DOCKYARD CREEK COSPICUA
  Regatta Quay Rehabilitation W orks


                      Bill of Quantities & Daywork Schedule




Regatta Rehabilitation Works
DOCKYARD CREEK COSPICUA
 Regatta Quay Rehabilitation W orks




                           PREAMBLES to Bill of Quantities

                                  TABLE OF CONTENTS



                                        o   Method of Measurement
                                        o   Descriptions
                                        o   Composite Items
                                        o   Units and Symbols
                                        o   Abbreviations
                                        o   Definitions
                                        o   Dayworks
                                        o   Preliminaries




Regatta Rehabilitation Works
General Landscaping and Services Works
Dockyard Creek Cospicua, East Side                                     Method of Measurement


Method of Measurement

    Remeasurement shall be carried out in accordance with the 'Standard Method of
     Measurement of Building Works - SMM7, Seventh Edition Revised 1998,
     incorporating Amendments 1 + 2', Drawings and Specifications.

    All rates are to include the coverage of items stated in the Schedule of Rates
     and in accordance with the 'Standard Method of Measurement of Building Works
     - SMM7, Seventh Edition Revised 1998, incorporating Amendments 1 + 2',
     Drawings and Specifications.

    All quantities are to be measured net to the nearest whole unit. Work shall be
     measured net as fixed in position except where otherwise stated in a
     measurement rule to the work.

    Quantities measured in tonnes shall be given to two decimal places. Other
     quantities shall be given to the nearest whole unit except than any quantity less
     than one unit shall be given as one unit.

    Measured Items are deemed to be ‘supply and fix’ unless otherwise stated.
     Dimensions used in calculating quantities shall be taken to the nearest 10 mm
     (I.e. 5mm and over shall be regarded as 10 mm and less than 5mm shall be
     disregarded)

    The units and classifications as stated in the bills of quantities shall prevail over
     the standard method of measurement unless specifically agreed otherwise.


Descriptions

    Dimensions stated in descriptions are generally in the sequence length, width,
     height. Where ambiguity could arise, the dimensions shall be identified.

    Headings and sub-headings in the bills of quantities shall be read as part of the
     descriptions of the items to which the headings apply.

    The use of a hyphen includes the range of dimension between and the two
     dimensions stated.

    Unless otherwise specifically stated as excluded in a Schedule of Rates or
     herein, the following shall be deemed to be included with all items:

a)   Labour and all costs in connection therewith.
b)   Materials, goods and all costs in connection therewith.
c)   Assembling, fitting and fixing of materials and goods in position.
d)   Plant and all costs in connection therewith.
e)   Waste of materials.
f)   Square cutting
g)   Establishment charges, overhead charges and profit.



                                                                     Method of Measurement 2 of 4
General Landscaping and Services Works
Dockyard Creek Cospicua, East Side                                    Method of Measurement



Composite Items

Work to be manufactured off site may be combined with another to be fixed on site
into one item even though the rules require the items to be measured separately.
Items shall be deemed to include breaking down for transport and installation and
subsequent re-assembly etc.

Units and Symbols

The following units, symbols and abbreviations are used in this method of
measurement and bills of quantities:

                  m              metre
                  m2             square metre
                  m3             cubic metre
                  mm             millimetre
                  nr             number
                  kg             kilogramme
                  t              metric tonne
                  h              hour
                  LS             Lump Sum
                  PS             Provisional Sum
                  >              Exceeding
                  <              less than
                  %              Percentage
                  -              Hyphen
                  €              Euro

Abbreviations

                  min.           Minimum
                  n.e.           not exceeding
                  MEPA           Malta Environment & Planning Authority
                  BOQ            Schedule of Rates
                  Approx.        Approximate or Approximately



Definitions

Any references in the Bills to Specifications and/or Drawings are for convenience
only and in pricing the Bills the Contractor is to take into account all relevant
requirements of the Specifications and Drawings.

The terms "include", "is included', "including" and similar, are used to indicate that
the materials or items in question shall not be measured as separate items, but their
costs are to be included in the rate of the item in which they occur.




                                                                    Method of Measurement 3 of 4
General Landscaping and Services Works
Dockyard Creek Cospicua, East Side                                     Method of Measurement


The word "extra" or "extra over" used in the Bills means the additional cost of the
work in question over and above the cost already measured.


Dayworks

Where the work cannot be properly valued by means of measurement, contemporary
records are kept by the contractor and duly signed and approved by the Supervisor’s
representative for payment purposes.

The use of dayworks for payment purpose is at the discretion of the Employer or his
representative.

All daywork rates for labour shall include and take into account supervision,
insurance, overheads, and equipment (other than mechanically operated
equipment), profit, etc.

All day work rates for mechanical equipment shall include and take into account
operators and attendants, fuel and power, lubricating oils, maintenance, sharpening
of tools, replacement of spare parts, consumables, costs of licences, insurance, etc.

All Daywork hourly rated items are to be measured for the duration of use for the
purposes of the project and will exclude travel time to arrive at the site by staff
equipment, idle time & rest time. Contractor is to give sufficient evidence to the
Supervisor of the activities to be undertaken for approval prior to commencement.


Preliminaries

The pricing of the Preliminaries section shall include for all the obligations, liabilities
and services required by the Contract, as well as all other sundries which have not
been included in other sections of the Schedule of Rates.

