12 HEALTH AND SAFETY
STRUCTURE
12.1 INTRODUCTION
12.2 OBJECTIVE
12.3 SAFETY PRECAUTIONS
12.4 ALLIEDACTIVITIES
12.5 SUMMARY OF FIBRE HANDLING SAFETY RULES
12.6 REFERENCES AND SUGGESTED FURTHER READINGS
12.7 KEY LEARNING
Optical Fiber Splicer Health and Safety
BRBRAITT, Jabalpur Page 2 of 14
For Restricted Circulation
12.1 INTRODUCTION
When most people think of safety in fiber optic installations, the first thing that comes
to mind is eye damage from laser light in the fiber. They have an image of a laser burning
holes in metal or perhaps burning off warts. While these images may be real for their
applications, they have little relevance to most types of fiber optic communications. Eye
safety is an issue, but usually not from light in the fiber. However, fiber optics installation is
not without risks.
12.2 OBJECTIVE
After reading this unit, you should be able to understand:
 Different safety precautions
 Eye safety
 Bare fiber safety
 General Health and safety rules
12.3 SAFETY PRECAUTIONS
12.3.1 EYE SAFETY
Safety glasses MUST be worn at all times during splicing work is performed on a
fibre cable. The biggest hazard when working with fibre optics is small and sharp shards of
the fibre produced when stripping or cleaving the cable.
12.3.2 BARE FIBER SAFETY
The broken ends of fibers and scraps of fiber created during termination and splicing
can be extremely dangerous. The ends are extremely sharp and can easily penetrate your skin.
They invariably break off and are very hard to find and remove. Sometimes a pair of tweezers
and perhaps a magnifying glass will get them out. Most of the time, you have to wait to let
them infect and work themselves out, which can be painful!
Be careful when handling fibers to not stick the broken ends into your fingers.
Optical Fiber Splicer Health and Safety
BRBRAITT, Jabalpur Page 3 of 14
For Restricted Circulation
Dispose of all scraps properly. Some people keep a piece of double stick tape on the bench to
stick fiber scraps onto. Prefer to use a dedicated container for all fiber scraps. In our training
programs, we use the same paper containers used for takeout at the deli, in the pint size, with
a lid. We put all the scraps in the container, then when finished, put on the lid, tape it and
dispose of it later. Do not drop fiber scraps on the floor where they will stick in carpets or
shoes and be carried elsewhere-like home!
Obviously do not eat or drink anywhere near the work area. Fiber scraps can get into
food or drink and be swallowed. The scraps can imbed themselves in you digestive system
and never be found. Doesn't sound too appetizing, does it?!
12.3.3 MATERIALS SAFETY
Fiber splicing and termination processes require various chemical cleaners and
adhesives. The safety instructions defined for this substance should also be followed. If there
is confusion in usage of these products, ask the manufacturer for MSDS (Material Safety
Data Sheet). Remember the following instructions while working with materials.
 Always work in well-ventilated areas
 Avoid skin contact to materials involved as much as possible
 Avoid using chemicals that cause allergic reactions.
Even simple isopropyl alcohol, used as a cleaner flammable and should be handle
appropriately.
Hexane Iso-Propanol
Type of
Exposure
Effect of
exposure
Emergency
Treatment
Effect of
exposure
Emergency
Treatment
Inhalation Irritation of
respiratory tract,
cough
Maintain
Respiration, Bed
rest
Irritation of
upper
respiratory tract
Remove victim to
fresh air area
Administer artificial
respiration if
breathing is regular
Optical Fiber Splicer Health and Safety
BRBRAITT, Jabalpur Page 4 of 14
For Restricted Circulation
Ingestion Nausea, Vomiting
Headache
Do not induce
vomiting,
immediately seek,
medical advice.
Drunkenness &
vomiting
Have a victim drink
water and milk,
seek medical aid
Contact
with skin
Irritation Wipe of affected
area of skin &
wash with soap &
water
Harmless to skin Wipe of affected
area of skin & wash
with soap & water
Contact
with eyes
Irritation Wash eyes with
plenty of water
for 15 minutes
Irritation Wash eyes with
plenty of water for
15 minutes
12.3.4 FIRE SAFETY
The fusion splices use an electric spark to make splice, so ensure that there are no
flammable gases in the space where fusion splicing is done.
 Splicing should never be done in places manholes where gases can accumulate.
 The cables are brought up to the surface into a splicing trailer where all fiber work is
done. So the splicing trailer is temperature-controlled and kept spotlessly clean to
ensure good splicing.
 Smoking should not be allowed around fiber optic work. The ashes from smoking can
contribute to the dust problems in fibers, apart from the drainage of explosion posed
by them due to presence of combustible substances.
12.3.5 SAFETY PRECAUTIONS WHEN EXCAVATING OR WORKING IN
EXCAVATIONS CLOSE TO ELECTRIC CABLES
The Engineer- in-charge of the work should get full information from Electricity
under taking regarding any electric cables, which are known or suspected to exist near the
proposed excavation and unless this is done, excavation should not be carried out in the
section concerned. The electricity undertaking should be asked to send a representative and
work should be preceded with close consultation with them.
Optical Fiber Splicer Health and Safety
BRBRAITT, Jabalpur Page 5 of 14
For Restricted Circulation
Only wooden handled hand tools should be used until the electric cables have been
completely exposed. Power Cables, not laid in conduits, are usually protected from above by
a cover slab of concrete, brick or stone. They may or may not be protected on the sides. It is
safer, therefore, always to drive the point of the pickaxe downwards then uncovering a cable,
so that there is less chance of missing such warning slabs. No workman should be permitted
to work alone where there are electric cables involved. At least one more man should be
working near by so that help can be given quickly in case of an accident. If disconnection of
power could be arranged in that section it will be better. No electric cables shall be moved or
altered without the consent of the Electric Authority and they should be contacted to do the
needful. If an electric cable is damaged even slightly, it should be reported to the Electric
Authority and any warning bricks disturbed during excavation should be replaced while back
filling the trench. Before driving a spike into the ground, the presence of other underground
properties should be checked. Information on plans regarding the location of power cables
need not to be assumed as wholly accurate. Full precautions should be taken in the vicinity
until the power cable is uncovered. All electric cables should be regarded as being live and
consequently dangerous. Any power is generally dangerous, even low voltage proving fatal in
several cases.
12.3.6 SAFETY PRECAUTIONS WHILE WORKING IN PUBLIC STREET AND
ALONG RAILWAY LINES:
Where a road or footpath is to be opened up in the course of work, special care should
be taken to see that proper protection is provided to prevent any accidents from occurring.
Excavation work should be done in such a manner that it will not unduly cause inconvenience
to pedestrians or occupants of buildings or obstruct road traffic. Suitable bridges over open
trenches should be so planned that these are required for the minimum possible time. Where
bridges are constructed to accommodate vehicular traffic and is done near or on railway
property, it should be with the full consent and knowledge of the competent railway
authorities.
12.3.7 DANGER FROM FALLING MATERIAL
Care should be taken to see that apparatus, tools or other excavating implements or
excavated materials are not left in a dangerous or insecure position so as to fall or be knocked
into the trench thereby injuring any workman who may be working inside the trench.
