SlideShare a Scribd company logo
1 of 8
Flat No-01
S.M. Tiwari 330/4 UGF Shiv Apartment, Plot No-330,Ward 4
Mehrauli New Delhi-110030
SENIOR PROFESSIONAL
Project Management/ Civil Engineering/ Contract Management
• 9971801434
• Psmt2004@yahoo.co.in
Objective: Seeking a challenging career in Project Management where I can enhance my skills and reach at the
Technical zenith of excellence and contribute to maximum in achieving the long term goals of an organization.
 EXPERIENCE & SKILLS :
 Name of the Employer : M/S MMR SAHA INFRASTRUCTURE LTD.
(NOIDA Head Office)
 Duration : From July 2014 to till date
 Projects : Taking Care of 3 Projects at Noida & 1In Bulandsahr
 MMR 52 nd Avenue : Area - 12 Lakh Sq Ft, Value - 360 Cr, Type- Residential
 MMR Galleria : Area - 11 L Sq Ft, Value - 450 Cr, Type - Commercial
 MMR vone Mall : Area-4 L sft Value- Cost 120 Cr, Type- Commercial
 Architect : Hafeez Contractor
 Designation : AGM Contract and Billing
 Job Profile :
 Creates and executes project work plans and revises as appropriate to meet changing needs and
requirements.
 Identifies resources needed and assigns individual responsibilities.
 Bringing about optimum utilization of resources- labour, materials and equipment, and ensuring their
procurement at most cost-effective terms.
 Manages day-to-day operational aspects of a project and scope & Periodic inspection of construction
sites.
 Co-ordinate the efforts of all parties involved in the project, which include the architects, consultants,
contractors, sub-contractors and labourers.
 Reviews deliverables prepared by team before passing to client.
 Effectively applies our methodology and enforces project standards.
 Prepares for engagement reviews and quality assurance procedures.
 Minimizes our exposure and risk on project.
 Ensures project documents are complete, current, and stored appropriately.
 Tracks and reports team hours and expenses on a weekly basis.
 Manages respective project budget.
Page 1 of 8
 Determines appropriate revenue recognition, ensures timely and accurate invoicing, and monitors
receivables for project.
 Follows up with clients, when necessary, regarding unpaid invoices.
 Project accounting functions including managing the budget, tracking if team expenses and minimizing
exposure and risk in the project
 Analyzes project profitability, revenue, margins, bill rates and utilization.
 Accurately forecasts revenue, profitability, margins, bill rates and utilization.
 Negotiating contracts with subcontractors or vendors on projects.
 Supervising site superintendents and laborers.
 Assures project legal documents are completed and signed.
 Coordinating and overseeing the construction materials that are brought in as well as inspect the quality
of other tools and machinery that are brought on the site.
 Management of Health, Safety, quality and environmental
 Implementation and maintenance of group Safety standards and policies
 Monitored safety performance of all personnel on site and recommended improvements to safety
procedures.
 In coordination With the Planning Engineer, prepared detailed work program.
 Process and Policy Compliances.
 Certification of bill forwarded by contractors civil , finishing ,Plumbing and Services .
 Checking of reconciliation statement of free issue material.
 Preparation of Payment certificate.
 Checking of compliances as per contract.
 Checking of deviation statement.
 Checking of bills in terms of quality parameter.
 Certification of extra items.
 Certification of escalation bills.
 Certification of Secured Advances and its recovery.
 Payment tracking sheets wrt to budget and contracts.
 Preparation of S curve of Project.
 Appointment of Project Management Consultant, QS Consultant, Contractor & Supplier
 Selection of vendor with respect to Quality & Price
 To interact with various contracting agencies for Optimal Services
 To coordinate different departments at site for the progress of the project
 Floating of Tender, Taking bid from the Contractor.
 Preparation of Comparison Statement.
 Negotiation with vendors at different stages of projects.
 Taking the approval with management to award the contract
 Preparation of Work Order/Purchase Order
 Name of the Employer : M/S EARTH INFRASTRUCTURE LTD.
(DELHI Head Office)
Page 2 of 8
 Duration : From Sept 2013 to June 2014
 Projects : Taking Care of 3 Projects at Noida & 1In Gurgaon
 Earth Elacasa : Area - 12 Lakh Sq Ft, Value - 360 Cr, Type- Residential
 Earth techsix : Area - 11 L Sq Ft, Value - 450 Cr, Type - Residential
 Earth Sapphire : Area-4 L sft Value- Cost 120 Cr, Type- Commercial
 Architect : DFA
 Designation : GM Contract
 Job Profile :
 Creates and executes project work plans and revises as appropriate to meet changing needs and
requirements.
 Identifies resources needed and assigns individual responsibilities.
 Bringing about optimum utilization of resources- labour, materials and equipment, and ensuring their
procurement at most cost-effective terms.
 Manages day-to-day operational aspects of a project and scope & Periodic inspection of construction
sites.
 Co-ordinate the efforts of all parties involved in the project, which include the architects, consultants,
contractors, sub-contractors and labourers.
 Reviews deliverables prepared by team before passing to client.
 Effectively applies our methodology and enforces project standards.
 Prepares for engagement reviews and quality assurance procedures.
 Minimizes our exposure and risk on project.