Zero rates in the Preliminaries section shall mean that relative costs are already
included within other rates of the Schedule of Rates.




                                                                     Method of Measurement 4 of 4
Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works                                        Bill of Quantities


        Item                        Description                          Quantity   Unit   Rate   Amount


                Regatta - Quay Rehabilitation works

         A      Preliminaries / General conditions

        A40     Contractor's general cost items

                  Allow for all the obligations, liabilities and
        A4001     services described in the Contract Documents
                  other than those listed below                             1       Item

                  Allow for all necessary insurances as required by
                  the contract and as requested by the general
        A4002     legislation to indemnify the employer and his
                  representatives, including Contractor's all Risks
                  insurance                                                 1       Item

                  Supply of temporary lighting in order to enable
        A4003     works to be carried out at night (if required)
                  during the contract period; as directed                   1       Item


                  Supply of metal hoarding required to segregate
        A4004
                  the site area during the carrying out of the Works,
                  as directed or as shown on drawings                       1       Item

                  Provision of all Plant and tools required to carry
        A4005
                  out of the Works                                          1       Item

                  Site Access: as directed by the supervisor. The
                  Contractor is strongly advised to visit the site and
        A4006
                  acquaint himself with all constraints on access
                  which may occur.                                          1       Item

                  Noise and pollution control: Contractor is to make
                  provisions against noise, dust contamination and
                  any form of pollution and comply with the
                  provisions of Legal Notice 337 of 2001, Waste
                  Management (Permit and Control) Regulations
        A4007
                  and Legal Notice 106 of 2007, Waste
                  Management (Activity Registration) Regulations.
                  In particular waste material generated shall, if not
                  reused, be deposited at facilities approved by
                  MEPA.                                                     1       Item

                  Work adjacent to services: comply with service
        A4008     authorities and statutory undertakers
                  recommendations                                           1       Item

                  Development Permit: The contractor shall comply
        A4009     with all conditions of the planning Authority's
                  permit ref. PA 2002/09                                    1       Item




                        Amount Carried Forward to Summary Page                              €


                                                             1
Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works                                       Bill of Quantities


        Item                        Description                         Quantity   Unit   Rate   Amount

                  Security: Take adequate precautions to
        A4010     safeguard the site, the works and materials from
                  theft                                                    1       Item

                  Heath and Safety: Comply with General Health
                  and Safety Provision requirements and
        A4011
                  Occupational Health and Safety Authority Act
                  2000 and any subsequent legislation                      1       Item

                  Surveys: Carry out all surveys required for setting
                  out of the works and agreeing measurement;
        A4012     including providing and erecting permanent
                  setting-out marks of the quantity and quality or as
                  required by the Supervisor                               1       Item


        A4013     Provision and management of Staff, including
                  certified divers necessary to carry out the works        1       Item


                  Cleaning: Continuously keep the site and
                  immediate surroundings clean and in a
        A4014     workmanlike condition free from debris, surplus
                  materials and other type of loose matter which
                  could disturb the proper conditions of any roads
                  or adjoining buildings and structures                    1       Item


                  Permits and license fees: Allow for applying for
        A4015     and obtaining any permits and licenses
                  necessary to carry out the works, except where
                  such items will be at the Employer's cost                1       Item

                  Provision of Quality Assurance & quality control,
        A4016     testing and certification to the supervisor's
                  approval                                                 1       Item

                  Allow for the provision of under water recording
                  report (video and photos) for all works carried
        A4017
                  out; as specified or as requested by the
                  supervisor                                               1       Item




                        Amount Carried Forward to Summary Page                             €



                                                            2
Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works                                 Bill of Quantities


        Item                      Description                     Quantity   Unit   Rate   Amount
                Refer to CTP drawings ref. 9894-100 & 101

         C      Demolition/Alteration/Renovation

        C20     Alterations - Spot Items

                Removing fittings and fixtures


                  Items and materials arising from alterations
                  and spot Items are the property of the
                  Employer, unless otherwise stated.

                   Handle with care, transport and store in a
                   designated area (area to be approved by the
                   Supervisor)

       C2001         Careful removal of existing Cannon Bollard      1        nr

                Removing finishings


                  Items and materials arising from alterations
                  and spot Items are the property of the
                  Employer, unless otherwise stated.

                   Handle with care, transport and store in a
                   designated area (area to be approved by the
                   Supervisor)

                     Careful removal existing hardstone blocks,

       C2002           above sea level                               5        nr

       C2003           below sea level                               5        nr

                Cutting to reduce thickness

                  Trimming to form steps using high pressure
                  water jetting or mechanical breaking; work
                  below mean sea level

       C2004           as per drawing 9894-100 section 1-1           1       item




                        Amount Carried Forward to Summary Page                       €

                                                         3
Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works                                    Bill of Quantities


        Item                         Description                     Quantity   Unit   Rate   Amount
         D      Ground Work

        D20     Excavating and filling

                Excavating

                  Excavating below ground water level

                   Remove silt and sediment next to Quay, by
                   airlift to inspect integrity of foundation

                     as per Regatta Quay Elevation, drawing 9894-
       D2001         100                                                1       Item

                   In existing concrete slab, rock or hard paving,
                   including any necessary trimming


       D2002         For Slipway ramp (work in proximity of Quay)      52       m3

                  To reduce levels

                   In existing concrete slab, rock or hard paving,
                   including any necessary trimming


