ISMAIL M. Y. SHAIKH
:09028768346
: ismail.shaikh1983@gmail.com / way2ims@gmail.com
~ Project Management – Nearly 10 Years of Experience ~
Location Preference: India & Gulf
P R O F I L E S N A P S H O T
 Gained insightful experience in executing multiple projects in EPC industry for African,
Gulf & Indian clients
 Expertise in devising strategic plans & schedules for project activities with focus on
optimum utilization of manpower & materials; performing installation & commissioning
activities as per the specified designs
 Appearing for PMP. Well versed with techniques like PERT, CPM, TBE & EVM. Project
management in all knowledge areas and process groups
 Well versed with SAP (PS and SD Module), PCS, MS-Project/Primavera P6 , MS Office,
Catia V5, AutoCAD 2000, 2004, 2008 and LT Version - Material Master System for
Making Material Codes
 Proficient in establishing & nurturing strong rapport with key stakeholders / clients;
monitoring all site related activities and ensuring their smooth execution as per project
schedule with focus on optimum utilization of manpower & materials
 Implementing ISO9001, QMS, OHSAS & EHS Standards;workingwitha strong vigilance to
any potential hazards by performing regular inspections to ensure health and safety in
compliance with the rules & regulations
W O R K E X P E R I E N C E
Since June’13 Maritime Industrial Services Arabia Co. Ltd. Jubail, Saudi Arabia as Project Engineer - II
Project Management Team
Key Result Areas:
 Superheating projects while developing baselines; controlling projects with respect to cost, resource deployment, time
over-runs and quality compliance to ensure satisfactory execution of the same
 Liaising with:
o Various Functional departments and out house contractors for smooth project execution
o Various internal departments like procurement, engineering, QC and production for day-to-day progress of work
activities on the project
 Ensuring preparation of deliverables/reports/procedures and standard project documents required for the project
 Attending weekly project review & progress meetings (internal as well as with client) with progress report and
preparing minutes of meetings
 Applying PERT & CPM techniques to avoid any delay & ensure work completion before time
 Preparing management reports with EVM technique to show current status of the project
 Approving and controlling all invoices, monitoring project receivables and resolving any receivable problems with
client.
 Identifying, tracking and managing all changes in the scope of work, schedule and execution of the projects. Follow up
for change order approval with client.
 Reviewing project plan and assisting in preparation of subcontract package for outsourcing
 Arranging Free IssueMaterials from clientand assistinginlogistics,shipment, receipt, MRV clearance and safe storage at site
 Approving PO on vendor for core bought out & sub-contracting items
 Organizing safety orientation programs, trainings & mobilization of crew at site on weekly basis, thereby ensuring
adherence to Company Safety Standards
 Preparing and monitoring material & manpower mobilization and demobilization plan
 Coordinate with the project quality coordinators/inspectors to ensure that the work is being performed per ITP & Saudi
Aramco Standards
 Preparing techno-commercial documents: price break-up, cash in-cash out reports and sales order creation. Review of
contract, order intimation, LOI, letter of credit, INCOTERMS, bank guarantees, etc.
 Planning SOPs, manuals & work instructions for operations and maintaining reports for facilitating decision making by
the management
 Discerning and managing risks involved in the projects, planning for contingencies and suggesting technology-based
solutions for mitigating the same
AREAS OF EXPERTISE:
Strategic Planning
Project Management
Manufacturing
Operations
Installation &
Commissioning
Process Optimization
Resource Management
Quality Management
Procurement Planning
Site Operations
Budgeting & Cost
Control
MIS Documentation
 Participating in technical discussions, developing & updating new specifications, evaluating subcontract document,
issuing instructions for corrective actions and recommending cost effective and value added engineering solutions
 Analyzing and mapping existing processes to the desired levels (GAP Analysis), evaluating available solutions to achieve
higher levels of efficiency & effectiveness
Accomplishments:
 Completed projects before time by crashing the project with less incremental cost and thus achieving bonus from client.
Sr. No. Project Standard delivery Achieved Delivery Bonus
1 Petro Rabigh ( Dryers & Pressure Vessels) 50 Weeks 44 Weeks SAR 500,000
2 Forster Wheeler (Pressure vessels & HE) 68 Weeks 60 Weeks SAR 1,200,000
 Acquired additional business worth US$ 10 Million new projects such as Heat Exchangers for Jubail United Petrochemical
company, Tube bundles for SAMREF through delivering ahead of deadlines
Aug’10 – Jun’13 Walchandnagar Industries P. Ltd. Pune, India as Sr. Project Engineer
Key Result Areas:
 Lead Domestic & International Project Team while working with internal departments and customers during project
phases like initiation, planning, execution & completion
 Managed entire execution, planning of project, risk management, cost management, scope management & site
