This document discusses various perspectives on strategy and strategic human resource management. It provides definitions of strategy from several scholars, such as Mintzberg, Quinn and Purcell. It also defines strategic management and strategic HRM. The document outlines different types of strategies, including business, operations and resource strategies. It discusses the role of HR in strategy formulation and implementation. Finally, it presents models of strategic HRM and discusses advantages and disadvantages of taking a strategic approach to HRM.
Strategic Human Resource Management (SHRM) - MBA 423 Human Resources Manageme...Stuart Gow
Chapter Review/ Discussion Questions (CRQs) – 10% marks
At the end of each chapter of the text book, there are chapter review questions (CRQs) which are meant to review and test the student’s understanding of the chapter. The facilitator will chose and then allocate the CRQs to each group during week 2 for class presentations in weeks 3 to 7. Some of these questions are being recommended by Stone as possible essay questions which are frequently asked in examinations throughout the world. The time for each presentation may vary from 10 to 20 minutes followed by class discussions. The group’s power-point presentations, both soft and hard copies, must be submitted to the course facilitator on or before the presentation. No written report is required for CRQs. The class and the facilitator will evaluate each group’s presentation. A blank evaluation form will be made available in class and posted in Moodle. However, the MBA 423 Human Resource Management GSB, FBE, USP facilitator has the final say in terms of the final marks to be allocated to each group. The criterias to be used as a guide for evaluating the CRQ presentations is provided in the blank evaluation form.
MBA 423 Human Resources Management (Elective Course)
The effective management of people has an important bearing on organisational success. The importance of personnel policies and procedures has created opportunity for managers and administrators with expertise in this field. The course provides conceptual and practical skills in areas such as the strategic aspects of human resource management, manpower planning, recruitment and selection, performance appraisal, training and development, salary administration and employee benefits. Industrial relations in the context of the South Pacific region is an important theme.
http://www.usp.ac.fj/index.php?id=mba423
Students:
Stuart Gow
Amrish Narayan
Chaminda Wanninayake
Graduate School of Business
Faculty of Business and Economics
University of the South Pacific,
Private Bag, Laucala Campus,
Suva, Fiji.
Tel: (679) 323 1391/323 1392
Fax: (679) 323 1397
This ppt will help you to understand about various HR challenges in current business environment & give you a brief insight to increase your conceptual idea in HR field.
Strategic Human Resource Management (SHRM) - MBA 423 Human Resources Manageme...Stuart Gow
Chapter Review/ Discussion Questions (CRQs) – 10% marks
At the end of each chapter of the text book, there are chapter review questions (CRQs) which are meant to review and test the student’s understanding of the chapter. The facilitator will chose and then allocate the CRQs to each group during week 2 for class presentations in weeks 3 to 7. Some of these questions are being recommended by Stone as possible essay questions which are frequently asked in examinations throughout the world. The time for each presentation may vary from 10 to 20 minutes followed by class discussions. The group’s power-point presentations, both soft and hard copies, must be submitted to the course facilitator on or before the presentation. No written report is required for CRQs. The class and the facilitator will evaluate each group’s presentation. A blank evaluation form will be made available in class and posted in Moodle. However, the MBA 423 Human Resource Management GSB, FBE, USP facilitator has the final say in terms of the final marks to be allocated to each group. The criterias to be used as a guide for evaluating the CRQ presentations is provided in the blank evaluation form.
MBA 423 Human Resources Management (Elective Course)
The effective management of people has an important bearing on organisational success. The importance of personnel policies and procedures has created opportunity for managers and administrators with expertise in this field. The course provides conceptual and practical skills in areas such as the strategic aspects of human resource management, manpower planning, recruitment and selection, performance appraisal, training and development, salary administration and employee benefits. Industrial relations in the context of the South Pacific region is an important theme.
http://www.usp.ac.fj/index.php?id=mba423
Students:
Stuart Gow
Amrish Narayan
Chaminda Wanninayake
Graduate School of Business
Faculty of Business and Economics
University of the South Pacific,
Private Bag, Laucala Campus,
Suva, Fiji.
Tel: (679) 323 1391/323 1392
Fax: (679) 323 1397
This ppt will help you to understand about various HR challenges in current business environment & give you a brief insight to increase your conceptual idea in HR field.