Optical Fiber Splicer Health and Safety
BRBRAITT, Jabalpur Page 6 of 14
For Restricted Circulation
12.3.8 CARE WHEN WORKING IN EXCAVATIONS
Jumping into a trench is dangerous. If it is deep, workmen should be encouraged to
lower themselves. Workers should work at safe distance so as to avoid striking each other
accidentally with tools. If the walls of the trench contain glass bits, corroded wire or sharp
objects they should be removed carefully. If an obstruction is encountered, it should be
carefully uncovered and protected if necessary. If an obstruction is encountered, it should be
carefully uncovered and protected if necessary. Care must be taken to see that excavated
material is not left in such a position that it is likely to cause any accident or obstruction to a
roadway or waterway. If possible the excavated material should be put between the workmen
and the traffic without encroaching too much on the road.
12.3.9 DANGER OF CAVE IN
When working in deep trenches in loose soil, timbering up/shoring the sides will
prevent soil subsidence. The excavated material should be kept at sufficient distance from the
edge of the trench or pit. Vehicles or heavy equipment must not be permitted to approach too
close to the excavation.
When making tunneled opening, it should be ensured that the soil is compact enough
to prevent cave in even under adverse conditions of traffic. Extra care should be taken while
excavating near the foundations of buildings or retaining walls. In such cases, excavation
should be done gradually and as far as possible in the presence of the owners of the property.
12.3.10 PROTECTION OF EXCAVATIONS :
Excavations in populated areas, which are not likely to be filled up on the same day
should be protected by barriers or other effective means of preventing accidents and the
location of all such openings must in any event be indicated by red flags or other suitable
warning signs. During the hours from dusk to dawn, adequate number of red warning lamps
should be displayed. Supervisory officers should ensure that all excavations are adequately
protected in this manner as serious risk and responsibility is involved. Notwithstanding
adoption of the above mentioned precautions, works involving excavations should be so
arranged as to keep the extent of opened ground and the time to open it to a minimum.
Optical Fiber Splicer Health and Safety
BRBRAITT, Jabalpur Page 7 of 14
For Restricted Circulation
12.3.11 PRECAUTIONS WHILE WORKING ON ROADS
The period between half an hour after sun-set and half an hour before sunrise, and any
period of fog or abnormal darkness may also be considered as night for the purpose of these
instructions, for the purpose of providing the warning signs.
Excavation liable to cause danger to vehicles or the public must at all times be
protected with fencing of rope tied to strong uprights or bamboo poles at a suitable height or
by some other effective means. Any such temporary erection which is likely to cause
obstructions and which is not readily visible should be marked by posts carrying red flags or
boards with a red background by day and by continuously lighted lamps at night.
The flags and the lamps should be placed in conspicuous positions so as to indicate
the pedestrians and drivers of vehicles the full expanse i.e. both width and length of the
obstruction. The distance between lamps or between floors should not generally exceed 1.25
m along the width and 6m along length of the obstruction in non-congested areas, but 4
meters along the length in congested areas.
If the excavation is extensive, sufficient notice to give adequate warning of the danger
should be displayed consciously not less than 1.25 m above the ground and close to the
excavation. Where any excavation is not clearly visible for a distance of 25m to traffic
approaching from any direction or any part of the carriage way of the road in which the
excavation exists, a warning notice should be placed on the kerb or edge of all such roads
from which the excavation or as near the distance as is practicable but not less than 10 m
from the junction of an entering or intersecting road in which the excavation exists. All
warnings, in these should have a red background and should be clearly visible and legible.
All warning lamps should exhibit a red light, but white lights may be used in addition to
facilitate working at night. Wherever required a passage for pedestrians with foot bridge
should be provided. At excavations, cable drums, tools and all materials likely to offer
obstructions should be properly folded round and protected. This applies to jointer’s tents as
well. Leads, hoses etc. stretched and across the carriage way should be guarded adequately
for their own protection and also that of the public.
Optical Fiber Splicer Health and Safety
BRBRAITT, Jabalpur Page 8 of 14
For Restricted Circulation
12.3.12 TRAFFIC CONTROL
The police authorities are normally responsible for the control of traffic and may
require the setting up of traffic controls to reduce the inconvenience occasioned by
establishment of a single line of traffic due to restriction in road width or any other form of
obstruction caused by the work. As far as possible, such arrangements should be settled in
advance. If there are any specific regulations imposed by the local authorities, these should be
followed.
12.3.13 WORK ALONG RAILWAY LINES
Normally all works at Railway crossing is to be done under supervision of the railway
authorities concerned, but it is to be borne in mind that use of white, red or green flags by the
Departmental staff is positively forbidden to be used when working along a railway line as
this practice may cause an accident through engine drivers mistaking them for railway
signals. When working along a double line of railway, the men should be warned to keep a
sharp look on both the “UP” and ‘DOWN” lines to avoid the possibility of any accident when
trains pass or happen to cross one another near the work spot.
12.3.14 SAFETY PRECAUTIONS FOR USE OF EXPLOSIVES DURING
BLASTING FOR TRENCHING:
In areas where the cable trench cannot be done manually on account of boulders and
rocks, it is necessary to blast the rocks by using suitable explosives. The quality of explosive
to be used depends on the nature of the rocks and the kind of boulders. A few types of
explosive fuses and detonators normally used for making trenches for cable works are
detailed below:
 Gun powder
 Nitrate Mixture
 Gilatine
 Safety fuse
 Electric Detonator
Optical Fiber Splicer Health and Safety
BRBRAITT, Jabalpur Page 9 of 14
For Restricted Circulation
 Ordinary Detonator
A detailed survey of the route is to be done to assess the length of the section where
trenching is to be done with the help of blasting. A route diagram of the rocky section may be
prepared indicating the length of the route where the explosives are to be used. For the
purpose of obtaining license, a longer length of route should be given in the application as in
many cases, after digging; rocks appear which was not initially anticipated.
Next a license will have to be obtained for use and storing of explosive in that section.
If the area falls under a police commissioner, the authority for granting such license is the
police commissioner of the concerned area. When the route does not fall in the jurisdiction of
a police commissioner, the authority for issuing license is the District Magistrate.
The concerned authority should be applied in prescribed form with a route map. The
concerned authority will make an enquiry and issue license for using/storing explosives for
cables trenching work. The license should be got renewed if the blasting operation needs to
be extended. Once the license is granted, it is the responsibility of the holders of the license
