• Estimation of machining time
• Importance of machine time calculation
• Calculation of machining time for different lathe operations,
Drilling and Boring
• Machining time calculation for Milling, Shaping and Planning
• Machining time calculation for grinding
Introduction
• To estimate the total cost of any product involving machining
operations, the machining cost is to be estimated primarily.
• In order to estimate the machining cost, one has to calculate
the machining time required for these machining operations.
• After knowing the machining time and rate of machining, the
total machining cost can be calculated.
• Therefore the estimation of machining time for various
operations such as lathe, drilling. boring, shaping, planning,
milling and grinding operations are very essential in the cost
estimation activity.
What is meant by Machining Time?
• It is time for which the machine works on the component
• From the time when the tool touches the work to when the
tool leaves the component after completion of operation
• The machining time depends on die type and extent of
machining required, material being machined, speed, feed,
depth of cut and number of cuts required
• In addition to the actual machining time, an estimator bas to
consider other time elements such as set-up time, handling
time, tear down time, down time and allowances to the
workers.
FACTORS TO BE CONSIDERED FOR
MACHINE TIME CALCULATION
•Set up time
•Operation time
•Tear down time
•Personal allowance
•Fatigue allowance
•Checking allowance
•Miscellaneous allowance
SETUPTIME
• This takes into account the time required to prepare the
machine for doing the job with the time taken to study the
blue print.
• The time to prepare the machine, in turn
• The time to install and adjust the tools in the machine, as well
as to make the machine ready to start the work.
OPERATION TIME
• The sum of handling time and machining time for a job is
called operation time.
• It is the duration of time that elapses between output of two
consecutive units of production.
TEAR DOWN TIME
• Tear down time takes into account the time necessary to
remove from the machine all tools and accessories, such as
jigs and fixtures, gauges and instruments etc.
• The time required for clearing operational chips from the
machine table and clearing of the machine itself are included
on this.
• Tear down time is generally 10 minute per shift of 8 hrs.
PERSONALALLOWANCE
• The time allowed for workers to meet their personal needs,
such as going to the urinal, drinking water, smoking, washing
their hands, etc is known as personal allowance.
• It is generally 5 to 10 minutes
FATIGUE ALLOWANCE
• The long working hours and poor working conditions such as
poor lighting, poor ventilation etc., cause fatigue
• Fatigue effect the efficiency of worker
• Fatigue decreases the worker capacity to work.
• The allowance for fatigue is taken depending upon the type
of work.
IMPORTANCE OF MACHINING TIME
CALCULATION
•To find the manufacturing cost of a particular job the
calculation of machining time is important, this
requires one or more machining operations.
•After determining the total time for machining, and
knowing the machining cost per unit time, the total
cost of machining can be worked out.
•Machining time is calculated by applying certain
basic formulae, tables of variables and constants.
• The basic formula used is
TRAVEL OF THE TOOL
• This is determined from the dimensions in the actual drawing of the part to be
manufactured.
• The necessary allowances for the tool approach and over-run for clearing the
tool off the job are taken into account with the actual length of the work, to
find the travel of the tool.
FEED
• Feed is the distance that the tool travels into the job in one revolution
• If the work or the distance that the table holding the work travels is
one stroke of the tool. In metric units, feed is usually expressed in
mm/revolution or mm/stroke.
• Feed depends on the depth of cut, fitness of the work desired, rpm of
the job, etc.
DEPTH OF CUT
• It is the penetration of the cutting tool into the job in a single cut.
• In metric units, the depth of cut is expressed in mm.
• The depth of cut depends upon the fitness of the job required, such as
higher depth of cut for rough cut and smaller depth of cut for finish
cut.
RPM
• It represents the number of revolutions of the m/c spindle in one
minute.
• Thus it is the number of revolutions per minute of the job or of tool.
CUTTING SPEED
• The cutting speed can be defined as the relative surface speed
between the tool and the job.
• It is expressed in meters per minute (mpm)
• For example if a job of diameter D mm is revolving at a speed of N
rpm
CALCULATION OF MACHINING TIME FOR
DIFFERENT LATHE
OPERATIONS
Where D = Diameter of given blank,
d = diameter of blank after turning.
• In turning operation, the depth of cut should not exceed 3 mm for
rough cuts and 0.7 5 mm for finishing cuts.
FACING OPERATION
KNURLING
Continued…
REAMING
EXTERNAL RELIEF TURNING
TAPPING
THREADING
DRILLING
BORING
CHAMFERING
MACHINING TIME FOR SHAPING AND PLANING
• Shaping, planning and slotting operations are carried out on
reciprocating machines with a single point cutting tool.
Formula used
Estimation of time for milling operation
The approach is the distance the cutter must be engaged
before the full depth of cut is reached.
When cutter diameter is less than the width of the work.
(b) When cutter diameter is greater than the width of the
work.
Slab milling operation:
Estimation of time for Grinding operation
Formula used
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION

