CONTENTS
Definition Relevance in healthcare Traditional vs Modern techniques
Description of each technique Classification
Challenges
References
"The first rule of management is delegation. Don't try and do everything yourself because you can't." ā€”
Anthea Turner
Estimated time: 90-120 minutes
2
ā€œManagement is getting the right things done
ļ‚§ in right way,
ļ‚§ in right time,
ļ‚§ by right persons,
ļ‚§ with right amount of resources and
effective use of resources.ā€
MANAGEMENT
It is the efficient use of resources and to get people to work harmoniously
together in order to achieve objective 3
Applications of management techniques
Marketing
Operations
Finance Human Resource
Information Technology
Management Science
4
Why we need management in healthcare? 5
"Management is the opportunity to help people become better people. Practiced that way, it's a
magnificent profession" ā€” Clayton Christenson
RELEVANCE IN HEALTHCARE
ā€¢ Overlapping, conflicting and competing organizations within Health system
ā€¢ Widely scattered funding mechanism with little control over costs
ā€¢ Decisions on the mixture of facilities and services without reference to population
need and with no information about those who do not use the services
ā€¢ It has been proved that these techniques are useful in increasing the efficiency
by cost reduction as well as ensuring better health care
6
Traditional vs Modern Management Techniques
Based on behavioral sciences
(Personnel selection, training & retraining,
motivational methods, leadership
development, supervision etc..)
TRADITIONAL MODERN
Based on sociology, psychology, educational
technology, economics and statistics
Needed for larger and complicated organizations
with their own unique organizational and
structural issues
The conventional methods of management
are no longer adequate to meet the
demand of todayā€™s projects
7
Classification of
MMT
01
02
03
04
05 Miscellaneous
Financial techniques
Mathematical techniques
Activity analysis
Statistical techniques
Miscellaneous
Financial techniques
Statistical techniques
Activity analysis
Mathematical techniques
1) Time trends and forecasting
2) Decision theory and tree
1) Time and Motion study
2) Work sampling and activity analysis
3) Queuing theory
4) Gantt chart and work schedule
1) Simulation study/ model
2) System analysis
3) Linear programming
4) Inventory control
5) Network analysis
6) PERT
7) CPM
9
Miscellaneous
Financial techniques
1) Cost accounting and analysis
2) Cost Benefit Analysis
3) Cost Effective Analysis
4) Zero base budgeting
5) Input output analysis
1) Management by exception
2) Situation analysis
3) SWOT Analysis
4) Log frame Analysis
10
Statistical techniques
11
TIME TRENDS AND FORECASTING
(Eg: Seasonal trend, Cyclical trend, Secular trend)
Based on past experience, predictions can be made about
the expected occurrence, by using mathematical methods
(Eg: Demographers made projections about population,
epidemiologists anticipation of epidemic)
Based on information on occurrence of certain events, certain patterns can be recognized
12
DECISION TREE A decision tree is a flowchart that starts with
one main idea and then branches out based on
the consequences of your decisions
Itā€™s called a ā€œdecision treeā€ because the model
typically looks like a tree with branches
It enables people to decompose a large complex
decision problem into several smaller problems
13
Types of environment:
1. Decision making under certainty
2. Decision making under uncertainty
3. Decision making under risk
Decision tree
A method for determining the optimal course of action when a number of alternatives
are available and their consequences cannot be forecast with certainty
14
DECISION TREE SYMBOLS
ā€¢Decision nodes: Squares that represent a decision being made on tree.
Every decision tree starts with a decision node.
ā€¢Alternative branches: Lines that branch out from decision node. These
branches show two outcomes that stem from the initial decision.
ā€¢Chance nodes: Circles that show multiple possible outcomes.
ā€¢End nodes: Triangles that show a final outcome.
15
Decision node
Chance nodes
End nodes
Alternative branches
16
Surgery
Drug
Disease absent
Disease present
Disease present
Disease absent
Survive
Operative death
Cure
No cure
Curative
Palliative
Survive
Operative death
Cure
No cure
Survive
Operative death
Cure
No cure
17
Surgery
Drug
Disease absent
Disease present
Disease present
Disease absent
Survive
Operative death
Cure
No cure
Curative
Palliative
Survive
Operative death
Cure
No cure
Survive
Operative death
Cure
No cure
Each path through the tree defines a unique potential result
18
Surgery
Drug
Disease absent
Disease present
Disease present
Disease absent
Survive
Operative death
Cure
No cure
Curative
Palliative
Survive
Operative death
Cure
No cure
Survive
Operative death
Cure
No cure
10%
10%
90%
90%
90%
90%
90%
90%
99%
98%
10%
1%
10%
2%
10%
10%
Insert probabilities at each chance node based on data
from literature, modeling, expert judgment, etc.
19
Surgery
Drug
Disease absent
Disease present
Disease present
Disease absent
Survive
Operative death
Cure
No cure
Curative
Palliative
Survive
Operative death
Cure
No cure
Survive
Operative death
Cure
No cure
10%
10%
90%
90%
90%
90%
90%
90%
99%
98%
10%
1%
10%
2%
10%
10%
Assign a value to the outcome at each end points
20 LY
0 LY
20 LY
20 LY
2 LY
0 LY
0 LY
20 LY
20 LY
2 LY
2 LY
Average outcome:
Operative death = 0 LY
Death from progression of disease = 2 LY
Cure = 20 LY
20
Surgery
Drug
Disease absent
Disease present
Disease present
Disease absent
Survive
Operative death
Cure
No cure
Curative
Palliative
Survive
Operative death
Cure
No cure
Survive
Operative death
Cure
No cure
10%
10%
90%
90%
90%
90%
90%
90%
99%
98%
10%
1%
10%
2%
10%
10%
20 LY
0 LY
20 LY
20 LY
2 LY
0 LY
0 LY
20 LY
20 LY
2 LY
2 LY
Compute average results, working from right to left
Average LY
= 10% (20) + 90% (2)
= 3.8 LY
21
Surgery
Drug
The outcome for each decision is more apparent now
19.46 LY
18.38 LY
Surgery (intending cure) produces average of 19.46 LY
Medical management yields an average of 18.38 LY
The incremental benefit of surgery versus medical
management is 19.46 ā€“ 18.38 = 1.08 LY
22
ā€¢ Simple to understand and interpret
ā€¢ Useful to analyze the possible outcomes of complex decisions
ā€¢ Possible scenarios can be added
ā€¢ Most rational decision is taken in terms of resource and effectiveness
ā€¢ Worst, best and expected values can be determined for different scenarios
ADVANTAGES OF DECISION TREES
23
Miscellaneous
Financial techniques
Statistical techniques
Activity analysis
Mathematical techniques
1) Time trends and forecasting
2) Decision theory and tree
1) Time and Motion study
2) Work sampling and activity analysis
3) Queuing theory
4) Gantt chart and work schedule
1) Simulation study/ model
2) System analysis
3) Linear programming
4) Inventory control
5) Network analysis
6) PERT
7) CPM
24
Activity analysis
25
BASIS TIME STUDY MOTION STUDY
Meaning
Time study is conducted to find
out the standard time for
performing a task
Motion study is conducted to find out
total movements of workers while they
are performing the task
Purpose
To find out standard time to fix
dayā€™s work for the workers
To eliminate wasteful and unproductive
movements of workers to increase their
efficiency level
Method of
conducting
It is conducted with the help of a
stopwatch
It is conducted with the help of a moving
camera which keep eyes on movements
ā€œTime is what we want most but what we use worstā€ ā€“ William Penn
TIME AND MOTION STUDY
26
Modification: One servant from the central lab goes to different ward with trolley
at predetermined time. Reports delivered in same way
Example: From each ward, lab samples are sent with a servant to central
laboratory. Servants take excessive time to return
ADVANTAGES
ā€¢ Reduction of physical effort
ā€¢ Time saving
ā€¢ Increase productivity
27
Work sampling is a method of finding the percentage occurrence of a certain activity
by statistical sampling and random observations
WORK SAMPLING
Technique in which a large number of instantaneous observations are made at random intervals over
a specified period of time on a group of workers machines and processes
Each observation records what is happening at that instant (Working/ Not working)
The percentage of observations recorded for a particular activity is the measure of
percentage of time during which that activity occurs
28
STEPS
ā€¢ Determine the main objective of the study
ā€¢ Define each activity to be measured
ā€¢ Obtain the approval of the supervisor of the department where work sampling is to be
performed
ā€¢ State the desired accuracy limits for the ultimate RESULTS
ā€¢ Conduct a pilot study to
i. Estimate the approximate percentage occurrence of the activity (p)
ii. Estimate the required number of observations for the desired accuracy set
iii. Ensure that the workers have become habitual to the visits of work study engineer
ā€¢ Design the actual study
ā€¢ Calculate the number of observations (N) to be made by using the following formula N = 4pq/L2
29
ADVANTAGES
ā€¢ Work sampling is a low cost alternative to continuous monitoring, just as sampling
in the audit context is a low cost alternative to 100% evaluation of an account
ā€¢ A simultaneous work sampling of several operators or machines can be made by a
single observer
Ex: There is complain that nursing officers are working only 70% of their duty time in wards
Number of observations required for work sampling (N) = 4 (0.7) (0.3)/ (0.05)2 = 336
Results: Nursing officers were seen working on 252 observations (=75% of the time)
Out of the total working time, 35% were spent on bedside and 65% on clerical ward work
30
QUEUING THEORY
31
32
ā€¢ Queuing theory was first introduced in the early 20th century
by Danish mathematician and engineer Agner Krarup Erlang.
ā€¢ Erlang worked for the Copenhagen Telephone Exchange and
wanted to analyze and optimize its operations.
ā€¢ He sought to determine how many circuits were needed to
provide an acceptable level of telephone service, for people
not to be ā€œon holdā€ (or in a telephone queue) for too long.
ā€¢ Also to find out how many telephone operators were needed
to process a given volume of calls.
ā€¢"Start with the end in mind." ā€” Stephen Covey 33
His mathematical analysis
culminated in his 1920 paper
ā€œTelephone Waiting Timesā€, which
served as the foundation of applied
queuing theory. The international
unit of telephone traffic is called the
Erlang in his honor.
34
Queuing theory is a mathematical approach applied to the analysis of waiting lines
At its core, a queuing situation involves two parts
Someone who requests a service Someone who delivers the service
Customer Server
Doctor
35
Cost associated with patients having to wait for service
ā€¢ Loss of business to HCO.
ā€¢ Costs incurred by society.
ā€¢ Decreased patient satisfaction and quality of care.
Cost of providing the services (capacity cost)
ā€¢ Salaries paid to employees.
ā€¢ Salaries paid to employees or servers while they wait for service from other
server, for eg: waiting for the pathology report, radiology report, labs, etc.
ā€¢ Fixed costs ā€“ cost of waiting space, facilities, equipment, and supplies.
COSTS OF WAITING IN LINES OR QUEUE
36
ā€¢"It's easy to solve a problem that everyone sees, but it's hard to solve a problem that almost no one sees."
ā€” Tony Fadell
Arrival rate
Customers
Queue discipline Service rate
Queue Service facility Served customers
Queuing theory scrutinizes the entire system of waiting in line, including elements like
customer arrival rate, number of servers, number of customers, capacity of the waiting area,
average service completion time, and queuing discipline.
37
The Gantt chart can also include the start and end dates of
tasks, milestones, dependencies between tasks, and
assignees.
GANTT CHART
Devised by Henry Gantt, an
American engineer and
project management
consultant
A project management tool that illustrates work completed over
a period of time in relation to the time planned for the work
It typically includes two sections:
ā€¢ Left side outlines a list of tasks
ā€¢ Right side has a timeline with schedule bars that visualize work
38
CHARACTERISTICS
39
ā€¢ The bar in each row identifies the corresponding task
ā€¢ The horizontal position of the bar identifies start and end times of the task
ā€¢ Bar length represents the duration of the task
ā€¢ Task durations can be compared easily
ā€¢ Good for allocating resources and re-scheduling
ā€¢ Precedence relationships can be represented using arrows
ā€¢ Critical activities are usually highlighted
ā€¢ Slack times are represented using bars with doted lines
ā€¢ The bar of each activity begins at the activity earliest start time (ES)
ā€¢ The bar of each activity ends at the activity latest finish time (LF).
Choose research area
Preliminary research
Decide research topic
Decide methodology
Submit/present proposal
Finalize methodology
Conduct research
Analyze data
Write up
Submit assignment
10 11 12 13 14 15 16 17 18 19 20
9
8
7
6
5
4
DURATION (in weeks)
40
Miscellaneous
Financial techniques
Statistical techniques
Activity analysis
Mathematical techniques
1) Time trends and forecasting
2) Decision theory and tree
1) Time and Motion study
2) Work sampling and activity analysis
3) Queuing theory
4) Gantt chart and work schedule
1) Simulation study/ model
2) System analysis
3) Linear programming
4) Inventory control
5) Network analysis
6) PERT
7) CPM
41
Mathematical techniques
42
SYSTEM ANALYSIS
ā€¢ Set of objectives to be achieved is defined and alternatives to
achieve these are formulated
ā€¢ Alternatives are evaluated in terms of cost-effectiveness
ā€¢ Mathematical models may be used
43
Study of inter relationships operating in the various components
within a system and also between a system and other systems
System: An arrangement and set of relationships among multiple parts functioning as a whole
LINEAR PROGRAMMING
44
It is a useful tool for deciding the course of action for a problem in which there are
competing alternatives uses for limited resources
Mathematical tool where components of a system and its constraints are depicted in a
linear equation and the desirable combination of activities with regard to certain given
set of objectives and constraints is arrived
