LTE, UMTS Long Term Evolution

LTE measurements – from RF to
application testing
  Reiner Stuhlfauth
  Reiner.Stuhlfauth@rohde-schwarz.com

  Training Centre
  Rohde & Schwarz, Germany
Subject to change – Data without tolerance limits is not binding.
R&S® is a registered trademark of Rohde & Schwarz GmbH & Co. KG. Trade names are trademarks
of the owners.
 2011       ROHDE & SCHWARZ GmbH & Co. KG
             Test & Measurement Division
             - Training Center -
This folder may be taken outside ROHDE & SCHWARZ facilities.

ROHDE & SCHWARZ GmbH reserves the copy right to all of any part of these course notes.
Permission to produce, publish or copy sections or pages of these notes or to translate them must first
be obtained in writing from
ROHDE & SCHWARZ GmbH & Co. KG, Training Center, Mühldorfstr. 15, 81671 Munich, Germany
Mobile Communications: Fields for testing

l RF testing for mobile stations and user equipment
l RF testing for base stations
l Drive test solutions and verification of network
  planning
l Protocol testing, signaling behaviour
l Testing of data end to end applications
l Audio and video quality testing
l Spectrum and EMC testing



                 November 2012 | LTE measurements|   2
Test Architecture RF-/L3-/IP Application-Test




                November 2012 | LTE measurements|   3
LTE: EPS Bearer

              E-UTRAN                                   EPC                        Internet


     UE                  eNB                S-GW                  P-GW                  Peer
                                                                                        Entity


                                     End-to-end Service


                               EPS Bearer                             External Bearer


          Radio Bearer          S1 Bearer          S5/S8 Bearer




              Radio                S1                  S5/S8                Gi




                         November 2012 | LTE measurements|        4
Mobile Radio Testing
 Adjust the downlink          Generate downlink
signal to how uplink is                                                   Perform
                            signal and send control
       received                                                      RF measurements on
                                  commands
                                                                       received uplink




             Core network



          A mobile radio tester emulates a
                    base station

                             November 2012 | LTE measurements|   5
Mobile Radio Testing
  Generate downlink                                   Generate downlink
    signal and send                                        signal
 signaling information                                  No signaling              Control PC




         Signaling testing                                      Non-Signaling testing


                         November 2012 | LTE measurements|      6
LTE measurements
 general aspects




November 2012 | LTE measurements|   7
LTE RF Testing Aspects
UE requirements according to 3GPP TS 36.521
Power                                          Transmit signal quality
  Maximum    output power                             Frequency  error
  Maximum power reduction                             Modulation quality, EVM
  Additional Maximum Power                            Carrier Leakage
   Reduction                                           In-Band Emission for non allocated RB
  Minimum output power
                                                       EVM equalizer spectrum flatness
  Configured Output Power
                                                 Output RF spectrum emissions
  Power Control
                                                     Occupied  bandwidth
    Absolution Power Control
                                                     Out of band emissions
    Relative Power Control
    Aggregate Power Control                         Spectrum emisssion mask

  ON/OFF     Power time mask                        Additional Spectrum emission mask
                                                     Adjacent Channel Leakage Ratio
36.521: User Equipment (UE) radio
transmission and reception                       Transmit Intermodulation

                             November 2012 | LTE measurements|   8
LTE RF Testing Aspects
UE requirements according to 3GPP, cont.
     Receiver characteristics:
       Reference   sensitivity level
       Maximum input level
       Adjacent channel selectivity
       Blocking characteristics
            In-band Blocking
            Out of band Blocking
            Narrow Band Blocking
       Spurious response
       Intermodulation characteristics
       Spurious emissions


     Performance

                 November 2012 | LTE measurements|   9
LTE RF Testing Aspects
BS requirements according to 3GPP

   l Transmitter Characteristics
     l Base station output power
     l Frequency error
     l Output power dynamics
     l Transmit ON/OFF power
     l Output RF spectrum emissions (Occupied bandwidth, Out of band
       emission, BS Spectrum emission mask, ACLR, Spurious emission,
       Co-existence scenarios,…)
     l Transmit intermodulation
     l Modulation quality                    TR 36.804: Base Station (BS) radio
                                                            transmission and reception




                   November 2012 | LTE measurements|   10
LTE RF Testing Aspects
BS requirements according to 3GPP, cont.

   l Receiver Characteristics
       l Reference sensitivity level
       l Dynamic range
       l Adjacent Channel Selectivity (ACS)
       l Blocking characteristics
       l Intermodulation characteristics
       l Spurious emissions
   l   Performance




                    November 2012 | LTE measurements|   11
LTE RF Measurements – regional requirements

l   Regional / band-specific requirements exist (e.g. spurious emissions)
l   Since UEs roam implementation has to be dynamic

 Concept of network signaled RF requirements has been introduced with
    LTE.
    - Network signaled value: NS_01 … NS_32
    - transmitted as IE AdditionalSpectrumEmission in SIB2




                         November 2012 | LTE measurements|   12
LTE bands and channel bandwidth
                                                                              E-UTRA band / channel bandwidth

      E-UTRA Band
                                  1.4 MHz                      3 MHz                      5 MHz                      10 MHz         15 MHz    20 MHz
            1                                                                                 Yes                           Yes       Yes       Yes

            2                          Yes                        Yes                         Yes                          Yes       Yes[1]    Yes[1]

            3                          Yes                        Yes                         Yes                          Yes       Yes[1]    Yes[1]

            4                          Yes                        Yes                         Yes                          Yes        Yes       Yes

            5                          Yes                        Yes                         Yes                          Yes[1]

            6                                                                                 Yes                          Yes[1]

            7                                                                                 Yes                          Yes        Yes      Yes[1]

            8                          Yes                        Yes                         Yes                          Yes[1]

            9                                                                                 Yes                          Yes       Yes[1]    Yes[1]

            10                                                                                Yes                          Yes        Yes       Yes

            11                                                                                Yes                          Yes[1]

            12                         Yes                        Yes                        Yes[1]                        Yes[1]

            13

            14
                                                                                             Yes[1]

                                                                                             Yes[1]
                                                                                                                           Yes[1]

                                                                                                                           Yes[1]
                                                                                                                                     Not every channel
            ...

            17                                                                               Yes[1]                        Yes[1]
                                                                                                                                      bandwidth for
            ...                                                                                                                        every band!
            33                                                                                Yes                          Yes        Yes       Yes

            34                                                                                Yes                          Yes        Yes

            35                         Yes                        Yes                         Yes                          Yes        Yes       Yes

            36                         Yes                        Yes                         Yes                          Yes        Yes       Yes

            37                                                                                Yes                          Yes        Yes       Yes

            38                                                                                Yes                          Yes        Yes       Yes

            39                                                                                Yes                          Yes        Yes       Yes

            40                                                                                Yes                          Yes        Yes       Yes

  NOTE 1: bandwidth for which a relaxation of the specified UE receiver sensitivity requirement (Clause 7.3) is allowed.

                                                        November 2012 | LTE measurements|                                      13
Tests performed at “low, mid and highest frequency”
                Nominal frequency
 RF power


                described by EARFCN
                (E-UTRA Absolute                    lowest EARFCN possible
                Radio Frequency
                Channel Number)
                                                    and 1 RB at position 0


                                      Frequency = whole LTE band
 RF power




                                                    mid EARFCN
                                                    and 1 RB at position 0

                                      Frequency
 RF power




                                                    Highest EARFCN
                                                    and 1 RB at max position

                                      Frequency

               November 2012 | LTE measurements|   14
Test Environment – Test System Uncertainty
  36.101 / 36.508
  • Temperature/Humidity
     -normal conditions +15C to +35C, relative humidity 25 % to 75 %
     -extreme conditions -10C to +55C (IEC 68-2-1/68-2-2)

  • Voltage

  • Vibration

 Acceptable Test System Uncertainty (Test Tolerance, TT) defined for each test individually
 in 36.521 Annex F (will be ignored further on for the sake of simplicity)

           Test        Minimum Requirement in TS                Test     Test Requirement in TS 36.521-
                                36.101                       Tolerance                1
                                                                (TT)
    6.2.2. UE         Power class 1: [FFS]                   0.7 dB      Formula:
    Maximum Output    Power class 2: [FFS]                   0.7 dB      Upper limit + TT, Lower limit - TT
    Power             Power class 3: 23dBm ±2 dB             0.7 dB      Power class 1: [FFS]
                      Power class 4: [FFS]                   0.7 dB      Power class 2: [FFS]
                                                                         Power class 3: 23dBm ±2.7 dB
                                                                         Power class 4: [FFS]

                         November 2012 | LTE measurements|       15
LTE RF measurements
   on base stations




 November 2012 | LTE measurements|   16
OFDM risk: Degradation

                   Channel (ideal)


                   sl  n                                rl  n 

                      1
                     TMC




                                                           Samples
                                                 f
              f0    f1        f2   f3                                f0   f1   f2   f3
             November 2012 | LTE measurements|       17
OFDM risk: Degradation due to Frequency Offset

                     Channel
                                          e j 2fn

                     sl  n                                   rl  n 



                      f




                                                                Samples
                                                      f
                f0   f1         f2   f3                                   f0   f1   f2   f3

               November 2012 | LTE measurements|          18
OFDM risk: Degradation due to Clock Offset

                    Channel


                    sl  n                                   rl  n 



                     f  k




                                                                Samples
                                                      f
               f0   f1         f2   f3                                    f0   f1   f2   f3

              November 2012 | LTE measurements|           19
Subcarrier zero handling
Subcarrier 0 or DC subcarrier
causes problems in DAC for
direct receiver strategies, DC offset!


 Downlink:
                                                                                                                                                      f-1   f+1
                         1
                                                           j 2kf t  N CP ,l Ts 
                                                                                       N RB Nsc / 2
                                                                                          DL RB


sl( p ) t                              ak (p)) ,l  e
                                            (
                                                                                            ak( (p)) ,l  e j 2kf t  NCP ,lTs                       DC subcarrier,
                     
                 k   N RB N sc / 2
                         DL RB
                                                                                       k 1                                                                suppressed
                                                                                                                                         1/TSYMBOL=15kHz
Uplink:
                  N RB Nsc / 2 1
                     UL RB

                                                                      j 2 k 1 2 f t  N CP ,l Ts 
sl t                                           a k (  ) ,l  e
                         
                 k   N RB N sc / 2
                         UL RB
                                                                                                                                          f-1   f0    f1
                                                                                                                                                                     f
                                                                                        ½ subcarrier
                                                                                                                                                 DC subcarrier
                                                                                        offset
                                                                    November 2012 | LTE measurements|                             20
LTE: DC subcarrier usage




    DC subcarrier or subcarrier 0 is not used in downlink!

                November 2012 | LTE measurements|   21
DC offset – possible reasons
  DC offset originated by mixer:

                                fBB=fRx-fLO
fRX=fLO+fBB+fLO_ɛ   1st mixer
                                fLO –fLO_ɛ=DC                           fBB + DC

                                                         Non-linearities of
         fLO_ɛ              fLO                         Amplifier also cause
                                                          DC in the signal

                           PLL

 Idea: set PLL to frequency fLO to get frequency of baseband
 as fBB = fRX – fLO
 But: if synthesizer has leakage: fLO_ɛ will spread into the input:
 At the output we get direct current, DC!
                    November 2012 | LTE measurements|    22
Base station test models
                  Parameter                      1.4 MHz    3 MHz      5 MHz     10 MHz         15 MHz    20 MHz
      Reference, Synchronisation Signals
 RS boosting, PB = EB/EA                            1          1          1         1              1         1
 Synchronisation signal EPRE / ERS [dB]           0.000      0.000      0.000     0.000          0.000     0.000
 Reserved EPRE / ERS [dB]                          -inf       -inf       -inf      -inf           -inf      -inf
                        PBCH
 PBCH EPRE / ERS [dB]                             0.000      0.000      0.000     0.000          0.000     0.000
 Reserved EPRE / ERS [dB]                          -inf       -inf       -inf      -inf           -inf      -inf
                       PCFICH
 # of symbols used for control channels             2          1          1         1              1         1
 PCFICH EPRE / ERS [dB]                           3.222        0          0         0              0         0
                        PHICH
 # of PHICH groups                                  1          1          1         2              2         3
 # of PHICH per group                               2          2          2         2              2         2
 PHICH BPSK symbol power / ERS [dB]               -3.010     -3.010    -3.010     -3.010         -3.010    -3.010
 PHICH group EPRE / ERS [dB]                        0          0          0         0              0         0
                       PDCCH
 # of available REGs                                23        23         43        90             140       187
 # of PDCCH                                         2          2          2         5              7        10
 # of CCEs per PDCCH                                1          1          2         2              2         2         TS 36.141
 # of REGs per CCE                                  9          9          9         9              9         9
 # of REGs allocated to PDCCH                       18        18         36        90             126       180
                                                                                                                    Defines several
 # of <NIL> REGs added for padding                  5          5          7         0             14         7        Test models
 PDCCH REG EPRE / ERS [dB]                        0.792      2.290      1.880     1.065          1.488     1.195
 <NIL> REG EPRE / ERS [dB]                         -inf       -inf       -inf      -inf           -inf      -inf    For base station
                       PDSCH
 # of QPSK PDSCH PRBs which are boosted             6         15         25        50             75        100
                                                                                                                     e.g. E-TM1.1
 PRB PA = EA/ERS [dB]                               0          0          0         0              0         0
 # of QPSK PDSCH PRBs which are de-boosted          0          0          0         0              0         0

 PRB PA = EA/ERS [dB]                              n.a.       n.a.      n.a.       n.a.           n.a.      n.a.