More Related Content

Similar to MACHINING TIME CALCULATION

unit 03 ppt MT- 2.pptx
unit 03 ppt MT- 2.pptxunit 03 ppt MT- 2.pptx
unit 03 ppt MT- 2.pptx
VENKATESH676259
 
Introduction to Manufacturing Systemsshaping machine.pdf
Introduction to Manufacturing Systemsshaping machine.pdfIntroduction to Manufacturing Systemsshaping machine.pdf
Introduction to Manufacturing Systemsshaping machine.pdf
PrabathDissanayake8
 
Process planning with an example
Process planning with an exampleProcess planning with an example
Process planning with an example
Hiran Gabriel
 
2. LATHE OPERATIONS.ppt
2. LATHE OPERATIONS.ppt2. LATHE OPERATIONS.ppt
2. LATHE OPERATIONS.ppt
MPIndhu
 
SNSCT
SNSCTSNSCT
SNSCT
DharunCk
 
lathe operations
lathe operationslathe operations
lathe operations
Raja P
 
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUSTInternship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Hamza Nasir
 
PMTF INTERNSHIP (9 june tp 25 june-2015)
PMTF INTERNSHIP (9 june tp 25 june-2015)PMTF INTERNSHIP (9 june tp 25 june-2015)
PMTF INTERNSHIP (9 june tp 25 june-2015)
Asim Aslam
 
internship presentation.pptx
internship presentation.pptxinternship presentation.pptx
internship presentation.pptx
ChinmaiKumar
 
Drilling (1)
Drilling (1)Drilling (1)
Drilling (1)
kalyana sreenivasan
 
Drilling
DrillingDrilling
Drilling operation
Drilling operationDrilling operation
Drilling operation
ShehryarAwan3
 
Chapter 3 CNC turning and machining centers
Chapter 3 CNC turning and machining centersChapter 3 CNC turning and machining centers
Chapter 3 CNC turning and machining centers
RAHUL THAKER
 
Milling Machine
Milling MachineMilling Machine
Milling Machine
Dhyey Shukla
 
Machine tools
Machine toolsMachine tools
Machine tools
Ubaid Shah
 
All in 1 IE
All in 1 IEAll in 1 IE
All in 1 IE
shakil tutul
 
Economics of metal cutting operations
Economics of metal cutting operationsEconomics of metal cutting operations
Economics of metal cutting operations
Darshan Panchal
 
Lathe shaper slotter planer milling drilling machine tool ii
Lathe shaper slotter planer milling drilling machine tool iiLathe shaper slotter planer milling drilling machine tool ii
Lathe shaper slotter planer milling drilling machine tool ii
iukashyap
 
TYPES OF FINISHING GRINDING SURFACE GRINDIN
TYPES OF FINISHING  GRINDING SURFACE GRINDINTYPES OF FINISHING  GRINDING SURFACE GRINDIN
TYPES OF FINISHING GRINDING SURFACE GRINDIN
prasannakumarbn
 
Machine operations
Machine operationsMachine operations
Machine operations
garfield Tulloch
 

Similar to MACHINING TIME CALCULATION (20)

unit 03 ppt MT- 2.pptx
unit 03 ppt MT- 2.pptxunit 03 ppt MT- 2.pptx
unit 03 ppt MT- 2.pptx
 
Introduction to Manufacturing Systemsshaping machine.pdf
Introduction to Manufacturing Systemsshaping machine.pdfIntroduction to Manufacturing Systemsshaping machine.pdf
Introduction to Manufacturing Systemsshaping machine.pdf
 
Process planning with an example
Process planning with an exampleProcess planning with an example
Process planning with an example
 
2. LATHE OPERATIONS.ppt
2. LATHE OPERATIONS.ppt2. LATHE OPERATIONS.ppt
2. LATHE OPERATIONS.ppt
 
SNSCT
SNSCTSNSCT
SNSCT
 
lathe operations
lathe operationslathe operations
lathe operations
 
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUSTInternship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
 