Linear Programming (LP) problems are optimization problems in which the objective
function and the constraints are all linear
A Company manufacturers two types of drugs A and B. Each product uses Machine X and
Machine Y. The process time per unit of drug a on Machine X is 10 hours and on the
Machine Y is 8 hours. The processing time per unit of drug B on Machine X is 15 hours and
on the Machine Y is 10 hours. The maximum number of hours available per week on
Machine X and Machine Y are 80 hours and 60 hours respectively. Also the profit per unit of
selling Drug A and Drug B are Rs 25 and Rs 35 respectively. Formulate a LP model to
determine the production volume of each of the drugs such that total profit is maximized.
45
46
Machine
Machine hours/ unit Limit on
machine
hours
Drug A Drug B
Machine X 10 15 80
Machine Y 8 10 60
Profit/ unit (Rs) 25 35
Maximize Z = 25(A) + 35 (B)
10 (A) + 15 (B) ā‰¤ 80
8 (A) + 10 (B) ā‰¤ 60
A and B ļ‚³ 0
ABC
analysis
VED
analysis
SDE
analysis
FNSD
analysis
HML
analysis
XYZ
analysis
SOS
analysis
Types
Method of maintaining of stock at a
level at which purchasing and storing
costs are the lowest possible without
interference with supply
Objective : To maintain optimum stock
INVENTORY
MANAGEMENT
47
ABC METHOD
ITEM % COST %
A 10% 70%
B 20% 20%
C 70% 10%
A items: Less quantity; more resources
ā€¢ Tight control
ā€¢ Rigid estimate of requirement
ā€¢ Strict & closer watch
ā€¢ Low safety stock
ā€¢ Managed by top management
Also known as ā€˜Proportional Part Valueā€™ method
C items: More quantity; less resources
ā€¢ Ordinary control measures
ā€¢ Purchase based on usage estimates
ā€¢ High safety stocks
Different items categorized into three
groups based on annual expenditure
incurred on these items
48
V = Vital life saving drugs
(Absence of which cannot be tolerated)
E = Essential items
(Absence can be tolerated for a short time period)
D = Desirable
(Non availability can be tolerated for a longer period)
VED Analysis
Based on criticality in patient care
49
A
B
C CV CE CD
BV
AV
V E D
AD
BD
BE
AE Category I
Category II
Category III
Close monitoring & control
Combination of ABC & VED
Analysis
Moderate control
No control needed
CV CE CD
BV
AV AD
BD
BE
AE
50
It looks at quantity, consumption rate and how often the item is issued and used
F = Fast moving (needs constant monitoring)
N = Normal moving (consumed on regular basis; purchased once or twice a year)
S = Slow moving (periodically reviewed to prevent expiry & obsolescence)
D = Dead stock (Items which is no longer required)
FNSD Analysis
Inventories are classified on the basis of productā€™s unit price
H = High value of inventories (High cost)
M = Medium value of inventories (Medium cost)
L = Low value of inventories (Low cost)
HML Analysis
51
Materials are categorized based on the nature of supply
Seasonal and Off-Seasonal materials
Helps to manage purchases and storage of materials which are seasonal in nature
SOS Analysis
Classification is based on the scarcity of supply
This technique handles problem faced in lead time analysis and purchasing strategies
S ā€“ Scarce (imported; longer time to arrive; supply irregular)
D ā€“ Difficult to procure
E ā€“ Easy to procure
SDE Classification
52
Materials are categorized according to variability of their demand or forecasted consumption
X ā€“ Very little variation (future demand can be reliably forecasted)
Y ā€“ Some variation (demand can be predicted to some extent)
Z ā€“ Most variation (demand forecasting is impossible)
XYZ Analysis
53
The activities are interrelated in a logical sequence which is known as
ā€œPrecedence relationshipā€
Project is represented in the form of network for the purpose of analysis to get
solutions for scheduling and controlling its activities
PROJECT MANAGEMENT (NETWORK ANALYSIS)
A project consists of interrelated activities which are to be executed in a certain
order before the entire task is completed
54
PHASES OF PROJECT MANAGEMENT
PLANNING
ā€¢ Dividing the project into distinct activities
ā€¢ Estimating time requirement for each
activity
ā€¢ Establishing precedence relationships
among the activities
ā€¢ Construction of arrow diagram (Network)
SCHEDULING
CONTROLLING
ā€¢ Determines the start and end time of each and
every activity
ā€¢ Uses the arrow diagram and time chart for
continuous monitoring and progress reporting
55
GUIDELINES FOR NETWORK CONSTRUCTION
ā€¢ The starting event and ending event of an activity are called tail event and
head event respectively
ā€¢ The network should have a unique starting node (tail event)
ā€¢ The network should have a unique completion node (head event)
ā€¢ No activity should be represented by more than one arc in the network
ā€¢ No two activities should have the same starting node and same ending node
56
ACTIVITY
PREDECESS
OR
DURATION
A - 1
B - 2
C - 3
D A 4
E B 5
F B 4
G C 6
H D, E 6
I G 2
J F, H, I 3
ļ¶ Construct the CPM network
ļ¶ Determine Critical path and Project completion time
57
1
5
2
7
4
3 6 8
A = 1 day
C = 3 days
B = 2 days
D = 4 days
E = 5 days
F = 4 days
G = 6 days
H = 6 days
I = 2 days
J = 3 days
58
CPM
The critical path of a project network is the longest
path in the network
59
1
5
2
7
4
3 6 8
A = 1 day
C = 3 days
B = 2 days
D = 4 days
E = 5 days
F = 4 days
G = 6 days
H = 6 days
I = 2 days
J = 3 days
1
5
2
6 8
7
4
3
1
5
2
6 8
7
4
3
7
4
60
CRITICAL PATH
Program Evaluation and
Review Technique
61
Under PERT, three time-estimates are made
1. Most Likely Time: Time taken most frequently in completing a particular activity.
2. Optimistic Time: Time in which an activity can be completed, if all goes as per the
predetermined plan.
3. Pessimistic Time: Time taken to complete an activity under most adverse
conditions. This is thus the longest possible time taken to complete a project.
Activity Time= [Optimistic time + 4 x (Likely expected time) + Pessimistic time] /6
62
Consider the following table summarizing the details of a project:
ACTIVITY PREDECESSOR
DURATION (WEEKS)
OPTIMISTIC MOST LIKELY PESSIMISTIC
A - 5 6 7
B - 1 3 5
C - 1 4 7
D A 1 2 3
E B 1 2 9
F C 1 5 9
G C 2 2 8
H E, F 4 4 10
I D 2 5 8
J H, G 2 2 8
ā€¢ Construct the project network
ā€¢ Find the expected duration of
each activity
ā€¢ Find the critical path and the
project completion time
63
1
5
2
6 8
7
4
3
A
H
G
F
I
D
E
B
C J
64
ACTIVITY PREDECESSOR
DURATION (WEEKS) EXPECTED
TIME
OPTIMISTIC MOST LIKELY PESSIMISTIC
A - 5 6 7 6
B - 1 3 5 3
C - 1 4 7 4
D A 1 2 3 2
E B 1 2 9 3
F C 1 5 9 5
G C 2 2 8 3
H E, F 4 4 10 5
I D 2 5 8 5
J H, G 2 2 8 3
Expected time =
[O + (4 x M) + P] / 6
65
1
5
2
6 8
7
4
3
A = 6
H = 5
G = 3
F = 5
I = 5
D = 2
E = 3
B = 3
C = 4
J = 3
Critical path = C-F-H-J Project completion time = 17 weeks
1
5
2
6 8
7
4
3
66
Plan service
Equipment ordered Equipment installed
Start providing service
Staff recruited Staff trained
2 months
10 months
1 month
4 months
2 months
1 month
67
Miscellaneous
Financial techniques
Statistical techniques
Activity analysis
Mathematical techniques
1) Time trends and forecasting
2) Decision theory and tree
1) Time and Motion study
2) Work sampling and activity analysis
3) Queuing theory
4) Gantt chart and work schedule
1) Simulation study /model
2) System analysis
3) Linear programming
4) Inventory control
5) Network analysis
6) PERT
7) CPM
68
Miscellaneous
Financial techniques
1) Cost accounting and analysis
2) Cost Benefit Analysis
3) Cost Effective Analysis
4) Zero base budgeting
5) Input output analysis
1) Management by exception
2) Situation analysis
3) SWOT Analysis
4) Log frame Analysis
69
Financial techniques
70
Is there a good evidence of effectiveness of interventions being compared
Are the effectiveness of interventions equal?
Can the outcome be valued in monetary terms
Can outcomes be measured in terms of QALY/ DALY
Costing study
Cost minimization analysis
Cost-benefit analysis
Cost effectiveness
Cost Utility analysis
YES NO
YES
NO
YES NO
NO
YES
71
ZERO-BASED BUDGETING
Method of budgeting in which all expenses must be justified for each new year
(current need, cost, alternate options) rather than based on previous years
Setting objectives Developing decision unit Developing decision packages
Ranking decision packages
Resource allocation
Controlling and Monitoring
PROCESS
72
BENEFITS
ā€¢ Efficient allocation of resources, as it is based on needs and benefits rather than history
ā€¢ Drives managers to find cost effective ways to improve operations
ā€¢ Detects inflated budgets
ā€¢ Increases staff motivation by providing greater initiative and responsibility in decision-making
ā€¢ Identifies and eliminates wasteful and obsolete operations
ā€¢ Flexible technique
ā€¢ Useful for government department
73
DRAWBACKS
ā€¢ More time-consuming than incremental budgeting
ā€¢ Justifying every line item can be problematic for departments with intangible outputs
ā€¢ Requires specific training, due to increased complexity
ā€¢ High administrative cost
ā€¢ Increased paper work and man-power
74
INPUT-OUTPUT ANALYSIS
Input-output analysis seeks to explain how one industry sector affects others in the same nation
There is a circular relationship between inputs and output of an economy
Wassily Leontief, a Soviet-American economist developed the input-output analysis
method, earning him the Nobel Prize in economics in 1973
Output of A Input of B, C, D
75
X1 X2 FD
X1 X11 X12 F1
X2 X21 X22 F2
Balancing equation: X1 = X11 + X12 + F1
Purchasing sector
Selling
sector
An input-output table shows how much of each input is needed to produce
unit amount of each output
76
Miscellaneous
Financial techniques
1) Cost accounting and analysis
2) Cost Benefit Analysis
3) Cost Effective Analysis
4) Zero base budgeting
5) Input output analysis
1) Management by exception
2) Situation analysis
3) SWOT Analysis
4) Log frame Analysis
77
Miscellaneous
78
MANAGEMENT BY EXCEPTION
Management by exception is the practice of examining the financial
and operational results of a business, and only bringing issues to the
attention of management if results represent substantial differences
from the budgeted or expected amount.
79
Efficient practices
Managers can lead their company efficiently by delegating tasks. They focus on achieving the
company's vision while other employees work on daily tasks to keep the company operational.
Sets clear priorities
For example, if an employee knows they should notify a manager if they sign a high-profile
client, the employee also understands how important that activity is.
Motivates employees
Because management by exception allows employees to work independently, it can motivate
employees to take more responsibility at work.
Quickly addresses problems
ADVANTAGES
80
DISADVANTAGES
Less focus on preventive measures
Because management by exception relies on reacting to a problem, it can neglect to
put preventative measures in place.
Requires close monitoring
Companies need to establish close monitoring practices ensuring professionals alert
the managers when a problem arises.
Requires advanced problem-solving skills
All leaders within a company are required to have exceptional problem-solving skills.
This helps them quickly address issues and find creative solutions.
81
SITUATIONAL ANALYSIS
It is an integral component of the management process to find out what the existing situation
is, analyze the same, identify, which aspects needs changing, and then plan accordingly
This method described as ā€˜where are we nowā€™, is the means by which a company can identify
its own strengths and weaknesses as they relate to external opportunities and threats
82
For example, studies regarding drug prescription and consumption in different types of health
facilities. The result of these studies reveal the prescribing habits of Doctors, and the need
and ways for improving drug management to make them safer and economical
OBJECTIVE INTERVENTION OUTPUTS INDICATORS
To increase deliveries
by SBA from 20% in
2012 to 80% in 2017
ā€¢ SBAs are posted at PHC
on 8 hours duty
ā€¢ One MO available at PHC
on 8 hours shift basis
ā€¢ Referral transport
available
ā€¢ Number of deliveries
by SBA
ā€¢ Expected outcome:
80% deliveries by SBA
ā€¢ % of deliveries by SBA
out of total deliveries
ā€¢ Verify from HMIS
LOGICAL FRAMEWORK
A logical framework or ā€˜Log Frameā€™ is a management tool for Planning, Progress
Monitoring and Evaluation of the program
This tool ensures that planning is result-oriented and outcomes are evidence-based
A Logical Framework for safe deliveries 83
84
It involves identifying the internal and external
factors that are favorable and unfavorable to
achieve a objective
SWOT ANALYSIS
SWOT analysis is a strategic planning
method used to evaluate the Strengths,
Weaknesses, Opportunities, and Threats
involved in a project/ program
85
HELPFUL HARMFUL
ā€¢ Political will
ā€¢ Commitment of key research institutes
ā€¢ Framework in form of NCD programs
ā€¢ Integration of all chronic diseases
ā€¢ Dedicated resources
ā€¢ Poor monitoring and evaluation
ā€¢ Limited implementation capacity
ā€¢ Low levels of community awareness
ā€¢ Low utilization rates
ā€¢ Low expenditure rates
ā€¢ Best buys
ā€¢ PEN Intervention Package
ā€¢ Health system strengthening
ā€¢ NCD surveillance
ā€¢ Digitization
ā€¢ Adherence monitoring
ā€¢ Rising burden of NCDs
ā€¢ Low budget allocation for NCD programs
ā€¢ Diversity in sub-populations
ā€¢ Absence of regulatory mechanism
SWOT Analysis of NCD program
INTERNAL
EXTERNAL
S
O T
W
86
Miscellaneous
Financial techniques
1) Cost accounting and analysis
2) Cost Benefit Analysis
3) Cost Effective Analysis
4) Zero base budgeting
5) Input output analysis
1) Management by exception
2) Situation analysis
3) SWOT Analysis
4) Log frame Analysis
87
Globalization Technology
Human
resource
Social
responsibility
CHALLENGES
88
REFERENCES
ā€¢ https://www.gantt.com/
ā€¢ https://queue-it.com/blog/queuing-theory/
ā€¢ WHO Modern management methods and the organization of health services
ā€¢ https://www.youtube.com/watch?v=WrAf6zdteXI
ā€¢ Park textbook of community medicine
ā€¢ Public Health Management by Sunderlal
ā€¢ Treatise on Health Management by SC Mohapatra
ā€¢ Handbook of Health Planning and Management by Sukamal Bisoi
ā€¢ Pdf on MMT by Dr. Sharon (shared in telegram group)
ā€¢ YouTube videos (link will be provided on request)
89
SUGGESTIONS
QUERIES
IDEAS
OBSERVATIONS
90
!
.
U
O
Y
K
N
A
H
T .
. !!