 Ensures project documents are complete, current, and stored appropriately.
 Tracks and reports team hours and expenses on a weekly basis.
 Manages respective project budget.
 Determines appropriate revenue recognition, ensures timely and accurate invoicing, and monitors
receivables for project.
 Follows up with clients, when necessary, regarding unpaid invoices.
 Project accounting functions including managing the budget, tracking if team expenses and minimizing
exposure and risk in the project
 Analyzes project profitability, revenue, margins, bill rates and utilization.
 Accurately forecasts revenue, profitability, margins, bill rates and utilization.
 Negotiating contracts with subcontractors or vendors on projects.
 Supervising site superintendents and laborers.
 Assures project legal documents are completed and signed.
Page 3 of 8
 Coordinating and overseeing the construction materials that are brought in as well as inspect the quality
of other tools and machinery that are brought on the site.
 Management of Health, Safety, quality and environmental
 Implementation and maintenance of group Safety standards and policies
 Monitored safety performance of all personnel on site and recommended improvements to safety
procedures.
 In coordination With the Planning Engineer, prepared detailed work program.
 Process and Policy Compliances.
 Certification of bill forwarded by contractors civil , finishing ,Plumbing and Services .
 Checking of reconciliation statement of free issue material.
 Preparation of Payment certificate.
 Checking of compliances as per contract.
 Checking of deviation statement.
 Checking of bills in terms of quality parameter.
 Certification of extra items.
 Certification of escalation bills.
 Certification of Secured Advances and its recovery.
 Payment tracking sheets wrt to budget and contracts.
 Preparation of S curve of Project.
 Appointment of Project Management Consultant, QS Consultant, Contractor & Supplier
 Selection of vendor with respect to Quality & Price
 To interact with various contracting agencies for Optimal Services
 To coordinate different departments at site for the progress of the project
 Floating of Tender, Taking bid from the Contractor.
 Preparation of Comparison Statement.
 Negotiation with vendors at different stages of projects.
 Taking the approval with management to award the contract
 Preparation of Work Order/Purchase Order
 Name of the Employer : M/S UNITECH LTD.
(Gurgaon Head Office)
 Duration : From Feb 2012 to Sept 2013
 Projects : Taking Care of 3 Projects at Bangalore & 1 In Mysore
 Valdel Mall : Area - 8 Lakh Sq Ft, Value - 240 Cr, Type- Commercial
 Electronic City : Area - 20 L Sq Ft, Value - 500 Cr, Type - Villament
 Aranya Vilas : Area-4 L sft Value- Cost 120 Cr, Type- Residential New Victorian Villa
 Architect : Mr. Sanjay N Kumar/ LDPE Australia/ Element Design Australia/MASS Architect
 Designation : DGM Billing & Contract
 Job Profile :
 Certification of bill forwarded by contractors civil , finishing ,Plumbing and Services .
 Checking of reconciliation statement of free issue material.
 Preparation of Payment certificate.
 Checking of compliances as per contract.
 Checking of deviation statement.
 Checking of bills in terms of quality parameter.
 Certification of extra items.
Page 4 of 8
 Certification of escalation bills.
 Certification of Secured Advances and its recovery.
 Payment tracking sheets wrt to budget and contracts.
 Preparation of S curve of Project.
 Pictorial presentation of project expenses.
 Auditing of work of other zones .
 Preparation of budget of project.
 Appointment of Project Management Consultant, QS Consultant, Contractor & Supplier
 Selection of vendor with respect to Quality & Price
 To interact with various contracting agencies for Optimal Services
 To coordinate different departments at site for the progress of the project
 Floating of Tender, Taking bid from the Contractor.
 Preparation of Comparison Statement.
 Negotiation with vendors at different stages of projects.
 Taking the approval with management to award the contract
 Preparation of Work Order/Purchase Order
 Name of the Employer : M/S EMAAR MGF LAND LIMITED
(Gurgaon)
 Duration : From Sept 2010 to Jan 2012
 Projects :
 Palm Spring Gurgaon
 Palm Drive Gurgaon
 Palm Hills Gurgaon
 Esplanded Chennai
 Architect : ARCOP – Architect
 Value of Project : Central Contract of 2000 Cr. Approx Per Annum
 Designation : Assistant General Manager – Billing , Contracts & Procurement
 Job Profile :
 Certification of bill forwarded by contractors civil , finishing ,Plumbing and Services .
 Checking of reconciliation statement of free issue material.
 Preparation of Payment certificate.
 Checking of compliances as per contract.
 Checking of deviation statement.
 Checking of bills in terms of quality parameter.
 Certification of extra items.
 Certification of escalation bills.
 Certification of Secured Advances and its recovery.
 Payment tracking sheets wrt to budget and contracts.
 Preparation of S curve of Project.
 Pictorial presentation of project expenses.
 Appointment of Project Management Consultant, QS Consultant, Contractor & Supplier
 Selection of vendor with respect to Quality & Price
 To interact with various contracting agencies for Optimal Services
 To coordinate different departments at site for the progress of the project
 Floating of Tender, Taking bid from the Contractor.
 Preparation of Comparison Statement.
