Construction
Reservoir schematic overview
Sub-gradeVerification
Test
Standard PenetrationTest
(SPT)
RegulatingTank
Structural Fill
Structural Fill applied in layers
over the sub-grade , level of
achieved compaction
determined over Field Density
Test (FDT)
Plate LoadTest
Conducted over the final layer
of structural fill.
RegulatingTank -
Structural Fill
Final layer of structural fill,
compacted, leveled and ready
for blinding concrete
RegulatingTank
BlindingConcrete
BlindingConcrete (Class C)
Design:
W=185kg/m3;
Cement=300kg/m3;
Agg=1.880kg/m3;
Add=2.4kg/m3.
AJRT Tank
Bottom Slab
Formwork drawing - bottom
slab plan
Base Slab - Corrosion
Protection
2mm thick PE Sheeting
between BlindingConcrete and
Base Slab concrete as corrosion
protection
Bottom Slab - Sections
Compressible Material
Extruded PolystyreneType I
(ASTMC578)
laid on the top of Blinding
Concrete (Class C)
Base Slab
Reinforcement
Steel ReinforcingWorks (ASTM
A615):
-Ø>14mmGRADE 60,Yield
Strength = 400MPa, deformed;
-Ø=12mmGRADE 40,Yield
Strength =280MPa, deformed;
-Ø<12mm MILD Steel,Yield
Strength =250MPa, round
Base Slab Formwork
RMD Kvikform Base Slab
shutter with visible black
corrosion protection (PE sheet)
for later overlapping to vertical
surface of the Reservoir wall.
Base Slab Formwork
RMD Kvikform, wall kicker
10cm height
Batching Plant
New Batching Plant erected for
supply of
RegulatingTank concrete
works
Batching Plant
Batching Plant &
Cement Silos
Batching Plant with
Chiller, Silos,
Aggregate Separator
Batching Plant Chiller
For regulation of concrete
temperature in Saharan Desert
climate. During the production,
concrete temperature on
delivery to the Site did not
exceed 32°C although ambient
temperature often reached
52°C.
Batching Plant
Controls
Batching Plant
Automatic mixing & control
Batching Plant
Aggregate Separators
Sand blowing for decrease of
fine materials
Concrete Quality
Control
Cylinder moulds for sampling of
concrete
Fresh Concrete Quality
Control -Workability
SlumpTest
Fresh Concrete Quality
Control –
Air Content
RegulatingTank –
Outlet Section Base
SlabConcrete
81nr of Base Slab modules (max
width 15x15m).
The sequential bay method of
construction has been used
with each consecutive bay
having at least two adjacent
free edges and not more than
two adjacent edges continuous
with previous bays
ConcreteWorks
Trowell of the Base Slab
concrete surface, over applied
curing compound BASF
Masterkure 106D; SIKA
Base Slab Structural
Concrete
Concrete ClassA:
(W=189kg/m3; C=386kg/m3;
W/C=0.49 ; Agg=1.830kg/m3;
Add=3,1kg/m3)
Cement –Type II,ASTMC150;
Additive BASF Lubricon L-200,
BASF MelcretTB101Type G
Construction Joints –
Water Stop
SCP Ltd - 25x8mm Dual Seal
SwellableWater Stop
SwellableWater Stop
SCP Ltd - 25x8mm Dual Seal
SwellableWater Stop
Walls –Work Plan
RegulatingTankWalls
Formwork
RMD Kwikform Shuttering
System
RegulatingTankWalls
Formwork
In total 55nr of Wall-segments
installed with concrete, max
modular wall-length = 15m’,
height = 6.06m; width = 0.45m
RegulatingTankWalls
Formwork
RegulatingTankWalls
Concrete Installation
Construction Joint
Base Slab /Walls /
Walls