Performance Management & Reward Systems: Performance linked remuneration system, Types of Rewards, Designing Reward System, Total Reward Strategies, Characteristics of an Effective Performance Reward Plan. Performance Analysis, Performance Review Discussion, Using Performance Management Systems Data for HR Decisions, Performance Improvements and Performance Management Skills.
Understand Human Resource Planning (HRP) and purpose of HRP.
Identify the relationship between strategy and HRP.
Identify the steps of HR planning process.
Describe the approaches to understand the jobs.
Discuss the phases of job analysis, including what it is and how it’s used.
Design model for forecasting HR requirements and employee requisition form.
Develop job descriptions , including summaries and job functions, using the Internet and traditional methods by using Job analysis questionnaire.
Develop job specifications using the Internet as well as your judgment.
Explain job analysis in a “jobless” world, including what it means and how it’s done in practice.
Human Resource Management Model
Purpose of Human Resource Management Model
Harvard Model
Matching Model
Guest Model
Dave Ulrich Model
Storey Model
Best practice model
Best fit Model
Bath People and Performance Model
Strategic human resource management and strategic management processVARUN SHARMA
hey guys!! it is my second presentation on Strategic Human Resource Management and Strategic Human Resource Management Process..have a look and give me suggestions for it :)
Strategic HRM Alignment Business and HR ExcellenceSeta Wicaksana
Strategy is a term that comes from the Greek strategia, meaning "generalship." In the military, strategy often refers to maneuvering troops into position before the enemy is actually engaged
Performance Management & Reward Systems: Performance linked remuneration system, Types of Rewards, Designing Reward System, Total Reward Strategies, Characteristics of an Effective Performance Reward Plan. Performance Analysis, Performance Review Discussion, Using Performance Management Systems Data for HR Decisions, Performance Improvements and Performance Management Skills.
Understand Human Resource Planning (HRP) and purpose of HRP.
Identify the relationship between strategy and HRP.
Identify the steps of HR planning process.
Describe the approaches to understand the jobs.
Discuss the phases of job analysis, including what it is and how it’s used.
Design model for forecasting HR requirements and employee requisition form.
Develop job descriptions , including summaries and job functions, using the Internet and traditional methods by using Job analysis questionnaire.
Develop job specifications using the Internet as well as your judgment.
Explain job analysis in a “jobless” world, including what it means and how it’s done in practice.
Human Resource Management Model
Purpose of Human Resource Management Model
Harvard Model
Matching Model
Guest Model
Dave Ulrich Model
Storey Model
Best practice model
Best fit Model
Bath People and Performance Model
Strategic human resource management and strategic management processVARUN SHARMA
hey guys!! it is my second presentation on Strategic Human Resource Management and Strategic Human Resource Management Process..have a look and give me suggestions for it :)
Strategic HRM Alignment Business and HR ExcellenceSeta Wicaksana
Strategy is a term that comes from the Greek strategia, meaning "generalship." In the military, strategy often refers to maneuvering troops into position before the enemy is actually engaged
Strategy meaning
Strategy concept
Strategic management
Strategy management process
Strategic HRM
Aims of strategic HRM
Approaches to strategic HRM
HR strategies
Types of Hr strategies
Difference between strategic HRM and HRM
Hard & soft elements of HRM
Once you finish your education and are through with the college ready to take on the challenges of the corporate world here are 10 life rules to help you through and live your life like a rockstar !
Once you are done with a good planning and modeling the launch of your new venture is equally important. Learn the key elements to launch your own business in India and discover the path traced from the startup stage to the IPO. Also understand the revival and exit startegy to milk the venture.
A business plan is definitely a blueprint that determines the success of an enterprise. This is the reason why it is so crucial to develop a good Business plan after a careful environment scan and SWOT analysis. Learn the key components and methods with which you can develop a good business plan.
The thought process of the entrepreneur varies from a normal person to an extent that it functions differently. Learn about the difference, the role creativity plays, what motivates an entrepreneur and the process of transitioning from Idea to Business opportunity!
Also get an insight why business fail, so that you can avoid those mistakes and how to start a business with low investment.