management
 Controlled on site fabrication works; supervised exchange of bulk drawings with customer, internal department, civil &
erection contractors
 Created customer master and planned standard WBS in SAP & budget allocation for various project activities and
preparation of budget note for approval
 Devised monthly sales plan, sales price break-up, final billing break up, progress reports and project cost monitoring
against estimated cost
 Estimated container requirement if delivery terms are C&F or CIF
 Prepared:
o Sales orders for all packages and PRs for bought out items
o Sales advice for booking of sales after delivery of the package
 Project Management coordination with Design, Purchase, Process, Manufacturing, QC, Export, Excise & Shipping
Department
 Interacted with client for payment collection (advance & progressive as per terms of payments)
 Prepared change order request and followup with customer for its acceptance and amendment of contract.
 Coordinated third party inspection at works or at vendors works
 Liaised with shipping/freight forwarding agents for custom clearances of the export goods
 Supervised after sales services from erection engineers, vendors & consultants. Resolve customer site
complaintsduring and after commissioning
 Processed servicepayments for Inspection agencies, vendor services during & after erection and Freight forwarding
agencies
Accomplishment:
 Achieved savings of INR 1.6 Cr by delivering bought out items like HT/LT Cables, LT Motors, Transformers, Reverse Air
bag house & process fans directly to site for Anjani Cement
P R E V I O U S E X P E R I E N C E
Jun’09 – Jun’10 Hindas Mechanical Co. Jubail, Saudi Arabia as Project Management Officer
Key Result Areas:
 Executed the assigned projects and ensured package for submittal to the client meets all requirements
 Supervised schematic designing & drafting of mechanical structures such as trusses, piping work and other mechanical
equipment; obtained approval of engineering drawings by Royal commission of Saudi Arabia
 Coordinated activities concerned with technical developments, scheduling and resolving engineering problems
 Obtained approval on purchase requisition for raw material procurement
 Managed inspection of ready structures & civil works at site and obtained clearance certificate for the inspected items
from Inspector of the Royal Commission of Saudi Arabia
 Conducted follow ups with clients for payments as per the contract; resolved complaints & NCR raised by client or
Royal Commission Inspector
 Oversaw after sales services to the customer within warranty period
Oct’05 – Dec’08 Silicon Shipwright Pvt. Ltd. Goa, India as GET I Project Engineer
Key Result Areas:
 Planned, executed and monitored entire project with respect to the planned schedules
 Liaised with Sub-contractors for contract finalization, work orders and negotiations
 Liaised with:
o Procurement Department for vendor's prequalification and material submittals; prepared compliance statement &
obtained necessary approvals from clients
o Internal departments for day-to-day progress of work activities on the project
 Monitored monthly & weekly billing/quantity & variation claims, rechecking of subcontractor &supplier bills, thereby
ensured timely submission and clearing payments
 Appeared for monthly MRMs with details of project progress; ensured all operations are undertaken in a safe manner
in accordance with project PQP /company QMS policy
 Coordinated & conducted In-house trainings for finishing activity and related operations activities
Accomplishments:
 Active participant in implementation of ISO-9001, QMS &HSE Systems on site which led to save 5000 Man hours,
decrease in accidents by 90%
 Identified customercomplaints – NCR(Quality & HSE) and prevent/close these issues to ensuremaximum satisfaction levels
E D U C A T I O N
2004 B.E. in Mechanical Engineering from RMCET, Mumbai University
P R O J E C T S H A N D L E D
 Maweni Limestone Project at Darr-Es-Salam & Tanga-One of the Walchand’s Biggest EPC Project
 Kuwait Cement Project, Anjani Cement Ltd.
 Boiler Supply for Warna Sugar Factory
 SABIC Project (Heat Exchangers), SAMREF (Heat Exchangers), Forster Wheeler Sadara Project (CS & SS Pressure
Vessels), JUPC Project (Heat Exchangers)
 Saudi Aramco (Sand Traps), Fluor Arabia Sadara Project (CS Columns), Petro Rabigh Ethane Dryer Project (Pressure
Vessels & Dryers), CAT Safaniya Project (Pressure Vessels), Saudi Electricity Company (Scraper Traps, Jib Cranes &
handling Systems), Qatar Shell (Pressure Vessels)
 O & M shutdown projects for Petrokemya, Sadaf, Saudi Kayan & Tasnee
 Tekfen, Sadara; Above Ground Pipe Erection Project which included 18KM pipe fabrication & erection and around
25KM inch diameter welding with NDE
 Replacement of Tube Bundles in 6 Existing Heat Exchangers at Jubail United Petrochemical Company
 Cone & Counter Weight Replacement Site Project for Sadaf
P E R S O N A L D E T A I L S
Date of Birth : 6th January 1983
Languages Known : English, Hindi, Marathi & Arabic
Address : Flat No. 501, Mangal Bhairav, Nanded City, Pune
Nationality : Indian
Marital Status : Married
Visa Details : Work Visa
Driving License : India/Saidi Arabia
No. of Dependents : 02
Passport Details : G3341810

