1. [Resume: Shirish.S.Rahurkar] Page 1
SHIRISH.S.RAHURKAR
BE CIVIL, MIE, CHARTERED ENGINEER
Mobile: +91 8806963263 E Mail: shirprofess@yahoo.co.in
Current address: Mumbai Address: B4/12, Damodar Nagar Hinge Khurd, Off Sinhagad road, Pune 411031,
State: Maharashtra: India
Aspires to pursue challenging assignments in Construction Industry with a frontline organization
Pro- active and result oriented with over 18 years of experience in all aspects of Construction and project
Management. Demonstrated management style in the development and implementation of strategic plans
and procedures, to ensure company growth. Well versed with several financial, project management
methods, economics, etc. Proficient in handling operations in Execution , Contracts administration , Planning
implementation and monitoring techniques , execution of conceptualized project designs , Extensive
experience in conceptualizing and implementing Project management procedures, Verifiable track record of
complying with acheiving project objectives in given frame of time , cost and quality . Ascertain needs and
goals, streamline operations and envision new concepts and innovative styles . Effective communication and
relationship management skills.
AREAS OF STRENGTH INCLUDE
Costing & Estimation: Designing and implementing systems & procedures; supervising
preparation of financial statements. In E-enabled environment checking data, maintaining and scrutinizing
statutory books of contracts and subsidiaries in compliance with time & accuracy norms. Extending advise
pertaining to .
MIS: Supervising preparation of MIS reports to provide feedback to top management on financial
performance, viz. fund management. Ensuring that all income/expenses at the end of the month are
allocated properly.
Budgeting / Costing: Formulating budgets and conducting variance analysis to determine
difference between projected & actual results and implementing corrective actions. Projecting the liquidity
position, establishing strategic cost management system for monitoring various overheads and devising
product costing techniques. Thoroughly aware with cost data base handling, activity rate analysis, cash
flow techniques, and budget reports.
Contracts : Worked extensively in this dept and handled the data base of over 250 contractors /
setting billing procedures / verifying the claims , raising the work orders , contractual agreements ,
making debit notes , troubleshooting the claims disputes, maintaining a document system for the bills ,
approving / negotiating the rates / Inviting tenders , making the bid comparisons , prebid and post bid
preparations , preparation of contacts awards . aware of prebid and post bid procedures
Co-ordination : Interfacing tactically within the inter departments like purchase , estimating , costing
, contracts , execution and planning departments and leading the team
Drawing Co-ordination :
Can prepare the entire scope of applied drawings. Viz Architectural, Structural, Survey, design/custom built
with necessary design detailing and trouble shooting the queries, Also study the proposal drawings till the
Concept stage
Purchase : Worked in purchase depts within the parameters of the purchase procedures , study of
stock levels , reorder level , lead periods , maintained data base of approved suppliers , making cost
comparitive statements for the bidding suppliers
Planning : Performing analytical review of Planned and achieved reports for project & recourses s
planning and evaluation of internal control systems for maintaining the planning objectives. Co -ordinating
with concerned bottom line and top management . Discussing their queries & giving suitable replies to the
client .
Execution : Maintaining the flow of daily work progress with deployment/ coordination of proper
resources of Labour , Manpower and machinery
2. [Resume: Shirish.S.Rahurkar] Page 2
Procurement : Responsible for procurement of resources viz Manpower ( Contracting agencies ) ,
machinery and co-ordinating proper material inflow
Surveying : Survey with dumply level , tacheometric , total Station , Theodoilite , countouring
,traverse closing
Maintenecne and repairs : Handled and deployed the maintencence of ongoing buildings with
multiple agencies and work force .
EMPLOYMENT PROFILE
Company M/s FK CONSULTANTS
Project Costconsultants for the multiple projects
Cost
Post Held Senior Manager
Period Nov 2013 To June
. Bar bending and quantity take off and rerconcilation for high rise multiple projects
. , Airports ,BOQ Preparation QS and tender costs for 3 terminal building s of
airport
EMPLOYMENT PROFILE
Company M/s Della adventures and resorts
Project Construction of hotel Chalets and resorts , Lonavala
Cost
Post Held Senior Project Manager
Period Feb 2011 to June To June 2013
MAIN ROLES & RESPONSIBILITIES
Leading the team of engineers 2 engineers & reporting to director
Responsible for the construction of hotel Chalets & resorts.
