 DATE : August 2016– Current
 COMPANY
 PROJECT
 POSITION
:
:
:
MURRAY AND ROBERTS
MORUPULE A POWER STATION (Botswana)
SNR QUANTITY SURVEYOR
 DUTIES  Preparingmonthly payment certificate and monthly cost reports and presentation
 Drafting contract letters, notices and handling contract administration
 Preparing monthly payment for sub-contractor and review
 Adjudication of Subcontract quotes and advising on appointment
 Support MRPE’s planning function with quantities and allowable information
 Prepare chart of accounts for project control at contract start-up
 Pricingnewworksandsite instructions,quantifyingmaterial neededtobe ordered
 Prepare, update and manage accurate contract budgets and forecasts
 Preparation and agreeing final account with client and subcontractors
 Reporting of KPI’s for labour, plant, material (wastage reports, productivity monitoring

 DATE : August 2015–March 2016
P a g e 2 | 9
 COMPANY
 PROJECT
 POSITION
:
:
:
REDIS CONSTRUCTIONAFRIKA (PTY) LTD
LETLHAKANE TREATMENT PLANT DEBTSWANA (Botswana)
CONTRACT ADMINISTRATOR
 DUTIES  Preparingmonthly payment certificate and monthly cost reports and presentation
 have previously worked in over 1 billion rand project
 Preparing monthly payment for sub-contractor
 Adjudication of Subcontract quotes
 Preparations of claims and assessment of claims to be issued to the client.
 Advising on appointment of sub-contractors
 Pricing new works and site instructions
 Quantifying material needed to be ordered.
 Preparation and agreeing final account with client and subcontractors
 Handling contract administration and correspondence
Prepare tenders for submission with accurate pre-qualification of
documentation
 Prepare work to be estimated by gathering blueprints, specifications, proposals and
related documents
 Develop building and structural engineering estimates by analysing material and
manpower requirements
 Assess and determine the material, labour and equipment required
 Adhere to specifications as required by the project and client
 Adjudicate subcontractor prices
 Justify and present resolution for the building and structural cost of wasted materials and
possible delays
 Interpret drawings using governing codes and standards, engineering formulas, skills and
experience, materials and symbols on blueprints
 Assist with vendor quotation analysis
 Liaise with clients and project parties
 Maintain tender documents and file recording
 Analyse quotations from sub-contractors and supplier
P a g e 3 | 9
 DATE : 10 December2013 – 31July 2015
 COMPANY
 PROJECT
 POSITION
:
:
:
REDIS CONSTRUCTIONAFRIKA (PTY) LTD
BUA Sugar RefineryNigeria
Contract Administrator
 DUTIES  Taking over contract and liaison, familiarisation with all documents relating to
the contract, and ensuring that all contract provisions are adheredto
 Responsible forcontractadministration by development a schedule for service
delivery in accordance with the contract
 Receives contract file for a firm order, the QCP has been approved and a
provisional delivery schedule had been agreed.
 Informs client of Role in the execution of the contract.
 Arranges customer liaison meetings on major contracts.
 Attends weekly planning and contract review meetings
 Attends site meetings when required.
 Uses minutes of above meetings to manage contract execution.
 Maintains records of communication with relevant parties to ensure accurate
record of progress and conformance to contractual obligations.
 Submits contract progress reports to customers as per agreement.
 Monitors delivery against targets on a daily basis and liaised with customer,
relevant departments and transporter to expedite deliveries.
 Liaises with project teams to facilitate transfers between units.
 Liaises with relevant parties to timeously communicate/ resolve problems.
 Prepares contract closure report as per company requirements.
 Ensures that the contractor H & S procedure is implemented when contractors
are used on site.
 Ensuring that all work is performed in accordance with relevant safe working
procedures.
 Prepares and submitted a monthly contract review report as per the agreed
requirements.