       D2003         For Slipway ramp (work in proximity of Quay)      50       m3



                Disposal

                  Excavated material

                     Off-site; including any type of excavated or
                     broken out material (rate includes dumping
       D2004         and tipping charges)                              102      m3




                        Amount Carried Forward to Summary Page                          €



                                                           4
Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works                                    Bill of Quantities


        Item                       Description                       Quantity   Unit   Rate   Amount


         E      In situ concrete/Large precast concrete

        E05     In situ concrete construction generally

                  Grade C25/30 if using SRPC

                  Beds

                   Thickness exceeding 150 mm, below sea water
                   level

                     Unreinforced concrete filling to quay; as per
        E0501        drg 9894 - 101                                    52       m3

                  Grade C28/35 if using CEM III

                   Thickness exceeding 150 mm, below sea water
                   level

        E0502        Unreinforced concrete filling to quay wall         3       m3

                  Sand/Cement

                   grout filled polypropylene bag work facing

        E0503        as per drawing 9894 - 100 section 1-1              5       m3

                Extra over concrete elements (unless included
                in main item)

                  For additives

        E0504
                   Anti-wash out admixture as per specifications       55       m3

        E0505      Fibre reinforcement additives as per
                   specifications                                      52       m3




                         Amount Carried Forward to Summary Page                         €

                                                           5
Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works                                Bill of Quantities


        Item                        Description                  Quantity   Unit   Rate   Amount

        E20     Formwork for in situ concrete

                Sides of upstands

                  Plain vertical (ground beams, kerbs etc.)
                  below sea water level

        E2001      Height 250 - 500 mm; Side of Quay               14        m




                        Amount Carried Forward to Summary Page                      €




                                                        6
Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works                                    Bill of Quantities


        Item                         Description                     Quantity   Unit   Rate   Amount

        E42     Accessories cast into in situ concrete

                Inserts

                   to existing concrete surfaces, below sea
                   water level


                     Inclined drilling of 500mm deep hole in
                     existing concrete, insert 20mm steel anchor
                     bars, and grout with non-shrink grout (Fosroc
                     Conbex 250 or approved equivalent)

        E4201             as per drg 9894-100 section 1-1               4        nr




                          Amount Carried Forward to Summary Page                        €



                                                            7
Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works                                      Bill of Quantities


        Item                       Description                         Quantity   Unit   Rate   Amount

         X      Sundry / Miscellaneous Items

                   Works in Foundation PF0.08

                     Underpinning of wall, including dewatering
                     and cleaning area from existing debris. Filling
                     in opening with Grade C25 concrete and
                     SPRC additive or approved equivalent,
                     including lip formwork to one side,
                     approximately measuring 1.40m x 1.40m and
        X001         making good                                         1.00     Item

                   Works in Foundation PF0.09

                     Excavation including carting away and
                     dumping surplus material, filling with grade
                     C25 mass concrete (approx. 6m3) and SPRC
                     additive or approved equivalent including cast-
                     in 2 x 150mm upvc sleeves, 1000mm long
        X002         approx.                                             1.00     Item




                        Amount Carried Forward to Summary Page                            €



                                                           8
Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works                                    Bill of Quantities


        Item                       Description                       Quantity   Unit   Rate   Amount
         Z      Daywork Schedule
                To be read in conjunction with Preambles to the
                Bill of Quantities
                Labour
        Z001    Unskilled labourer                                    10.00     HR
        Z002    Semi-skilled labourer                                 10.00     HR
        Z003    Skilled labourer                                      10.00     HR

                Plant
                Plant rates are inclusive of fuel, travelling time
                , maintenance and operator

        Z004    Tipper truck up to 20 c.m.                             5.00     HR
        Z005    Ready mix truck                                        5.00     HR
        Z006    Mini excavator                                         5.00     HR
                Hydraulic wheeled excavator - JCB or similar
        Z007                                                           5.00     HR
        Z008    Excavator - 25 ton                                     5.00     HR
        Z009    Mobile crane - 18 ton                                  5.00     HR
        Z010    Bobcat                                                 5.00     HR
        Z011    Air compressor                                         5.00     HR
        Z012    Small hand held tools                                  5.00     HR
        Z013    Water Bowser                                           1.00     Trip

                Material
        Z014    Type 1 fill material                                   5.00     m3
        Z015    Washed aggregate 20mm                                  5.00     m3

        Z016    C10 concrete                                           5.00     m3
        Z017    C15 concrete                                           5.00     m3
        Z018    C20 concrete                                           5.00     m3
        Z019    C25 concrete                                           5.00     m3
        Z020    C30 concrete                                           5.00     m3

        Z021    Reinforcement bars up to 12mm diameter               100.00     kg
        Z022    Reinforcement bars over 12mm diameter                100.00     kg

        Z023    150mm hollow concrete blocks                          50.00     Nr
        Z024    180mm hollow concrete blocks                          50.00     Nr
        Z025    230mm single type hollow concrete blocks              50.00     Nr

        Z026    230mm double type hollow concrete blocks              50.00     Nr

                uPVC pipes
        Z027    50mm diameter                                          6.00      m
        Z028    110mm diameter                                         6.00      m
        Z029    200mm diameter                                         6.00      m
        Z030    400mm diameter                                         6.00      m

                the price of any other material shall be
                accepted on presentation of fiscal invoice

                Note: All Rates include overheads and profits
                and exclude VAT
                        Amount Carried Forward to Summary Page                          €




