Shreenivash Chandra
Contact: +213697072980 (Algeria)
+91 9016712773 (India)
+971 56 6210955 (UAE)
E-mail: shreenivash211@gmail.com
shreenivashchandra@yahoo.co.in
CAREER SUMMARY
A result oriented professional having more than 16 years of experience in Project Management for EPC
Projects (9 years) and in Production Planning (7 years). Range of experience covers Integrated Gas facilities,
Cross country pipeline projects, Utility Plants, Building and Production planner for manufacturing of auto
components and assemblies for automotive allied Industries. Worked for ADCO, GASCO projects in UAE, for
GSPL, ONGC, RGTIL projects in India. Has extensive & flexible knowledge in Industrial field works, Managing
the projects and Cost control efficiency with competence.
WORK EXPERIENCES:
1. Presently working in Petrofac International LLC. As Lead Planning Engineer since Sep 2011.
Project Title : Separation and inlet Boosting facilities of Alrar area of STAH-ALGERIA (July’16 to Present)
Project Details: Engineering Procurement Construction and Commissioning of Separation and inlet
Boosting facilities for liquids and gas contained in the crude gas coming from the fields of Alrar East and
Alrar West
Client : SONATRACH
RESPONSIBILITIES:
 Preparation of Pre-commissioning and commissioning Level-IV schedule.
 Preparation and updating System/Subsystem Skyline.
 Preparation and updating Completion dashboard.
Project Title : Bab Gas Compression Project Phase – II (Dec’13 to June’16)
Project Details: Engineering Procurement Construction of New Compressor Station CS-4, modification of
three existing Compressor Stations (CS-1, 2 & 3) and upgrade the Gas gathering network by extension of
two remote Manifold Stations (RMS-2 & 3), installation of new Direct Gas Manifold (DGM-2), rerouting of
11 flow lines and connecting 24 new well heads to the Gas network ~ 250 Kms of flow lines and trunk lines,
Laying of 33 kV overhead transmission line from MIS to CS-4 ~ 11 Kms.
Client : Abu Dhabi Company for Onshore Oil Operations. (ADCO)
RESPONSIBILITIES:
 Prepare Project Calendar, WBS, Look ahead schedule etc.
 Prepare Project Control Procedure, Planning & Scheduling Procedure, Progress Measurement
Procedure
 Prepare Engineering, Procurement & Construction (EPC) Level III Schedule.
 Update all Project Schedules, collecting actual data, evaluating forecast dates and monitoring
progress and productivity
 Prepare Progress Measurement sheets, Weekly Commodity & Manpower reports.
 Prepare regular status reports and forecasts for project management and client review.
Shreenivash Chandra
Planning Engineer
 Prepare and updating of Pre-commissioning and commissioning schedule.
 Prepare all necessary Graphs (“S” curves, Histogram etc.) required for the project.
 Participate in the coordination meetings (internal, with subcontractors or with the Client
whenever opportune)
 Monitoring of sub-contractors’ progress, weekly/ monthly report.
 Review monthly reports and assesses schedule progress, delaying factors.
 Preparation of recovery plans for schedule slippages and identification corrective action to be taken
 Support the Project during the contract changes/claims process providing the time impact analysis
 Prepare Shutdown & Tie-in Schedule and monitoring the shutdown activities.
Project Title : Ruwais 4th
NGL Train Project (Sep’11 to Oct’13)
Project Details: Engineering Procurement Construction of Integrated Gas Facility to produce Raw Ethane,
Propane, Butane, and Paraffinic Naphtha hydrocarbons, byproduct liquid Sulphur
Client : Abu Dhabi Gas industries Ltd. (GASCO)
RESPONSIBILITIES:
 Prepare regular status reports and forecasts for project management and client review.
 Periodically update Engineering, Procurement & Construction (EPC) Schedule Level III.
 Develop and update periodically Pre-commissioning, Commissioning, & Start-up Schedules (Lvl IV).
 Prepare Progress measurement sheets, Weekly Commodity & Manpower reports.
 Prepare all necessary Graphs (“S” curves, Histogram etc.) required for the project.
 Providing update & support to System Champions to complete the priority works.
 Co-ordination and monitoring with subcontractors to close out of check sheet for completed jobs.
 Participates in meetings with the respective Sub-contractors & Clients.