More Related Content

What's hot

NPCDCS-INDIA
NPCDCS-INDIANPCDCS-INDIA
NPCDCS-INDIA
MAHESWARI JAIKUMAR
Ā 
NCPCDS presentation
NCPCDS presentationNCPCDS presentation
NCPCDS presentation
Sahil Thakur
Ā 
Epidemiologic Transition
Epidemiologic Transition Epidemiologic Transition
Epidemiologic Transition TARIQ JAVED GILL
Ā 
International health
International healthInternational health
International health
Dr. Dharmendra Gahwai
Ā 
Central health services management in nepal
Central health services management in nepal Central health services management in nepal
Central health services management in nepal
Sunita Rajbanshi
Ā 
National health program evaluation
National health program evaluationNational health program evaluation
National health program evaluation
rahul gajbhiye
Ā 
International health regulations(ihr).pptx
International health regulations(ihr).pptxInternational health regulations(ihr).pptx
International health regulations(ihr).pptx
ADESH MEDICAL COLLEGE
Ā 
International health regulation
International health regulationInternational health regulation
International health regulation
Venu Bolisetti
Ā 
Measuring Health and Disease I: Introduction to Epidemiology Module Guide
Measuring Health and Disease I: Introduction to Epidemiology Module GuideMeasuring Health and Disease I: Introduction to Epidemiology Module Guide
Measuring Health and Disease I: Introduction to Epidemiology Module Guide
Saide OER Africa
Ā 
Nepal health sector strategy Outcome 1
Nepal health sector strategy Outcome 1Nepal health sector strategy Outcome 1
Nepal health sector strategy Outcome 1
Surakshya Poudel
Ā 
National Health Policy and Plan
National Health Policy and PlanNational Health Policy and Plan
National Health Policy and Planlal bahadur Kunwar
Ā 
Hmis
HmisHmis
Public Health Leadership
Public Health LeadershipPublic Health Leadership
Public Health Leadership
Ramya Gokulakannan
Ā 
Outbreak investigation
Outbreak investigationOutbreak investigation
Outbreak investigation
Amandeep Kaur
Ā 
Health care system of nepal
Health care system of nepalHealth care system of nepal
Health care system of nepal
roshan khadka
Ā 
National Vector Borne Disease Control Programme (NVBDCP)
 National Vector Borne Disease Control Programme (NVBDCP) National Vector Borne Disease Control Programme (NVBDCP)
National Vector Borne Disease Control Programme (NVBDCP)
Kailash Nagar
Ā 
International health
International healthInternational health
International health
Ashok Pandey
Ā 
Health management information system
Health management information systemHealth management information system
Health management information system
Prakash Ghimire
Ā 

What's hot (20)

NPCDCS-INDIA
NPCDCS-INDIANPCDCS-INDIA
NPCDCS-INDIA
Ā 
Presentation of health policies
Presentation of health policiesPresentation of health policies
Presentation of health policies
Ā 
NCPCDS presentation
NCPCDS presentationNCPCDS presentation
NCPCDS presentation
Ā 
Epidemiologic Transition
Epidemiologic Transition Epidemiologic Transition
Epidemiologic Transition
Ā 
International health
International healthInternational health
International health
Ā 
Central health services management in nepal
Central health services management in nepal Central health services management in nepal
Central health services management in nepal
Ā 
National health program evaluation
National health program evaluationNational health program evaluation
National health program evaluation
Ā 
International health regulations(ihr).pptx
International health regulations(ihr).pptxInternational health regulations(ihr).pptx
International health regulations(ihr).pptx
Ā 
International health regulation
International health regulationInternational health regulation
International health regulation
Ā 
Measuring Health and Disease I: Introduction to Epidemiology Module Guide
Measuring Health and Disease I: Introduction to Epidemiology Module GuideMeasuring Health and Disease I: Introduction to Epidemiology Module Guide
Measuring Health and Disease I: Introduction to Epidemiology Module Guide
Ā 
Nepal health sector strategy Outcome 1
Nepal health sector strategy Outcome 1Nepal health sector strategy Outcome 1
Nepal health sector strategy Outcome 1
Ā 
National Health Policy and Plan
National Health Policy and PlanNational Health Policy and Plan
National Health Policy and Plan
Ā 
Hmis
HmisHmis
Hmis
Ā 
public health surveillance
public health surveillance public health surveillance
public health surveillance
Ā 
Public Health Leadership
Public Health LeadershipPublic Health Leadership
Public Health Leadership
Ā 
Outbreak investigation
Outbreak investigationOutbreak investigation
Outbreak investigation
Ā 
Health care system of nepal
Health care system of nepalHealth care system of nepal
Health care system of nepal
Ā 
National Vector Borne Disease Control Programme (NVBDCP)
 National Vector Borne Disease Control Programme (NVBDCP) National Vector Borne Disease Control Programme (NVBDCP)
National Vector Borne Disease Control Programme (NVBDCP)
Ā 
International health
International healthInternational health
International health
Ā 
Health management information system
Health management information systemHealth management information system
Health management information system
Ā 