 Monitors customerand companyperformance againstcontractual requirements
and timeously report deviations to management.
 Ensures all documents were obtained and maintained which may be used in
claims or counter claims.
 Discusses concerns with relevant department heads.
 Prepares claimdocumentationsasand when required to substantiate or refute
P a g e 4 | 9
claims.
 Prepares payment certificates when required.
 Follows up with customers to ensure prompt payment.
 Liaises with finance on payment issues and prepare site estimates and VO
 Administers performance guarantees.
 DATE : August 2012–December2013
 COMPANY : REDIS CONSTRUCTION AFRIKA (PTY) LTD
 PROJECT : Mutanda Mining – Mumi Copper Mine - DRC
 POSITION : Contract Administrator
 DUTIES  Was responsible for all aspects of Contracts Administration on site
 Discussed concerns with relevant department heads.
 Preparesclaimdocumentationsasand when required to substantiate or refute
claims.
 Prepared payment certificates, attend site tender briefings and do estimates
 Followed up with customers to ensure prompt payment.
 Liaised with finance on payment issues.
 Administered performance guarantees
 Maintainedrecordsof communication with relevant parties to ensure accurate
record of progress and conformance to contractual obligations.
 Submitted contract progress reports to customers as per agreement.
 Monitored delivery against targets on a daily basis and liaised with customer,
relevant departments and transporter to expedite deliveries.
 Liaised with project teams to facilitate transfers between units.
 Liaised with relevant parties to timeously communicate/ resolve problems.
 Prepared contract closure report as per company requirements.
 Ensured that the contractor H & S procedure is implemented when contractors
are used on site.
 Prepared and submitted a monthly contract review report as per the agreed
requirements.
 Monitored customer and company performance against contractual
requirements and timeously report deviations to management.
P a g e 5 | 9
 DATE : November2010 – April 2012
 COMPANY : GROUP FIVE OIL AND GAS
 POSITION : Snr Quantity Surveyor
 DUTIES  Taking off quantities from drawings for preparation of estimates, tender
documents and payments certificates.
 Was responsibleforprojectestimating,budgetcontrol,scopingandpreparation
of payment certificate to client – applying NEC
 Was responsible for core contractor counter estimates
 Audited the controls of core contractors in order to ensure compliance
 Attends site meetings when required.
 Uses minutes of above meetings to manage contract execution.
 Maintains records of communication with relevant parties to ensure accurate
record of progress and conformance to contractual obligations.
 Submits contract progress reports to customers as per agreement.
 Monitors delivery against targets on a daily basis and liaised with customer,
relevant departments and transporter to expedite deliveries.
 Liaises with project teams to facilitate transfers between units.
 Liaises with relevant parties to timeously communicate/ resolve problems.
 Prepares contract closure report as per company requirements.
 Ensures that the contractor H & S procedure is implemented when contractors
are used on site.
 Ensuring that all work is performed in accordance with relevant safe working
procedures.
 Prepares and submitted a monthly contract review report as per the agreed
requirements.
 DATE : July 2009 – October 2010
 COMPANY : FABRICON PIPE & LABOUR HIRE MECHANICAL ENGINEERS
 POSITION : Snr Quantity Surveyor
 DUTIES  Managed cost, resources, materials and equipment
 Ensured that all site personnel understood the requirements.
 Was responsible for cost monitoring
 Attend tender briefing and prepare estimates
 Ensured that all jobs ran smoothly in respect of claims, costs and escalation
 Compiled estimates & monitored production
P a g e 6 | 9
 DATE : January 2009 – July 2010
 COMPANY : GRINAKER LTA, FRASER CHALMERS SIYAKHA
 POSITION : Tankage Quantity Surveyor
 DUTIES  Compiled and controlled contractor escalation estimates
 Re-measured work executed by core contractors
 Prepared contractor invoices
