Content
Introduction 					3
Construction method 				5
Advantage and disadvantage			 6
Material of the actual building			 9
Load distribution analysis		 12
Modelling process			 13
Analysis od failure/success(process) 17
Final Model				 19
Conclusion					 20
Reference					 21
3
Introduction
	 O2 Arena is a multi-purpose indoor arena located in London, England. It is covered by Millennium Dome, a
large white PTFE coated glass-fibre fabric with twelve 100 meter high yellow towers which indicate each month of
a year and each hour of the clock face. Millennium Dome was designed and built between 1996 and 1999. The aim
of building Millennium Dome was to house Millennium Experience exhibition. The dome was designed as a ten-
sioned fabric-and-cable roof by a bunch
of architect to provide shelter for the Mil-
lennium Experience exhibition. Due to
the financial problems, the original exhi-
bition and associated complex have been
demolished except the dome. Millennium
Dome was then sold to the O2 Compa-
ny. Currently, the structures under the
dome such as arena, basketball court and
complex etc. have attract millions of vis-
itors. As a large arena in the world which
covered by one of the largest dome in the
world, it has become the famous venue
for concerts and family shows.
4
O2 Arena Builders
There are a few architect who design and construct this Arena, O2 Arena, London (Millennium Dome). In addition,
they also has consultant for the material used especially the dome’s fabric.
	 Architects, Builders and Consultants Head
	 Architect: Richard Rogers(Head)
	 Concept Architect: Rogers Stirk Harbour + Partners
	 Design Architect: Bblur Architect  
	 Photos + Information: HOK Sport / Populous
	 Engineer: Buro Happold
	 Main Contractor: ISG Group
	 Specialist Fabric Consultant: Base structure
This Arena was design by Richard Rogers. He is known for his
functional and semi-modernist design flair in UK. There are a few building he had
worked on. Building such as Lloyd’s Building and The Court of Human Rights Build-
ing in Strasbourg. In addition, he had also won a number of medals and awards. A
few example would be The Thomas Jefferson Medal, the Minerva Medal, the RIBA
Stirling Prize, and the Pritzker Prize in recognition of his architectural achieve-
ments. He is also a partner at the Rogers Stirk Harbour + Partners architecture firm.
Introduction
5
Construction Method
O2 Are na Surface Structure
The entire roof structure of O2 Arena was made up of Thin Shell Structure “Membrane Structure”. Its members are
united as 1 homogeneous entity to form the structure and spaces. The membrane is made up of fabric structure and
other tensile structure. This kind of construction is also consider as a light weight construction. Considering the
surface is a thin and flexible membrane, it has the ability to resist a certain load through the tensile stress from the
fabric itself without it being compression or bending. It is the largest in the world with a diameter of 320m (1050 ft.).
How it is built
The entire fabric is being supported by 72tensioned steel stringer cables paring with
32mm diameter steel spiral strand each for providing tension. The fabric material uses
PTFE (polytetrafluoroethylene) - coated fiberglass. The stringers are supported at a
radial spacing between 25m and 30m by an arrangement of upper hanger and lower
tie-down cables set out around the 12 100m high primary steelwork masts. The string-
ers on their radial lines are being kept in place by the circumferential cables. The force
from the primary cables produce by rain, snow, wind etc from nature, everything is
being collected from the centre by a 30m diameter cable ring. This was built with 12
48mm diameter cables to provide safety against failure or error of cable breakage. At
the perimeter, the radial cable forces are collected by 12 curved boundary cables and
taken to 24 anchorage points.
6
Advantage & Disadvantage
Advantagesofthe designstructure
- Extremely light weight
- Large span (size)
- Minimum amount of structure
- An open and unobstructed interior
- The low weight of the materials makes construction easier and cheaper than standard design
Cost efficiency
Depending on the requirement, the shaped fabric under tension is able to reduce the
cost of construction by increase its spanned area under tension. In addition, the mem-
brane provides both structure and roofing shell.
DesignFreedom
With the flexible and highly formable systems provided from the tensile fabric mem-
brane, this provide the architect to go all out by using conventional construction materi-
als. It also improve its functionality by providing a well-designed tensile structure which
adds aesthetics to the building.
Noise pollution
The fabric curved construction method is able to diffuses both internal and external
sound and whilst absorbing at the same time.
7
Lowerenergycosts
The fabric have high sun reflecting properties and low absorbency of sunlight. Trans-
lucent materials provide a comfortable and natural light source by removing all arti-
ficial lighting during the daytime. This greatly reduces the solar energy and heat that
enters the structure. The woven base cloth combined with the appropriate coating
allows a light transmission value of around 10%. This provides a very comfortable
level of illumination compared to the full brightness of outside.
Semi-permanent nature
Tension membrane structures ‘historically’ have been closely tied to major events
such as exhibitions, where shelters are needed for short periods of time. Tension
Fabric structures can be easily designed for rapid relocation and re-erection; mak-
ing them perfect for high impact event structures. Not only does this help with
practicality it also helps with planning permission for fixed term structures as they
are classed by most authorities as semi- permanent structures.
Advantage & Disadvantage
8
Disadvantages
- Poor performance • Thermal
			 • Acoustic
- Exterior moisture and dehumidifier and address condensation
Difficult making meaningful connections
If there is no suitable structure within the existing building, it would be difficult to make
any meaningful connections to that building for a tensile canopy, but sufficient anchor-
age might be achieved for a rigid type of construction. That said, it is nearly always pos-
sible to design the canopy in such a way that it imposes identical loads onto a building
as a rigid canopy structure would, but in these cases, the cost of the additional engineer-
ing, steel fabrication and installation difficulties is likely to make it an uneconomical
solution.
Easy to be damaged
Fabric structures, if properly engineered and installed are virtually immune to damage
and weather properties. Providing that they are not likely to be vandalize or damage,
they provide a reassuringly simple and durable solution.
Difficulty of Maintenance
Dirt can be clearly seen glass or polycarbonate, however the light diffusing properties
of the fabric mean that the surface dirt is not easily identified. It’s quite surprising how
Advantage & Disadvantage
9
Material
Materials for Millennium Dome (O2 Arena)
PTFE (polytetrafluroethlyene) coated glass fibre fabric
PTFE coated glass fibre fabric is a dynamic tensile material unmatched for its aesthetics and
durability making it ideal for large scale roof and tensile membrane structures. It is used for cladding the dome of
O2 Arena. It has the properties of high durability and flame resistance. Usually, this kind of glass fibres are not af-
fected by UV light but they are easily damaged by the water. Hence, a PTFE coating is needed to be applied on it.
The function of this coating is to protect the fibre from water and abrasion. However, the PTFE itself is complete-
ly inert and not affected by the weather. In all words, PTFE coated glass fibre has a longer life span and avoids the
problem of dirt retention and discoloration. This is why it always stay looking clean.
10
Reinforced concrete
Reinforcedconcreteisacompositematerialwhicharecounteractedbytheinclusion
ofreinforcement, having high compressive and tensile strength. In fact, there
are 24 spots of reinforced concrete which we can find around the O2 Arena,
standing on top of the ground and are attached to main cables of this building.
It has been used as an anchorage points to support the whole structure. Con-
crete, if unreinforced, is notorious for cracking easily at any sourced of stress.
It will cracks at all thickenings, ends of embedded steel and even down the
middle of aisles. Hence, it has to undergo several retrofitting, like reinforcing
the concrete by adding steel rods to the concrete mixture, allowing concrete to
set solid. The steel rods ensures that reinforced concrete can withstand tensile
forces and hence, it become a versatile and composite material.