Role Of Agencies assisting EntrepreneurshipAnubha Rastogi
Various agencies in India including DICs, NSICs, EDII, NIESBUD,NEDB and more are functioning to promote entrepreneurship. Several new initiatives have also been taken by the Government of India to promote the culture of entrepreneurship.
Women today are forming the indispensable part of the society, we are talking about women empowerment, we are talking about breaking the glass ceiling, yet there are many issues that need to be addressed. Learn the insights about women entrepreneurs with a key focus in Indian ecosystem.
Profits are no longer contradictory with social upliftment. Making organizations that are self-sustainable and still impacting the society through a bottom-up approach is absolutely possible.
Learn some successful examples of social entrepreneurs in India and how they are impacting the society. Also, discover what it takes to be a social entrepreneur.
Discover how entrepreneurship is changing in the recent times and the fundamentals of starting your own venture from the scratch. Your Financing options, making your business plan , preparing your pitch deck and other challenges and mistakes to be avoided as you take the course of entrepreneurship.
Entrepreneur & Entrepreneurship Development Anubha Rastogi
Being an entrepreneur can be challenging, rewarding, frustrating, satisfying, disappointing, and exhilarating. To help you through all the highs and lows of starting your own enterprise here is easy to understand guide with basic fundamentals of entrepreneurship being explained.
making everything a delightful experience and getting closer to customer to engage them in the process is something which winning companies are adopting. Gamification and App Development solve the purpose. learn the key fundamentals and explore how can they add value.
With advent of the internet and global connectivity, the way business is done is changing, the way we utilize the people and their potential is changing, the way we interact with people is changing. Nobody is a stranger now and we are connected to one another with the network of networks.
Virtual Communities are interaction platforms for the new age millennials and beyond. The presentation explores different dimensions of establishing and fostering such Communities and the way their potential can be harnessed for the process of co-Creation.
Designing Organisation for Digital SuccessAnubha Rastogi
When everything is becoming digital it is so important for organizations to transform themselves digitally. The presentation examines the characteristics of a digital organization and the roadmap that should be undertaken to bring about the digital transformation. Going further about the details of digital leadership principles and how do you successfully build an Online PR system.
Social Media Marketing: The Power of NetworksAnubha Rastogi
Social Media has emerged as the next big revolution in the world. Changing the way we interact with people and shooting up the speed of information transfer that is happening in the blink of seconds, social media has brought about a revolution.
the presentation explores various mediums of social media that can be harnessed for leveraging maximum benefits.
Video Marketing: Harnessing the power of multimedia.Anubha Rastogi
People remember 20 percent of what they hear, 30% of what they see and an amazing 70% of what they see & hear, and probably that's the reason why videos are absolute favourites of both the marketers and consumers. The presentation gives key insights on video marketing and how can that be harnessed in the best way to drive results.
We are living in a world where an average user spends 5-6 hours on the handheld device Mobile which has become an indispensable part of life. How can this mini device be used to drive growth, reputation and sales, the presentation examines the fact.
Search Marketing is one of the core aspects of Digital Marketing. Paid or Organic, it is not about the competition between the two...but the way both are utilized in sync to drive SERP traffic onto your website.
Content Marketing: How to make a good content and its impactAnubha Rastogi
Learn how to create a good content, the basic fundamentals and how content planning and writing is done and in the process understand the impact of a good content in establishing a brand image and sales.
How to Make a Field invisible in Odoo 17Celine George
It is possible to hide or invisible some fields in odoo. Commonly using “invisible” attribute in the field definition to invisible the fields. This slide will show how to make a field invisible in odoo 17.
Instructions for Submissions thorugh G- Classroom.pptxJheel Barad
This presentation provides a briefing on how to upload submissions and documents in Google Classroom. It was prepared as part of an orientation for new Sainik School in-service teacher trainees. As a training officer, my goal is to ensure that you are comfortable and proficient with this essential tool for managing assignments and fostering student engagement.
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
Palestine last event orientationfvgnh .pptxRaedMohamed3
An EFL lesson about the current events in Palestine. It is intended to be for intermediate students who wish to increase their listening skills through a short lesson in power point.