SCP Ltd - 25x8mm Dual Seal
SwellableWater Stop
between each of 55nr modular
wall-segments
Construction Joint
Base Slab /Walls
SCP Ltd - 25x8mm Dual Seal
SwellableWater Stop
Walls,Columns & Roof
Slab - Sections
Columns Formwork
RMD Kwikform, Columns
Ø400mm
Columns Formwork
RMD Kwikform Column-kickers
RegulatingTank
Columns (500nr)
500nr Columns Ø400mm
Concrete ClassA (W=189kg/m3;
C=386kg/m3;W/C=0.49 ;
Agg=1830kg/m3;
Add=3.1kg/m3)
RegulatingTank – Roof
Slab Formwork
RMD Kwikform Scafffolding
Roof Slab - Sections
RegulatingTank – Roof
Slab Formwork
RegulatingTank
PartitionOverflow
Wall
PartitionOverflow Wall
dividing RegulatingTank
onto 2 separate Water
Chambers (2x35.000m3)
Roof Slab
ReinforcementWorks
Access Manhole openings–
DN600
Roof Slab
ReinforcementWorks
81nr of Roof Slab modules (max
width 15x15m), with 25x8mm
DualSeal Swellable Water Stop
in construction joint between
each slab
Roof Slab Concrete
Installation
Roof Slab d=300mm;
Concrete ClassA (W=189kg/m3;
C=386kg/m3;
W/C=0.49 ; Agg=1830kg/m3;
Add=3.1kg/m3)
Cement –Type II,ASTMC150;
Additive BASF Lubricon L-200,
BASF MELCRETTB101Type G
RegulatingTankView
during construction
Roof Slab
Survey verification of Roof Slab
plywood formwork (behind
visible tower-crane and
concrete pouring of columns)
RegulatingTank Roof
Slab
Reservoir height bottom to
roof slab -6,06m, 500nr
columns, 81nr base slab, 81nr
roof slab modules (max width
15x15m), with 25x8mm Dual
Seal Swellable Water Stop in
construction joint between
each slab
RegulatingTank Roof
Slab
The sequential bay method of
construction has been used
with each consecutive bay
having at least two adjacent
free edges and not more than
two adjacent edges continuous
with previous bays
RegulatingTank
Access Manhole
Sealing ofTie-rod holes,
finishing works remaining
Outlet Shafts &
Overflow
Outlet Shafts &
Overflow
RegulatingTank
Overflow Pipe
Penetration
Overflow Steel DN1600mm
Pipe Nozzle (25x8mm Dual Seal
SwellableWater Stop & elastic
sealing 2x1.5cm)
RegulatingTank –
Overflow PipeWall
Closure of Wall Shutter
RegulatingTank
Overflow Pipe
Shutter gaps sealing, centering
of the Steel DN1600 Pipe
elevation
RegulatingTankOutlet
Shaft 1
Outlet Shaft with Steel
DN1400mm Pipe
RegulatingTankOutlet
Shaft 2
ReinforcementWorks on Outlet
Shaft 2 with Steel DN1400mm
Pipe
Outlet Shaft 1
Formworks
Outlet Shaft 1
Concrete Installation
Outlet Shaft 1
Inlet & Drain Shaft
Inlet & Drain Shaft
Inlet Section –
Integrated Surge Shaft
RegulatingTank PartitionWall
visible at the back
RegulatingTank Inlet
& Surge Shaft
Inlet Pipes Steel DN1200mm
Inlet &Tank
Integrated Surge Shaft
Steel DN1200 Pipes
Inlet Surge Shaft with
Inlet DN1200 pressure
pipes
Wall’s reinforcement works,
pipe nozzles positioning and
anchoring in progress
Surge ShaftWall
Formworks
Surge Shaft
Surge Shaft Corrosion
Protection
All buried concrete surfaces in
contact with soil are protected
byCoalTar Epoxy coating,
average dry film thickness 150
microns to give overall dry film
thickness of 450microns.
Underside of bottom slab
protected by 2 PE sheets with
friction coefficient <0.1
Inlet Surge Shaft –