 Negotiation with vendors at different stages of projects.
 Taking the approval with management to award the contract
 Preparation of Work Order/Purchase Order
 Name of the Employer : ADVANCE INDIA PROJECTS LTD.
 Duration : From Mar 2007 to Sept 2010
 Project Details :
 The Celebration Mall Amritsar: Area 3,10,000 sq ft., Project Cost-95 cr.
Page 5 of 8
 The Celebration Mall Udaipur : Area 5,10,000 sq ft., Project Cost- 156 cr.
 Dream City Amritsar : Area 148 Acres Township, Infra Development Cost - 56Cr.Total
Cost-1700 Cr
 Dream City Khanna : Project Cost- 680Cr, Infra Dev, Cost- 30Cr,
 Dream City Mohali : Initial Stage
 Architect
 Hafiz – Contractor, Survana International, Singapore
 Panika, Ahmadabad
 Sapna Kumar & Associate, Delhi
 Designation : Senior Manager/Assistant General Manager – Billings and Co-ordination
 Job Profile :
 Support In Project Concept Finalization Process
 Certification of bill forwarded by contractors civil , finishing ,Plumbing and Services .
 Checking of reconciliation statement of free issue material.
 Preparation of Payment certificate.
 Checking of compliances as per contract.
 Checking of deviation statement.
 Checking of bills in terms of quality parameter.
 Certification of extra items.
 Certification of escalation bills.
 Certification of Secured Advances and its recovery.
 Payment tracking sheets wrt to budget and contracts.
 Preparation of S curve of Project.
 Pictorial presentation of project expenses
 Project Management, Assigning, Reviewing & Tracking Project as per defined project plan.
 Taking care of Statutory Approvals, Cost Management, Contracts & Execution of Projects
 Cost Estimation, Budget Proposals & Cost Control during Design & Execution
 Monitoring & Execution of Commercial, Township & Residential Project
 Coordination for Labour & Material
 Preparing Zero Budget, Planning Budget, Achievement Budget & Cash Flow Chart.
 Preparing Documents & Rates for Tenders
 Planning & Executing all the site activities in terms of Structure, Finishing & Services
 Name of the Employer : M/S GANNON DUNKERLEY & CO. LTD.
(Ahmadabad)
Duration : From Nov 1997 to Mar 2007
Projects :
 Arvind Mill, Ahmedabad
 Cadila Pharmaceutical, Ahmadabad
 Corporate Office of Cadila Pharmaceuticals
Designation :Joined as Assistant Engineer, Promoted to Manager Billing
Job Profile :
 Monitoring & Execution of Commercial, Township & Residential Project
 Taking the approval with management to award the contract
 Verifying & Certifying the bills submitted by the Contractors
 Support in Certification
 Preparing Reconciliation Statement for Labour & Material
 Planning & Executing all site activities in terms of Structure, Finishing & Services
 Preparing Zero Budget, Planning Budget, Achievement Budget & Cash Flow Chart
 Verifying & Certifying the bills submitted by the contractor
 Doing Internal Audit for ISO Guidelines
 Rate Analysis of Items
 Preparing Escalation Claims for the Organization
 Coordination for Labour & Material
 Preparing Zero Budget, Planning Budget, Achievement Budget & Cash Flow Chart
 Preparing Documents & Rates for Tenders
Page 6 of 8
 Name of the Employer : M/S SIMPLEX CONCRETE PILES (I) LTD.
(New Delhi)
 Duration : From Apr 1995 to Oct 1997
 Designation : Joined as Junior Engineer, Promoted to Assistant Engineer
 Job Profile :
 Preparing Estimate BOQ & Tender Documents
 Furnishing the project programs to Management, Monitoring & Updating the programs, Recording
Delays with reasons
 Prepare Escalation claims for the Company
 Preparing Documents and Rates for Tenders
 Verifying & Certifying the bills submitted by the contractor
 Planning & Executing all the site activities in terms of Structure, Finishing & Services
 Name of the Employer : M/S ERA CONSTRUCTIONS (I) LTD.
(New Delhi)
 Duration : From Mar 1993 to Mar 1995
 Designation : Site Engineer
 Job Profile :
 Planning & Executing all site activities in terms of Structure, Finishing & Services
 Preparing Estimates & Tender Documents
 Verifying & Certifying the bills submitted by the contractor
 ACHIEVEMENTS:
 During Simplex in Feb 1997 we have done 1 Lakh 39 THOUSAND Cubic CM of concrete done by team –
Gunnies Record Holder
 During Simplex Bechtel France –First Project in India done before time.- 48 Sq K/M. COST- 23,000 CR at
Jamnagar.
 Advance India - Advance India is the only organization to complete the Celebration Mall in the year 2009.
Three basements made with Sandy strata is a record at Celebration Mall, Amritsar.
 Ornamental Dream City, Amritsar Gate is an Example of Par Excellence.
 IT SKILLS :
 Operating Systems : Windows 7/ XP, MS-DOS 6.2x
 Planning Software : MS Project 2007
 Office Software : Microsoft Office ( Word, Excel, PowerPoint, Outlook )
 Web Tools : HTML, MS Outlook, Internet , E-Mail
 Oracle based Planning & billing software
 Unitech- Sap Based Software
 TRAINING PROGRAMME ATTENDED :
 Industrial Safety Course for Construction Management – 6 weeks
 Quantity Surveyor & Contract Management – 12 weeks
 FICCCI – Modern Construction Tech – 1 Week
 ACADEMIC QUALIFICATIONS:
Page 7 of 8
Examination Passed Name of the Board/University
Name of the
Institution
Year of
Passing
Division/
Class
Graduate in Civil
Engineering
State Board of Technical Education,
Patna
JMIT, Darbhanga 1993
1st Division
with
Distinction
 PERSONAL DETAILS :
 Date of Birth : 01/09/1970
 Marital Status : Married
 Category : General
 Current CTC : 175000/- per Month
 Location Preference : Delhi, NCR
Page 8 of 8