 Prepare estimates
 Audited controls of core contractors to ensure compliance
 Participated in central planning meetings
 Supporting engineers
 Was responsible for auditing of contractor timekeeping
 Assisted in compiling of strategies for core contractors
 DATE : March 2008 – October 2008
 COMPANY : GROUP FIVE OIL & GAS
 POSITION : Quantity Surveyor
 DUTIES  Compiled and controlled contractor escalation estimates
 Re-measured work executed by core contractors
 Prepared contractor invoices
 Audited controls of core contractors to ensure compliance
 Participated in central planning meetings
 Supporting engineers
 Was responsible for auditing of contractor timekeeping
 Assisted in compiling of strategies for core contractors
 DATE : March 2007 – March 2008
 COMPANY : ENGEN REFINERY
 POSITION : Project Controls Quantity Surveyor
 DUTIES  Was responsible for estimating
 Re-measured work executed by core contractors
 Prepared contractor invoices
P a g e 7 | 9
 Audited controls of core contractors to ensure compliance
 Participated in central planning meetings
 Supporting engineers
 Was responsible for auditing of contractor timekeeping
 Assisted in compiling of strategies for core contractors
COMPUTER LITERACY
Microsoft Suite of Products: *Windows
*Microsoft Excel - Expert
*Microsoft Word - Proficient
*Microsoft Power Point - Proficient
*Microsoft Outlook – Proficient
*MS Project
*SAP
*Pacer
*Priso
AREAS OF COMPETENCE
: Contract administration, Quantity Surveying& Estimating
: Negotiating and Report writing
:Fidic 1999, NEC3 (Engineering and Construction Contract)&knowledge JBCC
:Knowledge of ISO 9000: 2000 quality management system
:Knowledge on quality system ASME VIII dev, ASME IX; ASME B31.3process
pipe,
API 1104 code in piping and pressure vessels design and manufacturing
Qualification Date Institution/ Training Provider
N Dip:QuantitySurveyor June 2006 Durban Institute of Technology
N Dip:ProjectManagement June 2008 VarsityCollege
Certificate 3CPD(FIDIC,JBCC,GCC2010 NEC3)
National Certificate (Matric)
Aug 2015
1999
CASI Training solution
Mount Ayliff S.S.S
P a g e 8 | 9
PROJECT EXPERIENCE
BOTSWANAPOWERCORPPRATION(BPC)/DOOSAN -(Botswana)
Position– SnrQuantity Surveyor
RefurbishmentofMorupuleApowerstation
Contractvalue:+- $19 560000
DEBTSWANA DIAMOND COMPANY(ORAPAAND LETLHAKANEMINES -Botswana)
Position – Contract Administrator
Build New Letlhakane Mine Tailings Resource Treatment (SMPP)
Contract value: +- $33 333 000
BUASUGARREFINERY(PortHarcothNigeria)
Position – Contract Administrator
Build New Sugar Refinery, Pasta Building
Contract value: $12 000 000
MUTANDAMINE DRC (CONGO)KOLWEZI
Position – Contract Administrator
Building new copper & cobalt mine
Contract value: +-$44 000 000
NMPP PIPELINE – TRANSNET PROJECT
Position – Quantity Surveyor
New Multi product pipeline station (Postcontractmanagement – NEC3 ECC3 Based Target Cost contract, a Sub
project of the R24.billion pipe line project)
TRANSNET PIPELINE PROVERTRANSFERTANKS
Position – ProjectManager
Fabrication, manufacture, Inspection, testing and installation 3 identical Carbon steelProver Transfer tanks for Langlagte
Depot
Contract value - R1, 2000,000
ASSMANG CATORIDGEREMEASURE
Position – Lead Quantity Surveyor
Remeasuring of all new plant including piping, structure and ducting
Remeasured workCost – R16, 000,000
KINGSHAKAINTERNATIONALAIRPORTPIPELINE RENEWAL
Position – Site Manager / Quantity Surveyor (Group FiveOil & Gas)
Fabrication and installing 16 inch pipe, Low points, High points and pump station
Contract value – R42, 000,000
SUMMARY OF EXPERIENCE
Having started my career in the construction industry in 2004 I have gained a wealth of experience in both
Quantity Surveying, Estimating and Cost Control functions across a wide sector of the constructionindustry
ranging from refurbishment contracts and commercialdevelopments to Shut down projects, mining, materials
handling and tankage costing
Ability to workunder pressure and to deadlines, resilient, good communication skills, innovativethinking and able
to workin a team. Remarkable supervision, motivationand performance appraisal knowledge.
P a g e 9 | 9