Similar to Modern Management Techniques.pptx

Modern management techniques part 1
Modern management techniques part 1Modern management techniques part 1
Modern management techniques part 1vishal soyam
Ā 
Modern mgmt tchnq
Modern mgmt tchnqModern mgmt tchnq
Modern mgmt tchnq
Arun Kokane
Ā 
Modern management techniques
Modern management techniquesModern management techniques
Modern management techniques
Ravi Rohilla
Ā 
Operation research
Operation researchOperation research
Operation research
Mounica Prasad
Ā 
Shing Lee MedicReS World Congress 2015
Shing Lee MedicReS World Congress 2015Shing Lee MedicReS World Congress 2015
Shing Lee MedicReS World Congress 2015
MedicReS
Ā 
Quantitave methods in management of health.pptx
Quantitave methods in management of health.pptxQuantitave methods in management of health.pptx
Quantitave methods in management of health.pptx
ananthaprakashveesam
Ā 
Dr Ayman Ewies - Clinical audit made easy
Dr Ayman Ewies - Clinical audit made easyDr Ayman Ewies - Clinical audit made easy
Dr Ayman Ewies - Clinical audit made easy
AymanEwies
Ā 
Operations Management A CEO Checklist for High-Value H.docx
Operations Management A CEO Checklist for High-Value H.docxOperations Management A CEO Checklist for High-Value H.docx
Operations Management A CEO Checklist for High-Value H.docx
vannagoforth
Ā 
Certified Specialist Business Intelligence (.docx
Certified     Specialist     Business  Intelligence     (.docxCertified     Specialist     Business  Intelligence     (.docx
Certified Specialist Business Intelligence (.docx
durantheseldine
Ā 
Audit and stat for medical professionals
Audit and stat for medical professionalsAudit and stat for medical professionals
Audit and stat for medical professionals
Nadir Mehmood
Ā 
Modelling workflow processes for clinical information systems: impact on deci...
Modelling workflow processes for clinical information systems: impact on deci...Modelling workflow processes for clinical information systems: impact on deci...
Modelling workflow processes for clinical information systems: impact on deci...Phil Gooch
Ā 
Data Analytics for Real-World Business Problems
Data Analytics for Real-World Business ProblemsData Analytics for Real-World Business Problems
Data Analytics for Real-World Business Problems
Alexander Kolker
Ā 
Introduction to Statistics and Probability:
Introduction to Statistics and Probability:Introduction to Statistics and Probability:
Introduction to Statistics and Probability:
Shrihari Shrihari
Ā 
Industrial & production Engineering (IPE) interview question.pdf
Industrial & production Engineering (IPE) interview question.pdfIndustrial & production Engineering (IPE) interview question.pdf
Industrial & production Engineering (IPE) interview question.pdf
rafsanttt
Ā 
Operational research
Operational researchOperational research
Operational research
Dr Ramniwas
Ā 
Research design mahesh
Research design maheshResearch design mahesh
Research design maheshDr. Sunil Kumar
Ā 
Numerus CEN-ISBS presentation 2017-08-30
Numerus CEN-ISBS presentation 2017-08-30Numerus CEN-ISBS presentation 2017-08-30
Numerus CEN-ISBS presentation 2017-08-30
Jonathan Alsop
Ā 
Unit 1.pptx
Unit 1.pptxUnit 1.pptx
Unit 1.pptx
Vighnesh53
Ā 
How To Drive Clinical Improvement Programs That Get Results - HAS Session 20
How To Drive Clinical Improvement Programs That Get Results - HAS  Session 20How To Drive Clinical Improvement Programs That Get Results - HAS  Session 20
How To Drive Clinical Improvement Programs That Get Results - HAS Session 20
Health Catalyst
Ā 
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSN
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSNIntroduction to Lean Management Dr Richard Guerrero_Wessex AHSN
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSN
Health Innovation Wessex
Ā 

Similar to Modern Management Techniques.pptx (20)

Modern management techniques part 1
Modern management techniques part 1Modern management techniques part 1
Modern management techniques part 1
Ā 
Modern mgmt tchnq
Modern mgmt tchnqModern mgmt tchnq
Modern mgmt tchnq
Ā 
Modern management techniques
Modern management techniquesModern management techniques
Modern management techniques
Ā 
Operation research
Operation researchOperation research
Operation research
Ā 
Shing Lee MedicReS World Congress 2015
Shing Lee MedicReS World Congress 2015Shing Lee MedicReS World Congress 2015
Shing Lee MedicReS World Congress 2015
Ā 
Quantitave methods in management of health.pptx
Quantitave methods in management of health.pptxQuantitave methods in management of health.pptx
Quantitave methods in management of health.pptx
Ā 
Dr Ayman Ewies - Clinical audit made easy
Dr Ayman Ewies - Clinical audit made easyDr Ayman Ewies - Clinical audit made easy
Dr Ayman Ewies - Clinical audit made easy
Ā 
Operations Management A CEO Checklist for High-Value H.docx
Operations Management A CEO Checklist for High-Value H.docxOperations Management A CEO Checklist for High-Value H.docx
Operations Management A CEO Checklist for High-Value H.docx
Ā 
Certified Specialist Business Intelligence (.docx
Certified     Specialist     Business  Intelligence     (.docxCertified     Specialist     Business  Intelligence     (.docx
Certified Specialist Business Intelligence (.docx
Ā 
Audit and stat for medical professionals
Audit and stat for medical professionalsAudit and stat for medical professionals
Audit and stat for medical professionals
Ā 
Modelling workflow processes for clinical information systems: impact on deci...
Modelling workflow processes for clinical information systems: impact on deci...Modelling workflow processes for clinical information systems: impact on deci...
Modelling workflow processes for clinical information systems: impact on deci...
Ā 
Data Analytics for Real-World Business Problems
Data Analytics for Real-World Business ProblemsData Analytics for Real-World Business Problems
Data Analytics for Real-World Business Problems
Ā 
Introduction to Statistics and Probability:
Introduction to Statistics and Probability:Introduction to Statistics and Probability:
Introduction to Statistics and Probability:
Ā 
Industrial & production Engineering (IPE) interview question.pdf
Industrial & production Engineering (IPE) interview question.pdfIndustrial & production Engineering (IPE) interview question.pdf
Industrial & production Engineering (IPE) interview question.pdf
Ā 
Operational research
Operational researchOperational research
Operational research
Ā 
Research design mahesh
Research design maheshResearch design mahesh
Research design mahesh
Ā 
Numerus CEN-ISBS presentation 2017-08-30
Numerus CEN-ISBS presentation 2017-08-30Numerus CEN-ISBS presentation 2017-08-30
Numerus CEN-ISBS presentation 2017-08-30
Ā 
Unit 1.pptx
Unit 1.pptxUnit 1.pptx
Unit 1.pptx
Ā 
How To Drive Clinical Improvement Programs That Get Results - HAS Session 20
How To Drive Clinical Improvement Programs That Get Results - HAS  Session 20How To Drive Clinical Improvement Programs That Get Results - HAS  Session 20
How To Drive Clinical Improvement Programs That Get Results - HAS Session 20
Ā 
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSN
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSNIntroduction to Lean Management Dr Richard Guerrero_Wessex AHSN
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSN
Ā 

More from Immanuel Joshua

Psychiatry Case Presentation (Depression).pptx
Psychiatry Case Presentation (Depression).pptxPsychiatry Case Presentation (Depression).pptx
Psychiatry Case Presentation (Depression).pptx
Immanuel Joshua
Ā 
Monkeypox_An overview.pptx
Monkeypox_An overview.pptxMonkeypox_An overview.pptx
Monkeypox_An overview.pptx
Immanuel Joshua
Ā 
Total Quality Management.pptx
Total Quality Management.pptxTotal Quality Management.pptx
Total Quality Management.pptx
Immanuel Joshua
Ā 
World Breastfeeding Week.pptx
World Breastfeeding Week.pptxWorld Breastfeeding Week.pptx
World Breastfeeding Week.pptx
Immanuel Joshua
Ā 
Rabies.pptx
Rabies.pptxRabies.pptx
Rabies.pptx
Immanuel Joshua
Ā 
Journal Club_Mixed Method Research_IAPSMCON-2022.pptx
Journal Club_Mixed Method Research_IAPSMCON-2022.pptxJournal Club_Mixed Method Research_IAPSMCON-2022.pptx
Journal Club_Mixed Method Research_IAPSMCON-2022.pptx
Immanuel Joshua
Ā 
NTEP (National Tuberculosis Elimination Programme).pptx
NTEP (National Tuberculosis Elimination Programme).pptxNTEP (National Tuberculosis Elimination Programme).pptx
NTEP (National Tuberculosis Elimination Programme).pptx
Immanuel Joshua
Ā 
Arthropods (entomology)
Arthropods (entomology)Arthropods (entomology)
Arthropods (entomology)
Immanuel Joshua
Ā 
National aids control programme
National aids control programmeNational aids control programme
National aids control programme
Immanuel Joshua
Ā 
Mosquito (entomology)
Mosquito (entomology)Mosquito (entomology)
Mosquito (entomology)
Immanuel Joshua
Ā 
World health day 2021
World health day 2021World health day 2021
World health day 2021
Immanuel Joshua
Ā 
Covid vaccines
Covid vaccinesCovid vaccines
Covid vaccines
Immanuel Joshua
Ā 

More from Immanuel Joshua (12)