 Monitoring of sub-contractors’ progress, weekly/ monthly report.
 Review monthly reports and assesses schedule progress, delaying factors.
 Raising Client Invoice.
 Deal with client and consultant in the purpose of their requirements.
 Support the Project Control Manager in the preparation of the Project close-out Report and the
schedule and productivity
2. Worked in IVRCL Ltd. as Sr. Engineer (Planning) since Nov 2009 to Sep 2011.
Project Title: Bihar Vidhansabha & Secretariat Block Project (Feb’11 – Sep’11)
Project Details: Extension of Vidhansabha and Secretariat Complex at Patna
Client : Building Construction Department, Bihar (BCD)
RESPONSIBILITIES:
 Preparation of Daily Progress Report, Weekly, Monthly Reports, Work Order etc.
 Estimation of Quantities.
 Manage the manpower & equipments between office & sites.
 Planning & scheduling of various activities.
 Certifying subcontractors’ invoice.
 Controlling & monitoring of all activities.
Shreenivash Chandra
Planning Engineer
 Reporting & Co-ordination with site activities
 Providing the site in charge’s with daily execution plan, briefing them.
 Maintaining Daily schedules of machines, manpower and resources.
 Keeping a watch on the critical items.
 Correspondence with Client & consultant.
Project Title : Nano Spurline Project (Feb’10 – Jan’11)
Project Details: Laying of Gas Pipeline 12”ø & 6”ø (6.4 / 7.9 / 9.5) mm. THK
Client : Gujarat State Petronet Ltd. (GSPL)
RESPONSIBILITIES:
 Preparation of Daily Progress Report, Weekly & Monthly Reports.
 Develop and update periodically Engineering, Procurement & Construction (EPC) Schedules (Level II,
III) in accordance with the work breakdown structure.
 Planning & scheduling of various activities.
 Raising Invoice to Client and certifying subcontractors’ invoice.
 Co-ordination & monitoring of all site activities
 Keeping a watch on the critical items.
 Deal with client and consultant in the purpose of their requirements.
 Maintaining Document Control Register.
 Preparing & Updating S-Curves.
 Correspondence with Client & consultant.
 Follow up with vendors for timely delivery.
Project Title : Petrochemical Complex at Dahej (Nov’09 – Feb’10)
Project Details: Infrastructure development Package for Petrochemical Complex
Client : ONGC Petro Additions Ltd. (OPaL)
RESPONSIBILITIES:
 Preparation of Daily/Weekly/Monthly Progress Reports, Work Order etc.
 Estimation of Quantities.
 Update Engineering, Procurement & Construction (EPC) Schedules (Level II, III).
 Planning & scheduling of various activities.
 Raising invoice to client and certifying subcontractors’ invoice.
 Preparation of monthly presentation for review meeting with client.
 Deal with client and consultant in the purpose of their requirements.
 Preparation & Updating S-Curves.
 Inter Department coordination.
3. Worked in Punj Lloyd Ltd. as Planning & Billing Engineer since July 2007 to Nov 2009.
Project Title: Darod – Jafrabad Gas Pipe Line Project (DJPL)(Apr’09 – Nov’09)
Project Details: Laying of Gas Pipeline 24”ø (11.9 / 14.3 / 17.2) mm. THK
Client : Gujarat State Petronet Ltd. (GSPL)
RESPONSIBILITIES:
Shreenivash Chandra
Planning Engineer
 Preparation of Daily Progress Report, Weekly, Monthly Reports etc.
 Develop Engineering, Procurement & Construction (EPC) Schedules (Level II, III) & in accordance
with the work breakdown structure.
 Planning & scheduling of various activities.
 Raising Client RA-bills.
 Controlling & monitoring of all activities.
 Reporting & Co-ordination with site activities
 Deal with client and consultant in the purpose of their requirements.
 Maintaining Document Control Register.
 Preparing & Updating S-Curves.
 Inter Department coordination.
 Correspondence with Client & consultant.
 Follow up with vendors for timely delivery.
Project Title : East West Pipe Line Project (EWPL) (Jul’07 – Apr’09)
Project Details: Laying of Gas Pipeline 48”ø (17.2 / 20.7 / 25.4) mm. THK
Client : Reliance Gas Transportation infrastructure Ltd. (RGTIL)
RESPONSIBILITIES:
 Preparation of Daily Progress Report, Weekly, Monthly Reports Work Order etc.