More Related Content

What's hot

Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBESahl Buhary
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationHarish Mahavar
 
1 regatta quay rehab boq 20120420 blank
1 regatta quay rehab boq 20120420 blank 1 regatta quay rehab boq 20120420 blank
1 regatta quay rehab boq 20120420 blank Thomas Magatu
 
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTSFINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTSLenson Mhango
 
Cpm ch 2tender
Cpm ch 2tenderCpm ch 2tender
Cpm ch 2tenderneharajpl
 
M3 Lecture 11 provisional sum prime cost sum
M3 Lecture 11 provisional sum  prime cost sumM3 Lecture 11 provisional sum  prime cost sum
M3 Lecture 11 provisional sum prime cost sumEst
 
ITD Presentation
ITD PresentationITD Presentation
ITD Presentationmasonsth
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment마 이환
 
Pp2 group assignment
Pp2 group assignmentPp2 group assignment
Pp2 group assignmentlohwenjun
 
Tendering Document for the Procurement of Works
Tendering Document for the Procurement of WorksTendering Document for the Procurement of Works
Tendering Document for the Procurement of WorksMohammad Alimuzzaman Bappy
 
Ici qs
Ici qsIci qs
Ici qsGynie
 

What's hot (20)

Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
Anil Resume
Anil ResumeAnil Resume
Anil Resume
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBE
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping station
 
1 regatta quay rehab boq 20120420 blank
1 regatta quay rehab boq 20120420 blank 1 regatta quay rehab boq 20120420 blank
1 regatta quay rehab boq 20120420 blank
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTSFINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
 
Project Report
Project ReportProject Report
Project Report
 
Cpm ch 2tender
Cpm ch 2tenderCpm ch 2tender
Cpm ch 2tender
 
M3 Lecture 11 provisional sum prime cost sum
M3 Lecture 11 provisional sum  prime cost sumM3 Lecture 11 provisional sum  prime cost sum
M3 Lecture 11 provisional sum prime cost sum
 
CV_Civil_Engineer
CV_Civil_EngineerCV_Civil_Engineer
CV_Civil_Engineer
 
Quantity Surveyor
Quantity SurveyorQuantity Surveyor
Quantity Surveyor
 
ITD Presentation
ITD PresentationITD Presentation
ITD Presentation
 
PP2 - Assignment
PP2 - Assignment PP2 - Assignment
PP2 - Assignment
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment
 
Pp2 group assignment
Pp2 group assignmentPp2 group assignment
Pp2 group assignment
 
jeremiah lukwesa kaluba
jeremiah lukwesa kalubajeremiah lukwesa kaluba
jeremiah lukwesa kaluba
 
Tendering Document for the Procurement of Works
Tendering Document for the Procurement of WorksTendering Document for the Procurement of Works
Tendering Document for the Procurement of Works
 
Tender
TenderTender
Tender
 
Ici qs
Ici qsIci qs
Ici qs
 

Viewers also liked

Galane gold company presentation
Galane gold company presentationGalane gold company presentation
Galane gold company presentationGalaneGold
 
MH SMALL_CV 2016
MH SMALL_CV 2016MH SMALL_CV 2016
MH SMALL_CV 2016MARK SMALL
 
Resume - Uyapo Kenosi
Resume - Uyapo KenosiResume - Uyapo Kenosi
Resume - Uyapo KenosiBoyce Kenosi
 
Knight Frank - Africa Report 2013
Knight Frank - Africa Report 2013Knight Frank - Africa Report 2013
Knight Frank - Africa Report 2013asafeiran
 
Power sobre adolescencia
Power sobre adolescenciaPower sobre adolescencia
Power sobre adolescenciacary1978
 
Los materiales | Mario Villacorta García
Los materiales | Mario Villacorta GarcíaLos materiales | Mario Villacorta García
Los materiales | Mario Villacorta GarcíaMario Villacorta Garcia
 
Mathew R. Kumfer Resume
Mathew R. Kumfer ResumeMathew R. Kumfer Resume
Mathew R. Kumfer ResumeMathew Kumfer
 
Power sobre adolescencia
Power sobre adolescenciaPower sobre adolescencia
Power sobre adolescenciacary1978
 
Understanding Online Consumer Purchase Behaviour for Varied Consumer Clusters...
Understanding Online Consumer Purchase Behaviour for Varied Consumer Clusters...Understanding Online Consumer Purchase Behaviour for Varied Consumer Clusters...
Understanding Online Consumer Purchase Behaviour for Varied Consumer Clusters...inventionjournals
 
