UBBL – Pipe and Service Duct
By Law – 84
Suitable measures should be taken to prevent penetration of dampness and moisture inside
the building
By Law – 123
Adequate spaces to accommodates pipes, stop cocks to allow repair, modification, extension,
maintenance and access to ducts or enclosure.
Sufficient amount of valves are used in different pipe locations, allow easier repairing and
maintenance of system
Water tank situated on rooftop level, allowing gravity force to channel water to entire building
without needing support to restore
Electrical By-Laws
Electrical Supply ACT 197 ( ACT 1447)
Regulation 15 : Apparatus, Conductor, Accessory, etc.
Any conductor or apparatus that is exposed to weather, water, corrosion under heating
or used in inflammable surroundings or in an explosive atmosphere shall be
constructed or protected in such as manner as to prevent danger
Regulation 16 : Switch fuse Switch , Circuit Breaker, Contractor, Fuse, etc.
3) Any fuse or Circuit breaker shall be :
(a) Constructed and arranged in such a manner so as to break the current when it
exceeds a given value for such as sufficient time to prevent danger
(b) Constructed guarded or placed in a manner as to prevent danger or overheating
arcing or from the scattering of hot metal or other substances or enclosure
Electrical System Cold and Hot Water Supply System
Schematic diagram of Cold and Hot water Supply system
Ground Floor Plan
N.T.S
First Floor Plan
N.T.S
Ground Floor Plan
N.T.S
First Floor Plan
N.T.S
CHRISTIODY ( 0304191)
Sewerage System By-Laws
Law of Malaysia ACT 133
No water pipe, stack pipe or down spout to be used for conveying surface water from any
premises shall be used or permitted to serve or to act as ventilating shaft to any drain or
sewer
Separation of pipe usage between soil waste and ventilating pipe to ensure efficiency and
sanitary of building. It also ensure the safety from the health threat to occupant
UBBL – Drainage system
All roof of building shall be constructed as to drain effectively to suitable and sufficient
channels, gutter, chutes, or thoughts which shall be provided in accordance with the
requirements of these by laws for receiving and conveying all water which may fall on and
off from the roof.
Sewerage System Drainage and Storm System
Sump Down Pour pipe Gutter
Component :
Ground Floor Plan
N.T.S
Roof Plan
N.T.S
Schematic diagram of Drainage and storm
water system
CHRISTIODY ( 0304191)
First Floor Plan
N.T.S

More Related Content

Similar to Final board services

A2 colour service p2
A2 colour service p2A2 colour service p2
A2 colour service p2
Teo Kean Hui
 
Project 2 building services anith (2)
Project 2 building services anith (2)Project 2 building services anith (2)
Project 2 building services anith (2)
Anith Syazlin
 
B service project 2
B service project 2B service project 2
B service project 2
- -
 
Project 2 finallllllll
Project 2 finallllllllProject 2 finallllllll
Project 2 finallllllll
Noor Syahirah Abdul Aziz
 
Project 2 final
Project 2 finalProject 2 final
Project 2 final
Noor Syahirah Abdul Aziz
 
Journal with Drawings
Journal with DrawingsJournal with Drawings
Journal with Drawings
Nik Munawwar Nik Din
 
School Services
School ServicesSchool Services
School Services
Ashraf Ahmad
 
Bs2
Bs2Bs2
Bs2
Bs2Bs2
Building Services Project 2: How Seng Guan
Building Services Project 2: How Seng GuanBuilding Services Project 2: How Seng Guan
Building Services Project 2: How Seng Guan
shacjhow
 
B.Service Report
B.Service ReportB.Service Report
B.Service Report
KimberlyAussie
 
b service project 2
b service project 2 b service project 2
b service project 2
Pei Di
 
SERVICES
SERVICESSERVICES
SERVICES
saikamal ck
 
Project 2 building service
Project 2  building serviceProject 2  building service
Project 2 building service
Ong Shi Hui
 
plumbing principles.pdf
plumbing principles.pdfplumbing principles.pdf
plumbing principles.pdf
VigneshWaran770976
 
Diary Report
Diary ReportDiary Report
Diary Report
Chong Chin Pin
 
Electrical Safety - Class.ppt
Electrical Safety - Class.pptElectrical Safety - Class.ppt
Electrical Safety - Class.ppt
amit173203
 
