 Section 1. Instruction to Tenderers
 Section 2. Tender Data Sheet
 Section 3. General Conditions of Contract
 Section 4. Particular Conditions of Contract
 Section 5. Tender & Contract Forms
 Section 6. Bill of Quantities
 Section 7. General Specifications
 Section 8. Particular Specifications
 Section 9. Drawings
A. General
Scope
Corrupt and Fraudulent cases
Tenderer’s Eligibility
B. Tender Document
Clarification
Addendum
C. Qualification Criteria
Experience
Financial requirements
D. Tender Preparation
Language, Prices, Currency
Tenderer’s Documents
Tender Security
E. Tender Submission
Sealing, Marking and Submitting
Modification, Substitution and Withdrawal
F. Tender Opening & Evaluation
Tender Opening
Preliminary, Technical and Financial Examination
Post-qualification
G. Contract Award
Notifying Award
Performance Security
A. General
Name of the Procuring Entity & Works
Lot No. – Single Lot
B. Tender Document
Address of the Procuring Entity
C. Qualification Criteria
Experience – Tk. 1.5 million over 3 years
Annual Construction Turnover - Tk. 1 million
Liquid Asset – Tk. 500 thousand
D. Tender Preparation
Additional Documents
Validity Period – 90 days
Tender Security – Tk. 60 thousand
E. Tender Submission
Address for Submission
Deadline - 22/07/2013 up to 3:00pm
F. Tender Opening & Evaluation
Tender Opening Address
Time & Date - 22/07/2013 up to 3:30pm
G. Contract Award
Performance Security – 10% of the contract
price
A. General
Definitions
Corrupt, Fraudulent, Collusive or Coercive
Practices
Documents Forming the Contract and Priority of
Documents
Eligibility
A. General
Possession of the Site
Procuring Entity’s Responsibilities
Contractor’s Responsibilities
Taxes and Duties
Contractor’s Personnel
B. Time Control
Start Date
Intended Completion Date
Programme of Works
Extension of the Intended Completion
C. Time Control
Execution of Works
Identifying Defects
Testing
Rejection of Works
Remedial Work
Correction of Defects
D. Cost Control
Contract Price
Bill of Quantities (BOQ)
Changes in the Quantities and Unit Rate or
Price
Variations
Costing of Variation Orders
D. Cost Control
Payment Certificates
Payments to the Contractor
Compensation Events
Retention Money
Liquidated Damages
Performance Security
E. Completion of Contract
Completion
Completion Certificate and Taking Over
Amendment to Contract
Final Account
Release from Performance
F. Termination and Settlement of Disputes
Termination
Payment upon Termination
Property
G. Disputes and Arbitration
Settlement of Disputes
Name of the Contractor and Project Manager
Name of the Procuring Entity
Location of site – Uttara, Sector-12, Dhaka
Brief Description of the Works
Other Documents forming the Contract
Date of Possession of Site
Date of Starting & Completion
Submission of Programme of Works – 10 days
of signing contract
Defect Liability Period – 12 months
Compensation Events – None
Contract Price
Portion of Payments to be Retained –
10% of Performance Security
Amount of Liquidated Damages –
0.1 of 1% of the final contract price
Max Amount of Liquidated Damages –
10% of final contract price
Procuring Entity’s additional cost for completing
uncompleted works –
10% of the contract value of the works not
completed
Location of Arbitration – Dhaka
Tender Forms
a) Tender Submission Letter
b) Tenderer’s Information
c) Bank Guarantee for Tender Security
Contract Forms
a) Notification of Award
b) Contract Agreement
c) Bank Guarantee for Performance
Security
Tender Forms
a) Tender Submission Letter
Tender Price and Validation Date Limit
Attachment: Tender Security
(pay order/bank draft/ bank Guarantee)
Tender Forms
b) Tenderer’s Information
Eligibility and Qualification Information
National Identification of Tenderer
Working Experience
Source of Financial Resources
Tender Forms
c) Bank Guarantee for Tender Security
Valid up to 28 days beyond the expiration date
of tender validity period