More Related Content

What's hot

Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeepSandeep Yadav
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveyinggeddolan
 
RESUME MODIFIED 05 JUNE 2016 (1)
RESUME MODIFIED 05 JUNE  2016 (1)RESUME MODIFIED 05 JUNE  2016 (1)
RESUME MODIFIED 05 JUNE 2016 (1)DEEPINDER WALIA
 
Construction industry and estimating
Construction industry and estimatingConstruction industry and estimating
Construction industry and estimatingalanchong88
 
Vetting of cost estimates for an underconstruction nh project
Vetting of cost estimates for an underconstruction nh projectVetting of cost estimates for an underconstruction nh project
Vetting of cost estimates for an underconstruction nh projectSandeep Yadav
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYINGlizwi nyandu
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1Sow Wei Henn
 
Assignment - Management Contracting
Assignment - Management ContractingAssignment - Management Contracting
Assignment - Management ContractingKai Yun Pang
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBESahl Buhary
 
BHAVIK CV (Biodata) - Updated - May'16
BHAVIK CV (Biodata) - Updated - May'16BHAVIK CV (Biodata) - Updated - May'16
BHAVIK CV (Biodata) - Updated - May'16Bhavik Barot
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - ReportKai Yun Pang
 

What's hot (20)

Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeep
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveying
 
sp - Copy
sp - Copysp - Copy
sp - Copy
 
RESUME MODIFIED 05 JUNE 2016 (1)
RESUME MODIFIED 05 JUNE  2016 (1)RESUME MODIFIED 05 JUNE  2016 (1)
RESUME MODIFIED 05 JUNE 2016 (1)
 
Construction industry and estimating
Construction industry and estimatingConstruction industry and estimating
Construction industry and estimating
 
Pp1 group assignment
Pp1 group assignmentPp1 group assignment
Pp1 group assignment
 
Tendering-professional practices-jamia millia islamia
Tendering-professional practices-jamia millia islamiaTendering-professional practices-jamia millia islamia
Tendering-professional practices-jamia millia islamia
 
Mohammed Ramzy - CV1
Mohammed Ramzy - CV1Mohammed Ramzy - CV1
Mohammed Ramzy - CV1
 