PMTF INTERNSHIP (9 june tp 25 june-2015)
PMTF INTERNSHIP (9 june tp 25 june-2015)PMTF INTERNSHIP (9 june tp 25 june-2015)
PMTF INTERNSHIP (9 june tp 25 june-2015)
 
internship presentation.pptx
internship presentation.pptxinternship presentation.pptx
internship presentation.pptx
 
Drilling (1)
Drilling (1)Drilling (1)
Drilling (1)
 
Drilling
DrillingDrilling
Drilling
 
Drilling operation
Drilling operationDrilling operation
Drilling operation
 
Chapter 3 CNC turning and machining centers
Chapter 3 CNC turning and machining centersChapter 3 CNC turning and machining centers
Chapter 3 CNC turning and machining centers
 
Milling Machine
Milling MachineMilling Machine
Milling Machine
 
Machine tools
Machine toolsMachine tools
Machine tools
 
All in 1 IE
All in 1 IEAll in 1 IE
All in 1 IE
 
Economics of metal cutting operations
Economics of metal cutting operationsEconomics of metal cutting operations
Economics of metal cutting operations
 
Lathe shaper slotter planer milling drilling machine tool ii
Lathe shaper slotter planer milling drilling machine tool iiLathe shaper slotter planer milling drilling machine tool ii
Lathe shaper slotter planer milling drilling machine tool ii
 
TYPES OF FINISHING GRINDING SURFACE GRINDIN
TYPES OF FINISHING  GRINDING SURFACE GRINDINTYPES OF FINISHING  GRINDING SURFACE GRINDIN
TYPES OF FINISHING GRINDING SURFACE GRINDIN
 
Machine operations
Machine operationsMachine operations
Machine operations
 

More from SIVASHANKAR N

Artificial Neural Network in recent research
Artificial Neural Network in recent researchArtificial Neural Network in recent research
Artificial Neural Network in recent research
SIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
SIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-4 ABRASIVE PROCESS
MANUFACTURING PROCESS-II UNIT-4 ABRASIVE PROCESSMANUFACTURING PROCESS-II UNIT-4 ABRASIVE PROCESS
MANUFACTURING PROCESS-II UNIT-4 ABRASIVE PROCESS
SIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-3 SHAPER MACHINES
MANUFACTURING PROCESS-II UNIT-3 SHAPER MACHINESMANUFACTURING PROCESS-II UNIT-3 SHAPER MACHINES
MANUFACTURING PROCESS-II UNIT-3 SHAPER MACHINES
SIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
SIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
SIVASHANKAR N
 
PRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATIONPRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATION
SIVASHANKAR N
 
INTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATIONINTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATION
SIVASHANKAR N
 
PROCESS PLANNING ACTIVITIES
PROCESS PLANNING ACTIVITIESPROCESS PLANNING ACTIVITIES
PROCESS PLANNING ACTIVITIES
SIVASHANKAR N
 
PROCESS PLANNING AND COST ESTIMATION
PROCESS PLANNING AND COST ESTIMATION PROCESS PLANNING AND COST ESTIMATION
PROCESS PLANNING AND COST ESTIMATION
SIVASHANKAR N
 
PRINCIPLES OF MANAGEMENT.pptx
PRINCIPLES OF MANAGEMENT.pptxPRINCIPLES OF MANAGEMENT.pptx
PRINCIPLES OF MANAGEMENT.pptx
SIVASHANKAR N
 
PRODUCTION PLANNING AND CONTROL unit 5.ppt
PRODUCTION PLANNING AND CONTROL unit 5.pptPRODUCTION PLANNING AND CONTROL unit 5.ppt
PRODUCTION PLANNING AND CONTROL unit 5.ppt
SIVASHANKAR N
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
SIVASHANKAR N
 
PRODUCTION PLANNING AND CONTROL UNIT3
PRODUCTION PLANNING AND CONTROL UNIT3PRODUCTION PLANNING AND CONTROL UNIT3
PRODUCTION PLANNING AND CONTROL UNIT3
SIVASHANKAR N
 
PRODUCTION PLANNING AND CONTROL UNIT 2
PRODUCTION PLANNING AND CONTROL UNIT 2PRODUCTION PLANNING AND CONTROL UNIT 2
PRODUCTION PLANNING AND CONTROL UNIT 2
SIVASHANKAR N
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
SIVASHANKAR N
 