                                                          9
Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works                Bill of Quantities


     Item                         Section                    Sub-amount   Amount


            Regatta - Quay Rehabilitation
            works
             Summary
       A    Preliminaries / General conditions

                      Page Nr 1
                      Page Nr 2

       C    Existing site / buildings / services

                      Page Nr 3

       D    Ground Work

                      Page Nr 4

            In Situ concrete / Large precast
       E    concrete

                      Page Nr 5
                      Page Nr 6
                      Page Nr 7

       X    Sundry / Miscellaneous Items

                      Page Nr 8

       Z    Dayworks

                      Page Nr 9




                                   Total (Excluding VAT)         €

                                             Add 18 % VAT        €

                                   Total (Including VAT)         €




                                                       10

More Related Content

What's hot

Well hydraulics
Well hydraulicsWell hydraulics
Well hydraulicsSaad Raja
 
Introduction to ground water hydrology
Introduction to ground water hydrologyIntroduction to ground water hydrology
Introduction to ground water hydrologyMohsin Siddique
 
Topic 3 mass haul diagram
Topic 3   mass haul diagramTopic 3   mass haul diagram
Topic 3 mass haul diagramkmasz kamal
 
Darcy´s law
Darcy´s lawDarcy´s law
Darcy´s lawoscar
 
Hydrology introduction ( catchment area)
Hydrology introduction ( catchment area)Hydrology introduction ( catchment area)
Hydrology introduction ( catchment area)Latif Hyder Wadho
 
Hydrometer Analysis for Soil (Sedimentation)
Hydrometer Analysis for Soil (Sedimentation)Hydrometer Analysis for Soil (Sedimentation)
Hydrometer Analysis for Soil (Sedimentation)Abdul Majid
 
Taxiway design and geometrical design of taxiway
Taxiway design and geometrical design of taxiwayTaxiway design and geometrical design of taxiway
Taxiway design and geometrical design of taxiwayBALAJI ND
 
Surface Analysis in GIS
Surface Analysis in GISSurface Analysis in GIS
Surface Analysis in GISRituSaha3
 
identification of ground water potential zones using gis and remote sensing
identification of ground water potential zones using gis and remote sensingidentification of ground water potential zones using gis and remote sensing
identification of ground water potential zones using gis and remote sensingtp jayamohan
 
spatial resolutionin remote sensing
 spatial resolutionin remote sensing spatial resolutionin remote sensing
spatial resolutionin remote sensingGhassan Hadi
 
Introduction to Groundwater Modelling
Introduction to Groundwater ModellingIntroduction to Groundwater Modelling
Introduction to Groundwater ModellingC. P. Kumar
 
Factors affecting runoff
Factors affecting runoffFactors affecting runoff
Factors affecting runoffdheeraj byrapu
 
HYDROLOGICAL PROPERTIES OF WATER BEARING STRATA
HYDROLOGICAL PROPERTIES OF WATER BEARING STRATA HYDROLOGICAL PROPERTIES OF WATER BEARING STRATA
HYDROLOGICAL PROPERTIES OF WATER BEARING STRATA Student
 

What's hot (20)

Well hydraulics
Well hydraulicsWell hydraulics
Well hydraulics
 
Introduction to ground water hydrology
Introduction to ground water hydrologyIntroduction to ground water hydrology
Introduction to ground water hydrology
 
Topic 3 mass haul diagram
Topic 3   mass haul diagramTopic 3   mass haul diagram
Topic 3 mass haul diagram
 
Darcy´s law
Darcy´s lawDarcy´s law
Darcy´s law
 
Hydrology introduction ( catchment area)
Hydrology introduction ( catchment area)Hydrology introduction ( catchment area)
Hydrology introduction ( catchment area)
 
Hydrometer Analysis for Soil (Sedimentation)
Hydrometer Analysis for Soil (Sedimentation)Hydrometer Analysis for Soil (Sedimentation)
Hydrometer Analysis for Soil (Sedimentation)
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
Taxiway design and geometrical design of taxiway
Taxiway design and geometrical design of taxiwayTaxiway design and geometrical design of taxiway
Taxiway design and geometrical design of taxiway
 
Lecture 6 soil permeability
Lecture 6 soil permeabilityLecture 6 soil permeability
Lecture 6 soil permeability
 
Surface Analysis in GIS
Surface Analysis in GISSurface Analysis in GIS
Surface Analysis in GIS
 
identification of ground water potential zones using gis and remote sensing
identification of ground water potential zones using gis and remote sensingidentification of ground water potential zones using gis and remote sensing
identification of ground water potential zones using gis and remote sensing
 
River training work
River training workRiver training work
River training work
 
spatial resolutionin remote sensing
 spatial resolutionin remote sensing spatial resolutionin remote sensing
spatial resolutionin remote sensing
 
Atterberg limits
Atterberg limitsAtterberg limits
Atterberg limits
 
Introduction to Groundwater Modelling
Introduction to Groundwater ModellingIntroduction to Groundwater Modelling
Introduction to Groundwater Modelling
 
Factors affecting runoff
Factors affecting runoffFactors affecting runoff
Factors affecting runoff
 
HYDROLOGICAL PROPERTIES OF WATER BEARING STRATA
HYDROLOGICAL PROPERTIES OF WATER BEARING STRATA HYDROLOGICAL PROPERTIES OF WATER BEARING STRATA
HYDROLOGICAL PROPERTIES OF WATER BEARING STRATA
 