JPResume
JPResumeJPResume
JPResume
 
Mr. moosa qadri
Mr. moosa qadriMr. moosa qadri
Mr. moosa qadri
 
Vetting of cost estimates for an underconstruction nh project
Vetting of cost estimates for an underconstruction nh projectVetting of cost estimates for an underconstruction nh project
Vetting of cost estimates for an underconstruction nh project
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
Khaled Last updated CV 15-9-2014 Final
Khaled Last updated CV 15-9-2014 FinalKhaled Last updated CV 15-9-2014 Final
Khaled Last updated CV 15-9-2014 Final
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
CV_Saifullah Khalid-
CV_Saifullah Khalid-CV_Saifullah Khalid-
CV_Saifullah Khalid-
 
Van herrera cv
Van herrera   cvVan herrera   cv
Van herrera cv
 
Assignment - Management Contracting
Assignment - Management ContractingAssignment - Management Contracting
Assignment - Management Contracting
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBE
 
BHAVIK CV (Biodata) - Updated - May'16
BHAVIK CV (Biodata) - Updated - May'16BHAVIK CV (Biodata) - Updated - May'16
BHAVIK CV (Biodata) - Updated - May'16
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 

Similar to 111 (20)

Eng's Nisar CV for Sr QS & Contract Engineer
Eng's Nisar CV for Sr QS & Contract EngineerEng's Nisar CV for Sr QS & Contract Engineer
Eng's Nisar CV for Sr QS & Contract Engineer
 
RESUME.1
RESUME.1RESUME.1
RESUME.1
 
Resume
ResumeResume
Resume
 
Luvuyo Sankqela CV rev 2
Luvuyo Sankqela CV rev 2Luvuyo Sankqela CV rev 2
Luvuyo Sankqela CV rev 2
 
RESUME MODIFIED 05 JUNE 2016 (1)
RESUME MODIFIED 05 JUNE  2016 (1)RESUME MODIFIED 05 JUNE  2016 (1)
RESUME MODIFIED 05 JUNE 2016 (1)
 
CV Shehzad SQS
CV Shehzad SQSCV Shehzad SQS
CV Shehzad SQS
 
Unnikrishnan_CV-
Unnikrishnan_CV-Unnikrishnan_CV-
Unnikrishnan_CV-
 
Deepak Grover
Deepak GroverDeepak Grover
Deepak Grover
 
Bellwether profile
Bellwether profileBellwether profile
Bellwether profile
 
COMPANY PORTFOLIO
COMPANY PORTFOLIOCOMPANY PORTFOLIO
COMPANY PORTFOLIO
 
Quantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AMQuantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AM
 
PMC .docx
PMC .docxPMC .docx
PMC .docx
 
PMC Proposal.docx
PMC Proposal.docxPMC Proposal.docx
PMC Proposal.docx
 
Yam yih hwan pp1 assignment aug 14
Yam yih hwan   pp1 assignment aug 14Yam yih hwan   pp1 assignment aug 14
Yam yih hwan pp1 assignment aug 14
 
CV_Arti Desai final
CV_Arti Desai finalCV_Arti Desai final
CV_Arti Desai final
 
151213CS2426993.2 (1)
151213CS2426993.2 (1)151213CS2426993.2 (1)
151213CS2426993.2 (1)
 
Jitender_Sharma
Jitender_SharmaJitender_Sharma
Jitender_Sharma
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 