Budgets / ERP implementation / agencies procurement and nomination of subcontractors/mobilization
drawing co-ordination / queries troubleshooting project planning and scheduling based on gnatt charts
Survey works
THE HIGHLIGHTS
Invitied 12 contactors for mobilisation , propared the cost budget ,planning report in span of 45 Days
Consultant for multiple projects (4Nos )handled team of project
Managers at multiple locations
Company M/s MWH global India Pvt Ltd ( UK )
Project EPC of Govt ETP Plants & pumping stations , Pune
Cost 70 crores
Post Held Senior Project Engineer
Period Jan 2007 to Jan 2010
Company M/s MWH global India Pvt Ltd ( UK )
Hecking / Clearing as per drawing RCC various STP / SPS units For several on going Projects over
Pune @ 15000 cum
3. [Resume: Shirish.S.Rahurkar] Page 3
I handled 4 on going projects single handedly
Fascade , linouts surveys for all strutures plinth checking
Preparing ,Site instructions and visit reports to determine the civil engineering and process aspects
Inspection of various process machineries viz pumps ,@30mtrs head
Client co-ordination - preparation of MOM, and attending relevant technical, contractual, design &
quality queries with client,& trouble shooting the same
Giving compliance for quality assuarance and inspections
Drawing co-ordinations, Reporting to HO
Incoming material approvals
Prequalification of contracts
Resolving design disputes and queries
Visited, inspected, preconstruction and post constructions RCC Checksas per QA / QC Norms for
15000 Cum concrete on ongoing 4 project simetanelously
Company : M/s Devi Construtions Pvt Ltd ( Pune ) EPC Contracts
Project : Turnkey Construction of TV Factory at , Pune
Cost : 16 crores
Post : Contracts Engineer
Period : April 2005 to Feb 2006
Company : M/s Devi Construtions Pvt Ltd ( Pune ) EPC Contracts
Directing the entire gamut of measurements & contractual & claims
Building operations along with a team of 1 personnel.
Coordinating with: Preparation of detailed estimates ,& rate analysis.
Quantity Surveyor, Client billing & Raising monthly bills
Fabrication of Non Tender items & extra building up the claims
Raising claims for delay analysis
Tendering pre tendering and post tendering procedures
Pre-award process and negotiation with clients
Liase with consultants for prebid works
Monthly and final reconciliation of labour and material
Successfully Made the measurements and subsequent scurutiny approval from client for works of
16 crores
Company : M/s CDAM PROJECT MANAGEMENT CONSULTANTS
MTDCCL & (Pune)
Project : Construction of Largest township of the period
Cost : 1500 crores
THE HIGHLIGHTS
THE HIGHLIGHTS
4. [Resume: Shirish.S.Rahurkar] Page 4
Post : Project Engineer ( Estimation & planning )
Period : Nov 2000 to April 2005
Post Medium rise, high rise, rowhouses , bunglows , Institutional
buildings, IT, buildings Infrastruture works, schools, hospital
( medium rise , high rise, rowhouses, bunglows institutional
buildings, IT buildings,infrastruture
works, schols hospitals Material forecasting and ensuring
continuity in work
Quantity Take off & Preparation of Budget Reports worth 200 Crores for multiple projects
Bar Chart schedules for various Projects & Sub Units
Cash flow statements.
Differed payment schedules to the subcontractors for lumsum contracts for on going multiple projects.
Keeping a track on subcontractors payments schedules , on weekly basis (200 Contractors ).
MIS Reports as required by the managemt.
Responsible for 500 crores of subcontractors billing.
Tender invitations & making cost comparision reports for the bids approval of the top management
Validation of work orders & agreements.
Worked on specially designed software for Construction industry having various modules.
Interlinked from Estimation, Budget preparation, Contract billing, Purchase module, Stores etc
Experience in review, analysis, defence , extinguishing contractors claims.
Development in contract and procurement strategies.