                                             November 2012 | LTE measurements|             23
Base station unwanted emissions
                                                                Spurious emissions
                      ACLR
                                              •Adjacent channel leakage
                                              •Operating band unwanted emissions
                             Channel
  Spurious domain   ΔfOOB   bandwidth    ΔfOOB                   Spurious domain




                               RB




                                     E-UTRA Band



                      Worst case:
               Ressource Blocks allocated
                    at channel edge
                            November 2012 | LTE measurements|        24
Adjacent Channel Leakage Ratio - eNB
E-UTRA transmitted         BS adjacent channel              Assumed             Filter on the      ACLR
    signal channel                   centre                    adjacent              adjacent        lim
      bandwidth                frequency offset                channel               channel          it
    BWChannel [MHz]             below the first                 carrier          frequency and
                              or above the last             (informative)        corresponding
                                 carrier centre                                 filter bandwidth
                                   frequency
                                  transmitted
 1.4, 3.0, 5, 10, 15, 20         BWChannel              E-UTRA of same        Square (BWConfig)    45 dB
                                                               BW

                               2 x BWChannel            E-UTRA of same        Square (BWConfig)    45 dB
                                                               BW

                             BWChannel /2 + 2.5         3.84 Mcps UTRA        RRC (3.84 Mcps)      45 dB
                                     MHz
                             BWChannel /2 + 7.5         3.84 Mcps UTRA        RRC (3.84 Mcps)      45 dB
                                     MHz
NOTE 1: BWChannel and BWConfig are the channel bandwidth and transmission bandwidth configuration
   of the E-UTRA transmitted signal on the assigned channel frequency.      Large bandwidth
NOTE 2: The RRC filter shall be equivalent to the transmit pulse shape filter defined in TS 25.104 [6],
   with a chip rate as defined in this table.
          Limit is either -13 / -15dBm absolute or as above
                                November 2012 | LTE measurements|     25
Adjacent channel leakage power ratio




              November 2012 | LTE measurements|   26
ACLR measurement                                                * RBW   10 kHz
                                                                  VBW    30 kHz
        Ref    0 dBm                     Att        25 dB         SWT 250 ms

        0
                                                                                                        *
                                                                                                        A
        -10

1 AP
VIEW
        -20


2 AP
VIEW
        -30


3 AP
CLRWR
        -40




        -50                                                                                             EXT
                                                                                                              UTRAACLR1   UTRAACLR2
                                                                                                              = 33 dB     = 36 dB       UTRAACLR2bis
                                                                                                        3DB
                                                                                                                                        = 43 dB
        -60




        -70




        -80




        -90                                                                                                     Additional requirement for
                                                                                                                E-UTRA frequency band I,
        -100                                                                                                    signaled by network to the UE
        Center     1.947 GHz                                2.5 MHz/                    Span   25 MHz

               fUTRA, ACLR2          fUTRA, ACLR1                         fCarrier



                                                    November 2012 | LTE measurements|    27
Date: 21.AUG.2008         15:51:00
Operating band unwanted emissions
                                                                                          Narrow bandwidth
  Frequency offset         Frequency offset of                 Minimum requirement              Measurem
   of measurement        measurement filter centre                                                 ent
 filter -3dB point, f     frequency, f_offset                                                  bandwidth
                                                                                                 (Note 1)

   0 MHz  f < 5        0.05 MHz  f_offset < 5.05                                              100 kHz
                                                                    7  f _ offset        
       MHz                        MHz                        7dBm               0.05 dB
                                                                    5  MHz               
    5 MHz  f <           5.05 MHz  f_offset <                       -14 dBm                   100 kHz
    min(10 MHz,               min(10.05 MHz,
       fmax)                   f_offsetmax)

   10 MHz  f           10.05 MHz  f_offset <                   -16 dBm (Note 5)              100 kHz
       fmax                    f_offsetmax



     TS 36.104 defines several limits: depending on
 Channel bandwidth, additional regional limits and node B
      limits category A or B for ITU defined regions
           => Several test setups are possible!
                               November 2012 | LTE measurements|       28
Operating band unwanted emissions




             November 2012 | LTE measurements|   29
Unwanted emissions – spurious emission
 The transmitter spurious emission limits apply from 9 kHz to 12.75 GHz,
 excluding the frequency range from 10 MHz below the lowest frequency of the downlink
  operating band up to 10 MHz above the highest frequency of the downlink operating band


         Frequency range              Maximum level               Measurement                Note
                                                                     Bandwidth



          9kHz - 150kHz                                              1 kHz                  Note 1


          150kHz - 30MHz                                            10 kHz                  Note 1

                                         -13 dBm
          30MHz - 1GHz                                              100 kHz                 Note 1


         1GHz – 12.75 GHz                                           1 MHz                   Note 2


     NOTE 1:    Bandwidth as in ITU-R SM.329 [5] , s4.1
     NOTE 2:    Bandwidth as in ITU-R SM.329 [5] , s4.1. Upper frequency as in ITU-R SM.329 [5] , s2.5 table 1


      Spurious emission limits, Category A

                              November 2012 | LTE measurements|         30
Spurious emissions – operating band excluded




              November 2012 | LTE measurements|   31
Base station maximum power
In normal conditions, the base station maximum output power
 shall remain within +2 dB and -2 dB of the rated output power
declared by the manufacturer.
                                                                                     Towards
                               External                             External    antenna connector
                                 PA                                  device            
     BS                                                               e.g.
   cabinet                                                          TX filter
                                   (if any)                          (if any)



                     Test port A                                                     Test port B



   Normal port for                                              Port to be used for
   measurements                                                measurements in case
                                                               external equipment is
                                                                       used
                           November 2012 | LTE measurements|   32
LTE – DVB interference scenarios
                                                  Adjacent channel leakage of
                                                  Basestation x into DTT channel N
                                                  is point of interest




For a BS declared to support Band 20 and to operate in geographic areas within the CEPT in
which frequencies are allocated to broadcasting (DTT) service, the manufacturer shall additionally
declare the following quantities associated with the applicable test conditions of
Table 6.6.3.5.3-4 and information in annex G of [TS 36.104] :
     PEM,N           Declared emission level for channel N
     P10MHz          Maximum output Power in 10 MHz

                              November 2012 | LTE measurements|   33
Base station receiver test
Example: Rx test, moving condition




70% of required throughput of FRC, Fixed Reference Channel


                           November 2012 | LTE measurements|   34
Base station receiver test – HARQ multiplexing



       UE sends PUSCH with alternating data
       and data with multiplexed ACK




                   November 2012 | LTE measurements|   35
Base station test – power dynamics

                      Synchronisation
                      time/frequency

BS under
Test                           FFT
                               2048
                                                Per                 Symbol
                                        100     subcarrier          Detection /
           RF-       CP-                RBs,    Ampl.               decoding
           correc-   remov              1200    /Phase
           tion                         sub     correction
                                        carr




                                                              EVM
 Resource element Tx                    RETP
  power: Distinguish:
•OFDM symbol
•Reference symbol



                              November 2012 | LTE measurements|     36
Downlink Power
           Reference Signal:
              Cell-specific              PDCCH power
                                                                                 PDSCH power to RS, where NO reference
       referenceSignalPower               depending
                                                                                  signals are present, is UE specific and
            (-60…+50dBm),                  on ρB/ρA
                                                                                      signaled by higher layers as PA.
        signaled in SIB Type 2
                                                                                                                                 For PDSCH power in same
      [Power]                                                                                                                  symbol as reference signal an
                                                                                                                               additional cell specific offset
                                                                                                                                is applied, that is signaled by
       -50.00 dBm                                                                                                                    higher layers as PB.


  PA = -4.77 dB




                                                          2011 © Rohde&Schwarz
       -54.77 dBm

PB = 3 (-3.98 dB)

       -58.75 dBm




                    0      1     2   3   4     5      6            7                 8     9     10        11   12   13     [Time]
                                                   OFDM symbols

      RS EPRE = Reference Signal                     Reference signal power = linear average of all Ref.
      Energy per Resource Element                    Symbols over whole channel bandwidth

       EPRE PDSCH   A / B  EPRE RS              B  PB   A                                A  PA (with some exeptions for MIMO)


                                     November 2012 | LTE measurements|                                37
Base station test – output power dynamics
                                                                  Measure avg OFDM
                                                                   symbol power +
                                                                  Compare active and
                                                                   non-active case

                                                                        Ref. Symbol, always on

                                                                        OFDM Symbol not active!

                                                                        OFDM Symbol active!

                   PDSCH
# of 64QAM PDSCH PRBs within a slot for which
EVM is measured
                                                1        1         1          1         1         1                        Test model:
PRB PA = EA/ERS [dB]                            0        0         0          0         0         0                        E-TM3.1
# of PDSCH PRBs which are not allocated         5        14        24        49        74        99
                                                                                                                           All RB allocated

Test model:                                                              PDSCH
                                                    # of 64QAM PDSCH PRBs within a slot for which EVM   6        15   25      50     75       100
E-TM2                                               is measured
Only 1 RB allocated

                                                        November 2012 | LTE measurements|                   38
DL Modulation quality: Constellation diagram
LTE downlink: several channels can be seen (example):

PDSCH with
16 QAM
PDCCH +
PBCH with
QPSK
S-SCH with
BPSK
CAZAC
Sequences,
Reference signals

                    November 2012 | LTE measurements|   39
LTE RF measurements
on user equipment UEs




 November 2012 | LTE measurements|   40
LTE Transmitter Measurements
                                  1        Transmit power
                                  1.1          UE Maximum Output Power
                                  1.2          Maximum Power Reduction (MPR)
                                  1.3          Additional Maximum Power Reduction (A-MPR)
                                  1.4          Configured UE transmitted Output Power
                                  2        Output Power Dynamics
                                  2.1          Minimum Output Power
                                  2.2          Transmit OFF power
                                  2.3          ON/OFF time mask
                                  2.3.1             General ON/OFF time mask
                                  2.3.2             PRACH time mask
                                  2.3.3             SRS time mask
                                  2.4          Power Control
                                  2.4.1        Power Control Absolute power tolerance
                                  2.4.2        Power Control Relative power tolerance
                                  2.4.3        Aggregate power control tolerance
                                  3        Transmit signal quality
                                  3.1          Frequency Error
                                  3.2          Transmit modulation
                                  3.2.1             Error Vector Magnitude (EVM)
                                  3.2.2             Carrier leakage
                                  3.2.3             In-band emissions for non allocated RB
                                  3.2.4             EVM equalizer spectrum flatness
                                  4        Output RF spectrum emissions
                                  4.1          Occupied bandwidth
                                  4.2          Out of band emission
                                  4.2.1             Spectrum Emission Mask
                                  4.2.2             Additional Spectrum Emission Mask
                                  4.2.3             Adjacent Channel Leakage power Ratio
                                  4.3          Spurious emissions
                                  4.3.1             Transmitter Spurious emissions
                                  4.3.2             Spurious emission band UE co-existence
                                  4.3.3             Additional spurious emissions
                                  5        Transmit intermodulation