Tank’s Base Slab gap
To be filled with Soil cement.
Surge Shaft –
Compressible Material
Corrosion Protection:
AmerCoat 78 HBB Resin Black +
Cure (1:4);
DoeCote 1080H + DoeClean
1080 (1:4)
Surge Shaft –
Compressible Material
Corrosion Protection:
-Compressible material –
Polystyrene 5cm
-- 3nr layers of Coal tar Epoxy
(min 450 microns)
Inlet Surge Shaft Soil
Cement filling
Soil Cement Mix Design:
W=300kg/m3;Cement =
140kg/m3 (5% of Soil mass);
W/C=2.1;Agg=1760kg/m3;
Add=0.44kg/m3
Tank’s Integrated
Surge Shaft – Soil
Cement filling
Slump = 5 - 15cm;
Minimal 7-days strength =
0.7MPa
Integrated Surge Shaft,
PartitionWall between
Water Chambers
RegulatingTank Inlet
side overview
RegulatingTank
Overview during
construction
RegulatingTank Drain
Shaft – Reservoir
Sump
Base Slab reinforcement works,
Drain Steel Pipe DN250mm,
Sump (750x750x300mm)
Drain Steel Pipe
DN250mmWall
Penetration
Pipe nozzle wall penetration,
swellable water stop, elastic
sealant for prevention of water
leakage.
RegulatingTank Drain
Shaft –Tank’s Sump
Internal Expansion Joint with
Water Stop
between Reservoir Sump and
Drain Shaft
RegulatingTank Drain
Shaft –Tank’s Sump
Internal ExpansionWater-Stop
(400mm)
left for connection with Drain
Shaft
RegulatingTank
view during
construction works
RegulatingTank view
during construction
SupportingTower Crane,
Batching Plant Silos visible on
the right side
Inlet OverflowWeir
Wall
Height of Weir (Overflow Wall)
top
50cm lower than Roof Slab
bottom
RegulatingTank
CornerWalls
The sequential bay method of
construction has been used
with each consecutive bay
having at least two adjacent
free edges and not more than
two adjacent edges continuous
with previous bays
RegulatingTankView
RegulatingTankOutlet
SectionView
Details
Details
RegulatingTank Roof
Slab
MaintenanceOpening 3x3m
RegulatingTank Roof
Slab
MaintenanceOpening 3x3m
RegulatingTank Roof
Slab Maintenance
Opening 3x3m
View from inside of the tank
RegulatingTank Roof
SlabWorks
InletOverflow WeirWall visible
on left side
RegulatingTankOutlet
Shaft 2
Assembling of Steel Pipes
DN1400
RegulatingTankOutlet
Shaft 2
Welding of DN1400 Steel Pipes
in protected environment.
Reservoir Overflow DN1600
Steel Pipe visible on upper left
side
RegulatingTankOutlet
Section
Outlet DN1400 Steel Pipes
aligned and welded.
Reservoir Overflow DN1600
Steel Pipe visible on upper left
side
RegulatingTankOutlet
Piping DN1400
View towards downstream
PumpStation
RegulatingTankOutlet
Pipe – towards Pump
Station
RegulatingTankOutlet
View
Steel DN1400 Pipes, Outlet
ShaftsWalls Reinforcement
works visible
RegulatingTank Inlet
Section Shafts
Transition from DN1600 PCCP
(Pre-stressed Concrete Cylinder
Pipes) to DN1200 Steel Pipes
RegulatingTankView
RegulatingTankOutlet
with Overflow
Discharge
RegulatingTankOutlet
with Overflow
Discharge
RegulatingTankOutlet
with Overflow
Discharge
Overflow Discharge
RegulatingTank – on
FirstWater
FirstWater on
4th November 2009
RegulatingTank – on
FirstWater
FirstWater on
4th November 2009
RegulatingTank – on
FirstWater
FirstWater on
4th November 2009
RegulatingTank on
FirstWater
FirstWater on
4th November 2009