for the proper use of explosives, its transportation and storing.
12.3.15 PRECAUTIONS DURING THUNDER-STORM
When a thunder- storm appears to be imminent in the vicinity of a magazine or store
house every person engaged in or around such magazine and store house shall be withdrawn
to a safe distance from such magazine or store house and the magazine and store house shall
be kept closed and locked until the thunder storm has ceased or the threat of it has passed.
12.3.16 MAINTENANCE OF RECORDS
Every person holding a license granted under these rules for possession, sale or use of
explosives shall maintain records in the prescribed form and shall produce such record on
demand to an Inspection Officer.
12.3.17 PRECAUTIONS TO BE OBSERVED AT SITE
The electric power at the blasting site shall be discontinued as far as practicable
before charging the explosives. No work other than that associated with the charging
Optical Fiber Splicer Health and Safety
BRBRAITT, Jabalpur Page 10 of 14
For Restricted Circulation
operations shall be carried out within 10 meters of the holes unless otherwise specified to the
contrary by the licensing authority.
When charging is completed, any surplus explosive detonators and fuses shall be
removed from the vicinity of the hole and stored at a distance which should prevent
accidental detonation in the event of a charge detonating prematurely in any hole. The holes
which have been charged with explosive shall not be left unattended till the blasting is
completed. Care shall be taken to ensure that fuse or wires connected to the detonation are
not damaged during the placing of stemming materials and tamping.
12.3.18 SUITABLE WARNING PROCEDURE TO BE MAINTAINED
The licensee or a person appointed by the licensee to be in charge of the use of
explosives at the site shall lay down a clear warning procedure consisting of warning signs
and suitable signals and all persons employed in the area shall be made fully conversant with
such signs and signals.
12.4 ALLIEDACTIVITIES
12.4.1 TRANSPORTATION OF MATERIALS:
The materials required for executing the work entrusted to the contractors against a
work order shall be made available at Project Store Depot. In some cases the materials may
be available at sub divisional store godown. The contractor shall be responsible for
transporting the materials, to be supplied by the BBNL or otherwise to execute the work
under the contract, to site at his/ their own cost. The costs of transportation are subsumed in
the standard Schedule Rates and therefore no separate charges are payable on this account.
12.4.2 DISPOSAL OF EMPTY CABLE DRUMS:
The contractor shall be responsible to dispose of the empty cable drums after laying of
the cables. The cost of various sizes of empty cable drums recoverable from the contractor
has been fixed taking into account the prevailing market rates as mentioned in this document.
It shall be obligatory on part of the contractor to dispose of the empty cable drums at
his/their level and the amount fixed for various empty cable drums shall be recovered from
Optical Fiber Splicer Health and Safety
BRBRAITT, Jabalpur Page 11 of 14
For Restricted Circulation
the bill for the work for which the drum (s) was/were issued or from any other amount due to
the contractor or the Security Deposit.
The contractor shall not be allowed to dump the empty cable drums in Govt./Public
place which may cause inconvenience to the BSNL / public.
12.4.3 SUPPLY OF MATERIALS:
There are some materials required to be supplied by the contractor for execution of
work under this contract like Bricks, Cement, Wire Mesh and Steel for protection, etc.,
besides using other consumables which do/don’t become the part of the asset. The contractor
shall ensure that the materials supplied are of best quality and workmanship and shall be
strictly in a accordance with the specifications.
12.4.4 SOCIAL AUDITING:
While carrying out the execution work of cable/Eqpt. in rural areas,
photography/videography may be carried out on sample basis for duration of 15 to 30
minutes per Gram Panchayat which may also involve the local people of the Gram
Panchayats and villages including the Gram Panchayat Pradhan (If possible) and same may
be submitted in a form of CD along with the documentation sets for information.
12.5 SUMMARY OF FIBRE HANDLING SAFETY RULES
 Keep all food and beverages out of the work area. If fiber particles are ingested they
can cause internal hemorrhaging.
 Always wear safety glasses with side shields to protect your eyes from fiber shards or
splinters. Treat fiber optic splinters the same as you would treat glass splinters.
 Keep track of all fiber and cable scraps and dispose of them properly. If available,
work on black work mats and wear disposable lab aprons to minimize fiber particles
on your clothing. Fiber particles on your clothing can later get into food, drinks,
and/or be ingested by other means.
 Never look directly into the end of fiber cables – especially with a microscope – until
you are positive that there is no light source at the other end – having tested it with a
Optical Fiber Splicer Health and Safety
BRBRAITT, Jabalpur Page 12 of 14
For Restricted Circulation
power meter. Use a fiber optic power meter to make certain the fiber is dark. When
using an optical tracer or continuity checker, look at the fiber from an angle at least 6
inches away from your eye to determine if the visible light is present.
 Contact lens wearers must not handle their lenses until they have thoroughly washed
their hands.
 Do not touch your eyes while working with fiber optic systems until your hands have
been thoroughly washed.
 Ensure that Personal protection equipments like helmets, knee pads, safety boots,
safety glasses and trench guards are appropriately used as required
 Only work in well-ventilated areas.
 Keep all combustible materials safely away from the curing ovens and fusion splicers.
 When finished with the lab, dispose of all scraps properly. Put all fiber scraps in a
properly marked container for disposal.
 Thoroughly clean your work area when you are done.
12.6 REFERENCES AND SUGGESTED FURTHER READINGS
 ITU-T manual on OF installation
 EI of BSNL
 EI on underground OF cable laying works by BBNL
 Fiber Optics Technician's Manual
 Understanding optical communication by Dutton
 Planning Fiber Optic Networks by Bob Chomycz
 www.timbercon.com
 http://www.ofsoptics.com
 http://www.thefoa.org/
 http://www.corning.com
Optical Fiber Splicer Health and Safety
BRBRAITT, Jabalpur Page 13 of 14
For Restricted Circulation
 http://www.fiber-optics.info
 http://www.rp-photonics.com
 http://www.occfiber.com and other websites
12.7 KEY LEARNING
Qu.1 Fill in the blanks
1. While using chemical cleaner follow the instruction of ………………………………….
2. Full form of MSDS is
……………………………………………………………………………………………
3. ……………………….. must be worn at all times during splicing work is performed on
a fibre cable.
4. When finished with the lab, dispose of all …………………………………properly.
Qu.2 State True or False
1. The broken ends of fibers and scraps of fiber created during termination and splicing
can be extremely dangerous.
2. There are no flammable gases in the space where fusion splicing is done.
3. Smoking should be allowed around fiber optic work.
4. A license will have to be obtained for use and storing of explosive in that section.
5. Keep all food and beverages out of the work area.
6. Put all fiber scraps in a properly marked container for disposal.
7. Always look directly into the end of fiber cables.
8. Always wear safety glasses with side shields to protect your eyes from fiber shards or
splinters.
Notes:
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
Optical Fiber Splicer Health and Safety
BRBRAITT, Jabalpur Page 14 of 14
For Restricted Circulation
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------