             November 2012 | LTE measurements|         41
UE Signal quality – symbolic structure of
mobile radio tester MRT
                      Test equipment
                      Rx
                                                            TxRx               EVM




                                                …
                                                …
                                                …
                                                            equalizer   IDFT   meas.
            DUT             RF
                         correction           FFT
                                                               Inband-




                                               …
                                               …
                                               …
                                                               emmissions



l   Carrier Frequency error
l   EVM (Error Vector Magnitude)
l   Origin offset + IQ offset
l   Unwanted emissions, falling into non allocated resource blocks.
l   Inband transmission
l   Spectrum flatness


                        November 2012 | LTE measurements|       42
UL Power Control: Overview
                                                       UL-Power Control is a
                                                       combination of:

                                                       l Open-loop:
                                                         UE estimates the DL-Path-
                                                         loss and compensates it
                                                         for the UL

                                                       l Closed-loop:
                                                         in addition, the eNB
                                                         controls directly the UL-
                                                         Power through power-
                                                         control commands
                                                         transmitted on the DL




              November 2012 | LTE measurements|   43
PUSCH power control
     l    Power level [dBm] of PUSCH is calculated every subframe i based on the following
          formula out of TS 36.213
 MPR

         Maximum allowed UE power
            in this particular cell,             Combination of cell- and UE-specific                    PUSCH transport
          but at maximum +23 dBm1)                 components configured by L3                               format




                                   Number of allocated                     Cell-specific         Downlink         Power control
                                   resource blocks (RB)                     parameter            path loss      adjustment derived
Transmit power for PUSCH                                                 configured by L3         estimate     from TPC command
in subframe i in dBm                                                                                         received in subframe (i-4)




         Bandwidth factor           Basic open-loop starting point Dynamic offset (closed loop)
                          1)   +23 dBm is maximum allowed power in LTE according to TS 36.101, corresponding to power class 3bis in WCDMA


                                     November 2012 | LTE measurements|            44
Pcmax definition                                                        „upper“ tolerance
     „lower“ tolerance
                                            „corrected“ UE power

PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H)

PCMAX_L = min{PEMAX_L, PUMAX }                           PCMAX_H = min{PEMAX_H, PPowerClass}


Max. power permitted                                           Max. power
       in cell,                                              permitted in cell
considering bandwidth
     confinement                                                                 Max. power for
                                                                                      UE
              Max. power for UE,
             considering maximum
               power reduction



                         November 2012 | LTE measurements|      45
Pcmax definition
      PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H),

     lPCMAX_L = min{PEMAX_L , PUMAX },

l     PEMAX_L is the maximum allowed power for this particular radio cell
      configured by higher layers and corresponds to P-MAX information
      element (IE) provided in SIB Type1
l
      l   PEMAX_L is reduced by 1.5 dB when the transmission BW is confined within
          FUL_low and FUL_low+4 MHz or FUL_high – 4 MHz and FUL_high,

                                                   PPowerClass +
                                                   2dB
                                                                                       23dBm
                                                PPowerClass - 2dB
    -1.5dB                                                                             -1.5dB



             FUL_low                                                FUL_high- 4MHz   FUL_high
                            November 2012 | LTE measurements|        46
Pcmax definition
    PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H),


PCMAX_L = min{PEMAX_L , PUMAX },


l   PUMAX corresponds to maximum power (depending on power class,
    taking into account Maximum Power Reduction MPR and additional
    A-MPR                     UE may decide to
                               reduce power



    UE power class                          Network may signal
    = 23dBm ±2 dB                           bandwidth restriction
                                                  NS_0x

                     November 2012 | LTE measurements|   47
UE Maximum Power Reduction
              UE transmits
              at maximum power, maximum allowed
              TX power reduction is given as


         Modulation      Channel bandwidth / Transmission bandwidth configuration   MPR (dB)
                                                     [RB]
                           1.4        3.0          5          10     15      20
                           MHz        MHz         MHz        MHz    MHz     MHz
           QPSK            >5          >4         >8         > 12   > 16    > 18      ≤1
          16 QAM           ≤5          ≤4         ≤8         ≤ 12   ≤ 16    ≤ 18      ≤1
         16 QAM Full       >5          >4         >8         > 12   > 16    > 18      ≤2


                  Higher order modulation schemes require
                  more dynamic -> UE will slightly repeal its
                      confinement for maximum power
              November 2012 | LTE measurements|         48
UE Additional Maximum Power Reduction A-MPR
Additional maximum                  Network       Requirements    E-UTRA Band           Channel          Resource        A-MPR (dB)
                                    Signaling      (sub-clause)                        Bandwidth          Blocks
power reduction                       value                                              (MHz)
requirements can be                   NS_01            NA                  NA              NA               NA              NA
signaled by the                                     6.6.2.2.3.1         2,4,35,36           3                >5             ≤1
network as NS value                                 6.6.2.2.3.1       2,4,10,35,36          5                >6             ≤1
in SIB2                               NS_03         6.6.2.2.3.1       2,4,10,35,36          10               >6             ≤1
(IE AdditionalSpectrumEmission)                     6.6.2.2.3.1       2,4,10,35,36          15               >8             ≤1
                                                    6.6.2.2.3.1       2,4,10,35,36          20              >10             ≤1
                                      NS_04         6.6.2.2.3.2           TBD              TBD              TBD             TBD
                                      NS_05         6.6.3.3.3.1             1           10,15,20       ≥ 50 for QPSK        ≤1

                                      NS_06         6.6.2.2.3.3       12, 13, 14, 17   1.4, 3, 5, 10        n/a             n/a

                                                    6.6.2.2.3.3                                                             Table
                                      NS_07                                13               10         Table 6.2.4.3-2
                                                    6.6.3.3.3.2                                                           6.2.4.3-2
                                                                                                            > 29            ≤1
                                      NS_08         6.6.3.3.3.3            19             10, 15            > 39            ≤2
                                                                                                            > 44            ≤3
                                     [NS_09]        6.6.3.3.3.4            21              TBD              TBD             TBD

                                        ..

                                      NS_32              -                  -                -                -               -




                                  November 2012 | LTE measurements|             49
PUSCH power control
Transmit output power ( PUMAX), cont’d.
                                              3GPP Band 13
                                       746     756                   777     787


                                            DL                         UL




   Network          Requiremen                        Channel
                                   E-UTRA                             Resources            A-MPR
     Signalling             ts                       bandwidth
                                       Band                            Blocks               (dB)
    Value           (sub-clause)                         (MHz)
        …                …            …                 …                   …               …
                                                                           Table           Table
                      6.6.2.2.3
       NS_07                          13                10                    6.2.4           6.2.4
                      6.6.3.3.2
                                                                               -2              -2
               Indicates the lowest RB
        …                 …            …                …                   …               …
                 index of transmitted
                                                                           Region A                          Region B        Region C
                   resource blocks

                                             RBStart                         0 – 12                   13 – 18      19 – 42   43 – 49
         Defines the length of a
        contiguous RB allocation           LCRB [RBs]        6–8             1 – 5 to 9 – 50            ≥8          ≥18         ≤2

                                           A-MPR [dB]            8                    12                12              6       3

   l        In case of EUTRA Band 13 depending on RB allocation as well as
            number of contiguously allocated RB different A-MPR needs to be
            considered.      November 2012 | LTE measurements| 50
Pcmax definition – tolerance values
   PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H)


                        PCMAx                            Tolerance
                       (dBm)                           T(PCMAX) (dB)
                 21 ≤ PCMAX ≤ 23                             2.0
Tolerance is     20 ≤ PCMAX < 21                             2.5
depending on
                 19 ≤ PCMAX < 20                             3.5
power levels
                 18 ≤ PCMAX < 19                             4.0
                 13 ≤ PCMAX < 18                             5.0
                  8 ≤ PCMAX < 13                             6.0
                 -40 ≤ PCMAX < 8                             7.0



                   November 2012 | LTE measurements|    51
Pcmax definition – tolerance values
     PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H)


    PCMAX_H = min{PEMAX_H , PPowerClass },

l    PEMAX_H is the maximum allowed power for this particular radio
     cell configured by higher layers and corresponds to P-MAX
     information element (IE) provided in SIB Type 1




      UE power class
      = 23dBm ±2 dB

                       November 2012 | LTE measurements|   52
Pcmax definition – tolerance values
 PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H)


PCMAX_H = min{PEMAX_H , PPowerClass },
 l    PPowerClass. There is just one power class specified for LTE,
      corresponding to power class 3bis in WCDMA with +23 dBm ± 2dB,
      MPR and A-MPR are not taken into account,

         Class 1    Tolerance        Class 2      Tolerance      Class 3         Tolerance (dB)   Class 4     Tolerance (dB)
EUTRA
              (dB         (dB)           (dBm)          (dB)         (dBm                             (dBm)
  band         m)                                                      )

 1                                                                   23               ±2
 2                                                                   23              ±22
 …                                                                   23              ±22
 40                                                                  23               ±2



                                 November 2012 | LTE measurements|          53
Pcmax value for power control - analogies
                                    PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H)

                          PCMAX_L = min{PEMAX_L, PUMAX }    PCMAX_H = min{PEMAX_H, PPowerClass}




Maximum speed = 280 km/h
 =PPowerClass



                                                         Under those conditions,
                                                       I shall drive more carefully!
                                                       Not going to the max seed!
=PEMAX_H              =PEMAX_L                  =PUMAX     -> speed reduction

                November 2012 | LTE measurements|    54
LTE RF Testing: UE Maximum Power




UE transmits
with 23dBm ±2 dB

QPSK modulation is used. All channel bandwidths are
tested separately. Max power is for all band classes
Test is performed for varios uplink allocations


                November 2012 | LTE measurements|   55
Resource Blocks number and maximum RF power
           1 active resource block
           (RB),
                                      Nominal
RF power



                                      band width                 One active resource block
                                      10 MHz
                                      = 50 RB’s
                                                                 (RB) provides maximum
                                                                 absolute RF power

                                         Frequency
                                                                 More RB’s in use will be at
RF power




                                                                 lower RF power in order to
                                                                 create same integrated
                                                                 power
                                         Frequency
RF power




                                                                 Additionally, MPR (Max.
                                                                 Power Reduction) and A-
                                           MPR                   MPR are defined

                                         Frequency

                             November 2012 | LTE measurements|    56
UE Maximum Output Power – Test Configuration
 Initial Conditions
 Test Environment as specified in TS 36.508 subclause 4.1            Normal, TL/VL, TL/VH, TH/VL, TH/VH             Temperature/Voltage
 Test Frequencies as specified in TS 36.508 subclause 4.3.1          Low range, Mid range, High range                   high/low

 Test Channel Bandwidths as specified in TS 36.508 subclause 4.3.1   Lowest, 5MHz, Highest
 Test Parameters for Channel Bandwidths
                                   Downlink Configuration                               Uplink Configuration
        Ch BW             N/A for Max UE output power testing              Mod’n                    RB allocation
                                                                                              FDD                   TDD
        1.4MHz                                                             QPSK                1                     1
        1.4MHz                                                             QPSK                5                     5
         3MHz                                                              QPSK                1                     1
         3MHz                                                              QPSK                4                     4
         5MHz                                                              QPSK                1                     1
         5MHz                                                              QPSK                8                     8
        10MHz                                                              QPSK                1                     1
        10MHz                                                              QPSK                12                    12
        15MHz                                                              QPSK                1                     1
        15MHz                                                              QPSK                16                    16
        20MHz                                                              QPSK                1                     1
        20MHz                                                              QPSK                18                    18


                                       November 2012 | LTE measurements|           57
UE maximum power
                                                      PPowerClass + 2dB

                                                                   23dBm
                                                           PPowerClass - 2dB




          maximum output                                        FUL_high
FUL_low   power for any
          transmission bandwidth
          within the channel bandwidth

             November 2012 | LTE measurements|   58
UE maximum power – careful at band edge!
                                              PPowerClass + 2dB

                                                                               23dBm
                                           PPowerClass - 2dB
-1.5dB                                                                         -1.5dB