Currency high lights 10.01.17
Currency high lights 10.01.17Currency high lights 10.01.17
Currency high lights 10.01.17Choice Equity
 

Viewers also liked (16)

Galane gold company presentation
Galane gold company presentationGalane gold company presentation
Galane gold company presentation
 
CURRICULUM_VITA1[1]
CURRICULUM_VITA1[1]CURRICULUM_VITA1[1]
CURRICULUM_VITA1[1]
 
MH SMALL_CV 2016
MH SMALL_CV 2016MH SMALL_CV 2016
MH SMALL_CV 2016
 
Diplomat africa 4
Diplomat africa 4Diplomat africa 4
Diplomat africa 4
 
Resume - Uyapo Kenosi
Resume - Uyapo KenosiResume - Uyapo Kenosi
Resume - Uyapo Kenosi
 
Jaga CV
Jaga CVJaga CV
Jaga CV
 
Knight Frank - Africa Report 2013
Knight Frank - Africa Report 2013Knight Frank - Africa Report 2013
Knight Frank - Africa Report 2013
 
Power sobre adolescencia
Power sobre adolescenciaPower sobre adolescencia
Power sobre adolescencia
 
Los materiales | Mario Villacorta García
Los materiales | Mario Villacorta GarcíaLos materiales | Mario Villacorta García
Los materiales | Mario Villacorta García
 
Conexão Empreendedora 2017
Conexão Empreendedora 2017Conexão Empreendedora 2017
Conexão Empreendedora 2017
 
Mathew R. Kumfer Resume
Mathew R. Kumfer ResumeMathew R. Kumfer Resume
Mathew R. Kumfer Resume
 
Kick off december_2016
Kick off december_2016Kick off december_2016
Kick off december_2016
 
Power sobre adolescencia
Power sobre adolescenciaPower sobre adolescencia
Power sobre adolescencia
 
Understanding Online Consumer Purchase Behaviour for Varied Consumer Clusters...
Understanding Online Consumer Purchase Behaviour for Varied Consumer Clusters...Understanding Online Consumer Purchase Behaviour for Varied Consumer Clusters...
Understanding Online Consumer Purchase Behaviour for Varied Consumer Clusters...
 
Marcas blancas
Marcas blancasMarcas blancas
Marcas blancas
 
Currency high lights 10.01.17
Currency high lights 10.01.17Currency high lights 10.01.17
Currency high lights 10.01.17
 

Similar to Luvuyo Sankqela CV rev 2

Similar to Luvuyo Sankqela CV rev 2 (20)

111
111111
111
 
Amol-KulkarniResume
Amol-KulkarniResumeAmol-KulkarniResume
Amol-KulkarniResume
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
 
Mohammed Ramzy - CV1
Mohammed Ramzy - CV1Mohammed Ramzy - CV1
Mohammed Ramzy - CV1
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015
 
CV Shehzad SQS
CV Shehzad SQSCV Shehzad SQS
CV Shehzad SQS
 
Curriculum Vitae of Kamashen Naicker
Curriculum Vitae of Kamashen NaickerCurriculum Vitae of Kamashen Naicker
Curriculum Vitae of Kamashen Naicker
 
W Ramos CV
W Ramos CVW Ramos CV
W Ramos CV
 
ARLIE LLUNAR-Projects Presentations
ARLIE LLUNAR-Projects PresentationsARLIE LLUNAR-Projects Presentations
ARLIE LLUNAR-Projects Presentations
 
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERRESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
 
Frances L. Vessell Resume 01.26.2017
Frances L. Vessell Resume 01.26.2017Frances L. Vessell Resume 01.26.2017
Frances L. Vessell Resume 01.26.2017
 
Project cost controller
Project cost controllerProject cost controller
Project cost controller
 
Khaled Last updated CV 15-9-2014 Final
Khaled Last updated CV 15-9-2014 FinalKhaled Last updated CV 15-9-2014 Final
Khaled Last updated CV 15-9-2014 Final
 