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
Synthetic Fiber Construction in lab .pptxPavel ( NSTU)
Synthetic fiber production is a fascinating and complex field that blends chemistry, engineering, and environmental science. By understanding these aspects, students can gain a comprehensive view of synthetic fiber production, its impact on society and the environment, and the potential for future innovations. Synthetic fibers play a crucial role in modern society, impacting various aspects of daily life, industry, and the environment. ynthetic fibers are integral to modern life, offering a range of benefits from cost-effectiveness and versatility to innovative applications and performance characteristics. While they pose environmental challenges, ongoing research and development aim to create more sustainable and eco-friendly alternatives. Understanding the importance of synthetic fibers helps in appreciating their role in the economy, industry, and daily life, while also emphasizing the need for sustainable practices and innovation.
Operation “Blue Star” is the only event in the history of Independent India where the state went into war with its own people. Even after about 40 years it is not clear if it was culmination of states anger over people of the region, a political game of power or start of dictatorial chapter in the democratic setup.
The people of Punjab felt alienated from main stream due to denial of their just demands during a long democratic struggle since independence. As it happen all over the word, it led to militant struggle with great loss of lives of military, police and civilian personnel. Killing of Indira Gandhi and massacre of innocent Sikhs in Delhi and other India cities was also associated with this movement.
Acetabularia Information For Class 9 .docxvaibhavrinwa19
Acetabularia acetabulum is a single-celled green alga that in its vegetative state is morphologically differentiated into a basal rhizoid and an axially elongated stalk, which bears whorls of branching hairs. The single diploid nucleus resides in the rhizoid.
Read| The latest issue of The Challenger is here! We are thrilled to announce that our school paper has qualified for the NATIONAL SCHOOLS PRESS CONFERENCE (NSPC) 2024. Thank you for your unwavering support and trust. Dive into the stories that made us stand out!
2. ‘Strategy is
problem solving
in unstructured
situations.’
Lester Dignam
‘There is a gap
between the
rhetoric and the
reality of SHRM.’
Lynda Grattan
‘Strategy consists
of illusions in the
board room.’
John Purcell
‘Strategy is
emergent and
flexible.’
Sean Tyson
‘Strategy is a
pattern in a
stream of
activities.’
Henry Mintzberg
‘Strategy is often
fragmentary,
evolutionary and
largely intuitive.’
James Quinn
THE CLOUDY NATURE OF STRATEGY
3. STRATEGY
At the core, its is the debate between best fit and best practice
Used for gaining a competitive advantage
Innovation: Offer something new; different from competitors
Quality Enhancement: Products and services
Cost Reduction: to be the lowest cost provider
Optimal strategy depends on the wants of customers and nature of
competitors
What is a strategy
• Text book definition: The company’s long-term plan for how
it will balance its internal strengths and weaknesses with its
external opportunity and threats to maintain a competitive
advantage
• Simply speaking: A plan that is expected to make an
organization adaptive and competitive
• Simplest speaking: A plan to make money
4. What is Strategic Management?
The Meaning of “Strategy”
A critical factor that affects Firm Performance
A factor that contributes to Competitive Advantage in markets
Having a long-term focus
Plans that involve the top executives and/or board of directors
of the firm
A general framework that provides a perspective for selecting
specific policies and procedures
• Strategic Management is a process for analyzing a company's
competitive situation, developing the company's strategic goals,
and devising a plan of action and allocation of resources that will
help a company achieve its goals.
• Strategic human resource management is the pattern of
planned human resource deployments and activities
intended to enable an organization to achieve its goals.
6. TYPES OF STRATEGY
Business
Examines correspondence between each firm’s competitive
strategy and its system of high performance work practices
Operations
An internal approach; connected to the work organization inside
a firm
Resource View
Views human resources as sources of sustained competitive
advantage
Example Of Strategic Choices
• Defender vs. Prospector
• Exploitation vs. Exploration
• Quality vs. Quantity
• Focused vs. Diversified
7. Strategic HRM is the process of defining
how the organization’s goals will be
achieved through people by means of HR
strategies and integrated HR policies and
practices.
STRATEGIC HRM DEFINED
The Linking Of The Human Resource
Function With The Company’s Strategies
To Accomplish That Strategy.