Psychiatry Case Presentation (Depression).pptx
Psychiatry Case Presentation (Depression).pptxPsychiatry Case Presentation (Depression).pptx
Psychiatry Case Presentation (Depression).pptx
Ā 
Monkeypox_An overview.pptx
Monkeypox_An overview.pptxMonkeypox_An overview.pptx
Monkeypox_An overview.pptx
Ā 
Total Quality Management.pptx
Total Quality Management.pptxTotal Quality Management.pptx
Total Quality Management.pptx
Ā 
World Breastfeeding Week.pptx
World Breastfeeding Week.pptxWorld Breastfeeding Week.pptx
World Breastfeeding Week.pptx
Ā 
Rabies.pptx
Rabies.pptxRabies.pptx
Rabies.pptx
Ā 
Journal Club_Mixed Method Research_IAPSMCON-2022.pptx
Journal Club_Mixed Method Research_IAPSMCON-2022.pptxJournal Club_Mixed Method Research_IAPSMCON-2022.pptx
Journal Club_Mixed Method Research_IAPSMCON-2022.pptx
Ā 
NTEP (National Tuberculosis Elimination Programme).pptx
NTEP (National Tuberculosis Elimination Programme).pptxNTEP (National Tuberculosis Elimination Programme).pptx
NTEP (National Tuberculosis Elimination Programme).pptx
Ā 
Arthropods (entomology)
Arthropods (entomology)Arthropods (entomology)
Arthropods (entomology)
Ā 
National aids control programme
National aids control programmeNational aids control programme
National aids control programme
Ā 
Mosquito (entomology)
Mosquito (entomology)Mosquito (entomology)
Mosquito (entomology)
Ā 
World health day 2021
World health day 2021World health day 2021
World health day 2021
Ā 
Covid vaccines
Covid vaccinesCovid vaccines
Covid vaccines
Ā 

Recently uploaded

šŸ’˜Ludhiana ā„‚all Girls šŸ“ž]][89011ā˜…83002][[ šŸ“± ā¤ESCORTS service in LudhianašŸ’ƒšŸ’¦Ludhi...
šŸ’˜Ludhiana ā„‚all Girls šŸ“ž]][89011ā˜…83002][[ šŸ“± ā¤ESCORTS service in LudhianašŸ’ƒšŸ’¦Ludhi...šŸ’˜Ludhiana ā„‚all Girls šŸ“ž]][89011ā˜…83002][[ šŸ“± ā¤ESCORTS service in LudhianašŸ’ƒšŸ’¦Ludhi...
šŸ’˜Ludhiana ā„‚all Girls šŸ“ž]][89011ā˜…83002][[ šŸ“± ā¤ESCORTS service in LudhianašŸ’ƒšŸ’¦Ludhi...
ranishasharma67
Ā 
POLYCYSTIC OVARIAN SYNDROME (PCOS)......
POLYCYSTIC OVARIAN SYNDROME (PCOS)......POLYCYSTIC OVARIAN SYNDROME (PCOS)......
POLYCYSTIC OVARIAN SYNDROME (PCOS)......
Ameena Kadar
Ā 
Artificial Intelligence to Optimize Cardiovascular Therapy
Artificial Intelligence to Optimize Cardiovascular TherapyArtificial Intelligence to Optimize Cardiovascular Therapy
Artificial Intelligence to Optimize Cardiovascular Therapy
Iris Thiele Isip-Tan
Ā 
GLOBAL WARMING BY PRIYA BHOJWANI @..pptx
GLOBAL WARMING BY PRIYA BHOJWANI @..pptxGLOBAL WARMING BY PRIYA BHOJWANI @..pptx
GLOBAL WARMING BY PRIYA BHOJWANI @..pptx
priyabhojwani1200
Ā 
Dimensions of Healthcare Quality
Dimensions of Healthcare QualityDimensions of Healthcare Quality
Dimensions of Healthcare Quality
Naeemshahzad51
Ā 
Navigating Women's Health: Understanding Prenatal Care and Beyond
Navigating Women's Health: Understanding Prenatal Care and BeyondNavigating Women's Health: Understanding Prenatal Care and Beyond
Navigating Women's Health: Understanding Prenatal Care and Beyond
Aboud Health Group
Ā 
Surgery-Mini-OSCE-All-Past-Years-Questions-Modified.
Surgery-Mini-OSCE-All-Past-Years-Questions-Modified.Surgery-Mini-OSCE-All-Past-Years-Questions-Modified.
Surgery-Mini-OSCE-All-Past-Years-Questions-Modified.
preciousstephanie75
Ā 
VVIP Dehradun Girls 9719300533 Heat-bake { Dehradun } Genteel ā„‚all Serviā„‚e By...
VVIP Dehradun Girls 9719300533 Heat-bake { Dehradun } Genteel ā„‚all Serviā„‚e By...VVIP Dehradun Girls 9719300533 Heat-bake { Dehradun } Genteel ā„‚all Serviā„‚e By...
VVIP Dehradun Girls 9719300533 Heat-bake { Dehradun } Genteel ā„‚all Serviā„‚e By...
rajkumar669520
Ā 
Deep Leg Vein Thrombosis (DVT): Meaning, Causes, Symptoms, Treatment, and Mor...
Deep Leg Vein Thrombosis (DVT): Meaning, Causes, Symptoms, Treatment, and Mor...Deep Leg Vein Thrombosis (DVT): Meaning, Causes, Symptoms, Treatment, and Mor...
Deep Leg Vein Thrombosis (DVT): Meaning, Causes, Symptoms, Treatment, and Mor...
The Lifesciences Magazine
Ā 
theĀ IUA Administrative Board and General AssemblyĀ meeting
theĀ IUA Administrative Board and General AssemblyĀ meetingtheĀ IUA Administrative Board and General AssemblyĀ meeting
theĀ IUA Administrative Board and General AssemblyĀ meeting
ssuser787e5c1
Ā 
Demystifying-Gene-Editing-The-Promise-and-Peril-of-CRISPR.pdf
Demystifying-Gene-Editing-The-Promise-and-Peril-of-CRISPR.pdfDemystifying-Gene-Editing-The-Promise-and-Peril-of-CRISPR.pdf
Demystifying-Gene-Editing-The-Promise-and-Peril-of-CRISPR.pdf
SasikiranMarri
Ā 
Yemen National Tuberculosis Program .ppt
Yemen National Tuberculosis Program .pptYemen National Tuberculosis Program .ppt
Yemen National Tuberculosis Program .ppt
Esam43
Ā 
GURGAON Call Girls ā¤8901183002ā¤ #ā„‚ALL# #gIRLS# In GURGAON ā‚¹,2500 Cash Payment...
GURGAON Call Girls ā¤8901183002ā¤ #ā„‚ALL# #gIRLS# In GURGAON ā‚¹,2500 Cash Payment...GURGAON Call Girls ā¤8901183002ā¤ #ā„‚ALL# #gIRLS# In GURGAON ā‚¹,2500 Cash Payment...
GURGAON Call Girls ā¤8901183002ā¤ #ā„‚ALL# #gIRLS# In GURGAON ā‚¹,2500 Cash Payment...
ranishasharma67
Ā 
Health Education on prevention of hypertension
Health Education on prevention of hypertensionHealth Education on prevention of hypertension
Health Education on prevention of hypertension
Radhika kulvi
Ā 
Haridwar ā¤CALL Girls šŸ” 89011ā˜…83002 šŸ” ā¤ā„‚all Girls IN Haridwar ESCORT SERVICEā¤
Haridwar ā¤CALL Girls šŸ” 89011ā˜…83002 šŸ” ā¤ā„‚all Girls IN Haridwar ESCORT SERVICEā¤Haridwar ā¤CALL Girls šŸ” 89011ā˜…83002 šŸ” ā¤ā„‚all Girls IN Haridwar ESCORT SERVICEā¤
Haridwar ā¤CALL Girls šŸ” 89011ā˜…83002 šŸ” ā¤ā„‚all Girls IN Haridwar ESCORT SERVICEā¤
ranishasharma67
Ā 
Neuro Saphirex Cranial Brochure
Neuro Saphirex Cranial BrochureNeuro Saphirex Cranial Brochure
Neuro Saphirex Cranial Brochure
RXOOM Healthcare Pvt. Ltd. ā€‹
Ā 
Telehealth Psychology Building Trust with Clients.pptx
Telehealth Psychology Building Trust with Clients.pptxTelehealth Psychology Building Trust with Clients.pptx
Telehealth Psychology Building Trust with Clients.pptx
The Harvest Clinic
Ā 
BOWEL ELIMINATION BY ANUSHRI SRIVASTAVA.pptx
BOWEL ELIMINATION BY ANUSHRI SRIVASTAVA.pptxBOWEL ELIMINATION BY ANUSHRI SRIVASTAVA.pptx
BOWEL ELIMINATION BY ANUSHRI SRIVASTAVA.pptx
AnushriSrivastav
Ā 
10 Ideas for Enhancing Your Meeting Experience
10 Ideas for Enhancing Your Meeting Experience10 Ideas for Enhancing Your Meeting Experience
10 Ideas for Enhancing Your Meeting Experience
ranishasharma67
Ā 
ABDOMINAL COMPARTMENT SYSNDROME
ABDOMINAL COMPARTMENT SYSNDROMEABDOMINAL COMPARTMENT SYSNDROME
ABDOMINAL COMPARTMENT SYSNDROME
Rommel Luis III Israel
Ā 

Recently uploaded (20)