Contract Forms
a) Notification of Award
Given to selected tenderer and requests to-
Accept it in writing within 7 working days
Furnish performance security
Sign the contract within 14 working days
Contract Forms
b) Contract Agreement
Most important document on the contract
condition according to which the work will
be executed
Payment of money to the contractor is
done after signing this document by both
party.
Contract Forms
c) Bank Guarantee for Performance Security
For the execution of work under this contract it must
be supported by a bank guarantee for performance
security
Main parts of ‘Bill of Quantities’
Earth Work
RCC Works
Reinforcements
Brick soling, CC, DPC
Brickwork, Plastering & Floor finish
Door and Window Materials
Earthwork
Layout & Marking
Earthwork in excavation
Sand filling
Earth filling
RCC Works
Formwork in footing,
column, grade beam etc.
Concrete in footing,
column, grade beam etc.
Reinforcement
Reinforcement in-
Footing
Grade beam
Column
Slab etc.
Brick soling, CC, DPC
Brick flat soling in
foundation and in floor
Mass concrete (1:3:6) in
foundation, Floor
Damp proof course (DPC)
(1:1.5:3)
Brickwork, plastering
and floor finish
Brick works in
superstructure(cement
sand (F.M. 1.2) mortar
(1:6))
Cement sand plaster with
fresh cement to wall both
inner-and outer
surface(Minimum 12 mm
thick sand (F.M. 1.2)
plaster (1:4)) etc.
Door and window
materials
Door frames.( Preferable
natural seasoned Mehgoni)
Door shutter. (Preferable
solid Gamari wood)
Windows. (Preferable
Aluminum sliding silver
colour)
The tenderers have to estimate the materials according
to the design of the project
The tenderers have to input unit price of the materials
as per specification given
The tenderers have to provide with the sub total and
gross total cost of the materials
The tenderer offering lowest gross total maintaining the
specifications and demand will be preferred for the
contract of the project
 General Items for Site Facilities
 Drawings
 Scaffolding
 Protection of Works
 Samples
 Temporary and Permanent Services
 Safety and Security Measures
 Safe Stairways, Ladders & Platforms
 Preserve & Protect all existing Public Properties
 Environment Protection & Disposal of
Wastes
 Dust Protection
 Weather Protection
 Demolished & Salvaged Materials
 Specification Materials
 Excavation
 Backfilling
 Concrete Materials
 Cement
• Comply with relevant ASTM
• Only OPC shall be used in all of the Structural Elements
 Fine & Coarse Aggregates
 All Aggregates Shall however be tested and
quarry shall be proved to comply with the Contract
Specifications
 Crushed Lime Stone Fines shall not be used
 Admixtures
 Resistance to workability, impermeability
shrinkage cracks
 No other admixture will be permitted unless it has
been approved by the Design Professional
 Reinforcement
 Reinforcing Steel: High yield deformed weld able steel
bars (BS Standard)
 Grade Minimum Yield Strength
 High Yield Steel 414 MPa
 Mild Steel 278 MPa
 Specification for Workmanship
 Shall be of good commercial quality
 Materials’ Testing
 The contractor to accompany the required
materials with a testing certificate from a
laboratory approved by the Engineer
 Any materials that don’t pass the test shall be
rejected
 Basis of measurement and payment is
provided in BOQ
In case of confusion/conflict or the items which have not
been covered here including Cast in Place Concrete,
Concrete Curing, Floor Tile Work, Wall Tile Work, Metal
Fabrication, Windows and Doors, Painting Works,
Drainage Electrical Installations Plumbing and sanitary
Installations, Fire fighting, Local Government Engineering
Department (LGED) Specification on “Building Works” shall
govern.
Ground Floor Plan
Column Layout Plan
Grade Beam Layout Plan & Long Section
Roof Beam Layout Plan & Long Section
Reinforcement Details of Roof
Footing Layout Plan
Footing & Column Schedule
THANK YOU