     FUL_low                                                FUL_high- 4MHz   FUL_high
               FUL_low+4MHz
 For transmission bandwidths confined within FUL_low and FUL_low + 4 MHz or
 FUL_high – 4 MHz and FUL_high, the maximum output power requirement is relaxed
 by reducing the lower tolerance limit by 1.5 dB
                        November 2012 | LTE measurements|    59
UE maximum power - examples
   Example 1: No maximum power reduction by higher layers
                          PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H)

PCMAX_L = min{PEMAX_L, PUMAX }                                              PCMAX_H = min{PEMAX_H, PPowerClass}

 Max. power permitted in cell,       Max. power for UE,                  Max. power permitted in        Max. power for UE
   considering bandwidth         considering maximum power                        cell
        confinement                       reduction


          PEMAX_L = none PUMAX = power class 3 = +23 dBm       T(PCMAX_L) = T(PCMAX_H)=2dB
          PEMAX_H = none PPowerClass = power class 3 = +23 dBm
                                                                   PPowerClass + 2dB 25dBm


                                                                                                              23dBm


                                                                                   PPowerClass - 2dB          21dBm



                FUL_low                                                                            FUL_high

                                     November 2012 | LTE measurements|    60
UE maximum power - examples
  Example 2: max cell power = 0 dBm + band edge maximum power reduction

                      PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H)

PCMAX_L = min{PEMAX_L, PUMAX }                                       PCMAX_H = min{PEMAX_H, PPowerClass}

  PEMAX_L = 0dBm -1.5 dB relaxation = -1.5dBm                       PEMAX_H = 0 dBm
  PUMAX = power class 3 – band relaxation = +21.5 dBm               PPowerClass = power class 3 = +23 dBm

     PCMAX_L=-1.5dBm
                                                                         PCMAX_H=0 dBm
                           T(PCMAX_L) = T(PCMAX_H)=7dB
                                                                            PCMAX_H + 7dB       +7dBm


                                                                                                0 dBm


                                                                            PCMAX_L - 7dB       -8.5dBm



            FUL_low             FUL_low+4MHz                                         FUL_high

                                November 2012 | LTE measurements|   61
UE maximum power - examples
Example 3: Band 13 with NS_07 signalled ( = A-MPR). No Max Power restriction
16 QAM, 12 Resource blocks and RB start = 13. Bandwidth = 10 MHz
  MPR = 1dB, A-MPR = 12 dB, no band edge relaxation
                PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H)
                                                                    PCMAX_H = min{PEMAX_H, PPowerClass}
PCMAX_L = min{PEMAX_L, PUMAX }

PEMAX_L = none                                                   PEMAX_H = none
PUMAX = power class 3 – MPR – A.MPR = +10 dBm                    PPowerClass = power class 3 = +23 dBm

 PCMAX_L=10 dBm         T(PCMAX_L) = 6 dB                               PCMAX_H=23 dBm         +25dBm
                        T(PCMAX_H)=2dB
                                                                           PCMAX_H +2dB
                                                                                               23 dBm


                                                                           PCMAX_L - 6dB       4 dBm



             RB start = 13     12 Resource blocks                                   FUL_high

                             November 2012 | LTE measurements|     62
UE maximum power - examples
 Example 4: band edge power relaxation – no higher layer reduction signalled
 QPSK, 15 RBs allocated, Band 2, RB allocated at band edge
    MPR = 1dB, A-MPR = 1 dB, band edge relaxation of 1.5dB
              PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H)
PCMAX_L = min{PEMAX_L, PUMAX }                                       PCMAX_H = min{PEMAX_H, PPowerClass}

  PEMAX_L =none                                                      PEMAX_H = none
  PUMAX = power class 3 – MPR-A-MPR-band relaxation                  PPowerClass = power class 3 = +23 dBm
  = 23-1-1-1.5=+19.5 dBm
                                                                          PCMAX_H= 23 dBm
   PCMAX_L=19.5dBm                                                           PCMAX_H + 2dB       +25 dBm
                                 T(PCMAX_L) = 3.5 dB
                                 T(PCMAX_H)=2dB
                                                                                                 23 dBm
                                                                 PCMAX_L – 2 dB
                                 PCMAX_L – 3.5 dB
                                                                                                 +16 dBm



            FUL_low          FUL_low+4MHz                                             FUL_high

                             November 2012 | LTE measurements|       63
LTE RF Testing: UE Minimum Power




UE transmits
with -40dBm



All channel bandwidths are tested separately.
Minimum power is for all band classes < -39 dBm


                November 2012 | LTE measurements|   64
LTE RF Testing: UE Off Power

The transmit OFF power is defined as the mean power in a duration of at least one
sub-frame (1ms) excluding any transient periods. The transmit OFF power shall not
exceed the values specified in table below


                         Channel bandwidth / Minimum output power / measurement bandwidth



                           1.4            3.0              5            10      15        20
                           MHz            MHz             MHz          MHz     MHz       MHz



    Transmit OFF power                                      -50 dBm

       Measurement
                         1.08 MHz       2.7 MHz         4.5 MHz    9.0 MHz   13.5 MHz   18 MHz
        bandwidth



                             November 2012 | LTE measurements|    65
Power Control Related test items

l Absolute Power Control Tolerance -- PUSCH open loop
 power control

l Relative Power Control Tolerance – PUSCH relative power
 control, including both power ramping and power change due
 to Ressource block allocation change or TPC commands

l Aggregate Power Control – PUSCH and PUCCH power
 control ability when RB changes every subframe




                    November 2012 | LTE measurements|   66
Absolute Power Control Tolerance
l The purpose of this test is to verify the UE transmitter’s
 ability to set its initial output power to a specific value at the
 start of a contiguous transmission or non-contiguous
 transmission with a long transmission gap.




                      November 2012 | LTE measurements|   67
Power Control - Absolute Power Tolerance
l   …. ability to set initial output power to a specific value at the start of a
      contiguous transmission or non-contiguous transmission with a long
      transmission gap (>20ms).

l   Set p0-NominalPUSCH to -105 (test point 1) and -93 (test point 2)



l   Test requirement example for test point 1:

                                       Channel bandwidth / expected output power (dBm)
                                 1.4          3.0           5       10        15          20
                                 MHz          MHz          MHz     MHz       MHz         MHz
          Expected Measured
                               -14.8 ±      -10.8 ±       -8.6 ±   -5.6 ±   -3.9 ±       -2.6 ±
            power Normal
                                 10.0         10.0         10.0     10.0     10.0         10.0
              conditions
          Expected Measured
                               -14.8 ±      -10.8 ±       -8.6 ±   -5.6 ±   -3.9 ±       -2.6 ±
            power Extreme
                                 13.0         13.0         13.0     13.0     13.0         13.0
              conditions



                              November 2012 | LTE measurements|    68
Configured UE transmitted Output Power


                              IE P-Max (SIB1) = PEMAX

 To verify that UE follows rules sent via
 system information, SIB
   Test: set P-Max to -10, 10 and 15 dBm, measure PCMAX

                                  Channel bandwidth / maximum output power
                        1.4            3.0            5             10    15    20
                        MHz            MHz           MHz           MHz   MHz   MHz
   PCMAX test point 1                                 -10 dBm ± 7.7
   PCMAX test point 2                                 10 dBm ± 6.7
   PCMAX test point 3                                 15 dBm ± 5.7




                        November 2012 | LTE measurements|     69
LTE Power versus time
                                                                            RB allocation
                                                                            is main source for
                                                                            power change



                                                                           Not scheduled
                                                                           Resource block




PPUSCH (i)  min{PMAX ,10 log10 (M PUSCH (i))  PO_PUSCH ( j )    PL   TF (TF (i))  f (i)}
                           Bandwidth allocation           Given by higher layers TPC commands
                                                          or not used

                              November 2012 | LTE measurements|   70
Accumulative TPC commands

                                   TPC Command Field     Accumulated
                                    In DCI format 0/3      PUSCH [dB]
                                            0                 -1
                                            1                 0
                                            2                 1
                                            3                 3




                                                2
                                                                          minimum
                                                                         power in LTE



            November 2012 | LTE measurements|       71
Absolute TPC commands
PPUSCH (i)  min{ PMAX ,10 log 10 ( M PUSCH (i))  PO_PUSCH ( j )    PL   TF (TF (i))  f (i)}




                                                           TPC Command Field      Absolute  PUSCH [dB]
                                                            In DCI format 0/3      only DCI format 0
                                                                      0                    -4
                                                                      1                    -1
                                                                      2                    1
                                                                      3                    4

Pm
                                                -1
                                                                 -4




                                        November 2012 | LTE measurements|          72
Relative Power Control
                                                                  Power pattern B
         Power pattern A




                                                                                RB change


                   RB change




  0 ..     9       sub-frame#                                  0 ..   9   sub-frame#
     1               2        3       4       radio frame        1          2        3      4   radio frame



      Power pattern C

                                                             l The purpose of this test is to verify
                                    RB change                   the ability of the UE transmitter to set
                                                                its output power relatively to the
                                                                power in a target sub-frame, relatively
                                                                to the power of the most recently
                                                                transmitted reference sub-frame, if the
    0 ..
      1
               9     sub-frame#
                       2        3         4    radio frame      transmission gap between these sub-
                                                                frames is ≤ 20 ms.
                                                November 2012 | LTE measurements|        73
Power Control – Relative Power Tolerance
l   …. ability to set output power relative to the power in a target sub
       frame, relative to the power of the most recently transmitted
       reference sub-frame, if the transmission gap between these
       sub-frames is ≤ 20 ms.




                          November 2012 | LTE measurements|   74
Power Control – Relative Power Tolerance
l   Various power ramping patterns are defined




                                        ramping down




                                                                 alternating


         ramping up



                        November 2012 | LTE measurements|   75
UE power measurements – relative power change
                                                  All combinations of
                  All combinations of                  PUSCH/PUCCH
 Power step P
                         PUSCH and                         and SRS
   (Up or down)                                                           PRACH [dB]
                           PUCCH                          transitions
     [dB]
                       transitions [dB]                 between sub-
                                                         frames [dB]
    ΔP < 2           ±2.5 (Note 3)                           ±3.0             ±2.5
   2 ≤ ΔP < 3             ±3.0                               ±4.0             ±3.0
   3 ≤ ΔP < 4             ±3.5                               ±5.0             ±3.5
  4 ≤ ΔP ≤ 10             ±4.0                               ±6.0             ±4.0
  10 ≤ ΔP < 15            ±5.0                               ±8.0             ±5.0
    15 ≤ ΔP               ±6.0                               ±9.0             ±6.0
     P


                                                  Power tolerance relative given by table

                                                           time

                       November 2012 | LTE measurements|          76
UE power measurements – relative power change
       Power                                                Power



                       FDD test patterns                                      TDD test patterns
                                                                                                                       test for
                                                                                                                        each
                                                                                                                     bandwidth,
                                                                                                                    here 10MHz
           0 1                          9 sub-frame#            0    2 3                7    8   9 sub-frame#


Sub-test            Uplink RB allocation          TPC command          Expected power
                                                                                                  Power step size
                                                                             step size
                                                                                                     range (Up or        PUSCH/
                                                                              (Up or
                                                                                                        down)
                                                                              down)
                                                                              ΔP [dB]                 ΔP [dB]              [dB]
   A             Fixed = 25                     Alternating TPC =
                                                                                1                      ΔP < 2            1 ± (1.7)
                                                      +/-1dB
   B             Alternating 10 and 18          TPC=0dB                        2.55                  2 ≤ ΔP < 3        2.55 ± (3.7)
   C             Alternating 10 and 24          TPC=0dB                        3.80                  3 ≤ ΔP < 4        3.80 ± (42.)
   D             Alternating 2 and 8            TPC=0dB               6.02                       4 ≤ ΔP < 10           6.02 ± (4.7)
   E             Alternating 1 and 25           TPC=0dB               13.98                      10 ≤ ΔP < 15          13.98 ± (5.7)
   F             Alternating 1 and 50           TPC=0dB               16.99                      15 ≤ ΔP               16.99 ± (6.7)


                                          November 2012 | LTE measurements|             77
UE aggregate power tolerance
Aggregate power control tolerance is the ability of a UE to maintain its power in
non-contiguous transmission within 21 ms in response to 0 dB TPC commands
        TPC command            UL channel                   Aggregate power tolerance within 21 ms

             0 dB                PUCCH                                      ±2.5 dB

             0 dB                PUSCH                                      ±3.5 dB

      Note:
      1. The UE transmission gap is 4 ms. TPC command is transmitted via PDCCH 4 subframes preceding
         each PUCCH/PUSCH transmission.



