Position Held :Procurement QC Manager
Brief Description of Responsibilities as Procurement
QC Manager:
Minimize non-conformance ratio for procured
materials/equipment.
In overall, DSI’s Procurement Department is committed to
an objective of reaching a Performance Quality Index of
greater than 90 (>90).
Achieving a 100% link to all TPI-Third Party Inspectors (In
or Out Kingdom) & SAIR-Saudi Aramco Inspection Rep.
related to all inspectable items.
Review and assists in the preparation of material technical
approval (MTA) and Material Requisition (MR) package
for all material as per contract scope.
Review, assists and submit the Inspection Assignment
package (IAP) for materials with Inspection level 1, 2, 3 &
4, as per Schedule ‘Q’.
Receiving Inspection Reports (IR), Inspection Release
Cert (IRC), record keeping and processing of all reports
received from Third Party Inspectors (TPI).
Rejects and Issues Non Conformance Reports (NCR) for
all materials or work that does not comply with contract
documents; also monitor the careful segregation of
quarantined materials and rectification of defects until
clearance of materials from quarantine.
Assuring the traceability of uniquely identified critical
materials while materials are in storage.
Monitoring and recording of condition and state of
preservation of materials released from storage for
processing and/or construction.
Arrange material inspection at vendor/supplier premises
as required in coordination with SA Vendor Inspection
(VID) Representative and approved third party vendor
inspector/s.
Ensure the verification of the compliance of the purchased
equipment and materials with the order requirements.
Ensure the inspections and tests are carried out in
accordance with the approved ARAMCO Forms 175, or
Special and the established Inspection and test plans
(ITP).
continuation…Brief Description of Responsibilities as
Procurement QC Manager:
Ensure the organization of the pre-inspection meeting
(PIM) with the Vendor.
Ensure shop inspections are carried out during fabrication
and Contractor’s inspectors attend the intermediate and
final shop tests, recording the results in the provided
forms.
Ensure that non conformances in the inspection reports
are pointed out, and that the product is marked and
segregated ensuring the involvement of the competent.
Ensure the verification that the vendor eliminates the non
conformances by means of approved procedures and that
the products are submitted to a further test prior to
delivery on site.
Ensure, when required, the timely communication of the
scheduled inspection/test to the COMPANY and/or
Independent (Third Party) Inspection Authority.
Ensure that release notes/certificates are issued to
assess the conformity of the products with the purchase
order requirements.
Verify with the applicability of S. Aramco Material System
Specification (SAMSS) and incorporate the inspection
requirement accordingly.
Follow-up the Pre-Inspection Meeting (PIM) - action items
and closes them.
Control and ensure the inspection coverage for the
Vendor sub orders through the PIM.
Communicate with the assigned inspector to make sure
the findings were addressed correctly in the inspection
report.
Prepares Procurement Plan, Sub-contracting Plan as per
contract and based on the criteria required by Saudi
Aramco; with considerations to Long Lead Items (LLI),
Major Material requirements, 9com Numbers, Level of
inspection, IAP-Inspection Assignment Package, NMR
and target delivery dates.
Advise Procurement Manager and Project Manager of
possible and anticipated delays or deviations from
required delivery schedules.
Project : UPDC – Upstream Professional Development
and Research Center.
Owner/PMT: Saudi Aramco - Dhahran
Position Held :Procurement In-charge
Brief Description of Responsibilities:
Study ongoing projects’ IFC Drawings, specifications,
B.O.Q, budget, scope of works & the Schedules
(Milestone) to fully familiarize in the nature of work to
be undertaken from start until completion concerning
Procurement/Purchasing activities.
Prepares Procurement Plan based on the criteria
required by the Client.
Prepares List of Materials, List of Long Lead Items and
Weekly Procurement Status Report.
Supervise and manage subordinate in the
preparations of RFQ, comparisons, submittal
documents, MTA, RTA, MR, NMR, MRP, IAP,PQI and
other related documents as required in the contract.
Negotiate and encourage prospect suppliers to provide
their best and final price, delivery and terms of
payment in favor for the company and project.
Prepares LOI, PO and Subcontracting Agreements to
selected suppliers/vendors incorporating all the
conditions and required documentations like: warranty,
NMR, SPDP and etc. as needed.
Ensures the availability of required procurement
reports; including development of all existing systems,
procedures and guidelines for the continued
improvement of Procurement activities.
Attend weekly, monthly and/or as scheduled Technical
& Managerial meetings to achieve smooth
coordination with all disciplines involve in obtaining
positive progress or accomplishments.
Conduct project site visits & make recommendations
on project operations with regards to Architectural and
Procurement aspects.
Project : MOVENPICK HOTEL-Al-Khobar
Owner/PMT: Movenpick
Position Held :Procurement In-charge
My Scope of works:
• Prepares List of Materials, List of Long Lead
Items and Weekly Procurement Status Report.
• Supervise and manage subordinates in the