111

  • 1. Flat No-01 S.M. Tiwari 330/4 UGF Shiv Apartment, Plot No-330,Ward 4 Mehrauli New Delhi-110030 SENIOR PROFESSIONAL Project Management/ Civil Engineering/ Contract Management • 9971801434 • Psmt2004@yahoo.co.in Objective: Seeking a challenging career in Project Management where I can enhance my skills and reach at the Technical zenith of excellence and contribute to maximum in achieving the long term goals of an organization.  EXPERIENCE & SKILLS :  Name of the Employer : M/S MMR SAHA INFRASTRUCTURE LTD. (NOIDA Head Office)  Duration : From July 2014 to till date  Projects : Taking Care of 3 Projects at Noida & 1In Bulandsahr  MMR 52 nd Avenue : Area - 12 Lakh Sq Ft, Value - 360 Cr, Type- Residential  MMR Galleria : Area - 11 L Sq Ft, Value - 450 Cr, Type - Commercial  MMR vone Mall : Area-4 L sft Value- Cost 120 Cr, Type- Commercial  Architect : Hafeez Contractor  Designation : AGM Contract and Billing  Job Profile :  Creates and executes project work plans and revises as appropriate to meet changing needs and requirements.  Identifies resources needed and assigns individual responsibilities.  Bringing about optimum utilization of resources- labour, materials and equipment, and ensuring their procurement at most cost-effective terms.  Manages day-to-day operational aspects of a project and scope & Periodic inspection of construction sites.  Co-ordinate the efforts of all parties involved in the project, which include the architects, consultants, contractors, sub-contractors and labourers.  Reviews deliverables prepared by team before passing to client.  Effectively applies our methodology and enforces project standards.  Prepares for engagement reviews and quality assurance procedures.  Minimizes our exposure and risk on project.  Ensures project documents are complete, current, and stored appropriately.  Tracks and reports team hours and expenses on a weekly basis.  Manages respective project budget. Page 1 of 8
  • 2.  Determines appropriate revenue recognition, ensures timely and accurate invoicing, and monitors receivables for project.  Follows up with clients, when necessary, regarding unpaid invoices.  Project accounting functions including managing the budget, tracking if team expenses and minimizing exposure and risk in the project  Analyzes project profitability, revenue, margins, bill rates and utilization.  Accurately forecasts revenue, profitability, margins, bill rates and utilization.  Negotiating contracts with subcontractors or vendors on projects.  Supervising site superintendents and laborers.  Assures project legal documents are completed and signed.  Coordinating and overseeing the construction materials that are brought in as well as inspect the quality of other tools and machinery that are brought on the site.  Management of Health, Safety, quality and environmental  Implementation and maintenance of group Safety standards and policies  Monitored safety performance of all personnel on site and recommended improvements to safety procedures.  In coordination With the Planning Engineer, prepared detailed work program.  Process and Policy Compliances.  Certification of bill forwarded by contractors civil , finishing ,Plumbing and Services .  Checking of reconciliation statement of free issue material.  Preparation of Payment certificate.  Checking of compliances as per contract.  Checking of deviation statement.  Checking of bills in terms of quality parameter.  Certification of extra items.  Certification of escalation bills.  Certification of Secured Advances and its recovery.  Payment tracking sheets wrt to budget and contracts.  Preparation of S curve of Project.  Appointment of Project Management Consultant, QS Consultant, Contractor & Supplier  Selection of vendor with respect to Quality & Price  To interact with various contracting agencies for Optimal Services  To coordinate different departments at site for the progress of the project  Floating of Tender, Taking bid from the Contractor.  Preparation of Comparison Statement.  Negotiation with vendors at different stages of projects.  Taking the approval with management to award the contract  Preparation of Work Order/Purchase Order  Name of the Employer : M/S EARTH INFRASTRUCTURE LTD. (DELHI Head Office) Page 2 of 8
  • 3.  Duration : From Sept 2013 to June 2014  Projects : Taking Care of 3 Projects at Noida & 1In Gurgaon  Earth Elacasa : Area - 12 Lakh Sq Ft, Value - 360 Cr, Type- Residential  Earth techsix : Area - 11 L Sq Ft, Value - 450 Cr, Type - Residential  Earth Sapphire : Area-4 L sft Value- Cost 120 Cr, Type- Commercial  Architect : DFA  Designation : GM Contract  Job Profile :  Creates and executes project work plans and revises as appropriate to meet changing needs and requirements.  Identifies resources needed and assigns individual responsibilities.  Bringing about optimum utilization of resources- labour, materials and equipment, and ensuring their procurement at most cost-effective terms.  Manages day-to-day operational aspects of a project and scope & Periodic inspection of construction sites.  Co-ordinate the efforts of all parties involved in the project, which include the architects, consultants, contractors, sub-contractors and labourers.  Reviews deliverables prepared by team before passing to client.  Effectively applies our methodology and enforces project standards.  Prepares for engagement reviews and quality assurance procedures.  Minimizes our exposure and risk on project.  