                                                                                            Tolerated UE power
  P                                                                                         deviation

                                                                                              UE power with
                                                                                              TPC = 0


                                                                                      Time = 21 milliseconds

                                  November 2012 | LTE measurements|    78
Aggregate Power Control
l The purpose of this test is to verify the UE’s ability to
  maintain its power level during a non-contiguous
  transmission within 21 ms in response to 0 dB TPC
  commands with respect to the first UE transmission, when
  the power control parameters specified in TS 36.213 are
  constant.
l Both PUSCH mode and PUCCH mode need to be tested
       Power                                  Power



                 FDD test patterns                         TDD test patterns




         0     5      0     5        0                3      8     3      8         3
         sub-frame#                                   sub-frame#



                                 November 2012 | LTE measurements|             79
UE aggregate power tolerance

 Power                                       Power



           FDD test patterns                                  TDD test patterns




   0     5      0     5        0                     3      8           3    8    3
   sub-frame#                                        sub-frame#


  Test performed with scheduling gap of 4 subframes

                          November 2012 | LTE measurements|        80
UE power measurement – timing masks

                              Start Sub-frame                       End sub-frame




                             Start of ON power                       End of ON power


   End of OFF power                                                                              Start of OFF power
       requirement                                                                                requirement
                                       * The OFF power requirements does not
                                         apply for DTX and measurement gaps
                 20µs                                                                         20µs
                 Transient period                                                   Transient period




                                    Timing definition OFF – ON commands


                                    Timing definition ON – OFF commands

                                November 2012 | LTE measurements|         81
Power dynamics




       PUSCH = OFF PUSCH = ON PUSCH = OFF                    time
Please note: scheduling cadence for power dynamics
                    November 2012 | LTE measurements|   82
General ON/OFF time mask
   Measured subframe = 2
   UL/DL Scheduling should be configured properly.
                                                        TDD Issues:
                                                        - Special Subframe
                                                          Configuration
                                                        - >off power before is
                                                          highter than off
                                                          power after
                                                        - <> tune down DL
                                                          power




               November 2012 | LTE measurements|   83
PRACH time mask
                                                       PRACH




                                                      ON power requirement

            End of OFF power                                                               Start of OFF power
              requirement                                                                    requirement


                         20µs                                                           20µs

                         Transient period                                     Transient period




  PRACH                                                        Channel bandwidth / Output Power [dBm] / measurement
             Measurement                                                             bandwidth
 preamble
              period (ms)
  format                                                   1.4          3.0           5            10             15         20
    0             0.9031                                   MHz          MHz          MHz          MHz            MHz        MHz
                                      Transmit OFF
    1             1.4844                                                                -48.5 dBm
                                         power
    2             1.8031           Transmission OFF
    3             2.2844             Measurement        1.08 MHz      2.7 MHz      4.5 MHz       9.0 MHz    13.5 MHz       18 MHz
                                       bandwidth
    4             0.1479
                                    Expected PRACH
                                    Transmission ON      -1± 7.5      -1 ± 7.5     -1 ± 7.5      -1 ± 7.5       -1 ± 7.5   -1 ± 7.5
                                    Measured power


                                November 2012 | LTE measurements|            84
UE power measurement – PRACH timing mask
     PRACH preamble format                                        Measurement period (ms)
                 0                                                          0.9031
                 1                                                          1.4844
                 2                                                          1.8031
                 3                                                          2.2844
                 4                                                          0.1479




                                                     PRACH




                                                    ON power requirement

      End of OFF power                                                                  Start of OFF power
        requirement                                                                       requirement


                     20µs                                                            20µs

                     Transient period                                      Transient period




                            November 2012 | LTE measurements|      85
PRACH measurements




For PRACH
you have to
set a trigger                                            Reminder:
                                                         PRACH is
                                                         CAZAC
                                                         sequence

                November 2012 | LTE measurements|   86
PRACH measurement: constellation diagram



                                                      Reminder:
                                                      PRACH is
                                                      CAZAC
                                                      sequence




             November 2012 | LTE measurements|   87
PRACH measurement: power dynamics




            November 2012 | LTE measurements|   88
Sounding Reference Signal Time Mask




             November 2012 | LTE measurements|   89
UE power measurement – SRS timing mask
                                                                                 SRS


                                                                           SRS ON power
                                                                            requirement
   Single Sounding
  Reference Symbol
                                                 End of OFF                                          Start of OFF power
                                           power requirement                                          requirement

                                                             20µs                                 20µs

                                                             Transient period             Transient period




                                                          SRS                     SRS

 Double Sounding                                  SRS ON power                  SRS ON power
 Reference Symbol                                  requirement                   requirement


                            End of OFF                                                                   Start of OFF power
                      power requirement                                                                  requirement

                                        20µs                 20µs               20µs              20µs
                                     Transient period           *Transient period         Transient period

   * Transient period is only specifed in the case of frequency hopping or a power change between SRS symbols



                                   November 2012 | LTE measurements|             90
UE power measurement – Subframe / slot boundary

                                                   N+1 Sub-frame
     N0 Sub-frame                                                                                        N+2 Sub-frame
                                       Sloti                               Sloti+1

                              Start of N+1 power                      End of N+1 power
                                 requirement                            requirement




           20µs           20µs                     20µs            20µs               20µs           20µs

           Transient period                        Transient period                   Transient period


                          If intra-slot hopping is enabled

          Periods where power changes may occur

                                   November 2012 | LTE measurements|             91
Tx power aspects
RB power = Ressource Block Power, power of 1 RB
TX power = integrated power of all assigned RBs




                  November 2012 | LTE measurements|   92
Resource allocation versus time

                                                            PUCCH
                                                            allocation




                                                          No resource
                                                          scheduled
PUSCH allocation, different #RB and RB offset

                 November 2012 | LTE measurements|   93
TTI based scheduling




              November 2012 | LTE measurements|   94
LTE scheduling impact on power versus time




TTI based scheduling.
Different RB allocation
                            Impact
                            on UE
                            power


                  November 2012 | LTE measurements|   95
Transmit signal quality




               November 2012 | LTE measurements|   96
Transmit signal quality – carrier leakage




                                                Frequency error


                                           fc               Fc+ε                               f

    Carrier leakage (The IQ origin offset) is an additive sinusoid waveform
 that has the same frequency as the modulated waveform carrier frequency.
                       Parameters                                       Relative Limit (dBc)

                   Output power >0 dBm                                          -25

              -30 dBm ≤ Output power ≤0 dBm                                     -20

             -40 dBm  Output power < -30 dBm                                   -10

                        November 2012 | LTE measurements|          97
Frequency Error
…. ability of both the receiver and the transmitter to process frequencies
   correctly…

The 20 frequency error Δf results must fulfil this test requirement:
|Δf| ≤ (0.1 PPM + 15 Hz)
observed over a period of one time slot (0.5ms)




                                   November 2012 | LTE measurements|   98
Impact on Tx modulation accuracy evaluation
l   3 modulation accuracy requirements
    l EVM for the allocated RBs
    l LO leakage for the centred RBs                  ! LO spread on all RBs
    l I/Q imbalance in the image RBs
                                                                         LO leakage
                level
                                                RF carrier

              signal                                                            I/Q imbalance

              noise


                        RB0        RB1        RB2        RB3      RB4    RB5   frequency

        EVM



                              November 2012 | LTE measurements|     99
Inband emissions
3 types of inband emissions: general, DC and IQ image




    Used
allocation <
½ channel
 bandwidth




               channel bandwidth
                  November 2012 | LTE measurements|   100
Carrier Leakage
Carrier leakage (the I/Q origin offset) is a form of interference caused by crosstalk or DC offset.
It expresses itself as an un-modulated sine wave with the carrier frequency.
I/Q origin offset interferes with the center sub carriers of the UE under test.
The purpose of this test is to evaluate the UE transmitter to verify its modulation quality in
terms of carrier leakage.

                             DC carrier leakage
                             due to IQ offset




   LO                Parameters                Relative
 Leakage                                      Limit (dBc)

                 Output power >0 dBm             -25

            -30 dBm ≤ Output power ≤0 dBm        -20
           -40 dBm  Output power < -30 dBm      -10



                                         November 2012 | LTE measurements|   101
Inband emmission – error cases
                                                        DC carrier leakage
                                                        due to IQ offset




              November 2012 | LTE measurements|   102
Inband emmission – error cases
                                                        Inband image
                                                        due to IQ inbalance




              November 2012 | LTE measurements|   103
Inband emmission – error cases
                                                        Inband image
                                                        due to IQ inbalance




              November 2012 | LTE measurements|   104
DC leakage and IQ imbalance in real world …




              November 2012 | LTE measurements|   105
UL Modulation quality: Constellation diagram
LTE PUSCH uses
QPSK, 16QAM
and 64 QAM (optional)
modulation schemes.
In UL there is only 1 scheme
allowed per subframe




                  November 2012 | LTE measurements|   106
Error Vector Magnitude, EVM
                Q
                      Magnitude Error (IQ error magnitude)



                                         Error Vector
                    Measured
                    Signal
                                  Ideal (Reference) Signal
                       Φ
                           Phase Error (IQ error phase)

                                                                       I

                                                                      Reference Waveform
                                 011001…           Ideal
                Demodulator
                                                  Modulator       -
 Input Signal
                                                                      Σ            Difference Signal
                                                                  +

                                                                Measured Waveform

                            November 2012 | LTE measurements|          107
Error Vector Magnitude, EVM
                   7 symbols / slot
            0123456 0123456 0123456 0123456                           time


                                                                     PUSCH symbol
frequency
                                                              Demodulation Reference
                                                              symbol, DMRS


                                                                  Limit values
                                                                              Unit   Level

                                                                  Parameter
                                                              QPSK             %     17.5
                                                              16QAM            %     12.5
                                                              64QAM            %     [tbd]



                        November 2012 | LTE measurements|   108
Error Vector Magnitude, EVM
 CP center
             1 SC-FDMA symbol, including Cyclic Prefix, CP
                                                                                      OFDM
 Cyclic                                                                               Symbol
 prefix                                                                              Part equal
                                                                                       to CP
                        FFT Window size

                                                         FFT window size depends
                                                         on channel bandwidth and
                                                         extended/normal CP length




                     November 2012 | LTE measurements|       109
Error Vector Magnitude, EVM
 CP center
                           1 SC-FDMA symbol, including Cyclic Prefix, CP
                                                                                                                    OFDM
 Cyclic                                                                                                             Symbol
 prefix                                                                                                            Part equal
                                                                                                                     to CP
                                              FFT Window size

                                                                FFT window size depends on channel bandwidth
                                                                and extended/normal CP length
                   Cyclic prefix length

                                       N cp                                                   Ratio of
                   N cp                                         Cyclic prefix     EVM
  Channel                                                                                     W to CP
                                  for symbols 1     Nominal     for symbols      window
  Bandwidt      for symbol 0                                                                    for
                                       to 6         FFT size    1 to 6 in FFT    length
   h MHz                                                                                     symbols 1
                                                                  samples           W
                                                                                               to 6*
                                                                                                         FFT window does
     1.4                                              128             9             [5]        [55.6]

      3                                               256             18           [12]        [66.7]
                                                                                                         not capture the
      5                                               512             36           [32]        [88.9]
                                                                                                         full length: OFDM
      10
                     160               144
                                                     1024             72           [66]        [91.7]    Symbol + CP
      15                                             1536            108           [102]       [94.4]

      20                                             2048            144           [136]       [94.4]

  * Note:          These percentages are informative and apply to symbols 1 through 6. Symbol 0 has a
  longer CP and therefore a lower percentage.
 Table from TS 36.101 for normal CP