Rubber
The aim of using rubber for this building is to achieve a maximum of weight
saving in individual components and parts. Rubber offer a considerable poten-
tial due to its low density and flexibility compared with metal counterparts. At
the bottom of each 12 masts, there is a rubber pot bearing with a single locating
bolt. The bearing allows slight rotation of the mast at the connection point with
the pyramid. Usage of rubber at the pot bearing helps to improve resistance
to surface crac king due to higher binder of contents. At the same time, it also
helps in improving the aging and oxidation resistance of surface construction
Material
11
Steel
In O2 Arena, steel is used mainly for its roof construction. Arranged radially over the fabric surface area the 72
tensioned steel stringer cables in pairs of 32mm diameter steel spiral strand. The stringers are supported at a radi-
al spacing between 25 and 30m by an arrangement
of upper hanger and lower tie-down cables set out
around the twelve 100m high primary steelwork
masts. All these masts, jut out from the fabric ceil-
ing, representing the months of the year and the
hours on a clock face. On the other hand, the upper
hangar, the lower tie-down cables carry the loads
from the fabric down to the ground when loaded by
wind or snow. The dome, was made up of the light-
est steel which are specified for the cables beneath
the roof, while a more durable mixture of alumin-
ium and zinc(of steel), is used for galvanizing the
external cables. Steel, is well known for its inherent
strength which enables architectural and design flex-
ibility. Hence, it is very suitable to be used for O2
Arena.
Material
12
Force transfer from the dome through the tensioned steel stringer cable to the 12 steel masts.
Force transfer to the ground through the steel masts.
Compression force from the ground to withstand the load and weight from the steel masts.
Load Distribution Analysis
13
Modelling Process
1)
First try out and locating the steel
structure in between which are sim-
ilar to the actual model to check the
proportion.
2)
First try on making the structure to
locate the fabric. Using hot glue gun
to stick the steel wires to form dome
structure.
3)
After doing some measurement of
the fabric according to the propor-
tion of the model, we draw it on the
material we prepared.
14
Modelling Process
4)
After doing some measurement of
the fabric according to the propor-
tion of the model, we draw it on the
material we prepared.
5)
After drawing the line on the table
cloth, we stitch according to the line
drawn.
6)
After doing some measurement of
the fabric according to the propor-
tion of the model, we draw it on the
material we prepared.
15
Modelling Process
7)
Reforming the steel structure by us-
ing the new method we find.
8)
When making the base of the steel
structure, we apply water on the pa-
per clay so that we are able to form
the smooth surface.
9)
Waiting for the paper clay to dry up
so that we can apply colour spray on
it.
16
Modelling Process
10)
We spray the steel structure after the
paper clay base dry .
11)
For the detailing parts, we use screw
and nuts, zinc plate, paper clay and
steel cable etc for constructing the
base details according to what we
analyse.
17
Failure/Success
Method of Construction
- We try a few different method to bring out the best product such as even using needle and string to steel and
wire cable. This is to bring out the not just the tex ture but also the feeling towards the real O2 Arena, London.
Some of us don’t know how to needle or threat and some of us even give up mid way bec ause of the confusion
and tangling in midway. Even though it may look easy but when we try it, it is not as easy as it looks. In addition
we not only have 1 but the entire roof is made of fabric and method of connection closest to the real thing is sew-
ing method.
Untidiness
The glue we used makes the steel dirty and cloudy. It is not as good looking as it was and it changes the texture of
the material.
18
Failure/Success
Connection
-Based on the experiment we have mad, solder wire
melting method or using hot glue gun for connec-
tion is not working due to the materials properties.
Besides that, w e also don’t have the welding tools to
connect the steel wire.
			 Fail to use hot glue gun
Problem Facing
Materials
- We are unable to decide the most suitable material to
represent the materials used in the construction. After
few try-outs, we decide to choose something that have
the similar texture and coloration. In addition, the ma-
terial we are able to find is limited because some of the
materials are not affordable as the economy as a student
is limited and there is no separate parts sold.
Tablecloth		 Screws and nuts
19
Final Model
20
Conclusion
After the entire project, we notice that even the smooth surface has its own benefits and speciality. As
for the O2 Arena, London, we realize that the entire structure is mostly made from steel and fabric. In
addition, the building doesn’t have much fenestration compare to other arena or stadium. What makes
this building so special is because the entire structure is built within a building and the amount of ener-
gy it is able to save.
21
Reference Link:
Michael mattan (n.d.). Millennium Dome in London - TensiNet. Retrieved June 15, 2014, from
http://www.tensinet.com/database/viewProject/3782
Rogers Stirk Harbour (n.d.). Facts - Millennium Experience. Retrieved June 10, 2014, from
http://www.rsh-p.com/work/buildings/millennium_experience
Millennium Dome. (2014, June 9). Retrieved from
http://www.princeton.edu/~achaney/tmve/wiki100k/docs/Millennium_Dome.html
Encyclopædia Britannica, Inc. (n.d.). Millennium Dome (building, Greenwich, London, United
Kingdom) -- Encyclopedia Britannica. Retrieved June 16, 2014, from
http://global.britannica.com/EBchecked/topic/382742/Millennium-Dome
O2 Arena and Millennium Dome - Buro Happold. (n.d.). Retrieved June 16, 2014, from
http://www.burohappold.com/projects/project/o2-arena-and-millennium-dome-65/
Artifice, Inc. (n.d.). Millennium Dome - Richard Rogers - Great Buildings Architecture. Retrieved June 15, 2014, from
http://www.greatbuildings.com/buildings/Millennium_Dome.html
Industrial Fabrics Association International (n.d.). Millennium Dome—What’s up with that? - Fabric Architecture. Retrieved June 14, 2014,
http://fabricarchitecturemag.com/articles/0910_f3_millennium_dome_update.html
O2 Arena London, London Venue, O2 Arena Venue | e-architect. (n.d.). Retrieved June 16, 2014,from
http://www.e-architect.co.uk/london/o2-arena
Reference