More Related Content

What's hot

L 1 overview of telecom network
L 1 overview of telecom networkL 1 overview of telecom network
L 1 overview of telecom network
Bala V
 
Construction safety lecture-3
Construction safety  lecture-3Construction safety  lecture-3
Construction safety lecture-3Saleem Malik
 
Guidelines of Gas cylinder rule, By B C Das
Guidelines of Gas cylinder rule, By B C DasGuidelines of Gas cylinder rule, By B C Das
Guidelines of Gas cylinder rule, By B C Das
Bimal Chandra Das
 
Optical communication system
Optical communication systemOptical communication system
Optical communication system
mohamed naeem
 
Fibre splicing
Fibre splicingFibre splicing
Fibre splicing
Nijas Mohamed
 
Safety management in electrification of railways
Safety management in electrification of railwaysSafety management in electrification of railways
Safety management in electrification of railways
Suresh Sunny
 
Safety in Material Handling
Safety in Material HandlingSafety in Material Handling
Safety in Material Handling
RENURAMAN JANARTHANAM
 
Safe Working during Monsoon- Construction Safety
Safe Working during Monsoon- Construction SafetySafe Working during Monsoon- Construction Safety
Safe Working during Monsoon- Construction Safety
Northstar Safety Systemz Pvt. Ltd.
 
High Speed and RF Design Considerations - VE2013
High Speed and RF Design Considerations - VE2013High Speed and RF Design Considerations - VE2013
High Speed and RF Design Considerations - VE2013
Analog Devices, Inc.
 
Signal degradation in optical fibers
Signal degradation in optical fibersSignal degradation in optical fibers
Signal degradation in optical fibers
Government Engineering College, Gandhinagar
 
Crane signal-person-training-slides
Crane signal-person-training-slidesCrane signal-person-training-slides
Crane signal-person-training-slides
Alfatih Mattar
 
Optical fiber Communication training ppt
Optical fiber Communication training pptOptical fiber Communication training ppt
Optical fiber Communication training ppt
huzaifa027
 
Rigger signalman handbook
Rigger  signalman handbookRigger  signalman handbook
Rigger signalman handbook
nhivan
 
Signal degradation
Signal degradationSignal degradation
Signal degradationanitasjadhav
 
Fabrication of fibers
Fabrication of fibers Fabrication of fibers
Fabrication of fibers
ARNAB GHOSH
 
STC-TrD-03-c-Safety rules for OHE.pptx
STC-TrD-03-c-Safety rules for OHE.pptxSTC-TrD-03-c-Safety rules for OHE.pptx
STC-TrD-03-c-Safety rules for OHE.pptx
ShashankMudholkar
 
Submarine cable
Submarine cableSubmarine cable
Submarine cable
Subrata Kumer Paul
 

What's hot (20)

L 1 overview of telecom network
L 1 overview of telecom networkL 1 overview of telecom network
L 1 overview of telecom network
 
Construction safety lecture-3
Construction safety  lecture-3Construction safety  lecture-3
Construction safety lecture-3
 
Guidelines of Gas cylinder rule, By B C Das
Guidelines of Gas cylinder rule, By B C DasGuidelines of Gas cylinder rule, By B C Das
Guidelines of Gas cylinder rule, By B C Das
 
Optical communication system
Optical communication systemOptical communication system
Optical communication system
 
Fibre splicing
Fibre splicingFibre splicing
Fibre splicing
 
Safety management in electrification of railways
Safety management in electrification of railwaysSafety management in electrification of railways
Safety management in electrification of railways
 
Safety in Material Handling
Safety in Material HandlingSafety in Material Handling
Safety in Material Handling
 
Safe Working during Monsoon- Construction Safety
Safe Working during Monsoon- Construction SafetySafe Working during Monsoon- Construction Safety
Safe Working during Monsoon- Construction Safety
 
High Speed and RF Design Considerations - VE2013
High Speed and RF Design Considerations - VE2013High Speed and RF Design Considerations - VE2013
High Speed and RF Design Considerations - VE2013
 
Signal degradation in optical fibers
Signal degradation in optical fibersSignal degradation in optical fibers
Signal degradation in optical fibers
 
Crane signal-person-training-slides
Crane signal-person-training-slidesCrane signal-person-training-slides
Crane signal-person-training-slides
 
Optical fiber Communication training ppt
Optical fiber Communication training pptOptical fiber Communication training ppt
Optical fiber Communication training ppt
 
Rigger signalman handbook
Rigger  signalman handbookRigger  signalman handbook
Rigger signalman handbook
 
Signal degradation
Signal degradationSignal degradation
Signal degradation
 
DSL a Brief
DSL a BriefDSL a Brief
DSL a Brief
 
Fabrication of fibers
Fabrication of fibers Fabrication of fibers
Fabrication of fibers
 
Fttx
FttxFttx
Fttx
 
STC-TrD-03-c-Safety rules for OHE.pptx
STC-TrD-03-c-Safety rules for OHE.pptxSTC-TrD-03-c-Safety rules for OHE.pptx
STC-TrD-03-c-Safety rules for OHE.pptx
 
SAFETY RULES
SAFETY RULESSAFETY RULES
SAFETY RULES
 
Submarine cable
Submarine cableSubmarine cable
Submarine cable
 

Similar to OFC Health and safety

Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4
Garry Pepper
 
Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4
Garry Pepper
 
5. Mansoon Safety.pptx
5. Mansoon Safety.pptx5. Mansoon Safety.pptx
5. Mansoon Safety.pptx
MohsinKhan281076
 
Safety precaution for welding and cutting
Safety precaution for welding and cuttingSafety precaution for welding and cutting
Safety precaution for welding and cutting
Arcraft Plasma Equipments ( I ) Pvt Ltd
 
2 safety precautions
2 safety precautions2 safety precautions
2 safety precautions
miamore07
 
Monsoon safety awareness & preparations.... Environment Health & Safety
Monsoon safety awareness & preparations.... Environment Health & SafetyMonsoon safety awareness & preparations.... Environment Health & Safety
Monsoon safety awareness & preparations.... Environment Health & Safety
MANOJ KUMAR
 
150 Question Answers | Occupational Health & Safety
150 Question Answers | Occupational Health & Safety150 Question Answers | Occupational Health & Safety
150 Question Answers | Occupational Health & Safety
Muhammad Usman
 
JVC SR-HD1350EU Blu-ray recorder + 250GB HDD
JVC SR-HD1350EU Blu-ray recorder + 250GB HDDJVC SR-HD1350EU Blu-ray recorder + 250GB HDD
JVC SR-HD1350EU Blu-ray recorder + 250GB HDD
AV ProfShop
 