preparation of RFQ, comparisons, submittal
documents, MTA, RTA, MR, NMR, MRP,
IAP,PQI and other related documents as
required in the contract.
• Negotiate and encourage prospect suppliers
to provide their best and final price, delivery
and terms of payment in favor for the company
and project.
• Prepares LOI, PO and Subcontracting
Agreements to selected suppliers/vendors
incorporating all the conditions and required
documentations like: warranty, NMR, SPDP
and etc. as needed.
• Ensures the availability of required
procurement reports; including development of
all existing systems, procedures and guidelines
for the continued improvement of Procurement
activities.
• Attend weekly, monthly and/or as scheduled
Technical & Managerial meetings to achieve
smooth coordination with all disciplines involve
in obtaining positive progress or
accomplishments.
• Conduct project site visits & make
recommendations on project operations with
regards to Architectural and Procurement
aspects.
Project : MOVENPICK HOTEL-Al-Khobar
Owner/PMT: Movenpick
Position Held :Procurement In-charge
My Scope of works:
Prepares RFQ - requests for quotations for all
required (Architectural/ Finishing) materials
including Qualified Subcontractor for this
project and coordinate with other discipline
concerning procurement.
Prepares material cost comparisons showing
actual cost against budget, and to filter the best
suppliers, which offer equipment/materials that
comply with the required specifications (or
approved equal) within the budget.
Coordinate the activities with ICC Procurement
Team, Project Consultants, Engineers, Quantity
Surveyors, Planners, suppliers and sub-
contractors to get and provide technical
information and back-up for all disciplines
involved within the project organization.
Project : WIPS – Aindar, KSA.
Owner/PMT : Saudi Aramco
Position Held :SR. Procurement ENGR.
My Scope of works:
Review and study the approved drawings
and contracts regarding the required
materials, equipment and scope of works,.
Prepares RFQ - requests for quotations for
all required (Architectural/ Finishing)
materials for this project and coordinate
with other discipline concerning RFQ &
procurement.
Prepares material cost comparisons
showing actual cost against budget, and
filter the best suppliers, which offer
equipment/materials that comply with the
required specifications or approved equal.
Coordinate the activities with ICC
Procurement Team, Project Consultants,
Engineers, Quantity Surveyors, Planners,
suppliers and sub-contractors to get and
provide technical information and back-up
for all disciplines involved within the
project organization.
• Conduct project site visits & make
recommendations on project operations
with regards to Architectural and
Procurement aspects.
Project : WIPS – Khursaniyah, KSA.
Owner/PMT : Saudi Aramco
Position Held :SR. Procurement ENGR.
My Scope of works:
Review and study the approved drawings
and contracts regarding the required
materials, equipment and scope of works,.
Prepares RFQ - requests for quotations for
all required materials for this project and
coordinate with other discipline concerning
RFQ & procurement.
Prepares material cost comparisons
showing actual cost against budget, and
filter the best suppliers, which offer
equipment/materials that comply with the
required specifications or approved equal.
Coordinate the activities with ICC
Procurement Team, Project Consultants,
Engineers, Quantity Surveyors, Planners,
suppliers and sub-contractors to get and
provide technical information and back-up
for all disciplines involved within the
project organization.
• Conduct project site visits & make
recommendations on project operations
with regards to Architectural and
Procurement aspects.
Project : COMMISSARY BLDG.
Owner/PMT : Saudi Aramco
Position Held :SR. Procurement ENGR.
My Scope of works:
Review and study the approved drawings and
contracts regarding the required materials,
equipment and scope of works,.
Prepares RFQ - requests for quotations for all
required materials for this project and
coordinate with other discipline concerning
RFQ & procurement.
Prepares material cost comparisons showing
actual cost against budget, and filter the best
suppliers, which offer equipment/materials that
comply with the required specifications or
approved equal.
Coordinate the activities with ICC Procurement
Team, Project Consultants, Engineers, Quantity
Surveyors, Planners, suppliers and sub-
contractors to get and provide technical
information and back-up for all disciplines
involved within the project organization.
• Ensures the availability of required
procurement reports; including development of
all existing systems, procedures and guidelines
for the continued improvement of Procurement
activities.
• Attend weekly, monthly and/or as scheduled
Technical & Managerial meetings to achieve
smooth coordination with all disciplines involve
in obtaining positive progress or
accomplishments.
• Conduct project site visits & make
recommendations on project operations with
regards to Architectural and Procurement
aspects.
Project : ANSARI HOUSING Proj.
Owner/PMT : Al-Ansari
Position Held :SR. Procurement ENGR.
My Scope of works:
Review and study the approved drawings
and contracts regarding the required
materials, equipment and scope of works,.
Prepares RFQ - requests for quotations for
all required (Architectural/ Finishing)
materials for this project and coordinate
with other discipline concerning RFQ &
procurement.