More Related Content

What's hot

Curtain wall
Curtain wallCurtain wall
Curtain wall
Kamrul Hasan Sagar
 
The tents structure system
The tents structure systemThe tents structure system
The tents structure system
Mazin Elbashkatib
 
Indian coffee house trivandrum, kerela
Indian coffee house trivandrum, kerelaIndian coffee house trivandrum, kerela
Indian coffee house trivandrum, kerela
Shruti Pavan
 
Glass in architecture
Glass in architectureGlass in architecture
Glass in architecture
Dhananjay Marda
 
Presentation1: Surry Hills Community Centre and Library
Presentation1: Surry Hills Community Centre and LibraryPresentation1: Surry Hills Community Centre and Library
Presentation1: Surry Hills Community Centre and Library
CalvinSuah
 
00 cladding report 1
00 cladding report 100 cladding report 1
00 cladding report 1
aduiti
 
What is the eden project
What is the eden project What is the eden project
What is the eden project Youngman Kim
 
Roof Coverings
Roof CoveringsRoof Coverings
Roof Coverings
VyshnaviMajety
 
Richard roger
Richard rogerRichard roger
Richard roger
Rucha Kulkarni
 
rem-koolhaas.ppt
rem-koolhaas.pptrem-koolhaas.ppt
rem-koolhaas.ppt
AanchalRawal7
 
Sangath- An Architect's Studio
Sangath- An Architect's StudioSangath- An Architect's Studio
Sangath- An Architect's Studio
Vidisha Barwal
 
Richard Rogers
Richard RogersRichard Rogers
Richard Rogers
VISHAKA BOTHRA
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
Gertrude Lee
 
Metal Cladding - Quinta Metalica in English
Metal Cladding - Quinta Metalica in EnglishMetal Cladding - Quinta Metalica in English
Metal Cladding - Quinta Metalica in English
Silos Cordoba
 
Long Span Building Construction
Long Span Building ConstructionLong Span Building Construction
Long Span Building Construction
Asz My
 
Aerospace Museum , california
Aerospace Museum , californiaAerospace Museum , california
Aerospace Museum , california
Rifquth sb
 
Hearst tower, NYC
Hearst tower, NYCHearst tower, NYC
Hearst tower, NYC
Palak Khandelwal
 
Form active structure system (1)
 Form active structure system (1) Form active structure system (1)
Form active structure system (1)
Prince Pathania
 
Residential Case Studies of Passive Strategies
Residential Case Studies of Passive StrategiesResidential Case Studies of Passive Strategies
Residential Case Studies of Passive Strategiesaiahouston
 

What's hot (20)

Curtain wall
Curtain wallCurtain wall
Curtain wall
 
The tents structure system
The tents structure systemThe tents structure system
The tents structure system
 
Indian coffee house trivandrum, kerela
Indian coffee house trivandrum, kerelaIndian coffee house trivandrum, kerela
Indian coffee house trivandrum, kerela
 
Glass in architecture
Glass in architectureGlass in architecture
Glass in architecture
 
Presentation1: Surry Hills Community Centre and Library
Presentation1: Surry Hills Community Centre and LibraryPresentation1: Surry Hills Community Centre and Library
Presentation1: Surry Hills Community Centre and Library
 
Renzo piano ppt
Renzo piano pptRenzo piano ppt
Renzo piano ppt
 
00 cladding report 1
00 cladding report 100 cladding report 1
00 cladding report 1
 
What is the eden project
What is the eden project What is the eden project
What is the eden project
 
Roof Coverings
Roof CoveringsRoof Coverings
Roof Coverings
 
Richard roger
Richard rogerRichard roger
Richard roger
 
rem-koolhaas.ppt
rem-koolhaas.pptrem-koolhaas.ppt
rem-koolhaas.ppt
 
Sangath- An Architect's Studio
Sangath- An Architect's StudioSangath- An Architect's Studio
Sangath- An Architect's Studio
 
Richard Rogers
Richard RogersRichard Rogers
Richard Rogers
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
Metal Cladding - Quinta Metalica in English
Metal Cladding - Quinta Metalica in EnglishMetal Cladding - Quinta Metalica in English
Metal Cladding - Quinta Metalica in English
 
Long Span Building Construction
Long Span Building ConstructionLong Span Building Construction
Long Span Building Construction
 
Aerospace Museum , california
Aerospace Museum , californiaAerospace Museum , california
Aerospace Museum , california
 
Hearst tower, NYC
Hearst tower, NYCHearst tower, NYC
Hearst tower, NYC
 
Form active structure system (1)
 Form active structure system (1) Form active structure system (1)
Form active structure system (1)
 