Ensures project documents are complete, current, and stored appropriately.  Tracks and reports team hours and expenses on a weekly basis.  Manages respective project budget.  Determines appropriate revenue recognition, ensures timely and accurate invoicing, and monitors receivables for project.  Follows up with clients, when necessary, regarding unpaid invoices.  Project accounting functions including managing the budget, tracking if team expenses and minimizing exposure and risk in the project  Analyzes project profitability, revenue, margins, bill rates and utilization.  Accurately forecasts revenue, profitability, margins, bill rates and utilization.  Negotiating contracts with subcontractors or vendors on projects.  Supervising site superintendents and laborers.  Assures project legal documents are completed and signed. Page 3 of 8
  • 4.  Coordinating and overseeing the construction materials that are brought in as well as inspect the quality of other tools and machinery that are brought on the site.  Management of Health, Safety, quality and environmental  Implementation and maintenance of group Safety standards and policies  Monitored safety performance of all personnel on site and recommended improvements to safety procedures.  In coordination With the Planning Engineer, prepared detailed work program.  Process and Policy Compliances.  Certification of bill forwarded by contractors civil , finishing ,Plumbing and Services .  Checking of reconciliation statement of free issue material.  Preparation of Payment certificate.  Checking of compliances as per contract.  Checking of deviation statement.  Checking of bills in terms of quality parameter.  Certification of extra items.  Certification of escalation bills.  Certification of Secured Advances and its recovery.  Payment tracking sheets wrt to budget and contracts.  Preparation of S curve of Project.  Appointment of Project Management Consultant, QS Consultant, Contractor & Supplier  Selection of vendor with respect to Quality & Price  To interact with various contracting agencies for Optimal Services  To coordinate different departments at site for the progress of the project  Floating of Tender, Taking bid from the Contractor.  Preparation of Comparison Statement.  Negotiation with vendors at different stages of projects.  Taking the approval with management to award the contract  Preparation of Work Order/Purchase Order  Name of the Employer : M/S UNITECH LTD. (Gurgaon Head Office)  Duration : From Feb 2012 to Sept 2013  Projects : Taking Care of 3 Projects at Bangalore & 1 In Mysore  Valdel Mall : Area - 8 Lakh Sq Ft, Value - 240 Cr, Type- Commercial  Electronic City : Area - 20 L Sq Ft, Value - 500 Cr, Type - Villament  Aranya Vilas : Area-4 L sft Value- Cost 120 Cr, Type- Residential New Victorian Villa  Architect : Mr. Sanjay N Kumar/ LDPE Australia/ Element Design Australia/MASS Architect  Designation : DGM Billing & Contract  Job Profile :  Certification of bill forwarded by contractors civil , finishing ,Plumbing and Services .  Checking of reconciliation statement of free issue material.  Preparation of Payment certificate.  Checking of compliances as per contract.  Checking of deviation statement.  Checking of bills in terms of quality parameter.  Certification of extra items. Page 4 of 8
  • 5.  Certification of escalation bills.  Certification of Secured Advances and its recovery.  Payment tracking sheets wrt to budget and contracts.  Preparation of S curve of Project.  Pictorial presentation of project expenses.  Auditing of work of other zones .  Preparation of budget of project.  Appointment of Project Management Consultant, QS Consultant, Contractor & Supplier  Selection of vendor with respect to Quality & Price  To interact with various contracting agencies for Optimal Services  To coordinate different departments at site for the progress of the project  Floating of Tender, Taking bid from the Contractor.  Preparation of Comparison Statement.  Negotiation with vendors at different stages of projects.  Taking the approval with management to award the contract  Preparation of Work Order/Purchase Order  Name of the Employer : M/S EMAAR MGF LAND LIMITED (Gurgaon)  Duration : From Sept 2010 to Jan 2012  Projects :  Palm Spring Gurgaon  Palm Drive Gurgaon  Palm Hills Gurgaon  Esplanded Chennai  Architect : ARCOP – Architect  Value of Project : Central Contract of 2000 Cr. Approx Per Annum  Designation : Assistant General Manager – Billing , Contracts & Procurement  Job Profile :  Certification of bill forwarded by contractors civil , finishing ,Plumbing and Services .  Checking of reconciliation statement of free issue material.  Preparation of Payment certificate.  Checking of compliances as per contract.  Checking of deviation statement.  Checking of bills in terms of quality parameter.  Certification of extra items.  Certification of escalation bills.  Certification of Secured Advances and its recovery.  Payment tracking sheets wrt to budget and contracts.  Preparation of S curve of Project.  Pictorial presentation of project expenses.  Appointment of Project Management Consultant, QS Consultant, Contractor & Supplier  Selection of vendor with respect to Quality & Price  To interact with various contracting agencies for Optimal Services  To coordinate different departments at site for the progress of the project  Floating of Tender, Taking bid from the Contractor.  Preparation of Comparison Statement.  Negotiation with vendors at different stages of projects.  Taking the approval with management to award the contract  Preparation of Work Order/Purchase Order  Name of the Employer : ADVANCE INDIA PROJECTS LTD.  Duration : From Mar 2007 to Sept 2010  Project Details :  The Celebration Mall Amritsar: Area 3,10,000 sq ft., Project Cost-95 cr. Page 5 of 8