Prepares material cost comparisons
showing actual cost against budget, and
filter the best suppliers, which offer
equipment/materials that comply with the
required specifications or approved equal.
Coordinate the activities with ICC
Procurement Team, Project Consultants,
Engineers, Quantity Surveyors, Planners,
suppliers and sub-contractors to get and
provide technical information and back-up
for all disciplines involved within the
project organization.
Project (bot.) : BIN KHALDOO PLAZA PH-1
Position Held : Procurement ENGR.
My Scope of works:
Review and study the approved drawings
and contracts regarding the required
materials, equipment and scope of works,.
Prepares RFQ - requests for quotations for
all required (Architectural/ Finishing)
materials for this project and coordinate
with other discipline concerning RFQ &
procurement.
Prepares material cost comparisons
showing actual cost against budget, and
filter the best suppliers, which offer
equipment/materials that comply with the
required specifications or approved equal.
Coordinate the activities with ICC
Procurement Team, Project Consultants,
Engineers, Quantity Surveyors, Planners,
suppliers and sub-contractors to get and
provide technical information and back-up
for all disciplines involved within the
project organization.
Project (Top) : QASSIM CEMENT FACTORY
Position Held : Procurement ENGR.
Project (bot.) : AMERICAN CONSULATE
Position Held : Procurement ENGR.
My Scope of works:
Review and study the approved drawings
and contracts regarding the required
materials, equipment and scope of works,.
Prepares RFQ - requests for quotations for
all required materials for this project and
coordinate with other discipline concerning
RFQ & procurement.
Prepares material cost comparisons
showing actual cost against budget, and
filter the best suppliers, which offer
equipment/materials that comply with the
required specifications or approved equal.
Coordinate the activities with ICC
Procurement Team, Project Consultants,
Engineers, Quantity Surveyors, Planners,
suppliers and sub-contractors to get and
provide technical information and back-up
for all disciplines involved within the
project organization.
Project : BERRI GAS PLANT (Admin. Bldg.)
Position Held : Procurement ENGR.
My Scope of works:
Review and study the approved drawings and
contracts regarding the required materials,
equipment and scope of works,.
Prepares RFQ - requests for quotations for all
required materials for this project and
coordinate with other discipline concerning
RFQ & procurement.
Prepares material cost comparisons showing
actual cost against budget, and filter the best
suppliers, which offer equipment/materials that
comply with the required specifications or
approved equal.
Coordinate the activities with ICC Procurement
Team, Project Consultants, Engineers, Quantity
Surveyors, Planners, suppliers and sub-
contractors to get and provide technical
information and back-up for all disciplines
involved within the project organization.
• Ensures the availability of required
procurement reports; including development of
all existing systems, procedures and guidelines
for the continued improvement of Procurement
activities.
• Attend weekly, monthly and/or as scheduled
Technical & Managerial meetings to achieve
smooth coordination with all disciplines involve
in obtaining positive progress or
accomplishments.
• Conduct project site visits & make
recommendations on project operations with
regards to Architectural and Procurement
aspects.
Project : THREE STOREY RESIDENCE Location : Legazpi City , Philippines
Company: DESIGN . Architects. Consultants Position Held : Draftsman / Estimator
Project : INTERIOR DESIGN of a Conference Rm.
& Dining Rm.
Location : Legazpi City , Philippines
Company: DESIGN . Architects. Consultants
Position Held : Draftsman / Estimator
Prepares preliminary and schematic design studies
based from the existing plan or layout as per Client’s
concept or requirements.
Conduct actual site measurements to come-up with
accurate layout and material take-off/applications.
Canvasses actual samples and swatches of required
materials or equipments from vendors and/or
suppliers for interior applications.
Creates final interior design based from the approved
preliminary design; showing floor pattern layouts,
wall module designs and reflected ceiling layout.
Do manual drafting in preparation of working
drawings on final interior layouts and 3D drawings
(manual/airbrush rendering) or perspectives
drawings for high level of interior design presentation
purposes.
Prepares on the spot sketch/details or shop drawings
prior to construction as required
on site during construction stage.
This sample of work
was prepared last
Sept. 2001 prior to
my application to
INMA Woodworks
Factory in Saudi
Arabia. Showing
Interior Design of a
kitchen using
wooden cabinets,
cornices/moldings,
Marble counter tops,
Floors & walls, glass
windows on steel
frames, etc. as
presentation
drawing.
This sample of work
was prepared last
Sept. 2001 prior to
my application to
INMA Woodworks
Factory in Saudi
Arabia. Showing
Interior Design of a
renovated kitchen
using wooden
cabinets, cornices/
moldings, Granite
counter tops,
ceramic tiles walls,
glass windows on
wooden frames, etc.
as presentation
drawing for Clients’
approval.
This sample of work was
prepared last Sept. 2001
prior to my application to
INMA Woodworks Factory
in Saudi Arabia. Showing
rendering for wood, face
mirrors, glass door, etc.
as presentation drawing.