More Related Content

What's hot

Water coning in oil wells and DWS technology
Water coning in oil wells and DWS technologyWater coning in oil wells and DWS technology
Water coning in oil wells and DWS technologyshubhamsaxena2329
 
Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewVladimir Popovic
 
Dewatering for open pit mines and quarries
Dewatering for open pit mines and quarriesDewatering for open pit mines and quarries
Dewatering for open pit mines and quarriesMartin Preene
 
Coning problems and remedies
Coning problems and remediesConing problems and remedies
Coning problems and remediesIrfan Jadoon
 
DEADMANS BRIDGE PRESENTATION
DEADMANS BRIDGE PRESENTATIONDEADMANS BRIDGE PRESENTATION
DEADMANS BRIDGE PRESENTATIONBrian Dennehy
 
Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015Terry Aylward
 
Water transportation to drilling sites
Water transportation to drilling sitesWater transportation to drilling sites
Water transportation to drilling sitesMartin Preene
 
DEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO Group
DEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO GroupDEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO Group
DEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO GroupBoris Svasta
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description detailsAonghus Murray
 
Water_Shut_Off_Winter traning(ISM)1
Water_Shut_Off_Winter traning(ISM)1 Water_Shut_Off_Winter traning(ISM)1
Water_Shut_Off_Winter traning(ISM)1 Akanksha Sidar
 
Derventa City Water Supply Project
Derventa City Water Supply ProjectDerventa City Water Supply Project
Derventa City Water Supply ProjectVladimir Popovic
 
Technical specifications for Phase 1 Wastewater Network tank interceptors
Technical specifications for Phase 1 Wastewater Network tank interceptorsTechnical specifications for Phase 1 Wastewater Network tank interceptors
Technical specifications for Phase 1 Wastewater Network tank interceptorsLaith Abdel Nabi
 
Proposed Methodology Shore Approach
Proposed Methodology  Shore ApproachProposed Methodology  Shore Approach
Proposed Methodology Shore ApproachMohd Zaini Baharum
 
Anchois 1- Oil&Gas Field
Anchois 1- Oil&Gas FieldAnchois 1- Oil&Gas Field
Anchois 1- Oil&Gas FieldJose V.Taboada
 

What's hot (17)

Water coning in oil wells and DWS technology
Water coning in oil wells and DWS technologyWater coning in oil wells and DWS technology
Water coning in oil wells and DWS technology
 
Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project Overview
 
Dewatering for open pit mines and quarries
Dewatering for open pit mines and quarriesDewatering for open pit mines and quarries
Dewatering for open pit mines and quarries
 
Coning problems and remedies
Coning problems and remediesConing problems and remedies
Coning problems and remedies
 
DEADMANS BRIDGE PRESENTATION
DEADMANS BRIDGE PRESENTATIONDEADMANS BRIDGE PRESENTATION
DEADMANS BRIDGE PRESENTATION
 
Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015
 
Water transportation to drilling sites
Water transportation to drilling sitesWater transportation to drilling sites
Water transportation to drilling sites
 
Mining Operations Optimize Dewatering Processes
Mining Operations Optimize Dewatering ProcessesMining Operations Optimize Dewatering Processes
Mining Operations Optimize Dewatering Processes
 
DEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO Group
DEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO GroupDEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO Group
DEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO Group
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
 
Water_Shut_Off_Winter traning(ISM)1
Water_Shut_Off_Winter traning(ISM)1 Water_Shut_Off_Winter traning(ISM)1
Water_Shut_Off_Winter traning(ISM)1
 
Derventa City Water Supply Project
Derventa City Water Supply ProjectDerventa City Water Supply Project
Derventa City Water Supply Project
 
Technical specifications for Phase 1 Wastewater Network tank interceptors
Technical specifications for Phase 1 Wastewater Network tank interceptorsTechnical specifications for Phase 1 Wastewater Network tank interceptors
Technical specifications for Phase 1 Wastewater Network tank interceptors
 
Proposed Methodology Shore Approach
Proposed Methodology  Shore ApproachProposed Methodology  Shore Approach
Proposed Methodology Shore Approach
 
DPR TILL 15-06-15
DPR TILL 15-06-15DPR TILL 15-06-15
DPR TILL 15-06-15
 
Anchois 1- Oil&Gas Field
Anchois 1- Oil&Gas FieldAnchois 1- Oil&Gas Field
Anchois 1- Oil&Gas Field
 
Sanipor
SaniporSanipor
Sanipor
 

Similar to Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70.000m3

WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)Vladimir Popovic
 
FL AWWA Steel Pipelines_0.pdf
FL AWWA Steel Pipelines_0.pdfFL AWWA Steel Pipelines_0.pdf
FL AWWA Steel Pipelines_0.pdfad_gordon
 