Black and Decker Scorpion
Black and Decker ScorpionBlack and Decker Scorpion
Black and Decker Scorpion
AllanMacDonald27
 
Roland MdX 40 Manual d'usuari
Roland MdX 40 Manual d'usuariRoland MdX 40 Manual d'usuari
Roland MdX 40 Manual d'usuariesclatec
 
Máy bắt vít dùng pin dtd137 rfe introduction manual
Máy bắt vít dùng pin dtd137 rfe introduction manualMáy bắt vít dùng pin dtd137 rfe introduction manual
Electrical Safety
Electrical  Safety Electrical  Safety
Electrical Safety
Reliance
 
RAIN SAFETY by HSE INTEGRO
RAIN SAFETY by HSE INTEGRORAIN SAFETY by HSE INTEGRO
RAIN SAFETY by HSE INTEGRO
Anant Singh
 
Case M4K Forklift Truck Service Repair Manual
Case M4K Forklift Truck Service Repair ManualCase M4K Forklift Truck Service Repair Manual
Case M4K Forklift Truck Service Repair Manual
jksmemm ekmdm
 
Manual sierra banco porter cable
Manual sierra banco porter cableManual sierra banco porter cable
Manual sierra banco porter cable
Lina Quintanilla
 
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...
Rajesh Prasad
 

Similar to OFC Health and safety (20)

Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4
 
Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4
 
5. Mansoon Safety.pptx
5. Mansoon Safety.pptx5. Mansoon Safety.pptx
5. Mansoon Safety.pptx
 
Safety precaution for welding and cutting
Safety precaution for welding and cuttingSafety precaution for welding and cutting
Safety precaution for welding and cutting
 
2 safety precautions
2 safety precautions2 safety precautions
2 safety precautions
 
Monsoon safety awareness & preparations.... Environment Health & Safety
Monsoon safety awareness & preparations.... Environment Health & SafetyMonsoon safety awareness & preparations.... Environment Health & Safety
Monsoon safety awareness & preparations.... Environment Health & Safety
 
150 Question Answers | Occupational Health & Safety
150 Question Answers | Occupational Health & Safety150 Question Answers | Occupational Health & Safety
150 Question Answers | Occupational Health & Safety
 
JVC SR-HD1350EU Blu-ray recorder + 250GB HDD
JVC SR-HD1350EU Blu-ray recorder + 250GB HDDJVC SR-HD1350EU Blu-ray recorder + 250GB HDD
JVC SR-HD1350EU Blu-ray recorder + 250GB HDD
 
Black and Decker Scorpion
Black and Decker ScorpionBlack and Decker Scorpion
Black and Decker Scorpion
 
Roland MdX 40 Manual d'usuari
Roland MdX 40 Manual d'usuariRoland MdX 40 Manual d'usuari
Roland MdX 40 Manual d'usuari
 
Máy bắt vít dùng pin dtd137 rfe introduction manual
Máy bắt vít dùng pin dtd137 rfe introduction manualMáy bắt vít dùng pin dtd137 rfe introduction manual
Máy bắt vít dùng pin dtd137 rfe introduction manual
 
Electrical Safety
Electrical  Safety Electrical  Safety
Electrical Safety
 
RAIN SAFETY by HSE INTEGRO
RAIN SAFETY by HSE INTEGRORAIN SAFETY by HSE INTEGRO
RAIN SAFETY by HSE INTEGRO
 
Case M4K Forklift Truck Service Repair Manual
Case M4K Forklift Truck Service Repair ManualCase M4K Forklift Truck Service Repair Manual
Case M4K Forklift Truck Service Repair Manual
 
Safety
SafetySafety
Safety
 
Safe diy
Safe diySafe diy
Safe diy
 
Máy chà nhám quỹ đạo tròn MT922 (2)
Máy chà nhám quỹ đạo tròn MT922 (2)Máy chà nhám quỹ đạo tròn MT922 (2)
Máy chà nhám quỹ đạo tròn MT922 (2)
 
Manual sierra banco porter cable
Manual sierra banco porter cableManual sierra banco porter cable
Manual sierra banco porter cable
 
Plumbing Safety
Plumbing SafetyPlumbing Safety
Plumbing Safety
 
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...
 

More from Bala V

Wll implant training
Wll implant trainingWll implant training
Wll implant training
Bala V
 
Human resource management v1
Human resource management v1Human resource management v1
Human resource management v1
Bala V
 
Gsm
GsmGsm
Gsm
Bala V
 
Transmission
TransmissionTransmission
Transmission
Bala V
 
Bb manual
Bb manualBb manual
Bb manual
Bala V
 
Broad band
Broad bandBroad band
Broad band
Bala V
 
Access network
Access networkAccess network
Access network
Bala V
 
OFCPulling
OFCPullingOFCPulling
OFCPulling
Bala V
 
Testing effectiveness of the splice through otdr and power meter tests
Testing effectiveness of the splice through otdr and  power meter testsTesting effectiveness of the splice through otdr and  power meter tests
Testing effectiveness of the splice through otdr and power meter tests
Bala V
 
Connectors coupler-fdf
Connectors coupler-fdfConnectors coupler-fdf
Connectors coupler-fdf
Bala V
 
Functionality of optical fiber tools and instrument
Functionality of optical fiber tools and  instrumentFunctionality of optical fiber tools and  instrument
Functionality of optical fiber tools and instrument
Bala V
 
Characteristics of optical fiber cable
Characteristics of optical fiber cableCharacteristics of optical fiber cable
Characteristics of optical fiber cable
Bala V
 
Types of optical fiber
Types of optical fiberTypes of optical fiber
Types of optical fiber
Bala V
 
Fiber optic basics
Fiber optic basicsFiber optic basics
Fiber optic basics
Bala V
 

More from Bala V (14)

Wll implant training
Wll implant trainingWll implant training
Wll implant training
 
Human resource management v1
Human resource management v1Human resource management v1
Human resource management v1
 
Gsm
GsmGsm
Gsm
 
Transmission
TransmissionTransmission
Transmission
 
Bb manual
Bb manualBb manual
Bb manual
 
Broad band
Broad bandBroad band
Broad band
 
Access network
Access networkAccess network
Access network
 
OFCPulling
OFCPullingOFCPulling
OFCPulling
 
Testing effectiveness of the splice through otdr and power meter tests
Testing effectiveness of the splice through otdr and  power meter testsTesting effectiveness of the splice through otdr and  power meter tests
Testing effectiveness of the splice through otdr and power meter tests
 
Connectors coupler-fdf
Connectors coupler-fdfConnectors coupler-fdf
Connectors coupler-fdf
 
Functionality of optical fiber tools and instrument
Functionality of optical fiber tools and  instrumentFunctionality of optical fiber tools and  instrument
Functionality of optical fiber tools and instrument
 