More Related Content

What's hot

CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015Ismail Shaikh
 
Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina
 
Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3Sunil Mall
 
GCGUICO_RESUME
GCGUICO_RESUMEGCGUICO_RESUME
GCGUICO_RESUME04231983
 
CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016Dayananda Hebbar
 
Saad Ali Al Khathami CV 2016
Saad Ali Al Khathami CV 2016Saad Ali Al Khathami CV 2016
Saad Ali Al Khathami CV 2016Saad Alkhathami
 
Astonish Expediting managed by professionals
Astonish Expediting managed by professionalsAstonish Expediting managed by professionals
Astonish Expediting managed by professionalsNitin Thakurta
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad
 
Bilal updated cv
Bilal updated cvBilal updated cv
Bilal updated cvBilal Nisar
 
Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain
 
Nabeeltd_CV_QCs
Nabeeltd_CV_QCsNabeeltd_CV_QCs
Nabeeltd_CV_QCsNABEEL T D
 
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMEngr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMMuhammad Awais
 

What's hot (20)

AVAITION SANG QASP
AVAITION SANG QASPAVAITION SANG QASP
AVAITION SANG QASP
 
PRANAB _Resume
PRANAB _ResumePRANAB _Resume
PRANAB _Resume
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
Sanjeev cv
Sanjeev   cvSanjeev   cv
Sanjeev cv
 
Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)
 
Sanjeev - cv
Sanjeev - cvSanjeev - cv
Sanjeev - cv
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3
 
Sanjeev - cv
Sanjeev - cvSanjeev - cv
Sanjeev - cv
 
GCGUICO_RESUME
GCGUICO_RESUMEGCGUICO_RESUME
GCGUICO_RESUME
 
Sanjeev - cv
Sanjeev - cvSanjeev - cv
Sanjeev - cv
 
CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016
 
Saad Ali Al Khathami CV 2016
Saad Ali Al Khathami CV 2016Saad Ali Al Khathami CV 2016
Saad Ali Al Khathami CV 2016
 
Astonish Expediting managed by professionals
Astonish Expediting managed by professionalsAstonish Expediting managed by professionals
Astonish Expediting managed by professionals
 
RESUME QA QC ENGG
RESUME  QA  QC ENGGRESUME  QA  QC ENGG
RESUME QA QC ENGG
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
 
Bilal updated cv
Bilal updated cvBilal updated cv
Bilal updated cv
 
Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3
 
Nabeeltd_CV_QCs
Nabeeltd_CV_QCsNabeeltd_CV_QCs
Nabeeltd_CV_QCs
 
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMEngr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
 

Similar to ARLIE LLUNAR-Projects Presentations

Similar to ARLIE LLUNAR-Projects Presentations (20)

Resume.Shahbaz
Resume.ShahbazResume.Shahbaz
Resume.Shahbaz
 
Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015
 
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERRESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
 
Anand resume scm
Anand resume scmAnand resume scm
Anand resume scm
 
OLANREWAJU'S CV
OLANREWAJU'S CVOLANREWAJU'S CV
OLANREWAJU'S CV
 
masood cv(1)
masood cv(1)masood cv(1)
masood cv(1)
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
 
Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016
 
P&Cc Module3 Cc1
P&Cc Module3 Cc1P&Cc Module3 Cc1
P&Cc Module3 Cc1
 
Mohammed Ramzy - CV1
Mohammed Ramzy - CV1Mohammed Ramzy - CV1
Mohammed Ramzy - CV1
 
LastNew CV
LastNew CVLastNew CV
LastNew CV
 
Luvuyo Sankqela CV rev 2
Luvuyo Sankqela CV rev 2Luvuyo Sankqela CV rev 2
Luvuyo Sankqela CV rev 2
 
Raguram palnichamy jun 2019
Raguram palnichamy jun 2019Raguram palnichamy jun 2019
Raguram palnichamy jun 2019
 
Manohar Resume
Manohar ResumeManohar Resume
Manohar Resume
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
Amol-KulkarniResume
Amol-KulkarniResumeAmol-KulkarniResume
Amol-KulkarniResume
 
Resume_08_07_2015
Resume_08_07_2015Resume_08_07_2015
Resume_08_07_2015
 
CJM Construction Consulting Presentation
CJM Construction Consulting PresentationCJM Construction Consulting Presentation
CJM Construction Consulting Presentation
 
CV_Engr._Asad_Rasheed_(Electronics) without MS
CV_Engr._Asad_Rasheed_(Electronics) without MSCV_Engr._Asad_Rasheed_(Electronics) without MS
CV_Engr._Asad_Rasheed_(Electronics) without MS
 
Resume
ResumeResume
Resume
 

More from Arlie Llunar

02_Public KIOSK & GAZEBO (Personal Proj.)
02_Public KIOSK & GAZEBO (Personal Proj.)02_Public KIOSK & GAZEBO (Personal Proj.)
02_Public KIOSK & GAZEBO (Personal Proj.)Arlie Llunar
 
04_TWO STOREY RESIDENCE (Personal Proj.)
04_TWO STOREY RESIDENCE (Personal Proj.)04_TWO STOREY RESIDENCE (Personal Proj.)
04_TWO STOREY RESIDENCE (Personal Proj.)Arlie Llunar
 