Residential Case Studies of Passive Strategies
Residential Case Studies of Passive StrategiesResidential Case Studies of Passive Strategies
Residential Case Studies of Passive Strategies
 

Viewers also liked

Cashco Products Presentation
Cashco Products PresentationCashco Products Presentation
Cashco Products Presentation
Benjamin Kyalo
 
Bsk global kay-tex customer presentation
Bsk global kay-tex customer presentationBsk global kay-tex customer presentation
Bsk global kay-tex customer presentationErtunc Ekin
 
Presentation1
Presentation1Presentation1
Higher Order Floquet Mode Radiating Elements
Higher Order Floquet Mode Radiating ElementsHigher Order Floquet Mode Radiating Elements
Higher Order Floquet Mode Radiating Elements
Michael Buckley
 
SKYSades SoCal - Tensile Architecture Overview
SKYSades SoCal - Tensile Architecture OverviewSKYSades SoCal - Tensile Architecture Overview
SKYSades SoCal - Tensile Architecture Overview
SKYShadesSoCal
 
Action Station, St Pancras enters the 21st century-Riba Journal January 2008
Action Station, St Pancras enters the 21st century-Riba Journal January 2008Action Station, St Pancras enters the 21st century-Riba Journal January 2008
Action Station, St Pancras enters the 21st century-Riba Journal January 2008MDSarchitect
 
Nanotech presentation
Nanotech presentationNanotech presentation
Nanotech presentation
Rajat Verma
 
FCSarch 18 Iron in Europe
FCSarch 18 Iron in EuropeFCSarch 18 Iron in Europe
FCSarch 18 Iron in Europejdankoff
 
Design and Analysis of FSS Radomes
Design and Analysis of FSS RadomesDesign and Analysis of FSS Radomes
Design and Analysis of FSS RadomesAltair
 
Fabric Architecture.Material Choices
Fabric Architecture.Material ChoicesFabric Architecture.Material Choices
Fabric Architecture.Material Choices
samarmijos
 
Designing for long spans 2
Designing for long spans 2Designing for long spans 2
Designing for long spans 2
SADEQ ALSALAMI
 
Tensile ppt
Tensile pptTensile ppt
Tensile ppt
winner
 
Aquatic centre london
Aquatic centre londonAquatic centre london
Aquatic centre londonIim Ali Imron
 
Struktur konstruksi bangunan pada stadion sepak bola
Struktur konstruksi bangunan pada stadion sepak bolaStruktur konstruksi bangunan pada stadion sepak bola
Struktur konstruksi bangunan pada stadion sepak bola
rickihermawan49
 
STRUKTUR BANGUNAN BENTANG LEBAR - MEMBRAN
STRUKTUR BANGUNAN BENTANG LEBAR - MEMBRANSTRUKTUR BANGUNAN BENTANG LEBAR - MEMBRAN
STRUKTUR BANGUNAN BENTANG LEBAR - MEMBRAN
rerianita
 
Long span cable
Long span cableLong span cable
Long span cable
Musahiddin Md Zainal
 
Domes
DomesDomes
Domes
Helga
 

Viewers also liked (20)

Cashco Products Presentation
Cashco Products PresentationCashco Products Presentation
Cashco Products Presentation
 
Bsk global kay-tex customer presentation
Bsk global kay-tex customer presentationBsk global kay-tex customer presentation
Bsk global kay-tex customer presentation
 
Presentation1
Presentation1Presentation1
Presentation1
 
Higher Order Floquet Mode Radiating Elements
Higher Order Floquet Mode Radiating ElementsHigher Order Floquet Mode Radiating Elements
Higher Order Floquet Mode Radiating Elements
 
SKYSades SoCal - Tensile Architecture Overview
SKYSades SoCal - Tensile Architecture OverviewSKYSades SoCal - Tensile Architecture Overview
SKYSades SoCal - Tensile Architecture Overview
 
St Pancras Project Profile
St Pancras Project ProfileSt Pancras Project Profile
St Pancras Project Profile
 
Action Station, St Pancras enters the 21st century-Riba Journal January 2008
Action Station, St Pancras enters the 21st century-Riba Journal January 2008Action Station, St Pancras enters the 21st century-Riba Journal January 2008
Action Station, St Pancras enters the 21st century-Riba Journal January 2008
 
St Pancras
St PancrasSt Pancras
St Pancras
 
Nanotech presentation
Nanotech presentationNanotech presentation
Nanotech presentation
 
ppt on RF
ppt on RFppt on RF
ppt on RF
 
FCSarch 18 Iron in Europe
FCSarch 18 Iron in EuropeFCSarch 18 Iron in Europe
FCSarch 18 Iron in Europe
 
Design and Analysis of FSS Radomes
Design and Analysis of FSS RadomesDesign and Analysis of FSS Radomes
Design and Analysis of FSS Radomes
 
Fabric Architecture.Material Choices
Fabric Architecture.Material ChoicesFabric Architecture.Material Choices
Fabric Architecture.Material Choices
 
Designing for long spans 2
Designing for long spans 2Designing for long spans 2
Designing for long spans 2
 
Tensile ppt
Tensile pptTensile ppt
Tensile ppt
 
Aquatic centre london
Aquatic centre londonAquatic centre london
Aquatic centre london
 
Struktur konstruksi bangunan pada stadion sepak bola
Struktur konstruksi bangunan pada stadion sepak bolaStruktur konstruksi bangunan pada stadion sepak bola
Struktur konstruksi bangunan pada stadion sepak bola
 
STRUKTUR BANGUNAN BENTANG LEBAR - MEMBRAN
STRUKTUR BANGUNAN BENTANG LEBAR - MEMBRANSTRUKTUR BANGUNAN BENTANG LEBAR - MEMBRAN
STRUKTUR BANGUNAN BENTANG LEBAR - MEMBRAN
 
Long span cable
Long span cableLong span cable
Long span cable
 
Domes
DomesDomes
Domes
 

Similar to O2 booklet

High Tech Building Materials: ETFE
High Tech Building Materials: ETFEHigh Tech Building Materials: ETFE
High Tech Building Materials: ETFE
Sneha Nagarajan
 