Characteristics of optical fiber cable
Characteristics of optical fiber cableCharacteristics of optical fiber cable
Characteristics of optical fiber cable
 
Types of optical fiber
Types of optical fiberTypes of optical fiber
Types of optical fiber
 
Fiber optic basics
Fiber optic basicsFiber optic basics
Fiber optic basics
 

Recently uploaded

一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 

Recently uploaded (20)

一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 

OFC Health and safety

  • 1. Optical Fiber Splicer Health and Safety BRBRAITT, Jabalpur Page 1 of 14 For Restricted Circulation 12 HEALTH AND SAFETY STRUCTURE 12.1 INTRODUCTION 12.2 OBJECTIVE 12.3 SAFETY PRECAUTIONS 12.4 ALLIEDACTIVITIES 12.5 SUMMARY OF FIBRE HANDLING SAFETY RULES 12.6 REFERENCES AND SUGGESTED FURTHER READINGS 12.7 KEY LEARNING
  • 2. Optical Fiber Splicer Health and Safety BRBRAITT, Jabalpur Page 2 of 14 For Restricted Circulation 12.1 INTRODUCTION When most people think of safety in fiber optic installations, the first thing that comes to mind is eye damage from laser light in the fiber. They have an image of a laser burning holes in metal or perhaps burning off warts. While these images may be real for their applications, they have little relevance to most types of fiber optic communications. Eye safety is an issue, but usually not from light in the fiber. However, fiber optics installation is not without risks. 12.2 OBJECTIVE After reading this unit, you should be able to understand:  Different safety precautions  Eye safety  Bare fiber safety  General Health and safety rules 12.3 SAFETY PRECAUTIONS 12.3.1 EYE SAFETY Safety glasses MUST be worn at all times during splicing work is performed on a fibre cable. The biggest hazard when working with fibre optics is small and sharp shards of the fibre produced when stripping or cleaving the cable. 12.3.2 BARE FIBER SAFETY The broken ends of fibers and scraps of fiber created during termination and splicing can be extremely dangerous. The ends are extremely sharp and can easily penetrate your skin. They invariably break off and are very hard to find and remove. Sometimes a pair of tweezers and perhaps a magnifying glass will get them out. Most of the time, you have to wait to let them infect and work themselves out, which can be painful! Be careful when handling fibers to not stick the broken ends into your fingers.
  • 3. Optical Fiber Splicer Health and Safety BRBRAITT, Jabalpur Page 3 of 14 For Restricted Circulation Dispose of all scraps properly. Some people keep a piece of double stick tape on the bench to stick fiber scraps onto. Prefer to use a dedicated container for all fiber scraps. In our training programs, we use the same paper containers used for takeout at the deli, in the pint size, with a lid. We put all the scraps in the container, then when finished, put on the lid, tape it and dispose of it later. Do not drop fiber scraps on the floor where they will stick in carpets or shoes and be carried elsewhere-like home! Obviously do not eat or drink anywhere near the work area. Fiber scraps can get into food or drink and be swallowed. The scraps can imbed themselves in you digestive system and never be found. Doesn't sound too appetizing, does it?! 12.3.3 MATERIALS SAFETY Fiber splicing and termination processes require various chemical cleaners and adhesives. The safety instructions defined for this substance should also be followed. If there is confusion in usage of these products, ask the manufacturer for MSDS (Material Safety Data Sheet). Remember the following instructions while working with materials.  Always work in well-ventilated areas  Avoid skin contact to materials involved as much as possible  Avoid using chemicals that cause allergic reactions. Even simple isopropyl alcohol, used as a cleaner flammable and should be handle appropriately. Hexane Iso-Propanol Type of Exposure Effect of exposure Emergency Treatment Effect of exposure Emergency Treatment Inhalation Irritation of respiratory tract, cough Maintain Respiration, Bed rest Irritation of upper respiratory tract Remove victim to fresh air area Administer artificial respiration if breathing is regular
  • 4. Optical Fiber Splicer Health and Safety BRBRAITT, Jabalpur Page 4 of 14 For Restricted Circulation Ingestion Nausea, Vomiting Headache Do not induce vomiting, immediately seek, medical advice. Drunkenness & vomiting Have a victim drink water and milk, seek medical aid Contact with skin Irritation Wipe of affected area of skin & wash with soap & water Harmless to skin Wipe of affected area of skin & wash with soap & water Contact with eyes Irritation Wash eyes with plenty of water for 15 minutes Irritation Wash eyes with plenty of water for 15 minutes 12.3.4 FIRE SAFETY The fusion splices use an electric spark to make splice, so ensure that there are no flammable gases in the space where fusion splicing is done.  Splicing should never be done in places manholes where gases can accumulate.  The cables are brought up to the surface into a splicing trailer where all fiber work is done. So the splicing trailer is temperature-controlled and kept spotlessly clean to ensure good splicing.  Smoking should not be allowed around fiber optic work. The ashes from smoking can contribute to the dust problems in fibers, apart from the drainage of explosion posed by them due to presence of combustible substances. 12.3.5 SAFETY PRECAUTIONS WHEN EXCAVATING OR WORKING IN EXCAVATIONS CLOSE TO ELECTRIC CABLES The Engineer- in-charge of the work should get full information from Electricity under taking regarding any electric cables, which are known or suspected to exist near the proposed excavation and unless this is done, excavation should not be carried out in the section concerned. The electricity undertaking should be asked to send a representative and work should be preceded with close consultation with them.
  • 5. Optical Fiber Splicer Health and Safety BRBRAITT, Jabalpur Page 5 of 14 For Restricted Circulation Only wooden handled hand tools should be used until the electric cables have been completely exposed. Power Cables, not laid in conduits, are usually protected from above by a cover slab of concrete, brick or stone. They may or may not be protected on the sides. It is safer, therefore, always to drive the point of the pickaxe downwards then uncovering a cable, so that there is less chance of missing such warning slabs. No workman should be permitted to work alone where there are electric cables involved. At least one more man should be working near by so that help can be given quickly in case of an accident. If disconnection of power could be arranged in that section it will be better. No electric cables shall be moved or altered without the consent of the Electric Authority and they should be contacted to do the needful. If an electric cable is damaged even slightly, it should be reported to the Electric Authority and any warning bricks disturbed during excavation should be replaced while back filling the trench. Before driving a spike into the ground, the presence of other underground properties should be checked. Information on plans regarding the location of power cables need not to be assumed as wholly accurate. Full precautions should be taken in the vicinity until the power cable is uncovered. All electric cables should be regarded as being live and consequently dangerous. Any power is generally dangerous, even low voltage proving fatal in several cases. 12.3.6 SAFETY PRECAUTIONS WHILE WORKING IN PUBLIC STREET AND ALONG RAILWAY LINES: Where a road or footpath is to be opened up in the course of work, special care should be taken to see that proper protection is provided to prevent any accidents from occurring. Excavation work should be done in such a manner that it will not unduly cause inconvenience to pedestrians or occupants of buildings or obstruct road traffic. Suitable bridges over open trenches should be so planned that these are required for the minimum possible time. Where bridges are constructed to accommodate vehicular traffic and is done near or on railway property, it should be with the full consent and knowledge of the competent railway authorities. 12.3.7 DANGER FROM FALLING MATERIAL Care should be taken to see that apparatus, tools or other excavating implements or excavated materials are not left in a dangerous or insecure position so as to fall or be knocked into the trench thereby injuring any workman who may be working inside the trench.