šŸ’˜Ludhiana ā„‚all Girls šŸ“ž]][89011ā˜…83002][[ šŸ“± ā¤ESCORTS service in LudhianašŸ’ƒšŸ’¦Ludhi...
šŸ’˜Ludhiana ā„‚all Girls šŸ“ž]][89011ā˜…83002][[ šŸ“± ā¤ESCORTS service in LudhianašŸ’ƒšŸ’¦Ludhi...šŸ’˜Ludhiana ā„‚all Girls šŸ“ž]][89011ā˜…83002][[ šŸ“± ā¤ESCORTS service in LudhianašŸ’ƒšŸ’¦Ludhi...
šŸ’˜Ludhiana ā„‚all Girls šŸ“ž]][89011ā˜…83002][[ šŸ“± ā¤ESCORTS service in LudhianašŸ’ƒšŸ’¦Ludhi...
Ā 
POLYCYSTIC OVARIAN SYNDROME (PCOS)......
POLYCYSTIC OVARIAN SYNDROME (PCOS)......POLYCYSTIC OVARIAN SYNDROME (PCOS)......
POLYCYSTIC OVARIAN SYNDROME (PCOS)......
Ā 
Artificial Intelligence to Optimize Cardiovascular Therapy
Artificial Intelligence to Optimize Cardiovascular TherapyArtificial Intelligence to Optimize Cardiovascular Therapy
Artificial Intelligence to Optimize Cardiovascular Therapy
Ā 
GLOBAL WARMING BY PRIYA BHOJWANI @..pptx
GLOBAL WARMING BY PRIYA BHOJWANI @..pptxGLOBAL WARMING BY PRIYA BHOJWANI @..pptx
GLOBAL WARMING BY PRIYA BHOJWANI @..pptx
Ā 
Dimensions of Healthcare Quality
Dimensions of Healthcare QualityDimensions of Healthcare Quality
Dimensions of Healthcare Quality
Ā 
Navigating Women's Health: Understanding Prenatal Care and Beyond
Navigating Women's Health: Understanding Prenatal Care and BeyondNavigating Women's Health: Understanding Prenatal Care and Beyond
Navigating Women's Health: Understanding Prenatal Care and Beyond
Ā 
Surgery-Mini-OSCE-All-Past-Years-Questions-Modified.
Surgery-Mini-OSCE-All-Past-Years-Questions-Modified.Surgery-Mini-OSCE-All-Past-Years-Questions-Modified.
Surgery-Mini-OSCE-All-Past-Years-Questions-Modified.
Ā 
VVIP Dehradun Girls 9719300533 Heat-bake { Dehradun } Genteel ā„‚all Serviā„‚e By...
VVIP Dehradun Girls 9719300533 Heat-bake { Dehradun } Genteel ā„‚all Serviā„‚e By...VVIP Dehradun Girls 9719300533 Heat-bake { Dehradun } Genteel ā„‚all Serviā„‚e By...
VVIP Dehradun Girls 9719300533 Heat-bake { Dehradun } Genteel ā„‚all Serviā„‚e By...
Ā 
Deep Leg Vein Thrombosis (DVT): Meaning, Causes, Symptoms, Treatment, and Mor...
Deep Leg Vein Thrombosis (DVT): Meaning, Causes, Symptoms, Treatment, and Mor...Deep Leg Vein Thrombosis (DVT): Meaning, Causes, Symptoms, Treatment, and Mor...
Deep Leg Vein Thrombosis (DVT): Meaning, Causes, Symptoms, Treatment, and Mor...
Ā 
theĀ IUA Administrative Board and General AssemblyĀ meeting
theĀ IUA Administrative Board and General AssemblyĀ meetingtheĀ IUA Administrative Board and General AssemblyĀ meeting
theĀ IUA Administrative Board and General AssemblyĀ meeting
Ā 
Demystifying-Gene-Editing-The-Promise-and-Peril-of-CRISPR.pdf
Demystifying-Gene-Editing-The-Promise-and-Peril-of-CRISPR.pdfDemystifying-Gene-Editing-The-Promise-and-Peril-of-CRISPR.pdf
Demystifying-Gene-Editing-The-Promise-and-Peril-of-CRISPR.pdf
Ā 
Yemen National Tuberculosis Program .ppt
Yemen National Tuberculosis Program .pptYemen National Tuberculosis Program .ppt
Yemen National Tuberculosis Program .ppt
Ā 
GURGAON Call Girls ā¤8901183002ā¤ #ā„‚ALL# #gIRLS# In GURGAON ā‚¹,2500 Cash Payment...
GURGAON Call Girls ā¤8901183002ā¤ #ā„‚ALL# #gIRLS# In GURGAON ā‚¹,2500 Cash Payment...GURGAON Call Girls ā¤8901183002ā¤ #ā„‚ALL# #gIRLS# In GURGAON ā‚¹,2500 Cash Payment...
GURGAON Call Girls ā¤8901183002ā¤ #ā„‚ALL# #gIRLS# In GURGAON ā‚¹,2500 Cash Payment...
Ā 
Health Education on prevention of hypertension
Health Education on prevention of hypertensionHealth Education on prevention of hypertension
Health Education on prevention of hypertension
Ā 
Haridwar ā¤CALL Girls šŸ” 89011ā˜…83002 šŸ” ā¤ā„‚all Girls IN Haridwar ESCORT SERVICEā¤
Haridwar ā¤CALL Girls šŸ” 89011ā˜…83002 šŸ” ā¤ā„‚all Girls IN Haridwar ESCORT SERVICEā¤Haridwar ā¤CALL Girls šŸ” 89011ā˜…83002 šŸ” ā¤ā„‚all Girls IN Haridwar ESCORT SERVICEā¤
Haridwar ā¤CALL Girls šŸ” 89011ā˜…83002 šŸ” ā¤ā„‚all Girls IN Haridwar ESCORT SERVICEā¤
Ā 
Neuro Saphirex Cranial Brochure
Neuro Saphirex Cranial BrochureNeuro Saphirex Cranial Brochure
Neuro Saphirex Cranial Brochure
Ā 
Telehealth Psychology Building Trust with Clients.pptx
Telehealth Psychology Building Trust with Clients.pptxTelehealth Psychology Building Trust with Clients.pptx
Telehealth Psychology Building Trust with Clients.pptx
Ā 
BOWEL ELIMINATION BY ANUSHRI SRIVASTAVA.pptx
BOWEL ELIMINATION BY ANUSHRI SRIVASTAVA.pptxBOWEL ELIMINATION BY ANUSHRI SRIVASTAVA.pptx
BOWEL ELIMINATION BY ANUSHRI SRIVASTAVA.pptx
Ā 
10 Ideas for Enhancing Your Meeting Experience
10 Ideas for Enhancing Your Meeting Experience10 Ideas for Enhancing Your Meeting Experience
10 Ideas for Enhancing Your Meeting Experience
Ā 
ABDOMINAL COMPARTMENT SYSNDROME
ABDOMINAL COMPARTMENT SYSNDROMEABDOMINAL COMPARTMENT SYSNDROME
ABDOMINAL COMPARTMENT SYSNDROME
Ā 

