4. Grade 62 or 67B high-carbon steel wire is adopted as raw material.
使用62或67B種高碳鋼彈簧硬鋼線材料。
With rest-proof and PVC-coatiog process. It prevent the steel wire from oxidization.
經磷酸防銹處理,外包覆PVC(因PVC具有較佳的彈性)。能完全包覆使彈簧硬鋼
線不會與空氣接觸,而產生氧化的現象。
The old hose, containing 1 out-layer was easily broken, and the new one, containing 3 out-
layer, is strong enough against breakage.
因早期只有外被覆層(一層)而且是收縮型的容易倒管,破損,現已加強管壁為三層
,屬於崩開型的透水管。
The mid layer, made from 0.1~0.38mm spunbonded nonwoven, allow the tiny organic material
passing through the hose to avoid outside sediment (the needle punched nonwoven over
0.6mm will cause outside sediment easily and lower the draining effiiciency).
中間不織布為長纖熱熔式,其厚度為0.1mm~0.38mm,該過的有機物還是要讓他過,
才不會堵塞在管壁上。( 若不織布採用針扎式的,其厚度為0.6mm以上的話,砂石容
易堵塞在管壁上,降低排水效果。)
The outer layer made from Polyester and other special yarn do not rot.
外被覆層採用特多龍紗及特殊合成纖維,不腐爛。
Sub-Soil Drainage Technology At Its Best
Hose Structure
軟管結構說明
6. Due to the different pressure underground, the water always flow from the high pressure area to low
pressure area where drain hose been buried. The underground water, surrounding the drain hose, will be
attracted by its weft yarn (capillary attraction) and collected in the hose, then drained out. This
continuous movement will lower the level of underground water effectively without any soil collapse and
chemical contamination. 利用土壓的原理而產生壓力差,而軟式透水管用鋼線做支撐體故使孔隙
水進到管內,管壁的緯紗有了毛細現象,吸水飽和流入管內後形成一條水道,因而達到了降
低地下水位的功能,且不會造成土層崩蝕及造成化學污染。
Drain hose is able to lower the level of underground water、drain the surface and penetrating water out
to improve the soil、solidify the soft soil and avoid soil collapse. 廣水軟式透水管可降低地下水位、
排除表面水、滲透水、土質改良、軟土加固防止崩塌及土石流。
The penetrable area of conventional HDPE is limited to the perforated area only, but raising up the
perforation area will decrease the resistance of pipe against pressure. Crownswear’s soft drain hose
provide more advantages in both penetration and pressure resistance than HDPE and other perforated
pipes.
透水面積大於50%以上,HDPE管視開孔率的多寡來計算透水面積,且孔率的多寡影響到管子
的耐壓強度。因此,廣水軟管透水量及耐壓強度大於HDPE管、網管及其他打洞硬式管。
Crownswear drain hose contains two parts: 軟管分二部份
Hose wall: it provide superior filtration、 drainage and more penetration area.
a.管 壁 部 份-具過濾性,排水功能,透水面積大。
Support: hose is supported by high tenacity steel wire to keep drainage effective.
b.支撐體部分-利用高強力彈簧硬鋼線支撐管壁,來達到排水的功能。
Advantages
功能特性
Sub-Soil Drainage Technology At Its Best
8. Methods of Installation
安裝方法
Flexibility, lightweight and easy to install cost effective.
伸縮性強 、容易安裝、施工方便、省時、省力。
Geotextiles is not required, for wrap-around the pipes.
無需不織布覆蓋軟管表面
No fittings is required for jointings (i.e.T-joints, Y-joints or elbows).無
需用接頭,節省接頭費用。
(We fabricate bends, tees, elbows reducer by using the parent hose.)
使用同軟管連接
The hose can be installed horizontally, vertically, diagonally or in
herringbone design or 90
。
or any other way the client wishes to
install.
軟管安裝方法可橫向,直向,斜向,八字型,可90。
彎曲安裝
Sub-Soil Drainage Technology At Its Best
12. for Field Drainage, Golf Course, Landscape to prevent ponding
高爾夫球場,運動場,棒球場,人造景觀休憩綠地排水
for Tunnel, Concealed Perimeter Drain
隧道,橫向水平鑽孔排水
for Roadside, Railside, Airport
道路路基排水,鐵、公路,機場排水
for Hillside Drainage and Slope Protection
山坡地開發邊坡之水土保持
for Garbage Treatment Site
廢棄處理場排水
for Coal Storage Areas
火力發電廠排水
for Retaining Walls in water logged areas
各種擋土牆背面垂直及水平排水
for Soil Stabilization and Land Reclamation
固實土壤,土質改良
Sub-Soil Drainage Technology At Its Best
Area of Usage
適用範圍
13. 中國衛岡隧道Tunnel Project in Nanjing, China
馬來西亞暗溝排水Bungalow at Jalan Tun Ismail, Ipoh Perak.