Sediment Transport
Sediment TransportSediment Transport
Sediment Transport
 
Optical remote sensing
Optical remote sensingOptical remote sensing
Optical remote sensing
 
Pumping test
Pumping testPumping test
Pumping test
 

Viewers also liked

Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantitiesBt Lee
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of QuantitiesNatalie Reid
 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimateimaduddin91
 
ICI Project 3 - The Project Brief
ICI Project 3 - The Project BriefICI Project 3 - The Project Brief
ICI Project 3 - The Project BriefRyan Kerry Jy
 
DD STAGE COST ESTIMATE SECTION 1 (J102) (1)
DD STAGE COST ESTIMATE SECTION 1 (J102) (1)DD STAGE COST ESTIMATE SECTION 1 (J102) (1)
DD STAGE COST ESTIMATE SECTION 1 (J102) (1)Gayan Kalpitha Perera
 
Final Project ICI
Final Project ICIFinal Project ICI
Final Project ICIvaylu
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationHarish Mahavar
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantityhlksd
 
Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine mohammadsalikali
 

Viewers also liked (14)

Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
Boq sample
Boq sampleBoq sample
Boq sample
 
Project Report
Project ReportProject Report
Project Report
 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimate
 
ICI Project 3 - The Project Brief
ICI Project 3 - The Project BriefICI Project 3 - The Project Brief
ICI Project 3 - The Project Brief
 
DD STAGE COST ESTIMATE SECTION 1 (J102) (1)
DD STAGE COST ESTIMATE SECTION 1 (J102) (1)DD STAGE COST ESTIMATE SECTION 1 (J102) (1)
DD STAGE COST ESTIMATE SECTION 1 (J102) (1)
 
Final Project ICI
Final Project ICIFinal Project ICI
Final Project ICI
 
Commentary on fidic iv clauses
Commentary on fidic iv clausesCommentary on fidic iv clauses
Commentary on fidic iv clauses
 
Bill Of Quantities
Bill Of QuantitiesBill Of Quantities
Bill Of Quantities
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping station
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine
 
Tunnel engineering
  Tunnel engineering  Tunnel engineering
Tunnel engineering
 

Similar to 1 regatta quay rehab boq 20120420 blank

Bo Q Preamble Td2 3 Jan 20
Bo Q Preamble Td2 3  Jan 20Bo Q Preamble Td2 3  Jan 20
Bo Q Preamble Td2 3 Jan 20prodv
 
Bo Q Preamble Td2 3 Jan 20
Bo Q Preamble Td2 3  Jan 20Bo Q Preamble Td2 3  Jan 20
Bo Q Preamble Td2 3 Jan 20guest5980d0
 
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESGeneral notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESR.R.G.S Bandara
 
General notes to building schedule of rates
General notes to building schedule of ratesGeneral notes to building schedule of rates
General notes to building schedule of ratesVj NiroSh
 
NCSIP ERs 140521
NCSIP ERs 140521NCSIP ERs 140521
NCSIP ERs 140521Assen Antov
 
A presentation on job planning job manuals,
A presentation on job planning job manuals,A presentation on job planning job manuals,
A presentation on job planning job manuals,SreeKrishna1
 
Bs iso 923 2000
Bs iso 923 2000Bs iso 923 2000
Bs iso 923 2000AYM1979
 
Project Management Services
Project Management ServicesProject Management Services
Project Management ServicesBruce Tharp
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variationVj NiroSh
 
Fireprotectionfirepreventionandfirecontrolregulations
FireprotectionfirepreventionandfirecontrolregulationsFireprotectionfirepreventionandfirecontrolregulations
FireprotectionfirepreventionandfirecontrolregulationsMohamed Tahoun, PMP
 
Estimation and costing book
Estimation and costing bookEstimation and costing book
Estimation and costing bookSubash Pathak
 
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...Rae Davies
 
FIDIC Pakistan laws of construction 1992.pdf
FIDIC Pakistan laws of construction 1992.pdfFIDIC Pakistan laws of construction 1992.pdf
FIDIC Pakistan laws of construction 1992.pdfMohammedBilal554495
 
contract difference for 12 sod modified 28_1_14
contract difference for 12 sod modified 28_1_14contract difference for 12 sod modified 28_1_14
contract difference for 12 sod modified 28_1_14David King
 

Similar to 1 regatta quay rehab boq 20120420 blank (20)

Bo Q Preamble Td2 3 Jan 20
Bo Q Preamble Td2 3  Jan 20Bo Q Preamble Td2 3  Jan 20
Bo Q Preamble Td2 3 Jan 20
 
Bo Q Preamble Td2 3 Jan 20
Bo Q Preamble Td2 3  Jan 20Bo Q Preamble Td2 3  Jan 20
Bo Q Preamble Td2 3 Jan 20
 
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESGeneral notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATES
 
General notes to building schedule of rates
General notes to building schedule of ratesGeneral notes to building schedule of rates
General notes to building schedule of rates
 
Kandil_Sameh_CPMPart 4 _b
Kandil_Sameh_CPMPart 4 _bKandil_Sameh_CPMPart 4 _b
Kandil_Sameh_CPMPart 4 _b
 