More Related Content

What's hot

Resume - Shibu Thomas rev
Resume - Shibu Thomas revResume - Shibu Thomas rev
Resume - Shibu Thomas revShibu Thomas
 
CV_Updated.11
CV_Updated.11CV_Updated.11
CV_Updated.11Kamesh P
 
Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndy Taylor
 
Construction phases
Construction phasesConstruction phases
Construction phasesMeesum Zaidi
 
Resume - Khalid Hussain Project
Resume - Khalid Hussain ProjectResume - Khalid Hussain Project
Resume - Khalid Hussain ProjectKhalid Hussain
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement ignitetribes
 
Shailesh Pawar Profile
Shailesh Pawar ProfileShailesh Pawar Profile
Shailesh Pawar ProfileShailesh Pawar
 
Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3Sunil Mall
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli
 
CustomerCopy raghu
CustomerCopy raghuCustomerCopy raghu
CustomerCopy raghuRaghu p
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - siteAbdulaziz Kaya
 
CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub ContractArunkumar Shirawalmath
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1Dave Thompson
 

What's hot (20)

Epc presentation robert foxpresentation
Epc presentation robert foxpresentationEpc presentation robert foxpresentation
Epc presentation robert foxpresentation
 
Why EPC
Why EPCWhy EPC
Why EPC
 
Resume - Shibu Thomas rev
Resume - Shibu Thomas revResume - Shibu Thomas rev
Resume - Shibu Thomas rev
 
CV_Updated.11
CV_Updated.11CV_Updated.11
CV_Updated.11
 
Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.doc
 
Construction phases
Construction phasesConstruction phases
Construction phases
 
Sachin parab
Sachin parabSachin parab
Sachin parab
 
Resume - Khalid Hussain Project
Resume - Khalid Hussain ProjectResume - Khalid Hussain Project
Resume - Khalid Hussain Project
 
Donald Buchanan CV
Donald Buchanan CVDonald Buchanan CV
Donald Buchanan CV
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement
 
Shailesh Pawar Profile
Shailesh Pawar ProfileShailesh Pawar Profile
Shailesh Pawar Profile
 
CV of Dinesh
CV of DineshCV of Dinesh
CV of Dinesh
 
Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli Resume
 
CustomerCopy raghu
CustomerCopy raghuCustomerCopy raghu
CustomerCopy raghu
 
C.V
C.VC.V
C.V
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
 
PROJECT ENGINEER
PROJECT ENGINEERPROJECT ENGINEER
PROJECT ENGINEER
 
CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub Contract
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
 

Similar to CV ISMAIL SHAIKH-31.10.2015

Similar to CV ISMAIL SHAIKH-31.10.2015 (20)

Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
Anand resume scm
Anand resume scmAnand resume scm
Anand resume scm
 
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project Engineer
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project Engineer
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016
 
Henry CV
Henry CVHenry CV
Henry CV
 
CV _Rajasekhar- Project Management
CV _Rajasekhar- Project ManagementCV _Rajasekhar- Project Management
CV _Rajasekhar- Project Management
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 
Sohaib_CV-
Sohaib_CV-Sohaib_CV-
Sohaib_CV-
 