More Related Content

What's hot

Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Construction
shillier38
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts final
FitBlar Mit
 

What's hot (20)

Tenders , Invitation of tender
Tenders , Invitation of tender Tenders , Invitation of tender
Tenders , Invitation of tender
 
Contract & Tender Management
Contract & Tender ManagementContract & Tender Management
Contract & Tender Management
 
Bid Evaluation
Bid EvaluationBid Evaluation
Bid Evaluation
 
BIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTBIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACT
 
Tender Management
Tender ManagementTender Management
Tender Management
 
Module 4 lecture 1
Module  4 lecture 1Module  4 lecture 1
Module 4 lecture 1
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
 
Lecture 2 tender process n documentation
Lecture 2 tender process n documentationLecture 2 tender process n documentation
Lecture 2 tender process n documentation
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentation
 
Tendering in construction introduction
Tendering in construction introductionTendering in construction introduction
Tendering in construction introduction
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Construction
 
Tender & bidding in construction projects
Tender  & bidding in construction projectsTender  & bidding in construction projects
Tender & bidding in construction projects
 
Bid propsl evaluation
Bid propsl evaluation Bid propsl evaluation
Bid propsl evaluation
 
Tendering
TenderingTendering
Tendering
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts final
 
Price variation in works contracts
Price variation in works contractsPrice variation in works contracts
Price variation in works contracts
 
Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)
 
Construction Claims
Construction ClaimsConstruction Claims
Construction Claims
 
Procurement system
Procurement systemProcurement system
Procurement system
 
Fidic Form of Contract.
Fidic Form of Contract.Fidic Form of Contract.
Fidic Form of Contract.
 

Viewers also liked

Equity powerpoint
Equity powerpointEquity powerpoint
Equity powerpoint
sbyam
 
How to tender. The basics.
How to tender. The basics.How to tender. The basics.
How to tender. The basics.
convcat11
 
Thesis5th Year Architecture Studio
Thesis5th Year Architecture StudioThesis5th Year Architecture Studio
Thesis5th Year Architecture Studio
Robertconklin
 

Viewers also liked (20)

Lotus procure : A Complete Overview
Lotus procure : A Complete OverviewLotus procure : A Complete Overview
Lotus procure : A Complete Overview
 
Lecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningLecture slides4; Construction Project Planning
Lecture slides4; Construction Project Planning
 
Intro To Procurement And Tendering In Wales Slideset
Intro To Procurement And Tendering In Wales   SlidesetIntro To Procurement And Tendering In Wales   Slideset
Intro To Procurement And Tendering In Wales Slideset
 
UDL as an Architecture for Learning
UDL as an Architecture for LearningUDL as an Architecture for Learning
UDL as an Architecture for Learning
 
Ethiopian tender practice
Ethiopian tender practiceEthiopian tender practice
Ethiopian tender practice
 
Bussiness planning process
Bussiness planning processBussiness planning process
Bussiness planning process
 
Re Defining The Learning Architecture In Your School Tony Carrucan
Re Defining The Learning Architecture In Your School Tony CarrucanRe Defining The Learning Architecture In Your School Tony Carrucan
Re Defining The Learning Architecture In Your School Tony Carrucan
 
Tendering process cvc_guidelines
Tendering process cvc_guidelinesTendering process cvc_guidelines
Tendering process cvc_guidelines
 
Equity powerpoint
Equity powerpointEquity powerpoint
Equity powerpoint
 
Tender Management by Ramon A. Pili
Tender Management by Ramon A. PiliTender Management by Ramon A. Pili
Tender Management by Ramon A. Pili
 
Pp group assignment
Pp group assignmentPp group assignment
Pp group assignment
 
Ct assignment
Ct assignmentCt assignment
Ct assignment
 
How to tender. The basics.
How to tender. The basics.How to tender. The basics.
How to tender. The basics.
 
Professional Practice 1 Assignment
Professional Practice 1 AssignmentProfessional Practice 1 Assignment
Professional Practice 1 Assignment
 
Tendering and Procurement Best Practices
Tendering and Procurement Best PracticesTendering and Procurement Best Practices
Tendering and Procurement Best Practices
 
Interior Architecture (Design Studio); Sustainability - Part B
Interior Architecture (Design Studio); Sustainability - Part BInterior Architecture (Design Studio); Sustainability - Part B
Interior Architecture (Design Studio); Sustainability - Part B
 
Professional practice 1 (QS)
Professional practice 1 (QS)Professional practice 1 (QS)
Professional practice 1 (QS)
 
Tendering procedures 1
Tendering procedures 1Tendering procedures 1
Tendering procedures 1
 
Tendering and Procurement - Basic Principles
Tendering and Procurement   - Basic PrinciplesTendering and Procurement   - Basic Principles
Tendering and Procurement - Basic Principles
 
Thesis5th Year Architecture Studio
Thesis5th Year Architecture StudioThesis5th Year Architecture Studio
Thesis5th Year Architecture Studio
 