03_THREE BEDROOM RESIDENCE (Personal Proj.)
03_THREE BEDROOM RESIDENCE (Personal Proj.)03_THREE BEDROOM RESIDENCE (Personal Proj.)
03_THREE BEDROOM RESIDENCE (Personal Proj.)Arlie Llunar
 
College-Diploma(B.S.Architecture).PDF
College-Diploma(B.S.Architecture).PDFCollege-Diploma(B.S.Architecture).PDF
College-Diploma(B.S.Architecture).PDFArlie Llunar
 
Social & Civic_Affiliation_NAMPAP.PDF
Social & Civic_Affiliation_NAMPAP.PDFSocial & Civic_Affiliation_NAMPAP.PDF
Social & Civic_Affiliation_NAMPAP.PDFArlie Llunar
 
Social & Civic_Affiliation_UAP
Social & Civic_Affiliation_UAPSocial & Civic_Affiliation_UAP
Social & Civic_Affiliation_UAPArlie Llunar
 
Cert_Professional_MASTER PLUMBER (DFA Certified).PDF
Cert_Professional_MASTER PLUMBER (DFA Certified).PDFCert_Professional_MASTER PLUMBER (DFA Certified).PDF
Cert_Professional_MASTER PLUMBER (DFA Certified).PDFArlie Llunar
 
Employment Cert.5-ACM CONSTRUCTION Phil..PDF
Employment Cert.5-ACM CONSTRUCTION Phil..PDFEmployment Cert.5-ACM CONSTRUCTION Phil..PDF
Employment Cert.5-ACM CONSTRUCTION Phil..PDFArlie Llunar
 
Employment Cert.3-ULTRA SYSTEMS Phil..PDF
Employment Cert.3-ULTRA SYSTEMS Phil..PDFEmployment Cert.3-ULTRA SYSTEMS Phil..PDF
Employment Cert.3-ULTRA SYSTEMS Phil..PDFArlie Llunar
 
Training_Cert_BAAN System KSA.PDF
Training_Cert_BAAN System KSA.PDFTraining_Cert_BAAN System KSA.PDF
Training_Cert_BAAN System KSA.PDFArlie Llunar
 
Employment Cert.2-INMA WOODWORKS KSA.PDF
Employment Cert.2-INMA WOODWORKS KSA.PDFEmployment Cert.2-INMA WOODWORKS KSA.PDF
Employment Cert.2-INMA WOODWORKS KSA.PDFArlie Llunar
 
Employment Cert._Appreciation-Proc.ENGR.
Employment Cert._Appreciation-Proc.ENGR.Employment Cert._Appreciation-Proc.ENGR.
Employment Cert._Appreciation-Proc.ENGR.Arlie Llunar
 
Employment Cert.6-DESIGN Phil..PDF
Employment Cert.6-DESIGN Phil..PDFEmployment Cert.6-DESIGN Phil..PDF
Employment Cert.6-DESIGN Phil..PDFArlie Llunar
 

More from Arlie Llunar (13)

02_Public KIOSK & GAZEBO (Personal Proj.)
02_Public KIOSK & GAZEBO (Personal Proj.)02_Public KIOSK & GAZEBO (Personal Proj.)
02_Public KIOSK & GAZEBO (Personal Proj.)
 
04_TWO STOREY RESIDENCE (Personal Proj.)
04_TWO STOREY RESIDENCE (Personal Proj.)04_TWO STOREY RESIDENCE (Personal Proj.)
04_TWO STOREY RESIDENCE (Personal Proj.)
 
03_THREE BEDROOM RESIDENCE (Personal Proj.)
03_THREE BEDROOM RESIDENCE (Personal Proj.)03_THREE BEDROOM RESIDENCE (Personal Proj.)
03_THREE BEDROOM RESIDENCE (Personal Proj.)
 
College-Diploma(B.S.Architecture).PDF
College-Diploma(B.S.Architecture).PDFCollege-Diploma(B.S.Architecture).PDF
College-Diploma(B.S.Architecture).PDF
 
Social & Civic_Affiliation_NAMPAP.PDF
Social & Civic_Affiliation_NAMPAP.PDFSocial & Civic_Affiliation_NAMPAP.PDF
Social & Civic_Affiliation_NAMPAP.PDF
 
Social & Civic_Affiliation_UAP
Social & Civic_Affiliation_UAPSocial & Civic_Affiliation_UAP
Social & Civic_Affiliation_UAP
 
Cert_Professional_MASTER PLUMBER (DFA Certified).PDF
Cert_Professional_MASTER PLUMBER (DFA Certified).PDFCert_Professional_MASTER PLUMBER (DFA Certified).PDF
Cert_Professional_MASTER PLUMBER (DFA Certified).PDF
 
Employment Cert.5-ACM CONSTRUCTION Phil..PDF
Employment Cert.5-ACM CONSTRUCTION Phil..PDFEmployment Cert.5-ACM CONSTRUCTION Phil..PDF
Employment Cert.5-ACM CONSTRUCTION Phil..PDF
 