Monolithic dome ppt
Monolithic dome pptMonolithic dome ppt
Monolithic dome ppt
Padmashree Sridhar
 
Monolithic Dome Seminar paper rev01
Monolithic Dome Seminar paper rev01Monolithic Dome Seminar paper rev01
Monolithic Dome Seminar paper rev01Shola O. Aribido
 
Aerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern AgeAerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern Age
IRJET Journal
 
tensile-guide.pdf
tensile-guide.pdftensile-guide.pdf
tensile-guide.pdf
MdMukarramReza
 
Post tensioning in building structures
Post tensioning in building structuresPost tensioning in building structures
Post tensioning in building structures
Luan Truong Van
 
Nanotechnology In Civil Engineering
Nanotechnology   In Civil   EngineeringNanotechnology   In Civil   Engineering
Nanotechnology In Civil Engineering
Colloquium
 
Special concrete in concrete technology
Special concrete in concrete technologySpecial concrete in concrete technology
Special concrete in concrete technology
Sunny Saha
 
IRJET- Deisign and Analysis of Geodesic Tunnel Dome for an Auditorium
IRJET-  	  Deisign and Analysis of Geodesic Tunnel Dome for an AuditoriumIRJET-  	  Deisign and Analysis of Geodesic Tunnel Dome for an Auditorium
IRJET- Deisign and Analysis of Geodesic Tunnel Dome for an Auditorium
IRJET Journal
 
PROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONSPROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONS
Nik Ahmad Munawwar Nik Din
 
IRJET- 3D Polysterene Wire Panel Construction System
IRJET- 3D Polysterene Wire Panel Construction SystemIRJET- 3D Polysterene Wire Panel Construction System
IRJET- 3D Polysterene Wire Panel Construction System
IRJET Journal
 
APPLICATION OF NANOTECHNOLOGY IN CIVIL ENGINEERING
APPLICATION OF NANOTECHNOLOGY IN CIVIL ENGINEERINGAPPLICATION OF NANOTECHNOLOGY IN CIVIL ENGINEERING
APPLICATION OF NANOTECHNOLOGY IN CIVIL ENGINEERING
Sarath Prasannakumar
 
Sandwich Panels Advantages And Disadvantages
Sandwich Panels Advantages And DisadvantagesSandwich Panels Advantages And Disadvantages
Sandwich Panels Advantages And Disadvantages
Barb Tillich
 
The cables structure system
The cables structure systemThe cables structure system
The cables structure system
Mazin Elbashkatib
 
plastic Facade- PLOYCARBONATE AND PTFE
plastic Facade- PLOYCARBONATE AND PTFE plastic Facade- PLOYCARBONATE AND PTFE
plastic Facade- PLOYCARBONATE AND PTFE
Revathy Royer
 
Tensile structures
Tensile structuresTensile structures
Tensile structures
RRSA
 
Building construction-2 project-2
Building construction-2 project-2Building construction-2 project-2
Building construction-2 project-2kerneng
 
Curtain wall111111111111111111111111.ppt
Curtain wall111111111111111111111111.pptCurtain wall111111111111111111111111.ppt
Curtain wall111111111111111111111111.ppt
kaleabhiwot1
 

Similar to O2 booklet (20)

High Tech Building Materials: ETFE
High Tech Building Materials: ETFEHigh Tech Building Materials: ETFE
High Tech Building Materials: ETFE
 
Monolithic dome ppt
Monolithic dome pptMonolithic dome ppt
Monolithic dome ppt
 
Monolithic Dome Seminar paper rev01
Monolithic Dome Seminar paper rev01Monolithic Dome Seminar paper rev01
Monolithic Dome Seminar paper rev01
 
Aerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern AgeAerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern Age
 
Final Document
Final DocumentFinal Document
Final Document
 
tensile-guide.pdf
tensile-guide.pdftensile-guide.pdf
tensile-guide.pdf
 
Post tensioning in building structures
Post tensioning in building structuresPost tensioning in building structures
Post tensioning in building structures
 
Nanotechnology In Civil Engineering
Nanotechnology   In Civil   EngineeringNanotechnology   In Civil   Engineering
Nanotechnology In Civil Engineering
 
Special concrete in concrete technology
Special concrete in concrete technologySpecial concrete in concrete technology
Special concrete in concrete technology
 
IRJET- Deisign and Analysis of Geodesic Tunnel Dome for an Auditorium
IRJET-  	  Deisign and Analysis of Geodesic Tunnel Dome for an AuditoriumIRJET-  	  Deisign and Analysis of Geodesic Tunnel Dome for an Auditorium
IRJET- Deisign and Analysis of Geodesic Tunnel Dome for an Auditorium
 
PROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONSPROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONS
 
IRJET- 3D Polysterene Wire Panel Construction System
IRJET- 3D Polysterene Wire Panel Construction SystemIRJET- 3D Polysterene Wire Panel Construction System
IRJET- 3D Polysterene Wire Panel Construction System
 
APPLICATION OF NANOTECHNOLOGY IN CIVIL ENGINEERING
APPLICATION OF NANOTECHNOLOGY IN CIVIL ENGINEERINGAPPLICATION OF NANOTECHNOLOGY IN CIVIL ENGINEERING
APPLICATION OF NANOTECHNOLOGY IN CIVIL ENGINEERING
 
Sandwich Panels Advantages And Disadvantages
Sandwich Panels Advantages And DisadvantagesSandwich Panels Advantages And Disadvantages
Sandwich Panels Advantages And Disadvantages
 
The cables structure system
The cables structure systemThe cables structure system
The cables structure system
 
ASHTECH
ASHTECHASHTECH
ASHTECH
 
plastic Facade- PLOYCARBONATE AND PTFE
plastic Facade- PLOYCARBONATE AND PTFE plastic Facade- PLOYCARBONATE AND PTFE
plastic Facade- PLOYCARBONATE AND PTFE
 