11 ritchie ccs_mrv_presentation_jan_2012_v1a
11 ritchie ccs_mrv_presentation_jan_2012_v1a11 ritchie ccs_mrv_presentation_jan_2012_v1a
11 ritchie ccs_mrv_presentation_jan_2012_v1a
 
NCSIP ERs 140521
NCSIP ERs 140521NCSIP ERs 140521
NCSIP ERs 140521
 
A presentation on job planning job manuals,
A presentation on job planning job manuals,A presentation on job planning job manuals,
A presentation on job planning job manuals,
 
Bs iso 923 2000
Bs iso 923 2000Bs iso 923 2000
Bs iso 923 2000
 
Project Management Services
Project Management ServicesProject Management Services
Project Management Services
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
 
Fireprotectionfirepreventionandfirecontrolregulations
FireprotectionfirepreventionandfirecontrolregulationsFireprotectionfirepreventionandfirecontrolregulations
Fireprotectionfirepreventionandfirecontrolregulations
 
Project control
Project controlProject control
Project control
 
Building ssr 2013-14
Building ssr 2013-14Building ssr 2013-14
Building ssr 2013-14
 
Sp4 079-tr-1-e-e
Sp4 079-tr-1-e-eSp4 079-tr-1-e-e
Sp4 079-tr-1-e-e
 
Estimation and costing book
Estimation and costing bookEstimation and costing book
Estimation and costing book
 
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
 
FIDIC Pakistan laws of construction 1992.pdf
FIDIC Pakistan laws of construction 1992.pdfFIDIC Pakistan laws of construction 1992.pdf
FIDIC Pakistan laws of construction 1992.pdf
 
UNIT 2.pptx
UNIT 2.pptxUNIT 2.pptx
UNIT 2.pptx
 
contract difference for 12 sod modified 28_1_14
contract difference for 12 sod modified 28_1_14contract difference for 12 sod modified 28_1_14
contract difference for 12 sod modified 28_1_14
 

