This document summarizes a water supply rehabilitation project in Vani, Georgia. It involved installing 1,720 meters of pipe distribution networks and 467 house connections. It also included installing a SCADA system with sensors to monitor flow, chlorine levels, and valves to automate the system. The contract was valued at 320,000 GEL to be completed by November 2012. It describes the various pipeline installations and sensor components of the SCADA system used to automate and monitor the water supply system.