Modern Management Techniques.pptx

  • 1. MODERN MANAGEMENT TECHNIQUES APPLICATION OF MMT IN HEALTHCARE Dr. Immanuel Joshua. E Junior Resident (PGT-3) Dept. of Community Medicine Banaras Hindu University 1
  • 2. CONTENTS Definition Relevance in healthcare Traditional vs Modern techniques Description of each technique Classification Challenges References "The first rule of management is delegation. Don't try and do everything yourself because you can't." ā€” Anthea Turner Estimated time: 90-120 minutes 2
  • 3. ā€œManagement is getting the right things done ļ‚§ in right way, ļ‚§ in right time, ļ‚§ by right persons, ļ‚§ with right amount of resources and effective use of resources.ā€ MANAGEMENT It is the efficient use of resources and to get people to work harmoniously together in order to achieve objective 3
  • 4. Applications of management techniques Marketing Operations Finance Human Resource Information Technology Management Science 4
  • 5. Why we need management in healthcare? 5
  • 6. "Management is the opportunity to help people become better people. Practiced that way, it's a magnificent profession" ā€” Clayton Christenson RELEVANCE IN HEALTHCARE ā€¢ Overlapping, conflicting and competing organizations within Health system ā€¢ Widely scattered funding mechanism with little control over costs ā€¢ Decisions on the mixture of facilities and services without reference to population need and with no information about those who do not use the services ā€¢ It has been proved that these techniques are useful in increasing the efficiency by cost reduction as well as ensuring better health care 6
  • 7. Traditional vs Modern Management Techniques Based on behavioral sciences (Personnel selection, training & retraining, motivational methods, leadership development, supervision etc..) TRADITIONAL MODERN Based on sociology, psychology, educational technology, economics and statistics Needed for larger and complicated organizations with their own unique organizational and structural issues The conventional methods of management are no longer adequate to meet the demand of todayā€™s projects 7
  • 8. Classification of MMT 01 02 03 04 05 Miscellaneous Financial techniques Mathematical techniques Activity analysis Statistical techniques
  • 9. Miscellaneous Financial techniques Statistical techniques Activity analysis Mathematical techniques 1) Time trends and forecasting 2) Decision theory and tree 1) Time and Motion study 2) Work sampling and activity analysis 3) Queuing theory 4) Gantt chart and work schedule 1) Simulation study/ model 2) System analysis 3) Linear programming 4) Inventory control 5) Network analysis 6) PERT 7) CPM 9
  • 10. Miscellaneous Financial techniques 1) Cost accounting and analysis 2) Cost Benefit Analysis 3) Cost Effective Analysis 4) Zero base budgeting 5) Input output analysis 1) Management by exception 2) Situation analysis 3) SWOT Analysis 4) Log frame Analysis 10
  • 12. TIME TRENDS AND FORECASTING (Eg: Seasonal trend, Cyclical trend, Secular trend) Based on past experience, predictions can be made about the expected occurrence, by using mathematical methods (Eg: Demographers made projections about population, epidemiologists anticipation of epidemic) Based on information on occurrence of certain events, certain patterns can be recognized 12
  • 13. DECISION TREE A decision tree is a flowchart that starts with one main idea and then branches out based on the consequences of your decisions Itā€™s called a ā€œdecision treeā€ because the model typically looks like a tree with branches It enables people to decompose a large complex decision problem into several smaller problems 13
  • 14. Types of environment: 1. Decision making under certainty 2. Decision making under uncertainty 3. Decision making under risk Decision tree A method for determining the optimal course of action when a number of alternatives are available and their consequences cannot be forecast with certainty 14
  • 15. DECISION TREE SYMBOLS ā€¢Decision nodes: Squares that represent a decision being made on tree. Every decision tree starts with a decision node. ā€¢Alternative branches: Lines that branch out from decision node. These branches show two outcomes that stem from the initial decision. ā€¢Chance nodes: Circles that show multiple possible outcomes. ā€¢End nodes: Triangles that show a final outcome. 15
  • 16. Decision node Chance nodes End nodes Alternative branches 16
  • 17. Surgery Drug Disease absent Disease present Disease present Disease absent Survive Operative death Cure No cure Curative Palliative Survive Operative death Cure No cure Survive Operative death Cure No cure 17
  • 18. Surgery Drug Disease absent Disease present Disease present Disease absent Survive Operative death Cure No cure Curative Palliative Survive Operative death Cure No cure Survive Operative death Cure No cure Each path through the tree defines a unique potential result 18
  • 19. Surgery Drug Disease absent Disease present Disease present Disease absent Survive Operative death Cure No cure Curative Palliative Survive Operative death Cure No cure Survive Operative death Cure No cure 10% 10% 90% 90% 90% 90% 90% 90% 99% 98% 10% 1% 10% 2% 10% 10% Insert probabilities at each chance node based on data from literature, modeling, expert judgment, etc. 19
  • 20. Surgery Drug Disease absent Disease present Disease present Disease absent Survive Operative death Cure No cure Curative Palliative Survive Operative death Cure No cure Survive Operative death Cure No cure 10% 10% 90% 90% 90% 90% 90% 90% 99% 98% 10% 1% 10% 2% 10% 10% Assign a value to the outcome at each end points 20 LY 0 LY 20 LY 20 LY 2 LY 0 LY 0 LY 20 LY 20 LY 2 LY 2 LY Average outcome: Operative death = 0 LY Death from progression of disease = 2 LY Cure = 20 LY 20
  • 21. Surgery Drug Disease absent Disease present Disease present Disease absent Survive Operative death Cure No cure Curative Palliative Survive Operative death Cure No cure Survive Operative death Cure No cure 10% 10% 90% 90% 90% 90% 90% 90% 99% 98% 10% 1% 10% 2% 10% 10% 20 LY 0 LY 20 LY 20 LY 2 LY 0 LY 0 LY 20 LY 20 LY 2 LY 2 LY Compute average results, working from right to left Average LY = 10% (20) + 90% (2) = 3.8 LY 21
  • 22. Surgery Drug The outcome for each decision is more apparent now 19.46 LY 18.38 LY Surgery (intending cure) produces average of 19.46 LY Medical management yields an average of 18.38 LY The incremental benefit of surgery versus medical management is 19.46 ā€“ 18.38 = 1.08 LY 22
  • 23. ā€¢ Simple to understand and interpret ā€¢ Useful to analyze the possible outcomes of complex decisions ā€¢ Possible scenarios can be added ā€¢ Most rational decision is taken in terms of resource and effectiveness ā€¢ Worst, best and expected values can be determined for different scenarios ADVANTAGES OF DECISION TREES 23
  • 24. Miscellaneous Financial techniques Statistical techniques Activity analysis Mathematical techniques 1) Time trends and forecasting 2) Decision theory and tree 1) Time and Motion study 2) Work sampling and activity analysis 3) Queuing theory 4) Gantt chart and work schedule 1) Simulation study/ model 2) System analysis 3) Linear programming 4) Inventory control 5) Network analysis 6) PERT 7) CPM 24
  • 26. BASIS TIME STUDY MOTION STUDY Meaning Time study is conducted to find out the standard time for performing a task Motion study is conducted to find out total movements of workers while they are performing the task Purpose To find out standard time to fix dayā€™s work for the workers To eliminate wasteful and unproductive movements of workers to increase their efficiency level Method of conducting It is conducted with the help of a stopwatch It is conducted with the help of a moving camera which keep eyes on movements ā€œTime is what we want most but what we use worstā€ ā€“ William Penn TIME AND MOTION STUDY 26
  • 27. Modification: One servant from the central lab goes to different ward with trolley at predetermined time. Reports delivered in same way Example: From each ward, lab samples are sent with a servant to central laboratory. Servants take excessive time to return ADVANTAGES ā€¢ Reduction of physical effort ā€¢ Time saving ā€¢ Increase productivity 27
  • 28. Work sampling is a method of finding the percentage occurrence of a certain activity by statistical sampling and random observations WORK SAMPLING Technique in which a large number of instantaneous observations are made at random intervals over a specified period of time on a group of workers machines and processes Each observation records what is happening at that instant (Working/ Not working) The percentage of observations recorded for a particular activity is the measure of percentage of time during which that activity occurs 28
  • 29. STEPS ā€¢ Determine the main objective of the study ā€¢ Define each activity to be measured ā€¢ Obtain the approval of the supervisor of the department where work sampling is to be performed ā€¢ State the desired accuracy limits for the ultimate RESULTS ā€¢ Conduct a pilot study to i. Estimate the approximate percentage occurrence of the activity (p) ii. Estimate the required number of observations for the desired accuracy set iii. Ensure that the workers have become habitual to the visits of work study engineer ā€¢ Design the actual study ā€¢ Calculate the number of observations (N) to be made by using the following formula N = 4pq/L2 29
  • 30. ADVANTAGES ā€¢ Work sampling is a low cost alternative to continuous monitoring, just as sampling in the audit context is a low cost alternative to 100% evaluation of an account ā€¢ A simultaneous work sampling of several operators or machines can be made by a single observer Ex: There is complain that nursing officers are working only 70% of their duty time in wards Number of observations required for work sampling (N) = 4 (0.7) (0.3)/ (0.05)2 = 336 Results: Nursing officers were seen working on 252 observations (=75% of the time) Out of the total working time, 35% were spent on bedside and 65% on clerical ward work 30
  • 32. 32
  • 33. ā€¢ Queuing theory was first introduced in the early 20th century by Danish mathematician and engineer Agner Krarup Erlang. ā€¢ Erlang worked for the Copenhagen Telephone Exchange and wanted to analyze and optimize its operations. ā€¢ He sought to determine how many circuits were needed to provide an acceptable level of telephone service, for people not to be ā€œon holdā€ (or in a telephone queue) for too long. ā€¢ Also to find out how many telephone operators were needed to process a given volume of calls. ā€¢"Start with the end in mind." ā€” Stephen Covey 33
  • 34. His mathematical analysis culminated in his 1920 paper ā€œTelephone Waiting Timesā€, which served as the foundation of applied queuing theory. The international unit of telephone traffic is called the Erlang in his honor. 34
  • 35. Queuing theory is a mathematical approach applied to the analysis of waiting lines At its core, a queuing situation involves two parts Someone who requests a service Someone who delivers the service Customer Server Doctor 35
  • 36. Cost associated with patients having to wait for service ā€¢ Loss of business to HCO. ā€¢ Costs incurred by society. ā€¢ Decreased patient satisfaction and quality of care. Cost of providing the services (capacity cost) ā€¢ Salaries paid to employees. ā€¢ Salaries paid to employees or servers while they wait for service from other server, for eg: waiting for the pathology report, radiology report, labs, etc. ā€¢ Fixed costs ā€“ cost of waiting space, facilities, equipment, and supplies. COSTS OF WAITING IN LINES OR QUEUE 36
  • 37. ā€¢"It's easy to solve a problem that everyone sees, but it's hard to solve a problem that almost no one sees." ā€” Tony Fadell Arrival rate Customers Queue discipline Service rate Queue Service facility Served customers Queuing theory scrutinizes the entire system of waiting in line, including elements like customer arrival rate, number of servers, number of customers, capacity of the waiting area, average service completion time, and queuing discipline. 37
  • 38. The Gantt chart can also include the start and end dates of tasks, milestones, dependencies between tasks, and assignees. GANTT CHART Devised by Henry Gantt, an American engineer and project management consultant A project management tool that illustrates work completed over a period of time in relation to the time planned for the work It typically includes two sections: ā€¢ Left side outlines a list of tasks ā€¢ Right side has a timeline with schedule bars that visualize work 38
  • 39. CHARACTERISTICS 39 ā€¢ The bar in each row identifies the corresponding task ā€¢ The horizontal position of the bar identifies start and end times of the task ā€¢ Bar length represents the duration of the task ā€¢ Task durations can be compared easily ā€¢ Good for allocating resources and re-scheduling ā€¢ Precedence relationships can be represented using arrows ā€¢ Critical activities are usually highlighted ā€¢ Slack times are represented using bars with doted lines ā€¢ The bar of each activity begins at the activity earliest start time (ES) ā€¢ The bar of each activity ends at the activity latest finish time (LF).
  • 40. Choose research area Preliminary research Decide research topic Decide methodology Submit/present proposal Finalize methodology Conduct research Analyze data Write up Submit assignment 10 11 12 13 14 15 16 17 18 19 20 9 8 7 6 5 4 DURATION (in weeks) 40
  • 41. Miscellaneous Financial techniques Statistical techniques Activity analysis Mathematical techniques 1) Time trends and forecasting 2) Decision theory and tree 1) Time and Motion study 2) Work sampling and activity analysis 3) Queuing theory 4) Gantt chart and work schedule 1) Simulation study/ model 2) System analysis 3) Linear programming 4) Inventory control 5) Network analysis 6) PERT 7) CPM 41
  • 43. SYSTEM ANALYSIS ā€¢ Set of objectives to be achieved is defined and alternatives to achieve these are formulated ā€¢ Alternatives are evaluated in terms of cost-effectiveness ā€¢ Mathematical models may be used 43 Study of inter relationships operating in the various components within a system and also between a system and other systems System: An arrangement and set of relationships among multiple parts functioning as a whole