Employment Cert.3-ULTRA SYSTEMS Phil..PDF
Employment Cert.3-ULTRA SYSTEMS Phil..PDFEmployment Cert.3-ULTRA SYSTEMS Phil..PDF
Employment Cert.3-ULTRA SYSTEMS Phil..PDF
 
Training_Cert_BAAN System KSA.PDF
Training_Cert_BAAN System KSA.PDFTraining_Cert_BAAN System KSA.PDF
Training_Cert_BAAN System KSA.PDF
 
Employment Cert.2-INMA WOODWORKS KSA.PDF
Employment Cert.2-INMA WOODWORKS KSA.PDFEmployment Cert.2-INMA WOODWORKS KSA.PDF
Employment Cert.2-INMA WOODWORKS KSA.PDF
 
Employment Cert._Appreciation-Proc.ENGR.
Employment Cert._Appreciation-Proc.ENGR.Employment Cert._Appreciation-Proc.ENGR.
Employment Cert._Appreciation-Proc.ENGR.
 
Employment Cert.6-DESIGN Phil..PDF
Employment Cert.6-DESIGN Phil..PDFEmployment Cert.6-DESIGN Phil..PDF
Employment Cert.6-DESIGN Phil..PDF
 

ARLIE LLUNAR-Projects Presentations

  • 1. Position Held :Procurement QC Manager Brief Description of Responsibilities as Procurement QC Manager: Minimize non-conformance ratio for procured materials/equipment. In overall, DSI’s Procurement Department is committed to an objective of reaching a Performance Quality Index of greater than 90 (>90). Achieving a 100% link to all TPI-Third Party Inspectors (In or Out Kingdom) & SAIR-Saudi Aramco Inspection Rep. related to all inspectable items. Review and assists in the preparation of material technical approval (MTA) and Material Requisition (MR) package for all material as per contract scope. Review, assists and submit the Inspection Assignment package (IAP) for materials with Inspection level 1, 2, 3 & 4, as per Schedule ‘Q’. Receiving Inspection Reports (IR), Inspection Release Cert (IRC), record keeping and processing of all reports received from Third Party Inspectors (TPI). Rejects and Issues Non Conformance Reports (NCR) for all materials or work that does not comply with contract documents; also monitor the careful segregation of quarantined materials and rectification of defects until clearance of materials from quarantine. Assuring the traceability of uniquely identified critical materials while materials are in storage. Monitoring and recording of condition and state of preservation of materials released from storage for processing and/or construction. Arrange material inspection at vendor/supplier premises as required in coordination with SA Vendor Inspection (VID) Representative and approved third party vendor inspector/s. Ensure the verification of the compliance of the purchased equipment and materials with the order requirements. Ensure the inspections and tests are carried out in accordance with the approved ARAMCO Forms 175, or Special and the established Inspection and test plans (ITP).
  • 2. continuation…Brief Description of Responsibilities as Procurement QC Manager: Ensure the organization of the pre-inspection meeting (PIM) with the Vendor. Ensure shop inspections are carried out during fabrication and Contractor’s inspectors attend the intermediate and final shop tests, recording the results in the provided forms. Ensure that non conformances in the inspection reports are pointed out, and that the product is marked and segregated ensuring the involvement of the competent. Ensure the verification that the vendor eliminates the non conformances by means of approved procedures and that the products are submitted to a further test prior to delivery on site. Ensure, when required, the timely communication of the scheduled inspection/test to the COMPANY and/or Independent (Third Party) Inspection Authority. Ensure that release notes/certificates are issued to assess the conformity of the products with the purchase order requirements. Verify with the applicability of S. Aramco Material System Specification (SAMSS) and incorporate the inspection requirement accordingly. Follow-up the Pre-Inspection Meeting (PIM) - action items and closes them. Control and ensure the inspection coverage for the Vendor sub orders through the PIM. Communicate with the assigned inspector to make sure the findings were addressed correctly in the inspection report. Prepares Procurement Plan, Sub-contracting Plan as per contract and based on the criteria required by Saudi Aramco; with considerations to Long Lead Items (LLI), Major Material requirements, 9com Numbers, Level of inspection, IAP-Inspection Assignment Package, NMR and target delivery dates. Advise Procurement Manager and Project Manager of possible and anticipated delays or deviations from required delivery schedules.
  • 3. Project : UPDC – Upstream Professional Development and Research Center. Owner/PMT: Saudi Aramco - Dhahran Position Held :Procurement In-charge Brief Description of Responsibilities: Study ongoing projects’ IFC Drawings, specifications, B.O.Q, budget, scope of works & the Schedules (Milestone) to fully familiarize in the nature of work to be undertaken from start until completion concerning Procurement/Purchasing activities. Prepares Procurement Plan based on the criteria required by the Client. Prepares List of Materials, List of Long Lead Items and Weekly Procurement Status Report. Supervise and manage subordinate in the preparations of RFQ, comparisons, submittal documents, MTA, RTA, MR, NMR, MRP, IAP,PQI and other related documents as required in the contract. Negotiate and encourage prospect suppliers to provide their best and final price, delivery and terms of payment in favor for the company and project. Prepares LOI, PO and Subcontracting Agreements to selected suppliers/vendors incorporating all the conditions and required documentations like: warranty, NMR, SPDP and etc. as needed. Ensures the availability of required procurement reports; including development of all existing systems, procedures and guidelines for the continued improvement of Procurement activities. Attend weekly, monthly and/or as scheduled Technical & Managerial meetings to achieve smooth coordination with all disciplines involve in obtaining positive progress or accomplishments. Conduct project site visits & make recommendations on project operations with regards to Architectural and Procurement aspects.