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
Anonymouscj7JdRbDb
 
Building services project2
Building services project2Building services project2
Building services project2
Jy Chong
 
plumbing ppt.pptx
plumbing ppt.pptxplumbing ppt.pptx
plumbing ppt.pptx
shashanksreddy
 

Similar to Final board services (20)

A2 colour service p2
A2 colour service p2A2 colour service p2
A2 colour service p2
 
Project 2 building services anith (2)
Project 2 building services anith (2)Project 2 building services anith (2)
Project 2 building services anith (2)
 
B service project 2
B service project 2B service project 2
B service project 2
 
Project 2 finallllllll
Project 2 finallllllllProject 2 finallllllll
Project 2 finallllllll
 
Project 2 final
Project 2 finalProject 2 final
Project 2 final
 
Journal with Drawings
Journal with DrawingsJournal with Drawings
Journal with Drawings
 
School Services
School ServicesSchool Services
School Services
 
Bs2
Bs2Bs2
Bs2
 
Bs2
Bs2Bs2
Bs2
 
Building Services Project 2: How Seng Guan
Building Services Project 2: How Seng GuanBuilding Services Project 2: How Seng Guan
Building Services Project 2: How Seng Guan
 
B.Service Report
B.Service ReportB.Service Report
B.Service Report
 
b service project 2
b service project 2 b service project 2
b service project 2
 
SERVICES
SERVICESSERVICES
SERVICES
 
Project 2 building service
Project 2  building serviceProject 2  building service
Project 2 building service
 
plumbing principles.pdf
plumbing principles.pdfplumbing principles.pdf
plumbing principles.pdf
 
Diary Report
Diary ReportDiary Report
Diary Report
 
Electrical Safety - Class.ppt
Electrical Safety - Class.pptElectrical Safety - Class.ppt
Electrical Safety - Class.ppt
 
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
 
Building services project2
Building services project2Building services project2
Building services project2
 
plumbing ppt.pptx
plumbing ppt.pptxplumbing ppt.pptx
plumbing ppt.pptx
 

More from Christiody Lim

Theory of urbanism text
Theory of urbanism   textTheory of urbanism   text
Theory of urbanism text
Christiody Lim
 
Theory of urbanism text
Theory of urbanism   textTheory of urbanism   text
Theory of urbanism text
Christiody Lim
 
board
boardboard
Project 1 part 1 stage 2 (Reflective text)
Project 1  part 1 stage 2 (Reflective text)Project 1  part 1 stage 2 (Reflective text)
Project 1 part 1 stage 2 (Reflective text)
Christiody Lim
 
Project 1 part 1 stage 2 (A3 board)
Project 1  part 1 stage 2 (A3 board)Project 1  part 1 stage 2 (A3 board)
Project 1 part 1 stage 2 (A3 board)Christiody Lim
 
Project 1 - Part 1
Project 1 - Part 1Project 1 - Part 1
Project 1 - Part 1
Christiody Lim
 
Structure p2
Structure p2Structure p2
Structure p2
Christiody Lim
 
B.structure report
B.structure reportB.structure report
B.structure report
Christiody Lim
 
Final proposal
Final proposalFinal proposal
Final proposal
Christiody Lim
 
Abstrac1
Abstrac1Abstrac1
Abstrac1
Christiody Lim
 
10 photos aa
10 photos aa10 photos aa
10 photos aa
Christiody Lim
 
Ecology and nature
Ecology and natureEcology and nature
Ecology and nature
Christiody Lim
 
Completed aa book compressed
Completed aa book compressedCompleted aa book compressed
Completed aa book compressed
Christiody Lim
 
Ultimatefinalservicereport
UltimatefinalservicereportUltimatefinalservicereport
Ultimatefinalservicereport
Christiody Lim
 
Asian architecture
Asian architectureAsian architecture
Asian architecture
Christiody Lim
 
Nature and architecture ( project 1)
Nature and architecture ( project 1) Nature and architecture ( project 1)
Nature and architecture ( project 1)
Christiody Lim
 
O2 booklet
O2 bookletO2 booklet
O2 booklet
Christiody Lim
 
Bcon report final
Bcon report finalBcon report final
Bcon report final
Christiody Lim
 
One city
One cityOne city
One city
Christiody Lim
 

More from Christiody Lim (20)