Ketan's resume
Ketan's resumeKetan's resume
Ketan's resume
 

CV ISMAIL SHAIKH-31.10.2015

  • 1. ISMAIL M. Y. SHAIKH :09028768346 : ismail.shaikh1983@gmail.com / way2ims@gmail.com ~ Project Management – Nearly 10 Years of Experience ~ Location Preference: India & Gulf P R O F I L E S N A P S H O T  Gained insightful experience in executing multiple projects in EPC industry for African, Gulf & Indian clients  Expertise in devising strategic plans & schedules for project activities with focus on optimum utilization of manpower & materials; performing installation & commissioning activities as per the specified designs  Appearing for PMP. Well versed with techniques like PERT, CPM, TBE & EVM. Project management in all knowledge areas and process groups  Well versed with SAP (PS and SD Module), PCS, MS-Project/Primavera P6 , MS Office, Catia V5, AutoCAD 2000, 2004, 2008 and LT Version - Material Master System for Making Material Codes  Proficient in establishing & nurturing strong rapport with key stakeholders / clients; monitoring all site related activities and ensuring their smooth execution as per project schedule with focus on optimum utilization of manpower & materials  Implementing ISO9001, QMS, OHSAS & EHS Standards;workingwitha strong vigilance to any potential hazards by performing regular inspections to ensure health and safety in compliance with the rules & regulations W O R K E X P E R I E N C E Since June’13 Maritime Industrial Services Arabia Co. Ltd. Jubail, Saudi Arabia as Project Engineer - II Project Management Team Key Result Areas:  Superheating projects while developing baselines; controlling projects with respect to cost, resource deployment, time over-runs and quality compliance to ensure satisfactory execution of the same  Liaising with: o Various Functional departments and out house contractors for smooth project execution o Various internal departments like procurement, engineering, QC and production for day-to-day progress of work activities on the project  Ensuring preparation of deliverables/reports/procedures and standard project documents required for the project  Attending weekly project review & progress meetings (internal as well as with client) with progress report and preparing minutes of meetings  Applying PERT & CPM techniques to avoid any delay & ensure work completion before time  Preparing management reports with EVM technique to show current status of the project  Approving and controlling all invoices, monitoring project receivables and resolving any receivable problems with client.  Identifying, tracking and managing all changes in the scope of work, schedule and execution of the projects. Follow up for change order approval with client.  Reviewing project plan and assisting in preparation of subcontract package for outsourcing  Arranging Free IssueMaterials from clientand assistinginlogistics,shipment, receipt, MRV clearance and safe storage at site  Approving PO on vendor for core bought out & sub-contracting items  Organizing safety orientation programs, trainings & mobilization of crew at site on weekly basis, thereby ensuring adherence to Company Safety Standards  Preparing and monitoring material & manpower mobilization and demobilization plan  Coordinate with the project quality coordinators/inspectors to ensure that the work is being performed per ITP & Saudi Aramco Standards  Preparing techno-commercial documents: price break-up, cash in-cash out reports and sales order creation. Review of contract, order intimation, LOI, letter of credit, INCOTERMS, bank guarantees, etc.  Planning SOPs, manuals & work instructions for operations and maintaining reports for facilitating decision making by the management  Discerning and managing risks involved in the projects, planning for contingencies and suggesting technology-based solutions for mitigating the same AREAS OF EXPERTISE: Strategic Planning Project Management Manufacturing Operations Installation & Commissioning Process Optimization Resource Management Quality Management Procurement Planning Site Operations Budgeting & Cost Control MIS Documentation
  • 2.  Participating in technical discussions, developing & updating new specifications, evaluating subcontract document, issuing instructions for corrective actions and recommending cost effective and value added engineering solutions  Analyzing and mapping existing processes to the desired levels (GAP Analysis), evaluating available solutions to achieve higher levels of efficiency & effectiveness Accomplishments:  Completed projects before time by crashing the project with less incremental cost and thus achieving bonus from client. Sr. No. Project Standard delivery Achieved Delivery Bonus 1 Petro Rabigh ( Dryers & Pressure Vessels) 50 Weeks 44 Weeks SAR 500,000 2 Forster Wheeler (Pressure vessels & HE) 68 Weeks 60 Weeks SAR 1,200,000  Acquired additional business worth US$ 10 Million new projects such as Heat Exchangers for Jubail United Petrochemical company, Tube bundles for SAMREF through delivering ahead of deadlines Aug’10 – Jun’13 Walchandnagar Industries P. Ltd. Pune, India as Sr. Project Engineer Key Result Areas:  Lead Domestic & International Project Team while working with internal departments and customers during project phases like initiation, planning, execution & completion  Managed entire