Similar to Tendering Document for the Procurement of Works

Measurement iv
Measurement ivMeasurement iv
Measurement iv
tfkc1212
 
Bonny Resume ( Proc)
Bonny Resume ( Proc)Bonny Resume ( Proc)
Bonny Resume ( Proc)
Bonny Sam
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CV
muhammad abdullah
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
마 이환
 

Similar to Tendering Document for the Procurement of Works (20)

Contract presentation
Contract presentation  Contract presentation
Contract presentation
 
Measurement iv
Measurement ivMeasurement iv
Measurement iv
 
Fififinalnal
FififinalnalFififinalnal
Fififinalnal
 
Contract_Design_for_Dam_Construction.pdf
Contract_Design_for_Dam_Construction.pdfContract_Design_for_Dam_Construction.pdf
Contract_Design_for_Dam_Construction.pdf
 
Bonny Resume ( Proc)
Bonny Resume ( Proc)Bonny Resume ( Proc)
Bonny Resume ( Proc)
 
Tender
TenderTender
Tender
 
Eng ramy nabil 2016
Eng ramy nabil 2016Eng ramy nabil 2016
Eng ramy nabil 2016
 
tendering
 tendering tendering
tendering
 
Arunkumar_Proc & Contr_25.12.2014
Arunkumar_Proc & Contr_25.12.2014Arunkumar_Proc & Contr_25.12.2014
Arunkumar_Proc & Contr_25.12.2014
 
Contracts & tenders
Contracts & tendersContracts & tenders
Contracts & tenders
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CV
 
Construction practices
Construction practicesConstruction practices
Construction practices
 
MEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATIONMEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATION
 
Construction Costing Proposal PowerPoint Presentation Slides
Construction Costing Proposal PowerPoint Presentation SlidesConstruction Costing Proposal PowerPoint Presentation Slides
Construction Costing Proposal PowerPoint Presentation Slides
 
Construction Bid Proposal Template PowerPoint Presentation Slides
Construction Bid Proposal Template PowerPoint Presentation SlidesConstruction Bid Proposal Template PowerPoint Presentation Slides
Construction Bid Proposal Template PowerPoint Presentation Slides
 
Pre Bid Risk Assessment
Pre Bid Risk AssessmentPre Bid Risk Assessment
Pre Bid Risk Assessment
 
Chapter one new.pptx
Chapter one new.pptxChapter one new.pptx
Chapter one new.pptx
 
Construction Work Schedule Proposal PowerPoint Presentation Slides
Construction Work Schedule Proposal PowerPoint Presentation SlidesConstruction Work Schedule Proposal PowerPoint Presentation Slides
Construction Work Schedule Proposal PowerPoint Presentation Slides
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
 
E9._Non-Conformity_Report_NCR.doc
E9._Non-Conformity_Report_NCR.docE9._Non-Conformity_Report_NCR.doc
E9._Non-Conformity_Report_NCR.doc
 

More from Mohammad Alimuzzaman Bappy

More from Mohammad Alimuzzaman Bappy (16)

Coal power environment global perspective
Coal power environment global perspectiveCoal power environment global perspective
Coal power environment global perspective
 
Energy Scenario of Denmark
Energy Scenario of DenmarkEnergy Scenario of Denmark
Energy Scenario of Denmark
 
Bod(biochemical oxygen demand)
Bod(biochemical oxygen demand) Bod(biochemical oxygen demand)
Bod(biochemical oxygen demand)
 
Energy as tender
Energy as tenderEnergy as tender
Energy as tender
 
Energy science
Energy scienceEnergy science
Energy science
 
Study of Ground Water Recharge from Rainfall in Dhaka City
Study of Ground Water Recharge from Rainfall in Dhaka CityStudy of Ground Water Recharge from Rainfall in Dhaka City
Study of Ground Water Recharge from Rainfall in Dhaka City
 
Organic Chemistry
Organic Chemistry Organic Chemistry
Organic Chemistry
 
Renewable Energy Scenario comparison (USA-Russia-France)
Renewable Energy Scenario comparison (USA-Russia-France)Renewable Energy Scenario comparison (USA-Russia-France)
Renewable Energy Scenario comparison (USA-Russia-France)
 
Climate change coastal zone of bangladesh
Climate change coastal zone of bangladeshClimate change coastal zone of bangladesh
Climate change coastal zone of bangladesh
 