隧道&路基排水配置圖Typical Tunnel Drainage Design
14. 擋土牆排水Typical Retaining Wall Design
檳城發林的擋土牆排水
Farlim area 9D, Bandar Baru Ayer Item, Pulau Pinang.
Horizontal Drainage on Back of Retaining Wall System
擋土牆背水平排水配置圖
Vertical Drainage on Back of Retaining Wall System
擋土牆背垂直排水配置圖
15. 典型邊坡排水設計Typical Slope Drainage Design
Blind Ditch and Branches of Intercepting Water on Ladder Slope
Slope Protection Drainage System
18. 運動場盲排系統SPORT FIELD BLIND DRAINAGE
SYSTEM.
馬來西亞華文小學操場整治Renovation of the playground of Chinese primary schools in Malaysia
未整建前滿地泥濘muddy ground 積水不退 The water will not recede
21. 馬來西亞首相府官員辦公大樓整治工程
Renovation project of the office building of the Prime Minister’s Office of Malaysia
(示意圖)
工程單位為了確定埋入的透水管
會排水,便用灑水車灑水測試,
照片證明確實有排水出來
In order to determine the buried permeable pipe, the
engineering unit
If it can drain water, use a sprinkler truck to test it.
The photos prove that there is indeed drainage
coming out
34. TABLE OF FLOW QUANTITY AND VELOCITY DATA
流量和流速參數表
Sub-Soil Drainage Technology At Its Best
35. Static Pressure of Ground
靜 土 壓
Sub-Soil Drainage Technology At Its Best
Static Pressure of Ground
The static pressure of ground above the buried
pipe can be counted pre following formula:
P: Static pressure of ground (kg/m2)
h: the burying depth
B: the width of ditch
W: the weight of 1 m3 soil (2000kg/m3,soil and
rock)
Ө: 40゚ (the angle of ____ ) (May adjust)
e: the base of _____ (May adjust)
B: Pipe diameter (D)X2
36. Typical Trench Details
一般土溝之設計詳圖
Recommendation I :
- Road Base
Drainage
- Railside Drainage
路肩、鐵道排水
Recommendation II :
- Concealed Perimeter
Drain
暗溝週邊排水
Recommendation III :
- Field Drainage
一般草場排水
NOTE:THE BACKFILLING MATERIALS WILL DEPENDS ON.
1.COST BETWEEN AGGREGATE AND SAND.
2.THE RATE OF INFILTRATION, USING AGGREGATE WILL CREATE A BETTER POROUSITY AND WILL
ENHANCE THE PERMEABILITY RATES.
** 回填土溝之材料選擇,將隨著下列因素變更
1.骨材與粗砂的成本。
2.用粗砂會獲得較好的孔隙率,且會增進其滲透率及排水量。
38. Method of Installation
Step 1: To measure the dimension &
level.
測量及水平高程
Step 2: To construct a sump.
鑿陰井
Field Drainage (Sport Field)
埋設透水軟管程序
39. Method of Installation
Step 3: To drill the holes for the hose
outlet.
鑽洞預留孔
Step 4: To excavate the
trench for main hose.
開挖
Field Drainage (Sport Field)
40. Method of Installation
Step 6: To backfill the hose
with sand.
砂石級配回填
Step 5: To lay the main hose.
埋放透水軟管
Field Drainage (Sport Field)
41. Method of Installation
Step 7: To excavate and level the
branch hose.
開挖支管埋設地及測量水平
Step 8: To lay and tie the
joints.
軟管相連接
Field Drainage (Sport Field)
42. Method of Installation
Step 9: The T-joint.
接頭方式
Step 10: To measure the finish
level.
完工後再測量一次水平
Field Drainage (Sport Field)
43. Method of Installation
Step 11: To mark the expected finish
level.
測量完水平後標示記號
Step 12: To flatten and chamfer
the surface layers.
地面回填整平
Field Drainage (Sport Field)
44. 廣水企業股份有限公司 Crownswear Head Office:
台北市士林區文林路726號2樓
2FL. NO.726. WEN LIN ROAD.TAIPEI,
TAIWAN, R.O.C
TEL:886-2-2832-1916 FAX:886-2-2832-1917
E-mail:crownmp@ms29.hinet.net
http://www.crownswear.com
南京廣水管業有限公司 Manufacturing Plant:
南京市馬群科學園區天馬路8號廠房
NO.8 TIANMA ROAD, MAQUN SCIENCE
PARK, 210049 NANJING. CHINA. PROC.
TEL:86-25-84358698 FAX:86-25-84365586
越南廣水責任有限公司 Crownswear Vietnam:
越南胡志明市新平郡第十二坊黃花探街
214 號5樓
5 Floor, No.214 Hoang Hoa Tham, Ward 12, Tan
Binh District, HCM City, Vietnam
TEL:84-8-866855110 FAX:84-8--62937939