  • 44. LINEAR PROGRAMMING 44 It is a useful tool for deciding the course of action for a problem in which there are competing alternatives uses for limited resources Mathematical tool where components of a system and its constraints are depicted in a linear equation and the desirable combination of activities with regard to certain given set of objectives and constraints is arrived Linear Programming (LP) problems are optimization problems in which the objective function and the constraints are all linear
  • 45. A Company manufacturers two types of drugs A and B. Each product uses Machine X and Machine Y. The process time per unit of drug a on Machine X is 10 hours and on the Machine Y is 8 hours. The processing time per unit of drug B on Machine X is 15 hours and on the Machine Y is 10 hours. The maximum number of hours available per week on Machine X and Machine Y are 80 hours and 60 hours respectively. Also the profit per unit of selling Drug A and Drug B are Rs 25 and Rs 35 respectively. Formulate a LP model to determine the production volume of each of the drugs such that total profit is maximized. 45
  • 46. 46 Machine Machine hours/ unit Limit on machine hours Drug A Drug B Machine X 10 15 80 Machine Y 8 10 60 Profit/ unit (Rs) 25 35 Maximize Z = 25(A) + 35 (B) 10 (A) + 15 (B) ā‰¤ 80 8 (A) + 10 (B) ā‰¤ 60 A and B ļ‚³ 0
  • 47. ABC analysis VED analysis SDE analysis FNSD analysis HML analysis XYZ analysis SOS analysis Types Method of maintaining of stock at a level at which purchasing and storing costs are the lowest possible without interference with supply Objective : To maintain optimum stock INVENTORY MANAGEMENT 47
  • 48. ABC METHOD ITEM % COST % A 10% 70% B 20% 20% C 70% 10% A items: Less quantity; more resources ā€¢ Tight control ā€¢ Rigid estimate of requirement ā€¢ Strict & closer watch ā€¢ Low safety stock ā€¢ Managed by top management Also known as ā€˜Proportional Part Valueā€™ method C items: More quantity; less resources ā€¢ Ordinary control measures ā€¢ Purchase based on usage estimates ā€¢ High safety stocks Different items categorized into three groups based on annual expenditure incurred on these items 48
  • 49. V = Vital life saving drugs (Absence of which cannot be tolerated) E = Essential items (Absence can be tolerated for a short time period) D = Desirable (Non availability can be tolerated for a longer period) VED Analysis Based on criticality in patient care 49
  • 50. A B C CV CE CD BV AV V E D AD BD BE AE Category I Category II Category III Close monitoring & control Combination of ABC & VED Analysis Moderate control No control needed CV CE CD BV AV AD BD BE AE 50
  • 51. It looks at quantity, consumption rate and how often the item is issued and used F = Fast moving (needs constant monitoring) N = Normal moving (consumed on regular basis; purchased once or twice a year) S = Slow moving (periodically reviewed to prevent expiry & obsolescence) D = Dead stock (Items which is no longer required) FNSD Analysis Inventories are classified on the basis of productā€™s unit price H = High value of inventories (High cost) M = Medium value of inventories (Medium cost) L = Low value of inventories (Low cost) HML Analysis 51
  • 52. Materials are categorized based on the nature of supply Seasonal and Off-Seasonal materials Helps to manage purchases and storage of materials which are seasonal in nature SOS Analysis Classification is based on the scarcity of supply This technique handles problem faced in lead time analysis and purchasing strategies S ā€“ Scarce (imported; longer time to arrive; supply irregular) D ā€“ Difficult to procure E ā€“ Easy to procure SDE Classification 52
  • 53. Materials are categorized according to variability of their demand or forecasted consumption X ā€“ Very little variation (future demand can be reliably forecasted) Y ā€“ Some variation (demand can be predicted to some extent) Z ā€“ Most variation (demand forecasting is impossible) XYZ Analysis 53
  • 54. The activities are interrelated in a logical sequence which is known as ā€œPrecedence relationshipā€ Project is represented in the form of network for the purpose of analysis to get solutions for scheduling and controlling its activities PROJECT MANAGEMENT (NETWORK ANALYSIS) A project consists of interrelated activities which are to be executed in a certain order before the entire task is completed 54
  • 55. PHASES OF PROJECT MANAGEMENT PLANNING ā€¢ Dividing the project into distinct activities ā€¢ Estimating time requirement for each activity ā€¢ Establishing precedence relationships among the activities ā€¢ Construction of arrow diagram (Network) SCHEDULING CONTROLLING ā€¢ Determines the start and end time of each and every activity ā€¢ Uses the arrow diagram and time chart for continuous monitoring and progress reporting 55
  • 56. GUIDELINES FOR NETWORK CONSTRUCTION ā€¢ The starting event and ending event of an activity are called tail event and head event respectively ā€¢ The network should have a unique starting node (tail event) ā€¢ The network should have a unique completion node (head event) ā€¢ No activity should be represented by more than one arc in the network ā€¢ No two activities should have the same starting node and same ending node 56
  • 57. ACTIVITY PREDECESS OR DURATION A - 1 B - 2 C - 3 D A 4 E B 5 F B 4 G C 6 H D, E 6 I G 2 J F, H, I 3 ļ¶ Construct the CPM network ļ¶ Determine Critical path and Project completion time 57
  • 58. 1 5 2 7 4 3 6 8 A = 1 day C = 3 days B = 2 days D = 4 days E = 5 days F = 4 days G = 6 days H = 6 days I = 2 days J = 3 days 58
  • 59. CPM The critical path of a project network is the longest path in the network 59
  • 60. 1 5 2 7 4 3 6 8 A = 1 day C = 3 days B = 2 days D = 4 days E = 5 days F = 4 days G = 6 days H = 6 days I = 2 days J = 3 days 1 5 2 6 8 7 4 3 1 5 2 6 8 7 4 3 7 4 60 CRITICAL PATH
  • 62. Under PERT, three time-estimates are made 1. Most Likely Time: Time taken most frequently in completing a particular activity. 2. Optimistic Time: Time in which an activity can be completed, if all goes as per the predetermined plan. 3. Pessimistic Time: Time taken to complete an activity under most adverse conditions. This is thus the longest possible time taken to complete a project. Activity Time= [Optimistic time + 4 x (Likely expected time) + Pessimistic time] /6 62
  • 63. Consider the following table summarizing the details of a project: ACTIVITY PREDECESSOR DURATION (WEEKS) OPTIMISTIC MOST LIKELY PESSIMISTIC A - 5 6 7 B - 1 3 5 C - 1 4 7 D A 1 2 3 E B 1 2 9 F C 1 5 9 G C 2 2 8 H E, F 4 4 10 I D 2 5 8 J H, G 2 2 8 ā€¢ Construct the project network ā€¢ Find the expected duration of each activity ā€¢ Find the critical path and the project completion time 63
  • 65. ACTIVITY PREDECESSOR DURATION (WEEKS) EXPECTED TIME OPTIMISTIC MOST LIKELY PESSIMISTIC A - 5 6 7 6 B - 1 3 5 3 C - 1 4 7 4 D A 1 2 3 2 E B 1 2 9 3 F C 1 5 9 5 G C 2 2 8 3 H E, F 4 4 10 5 I D 2 5 8 5 J H, G 2 2 8 3 Expected time = [O + (4 x M) + P] / 6 65
  • 66. 1 5 2 6 8 7 4 3 A = 6 H = 5 G = 3 F = 5 I = 5 D = 2 E = 3 B = 3 C = 4 J = 3 Critical path = C-F-H-J Project completion time = 17 weeks 1 5 2 6 8 7 4 3 66
  • 67. Plan service Equipment ordered Equipment installed Start providing service Staff recruited Staff trained 2 months 10 months 1 month 4 months 2 months 1 month 67
  • 68. Miscellaneous Financial techniques Statistical techniques Activity analysis Mathematical techniques 1) Time trends and forecasting 2) Decision theory and tree 1) Time and Motion study 2) Work sampling and activity analysis 3) Queuing theory 4) Gantt chart and work schedule 1) Simulation study /model 2) System analysis 3) Linear programming 4) Inventory control 5) Network analysis 6) PERT 7) CPM 68
  • 69. Miscellaneous Financial techniques 1) Cost accounting and analysis 2) Cost Benefit Analysis 3) Cost Effective Analysis 4) Zero base budgeting 5) Input output analysis 1) Management by exception 2) Situation analysis 3) SWOT Analysis 4) Log frame Analysis 69
  • 71. Is there a good evidence of effectiveness of interventions being compared Are the effectiveness of interventions equal? Can the outcome be valued in monetary terms Can outcomes be measured in terms of QALY/ DALY Costing study Cost minimization analysis Cost-benefit analysis Cost effectiveness Cost Utility analysis YES NO YES NO YES NO NO YES 71
  • 72. ZERO-BASED BUDGETING Method of budgeting in which all expenses must be justified for each new year (current need, cost, alternate options) rather than based on previous years Setting objectives Developing decision unit Developing decision packages Ranking decision packages Resource allocation Controlling and Monitoring PROCESS 72
  • 73. BENEFITS ā€¢ Efficient allocation of resources, as it is based on needs and benefits rather than history ā€¢ Drives managers to find cost effective ways to improve operations ā€¢ Detects inflated budgets ā€¢ Increases staff motivation by providing greater initiative and responsibility in decision-making ā€¢ Identifies and eliminates wasteful and obsolete operations ā€¢ Flexible technique ā€¢ Useful for government department 73
  • 74. DRAWBACKS ā€¢ More time-consuming than incremental budgeting ā€¢ Justifying every line item can be problematic for departments with intangible outputs ā€¢ Requires specific training, due to increased complexity ā€¢ High administrative cost ā€¢ Increased paper work and man-power 74
  • 75. INPUT-OUTPUT ANALYSIS Input-output analysis seeks to explain how one industry sector affects others in the same nation There is a circular relationship between inputs and output of an economy Wassily Leontief, a Soviet-American economist developed the input-output analysis method, earning him the Nobel Prize in economics in 1973 Output of A Input of B, C, D 75
  • 76. X1 X2 FD X1 X11 X12 F1 X2 X21 X22 F2 Balancing equation: X1 = X11 + X12 + F1 Purchasing sector Selling sector An input-output table shows how much of each input is needed to produce unit amount of each output 76
  • 77. Miscellaneous Financial techniques 1) Cost accounting and analysis 2) Cost Benefit Analysis 3) Cost Effective Analysis 4) Zero base budgeting 5) Input output analysis 1) Management by exception 2) Situation analysis 3) SWOT Analysis 4) Log frame Analysis 77
  • 79. MANAGEMENT BY EXCEPTION Management by exception is the practice of examining the financial and operational results of a business, and only bringing issues to the attention of management if results represent substantial differences from the budgeted or expected amount. 79
  • 80. Efficient practices Managers can lead their company efficiently by delegating tasks. They focus on achieving the company's vision while other employees work on daily tasks to keep the company operational. Sets clear priorities For example, if an employee knows they should notify a manager if they sign a high-profile client, the employee also understands how important that activity is. Motivates employees Because management by exception allows employees to work independently, it can motivate employees to take more responsibility at work. Quickly addresses problems ADVANTAGES 80
  • 81. DISADVANTAGES Less focus on preventive measures Because management by exception relies on reacting to a problem, it can neglect to put preventative measures in place. Requires close monitoring Companies need to establish close monitoring practices ensuring professionals alert the managers when a problem arises. Requires advanced problem-solving skills All leaders within a company are required to have exceptional problem-solving skills. This helps them quickly address issues and find creative solutions. 81
  • 82. SITUATIONAL ANALYSIS It is an integral component of the management process to find out what the existing situation is, analyze the same, identify, which aspects needs changing, and then plan accordingly This method described as ā€˜where are we nowā€™, is the means by which a company can identify its own strengths and weaknesses as they relate to external opportunities and threats 82 For example, studies regarding drug prescription and consumption in different types of health facilities. The result of these studies reveal the prescribing habits of Doctors, and the need and ways for improving drug management to make them safer and economical
  • 83. OBJECTIVE INTERVENTION OUTPUTS INDICATORS To increase deliveries by SBA from 20% in 2012 to 80% in 2017 ā€¢ SBAs are posted at PHC on 8 hours duty ā€¢ One MO available at PHC on 8 hours shift basis ā€¢ Referral transport available ā€¢ Number of deliveries by SBA ā€¢ Expected outcome: 80% deliveries by SBA ā€¢ % of deliveries by SBA out of total deliveries ā€¢ Verify from HMIS LOGICAL FRAMEWORK A logical framework or ā€˜Log Frameā€™ is a management tool for Planning, Progress Monitoring and Evaluation of the program This tool ensures that planning is result-oriented and outcomes are evidence-based A Logical Framework for safe deliveries 83
  • 84. 84
  • 85. It involves identifying the internal and external factors that are favorable and unfavorable to achieve a objective SWOT ANALYSIS SWOT analysis is a strategic planning method used to evaluate the Strengths, Weaknesses, Opportunities, and Threats involved in a project/ program 85
  • 86. HELPFUL HARMFUL ā€¢ Political will ā€¢ Commitment of key research institutes ā€¢ Framework in form of NCD programs ā€¢ Integration of all chronic diseases ā€¢ Dedicated resources ā€¢ Poor monitoring and evaluation ā€¢ Limited implementation capacity ā€¢ Low levels of community awareness ā€¢ Low utilization rates ā€¢ Low expenditure rates ā€¢ Best buys ā€¢ PEN Intervention Package ā€¢ Health system strengthening ā€¢ NCD surveillance ā€¢ Digitization ā€¢ Adherence monitoring ā€¢ Rising burden of NCDs ā€¢ Low budget allocation for NCD programs ā€¢ Diversity in sub-populations ā€¢ Absence of regulatory mechanism SWOT Analysis of NCD program INTERNAL EXTERNAL S O T W 86
  • 87. Miscellaneous Financial techniques 1) Cost accounting and analysis 2) Cost Benefit Analysis 3) Cost Effective Analysis 4) Zero base budgeting 5) Input output analysis 1) Management by exception 2) Situation analysis 3) SWOT Analysis 4) Log frame Analysis 87
  • 89. REFERENCES ā€¢ https://www.gantt.com/ ā€¢ https://queue-it.com/blog/queuing-theory/ ā€¢ WHO Modern management methods and the organization of health services ā€¢ https://www.youtube.com/watch?v=WrAf6zdteXI ā€¢ Park textbook of community medicine ā€¢ Public Health Management by Sunderlal ā€¢ Treatise on Health Management by SC Mohapatra ā€¢ Handbook of Health Planning and Management by Sukamal Bisoi ā€¢ Pdf on MMT by Dr. Sharon (shared in telegram group) ā€¢ YouTube videos (link will be provided on request) 89