 Manage the manpower & equipment between office & sites.
 Planning & scheduling of various activities.
 Raising Client RA-bills and certifying subcontractors’ invoice.
 Material Reconcile.
 Reporting & Co-ordination with site activities
 Providing the site in charge’s with daily execution plan, briefing them.
 Keeping a watch on the critical items.
 Inter Department coordination.
4. Worked in Pawan Auto Pvt. Ltd., Adityapur Industrial Area, Jamshedpur as Production
Planning Engineer since March 2000 to June 2007.
RESPONSIBILITIES:
 Production analysis and improving proposals, Processes cost analysis.
 To prepare and effectively implement action plans to improve overall equipment efficiency of
production machines.
 Day to day production planning and achieve maximum Production.
 Assign work load to operators & achieving daily production target.
 Arrangement of tools and repair & maintenance of tools.
 Proper utilization of Manpower.
 Shop floor administration, handling skilled manpower, Proper utilization of Manpower.
 Daily Tool consumption, Production reports preparation & Down time analysis.
Shreenivash Chandra
Planning Engineer
 Tools history record review, coordinating with Purchase, Stores, Tool room, Quality and
Maintenance departments to meet 100% schedule adherence.
 Maintain discipline according to safety rules.
 Multi skill development of Operator.
 To identify the training needs and impart on the job training to departmental personnel.
 To prepare management information reports for progress in the department.
 To encourage new product development activities
 Organize Continuous Improvement Project.
ACADEMIA:
1999 ME (Mechanical) from Kovrov State Technological Academy, Russia with Excellent grade
1991 Intermediate of Science from HS College, Haveli Kharagpur
1989 Matriculation from RSK High School
Computer Skills: Hands on Experience in Primavera P6, MS Project, MS Office, Excel etc.
PERSONEL SKILLS:
Comprehensive problem solving abilities, excellent verbal and written communication skills, ability to deal
with people diplomatically, willingness to learn.
EXTRA CURRICULAR:
• Won academic level Olympiad in theoretical mechanics.
• Awarded Honor’s Degree.
Personal Profile:
Date of Birth : 11-Apr-1976
Marital Status : Married with two children
Nationality : Indian
Permanent Address : C/o Shankar Vastralaya, PO- Haveli Kharagpur,
Dist. - Munger (Bihar), PIN - 811213
Present Address : ALRAR Project, Petrofac International UAE LLC, Algeria
Languages known : Hindi, English, Russian
Passport No. : H 5307419 (Valid up to May-2019)
Notice Period : One Month
Declaration:
I hereby declare that the above-mentioned information is correct up to my knowledge and I bear
the responsibility for the correctness of the above mentioned particulars.
Place: Alrar (Shreenivash Chandra)
Shreenivash Chandra
Planning Engineer
 Tools history record review, coordinating with Purchase, Stores, Tool room, Quality and
Maintenance departments to meet 100% schedule adherence.
 Maintain discipline according to safety rules.
 Multi skill development of Operator.
 To identify the training needs and impart on the job training to departmental personnel.
 To prepare management information reports for progress in the department.
 To encourage new product development activities
 Organize Continuous Improvement Project.
ACADEMIA:
1999 ME (Mechanical) from Kovrov State Technological Academy, Russia with Excellent grade
1991 Intermediate of Science from HS College, Haveli Kharagpur
1989 Matriculation from RSK High School
Computer Skills: Hands on Experience in Primavera P6, MS Project, MS Office, Excel etc.
PERSONEL SKILLS:
Comprehensive problem solving abilities, excellent verbal and written communication skills, ability to deal
with people diplomatically, willingness to learn.
EXTRA CURRICULAR:
• Won academic level Olympiad in theoretical mechanics.
• Awarded Honor’s Degree.
Personal Profile:
Date of Birth : 11-Apr-1976
Marital Status : Married with two children
Nationality : Indian
Permanent Address : C/o Shankar Vastralaya, PO- Haveli Kharagpur,
Dist. - Munger (Bihar), PIN - 811213
Present Address : ALRAR Project, Petrofac International UAE LLC, Algeria
Languages known : Hindi, English, Russian
Passport No. : H 5307419 (Valid up to May-2019)
Notice Period : One Month
Declaration:
I hereby declare that the above-mentioned information is correct up to my knowledge and I bear
the responsibility for the correctness of the above mentioned particulars.