  • 4. Project : MOVENPICK HOTEL-Al-Khobar Owner/PMT: Movenpick Position Held :Procurement In-charge My Scope of works: • Prepares List of Materials, List of Long Lead Items and Weekly Procurement Status Report. • Supervise and manage subordinates in the preparation of RFQ, comparisons, submittal documents, MTA, RTA, MR, NMR, MRP, IAP,PQI and other related documents as required in the contract. • Negotiate and encourage prospect suppliers to provide their best and final price, delivery and terms of payment in favor for the company and project. • Prepares LOI, PO and Subcontracting Agreements to selected suppliers/vendors incorporating all the conditions and required documentations like: warranty, NMR, SPDP and etc. as needed. • Ensures the availability of required procurement reports; including development of all existing systems, procedures and guidelines for the continued improvement of Procurement activities. • Attend weekly, monthly and/or as scheduled Technical & Managerial meetings to achieve smooth coordination with all disciplines involve in obtaining positive progress or accomplishments. • Conduct project site visits & make recommendations on project operations with regards to Architectural and Procurement aspects.
  • 5. Project : MOVENPICK HOTEL-Al-Khobar Owner/PMT: Movenpick Position Held :Procurement In-charge My Scope of works: Prepares RFQ - requests for quotations for all required (Architectural/ Finishing) materials including Qualified Subcontractor for this project and coordinate with other discipline concerning procurement. Prepares material cost comparisons showing actual cost against budget, and to filter the best suppliers, which offer equipment/materials that comply with the required specifications (or approved equal) within the budget. Coordinate the activities with ICC Procurement Team, Project Consultants, Engineers, Quantity Surveyors, Planners, suppliers and sub- contractors to get and provide technical information and back-up for all disciplines involved within the project organization.
  • 6. Project : WIPS – Aindar, KSA. Owner/PMT : Saudi Aramco Position Held :SR. Procurement ENGR. My Scope of works: Review and study the approved drawings and contracts regarding the required materials, equipment and scope of works,. Prepares RFQ - requests for quotations for all required (Architectural/ Finishing) materials for this project and coordinate with other discipline concerning RFQ & procurement. Prepares material cost comparisons showing actual cost against budget, and filter the best suppliers, which offer equipment/materials that comply with the required specifications or approved equal. Coordinate the activities with ICC Procurement Team, Project Consultants, Engineers, Quantity Surveyors, Planners, suppliers and sub-contractors to get and provide technical information and back-up for all disciplines involved within the project organization. • Conduct project site visits & make recommendations on project operations with regards to Architectural and Procurement aspects.
  • 7. Project : WIPS – Khursaniyah, KSA. Owner/PMT : Saudi Aramco Position Held :SR. Procurement ENGR. My Scope of works: Review and study the approved drawings and contracts regarding the required materials, equipment and scope of works,. Prepares RFQ - requests for quotations for all required materials for this project and coordinate with other discipline concerning RFQ & procurement. Prepares material cost comparisons showing actual cost against budget, and filter the best suppliers, which offer equipment/materials that comply with the required specifications or approved equal. Coordinate the activities with ICC Procurement Team, Project Consultants, Engineers, Quantity Surveyors, Planners, suppliers and sub-contractors to get and provide technical information and back-up for all disciplines involved within the project organization. • Conduct project site visits & make recommendations on project operations with regards to Architectural and Procurement aspects.
  • 8. Project : COMMISSARY BLDG. Owner/PMT : Saudi Aramco Position Held :SR. Procurement ENGR. My Scope of works: Review and study the approved drawings and contracts regarding the required materials, equipment and scope of works,. Prepares RFQ - requests for quotations for all required materials for this project and coordinate with other discipline concerning RFQ & procurement. Prepares material cost comparisons showing actual cost against budget, and filter the best suppliers, which offer equipment/materials that comply with the required specifications or approved equal. Coordinate the activities with ICC Procurement Team, Project Consultants, Engineers, Quantity Surveyors, Planners, suppliers and sub- contractors to get and provide technical information and back-up for all disciplines involved within the project organization. • Ensures the availability of required procurement reports; including development of all existing systems, procedures and guidelines for the continued improvement of Procurement activities. • Attend weekly, monthly and/or as scheduled Technical & Managerial meetings to achieve smooth coordination with all disciplines involve in obtaining positive progress or accomplishments. • Conduct project site visits & make recommendations on project operations with regards to Architectural and Procurement aspects.