                                          November 2012 | LTE measurements|                   110
EVM measurement according to Spec
                                                          Test Parameters for Channel Bandwidths
                                                                            Downlink                       Uplink Configuration
l Applies to PUSCH, PUCCH                                                 Configuration
                                                           Ch BW N/A for PUSCH EVM                     Mod’n               RB allocation
  and PRACH                                                1.4MHz
                                                                     testing
                                                                                                       QPSK
                                                                                                                          FDD
                                                                                                                            6
                                                                                                                                     TDD
                                                                                                                                        6
l PUSCH and PUCCH UL Tx                                    1.4MHz
                                                           1.4MHz
                                                                                                       QPSK
                                                                                                      16QAM
                                                                                                                            1
                                                                                                                            6
                                                                                                                                        1
                                                                                                                                        6
                                                           1.4MHz                                     16QAM                 1           1
  Pwer                                                      3MHz                                       QPSK                15          15

   l @ Max & -36.8 dBm
                                                            3MHz                                       QPSK                 4           4
                                                            3MHz                                      16QAM                15          15
                                                            3MHz                                      16QAM                 4           4
l PRACH UL Tx Power                                         5MHz                                       QPSK                25          25
                                                            5MHz                                       QPSK                 8           8
  l FDD: @ -31 dBm & 14 dBm*                                5MHz
                                                            5MHz
                                                                                                      16QAM
                                                                                                      16QAM
                                                                                                                           25
                                                                                                                            8
                                                                                                                                       25
                                                                                                                                        8
  l TDD: @ -39 dBm & 6 dBm                                  10MHz
                                                            10MHz
                                                                                                       QPSK
                                                                                                       QPSK
                                                                                                                           50
                                                                                                                           12
                                                                                                                                       50
                                                                                                                                       12
                                                            10MHz                                     16QAM                50          50
                                                                                                                        (Note 3)   (Note 3)
                                                            10MHz                                     16QAM                12          12
                                                            15MHz                                      QPSK                75          75
                                                            15MHz                                      QPSK                16          16
                                                            15MHz                                     16QAM                75          75
                                                                                                                        (Note 3)   (Note 3)
                                                            15MHz                                     16QAM                16          16
                                                            20MHz                                      QPSK               100         100
                                                            20MHz                                      QPSK                18          18
                                                            20MHz                                     16QAM               100         100
                                                                                                                        (Note 3)   (Note 3)
                                                            20MHz                                     16QAM                18          18
                                                          Note 1:          Test Channel Bandwidths are checked separately for each E-
* 20MHz, we can only reach 13 dBm                               UTRA band, which applicable channel bandwidths are specified in Table
                                                                5.4.2.1-1.
                                                          Note 2:          For partial RB allocation, the starting resource block shall be
                                                                RB #0 and RB# (max+1 - RB allocation) of the channel bandwidth.
                                    November 2012 | LTE measurements|
                                                          Note 3:                111
                                                                           Applies only for UE-Categories 2-5
Cyclic prefix aspects
                                        We can observe a phase shift




                         CP                                    CP
CP                       part   CP                             part


OFDM symbol n-1                      OFDM symbol n

         Content is                  OFDM symbol is periodic!
     different in each
      OFDM symbol                    Cyclic prefix does not provoque
                                     phase shift

                           November 2012 | LTE measurements|   112
Time windowing
  1 SC-FDMA symbol, including Cyclic Prefix, CP                   1 SC-FDMA symbol, including Cyclic Prefix, CP

                                                     OFDM                                              OFDM
Cyclic                                               Symbol Cyclic                                     Symbol
prefix                                              Part equal prefix                                 Part equal
                                                      to CP                                             to CP
 Continuous phase shift
                                                      Difference in phase shift




                                                                  Phase shift between SC-FDMA
                                                                  symbols will cause side lobes
                                                                  in spectrum display!




                              November 2012 | LTE measurements|         113
Time windowing                                                   Tx time window creates
                                                                 some kind of clipping in
                                                                 symbol transitions

               Tx Time window                                          Tx Time window
                                                 OFDM                                        OFDM
Cyclic                                           Symbol Cyclic                               Symbol
prefix                                          Part equal prefix                           Part equal
                                                  to CP                                       to CP
 Continuous phase shift
                                                               Difference in phase shift



                                                              Tx time window can be used
                                                              to shape the Tx spectrum in
                                                              a more steep way, but ….




                          November 2012 | LTE measurements|      114
Time windowing                                                   Tx time window creates
                                                                 some kind of clipping in
                                                                 symbol transitions

               Tx Time window                                          Tx Time window
                                                 OFDM                                        OFDM
Cyclic                                           Symbol Cyclic                               Symbol
prefix                                          Part equal prefix                           Part equal
                                                  to CP                                       to CP
 Continuous phase shift
                                                               Difference in phase shift



                                                              Tx time window will create
                                                              a higher Error Vector Magnitude!

                                                       Here the Tx time window of 5µsec causes
                                                       Some mismatch between the 2 EVM
                                                       Measurements of the first SC-FDMA symbol




                          November 2012 | LTE measurements|      115
EVM vs. subcarrier
                                                                             Nominal subcarriers

                                                                             Each subcarrier
                                                                             Modulated with
                                                                             e.g. QPSK

                                                                             Integration of all
                                                                         f   Error Vectors to
                                                                             Display EVM curve
                f0   f1   f2   f3

                                         Error vector




                                            ....



 Error vector


Note: simplified figure: in reality you
compare the waveforms due to SC-FDMA

                               November 2012 | LTE measurements|   116
EVM vs. subcarrier




              November 2012 | LTE measurements|   117
EVM Equalizer Spectrum Flatness
The EVM equalizer spectrum flatness is defined as the variation in dB of the equalizer coefficients
generated by the EVM measurement process.
The EVM equalizer spectrum flatness requirement does not limit the correction applied to the signal
in the EVM measurement process but for the EVM result to be valid,
the equalizer correction that was applied must meet the
EVM equalizer spectral flatness minimum requirements.                  Nominal subcarriers

                                                                      Amplitude Equalizer
                                                                         coefficients



                                                                                      f
                  f0   f1   f2    f3                                       Subcarriers before
                                                                           equalization
Integration of all
                                                         1
amplitude equalizer
coefficients to display
                                                                 | A( EC ( f )) |2
                                                     12 * N RB 12* N RB
                                  P( f )  10 * log
spectral flatness curve                                      | A( EC ( f ) |2

                                 November 2012 | LTE measurements|       118
Equalization
        1-tap equalization =
        Interpreting the frequency
        Selectivity as scalar factor
                                                       Equalizer tries to
                                                       set same power level for
                                                       all subcarriers

                                                                           A(f)

                                                   1-tap equalization =
                                                   Calculating scalar to
                                                   amplify or attenuate


                                                                           f


                   November 2012 | LTE measurements|     119
Spectrum flatness calculation
1-tap equalization =
Interpreting the frequency
                                                                        Equalizer tries to
Selectivity as scalar factor                                            set same power level for
                                                                        all subcarriers


                                                                                         A(f)

                             1                                   1-tap equalization =
                                     | A( EC ( f )) |2
                         12 * N RB 12* N RB                      Calculating scalar to
      P( f )  10 * log                                         amplify or attenuate
                                 | A( EC ( f ) |2


                                                                                         f


                                 November 2012 | LTE measurements|     120
Spectral flatness




              November 2012 | LTE measurements|   121
Spectrum Flatness
                                                                                            Maximum Ripple [dB]
                      Frequency Range
FUL_Meas – FUL_Low ≥ 3 MHz and FUL_High – FUL_Meas ≥ 3 MHz         5.4 (p-p)
                         (Range 1)
 FUL_Meas – FUL_Low < 3 MHz or FUL_High – FUL_Meas < 3 MHz         9.4 (p-p)
                         (Range 2)
Note 1: FUL_Meas refers to the sub-carrier frequency for which the equalizer
      coefficient is evaluated
Note 2: FUL_Low and FUL_High refer to each E-UTRA frequency band specified in
      Table 5.2-1




    < 5.4(5.4)                                                                                                            < 9.4(13.4) dBp-p
   dBp-p         max(Range 2)-min(Range 1) < 8.4(11.4) dB                  max(Range 1)-min(Range 2) < 6.4(7.4) dB




                                               Range 1                                  Range 2


                                                     FUL_High – 3(5) MHz                                       FUL_High


                                   November 2012 | LTE measurements|                  122
Output RF Spectrum Emissions
            Out-of-band emissions              occupied                 Spurious Emissions
                                               bandwidth
    Spectrum Emission Mask – SEM
 -> measurement point by point (RBW)

Adjacent Channel Leakage Ratio – ACLR
   -> integration (channel bandwidth)
                                                Channel
                Spurious domain        ΔfOOB   bandwidth    ΔfOOB             Spurious domain




                                                  RB




                                                        E-UTRA Band


                 Worst case:                                  from               Harmonics, parasitic
          Resource Blocks allocated at                     modulation          emissions, intermodulation
                channel edge                                process            and frequency conversion

                                  November 2012 | LTE measurements|     123
Impact on SEM definition
                                 l    SEM defined for worst case scenario: RBs allocated at channel edge
                                 l    OOB emission scales with channel BW
                                      >> a SEM per channel BW configuration


                                                5 MHz QPSK LTE Tx spectrum : +23.0 dBm / +22.0 dBm

                     30


                     20


                     10                                                                                          1 RB MPR 0dB
                                                                                                                 5 RBs MPR 0dB
                                                                                                                 6 RBs MPR 0dB
                      0                                                                                          7 RBs MPR 0dB
                                                                                                                 8 RBs MPR 0dB             Channel
level (dBm/100kHz)




                                                                                                                 9 RBs MPR 1dB           bandwidth
                     -10                                                                                         10 RBs MPR 1dB                       1.4   3   5    10   15 20
                                                                                                                 11 RBs MPR 1dB
                                                                                                                                          BWChannel
                                                                                                                 12 RBs MPR 1dB             [MHz]
                     -20                                                                                         13 RBs MPR 1dB
                                                                                                                 14 RBs MPR 1dB
                                                                                                                                        Length of OOB
                                                                                                                 15 RBs MPR 1dB         domain on one 5     6   10   15   20 25
                     -30                                                                                         16 RBs MPR 1dB
                                                                                                                 18 RBs MPR 1dB
                                                                                                                                          side [MHz]
                                                                                                                 20 RBs MPR 1dB
                     -40                                                                                         25 RBs MPR 1dB



                     -50


                     -60
                           -10   -9   -8   -7    -6    -5   -4        -3        -2    -1   0   1   2   3    4
                                                                 offset (MHz)


                                                                                     November 2012 | LTE measurements|            124
Adjacent Channel Leakage Ratio - ACLR
    The purpose of this test is to verify that the UE transmitter does not cause unacceptable
    interference to adjacent channels.
    This is accomplished by determining the adjacent channel leakage [power] ratio (ACLR).

l     UTRA ACLR 1+2
l     EUTRA ACLR
l     EUTRA measured with rectangular filter,
      WCDMA measured with RRC filter
                                    ΔfOOB                             E-UTRA channel

                                                                           Channel



               E-UTRAACLR1         UTRA ACLR2   UTRAACLR1




                                                                      RB




                                  November 2012 | LTE measurements|    125
Adjacent Channel Leakage Ratio, ACLR
                          Active LTE
                          carrier, 20MHz BW




                                                      1 adjacent LTE
                                                      carrier, 20MHz BW



                                                      2 adjacent WCDMA
                                                      carriers, 5MHz BW




            November 2012 | LTE measurements|   126
Occupied Bandwidth - OBW
               Occupied bandwidth is defined
               as the bandwidth containing 99 %
               of the total integrated mean power
               of the transmitted spectrum                                                                       99% of mean power




                                            Channel Bandwidth [MHz]

                                   Transmission Bandwidth Configuration [RB]

                                      Transmission
                                     Bandwidth [RB]




                                                                                            Channel edge
Channel edge


                Resource block




                                 Active Resource Blocks        DC carrier (downlink only)




                                                             November 2012 | LTE measurements|             127
Spectrum Emission Mask, SEM
OBW: Occupied bandwidth, defined as 99% of mean power
SEM: Spectrum ‚Emission Mask, measured with different resolution bandwidth,
1 MHz or 30 kHz RBW