Place: Alrar (Shreenivash Chandra)

CV Shreenivash Chandra

  • 1.
    Shreenivash Chandra Contact: +213697072980(Algeria) +91 9016712773 (India) +971 56 6210955 (UAE) E-mail: shreenivash211@gmail.com shreenivashchandra@yahoo.co.in CAREER SUMMARY A result oriented professional having more than 16 years of experience in Project Management for EPC Projects (9 years) and in Production Planning (7 years). Range of experience covers Integrated Gas facilities, Cross country pipeline projects, Utility Plants, Building and Production planner for manufacturing of auto components and assemblies for automotive allied Industries. Worked for ADCO, GASCO projects in UAE, for GSPL, ONGC, RGTIL projects in India. Has extensive & flexible knowledge in Industrial field works, Managing the projects and Cost control efficiency with competence. WORK EXPERIENCES: 1. Presently working in Petrofac International LLC. As Lead Planning Engineer since Sep 2011. Project Title : Separation and inlet Boosting facilities of Alrar area of STAH-ALGERIA (July’16 to Present) Project Details: Engineering Procurement Construction and Commissioning of Separation and inlet Boosting facilities for liquids and gas contained in the crude gas coming from the fields of Alrar East and Alrar West Client : SONATRACH RESPONSIBILITIES:  Preparation of Pre-commissioning and commissioning Level-IV schedule.  Preparation and updating System/Subsystem Skyline.  Preparation and updating Completion dashboard. Project Title : Bab Gas Compression Project Phase – II (Dec’13 to June’16) Project Details: Engineering Procurement Construction of New Compressor Station CS-4, modification of three existing Compressor Stations (CS-1, 2 & 3) and upgrade the Gas gathering network by extension of two remote Manifold Stations (RMS-2 & 3), installation of new Direct Gas Manifold (DGM-2), rerouting of 11 flow lines and connecting 24 new well heads to the Gas network ~ 250 Kms of flow lines and trunk lines, Laying of 33 kV overhead transmission line from MIS to CS-4 ~ 11 Kms. Client : Abu Dhabi Company for Onshore Oil Operations. (ADCO) RESPONSIBILITIES:  Prepare Project Calendar, WBS, Look ahead schedule etc.  Prepare Project Control Procedure, Planning & Scheduling Procedure, Progress Measurement Procedure  Prepare Engineering, Procurement & Construction (EPC) Level III Schedule.  Update all Project Schedules, collecting actual data, evaluating forecast dates and monitoring progress and productivity  Prepare Progress Measurement sheets, Weekly Commodity & Manpower reports.  Prepare regular status reports and forecasts for project management and client review.
  • 2.
    Shreenivash Chandra Planning Engineer Prepare and updating of Pre-commissioning and commissioning schedule.  Prepare all necessary Graphs (“S” curves, Histogram etc.) required for the project.  Participate in the coordination meetings (internal, with subcontractors or with the Client whenever opportune)  Monitoring of sub-contractors’ progress, weekly/ monthly report.  Review monthly reports and assesses schedule progress, delaying factors.  Preparation of recovery plans for schedule slippages and identification corrective action to be taken  Support the Project during the contract changes/claims process providing the time impact analysis  Prepare Shutdown & Tie-in Schedule and monitoring the shutdown activities. Project Title : Ruwais 4th NGL Train Project (Sep’11 to Oct’13) Project Details: Engineering Procurement Construction of Integrated Gas Facility to produce Raw Ethane, Propane, Butane, and Paraffinic Naphtha hydrocarbons, byproduct liquid Sulphur Client : Abu Dhabi Gas industries Ltd. (GASCO) RESPONSIBILITIES:  Prepare regular status reports and forecasts for project management and client review.  Periodically update Engineering, Procurement & Construction (EPC) Schedule Level III.  Develop and update periodically Pre-commissioning, Commissioning, & Start-up Schedules (Lvl IV).  Prepare Progress measurement sheets, Weekly Commodity & Manpower reports.  Prepare all necessary Graphs (“S” curves, Histogram etc.) required for the project.  Providing update & support to System Champions to complete the priority works.  Co-ordination and monitoring with subcontractors to close out of check sheet for completed jobs.  Participates in meetings with the respective Sub-contractors & Clients.  Monitoring of sub-contractors’ progress, weekly/ monthly report.  Review monthly reports and assesses schedule progress, delaying factors.  Raising Client Invoice.  Deal with client and consultant in the purpose of their requirements.  Support the Project Control Manager in the preparation of the Project close-out Report and the schedule and productivity 2. Worked in IVRCL Ltd. as Sr. Engineer (Planning) since Nov 2009 to Sep 2011. Project Title: Bihar Vidhansabha & Secretariat Block Project (Feb’11 – Sep’11) Project Details: Extension of Vidhansabha and Secretariat Complex at Patna Client : Building Construction Department, Bihar (BCD) RESPONSIBILITIES:  Preparation of Daily Progress Report, Weekly, Monthly Reports, Work Order etc.  Estimation of Quantities.  Manage the manpower & equipments between office & sites.  Planning & scheduling of various activities.  Certifying subcontractors’ invoice.  Controlling & monitoring of all activities.