Eng's Nisar CV for Sr QS & Contract Engineer
Eng's Nisar CV for Sr QS & Contract EngineerEng's Nisar CV for Sr QS & Contract Engineer
Eng's Nisar CV for Sr QS & Contract Engineer
 
CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
MEP ENGINEER
MEP ENGINEER MEP ENGINEER
MEP ENGINEER
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016
 
Govind_Bio
Govind_BioGovind_Bio
Govind_Bio
 

Luvuyo Sankqela CV rev 2

  • 1. P a g e 1 | 9 CURRICULUM VITAE SURNAME : Sankqela FIRST NAMES : Luvuyo DATE OF BIRTH : 09th April 1979 PRESENT POSITION CONTACT NUMBERS EMAIL ADDRESS SKYPE NAME : : : : Contracts Administrator +27 631015609 / +27 837129719– SA +267 76 577 456 – Botswana owam@mighty.co.za luvuyo.sankqela1 WORK EXPERIENCE  DATE : August 2016– Current  COMPANY  PROJECT  POSITION : : : MURRAY AND ROBERTS MORUPULE A POWER STATION (Botswana) SNR QUANTITY SURVEYOR  DUTIES  Preparingmonthly payment certificate and monthly cost reports and presentation  Drafting contract letters, notices and handling contract administration  Preparing monthly payment for sub-contractor and review  Adjudication of Subcontract quotes and advising on appointment  Support MRPE’s planning function with quantities and allowable information  Prepare chart of accounts for project control at contract start-up  Pricingnewworksandsite instructions,quantifyingmaterial neededtobe ordered  Prepare, update and manage accurate contract budgets and forecasts  Preparation and agreeing final account with client and subcontractors  Reporting of KPI’s for labour, plant, material (wastage reports, productivity monitoring   DATE : August 2015–March 2016
  • 2. P a g e 2 | 9  COMPANY  PROJECT  POSITION : : : REDIS CONSTRUCTIONAFRIKA (PTY) LTD LETLHAKANE TREATMENT PLANT DEBTSWANA (Botswana) CONTRACT ADMINISTRATOR  DUTIES  Preparingmonthly payment certificate and monthly cost reports and presentation  have previously worked in over 1 billion rand project  Preparing monthly payment for sub-contractor  Adjudication of Subcontract quotes  Preparations of claims and assessment of claims to be issued to the client.  Advising on appointment of sub-contractors  Pricing new works and site instructions  Quantifying material needed to be ordered.  Preparation and agreeing final account with client and subcontractors  Handling contract administration and correspondence Prepare tenders for submission with accurate pre-qualification of documentation  Prepare work to be estimated by gathering blueprints, specifications, proposals and related documents  Develop building and structural engineering estimates by analysing material and manpower requirements  Assess and determine the material, labour and equipment required  Adhere to specifications as required by the project and client  Adjudicate subcontractor prices  Justify and present resolution for the building and structural cost of wasted materials and possible delays  Interpret drawings using governing codes and standards, engineering formulas, skills and experience, materials and symbols on blueprints  Assist with vendor quotation analysis  Liaise with clients and project parties  Maintain tender documents and file recording  Analyse quotations from sub-contractors and supplier
  • 3. P a g e 3 | 9  DATE : 10 December2013 – 31July 2015  COMPANY  PROJECT  POSITION : : : REDIS CONSTRUCTIONAFRIKA (PTY) LTD BUA Sugar RefineryNigeria Contract Administrator  DUTIES  Taking over contract and liaison, familiarisation with all documents relating to the contract, and ensuring that all contract provisions are adheredto  Responsible forcontractadministration by development a schedule for service delivery in accordance with the contract  Receives contract file for a firm order, the QCP has been approved and a provisional delivery schedule had been agreed.  Informs client of Role in the execution of the contract.  Arranges customer liaison meetings on major contracts.  Attends weekly planning and contract review meetings  Attends site meetings when required.  Uses minutes of above meetings to manage contract execution.  Maintains records of communication with relevant parties to ensure accurate record of progress and conformance to contractual obligations.  Submits contract progress reports to customers as per agreement.  Monitors delivery against targets on a daily basis and liaised with customer, relevant departments and transporter to expedite deliveries.  