Debeljaca WS Reservoir 700m3
Debeljaca WS Reservoir 700m3Debeljaca WS Reservoir 700m3
Debeljaca WS Reservoir 700m3Vladimir Popovic
 
tender6-7_040616.pdf
tender6-7_040616.pdftender6-7_040616.pdf
tender6-7_040616.pdfKSLDESIGN
 
Traps and manhole aditya kumar barn1 ar14002
Traps and manhole aditya kumar barn1 ar14002Traps and manhole aditya kumar barn1 ar14002
Traps and manhole aditya kumar barn1 ar14002Aditya kumar
 
Flat slab strengthening zaragoza out2017 para pdf
Flat slab strengthening zaragoza out2017 para pdfFlat slab strengthening zaragoza out2017 para pdf
Flat slab strengthening zaragoza out2017 para pdfVálter Lúcio
 
Ntpc summer training 2017
Ntpc summer training 2017Ntpc summer training 2017
Ntpc summer training 2017ktx500
 
Total precase concrete structure for multi storey
Total precase concrete structure for multi storeyTotal precase concrete structure for multi storey
Total precase concrete structure for multi storeyBroad Homes Intl.
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16Leo Youngman
 
soft permeable pipe
soft permeable pipesoft permeable pipe
soft permeable pipecrownswear
 
soft permeable pipe
soft permeable pipesoft permeable pipe
soft permeable pipecrownswear
 
Soldier Bored and Diaphragm
Soldier Bored and DiaphragmSoldier Bored and Diaphragm
Soldier Bored and DiaphragmYingHongKang
 
D-wall Presentation - Rebar Cage.pdf
D-wall Presentation - Rebar Cage.pdfD-wall Presentation - Rebar Cage.pdf
D-wall Presentation - Rebar Cage.pdfAnonymousTxhyGf
 
pile foundation of burj khalifa
pile foundation of burj khalifapile foundation of burj khalifa
pile foundation of burj khalifaSUNILPRASAD68
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures ConstructionDavid H Moloney
 
Presentation on Prestressing prepared by Rais Uddin
Presentation on Prestressing prepared by Rais UddinPresentation on Prestressing prepared by Rais Uddin
Presentation on Prestressing prepared by Rais UddinRais Uddin
 
Presentation on prestressing prepared by Rais Uddin
Presentation on prestressing prepared by Rais UddinPresentation on prestressing prepared by Rais Uddin
Presentation on prestressing prepared by Rais UddinRais Uddin
 

Similar to Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70.000m3 (20)

WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)
 
FL AWWA Steel Pipelines_0.pdf
FL AWWA Steel Pipelines_0.pdfFL AWWA Steel Pipelines_0.pdf
FL AWWA Steel Pipelines_0.pdf
 
subsea
subseasubsea
subsea
 
Rehab Solutions for Today's Infrastructure
Rehab Solutions for Today's InfrastructureRehab Solutions for Today's Infrastructure
Rehab Solutions for Today's Infrastructure
 
Debeljaca WS Reservoir 700m3
Debeljaca WS Reservoir 700m3Debeljaca WS Reservoir 700m3
Debeljaca WS Reservoir 700m3
 
tender6-7_040616.pdf
tender6-7_040616.pdftender6-7_040616.pdf
tender6-7_040616.pdf
 
Traps and manhole aditya kumar barn1 ar14002
Traps and manhole aditya kumar barn1 ar14002Traps and manhole aditya kumar barn1 ar14002
Traps and manhole aditya kumar barn1 ar14002
 
Flat slab strengthening zaragoza out2017 para pdf
Flat slab strengthening zaragoza out2017 para pdfFlat slab strengthening zaragoza out2017 para pdf
Flat slab strengthening zaragoza out2017 para pdf
 
Ntpc summer training 2017
Ntpc summer training 2017Ntpc summer training 2017
Ntpc summer training 2017
 
Total precase concrete structure for multi storey
Total precase concrete structure for multi storeyTotal precase concrete structure for multi storey
Total precase concrete structure for multi storey
 