  • 6.  The Celebration Mall Udaipur : Area 5,10,000 sq ft., Project Cost- 156 cr.  Dream City Amritsar : Area 148 Acres Township, Infra Development Cost - 56Cr.Total Cost-1700 Cr  Dream City Khanna : Project Cost- 680Cr, Infra Dev, Cost- 30Cr,  Dream City Mohali : Initial Stage  Architect  Hafiz – Contractor, Survana International, Singapore  Panika, Ahmadabad  Sapna Kumar & Associate, Delhi  Designation : Senior Manager/Assistant General Manager – Billings and Co-ordination  Job Profile :  Support In Project Concept Finalization Process  Certification of bill forwarded by contractors civil , finishing ,Plumbing and Services .  Checking of reconciliation statement of free issue material.  Preparation of Payment certificate.  Checking of compliances as per contract.  Checking of deviation statement.  Checking of bills in terms of quality parameter.  Certification of extra items.  Certification of escalation bills.  Certification of Secured Advances and its recovery.  Payment tracking sheets wrt to budget and contracts.  Preparation of S curve of Project.  Pictorial presentation of project expenses  Project Management, Assigning, Reviewing & Tracking Project as per defined project plan.  Taking care of Statutory Approvals, Cost Management, Contracts & Execution of Projects  Cost Estimation, Budget Proposals & Cost Control during Design & Execution  Monitoring & Execution of Commercial, Township & Residential Project  Coordination for Labour & Material  Preparing Zero Budget, Planning Budget, Achievement Budget & Cash Flow Chart.  Preparing Documents & Rates for Tenders  Planning & Executing all the site activities in terms of Structure, Finishing & Services  Name of the Employer : M/S GANNON DUNKERLEY & CO. LTD. (Ahmadabad) Duration : From Nov 1997 to Mar 2007 Projects :  Arvind Mill, Ahmedabad  Cadila Pharmaceutical, Ahmadabad  Corporate Office of Cadila Pharmaceuticals Designation :Joined as Assistant Engineer, Promoted to Manager Billing Job Profile :  Monitoring & Execution of Commercial, Township & Residential Project  Taking the approval with management to award the contract  Verifying & Certifying the bills submitted by the Contractors  Support in Certification  Preparing Reconciliation Statement for Labour & Material  Planning & Executing all site activities in terms of Structure, Finishing & Services  Preparing Zero Budget, Planning Budget, Achievement Budget & Cash Flow Chart  Verifying & Certifying the bills submitted by the contractor  Doing Internal Audit for ISO Guidelines  Rate Analysis of Items  Preparing Escalation Claims for the Organization  Coordination for Labour & Material  Preparing Zero Budget, Planning Budget, Achievement Budget & Cash Flow Chart  Preparing Documents & Rates for Tenders Page 6 of 8
  • 7.  Name of the Employer : M/S SIMPLEX CONCRETE PILES (I) LTD. (New Delhi)  Duration : From Apr 1995 to Oct 1997  Designation : Joined as Junior Engineer, Promoted to Assistant Engineer  Job Profile :  Preparing Estimate BOQ & Tender Documents  Furnishing the project programs to Management, Monitoring & Updating the programs, Recording Delays with reasons  Prepare Escalation claims for the Company  Preparing Documents and Rates for Tenders  Verifying & Certifying the bills submitted by the contractor  Planning & Executing all the site activities in terms of Structure, Finishing & Services  Name of the Employer : M/S ERA CONSTRUCTIONS (I) LTD. (New Delhi)  Duration : From Mar 1993 to Mar 1995  Designation : Site Engineer  Job Profile :  Planning & Executing all site activities in terms of Structure, Finishing & Services  Preparing Estimates & Tender Documents  Verifying & Certifying the bills submitted by the contractor  ACHIEVEMENTS:  During Simplex in Feb 1997 we have done 1 Lakh 39 THOUSAND Cubic CM of concrete done by team – Gunnies Record Holder  During Simplex Bechtel France –First Project in India done before time.- 48 Sq K/M. COST- 23,000 CR at Jamnagar.  Advance India - Advance India is the only organization to complete the Celebration Mall in the year 2009. Three basements made with Sandy strata is a record at Celebration Mall, Amritsar.  Ornamental Dream City, Amritsar Gate is an Example of Par Excellence.  IT SKILLS :  Operating Systems : Windows 7/ XP, MS-DOS 6.2x  Planning Software : MS Project 2007  Office Software : Microsoft Office ( Word, Excel, PowerPoint, Outlook )  Web Tools : HTML, MS Outlook, Internet , E-Mail  Oracle based Planning & billing software  Unitech- Sap Based Software  TRAINING PROGRAMME ATTENDED :  Industrial Safety Course for Construction Management – 6 weeks  Quantity Surveyor & Contract Management – 12 weeks  FICCCI – Modern Construction Tech – 1 Week  ACADEMIC QUALIFICATIONS: Page 7 of 8
  • 8. Examination Passed Name of the Board/University Name of the Institution Year of Passing Division/ Class Graduate in Civil Engineering State Board of Technical Education, Patna JMIT, Darbhanga 1993 1st Division with Distinction  PERSONAL DETAILS :  Date of Birth : 01/09/1970  Marital Status : Married  Category : General  Current CTC : 175000/- per Month  Location Preference : Delhi, NCR Page 8 of 8