  • 3.
    Shreenivash Chandra Planning Engineer Reporting & Co-ordination with site activities  Providing the site in charge’s with daily execution plan, briefing them.  Maintaining Daily schedules of machines, manpower and resources.  Keeping a watch on the critical items.  Correspondence with Client & consultant. Project Title : Nano Spurline Project (Feb’10 – Jan’11) Project Details: Laying of Gas Pipeline 12”ø & 6”ø (6.4 / 7.9 / 9.5) mm. THK Client : Gujarat State Petronet Ltd. (GSPL) RESPONSIBILITIES:  Preparation of Daily Progress Report, Weekly & Monthly Reports.  Develop and update periodically Engineering, Procurement & Construction (EPC) Schedules (Level II, III) in accordance with the work breakdown structure.  Planning & scheduling of various activities.  Raising Invoice to Client and certifying subcontractors’ invoice.  Co-ordination & monitoring of all site activities  Keeping a watch on the critical items.  Deal with client and consultant in the purpose of their requirements.  Maintaining Document Control Register.  Preparing & Updating S-Curves.  Correspondence with Client & consultant.  Follow up with vendors for timely delivery. Project Title : Petrochemical Complex at Dahej (Nov’09 – Feb’10) Project Details: Infrastructure development Package for Petrochemical Complex Client : ONGC Petro Additions Ltd. (OPaL) RESPONSIBILITIES:  Preparation of Daily/Weekly/Monthly Progress Reports, Work Order etc.  Estimation of Quantities.  Update Engineering, Procurement & Construction (EPC) Schedules (Level II, III).  Planning & scheduling of various activities.  Raising invoice to client and certifying subcontractors’ invoice.  Preparation of monthly presentation for review meeting with client.  Deal with client and consultant in the purpose of their requirements.  Preparation & Updating S-Curves.  Inter Department coordination. 3. Worked in Punj Lloyd Ltd. as Planning & Billing Engineer since July 2007 to Nov 2009. Project Title: Darod – Jafrabad Gas Pipe Line Project (DJPL)(Apr’09 – Nov’09) Project Details: Laying of Gas Pipeline 24”ø (11.9 / 14.3 / 17.2) mm. THK Client : Gujarat State Petronet Ltd. (GSPL) RESPONSIBILITIES:
  • 4.