Handled an enormous database of subcontract billing and the Documents controls handled dextrously
Assistance in Setting up of ISO Procedures
Company : M/s Semb Corp Infrasturuture India Pvt Ltd ( Singapore )
Project : Turnkey Construction of Osho Residential Center , Pune &
Godrej millennium project .
Cost : 20 crores
Post : Senior Contracts Engineer
Period : Oct 1999 to November 2000
Quantity Surveying & Contracts Administration.
Quantity take off ( Estimation) &rate analysis.
Generation of database for labour material libraries.
Preparation of entire Budget based on this estimated quantities & rate analyisis
Preparation of Cash Flow based on planning schedules (Scurve analysis )
Monitoring the same & generation of MIS Reports on monthly basis and preparation of Cost report’s
Preparation of Contract agreements & Work orders for subcontractors & collating the bills v/s
contractual claims.
Baseline cost monitoring on monthly basis
THE HIGHLIGHTS
5. [Resume: Shirish.S.Rahurkar] Page 5
Preparation of Purchase orders as per techno commercial bids
Checking Bills of the various subcontractors, preparation Cummulative billing statements / Abstracts /
And keeping track on subcontractors payments
Monthly ,Interim & Final reconciliation for major civil items items
Techno commercial bids for civil , services , plumbing contracts
Assistance in follow-up of ISO Procedures
Company : M/s Alfaraj Trading Manama ( Baharain )
Project : Multidiciplinary contaracting Comapany
Cost :
Post : Senior Engineer
Period : March 1998 to June 2000
Responsible For: Water supply projects for the Ministry of water supply
Execution / purchase follow-ups / pretender and post tender procedures as per Ministry Norms
Shut down works for Alba Bahrain ,Balexeco,& Mina salman local factories Bahrain.
Tendering for local works ,PO Making , Execution of Villas , and various jobs for local Companies
Bagged few big projects for the company and responsible for the profit center generation
Company : M/s U.B. Engineering Ltd , Pune
Formerly WIE : Turnkey EPC Contacting
Cost :
Post : Assitant Engineer
Period : August 1994 to Jan 1998
Project/ location: Knitting Factory , Ambernath
Cost : 4 crores without steel cement
Post : Assitant Engineer
Period : August 1994 to Jan 1998
Compilation of client Bills ( RA Bills @ Rs 40 Lakhs per months )
Quantity take off – reconciliations – subcontract billing –resources planning.
Raising material advance & material recovery statements there off.
Interpretation of various tender items / clauses & building up contractual Claims
Preparation planning schedules based on bar charts.
Resource planning for materials , manpower , equipments and plants and project overheads based on
quantity take off
Delay analysis for the project
Earth work reconciliation statements
THE HIGHLIGHTS
6. [Resume: Shirish.S.Rahurkar] Page 6
Project/ location : 4 x 400 Mwatt electric power swithyard , Chandrapur
Consultant : Comolex France
Cost : 9 crores without steel cement
Post : Assitant Engineer
Period August 1994 to Jan 1998
Responsible for Execution
Mass Concreting of Filter foundations ( Approx 3600 in span of 3 months )
Formwork planning for the same.
I could achieve The timely completion & help my Company In earning handsome incentive
PROJECT Project : Turnkey Job For Newlatex plant ( Worth 4 Crores )
For M/s Synthetics & Chemicals Ltd Bareilly
Responsible for ( Consultants : M/s Tata Consulting Engineers )
Execution
Execution of foundations for various static & rotary equipments Viz Heat exchangers, Compressors,
Stripping coloumns, piperacks, Pump foundations.
Concreting of cable trenches / Cable tunnels / road crossings..
Control Rooms, PMMC Rooms Chemical preparation rooms.
Co -ordination with clients & consultants & getting clearances.
Preparation of monthly client bills .
Compilation of planned V/s actual Progress
MOMs , drawing co-rodination .