                            99% of mean power


                                                                   1 MHz RBW
                                                                   30 kHz RBW




                         November 2012 | LTE measurements|   128
Impact on SEM limit definition

                                                                  Limits depend
                                                                    on channel
                                                                    bandwidth
                                                    Spectrum emission limit (dBm)/ Channel bandwidth

                                               ΔfOOB     1.4     3.0   5     10    15    20    Measurement
                                               (MHz)     MH       M    M     M     M     M      bandwidth
                                                          z      Hz    Hz    Hz    Hz    Hz
                                                0-1     -10     -13   -15   -18   -20   -21     30 kHz

                                               1-2.5    -10     -10   -10   -10   -10   -10      1 MHz

                                               2.5-5    -25     -10   -10   -10   -10   -10      1 MHz

                                                5-6             -25   -13   -13   -13   -13      1 MHz
           Limits vary
                                                6-10                  -25   -13   -13   -13      1 MHz
      dependent on offset
                                               10-15                        -25   -13   -13      1 MHz
       from assigned BW
                                               15-20                              -25   -13      1 MHz


                                               20-25                                    -25      1 MHz




                November 2012 | LTE measurements|          129
SEM definition depends on band
Spectrum emission mask depends on additionally signalled band values NS_0x

                Spectrum emission limit (dBm)/ Channel bandwidth

   ΔfOOB        1.4        3.0               5               10       Measurement
   (MHz)        MHz        MHz               MHz             MHz         bandwidth
       0-0.1      -13          -13                -15          -18        30 kHz
       0.1-1      -13          -13                -13          -13       100 kHz
       1-2.5      -13          -13                -13          -13        1 MHz
       2.5-5      -25          -13                -13          -13        1 MHz
        5-6                    -25                -13          -13        1 MHz

        6-10         e.g.                         -25          -13        1 MHz
                     NS_07
       10-15       =band 13                                    -25        1 MHz



                         November 2012 | LTE measurements|    130
Transmitter Spurious Emissions
 …to verify that UE transmitter does not cause unacceptable interference
 to other channels or other systems in terms of transmitter spurious emissions.

 The spurious emission limits apply for the frequency                    Frequency Range         Maximum       Measurement
 ranges that are more than ΔfOOB (MHz) from the                                                   Level         Bandwidth
 edge of the channel bandwidth
                                                                        9 kHz  f < 150 kHz          -36 dBm      1 kHz
                                                                       150 kHz  f < 30 MHz          -36 dBm     10 kHz
 Channel       1.4    3.0        5        10     15          20
bandwidth      MHz    MHz       MHz      MHz    MHz         MHz        30 MHz  f < 1000 MHz         -36 dBm     100 kHz
ΔfOOB (MHz)     2.8     6       10       15         20       25        1 GHz  f < 12.75 GHz         -30 dBm      1 MHz

                                           Channel
              Spurious domain    ΔfOOB    bandwidth         ΔfOOB                  Spurious domain




                                               RB




                                                         E-UTRA Band


                                  November 2012 | LTE measurements|          131
LTE Uplink: PUCCH

                                                         Allocation of
                                                         PUCCH only.




                                                        frequency



              November 2012 | LTE measurements|   132
PUCCH measurements
       PUCCH is transmitted on the 2 side
       parts of the channel bandwidth




             November 2012 | LTE measurements|   133
Transmit intermodulation
 The transmit intermodulation performance is a measure of the capability of the transmitter
 to inhibit the generation of signals in its non linear elements caused by presence of the
 wanted signal and an interfering signal reaching the transmitter via the antenna.



 User Equipment(s) transmitting in close vicinity of each other can produce intermodulation products,
 which can fall into the UE, or eNode B receive band as an unwanted interfering signal.
 The UE intermodulation attenuation is defined by the ratio of the mean power of the wanted signal
 to the mean power of the intermodulation product when an interfering CW signal is added at a level
 below the wanted signal at each of the transmitter antenna port with the other antenna port(s)
 if any is terminated.



  BWChannel (UL)                   5MHz                  10MHz                   15MHz             20MHz
  Interference Signal
                            5MHz        10MHz       10MHz         20MHz      15MHz    30MHz    20MHz    40MHz
  Frequency Offset
  Interference CW Signal
                                                                     -40dBc
  Level
  Intermodulation Product   -29dBc      -35dBc      -29dBc        -35dBc     -29dBc   -35dBc   -29dBc   -35dBc
  Measurement bandwidth     4.5MHz     4.5MHz      9.0MHz     9.0MHz        13.5MHz 13.5MHz    18MHz    18MHz



                              November 2012 | LTE measurements|            134
Spurious Emissions
 The spurious emissions power is the power of emissions generated or
 amplified in a receiver that appear at the UE antenna connector.



              General receiver spurious emission requirements

                   Frequency Band            Measurement     Maximum
                                              Bandwidth        level
              30MHz  f < 1GHz                  100 kHz      -57 dBm
              1GHz  f  12.75 GHz               1 MHz       -47 dBm




                         November 2012 | LTE measurements|    135
SEM – effect of scrambling
                    Modulation              Transform           Resource        SC-FDMA
       Scrambling                                            element mapper
                     mapper                  precoder                           signal gen.
Constant
Bit pattern
                                                                          Scrambling
                                                                           disabled +
                                                                          constant bit
                                                                             stream
    Scrambling
      should
  randomize the
    bit stream




                       November 2012 | LTE measurements|   136
LTE Receiver Measurements


                                  1       Reference sensitivity level
                                  2       Maximum input level
                                  3       Adjacent Channel Selectivity (ACS)
                                  4       Blocking characteristics
                                  4.1     In-band blocking
                                  4.2     Out-of-band blocking
                                  4.3     Narrow band blocking
                                  5       Spurious response
                                  6       Intermodulation characteristics
                                  6.1     Wide band Intermodulation
                                  7       Spurious emissions




            November 2012 | LTE measurements|    137
LTE open loop power control and RSRP reporting
                                                           Pathloss =
System Information:
referenceSignalPower                        referenceSignalPower - RSRP
[-60 .. 50]dBm

                                                                           UE measures RSRP:
                                                                           Reference Signal
                                                                           Receive Power



               PDSCH, PUCCH or
               SRS receive power                                                     UE
               at eNodeB
                                                                PDSCH, PUCCH or
                            UE reports RSRP:                    SRS transmit power
                            back to the eNB                     at UE




                       November 2012 | LTE measurements|       138
Reference Signal Receive Power, RSRP

          R                                             R
                  Entire bandwidth


          R                                             R




                    Scan over entire bandwidth,
              RSRP = power of 1 symbol, as mean power




              November 2012 | LTE measurements|   139
Received Signal Strength Indicator, RSSI



                                                        R
noise          R
                        Entire bandwidth

                                                            interferer
               R                                        R




              November 2012 | LTE measurements|   140
LTE measurements
 RSRP = Reference Signal Received Power

    Definition        Reference signal received power, the mean measured power of the
                      reference symbols during the measurement period.



    Applicable for    TBD


E-UTRA Carrier RSSI



    Definition         E-UTRA Carrier Received Signal Strength Indicator, comprises the total
                       received wideband power observed by the UE from all sources, including co-
                       channel serving and non-serving cells, adjacent channel interference, thermal
                       noise etc.

    Applicable for     TBD




                                November 2012 | LTE measurements|   141
LTE measurements: RSRQ Reference Signal Received Quality
                                                      RSRP
                              RSRQ =
                                                      RSSI

  Definition       Reference Signal Received Quality (RSRQ) is defined as the ratio N×RSRP/(E-
                         UTRA carrier RSSI), where N is the number of RB’s of the E-UTRA carrier
                         RSSI measurement bandwidth. The measurements in the numerator and
                         denominator shall be made over the same set of resource blocks.
                   E-UTRA Carrier Received Signal Strength Indicator (RSSI), comprises the
                         linear average of the total received power (in [W]) observed only in OFDM
                         symbols containing reference symbols for antenna port 0, in the
                         measurement bandwidth, over N number of resource blocks by the UE
                         from all sources, including co-channel serving and non-serving cells,
                         adjacent channel interference, thermal noise etc.
                   The reference point for the RSRQ shall be the antenna connector of the UE.
                   If receiver diversity is in use by the UE, the reported value shall not be lower
                         than the corresponding RSRQ of any of the individual diversity branches.
  Applicable for   RRC_CONNECTED intra-frequency,
                   RRC_CONNECTED inter-frequency



                          November 2012 | LTE measurements|   142
RX Measurements – general setup
                                                                      AWGN
  Receive Sensitivity Tests                                           Blockers
                                                                      Adjacent channels
                                     Transmit data
      User                            according to
    definable                      table on PDSCH
       DL                                                                     Use both
   assignment                                                                 Rx Antennas
      Table
   (TTI based)
                                                                          +

                                 Receive feedback
Specifies DL scheduling
                                   on PUSCH
parameters like
                                    or PUCCH
RB allocation
Modulation, etc.
for every TTI (1ms)                              ACK/NACK/DTX

                                                 Counting


        requirements in terms of throughput (BLER) instead of BER
                          November 2012 | LTE measurements|     143
Downlink channel power for Rx tests
 Physical Channel      EPRE Ratio                             Physical Channel    EPRE Ratio

PBCH                PBCH_RA = 0 dB
                                                            PBCH                 PBCH_RA = A
                    PBCH_RB = 0 dB
                                                                                 PBCH_RB = B
PSS                  PSS_RA = 0 dB
                                                            PSS                   PSS_RA = A
SSS                  SSS_RA = 0 dB
                                                            SSS                   SSS_RA = A
PCFICH              PCFICH_RB = 0 dB
                                                            PCFICH               PCFICH_RB =
PDCCH               PDCCH_RA = 0 dB
                                                                                       B
                    PDCCH_RB = 0 dB                         PDCCH                PDCCH_RA = A
                                                                                 PDCCH_RB = B
PDSCH               PDSCH_RA = 0 dB
                                                            PDSCH                PDSCH_RA = A
                    PDSCH_RB = 0 dB                                              PDSCH_RB = B

PHICH               PHICH_RB = 0 dB                         PHICH                PHICH_RB = B


For tests where no Ref. Signal                          For tests where Ref. Signal
boosting is applied                                     boosting is applied, e.g. ρA = -3dB
                        November 2012 | LTE measurements|          144
Fixed reference channels
                     Parameter                        Unit                                       Value
Channel bandwidth                                     MHz              1.4          3       5            10     15       20
Allocated resource blocks                                              6            15     25            50     75      100
Subcarriers per resource block                                         12           12     12            12     12       12
Allocated subframes per Radio Frame                                    10           10     10            10     10       10
Modulation                                                            QPSK     QPSK       QPSK       QPSK      QPSK     QPSK
Target Coding Rate                                                     1/3          1/3    1/3           1/3    1/3      1/3
Number of HARQ Processes                           Processes           8            8       8            8       8       8
Maximum number of HARQ transmissions                                   1            1       1            1       1       1
Transport block CRC                                    Bits            24           24     24            24     24       24
Number of Code Blocks per Sub-Frame
   (Note 4)
 For Sub-Frames 1,2,3,4,6,7,8,9                        Bits           1368      3780      6300       13800     20700    27600
 For Sub-Frame 5                                       Bits            n/a          n/a    n/a           n/a    n/a      n/a
 For Sub-Frame 0                                       Bits           528       2940      5460       12960     19860    26760
Max. Throughput averaged over 1 frame                 kbps            341.6    1143.2     1952.8    3952.8     6040.8   7884
UE Category                                                            1-5          1-5    1-5           1-5    1-5      1-5


     Fixed reference channels defined in TS 36.101 for receiver quality measurements

                                  November 2012 | LTE measurements|           145
RX sensitivity level
Criterion: throughput shall be > 95% of possible maximum
(depend on RMC)

                                 Channel bandwidth
 E-UTRA
           1.4 MHz   3 MHz        5 MHz        10 MHz          15 MHz      20 MHz    Duplex
    Ban
            (dBm)    (dBm)        (dBm)         (dBm)           (dBm)       (dBm)      Mode
     d
   1          -        -           -100           -97           -95.2        -94       FDD
   2       -104.2    -100.2         -98           -95           -93.2        -92       FDD
   3       -103.2    -99.2          -97           -94           -92.2        -91       FDD
   4       -106.2    -102.2        -100           -97           -95.2        -94       FDD
   5       -104.2    -100.2         -98           -95                                  FDD
   6          -        -           -100           -97                                   FDD
                                                                          Extract from TS 36.521