Tensile structures
Tensile structuresTensile structures
Tensile structures
 
Building construction-2 project-2
Building construction-2 project-2Building construction-2 project-2
Building construction-2 project-2
 
Curtain wall111111111111111111111111.ppt
Curtain wall111111111111111111111111.pptCurtain wall111111111111111111111111.ppt
Curtain wall111111111111111111111111.ppt
 

More from Christiody Lim

Theory of urbanism text
Theory of urbanism   textTheory of urbanism   text
Theory of urbanism text
Christiody Lim
 
Theory of urbanism text
Theory of urbanism   textTheory of urbanism   text
Theory of urbanism text
Christiody Lim
 
board
boardboard
Project 1 part 1 stage 2 (Reflective text)
Project 1  part 1 stage 2 (Reflective text)Project 1  part 1 stage 2 (Reflective text)
Project 1 part 1 stage 2 (Reflective text)
Christiody Lim
 
Project 1 part 1 stage 2 (A3 board)
Project 1  part 1 stage 2 (A3 board)Project 1  part 1 stage 2 (A3 board)
Project 1 part 1 stage 2 (A3 board)Christiody Lim
 
Project 1 - Part 1
Project 1 - Part 1Project 1 - Part 1
Project 1 - Part 1
Christiody Lim
 
Structure p2
Structure p2Structure p2
Structure p2
Christiody Lim
 
B.structure report
B.structure reportB.structure report
B.structure report
Christiody Lim
 
Final proposal
Final proposalFinal proposal
Final proposal
Christiody Lim
 
Abstrac1
Abstrac1Abstrac1
Abstrac1
Christiody Lim
 
10 photos aa
10 photos aa10 photos aa
10 photos aa
Christiody Lim
 
Final board services
Final board servicesFinal board services
Final board services
Christiody Lim
 
Ecology and nature
Ecology and natureEcology and nature
Ecology and nature
Christiody Lim
 
Completed aa book compressed
Completed aa book compressedCompleted aa book compressed
Completed aa book compressed
Christiody Lim
 
Ultimatefinalservicereport
UltimatefinalservicereportUltimatefinalservicereport
Ultimatefinalservicereport
Christiody Lim
 
Asian architecture
Asian architectureAsian architecture
Asian architecture
Christiody Lim
 
Nature and architecture ( project 1)
Nature and architecture ( project 1) Nature and architecture ( project 1)
Nature and architecture ( project 1)
Christiody Lim
 
Bcon report final
Bcon report finalBcon report final
Bcon report final
Christiody Lim
 
One city
One cityOne city
One city
Christiody Lim
 

More from Christiody Lim (20)

Theory of urbanism text
Theory of urbanism   textTheory of urbanism   text
Theory of urbanism text
 
Theory of urbanism text
Theory of urbanism   textTheory of urbanism   text
Theory of urbanism text
 
board
boardboard
board
 
Project 1 part 1 stage 2 (Reflective text)
Project 1  part 1 stage 2 (Reflective text)Project 1  part 1 stage 2 (Reflective text)
Project 1 part 1 stage 2 (Reflective text)
 
Project 1 part 1 stage 2 (A3 board)
Project 1  part 1 stage 2 (A3 board)Project 1  part 1 stage 2 (A3 board)
Project 1 part 1 stage 2 (A3 board)
 
Project 1 - Part 1
Project 1 - Part 1Project 1 - Part 1
Project 1 - Part 1
 
Structure p2
Structure p2Structure p2
Structure p2
 
B.structure report
B.structure reportB.structure report
B.structure report
 
Final proposal
Final proposalFinal proposal
Final proposal
 
Abstrac1
Abstrac1Abstrac1
Abstrac1
 
10 photos aa
10 photos aa10 photos aa
10 photos aa
 
Final board services
Final board servicesFinal board services
Final board services
 
Ecology and nature
Ecology and natureEcology and nature
Ecology and nature
 
Completed aa book compressed
Completed aa book compressedCompleted aa book compressed
Completed aa book compressed
 
Ultimatefinalservicereport
UltimatefinalservicereportUltimatefinalservicereport
Ultimatefinalservicereport
 
Asian architecture
Asian architectureAsian architecture
Asian architecture
 
Nature and architecture ( project 1)
Nature and architecture ( project 1) Nature and architecture ( project 1)
Nature and architecture ( project 1)
 
Bcon report final
Bcon report finalBcon report final
Bcon report final
 
Ntu
NtuNtu
Ntu
 
One city
One cityOne city
One city
 

Recently uploaded

AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 

Recently uploaded (20)

AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 

O2 booklet

  • 1. 1 O 2 A R E N A , L O N D O N , U K D a n i e l Ya p C h u n g K i a t 0 3 0 9 1 0 0 C h r i s t i o d y 0 3 0 4 1 9 1 C h i n P u i M a n 0 3 1 0 3 3 1 C h e a n g E i l e e n 1 0 0 6 A 7 7 2 4 9 C h e w W e n L i n 1 0 0 7 C 1 0 6 4 6 A l e x W o n g K a i T z e 0 3 0 3 2 2 8
  • 2. 2 Content Introduction 3 Construction method 5 Advantage and disadvantage 6 Material of the actual building 9 Load distribution analysis 12 Modelling process 13 Analysis od failure/success(process) 17 Final Model 19 Conclusion 20 Reference 21
  • 3. 3 Introduction O2 Arena is a multi-purpose indoor arena located in London, England. It is covered by Millennium Dome, a large white PTFE coated glass-fibre fabric with twelve 100 meter high yellow towers which indicate each month of a year and each hour of the clock face. Millennium Dome was designed and built between 1996 and 1999. The aim of building Millennium Dome was to house Millennium Experience exhibition. The dome was designed as a ten- sioned fabric-and-cable roof by a bunch of architect to provide shelter for the Mil- lennium Experience exhibition. Due to the financial problems, the original exhi- bition and associated complex have been demolished except the dome. Millennium Dome was then sold to the O2 Compa- ny. Currently, the structures under the dome such as arena, basketball court and complex etc. have attract millions of vis- itors. As a large arena in the world which covered by one of the largest dome in the world, it has become the famous venue for concerts and family shows.
  • 4. 4 O2 Arena Builders There are a few architect who design and construct this Arena, O2 Arena, London (Millennium Dome). In addition, they also has consultant for the material used especially the dome’s fabric. Architects, Builders and Consultants Head Architect: Richard Rogers(Head) Concept Architect: Rogers Stirk Harbour + Partners Design Architect: Bblur Architect   Photos + Information: HOK Sport / Populous Engineer: Buro Happold Main Contractor: ISG Group Specialist Fabric Consultant: Base structure This Arena was design by Richard Rogers. He is known for his functional and semi-modernist design flair in UK. There are a few building he had worked on. Building such as Lloyd’s Building and The Court of Human Rights Build- ing in Strasbourg. In addition, he had also won a number of medals and awards. A few example would be The Thomas Jefferson Medal, the Minerva Medal, the RIBA Stirling Prize, and the Pritzker Prize in recognition of his architectural achieve- ments. He is also a partner at the Rogers Stirk Harbour + Partners architecture firm. Introduction
  • 5. 5 Construction Method O2 Are na Surface Structure The entire roof structure of O2 Arena was made up of Thin Shell Structure “Membrane Structure”. Its members are united as 1 homogeneous entity to form the structure and spaces. The membrane is made up of fabric structure and other tensile structure. This kind of construction is also consider as a light weight construction. Considering the surface is a thin and flexible membrane, it has the ability to resist a certain load through the tensile stress from the fabric itself without it being compression or bending. It is the largest in the world with a diameter of 320m (1050 ft.). How it is built The entire fabric is being supported by 72tensioned steel stringer cables paring with 32mm diameter steel spiral strand each for providing tension. The fabric material uses PTFE (polytetrafluoroethylene) - coated fiberglass. The stringers are supported at a radial spacing between 25m and 30m by an arrangement of upper hanger and lower tie-down cables set out around the 12 100m high primary steelwork masts. The string- ers on their radial lines are being kept in place by the circumferential cables. The force from the primary cables produce by rain, snow, wind etc from nature, everything is being collected from the centre by a 30m diameter cable ring. This was built with 12 48mm diameter cables to provide safety against failure or error of cable breakage. At the perimeter, the radial cable forces are collected by 12 curved boundary cables and taken to 24 anchorage points.
  • 6. 6 Advantage & Disadvantage Advantagesofthe designstructure - Extremely light weight - Large span (size) - Minimum amount of structure - An open and unobstructed interior - The low weight of the materials makes construction easier and cheaper than standard design Cost efficiency Depending on the requirement, the shaped fabric under tension is able to reduce the cost of construction by increase its spanned area under tension. In addition, the mem- brane provides both structure and roofing shell. DesignFreedom With the flexible and highly formable systems provided from the tensile fabric mem- brane, this provide the architect to go all out by using conventional construction materi- als. It also improve its functionality by providing a well-designed tensile structure which adds aesthetics to the building. Noise pollution The fabric curved construction method is able to diffuses both internal and external sound and whilst absorbing at the same time.
  • 7. 7 Lowerenergycosts The fabric have high sun reflecting properties and low absorbency of sunlight. Trans- lucent materials provide a comfortable and natural light source by removing all arti- ficial lighting during the daytime. This greatly reduces the solar energy and heat that enters the structure. The woven base cloth combined with the appropriate coating allows a light transmission value of around 10%. This provides a very comfortable level of illumination compared to the full brightness of outside. Semi-permanent nature Tension membrane structures ‘historically’ have been closely tied to major events such as exhibitions, where shelters are needed for short periods of time. Tension Fabric structures can be easily designed for rapid relocation and re-erection; mak- ing them perfect for high impact event structures. Not only does this help with practicality it also helps with planning permission for fixed term structures as they are classed by most authorities as semi- permanent structures. Advantage & Disadvantage
  • 8. 8 Disadvantages - Poor performance • Thermal • Acoustic - Exterior moisture and dehumidifier and address condensation Difficult making meaningful connections If there is no suitable structure within the existing building, it would be difficult to make any meaningful connections to that building for a tensile canopy, but sufficient anchor- age might be achieved for a rigid type of construction. That said, it is nearly always pos- sible to design the canopy in such a way that it imposes identical loads onto a building as a rigid canopy structure would, but in these cases, the cost of the additional engineer- ing, steel fabrication and installation difficulties is likely to make it an uneconomical solution. Easy to be damaged Fabric structures, if properly engineered and installed are virtually immune to damage and weather properties. Providing that they are not likely to be vandalize or damage, they provide a reassuringly simple and durable solution. Difficulty of Maintenance Dirt can be clearly seen glass or polycarbonate, however the light diffusing properties of the fabric mean that the surface dirt is not easily identified. It’s quite surprising how Advantage & Disadvantage
  • 9. 9 Material Materials for Millennium Dome (O2 Arena) PTFE (polytetrafluroethlyene) coated glass fibre fabric PTFE coated glass fibre fabric is a dynamic tensile material unmatched for its aesthetics and durability making it ideal for large scale roof and tensile membrane structures. It is used for cladding the dome of O2 Arena. It has the properties of high durability and flame resistance. Usually, this kind of glass fibres are not af- fected by UV light but they are easily damaged by the water. Hence, a PTFE coating is needed to be applied on it. The function of this coating is to protect the fibre from water and abrasion. However, the PTFE itself is complete- ly inert and not affected by the weather. In all words, PTFE coated glass fibre has a longer life span and avoids the problem of dirt retention and discoloration. This is why it always stay looking clean.