Planning of resources and shuttering planning resources planning for material , labour , equipments ,
plants
Handled the execution / planning / client billing /mom/claims/manpower of 100labours
Project/ location : Construction of cold rolling plant , Pune , Sanaswadi
Project/ location : High rise mass housing 600 flats , Pune , Parvati nagar
Consultant : M.N.Dastur
Cost : 9 crores
Post : Junior Engineer
Period June 1993 to Aug 1994
THE HIGHLIGHTS
THE HIGHLIGHTS
7. [Resume: Shirish.S.Rahurkar] Page 7
Responsible for :Execution Mass housing P+ 6, 9 buildings
Supervision of RCC Works , Masonary , Finishing works.
Day to day cordination with the sub contractors
Preparation of estimates for the work orders , & preparing RA Bills for the sub contractors.
Project Shree Precoated steels Ltd Pune ( Ajmera Group )
Responsible for Supervision of road works.
Civil works for auxillary structures such as DM Plants , ETP Units Machine foundations etc &
shut down works.
Tubular structures & lighting towers
Fabrication & erection of down takes
Project/ location : 300 flats P+4 , Pune , Bibwewadi Pune , Parvati nagar
Consultant : M/s Spacedesigners syndicate
Cost : 75 crores
Post : Junior Engineer
Period : April 1992 to June 1993
Interpretation of construction drawings & Supervising the works By the sub contractors
RCC Works , Finishing activities
PERSONAL SNIPPETS
IT CREDENTIALS
Done user Application of SAP algorithms Module from M/s Algorithms Pvt Ltd
Windows & MS-OFFICE, Excel & ERP. SAP MODULES , Custom made softwares . FCP Software
LEARNING CIVIL ENGINEERING
1992 : Bachelor ofCivil Engineering BVCOEP , University of Pune
2006 : MIE Institute of engineers Pune , Culcutta
2007 : Chartered Engineer Institute of Engineers Pune . Culcatta
STUDY PROJECTS IN CIVIL ENGINEERING
1991 : Redevelopment of slums by providing additional FSI
Date of Birth : 2nd
March 1967
Passport Status : Ready & Available
Languages : English, Hindi, and Marathi
Scholarships & Merits : Capt laxmibai Bapat Scholarship award in 10
S.S.C
8. [Resume: Shirish.S.Rahurkar] Page 8
SUMMARIZED PROJECT EXPERIENCE
Sr.No. Projects Major role
1 300 FLATS HOUSING SCHEME BUILDERS EXECUTION, SITE INCHARGE
2 600 FLATS HOUSING SCHEME BUILDERS EXECUTION , SENIOR ENGINEER
3
STEEL PLANT (COLOUR COATING)
INDUSTIRAL CLIENT
EXECUTION , JE
4 600 FLATS HOUSING SCHEME BUILDERS EXECUTION JE
5 PROCESS PLANT (RUBBER ) EPC
EXECUTION , ASSIATANT
ENGINEER
6
HVDC (TRANSMISSION ) EPC EXECUTION , ASSIATANT
ENGINEER
7
KNITTING FACTORY EPC CLIENT BILLING / PLANNING ,
ASSIATANT ENGINEER
8
WATER SUPPLY ( MINISTRY OF BAHARAIN )
CONTRACTING HOD CIVIL EXECUTION / BILLING
9
MARINE SEPTIC TERMINAL (BAHARIAN)
CONTARCTING
EXECUTION / BILLING SENOIR
ENGINEER
10 VILLA WORKS ( BAHARIAN ) BUIDERS EXECUTION SENIOR ENGINEER
11 COMMERCIAL IT BUILDING / HOTEL PROJECT
CONTRACTS MANAGER
12 LARGEST TOWN SHIP OF ASIA BUILDERS
HOD PURCHASE /PLANNING AND
CONTRACT BILLING 200
CONTRACTORS
13 TELEVISION FACTORY EPC CONTRACTING CLIENT BILLING
14
EFFLUENT TREATMENT ,WASTE WATER
MANAGEMENT ( STP / SPS ) EPC GOVT DESIGN
CUM PROJECT MAGEMENT CONSULTANCY
PRINCIPAL
CONSULTANTEXECUTION ( SR PM
)
15 HOTEL PROJECTS SR. PROJECT MANAGER
16 HIGH RISE MULTIPLE PROJECTS , AIRPORTS , CONSULTANT