    Shreenivash Chandra Planning Engineer Preparation of Daily Progress Report, Weekly, Monthly Reports etc.  Develop Engineering, Procurement & Construction (EPC) Schedules (Level II, III) & in accordance with the work breakdown structure.  Planning & scheduling of various activities.  Raising Client RA-bills.  Controlling & monitoring of all activities.  Reporting & Co-ordination with site activities  Deal with client and consultant in the purpose of their requirements.  Maintaining Document Control Register.  Preparing & Updating S-Curves.  Inter Department coordination.  Correspondence with Client & consultant.  Follow up with vendors for timely delivery. Project Title : East West Pipe Line Project (EWPL) (Jul’07 – Apr’09) Project Details: Laying of Gas Pipeline 48”ø (17.2 / 20.7 / 25.4) mm. THK Client : Reliance Gas Transportation infrastructure Ltd. (RGTIL) RESPONSIBILITIES:  Preparation of Daily Progress Report, Weekly, Monthly Reports Work Order etc.  Manage the manpower & equipment between office & sites.  Planning & scheduling of various activities.  Raising Client RA-bills and certifying subcontractors’ invoice.  Material Reconcile.  Reporting & Co-ordination with site activities  Providing the site in charge’s with daily execution plan, briefing them.  Keeping a watch on the critical items.  Inter Department coordination. 4. Worked in Pawan Auto Pvt. Ltd., Adityapur Industrial Area, Jamshedpur as Production Planning Engineer since March 2000 to June 2007. RESPONSIBILITIES:  Production analysis and improving proposals, Processes cost analysis.  To prepare and effectively implement action plans to improve overall equipment efficiency of production machines.  Day to day production planning and achieve maximum Production.  Assign work load to operators & achieving daily production target.  Arrangement of tools and repair & maintenance of tools.  Proper utilization of Manpower.  Shop floor administration, handling skilled manpower, Proper utilization of Manpower.  Daily Tool consumption, Production reports preparation & Down time analysis.
  • 5.
    Shreenivash Chandra Planning Engineer Tools history record review, coordinating with Purchase, Stores, Tool room, Quality and Maintenance departments to meet 100% schedule adherence.  Maintain discipline according to safety rules.  Multi skill development of Operator.  To identify the training needs and impart on the job training to departmental personnel.  To prepare management information reports for progress in the department.  To encourage new product development activities  Organize Continuous Improvement Project. ACADEMIA: 1999 ME (Mechanical) from Kovrov State Technological Academy, Russia with Excellent grade 1991 Intermediate of Science from HS College, Haveli Kharagpur 1989 Matriculation from RSK High School Computer Skills: Hands on Experience in Primavera P6, MS Project, MS Office, Excel etc. PERSONEL SKILLS: Comprehensive problem solving abilities, excellent verbal and written communication skills, ability to deal with people diplomatically, willingness to learn. EXTRA CURRICULAR: • Won academic level Olympiad in theoretical mechanics. • Awarded Honor’s Degree. Personal Profile: Date of Birth : 11-Apr-1976 Marital Status : Married with two children Nationality : Indian Permanent Address : C/o Shankar Vastralaya, PO- Haveli Kharagpur, Dist. - Munger (Bihar), PIN - 811213 Present Address : ALRAR Project, Petrofac International UAE LLC, Algeria Languages known : Hindi, English, Russian Passport No. : H 5307419 (Valid up to May-2019) Notice Period : One Month Declaration: I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above mentioned particulars. Place: Alrar (Shreenivash Chandra)
  • 6.
    Shreenivash Chandra Planning Engineer Tools history record review, coordinating with Purchase, Stores, Tool room, Quality and Maintenance departments to meet 100% schedule adherence.  Maintain discipline according to safety rules.  Multi skill development of Operator.  To identify the training needs and impart on the job training to departmental personnel.  To prepare management information reports for progress in the department.  To encourage new product development activities  Organize Continuous Improvement Project. ACADEMIA: 1999 ME (Mechanical) from Kovrov State Technological Academy, Russia with Excellent grade 1991 Intermediate of Science from HS College, Haveli Kharagpur 1989 Matriculation from RSK High School Computer Skills: Hands on Experience in Primavera P6, MS Project, MS Office, Excel etc. PERSONEL SKILLS: Comprehensive problem solving abilities, excellent verbal and written communication skills, ability to deal with people diplomatically, willingness to learn. EXTRA CURRICULAR: • Won academic level Olympiad in theoretical mechanics. • Awarded Honor’s Degree. Personal Profile: Date of Birth : 11-Apr-1976 Marital Status : Married with two children Nationality : Indian Permanent Address : C/o Shankar Vastralaya, PO- Haveli Kharagpur, Dist. - Munger (Bihar), PIN - 811213 Present Address : ALRAR Project, Petrofac International UAE LLC, Algeria Languages known : Hindi, English, Russian Passport No. : H 5307419 (Valid up to May-2019) Notice Period : One Month Declaration: I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above mentioned particulars. Place: Alrar (Shreenivash Chandra)