1 regatta quay rehab boq 20120420 blank

  • 1. DOCKYARD CREEK COSPICUA Regatta Quay Rehabilitation W orks Bill of Quantities & Daywork Schedule Regatta Rehabilitation Works
  • 2. DOCKYARD CREEK COSPICUA Regatta Quay Rehabilitation W orks PREAMBLES to Bill of Quantities TABLE OF CONTENTS o Method of Measurement o Descriptions o Composite Items o Units and Symbols o Abbreviations o Definitions o Dayworks o Preliminaries Regatta Rehabilitation Works
  • 3. General Landscaping and Services Works Dockyard Creek Cospicua, East Side Method of Measurement Method of Measurement  Remeasurement shall be carried out in accordance with the 'Standard Method of Measurement of Building Works - SMM7, Seventh Edition Revised 1998, incorporating Amendments 1 + 2', Drawings and Specifications.  All rates are to include the coverage of items stated in the Schedule of Rates and in accordance with the 'Standard Method of Measurement of Building Works - SMM7, Seventh Edition Revised 1998, incorporating Amendments 1 + 2', Drawings and Specifications.  All quantities are to be measured net to the nearest whole unit. Work shall be measured net as fixed in position except where otherwise stated in a measurement rule to the work.  Quantities measured in tonnes shall be given to two decimal places. Other quantities shall be given to the nearest whole unit except than any quantity less than one unit shall be given as one unit.  Measured Items are deemed to be ‘supply and fix’ unless otherwise stated. Dimensions used in calculating quantities shall be taken to the nearest 10 mm (I.e. 5mm and over shall be regarded as 10 mm and less than 5mm shall be disregarded)  The units and classifications as stated in the bills of quantities shall prevail over the standard method of measurement unless specifically agreed otherwise. Descriptions  Dimensions stated in descriptions are generally in the sequence length, width, height. Where ambiguity could arise, the dimensions shall be identified.  Headings and sub-headings in the bills of quantities shall be read as part of the descriptions of the items to which the headings apply.  The use of a hyphen includes the range of dimension between and the two dimensions stated.  Unless otherwise specifically stated as excluded in a Schedule of Rates or herein, the following shall be deemed to be included with all items: a) Labour and all costs in connection therewith. b) Materials, goods and all costs in connection therewith. c) Assembling, fitting and fixing of materials and goods in position. d) Plant and all costs in connection therewith. e) Waste of materials. f) Square cutting g) Establishment charges, overhead charges and profit. Method of Measurement 2 of 4
  • 4. General Landscaping and Services Works Dockyard Creek Cospicua, East Side Method of Measurement Composite Items Work to be manufactured off site may be combined with another to be fixed on site into one item even though the rules require the items to be measured separately. Items shall be deemed to include breaking down for transport and installation and subsequent re-assembly etc. Units and Symbols The following units, symbols and abbreviations are used in this method of measurement and bills of quantities: m metre m2 square metre m3 cubic metre mm millimetre nr number kg kilogramme t metric tonne h hour LS Lump Sum PS Provisional Sum > Exceeding < less than % Percentage - Hyphen € Euro Abbreviations min. Minimum n.e. not exceeding MEPA Malta Environment & Planning Authority BOQ Schedule of Rates Approx. Approximate or Approximately Definitions Any references in the Bills to Specifications and/or Drawings are for convenience only and in pricing the Bills the Contractor is to take into account all relevant requirements of the Specifications and Drawings. The terms "include", "is included', "including" and similar, are used to indicate that the materials or items in question shall not be measured as separate items, but their costs are to be included in the rate of the item in which they occur. Method of Measurement 3 of 4
  • 5. General Landscaping and Services Works Dockyard Creek Cospicua, East Side Method of Measurement The word "extra" or "extra over" used in the Bills means the additional cost of the work in question over and above the cost already measured. Dayworks Where the work cannot be properly valued by means of measurement, contemporary records are kept by the contractor and duly signed and approved by the Supervisor’s representative for payment purposes. The use of dayworks for payment purpose is at the discretion of the Employer or his representative. All daywork rates for labour shall include and take into account supervision, insurance, overheads, and equipment (other than mechanically operated equipment), profit, etc. All day work rates for mechanical equipment shall include and take into account operators and attendants, fuel and power, lubricating oils, maintenance, sharpening of tools, replacement of spare parts, consumables, costs of licences, insurance, etc. All Daywork hourly rated items are to be measured for the duration of use for the purposes of the project and will exclude travel time to arrive at the site by staff equipment, idle time & rest time. Contractor is to give sufficient evidence to the Supervisor of the activities to be undertaken for approval prior to commencement. Preliminaries The pricing of the Preliminaries section shall include for all the obligations, liabilities and services required by the Contract, as well as all other sundries which have not been included in other sections of the Schedule of Rates. Zero rates in the Preliminaries section shall mean that relative costs are already included within other rates of the Schedule of Rates. Method of Measurement 4 of 4
  • 6. Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works Bill of Quantities Item Description Quantity Unit Rate Amount Regatta - Quay Rehabilitation works A Preliminaries / General conditions A40 Contractor's general cost items Allow for all the obligations, liabilities and A4001 services described in the Contract Documents other than those listed below 1 Item Allow for all necessary insurances as required by the contract and as requested by the general A4002 legislation to indemnify the employer and his representatives, including Contractor's all Risks insurance 1 Item Supply of temporary lighting in order to enable A4003 works to be carried out at night (if required) during the contract period; as directed 1 Item Supply of metal hoarding required to segregate A4004 the site area during the carrying out of the Works, as directed or as shown on drawings 1 Item Provision of all Plant and tools required to carry A4005 out of the Works 1 Item Site Access: as directed by the supervisor. The Contractor is strongly advised to visit the site and A4006 acquaint himself with all constraints on access which may occur. 1 Item Noise and pollution control: Contractor is to make provisions against noise, dust contamination and any form of pollution and comply with the provisions of Legal Notice 337 of 2001, Waste Management (Permit and Control) Regulations A4007 and Legal Notice 106 of 2007, Waste Management (Activity Registration) Regulations. In particular waste material generated shall, if not reused, be deposited at facilities approved by MEPA. 1 Item Work adjacent to services: comply with service A4008 authorities and statutory undertakers recommendations 1 Item Development Permit: The contractor shall comply A4009 with all conditions of the planning Authority's permit ref. PA 2002/09 1 Item Amount Carried Forward to Summary Page € 1
