrix Structures: Dual reporting relationships in  order to manage the conflicting needs of  functional, customer, product or geographic  forces. Elective • Integrative Roles: Managerial, coordinator or  Integrative Roles: Managerial coordinator or boundary‐spanning positions charged with  Managem orchestrating work across units. • Teams: Cross‐business structures that bring  Complexity ment Time and Energy people together to work independently and  share collective responsibility for outcomes. Can • Lateral Processes: Move decisions and  information through the organization in a  information through the organization in a y d Occur O formalized flow. Naturally • Networks: The interpersonal relationships and  communities of practice that underlie all other  types of lateral capability and serve to  coordinate work informally. Rick Walters © 2010 28
  • 29.
    Examples of Lateral Capabilities Augmenting  Organization Structure Design Organization Structure Design Cross-functional Cross-functional Cross-functional Networks Processes Teams • Project • Cross-business • IT Leadership Team Management M t Funding Model F di M d l • Regional P t R i l Partners • Business Analyst • Business Readiness • Global Initiatives • Architects • Standards Board • Cross-functional • Diversity es y • Job Rotations oa o s Projects ojec s • Others… • Others… • Others… Rick Walters © 2010 29
  • 30.
    Example of Integrative Role for the CTO to facilitate communications  and sharing across technical roles in the organization.  Prior to 2000 2001 2006 2007 + Customer Enterprise Centralized Facing g View Function Focus Perspective IT Architecture Centralized decision Separate customer Separate customer making and governance focused technical focused functions with for architecture. functions. CTO in integrative role. Rick Walters © 2010 30
  • 31.
    Excerpt from Chapter Five:  Defining and Rewarding Success Defining and Rewarding Success* Reward systems define expected behaviors and influence the  p p likelihood that people will demonstrate those behaviors. They  y ensure that everyone is pulling in the same direction. An aligned  reward system reduces internal competition and the frustration  and diffusion of energy that comes when people are given  p gg competing goals.  • Reward systems have four components:  1. Metrics: The systems that identify measures and targets for enterprise,  business unit, team, and individual performance  business unit team and individual performance 2. Desired Values and Behaviors: The actions that are most likely both to  produce desired business results and to reflect the organizational  values  3. Compensation: The monetary means intended to recognize a person s  Compensation: The monetary means intended to recognize a person’s past contribution as well as motivate continued or improved  performance 4. Reward and Recognition: The nonmonetary components that  complement compensation systems to let people know that they are  valued  l d * Source: Designing Dynamic Organizations: A Hands-On Guide for Leaders at All Levels. Jay Galbraith, Diane Downey, Amy Kates. (New York: AMACOM, 2002). 31
  • 32.
    Leadership Team Process – Defining a Recognition Program to Drive Desired  Behaviors and Values B h i dV l • Definition ‐ Defining the program helps  Alignment build consensus among the leadership  • Consider how the department level  y team members and clarify what values  recognition program fits with other  recognition program fits with other and behaviors are needed to meet  programs. business and organizational culture  goals • To get the most from each, in what  ways do the recognition programs align  • Process – The winner selection  to reinforce behaviors.  f b h process has value in asking the  – Consistency of message (what is  questions on a recurring basis, serving  valued, desired) as a reminder of what is important,  – Emphasis – what is needed to succeed  driving discussion about what it looks  d i i di i b t h t it l k in the current business environment or  in the current business environment or achieve this year’s priorities like in action and providing feedback  – Different levels or perspectives – and reinforcement. ensure programs are aligned but not  redundant • Results – T ibl Tangible and intangible  d i t ibl End f Y E d of Year Reflection R fl i results should be positively impacted  • Are we getting maximum benefits from  by the change in behaviors driven by  the program? the program. This includes business  – Effectively communicating expected  g goals  as well as the quality of the  q y values and behaviors values and behaviors working environment and  – Demonstrating and observing people  relationships.  exhibiting, behaving  – Reinforcing other programs Rick Walters © 2010 32
  • 33.
    People Practices* • Staffing the New Organization presents principles and tools to  guide the process of placing people into new roles and positions.  guide the process of placing people into new roles and positions • Assessing for Learning Aptitude presents a way to select for  learning‐agile candidates.  l i il did t • Performance Feedback reviews the ways in which multidirectional  feed‐back can support building lateral capability.  • From Training to Learning provides a checklist of the best  practices that many organizations are utilizing to create a  learning organization. Source: Designing Dynamic Organizations: A Hands-On Guide for Leaders at All Levels. Jay Galbraith, Diane Downey, Amy Kates. (New York: AMACOM, 2002). 33
  • 34.
  • 35.
    What level of capability would you like to achieve? Capability Levels Mentor Teach T h Practicing act c g Learning Lead L d Reading Do Speak Rick Walters © 2010 35
  • 36.
  • 37.
    References • The Social Engagement of Social Science: A Tavistock Anthology : The Socio‐Ecological  Perspective. Eric L. Trist, Fred E. Emery, Hugh Murray, Beulah Trist  (1997) • Designing Effective Organizations: The Sociotechnical Systems Perspective William A. Pasmore (Apr 1988) • Whole System Architecture: Beyond Reengineering : Designing the High Performance  Organization Lawrence M. Miller (1994) Lawrence M. Miller (1994) • Designing Dynamic Organizations: A Hands‐On Guide for Leaders at All Levels.  Jay Galbraith, Diane Downey, Amy Kates. (2002). • Applied Strategic Planning, An Introduction Timothy N. Nolan, eonard . Goodstein, and Pfeiffer ( 008) Timothy N. Nolan, Leonard D. Goodstein, and Pfeiffer (2008) • Business Process Improvement: The Breakthrough Strategy for Total Quality,  Productivity, and Competitiveness H. J. Harrington (1991) • Reengineering the Corporation: A Manifesto for Business Revolution   g g p Michael Hammer, James Champy. (1993) • Work Teams That Work: Skills for Managing Across the Organization  Anthony R. Montebello (1994) • Analyzing Performance Problems: Or, You Really Oughta Wanna‐‐How to Figure out  Why People Aren't Doing What They Should Be, and What to do About It Robert Frank Mager (1997) Rick Walters © 2010 37
  • 38.
  • 39.
    Organization Design Framework Created from conceptsin : Designing Dynamic Organizations: A Hands-On Guide for Leaders at All Levels. Jay Galbraith, Diane Downey, Amy Kates. (New York: AMACOM, 2002). 39