Design of an industrial park
Design of an industrial parkDesign of an industrial park
Design of an industrial park
 
Mrt
MrtMrt
Mrt
 
History of The world
History of The world History of The world
History of The world
 
Prediction of energy mix in power production bangladesh context 2030
Prediction of energy mix in power production bangladesh context 2030Prediction of energy mix in power production bangladesh context 2030
Prediction of energy mix in power production bangladesh context 2030
 
Flexural lecture
Flexural lectureFlexural lecture
Flexural lecture
 
Compression member
Compression memberCompression member
Compression member
 
Cement
CementCement
Cement
 

Recently uploaded

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 

Recently uploaded (20)

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 

Tendering Document for the Procurement of Works

  • 1.
  • 2.  Section 1. Instruction to Tenderers  Section 2. Tender Data Sheet  Section 3. General Conditions of Contract  Section 4. Particular Conditions of Contract  Section 5. Tender & Contract Forms  Section 6. Bill of Quantities  Section 7. General Specifications  Section 8. Particular Specifications  Section 9. Drawings
  • 3. A. General Scope Corrupt and Fraudulent cases Tenderer’s Eligibility B. Tender Document Clarification Addendum C. Qualification Criteria Experience Financial requirements
  • 4. D. Tender Preparation Language, Prices, Currency Tenderer’s Documents Tender Security E. Tender Submission Sealing, Marking and Submitting Modification, Substitution and Withdrawal
  • 5. F. Tender Opening & Evaluation Tender Opening Preliminary, Technical and Financial Examination Post-qualification G. Contract Award Notifying Award Performance Security
  • 6. A. General Name of the Procuring Entity & Works Lot No. – Single Lot B. Tender Document Address of the Procuring Entity C. Qualification Criteria Experience – Tk. 1.5 million over 3 years Annual Construction Turnover - Tk. 1 million Liquid Asset – Tk. 500 thousand
  • 7. D. Tender Preparation Additional Documents Validity Period – 90 days Tender Security – Tk. 60 thousand E. Tender Submission Address for Submission Deadline - 22/07/2013 up to 3:00pm
  • 8. F. Tender Opening & Evaluation Tender Opening Address Time & Date - 22/07/2013 up to 3:30pm G. Contract Award Performance Security – 10% of the contract price
  • 9. A. General Definitions Corrupt, Fraudulent, Collusive or Coercive Practices Documents Forming the Contract and Priority of Documents Eligibility
  • 10. A. General Possession of the Site Procuring Entity’s Responsibilities Contractor’s Responsibilities Taxes and Duties Contractor’s Personnel
  • 11. B. Time Control Start Date Intended Completion Date Programme of Works Extension of the Intended Completion
  • 12. C. Time Control Execution of Works Identifying Defects Testing Rejection of Works Remedial Work Correction of Defects
  • 13. D. Cost Control Contract Price Bill of Quantities (BOQ) Changes in the Quantities and Unit Rate or Price Variations Costing of Variation Orders
  • 14. D. Cost Control Payment Certificates Payments to the Contractor Compensation Events Retention Money Liquidated Damages Performance Security
  • 15. E. Completion of Contract Completion Completion Certificate and Taking Over Amendment to Contract Final Account Release from Performance
  • 16. F. Termination and Settlement of Disputes Termination Payment upon Termination Property
  • 17. G. Disputes and Arbitration Settlement of Disputes
  • 18. Name of the Contractor and Project Manager Name of the Procuring Entity Location of site – Uttara, Sector-12, Dhaka Brief Description of the Works Other Documents forming the Contract
  • 19. Date of Possession of Site Date of Starting & Completion Submission of Programme of Works – 10 days of signing contract Defect Liability Period – 12 months Compensation Events – None
  • 20. Contract Price Portion of Payments to be Retained – 10% of Performance Security Amount of Liquidated Damages – 0.1 of 1% of the final contract price Max Amount of Liquidated Damages – 10% of final contract price
  • 21. Procuring Entity’s additional cost for completing uncompleted works – 10% of the contract value of the works not completed Location of Arbitration – Dhaka
  • 22. Tender Forms a) Tender Submission Letter b) Tenderer’s Information c) Bank Guarantee for Tender Security Contract Forms a) Notification of Award b) Contract Agreement c) Bank Guarantee for Performance Security