  • 9. Project : ANSARI HOUSING Proj. Owner/PMT : Al-Ansari Position Held :SR. Procurement ENGR. My Scope of works: Review and study the approved drawings and contracts regarding the required materials, equipment and scope of works,. Prepares RFQ - requests for quotations for all required (Architectural/ Finishing) materials for this project and coordinate with other discipline concerning RFQ & procurement. Prepares material cost comparisons showing actual cost against budget, and filter the best suppliers, which offer equipment/materials that comply with the required specifications or approved equal. Coordinate the activities with ICC Procurement Team, Project Consultants, Engineers, Quantity Surveyors, Planners, suppliers and sub-contractors to get and provide technical information and back-up for all disciplines involved within the project organization.
  • 10. Project (bot.) : BIN KHALDOO PLAZA PH-1 Position Held : Procurement ENGR. My Scope of works: Review and study the approved drawings and contracts regarding the required materials, equipment and scope of works,. Prepares RFQ - requests for quotations for all required (Architectural/ Finishing) materials for this project and coordinate with other discipline concerning RFQ & procurement. Prepares material cost comparisons showing actual cost against budget, and filter the best suppliers, which offer equipment/materials that comply with the required specifications or approved equal. Coordinate the activities with ICC Procurement Team, Project Consultants, Engineers, Quantity Surveyors, Planners, suppliers and sub-contractors to get and provide technical information and back-up for all disciplines involved within the project organization.
  • 11. Project (Top) : QASSIM CEMENT FACTORY Position Held : Procurement ENGR. Project (bot.) : AMERICAN CONSULATE Position Held : Procurement ENGR. My Scope of works: Review and study the approved drawings and contracts regarding the required materials, equipment and scope of works,. Prepares RFQ - requests for quotations for all required materials for this project and coordinate with other discipline concerning RFQ & procurement. Prepares material cost comparisons showing actual cost against budget, and filter the best suppliers, which offer equipment/materials that comply with the required specifications or approved equal. Coordinate the activities with ICC Procurement Team, Project Consultants, Engineers, Quantity Surveyors, Planners, suppliers and sub-contractors to get and provide technical information and back-up for all disciplines involved within the project organization.
  • 12. Project : BERRI GAS PLANT (Admin. Bldg.) Position Held : Procurement ENGR. My Scope of works: Review and study the approved drawings and contracts regarding the required materials, equipment and scope of works,. Prepares RFQ - requests for quotations for all required materials for this project and coordinate with other discipline concerning RFQ & procurement. Prepares material cost comparisons showing actual cost against budget, and filter the best suppliers, which offer equipment/materials that comply with the required specifications or approved equal. Coordinate the activities with ICC Procurement Team, Project Consultants, Engineers, Quantity Surveyors, Planners, suppliers and sub- contractors to get and provide technical information and back-up for all disciplines involved within the project organization. • Ensures the availability of required procurement reports; including development of all existing systems, procedures and guidelines for the continued improvement of Procurement activities. • Attend weekly, monthly and/or as scheduled Technical & Managerial meetings to achieve smooth coordination with all disciplines involve in obtaining positive progress or accomplishments. • Conduct project site visits & make recommendations on project operations with regards to Architectural and Procurement aspects.
  • 13. Project : THREE STOREY RESIDENCE Location : Legazpi City , Philippines Company: DESIGN . Architects. Consultants Position Held : Draftsman / Estimator
  • 14. Project : INTERIOR DESIGN of a Conference Rm. & Dining Rm. Location : Legazpi City , Philippines Company: DESIGN . Architects. Consultants Position Held : Draftsman / Estimator Prepares preliminary and schematic design studies based from the existing plan or layout as per Client’s concept or requirements. Conduct actual site measurements to come-up with accurate layout and material take-off/applications. Canvasses actual samples and swatches of required materials or equipments from vendors and/or suppliers for interior applications. Creates final interior design based from the approved preliminary design; showing floor pattern layouts, wall module designs and reflected ceiling layout. Do manual drafting in preparation of working drawings on final interior layouts and 3D drawings (manual/airbrush rendering) or perspectives drawings for high level of interior design presentation purposes. Prepares on the spot sketch/details or shop drawings prior to construction as required on site during construction stage.
  • 15. This sample of work was prepared last Sept. 2001 prior to my application to INMA Woodworks Factory in Saudi Arabia. Showing Interior Design of a kitchen using wooden cabinets, cornices/moldings, Marble counter tops, Floors & walls, glass windows on steel frames, etc. as presentation drawing.
  • 16. This sample of work was prepared last Sept. 2001 prior to my application to INMA Woodworks Factory in Saudi Arabia. Showing Interior Design of a renovated kitchen using wooden cabinets, cornices/ moldings, Granite counter tops, ceramic tiles walls, glass windows on wooden frames, etc. as presentation drawing for Clients’ approval.
  • 17.
  • 18. This sample of work was prepared last Sept. 2001 prior to my application to INMA Woodworks Factory in Saudi Arabia. Showing rendering for wood, face mirrors, glass door, etc. as presentation drawing.