8. HR Strategy: Strategic Fit
Training Rewards
Corporate Strategy
Business Strategy
HR Strategy
HR System
(Performance Mgmt.)
9. A good HR strategy:
Satisfy business needs
Is founded on detailed analysis
Can be turned into actionable programmes
Is coherent and integrated
Takes account of the needs of line managers, employees and other stakeholders
11. SO WHAT IS STRATEGIC HUMAN RESOURCE
MANAGEMENT?
Is it about long-range strategic planning?
Is it about day-to-day strategic management?
Or is it about both?
12. •Aligned to corporate goals
•Set out clear aims
•Supported by business case
•Take account of individual as well as business
needs
•Contain realistic and achievable plans for
implementation
CRITERIA FOR HR STRATEGIES
13. STRATEGIC HRM GUIDELINES
• Be clear on what has to be achieved and why
• Ensure that what you do fits the business strategy, culture and
circumstances of the organization
• Aim for continuous improvement – evolution not revolution
• Don’t follow fashion – do your own thing
• Keep it simple – over-complexity is a common reason for
failure
• Don’t rush – it takes longer than you think
• Assess resource requirements and costs
• Manage change – involve,communicate and train
14. Advantages And Disadvantages Of
Strategic HRM
Advantages:
Help gain a competitive edge
Help solve HRM problems
Make the efficient use of
employees and reduce costs
Help anticipate and plan for
changes
Benefit long term
Disadvantages:
Difficulty in predicating the people
behavior
Problems with predicating external
events affecting HR planning
Needing constantly monitoring
Leading to industrial relation
problems
15. The Flexible Workforce
Definition:
A workforce that can respond quickly in quantity and
type to changes in demand a business may face.
Traditional HR versus Strategic HR
16.
17. The Role of HRM in Strategy
Formulation
Administrative Linkage — Lowest level of integration; HRM
function's attention is focused on day-to-day activities. No input
from the HRM function to the company's strategic plan is given.
One-Way Linkage — The strategic business planning function
develops the plan and then informs the HRM function of the plan.
HRM then helps in the implementation.
Two-Way Linkage — Allows for consideration of human resource
issues during the strategy formulation process. The HRM function
is expected to provide input to potential strategic choices and
then help implement the chosen option.
Integrative Linkage — Is based on continuing, rather than
sequential, interaction. The HR executive is an integral member
of the strategic planning team.
18. Strategy Formulation
Five components of the strategic management
process:
A mission is a statement of the organization's reasons for being.
Goals are what the organization hopes to achieve in the medium-to
long-term future
External analysis consists of examining the organization's operating
environment to identify strategic opportunities and threats.
Internal analysis attempts to identify the organization's strengths
and weaknesses.
Strategic choice is the organization's strategy, which describes the
ways the organization will attempt to fulfill its mission and achieve
its long term goals.
22. Staffing
Job Analysis
Human Resource Planning
Recruitment
Selection
1-22
Human Resource Development
Training
Development
Career Planning
Career Development
Organizational Development
Performance Management
Performance Appraisal
23. Compensation
Compensation - All rewards that individuals receive as a result
of their employment
1-23
Safety and Health
Employees who work in safe environment and enjoy good health are more
likely to be productive and yield long-term benefits to organization.
Employee and Labor Relations
Private-sector union membership has fallen from 39 percent in 1958 to 7.8
percent in 2005.
Business is required by law to recognize a union and bargain with it in
good faith if the firm’s employees want the union to represent them
Human resource activity is often referred to as industrial relations
Most firms today would rather have a union-free environment
25. The Five P’s Model of SHRM
Philosophy: Statements of how organization values & treats
employees; essentially culture of the organization
Policies: Expressions of shared values & guidelines for action on
employee-related business issues
Programs: Coordinated & strategized approaches to initiate,
disseminate, & sustain strategic organizational change efforts
necessitated by strategic business needs
Practices: HR practices motivate behaviors that allow individuals
to assume roles consistent with organization’s strategic
objectives.Three categories of roles:
Leadership
Managerial
Operational
Processes: Continuum of participation by all employees in specific
activities to facilitate formulation & implementation of other
activities