Bo q for shelter
Bo q  for shelterBo q  for shelter
Bo q for shelter
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
 
soft permeable pipe
soft permeable pipesoft permeable pipe
soft permeable pipe
 
soft permeable pipe
soft permeable pipesoft permeable pipe
soft permeable pipe
 
Soldier Bored and Diaphragm
Soldier Bored and DiaphragmSoldier Bored and Diaphragm
Soldier Bored and Diaphragm
 
D-wall Presentation - Rebar Cage.pdf
D-wall Presentation - Rebar Cage.pdfD-wall Presentation - Rebar Cage.pdf
D-wall Presentation - Rebar Cage.pdf
 
pile foundation of burj khalifa
pile foundation of burj khalifapile foundation of burj khalifa
pile foundation of burj khalifa
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures Construction
 
Presentation on Prestressing prepared by Rais Uddin
Presentation on Prestressing prepared by Rais UddinPresentation on Prestressing prepared by Rais Uddin
Presentation on Prestressing prepared by Rais Uddin
 
Presentation on prestressing prepared by Rais Uddin
Presentation on prestressing prepared by Rais UddinPresentation on prestressing prepared by Rais Uddin
Presentation on prestressing prepared by Rais Uddin
 

More from Vladimir Popovic

Seismic concrete Bore Piles at Makhinjauri water supply reservoir
Seismic concrete Bore Piles at Makhinjauri water supply reservoirSeismic concrete Bore Piles at Makhinjauri water supply reservoir
Seismic concrete Bore Piles at Makhinjauri water supply reservoirVladimir Popovic
 
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Vladimir Popovic
 
Tightness testing of gravity pipelines
Tightness testing of gravity pipelinesTightness testing of gravity pipelines
Tightness testing of gravity pipelinesVladimir Popovic
 
3-Days Construction Schedule
3-Days Construction Schedule3-Days Construction Schedule
3-Days Construction ScheduleVladimir Popovic
 
Water Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesWater Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesVladimir Popovic
 
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsVladimir Popovic
 
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsVladimir Popovic
 
Sealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesSealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesVladimir Popovic
 
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESAPPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESVladimir Popovic
 
Construction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopConstruction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopVladimir Popovic
 
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionMan Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionVladimir Popovic
 
Standard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsStandard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsVladimir Popovic
 
Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Vladimir Popovic
 
Man Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresMan Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresVladimir Popovic
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water ProjectVladimir Popovic
 

More from Vladimir Popovic (16)

Seismic concrete Bore Piles at Makhinjauri water supply reservoir
Seismic concrete Bore Piles at Makhinjauri water supply reservoirSeismic concrete Bore Piles at Makhinjauri water supply reservoir
Seismic concrete Bore Piles at Makhinjauri water supply reservoir
 
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
 
Tightness testing of gravity pipelines
Tightness testing of gravity pipelinesTightness testing of gravity pipelines
Tightness testing of gravity pipelines
 
3-Days Construction Schedule
3-Days Construction Schedule3-Days Construction Schedule
3-Days Construction Schedule
 
Water Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesWater Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing Examples
 
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
 
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
 
Sealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesSealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod Holes
 
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESAPPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
 
Construction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopConstruction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-Stop
 
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionMan Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
 
Standard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsStandard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elements
 
Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)
 
Man Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresMan Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor Structures
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water Project
 
Vani Water Supply Project
Vani Water Supply ProjectVani Water Supply Project
Vani Water Supply Project
 

Recently uploaded

A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfKamal Acharya
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf884710SadaqatAli
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234AafreenAbuthahir2
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdfKamal Acharya
 
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfDanfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfNurvisNavarroSanchez
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdfKamal Acharya
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfPipe Restoration Solutions
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopEmre Günaydın
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfAbrahamGadissa
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdfKamal Acharya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdfPratik Pawar
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...Amil baba
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-IVigneshvaranMech
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxVishalDeshpande27
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientistgettygaming1
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdfKamal Acharya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationRobbie Edward Sayers
 

Recently uploaded (20)

A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdf
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfDanfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptx
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 

Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70.000m3