  • 6. Optical Fiber Splicer Health and Safety BRBRAITT, Jabalpur Page 6 of 14 For Restricted Circulation 12.3.8 CARE WHEN WORKING IN EXCAVATIONS Jumping into a trench is dangerous. If it is deep, workmen should be encouraged to lower themselves. Workers should work at safe distance so as to avoid striking each other accidentally with tools. If the walls of the trench contain glass bits, corroded wire or sharp objects they should be removed carefully. If an obstruction is encountered, it should be carefully uncovered and protected if necessary. If an obstruction is encountered, it should be carefully uncovered and protected if necessary. Care must be taken to see that excavated material is not left in such a position that it is likely to cause any accident or obstruction to a roadway or waterway. If possible the excavated material should be put between the workmen and the traffic without encroaching too much on the road. 12.3.9 DANGER OF CAVE IN When working in deep trenches in loose soil, timbering up/shoring the sides will prevent soil subsidence. The excavated material should be kept at sufficient distance from the edge of the trench or pit. Vehicles or heavy equipment must not be permitted to approach too close to the excavation. When making tunneled opening, it should be ensured that the soil is compact enough to prevent cave in even under adverse conditions of traffic. Extra care should be taken while excavating near the foundations of buildings or retaining walls. In such cases, excavation should be done gradually and as far as possible in the presence of the owners of the property. 12.3.10 PROTECTION OF EXCAVATIONS : Excavations in populated areas, which are not likely to be filled up on the same day should be protected by barriers or other effective means of preventing accidents and the location of all such openings must in any event be indicated by red flags or other suitable warning signs. During the hours from dusk to dawn, adequate number of red warning lamps should be displayed. Supervisory officers should ensure that all excavations are adequately protected in this manner as serious risk and responsibility is involved. Notwithstanding adoption of the above mentioned precautions, works involving excavations should be so arranged as to keep the extent of opened ground and the time to open it to a minimum.
  • 7. Optical Fiber Splicer Health and Safety BRBRAITT, Jabalpur Page 7 of 14 For Restricted Circulation 12.3.11 PRECAUTIONS WHILE WORKING ON ROADS The period between half an hour after sun-set and half an hour before sunrise, and any period of fog or abnormal darkness may also be considered as night for the purpose of these instructions, for the purpose of providing the warning signs. Excavation liable to cause danger to vehicles or the public must at all times be protected with fencing of rope tied to strong uprights or bamboo poles at a suitable height or by some other effective means. Any such temporary erection which is likely to cause obstructions and which is not readily visible should be marked by posts carrying red flags or boards with a red background by day and by continuously lighted lamps at night. The flags and the lamps should be placed in conspicuous positions so as to indicate the pedestrians and drivers of vehicles the full expanse i.e. both width and length of the obstruction. The distance between lamps or between floors should not generally exceed 1.25 m along the width and 6m along length of the obstruction in non-congested areas, but 4 meters along the length in congested areas. If the excavation is extensive, sufficient notice to give adequate warning of the danger should be displayed consciously not less than 1.25 m above the ground and close to the excavation. Where any excavation is not clearly visible for a distance of 25m to traffic approaching from any direction or any part of the carriage way of the road in which the excavation exists, a warning notice should be placed on the kerb or edge of all such roads from which the excavation or as near the distance as is practicable but not less than 10 m from the junction of an entering or intersecting road in which the excavation exists. All warnings, in these should have a red background and should be clearly visible and legible. All warning lamps should exhibit a red light, but white lights may be used in addition to facilitate working at night. Wherever required a passage for pedestrians with foot bridge should be provided. At excavations, cable drums, tools and all materials likely to offer obstructions should be properly folded round and protected. This applies to jointer’s tents as well. Leads, hoses etc. stretched and across the carriage way should be guarded adequately for their own protection and also that of the public.
  • 8. Optical Fiber Splicer Health and Safety BRBRAITT, Jabalpur Page 8 of 14 For Restricted Circulation 12.3.12 TRAFFIC CONTROL The police authorities are normally responsible for the control of traffic and may require the setting up of traffic controls to reduce the inconvenience occasioned by establishment of a single line of traffic due to restriction in road width or any other form of obstruction caused by the work. As far as possible, such arrangements should be settled in advance. If there are any specific regulations imposed by the local authorities, these should be followed. 12.3.13 WORK ALONG RAILWAY LINES Normally all works at Railway crossing is to be done under supervision of the railway authorities concerned, but it is to be borne in mind that use of white, red or green flags by the Departmental staff is positively forbidden to be used when working along a railway line as this practice may cause an accident through engine drivers mistaking them for railway signals. When working along a double line of railway, the men should be warned to keep a sharp look on both the “UP” and ‘DOWN” lines to avoid the possibility of any accident when trains pass or happen to cross one another near the work spot. 12.3.14 SAFETY PRECAUTIONS FOR USE OF EXPLOSIVES DURING BLASTING FOR TRENCHING: In areas where the cable trench cannot be done manually on account of boulders and rocks, it is necessary to blast the rocks by using suitable explosives. The quality of explosive to be used depends on the nature of the rocks and the kind of boulders. A few types of explosive fuses and detonators normally used for making trenches for cable works are detailed below:  Gun powder  Nitrate Mixture  Gilatine  Safety fuse  Electric Detonator
  • 9. Optical Fiber Splicer Health and Safety BRBRAITT, Jabalpur Page 9 of 14 For Restricted Circulation  Ordinary Detonator A detailed survey of the route is to be done to assess the length of the section where trenching is to be done with the help of blasting. A route diagram of the rocky section may be prepared indicating the length of the route where the explosives are to be used. For the purpose of obtaining license, a longer length of route should be given in the application as in many cases, after digging; rocks appear which was not initially anticipated. Next a license will have to be obtained for use and storing of explosive in that section. If the area falls under a police commissioner, the authority for granting such license is the police commissioner of the concerned area. When the route does not fall in the jurisdiction of a police commissioner, the authority for issuing license is the District Magistrate. The concerned authority should be applied in prescribed form with a route map. The concerned authority will make an enquiry and issue license for using/storing explosives for cables trenching work. The license should be got renewed if the blasting operation needs to be extended. Once the license is granted, it is the responsibility of the holders of the license for the proper use of explosives, its transportation and storing. 12.3.15 PRECAUTIONS DURING THUNDER-STORM When a thunder- storm appears to be imminent in the vicinity of a magazine or store house every person engaged in or around such magazine and store house shall be withdrawn to a safe distance from such magazine or store house and the magazine and store house shall be kept closed and locked until the thunder storm has ceased or the threat of it has passed. 12.3.16 MAINTENANCE OF RECORDS Every person holding a license granted under these rules for possession, sale or use of explosives shall maintain records in the prescribed form and shall produce such record on demand to an Inspection Officer. 12.3.17 PRECAUTIONS TO BE OBSERVED AT SITE The electric power at the blasting site shall be discontinued as far as practicable before charging the explosives. No work other than that associated with the charging