Topic-4-Belt-Drives-Pulleys.ppt
Topic-4-Belt-Drives-Pulleys.pptTopic-4-Belt-Drives-Pulleys.ppt
Topic-4-Belt-Drives-Pulleys.ppt
SIVASHANKAR N
 
NC AND CNC
NC AND CNCNC AND CNC
NC AND CNC
SIVASHANKAR N
 
ABRASIVE AND BROACHING
ABRASIVE AND BROACHINGABRASIVE AND BROACHING
ABRASIVE AND BROACHING
SIVASHANKAR N
 
SHAPERS
SHAPERSSHAPERS
SHAPERS
SIVASHANKAR N
 

More from SIVASHANKAR N (20)

Artificial Neural Network in recent research
Artificial Neural Network in recent researchArtificial Neural Network in recent research
Artificial Neural Network in recent research
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
MANUFACTURING PROCESS-II UNIT-4 ABRASIVE PROCESS
MANUFACTURING PROCESS-II UNIT-4 ABRASIVE PROCESSMANUFACTURING PROCESS-II UNIT-4 ABRASIVE PROCESS
MANUFACTURING PROCESS-II UNIT-4 ABRASIVE PROCESS
 
MANUFACTURING PROCESS-II UNIT-3 SHAPER MACHINES
MANUFACTURING PROCESS-II UNIT-3 SHAPER MACHINESMANUFACTURING PROCESS-II UNIT-3 SHAPER MACHINES
MANUFACTURING PROCESS-II UNIT-3 SHAPER MACHINES
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
PRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATIONPRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATION
 
INTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATIONINTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATION
 
PROCESS PLANNING ACTIVITIES
PROCESS PLANNING ACTIVITIESPROCESS PLANNING ACTIVITIES
PROCESS PLANNING ACTIVITIES
 
PROCESS PLANNING AND COST ESTIMATION
PROCESS PLANNING AND COST ESTIMATION PROCESS PLANNING AND COST ESTIMATION
PROCESS PLANNING AND COST ESTIMATION
 
PRINCIPLES OF MANAGEMENT.pptx
PRINCIPLES OF MANAGEMENT.pptxPRINCIPLES OF MANAGEMENT.pptx
PRINCIPLES OF MANAGEMENT.pptx
 
PRODUCTION PLANNING AND CONTROL unit 5.ppt
PRODUCTION PLANNING AND CONTROL unit 5.pptPRODUCTION PLANNING AND CONTROL unit 5.ppt
PRODUCTION PLANNING AND CONTROL unit 5.ppt
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
PRODUCTION PLANNING AND CONTROL UNIT3
PRODUCTION PLANNING AND CONTROL UNIT3PRODUCTION PLANNING AND CONTROL UNIT3
PRODUCTION PLANNING AND CONTROL UNIT3
 
PRODUCTION PLANNING AND CONTROL UNIT 2
PRODUCTION PLANNING AND CONTROL UNIT 2PRODUCTION PLANNING AND CONTROL UNIT 2
PRODUCTION PLANNING AND CONTROL UNIT 2
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Topic-4-Belt-Drives-Pulleys.ppt
Topic-4-Belt-Drives-Pulleys.pptTopic-4-Belt-Drives-Pulleys.ppt
Topic-4-Belt-Drives-Pulleys.ppt
 
NC AND CNC
NC AND CNCNC AND CNC
NC AND CNC
 
ABRASIVE AND BROACHING
ABRASIVE AND BROACHINGABRASIVE AND BROACHING
ABRASIVE AND BROACHING
 
SHAPERS
SHAPERSSHAPERS
SHAPERS
 

Recently uploaded

Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
PauloRodrigues104553
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
PuktoonEngr
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 

Recently uploaded (20)

Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 

MACHINING TIME CALCULATION

  • 1. •UNIT I INTRODUCTION TO PROCESS PLANNING •UNIT II PROCESS PLANNING ACTIVITIES •UNIT III INTRODUCTION TO COST ESTIMATION •UNIT IV PRODUCTION COST ESTIMATION •UNIT V MACHINING TIME CALCULATION
  • 2. UNIT V MACHINING TIME CALCULATION • Estimation of machining time • Importance of machine time calculation • Calculation of machining time for different lathe operations, Drilling and Boring • Machining time calculation for Milling, Shaping and Planning • Machining time calculation for grinding
  • 3. Introduction • To estimate the total cost of any product involving machining operations, the machining cost is to be estimated primarily. • In order to estimate the machining cost, one has to calculate the machining time required for these machining operations. • After knowing the machining time and rate of machining, the total machining cost can be calculated. • Therefore the estimation of machining time for various operations such as lathe, drilling. boring, shaping, planning, milling and grinding operations are very essential in the cost estimation activity.
  • 4. What is meant by Machining Time? • It is time for which the machine works on the component • From the time when the tool touches the work to when the tool leaves the component after completion of operation • The machining time depends on die type and extent of machining required, material being machined, speed, feed, depth of cut and number of cuts required • In addition to the actual machining time, an estimator bas to consider other time elements such as set-up time, handling time, tear down time, down time and allowances to the workers.
  • 5. FACTORS TO BE CONSIDERED FOR MACHINE TIME CALCULATION •Set up time •Operation time •Tear down time •Personal allowance •Fatigue allowance •Checking allowance •Miscellaneous allowance
  • 6. SETUPTIME • This takes into account the time required to prepare the machine for doing the job with the time taken to study the blue print. • The time to prepare the machine, in turn • The time to install and adjust the tools in the machine, as well as to make the machine ready to start the work.
  • 7. OPERATION TIME • The sum of handling time and machining time for a job is called operation time. • It is the duration of time that elapses between output of two consecutive units of production. TEAR DOWN TIME • Tear down time takes into account the time necessary to remove from the machine all tools and accessories, such as jigs and fixtures, gauges and instruments etc. • The time required for clearing operational chips from the machine table and clearing of the machine itself are included on this. • Tear down time is generally 10 minute per shift of 8 hrs.
  • 8. PERSONALALLOWANCE • The time allowed for workers to meet their personal needs, such as going to the urinal, drinking water, smoking, washing their hands, etc is known as personal allowance. • It is generally 5 to 10 minutes FATIGUE ALLOWANCE • The long working hours and poor working conditions such as poor lighting, poor ventilation etc., cause fatigue • Fatigue effect the efficiency of worker • Fatigue decreases the worker capacity to work. • The allowance for fatigue is taken depending upon the type of work.
  • 9. IMPORTANCE OF MACHINING TIME CALCULATION •To find the manufacturing cost of a particular job the calculation of machining time is important, this requires one or more machining operations. •After determining the total time for machining, and knowing the machining cost per unit time, the total cost of machining can be worked out. •Machining time is calculated by applying certain basic formulae, tables of variables and constants.
  • 10. • The basic formula used is TRAVEL OF THE TOOL • This is determined from the dimensions in the actual drawing of the part to be manufactured. • The necessary allowances for the tool approach and over-run for clearing the tool off the job are taken into account with the actual length of the work, to find the travel of the tool.
  • 11. FEED • Feed is the distance that the tool travels into the job in one revolution • If the work or the distance that the table holding the work travels is one stroke of the tool. In metric units, feed is usually expressed in mm/revolution or mm/stroke. • Feed depends on the depth of cut, fitness of the work desired, rpm of the job, etc. DEPTH OF CUT • It is the penetration of the cutting tool into the job in a single cut. • In metric units, the depth of cut is expressed in mm. • The depth of cut depends upon the fitness of the job required, such as higher depth of cut for rough cut and smaller depth of cut for finish cut.
  • 12. RPM • It represents the number of revolutions of the m/c spindle in one minute. • Thus it is the number of revolutions per minute of the job or of tool. CUTTING SPEED • The cutting speed can be defined as the relative surface speed between the tool and the job. • It is expressed in meters per minute (mpm) • For example if a job of diameter D mm is revolving at a speed of N rpm
  • 13. CALCULATION OF MACHINING TIME FOR DIFFERENT LATHE OPERATIONS
  • 14. Where D = Diameter of given blank, d = diameter of blank after turning. • In turning operation, the depth of cut should not exceed 3 mm for rough cuts and 0.7 5 mm for finishing cuts.
  • 15.
  • 16.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34. MACHINING TIME FOR SHAPING AND PLANING • Shaping, planning and slotting operations are carried out on reciprocating machines with a single point cutting tool.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40. Estimation of time for milling operation
  • 41. The approach is the distance the cutter must be engaged before the full depth of cut is reached. When cutter diameter is less than the width of the work.
  • 42. (b) When cutter diameter is greater than the width of the work.
  • 44.
  • 45. Estimation of time for Grinding operation
  • 46.