  • 10. 10 Reinforced concrete Reinforcedconcreteisacompositematerialwhicharecounteractedbytheinclusion ofreinforcement, having high compressive and tensile strength. In fact, there are 24 spots of reinforced concrete which we can find around the O2 Arena, standing on top of the ground and are attached to main cables of this building. It has been used as an anchorage points to support the whole structure. Con- crete, if unreinforced, is notorious for cracking easily at any sourced of stress. It will cracks at all thickenings, ends of embedded steel and even down the middle of aisles. Hence, it has to undergo several retrofitting, like reinforcing the concrete by adding steel rods to the concrete mixture, allowing concrete to set solid. The steel rods ensures that reinforced concrete can withstand tensile forces and hence, it become a versatile and composite material.  Rubber The aim of using rubber for this building is to achieve a maximum of weight saving in individual components and parts. Rubber offer a considerable poten- tial due to its low density and flexibility compared with metal counterparts. At the bottom of each 12 masts, there is a rubber pot bearing with a single locating bolt. The bearing allows slight rotation of the mast at the connection point with the pyramid. Usage of rubber at the pot bearing helps to improve resistance to surface crac king due to higher binder of contents. At the same time, it also helps in improving the aging and oxidation resistance of surface construction Material
  • 11. 11 Steel In O2 Arena, steel is used mainly for its roof construction. Arranged radially over the fabric surface area the 72 tensioned steel stringer cables in pairs of 32mm diameter steel spiral strand. The stringers are supported at a radi- al spacing between 25 and 30m by an arrangement of upper hanger and lower tie-down cables set out around the twelve 100m high primary steelwork masts. All these masts, jut out from the fabric ceil- ing, representing the months of the year and the hours on a clock face. On the other hand, the upper hangar, the lower tie-down cables carry the loads from the fabric down to the ground when loaded by wind or snow. The dome, was made up of the light- est steel which are specified for the cables beneath the roof, while a more durable mixture of alumin- ium and zinc(of steel), is used for galvanizing the external cables. Steel, is well known for its inherent strength which enables architectural and design flex- ibility. Hence, it is very suitable to be used for O2 Arena. Material
  • 12. 12 Force transfer from the dome through the tensioned steel stringer cable to the 12 steel masts. Force transfer to the ground through the steel masts. Compression force from the ground to withstand the load and weight from the steel masts. Load Distribution Analysis
  • 13. 13 Modelling Process 1) First try out and locating the steel structure in between which are sim- ilar to the actual model to check the proportion. 2) First try on making the structure to locate the fabric. Using hot glue gun to stick the steel wires to form dome structure. 3) After doing some measurement of the fabric according to the propor- tion of the model, we draw it on the material we prepared.
  • 14. 14 Modelling Process 4) After doing some measurement of the fabric according to the propor- tion of the model, we draw it on the material we prepared. 5) After drawing the line on the table cloth, we stitch according to the line drawn. 6) After doing some measurement of the fabric according to the propor- tion of the model, we draw it on the material we prepared.
  • 15. 15 Modelling Process 7) Reforming the steel structure by us- ing the new method we find. 8) When making the base of the steel structure, we apply water on the pa- per clay so that we are able to form the smooth surface. 9) Waiting for the paper clay to dry up so that we can apply colour spray on it.
  • 16. 16 Modelling Process 10) We spray the steel structure after the paper clay base dry . 11) For the detailing parts, we use screw and nuts, zinc plate, paper clay and steel cable etc for constructing the base details according to what we analyse.
  • 17. 17 Failure/Success Method of Construction - We try a few different method to bring out the best product such as even using needle and string to steel and wire cable. This is to bring out the not just the tex ture but also the feeling towards the real O2 Arena, London. Some of us don’t know how to needle or threat and some of us even give up mid way bec ause of the confusion and tangling in midway. Even though it may look easy but when we try it, it is not as easy as it looks. In addition we not only have 1 but the entire roof is made of fabric and method of connection closest to the real thing is sew- ing method. Untidiness The glue we used makes the steel dirty and cloudy. It is not as good looking as it was and it changes the texture of the material.
  • 18. 18 Failure/Success Connection -Based on the experiment we have mad, solder wire melting method or using hot glue gun for connec- tion is not working due to the materials properties. Besides that, w e also don’t have the welding tools to connect the steel wire. Fail to use hot glue gun Problem Facing Materials - We are unable to decide the most suitable material to represent the materials used in the construction. After few try-outs, we decide to choose something that have the similar texture and coloration. In addition, the ma- terial we are able to find is limited because some of the materials are not affordable as the economy as a student is limited and there is no separate parts sold. Tablecloth Screws and nuts
  • 20. 20 Conclusion After the entire project, we notice that even the smooth surface has its own benefits and speciality. As for the O2 Arena, London, we realize that the entire structure is mostly made from steel and fabric. In addition, the building doesn’t have much fenestration compare to other arena or stadium. What makes this building so special is because the entire structure is built within a building and the amount of ener- gy it is able to save.
  • 21. 21 Reference Link: Michael mattan (n.d.). Millennium Dome in London - TensiNet. Retrieved June 15, 2014, from http://www.tensinet.com/database/viewProject/3782 Rogers Stirk Harbour (n.d.). Facts - Millennium Experience. Retrieved June 10, 2014, from http://www.rsh-p.com/work/buildings/millennium_experience Millennium Dome. (2014, June 9). Retrieved from http://www.princeton.edu/~achaney/tmve/wiki100k/docs/Millennium_Dome.html Encyclopædia Britannica, Inc. (n.d.). Millennium Dome (building, Greenwich, London, United Kingdom) -- Encyclopedia Britannica. Retrieved June 16, 2014, from http://global.britannica.com/EBchecked/topic/382742/Millennium-Dome O2 Arena and Millennium Dome - Buro Happold. (n.d.). Retrieved June 16, 2014, from http://www.burohappold.com/projects/project/o2-arena-and-millennium-dome-65/ Artifice, Inc. (n.d.). Millennium Dome - Richard Rogers - Great Buildings Architecture. Retrieved June 15, 2014, from http://www.greatbuildings.com/buildings/Millennium_Dome.html Industrial Fabrics Association International (n.d.). Millennium Dome—What’s up with that? - Fabric Architecture. Retrieved June 14, 2014, http://fabricarchitecturemag.com/articles/0910_f3_millennium_dome_update.html O2 Arena London, London Venue, O2 Arena Venue | e-architect. (n.d.). Retrieved June 16, 2014,from http://www.e-architect.co.uk/london/o2-arena Reference