Liaises with project teams to facilitate transfers between units.  Liaises with relevant parties to timeously communicate/ resolve problems.  Prepares contract closure report as per company requirements.  Ensures that the contractor H & S procedure is implemented when contractors are used on site.  Ensuring that all work is performed in accordance with relevant safe working procedures.  Prepares and submitted a monthly contract review report as per the agreed requirements.  Monitors customerand companyperformance againstcontractual requirements and timeously report deviations to management.  Ensures all documents were obtained and maintained which may be used in claims or counter claims.  Discusses concerns with relevant department heads.  Prepares claimdocumentationsasand when required to substantiate or refute
  • 4. P a g e 4 | 9 claims.  Prepares payment certificates when required.  Follows up with customers to ensure prompt payment.  Liaises with finance on payment issues and prepare site estimates and VO  Administers performance guarantees.  DATE : August 2012–December2013  COMPANY : REDIS CONSTRUCTION AFRIKA (PTY) LTD  PROJECT : Mutanda Mining – Mumi Copper Mine - DRC  POSITION : Contract Administrator  DUTIES  Was responsible for all aspects of Contracts Administration on site  Discussed concerns with relevant department heads.  Preparesclaimdocumentationsasand when required to substantiate or refute claims.  Prepared payment certificates, attend site tender briefings and do estimates  Followed up with customers to ensure prompt payment.  Liaised with finance on payment issues.  Administered performance guarantees  Maintainedrecordsof communication with relevant parties to ensure accurate record of progress and conformance to contractual obligations.  Submitted contract progress reports to customers as per agreement.  Monitored delivery against targets on a daily basis and liaised with customer, relevant departments and transporter to expedite deliveries.  Liaised with project teams to facilitate transfers between units.  Liaised with relevant parties to timeously communicate/ resolve problems.  Prepared contract closure report as per company requirements.  Ensured that the contractor H & S procedure is implemented when contractors are used on site.  Prepared and submitted a monthly contract review report as per the agreed requirements.  Monitored customer and company performance against contractual requirements and timeously report deviations to management.
  • 5. P a g e 5 | 9  DATE : November2010 – April 2012  COMPANY : GROUP FIVE OIL AND GAS  POSITION : Snr Quantity Surveyor  DUTIES  Taking off quantities from drawings for preparation of estimates, tender documents and payments certificates.  Was responsibleforprojectestimating,budgetcontrol,scopingandpreparation of payment certificate to client – applying NEC  Was responsible for core contractor counter estimates  Audited the controls of core contractors in order to ensure compliance  Attends site meetings when required.  Uses minutes of above meetings to manage contract execution.  Maintains records of communication with relevant parties to ensure accurate record of progress and conformance to contractual obligations.  Submits contract progress reports to customers as per agreement.  Monitors delivery against targets on a daily basis and liaised with customer, relevant departments and transporter to expedite deliveries.  Liaises with project teams to facilitate transfers between units.  Liaises with relevant parties to timeously communicate/ resolve problems.  Prepares contract closure report as per company requirements.  Ensures that the contractor H & S procedure is implemented when contractors are used on site.  Ensuring that all work is performed in accordance with relevant safe working procedures.  Prepares and submitted a monthly contract review report as per the agreed requirements.  DATE : July 2009 – October 2010  COMPANY : FABRICON PIPE & LABOUR HIRE MECHANICAL ENGINEERS  POSITION : Snr Quantity Surveyor  DUTIES  Managed cost, resources, materials and equipment  Ensured that all site personnel understood the requirements.  Was responsible for cost monitoring  Attend tender briefing and prepare estimates  Ensured that all jobs ran smoothly in respect of claims, costs and escalation  Compiled estimates & monitored production