  • 23. Tender Forms a) Tender Submission Letter Tender Price and Validation Date Limit Attachment: Tender Security (pay order/bank draft/ bank Guarantee)
  • 24. Tender Forms b) Tenderer’s Information Eligibility and Qualification Information National Identification of Tenderer Working Experience Source of Financial Resources
  • 25. Tender Forms c) Bank Guarantee for Tender Security Valid up to 28 days beyond the expiration date of tender validity period
  • 26. Contract Forms a) Notification of Award Given to selected tenderer and requests to- Accept it in writing within 7 working days Furnish performance security Sign the contract within 14 working days
  • 27. Contract Forms b) Contract Agreement Most important document on the contract condition according to which the work will be executed Payment of money to the contractor is done after signing this document by both party.
  • 28. Contract Forms c) Bank Guarantee for Performance Security For the execution of work under this contract it must be supported by a bank guarantee for performance security
  • 29. Main parts of ‘Bill of Quantities’ Earth Work RCC Works Reinforcements Brick soling, CC, DPC Brickwork, Plastering & Floor finish Door and Window Materials
  • 30. Earthwork Layout & Marking Earthwork in excavation Sand filling Earth filling RCC Works Formwork in footing, column, grade beam etc. Concrete in footing, column, grade beam etc.
  • 31. Reinforcement Reinforcement in- Footing Grade beam Column Slab etc. Brick soling, CC, DPC Brick flat soling in foundation and in floor Mass concrete (1:3:6) in foundation, Floor Damp proof course (DPC) (1:1.5:3)
  • 32. Brickwork, plastering and floor finish Brick works in superstructure(cement sand (F.M. 1.2) mortar (1:6)) Cement sand plaster with fresh cement to wall both inner-and outer surface(Minimum 12 mm thick sand (F.M. 1.2) plaster (1:4)) etc. Door and window materials Door frames.( Preferable natural seasoned Mehgoni) Door shutter. (Preferable solid Gamari wood) Windows. (Preferable Aluminum sliding silver colour)
  • 33. The tenderers have to estimate the materials according to the design of the project The tenderers have to input unit price of the materials as per specification given The tenderers have to provide with the sub total and gross total cost of the materials The tenderer offering lowest gross total maintaining the specifications and demand will be preferred for the contract of the project
  • 34.  General Items for Site Facilities  Drawings  Scaffolding  Protection of Works  Samples  Temporary and Permanent Services
  • 35.  Safety and Security Measures  Safe Stairways, Ladders & Platforms  Preserve & Protect all existing Public Properties  Environment Protection & Disposal of Wastes  Dust Protection  Weather Protection  Demolished & Salvaged Materials
  • 36.  Specification Materials  Excavation  Backfilling  Concrete Materials  Cement • Comply with relevant ASTM • Only OPC shall be used in all of the Structural Elements
  • 37.  Fine & Coarse Aggregates  All Aggregates Shall however be tested and quarry shall be proved to comply with the Contract Specifications  Crushed Lime Stone Fines shall not be used  Admixtures  Resistance to workability, impermeability shrinkage cracks  No other admixture will be permitted unless it has been approved by the Design Professional
  • 38.  Reinforcement  Reinforcing Steel: High yield deformed weld able steel bars (BS Standard)  Grade Minimum Yield Strength  High Yield Steel 414 MPa  Mild Steel 278 MPa
  • 39.  Specification for Workmanship  Shall be of good commercial quality  Materials’ Testing  The contractor to accompany the required materials with a testing certificate from a laboratory approved by the Engineer  Any materials that don’t pass the test shall be rejected
  • 40.  Basis of measurement and payment is provided in BOQ In case of confusion/conflict or the items which have not been covered here including Cast in Place Concrete, Concrete Curing, Floor Tile Work, Wall Tile Work, Metal Fabrication, Windows and Doors, Painting Works, Drainage Electrical Installations Plumbing and sanitary Installations, Fire fighting, Local Government Engineering Department (LGED) Specification on “Building Works” shall govern.
  • 41. Ground Floor Plan Column Layout Plan Grade Beam Layout Plan & Long Section Roof Beam Layout Plan & Long Section Reinforcement Details of Roof Footing Layout Plan Footing & Column Schedule
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.