Theory of urbanism text
Theory of urbanism   textTheory of urbanism   text
Theory of urbanism text
 
Theory of urbanism text
Theory of urbanism   textTheory of urbanism   text
Theory of urbanism text
 
board
boardboard
board
 
Project 1 part 1 stage 2 (Reflective text)
Project 1  part 1 stage 2 (Reflective text)Project 1  part 1 stage 2 (Reflective text)
Project 1 part 1 stage 2 (Reflective text)
 
Project 1 part 1 stage 2 (A3 board)
Project 1  part 1 stage 2 (A3 board)Project 1  part 1 stage 2 (A3 board)
Project 1 part 1 stage 2 (A3 board)
 
Project 1 - Part 1
Project 1 - Part 1Project 1 - Part 1
Project 1 - Part 1
 
Structure p2
Structure p2Structure p2
Structure p2
 
B.structure report
B.structure reportB.structure report
B.structure report
 
Final proposal
Final proposalFinal proposal
Final proposal
 
Abstrac1
Abstrac1Abstrac1
Abstrac1
 
10 photos aa
10 photos aa10 photos aa
10 photos aa
 
Ecology and nature
Ecology and natureEcology and nature
Ecology and nature
 
Completed aa book compressed
Completed aa book compressedCompleted aa book compressed
Completed aa book compressed
 
Ultimatefinalservicereport
UltimatefinalservicereportUltimatefinalservicereport
Ultimatefinalservicereport
 
Asian architecture
Asian architectureAsian architecture
Asian architecture
 
Nature and architecture ( project 1)
Nature and architecture ( project 1) Nature and architecture ( project 1)
Nature and architecture ( project 1)
 
O2 booklet
O2 bookletO2 booklet
O2 booklet
 
Bcon report final
Bcon report finalBcon report final
Bcon report final
 
Ntu
NtuNtu
Ntu
 
One city
One cityOne city
One city
 

Recently uploaded

WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 

Recently uploaded (20)

WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 

Final board services

  • 1. UBBL – Pipe and Service Duct By Law – 84 Suitable measures should be taken to prevent penetration of dampness and moisture inside the building By Law – 123 Adequate spaces to accommodates pipes, stop cocks to allow repair, modification, extension, maintenance and access to ducts or enclosure. Sufficient amount of valves are used in different pipe locations, allow easier repairing and maintenance of system Water tank situated on rooftop level, allowing gravity force to channel water to entire building without needing support to restore Electrical By-Laws Electrical Supply ACT 197 ( ACT 1447) Regulation 15 : Apparatus, Conductor, Accessory, etc. Any conductor or apparatus that is exposed to weather, water, corrosion under heating or used in inflammable surroundings or in an explosive atmosphere shall be constructed or protected in such as manner as to prevent danger Regulation 16 : Switch fuse Switch , Circuit Breaker, Contractor, Fuse, etc. 3) Any fuse or Circuit breaker shall be : (a) Constructed and arranged in such a manner so as to break the current when it exceeds a given value for such as sufficient time to prevent danger (b) Constructed guarded or placed in a manner as to prevent danger or overheating arcing or from the scattering of hot metal or other substances or enclosure Electrical System Cold and Hot Water Supply System Schematic diagram of Cold and Hot water Supply system Ground Floor Plan N.T.S First Floor Plan N.T.S Ground Floor Plan N.T.S First Floor Plan N.T.S CHRISTIODY ( 0304191)
  • 2. Sewerage System By-Laws Law of Malaysia ACT 133 No water pipe, stack pipe or down spout to be used for conveying surface water from any premises shall be used or permitted to serve or to act as ventilating shaft to any drain or sewer Separation of pipe usage between soil waste and ventilating pipe to ensure efficiency and sanitary of building. It also ensure the safety from the health threat to occupant UBBL – Drainage system All roof of building shall be constructed as to drain effectively to suitable and sufficient channels, gutter, chutes, or thoughts which shall be provided in accordance with the requirements of these by laws for receiving and conveying all water which may fall on and off from the roof. Sewerage System Drainage and Storm System Sump Down Pour pipe Gutter Component : Ground Floor Plan N.T.S Roof Plan N.T.S Schematic diagram of Drainage and storm water system CHRISTIODY ( 0304191) First Floor Plan N.T.S