  • 6. P a g e 6 | 9  DATE : January 2009 – July 2010  COMPANY : GRINAKER LTA, FRASER CHALMERS SIYAKHA  POSITION : Tankage Quantity Surveyor  DUTIES  Compiled and controlled contractor escalation estimates  Re-measured work executed by core contractors  Prepared contractor invoices  Prepare estimates  Audited controls of core contractors to ensure compliance  Participated in central planning meetings  Supporting engineers  Was responsible for auditing of contractor timekeeping  Assisted in compiling of strategies for core contractors  DATE : March 2008 – October 2008  COMPANY : GROUP FIVE OIL & GAS  POSITION : Quantity Surveyor  DUTIES  Compiled and controlled contractor escalation estimates  Re-measured work executed by core contractors  Prepared contractor invoices  Audited controls of core contractors to ensure compliance  Participated in central planning meetings  Supporting engineers  Was responsible for auditing of contractor timekeeping  Assisted in compiling of strategies for core contractors  DATE : March 2007 – March 2008  COMPANY : ENGEN REFINERY  POSITION : Project Controls Quantity Surveyor  DUTIES  Was responsible for estimating  Re-measured work executed by core contractors  Prepared contractor invoices
  • 7. P a g e 7 | 9  Audited controls of core contractors to ensure compliance  Participated in central planning meetings  Supporting engineers  Was responsible for auditing of contractor timekeeping  Assisted in compiling of strategies for core contractors COMPUTER LITERACY Microsoft Suite of Products: *Windows *Microsoft Excel - Expert *Microsoft Word - Proficient *Microsoft Power Point - Proficient *Microsoft Outlook – Proficient *MS Project *SAP *Pacer *Priso AREAS OF COMPETENCE : Contract administration, Quantity Surveying& Estimating : Negotiating and Report writing :Fidic 1999, NEC3 (Engineering and Construction Contract)&knowledge JBCC :Knowledge of ISO 9000: 2000 quality management system :Knowledge on quality system ASME VIII dev, ASME IX; ASME B31.3process pipe, API 1104 code in piping and pressure vessels design and manufacturing Qualification Date Institution/ Training Provider N Dip:QuantitySurveyor June 2006 Durban Institute of Technology N Dip:ProjectManagement June 2008 VarsityCollege Certificate 3CPD(FIDIC,JBCC,GCC2010 NEC3) National Certificate (Matric) Aug 2015 1999 CASI Training solution Mount Ayliff S.S.S
  • 8. P a g e 8 | 9 PROJECT EXPERIENCE BOTSWANAPOWERCORPPRATION(BPC)/DOOSAN -(Botswana) Position– SnrQuantity Surveyor RefurbishmentofMorupuleApowerstation Contractvalue:+- $19 560000 DEBTSWANA DIAMOND COMPANY(ORAPAAND LETLHAKANEMINES -Botswana) Position – Contract Administrator Build New Letlhakane Mine Tailings Resource Treatment (SMPP) Contract value: +- $33 333 000 BUASUGARREFINERY(PortHarcothNigeria) Position – Contract Administrator Build New Sugar Refinery, Pasta Building Contract value: $12 000 000 MUTANDAMINE DRC (CONGO)KOLWEZI Position – Contract Administrator Building new copper & cobalt mine Contract value: +-$44 000 000 NMPP PIPELINE – TRANSNET PROJECT Position – Quantity Surveyor New Multi product pipeline station (Postcontractmanagement – NEC3 ECC3 Based Target Cost contract, a Sub project of the R24.billion pipe line project) TRANSNET PIPELINE PROVERTRANSFERTANKS Position – ProjectManager Fabrication, manufacture, Inspection, testing and installation 3 identical Carbon steelProver Transfer tanks for Langlagte Depot Contract value - R1, 2000,000 ASSMANG CATORIDGEREMEASURE Position – Lead Quantity Surveyor Remeasuring of all new plant including piping, structure and ducting Remeasured workCost – R16, 000,000 KINGSHAKAINTERNATIONALAIRPORTPIPELINE RENEWAL Position – Site Manager / Quantity Surveyor (Group FiveOil & Gas) Fabrication and installing 16 inch pipe, Low points, High points and pump station Contract value – R42, 000,000 SUMMARY OF EXPERIENCE Having started my career in the construction industry in 2004 I have gained a wealth of experience in both Quantity Surveying, Estimating and Cost Control functions across a wide sector of the constructionindustry ranging from refurbishment contracts and commercialdevelopments to Shut down projects, mining, materials handling and tankage costing Ability to workunder pressure and to deadlines, resilient, good communication skills, innovativethinking and able to workin a team. Remarkable supervision, motivationand performance appraisal knowledge.