execution, planning of project, risk management, cost management, scope management & site management  Controlled on site fabrication works; supervised exchange of bulk drawings with customer, internal department, civil & erection contractors  Created customer master and planned standard WBS in SAP & budget allocation for various project activities and preparation of budget note for approval  Devised monthly sales plan, sales price break-up, final billing break up, progress reports and project cost monitoring against estimated cost  Estimated container requirement if delivery terms are C&F or CIF  Prepared: o Sales orders for all packages and PRs for bought out items o Sales advice for booking of sales after delivery of the package  Project Management coordination with Design, Purchase, Process, Manufacturing, QC, Export, Excise & Shipping Department  Interacted with client for payment collection (advance & progressive as per terms of payments)  Prepared change order request and followup with customer for its acceptance and amendment of contract.  Coordinated third party inspection at works or at vendors works  Liaised with shipping/freight forwarding agents for custom clearances of the export goods  Supervised after sales services from erection engineers, vendors & consultants. Resolve customer site complaintsduring and after commissioning  Processed servicepayments for Inspection agencies, vendor services during & after erection and Freight forwarding agencies Accomplishment:  Achieved savings of INR 1.6 Cr by delivering bought out items like HT/LT Cables, LT Motors, Transformers, Reverse Air bag house & process fans directly to site for Anjani Cement P R E V I O U S E X P E R I E N C E Jun’09 – Jun’10 Hindas Mechanical Co. Jubail, Saudi Arabia as Project Management Officer Key Result Areas:  Executed the assigned projects and ensured package for submittal to the client meets all requirements  Supervised schematic designing & drafting of mechanical structures such as trusses, piping work and other mechanical equipment; obtained approval of engineering drawings by Royal commission of Saudi Arabia  Coordinated activities concerned with technical developments, scheduling and resolving engineering problems  Obtained approval on purchase requisition for raw material procurement  Managed inspection of ready structures & civil works at site and obtained clearance certificate for the inspected items from Inspector of the Royal Commission of Saudi Arabia  Conducted follow ups with clients for payments as per the contract; resolved complaints & NCR raised by client or Royal Commission Inspector  Oversaw after sales services to the customer within warranty period Oct’05 – Dec’08 Silicon Shipwright Pvt. Ltd. Goa, India as GET I Project Engineer
  • 3. Key Result Areas:  Planned, executed and monitored entire project with respect to the planned schedules  Liaised with Sub-contractors for contract finalization, work orders and negotiations  Liaised with: o Procurement Department for vendor's prequalification and material submittals; prepared compliance statement & obtained necessary approvals from clients o Internal departments for day-to-day progress of work activities on the project  Monitored monthly & weekly billing/quantity & variation claims, rechecking of subcontractor &supplier bills, thereby ensured timely submission and clearing payments  Appeared for monthly MRMs with details of project progress; ensured all operations are undertaken in a safe manner in accordance with project PQP /company QMS policy  Coordinated & conducted In-house trainings for finishing activity and related operations activities Accomplishments:  Active participant in implementation of ISO-9001, QMS &HSE Systems on site which led to save 5000 Man hours, decrease in accidents by 90%  Identified customercomplaints – NCR(Quality & HSE) and prevent/close these issues to ensuremaximum satisfaction levels E D U C A T I O N 2004 B.E. in Mechanical Engineering from RMCET, Mumbai University P R O J E C T S H A N D L E D  Maweni Limestone Project at Darr-Es-Salam & Tanga-One of the Walchand’s Biggest EPC Project  Kuwait Cement Project, Anjani Cement Ltd.  Boiler Supply for Warna Sugar Factory  SABIC Project (Heat Exchangers), SAMREF (Heat Exchangers), Forster Wheeler Sadara Project (CS & SS Pressure Vessels), JUPC Project (Heat Exchangers)  Saudi Aramco (Sand Traps), Fluor Arabia Sadara Project (CS Columns), Petro Rabigh Ethane Dryer Project (Pressure Vessels & Dryers), CAT Safaniya Project (Pressure Vessels), Saudi Electricity Company (Scraper Traps, Jib Cranes & handling Systems), Qatar Shell (Pressure Vessels)  O & M shutdown projects for Petrokemya, Sadaf, Saudi Kayan & Tasnee  Tekfen, Sadara; Above Ground Pipe Erection Project which included 18KM pipe fabrication & erection and around 25KM inch diameter welding with NDE  Replacement of Tube Bundles in 6 Existing Heat Exchangers at Jubail United Petrochemical Company  Cone & Counter Weight Replacement Site Project for Sadaf P E R S O N A L D E T A I L S Date of Birth : 6th January 1983 Languages Known : English, Hindi, Marathi & Arabic Address : Flat No. 501, Mangal Bhairav, Nanded City, Pune Nationality : Indian Marital Status : Married Visa Details : Work Visa Driving License : India/Saidi Arabia No. of Dependents : 02 Passport Details : G3341810