  • 7. Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works Bill of Quantities Item Description Quantity Unit Rate Amount Security: Take adequate precautions to A4010 safeguard the site, the works and materials from theft 1 Item Heath and Safety: Comply with General Health and Safety Provision requirements and A4011 Occupational Health and Safety Authority Act 2000 and any subsequent legislation 1 Item Surveys: Carry out all surveys required for setting out of the works and agreeing measurement; A4012 including providing and erecting permanent setting-out marks of the quantity and quality or as required by the Supervisor 1 Item A4013 Provision and management of Staff, including certified divers necessary to carry out the works 1 Item Cleaning: Continuously keep the site and immediate surroundings clean and in a A4014 workmanlike condition free from debris, surplus materials and other type of loose matter which could disturb the proper conditions of any roads or adjoining buildings and structures 1 Item Permits and license fees: Allow for applying for A4015 and obtaining any permits and licenses necessary to carry out the works, except where such items will be at the Employer's cost 1 Item Provision of Quality Assurance & quality control, A4016 testing and certification to the supervisor's approval 1 Item Allow for the provision of under water recording report (video and photos) for all works carried A4017 out; as specified or as requested by the supervisor 1 Item Amount Carried Forward to Summary Page € 2
  • 8. Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works Bill of Quantities Item Description Quantity Unit Rate Amount Refer to CTP drawings ref. 9894-100 & 101 C Demolition/Alteration/Renovation C20 Alterations - Spot Items Removing fittings and fixtures Items and materials arising from alterations and spot Items are the property of the Employer, unless otherwise stated. Handle with care, transport and store in a designated area (area to be approved by the Supervisor) C2001 Careful removal of existing Cannon Bollard 1 nr Removing finishings Items and materials arising from alterations and spot Items are the property of the Employer, unless otherwise stated. Handle with care, transport and store in a designated area (area to be approved by the Supervisor) Careful removal existing hardstone blocks, C2002 above sea level 5 nr C2003 below sea level 5 nr Cutting to reduce thickness Trimming to form steps using high pressure water jetting or mechanical breaking; work below mean sea level C2004 as per drawing 9894-100 section 1-1 1 item Amount Carried Forward to Summary Page € 3
  • 9. Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works Bill of Quantities Item Description Quantity Unit Rate Amount D Ground Work D20 Excavating and filling Excavating Excavating below ground water level Remove silt and sediment next to Quay, by airlift to inspect integrity of foundation as per Regatta Quay Elevation, drawing 9894- D2001 100 1 Item In existing concrete slab, rock or hard paving, including any necessary trimming D2002 For Slipway ramp (work in proximity of Quay) 52 m3 To reduce levels In existing concrete slab, rock or hard paving, including any necessary trimming D2003 For Slipway ramp (work in proximity of Quay) 50 m3 Disposal Excavated material Off-site; including any type of excavated or broken out material (rate includes dumping D2004 and tipping charges) 102 m3 Amount Carried Forward to Summary Page € 4
  • 10. Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works Bill of Quantities Item Description Quantity Unit Rate Amount E In situ concrete/Large precast concrete E05 In situ concrete construction generally Grade C25/30 if using SRPC Beds Thickness exceeding 150 mm, below sea water level Unreinforced concrete filling to quay; as per E0501 drg 9894 - 101 52 m3 Grade C28/35 if using CEM III Thickness exceeding 150 mm, below sea water level E0502 Unreinforced concrete filling to quay wall 3 m3 Sand/Cement grout filled polypropylene bag work facing E0503 as per drawing 9894 - 100 section 1-1 5 m3 Extra over concrete elements (unless included in main item) For additives E0504 Anti-wash out admixture as per specifications 55 m3 E0505 Fibre reinforcement additives as per specifications 52 m3 Amount Carried Forward to Summary Page € 5
  • 11. Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works Bill of Quantities Item Description Quantity Unit Rate Amount E20 Formwork for in situ concrete Sides of upstands Plain vertical (ground beams, kerbs etc.) below sea water level E2001 Height 250 - 500 mm; Side of Quay 14 m Amount Carried Forward to Summary Page € 6
  • 12. Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works Bill of Quantities Item Description Quantity Unit Rate Amount E42 Accessories cast into in situ concrete Inserts to existing concrete surfaces, below sea water level Inclined drilling of 500mm deep hole in existing concrete, insert 20mm steel anchor bars, and grout with non-shrink grout (Fosroc Conbex 250 or approved equivalent) E4201 as per drg 9894-100 section 1-1 4 nr Amount Carried Forward to Summary Page € 7
  • 13. Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works Bill of Quantities Item Description Quantity Unit Rate Amount X Sundry / Miscellaneous Items Works in Foundation PF0.08 Underpinning of wall, including dewatering and cleaning area from existing debris. Filling in opening with Grade C25 concrete and SPRC additive or approved equivalent, including lip formwork to one side, approximately measuring 1.40m x 1.40m and X001 making good 1.00 Item Works in Foundation PF0.09 Excavation including carting away and dumping surplus material, filling with grade C25 mass concrete (approx. 6m3) and SPRC additive or approved equivalent including cast- in 2 x 150mm upvc sleeves, 1000mm long X002 approx. 1.00 Item Amount Carried Forward to Summary Page € 8
  • 14. Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works Bill of Quantities Item Description Quantity Unit Rate Amount Z Daywork Schedule To be read in conjunction with Preambles to the Bill of Quantities Labour Z001 Unskilled labourer 10.00 HR Z002 Semi-skilled labourer 10.00 HR Z003 Skilled labourer 10.00 HR Plant Plant rates are inclusive of fuel, travelling time , maintenance and operator Z004 Tipper truck up to 20 c.m. 5.00 HR Z005 Ready mix truck 5.00 HR Z006 Mini excavator 5.00 HR Hydraulic wheeled excavator - JCB or similar Z007 5.00 HR Z008 Excavator - 25 ton 5.00 HR Z009 Mobile crane - 18 ton 5.00 HR Z010 Bobcat 5.00 HR Z011 Air compressor 5.00 HR Z012 Small hand held tools 5.00 HR Z013 Water Bowser 1.00 Trip Material Z014 Type 1 fill material 5.00 m3 Z015 Washed aggregate 20mm 5.00 m3 Z016 C10 concrete 5.00 m3 Z017 C15 concrete 5.00 m3 Z018 C20 concrete 5.00 m3 Z019 C25 concrete 5.00 m3 Z020 C30 concrete 5.00 m3 Z021 Reinforcement bars up to 12mm diameter 100.00 kg Z022 Reinforcement bars over 12mm diameter 100.00 kg Z023 150mm hollow concrete blocks 50.00 Nr Z024 180mm hollow concrete blocks 50.00 Nr Z025 230mm single type hollow concrete blocks 50.00 Nr Z026 230mm double type hollow concrete blocks 50.00 Nr uPVC pipes Z027 50mm diameter 6.00 m Z028 110mm diameter 6.00 m Z029 200mm diameter 6.00 m Z030 400mm diameter 6.00 m the price of any other material shall be accepted on presentation of fiscal invoice Note: All Rates include overheads and profits and exclude VAT Amount Carried Forward to Summary Page € 9
  • 15. Dockyard Creek Cospicua, Regatta Quay Rehabilitation Works Bill of Quantities Item Section Sub-amount Amount Regatta - Quay Rehabilitation works Summary A Preliminaries / General conditions Page Nr 1 Page Nr 2 C Existing site / buildings / services Page Nr 3 D Ground Work Page Nr 4 In Situ concrete / Large precast E concrete Page Nr 5 Page Nr 6 Page Nr 7 X Sundry / Miscellaneous Items Page Nr 8 Z Dayworks Page Nr 9 Total (Excluding VAT) € Add 18 % VAT € Total (Including VAT) € 10