  • 10. Optical Fiber Splicer Health and Safety BRBRAITT, Jabalpur Page 10 of 14 For Restricted Circulation operations shall be carried out within 10 meters of the holes unless otherwise specified to the contrary by the licensing authority. When charging is completed, any surplus explosive detonators and fuses shall be removed from the vicinity of the hole and stored at a distance which should prevent accidental detonation in the event of a charge detonating prematurely in any hole. The holes which have been charged with explosive shall not be left unattended till the blasting is completed. Care shall be taken to ensure that fuse or wires connected to the detonation are not damaged during the placing of stemming materials and tamping. 12.3.18 SUITABLE WARNING PROCEDURE TO BE MAINTAINED The licensee or a person appointed by the licensee to be in charge of the use of explosives at the site shall lay down a clear warning procedure consisting of warning signs and suitable signals and all persons employed in the area shall be made fully conversant with such signs and signals. 12.4 ALLIEDACTIVITIES 12.4.1 TRANSPORTATION OF MATERIALS: The materials required for executing the work entrusted to the contractors against a work order shall be made available at Project Store Depot. In some cases the materials may be available at sub divisional store godown. The contractor shall be responsible for transporting the materials, to be supplied by the BBNL or otherwise to execute the work under the contract, to site at his/ their own cost. The costs of transportation are subsumed in the standard Schedule Rates and therefore no separate charges are payable on this account. 12.4.2 DISPOSAL OF EMPTY CABLE DRUMS: The contractor shall be responsible to dispose of the empty cable drums after laying of the cables. The cost of various sizes of empty cable drums recoverable from the contractor has been fixed taking into account the prevailing market rates as mentioned in this document. It shall be obligatory on part of the contractor to dispose of the empty cable drums at his/their level and the amount fixed for various empty cable drums shall be recovered from
  • 11. Optical Fiber Splicer Health and Safety BRBRAITT, Jabalpur Page 11 of 14 For Restricted Circulation the bill for the work for which the drum (s) was/were issued or from any other amount due to the contractor or the Security Deposit. The contractor shall not be allowed to dump the empty cable drums in Govt./Public place which may cause inconvenience to the BSNL / public. 12.4.3 SUPPLY OF MATERIALS: There are some materials required to be supplied by the contractor for execution of work under this contract like Bricks, Cement, Wire Mesh and Steel for protection, etc., besides using other consumables which do/don’t become the part of the asset. The contractor shall ensure that the materials supplied are of best quality and workmanship and shall be strictly in a accordance with the specifications. 12.4.4 SOCIAL AUDITING: While carrying out the execution work of cable/Eqpt. in rural areas, photography/videography may be carried out on sample basis for duration of 15 to 30 minutes per Gram Panchayat which may also involve the local people of the Gram Panchayats and villages including the Gram Panchayat Pradhan (If possible) and same may be submitted in a form of CD along with the documentation sets for information. 12.5 SUMMARY OF FIBRE HANDLING SAFETY RULES  Keep all food and beverages out of the work area. If fiber particles are ingested they can cause internal hemorrhaging.  Always wear safety glasses with side shields to protect your eyes from fiber shards or splinters. Treat fiber optic splinters the same as you would treat glass splinters.  Keep track of all fiber and cable scraps and dispose of them properly. If available, work on black work mats and wear disposable lab aprons to minimize fiber particles on your clothing. Fiber particles on your clothing can later get into food, drinks, and/or be ingested by other means.  Never look directly into the end of fiber cables – especially with a microscope – until you are positive that there is no light source at the other end – having tested it with a
  • 12. Optical Fiber Splicer Health and Safety BRBRAITT, Jabalpur Page 12 of 14 For Restricted Circulation power meter. Use a fiber optic power meter to make certain the fiber is dark. When using an optical tracer or continuity checker, look at the fiber from an angle at least 6 inches away from your eye to determine if the visible light is present.  Contact lens wearers must not handle their lenses until they have thoroughly washed their hands.  Do not touch your eyes while working with fiber optic systems until your hands have been thoroughly washed.  Ensure that Personal protection equipments like helmets, knee pads, safety boots, safety glasses and trench guards are appropriately used as required  Only work in well-ventilated areas.  Keep all combustible materials safely away from the curing ovens and fusion splicers.  When finished with the lab, dispose of all scraps properly. Put all fiber scraps in a properly marked container for disposal.  Thoroughly clean your work area when you are done. 12.6 REFERENCES AND SUGGESTED FURTHER READINGS  ITU-T manual on OF installation  EI of BSNL  EI on underground OF cable laying works by BBNL  Fiber Optics Technician's Manual  Understanding optical communication by Dutton  Planning Fiber Optic Networks by Bob Chomycz  www.timbercon.com  http://www.ofsoptics.com  http://www.thefoa.org/  http://www.corning.com
  • 13. Optical Fiber Splicer Health and Safety BRBRAITT, Jabalpur Page 13 of 14 For Restricted Circulation  http://www.fiber-optics.info  http://www.rp-photonics.com  http://www.occfiber.com and other websites 12.7 KEY LEARNING Qu.1 Fill in the blanks 1. While using chemical cleaner follow the instruction of …………………………………. 2. Full form of MSDS is …………………………………………………………………………………………… 3. ……………………….. must be worn at all times during splicing work is performed on a fibre cable. 4. When finished with the lab, dispose of all …………………………………properly. Qu.2 State True or False 1. The broken ends of fibers and scraps of fiber created during termination and splicing can be extremely dangerous. 2. There are no flammable gases in the space where fusion splicing is done. 3. Smoking should be allowed around fiber optic work. 4. A license will have to be obtained for use and storing of explosive in that section. 5. Keep all food and beverages out of the work area. 6. Put all fiber scraps in a properly marked container for disposal. 7. Always look directly into the end of fiber cables. 8. Always wear safety glasses with side shields to protect your eyes from fiber shards or splinters. Notes: ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------
  • 14. Optical Fiber Splicer Health and Safety BRBRAITT, Jabalpur Page 14 of 14 For Restricted Circulation ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------