          Sensitivity depends on band,
          channel bandwidth and RMC
                    under test
                           November 2012 | LTE measurements|        146
Block Error Ratio and Throughput

Rx
quality
                                                                 DL
                                                                 signal




 Criterion: throughput shall be                                  Channel
 > 95% of possible maximum                                       setup
 (depending on RMC)




                       November 2012 | LTE measurements|   147
Details LTE FDD signaling
Rx Measurements

                                                      l     Rx Measurements
                                                            l   Counting
                                                                – ACKnowledgement (ACK)
                                                                – NonACKnowledgement
                                                                  (NACK)
                                                                – DTX (no answer from UE)


                                                      l     Calculating
                                                            l   BLER (NACK/ALL)
                                                            l   Throughput [kbps]




                  November 2012 | LTE measurements|   148
Rx measurements: BLER definition


                       PDCCH, scheduling info




                 PDSCH, as PRBS
  Count
 #NACKs
   and        ACK/NACK feedback
 calculate
  BLER
                  Assumption is that eNB
                  Power = UE Rx power



              November 2012 | LTE measurements|   149
Rx measurements: BLER definition
                    PDCCH, scheduling info                    •ACK = UE properly
                                                              Receives PDCCH + PDSCH
                                                              •NACK = UE properly receives
                                                              PDCCH but does not understand
                                                              PDSCH
                                                              •DTX = UE does not understand
              PDSCH, user data                                PDCCH



            ACK/NACK feedback

                                                                           # NACK  # DTX
                              # ACK                           BLER =
   ACK relative =                                                      # ACK  # NACK  # DTX
                     # ACK  # NACK  # DTX
                             # NACK
   NACK relative =
                      # ACK  # NACK  # DTX
                              # DTX
   DTX relativ =
                     # ACK  # NACK  # DTX

                         November 2012 | LTE measurements|   150
BLER verification
   Downlink error
   insertion to verify
   the UE reports




                         November 2012 | LTE measurements|   151
Transportation Block Size Index
    Transportation block size                                              TBS Idx   Modulation


       User data                                    FEC                         0
                                                                                     QPSK
                                                                                9
  Flexible ratio between data and FEC = adaptive coding
                                                                                     16-QAM
                                                                               15
                                                                                     64-QAM
                                                                               26


                                                           Data
                                                           rate

                                           No change in data
                                          rate, but in reliability




                                                                                              S/N


                            November 2012 | LTE measurements|        152
Throughput versus SNR




             November 2012 | LTE measurements|   153
UE sensitivity – maximum input level




                                       Maximum input level




        Rx Parameter             Units                            Channel bandwidth
                                           1.4 MHz        3     MHz     5 MHz     10 MHz   15 MHz   20 MHz

 Wanted signal mean power       dBm                                         -25


                            November 2012 | LTE measurements|         154
UE sensitivity – RF sensitivity measurement

                      ACK/NACK
                                   PRBS

                                 minimum input level


                               Channel bandwidth
 E-UTRA
          1.4 MHz   3 MHz       5 MHz        10 MHz       15 MHz   20 MHz   Duplex
    Ban
           (dBm)    (dBm)       (dBm)         (dBm)        (dBm)    (dBm)     Mode
     d
   1         -        -          -100           -97        -95.2    -94     FDD
   2      -104.2    -100.2        -98           -95        -93.2    -92     FDD
   3      -103.2    -99.2         -97           -94        -92.2    -91     FDD
   4      -106.2    -102.2       -100           -97        -95.2    -94     FDD
   5      -104.2    -100.2        -98           -95                         FDD
   6         -        -          -100           -97                         FDD

                      November 2012 | LTE measurements|     155
Adjacent Channel Selectivity (ACS)
 … is a measure of a receiver's ability to receive a E-UTRA signal at its assigned channel frequency
 in the presence of an adjacent channel signal at a given frequency offset from the centre frequency of
 the assigned channel and with the given power

Requirement per BW, LTE interferer
  [1.4MHz]                                                                   [3MHz]                                                                                      5MHz
                                                                                                                                                                       Padj   = -51.3
                                                                           Padj   = -53.5




                                                                                                                                                                                                                    ACS= 33dB
  Padj = -57.5




                                                                                                                              ACS= 33dB
                                                        ACS= 33dB




                                                                                                                                                                         Pown= -82.3
                                                                                                                                                                                        2dB IM
                                                                             Pown= -84.5                                                                                   Nt= -84.3
                                                                                            2dB IM
 Pown= -88.5                                                                   Nt= -86.5
                 2dB IM
   Nt= -90.5
                           1.4MHz LTE 1.4MHz LTE                                                       3MHz LTE 3MHz LTE                                                                              5MHz LTE   5MHz LTE
                                   1.4MHz                                                                      3MHz                                                                                         5MHz




  10MHz                                                                     15MHz                                                                                       20MHz
Padj   = -48.3
                                                                          Padj    = -49.5                                                         Padj,w cdma= -51.3
                                            ACS= 33dB




                                                                                                                                           ACS=
                                                                                                                                           30dB




                                                                                                                                                                                                                                  27dB
                                                                                                                                                                                                                                  ACS=
                                                                                                                                                        Pow n= -76.3
                                                                            Pown= -77.5                                                                                                          2dB IM
  Pown= -79.3                                                                                         2dB IM                                               Nt= -78.3
                      2dB IM                                                  Nt= -79.5
    Nt= -81.3



                     10MHz LTE            5MHz LTE                                                   15MHz LTE                            5MHz LTE                                          20MHz LTE                           5MHz LTE

                                 7.5MHz                                                                               10MHz                                                                                      12.5MHz




                                                                    November 2012 | LTE measurements|                                         156
Adjacent Channel selectivity
      Adjacent Channel Selectivity (ACS) is a measure of a receiver's ability to receive a E-UTRA
      signal at its assigned channel frequency in the presence of an adjacent channel signal at a given
      frequency offset from the centre frequency of the assigned channel and with the given power

                                                                        Channel bandwidth

   Rx Parameter                Units          1.4 MHz         3 MHz          5 MHz     10 MHz 15 MHz            20 MHz


              ACS               dB              33.0           33.0           33.0         33.0           30       27

 Rx Parameter          Units                                          Channel bandwidth
                                 1.4 MHz           3 MHz            5 MHz            10 MHz         15 MHz       20 MHz

Wanted signal          dBm
    mean                                                              REFSENS + 14 dB
    power
                       dBm     REFSENS          REFSENS         REFSENS          REFSENS          REFSENS      REFSENS
                                   +45.5d           +45.5           +45.5dB*         +45.5d           +42.5d       +39.5dB
PInterferer                        B                dB                               B                B
BW Interferer          MHz         1.4                3                5               5              5             5
FInterferer (offset)   MHz     1.4+0.0025 /       3+0.0075        5+0.0025       7.5+0.0075       10+0.0125    12.5+0.0025
                               -1.4-0.0025             /               /               /               /             /
                                                  -3-0.0075       -5-0.0025      -7.5-0.0075      -10-0.0125   -12.5-0.0025


                                         November 2012 | LTE measurements|       157
Receiver performance - Blocking tests
                                              5MHz LTE interferer
         In-band blocking                     15MHz below to 15MHz above the UE receive band



                                              CW interferer , more than 15MHz below to
       Out-of-band blocking                   15MHz above the UE receive band


                                              CW interferer at a frequency,
       Narrow band blocking                   which is less than the nominal channel spacing




                                                               Throughput
                                                                shall be ≥
         f >> system bandwidth                                   95%
                      
                               
  fB                                                    fc
                                                                  frequency


                   November 2012 | LTE measurements|     158
Spurious Response
 Spurious response verifies the receiver's ability to receive a wanted signal on its assigned
 channel frequency without exceeding a given degradation due to the presence of an unwanted
 CW interfering signal at any other frequency at which a response is obtained i.e. for which
 the out of band blocking limit as specified in sub-clause 7.6.2 is not met.
 For Table 7.6.2.3-2 in frequency range 1, 2 and 3, up to      max 24, 6  N RB / 6
 exceptions are allowed for spurious response frequencies in each assigned frequency channel when measured using a 1MHz step size, where         N RB
  is the number of resource blocks in the downlink transmission bandwidth configuration (see Figure 5.4.2-1).
  For these exceptions the requirements of clause 7.7 Spurious Response are applicable. For Table 7.6.2.3-2 in frequency range 4, up to
 max 8, ( N RB  2  LCRBs ) / 8
  exceptions are allowed for spurious response frequencies in each assigned frequency channel when measured using a 1MHz step size, where         N RB
  is the number of resource blocks in the downlink transmission bandwidth configurations (see Figure 5.4.2-1) and LCRBs
    is the number of resource blocks allocated in the uplink. For these exceptions the requirements of clause 7.7 Spurious Response are applicable.
                                                                    Out of band blocking

                                       Parameter       Units                                   Frequency
                      E-UTRA
                       band                                        range 1           range 2              range 3          range 4

                                         PInterferer   dBm           -44               -30                  -15               -15

                    1, 2, 3, 4, 5,                              FDL_low -15 to    FDL_low -60 to    FDL_low -85 to
                                                                                                                               -
                   6, 7, 8, 9, 10,                               FDL_low -60       FDL_low -85          1 MHz
                    11, 12, 13,
                                       FInterferer
                    17, 18, 19,                        MHz
                                       (CW)                     FDL_high +15 to   FDL_high +60 to   FDL_high +85 to
                       20, 21,                                                                                                 -
                   33,34,35,36,3                                 FDL_high + 60     FDL_high +85      +12750 MHz
                    7,38,39,40
                     2, 5, 12, 17        FInterferer   MHz             -                  -                  -         FUL_low - FUL_high

                   NOTE: For the UE which supports both Band 11 and Band 21 the out of blocking is FFS.




                                                 November 2012 | LTE measurements|                  159
Rx quality - Intermodulation
                         Throughput                                     Wanted Signal C
                          shall be ≥                                                         Unmodulated
                            95%                                                              Interferer Icw




                                                           f              f
                                                                                               Modulated
                                                                                             Interferer Imod



                                                 fc               fcw                 fmod      frequency
See TS 36.101 for power and frequency offset definitions




                                      November 2012 | LTE measurements|         160
CQI reporting
                                Optimum throughput                                  ≡CQIn+2
                high              if the UE reports
 Overrated                               CQIn                               ≡CQIn+1




                 Throughput
 CQI report
                                                                                   ≡CQIn

                                                                        ≡CQIn-1
                                                                   ≡CQIn-2
   Underrated
   CQI report
                low
                                                      Prevailing conditions of SIR

                              low        SIR changes, CQI reporting must follow!       high
                                                            SIR


                November 2012 | LTE measurements|     161
CQI reporting

                Calculate Median CQI,
      Evaluate if more than 90% of reported CQI
           Are in range of median CQI ±1



Network sends median CQI – evaluate BLER on median CQI



  BLER on median CQI <= 10%                            BLER on median CQI > 10%
     Network sends CQI +1                                Network sends CQI -1
       -> BLER must be                                     -> BLER must be
            > 10%                                               < 10%


                       November 2012 | LTE measurements|    162
Rx tests – test mode
  UE                               SS


       ACTIVATE TEST MODE
                                                     Test modes defined to perform
       ACTIVATE TEST MODE
             COMPLETE
                                                     Rx measurements, loop back
                                                     possible in test mode



                                                UE                                   SS


                                                                CLOSE UE TEST LOOP



                                                       CLOSE UE TEST LOOP COMPLETE




                            November 2012 | LTE measurements|       163
UTRAN stack: 2 loop back mode defined
                                                      Loop back above
                                                      PDCP, i.e. Layer 2
              Packet Data Convergence
                  Protocol PDCP


                   Radio Link Control
                         RLC



               Medium Access Control
                       MAC




                   PHYSICAL LAYER
            November 2012 | LTE measurements|   164
Test loop mode A
                                UE Test Loop Mode A Function




        u0,u0 .......u K .................u N -1
           u 1,u1 .......uK -1                                          u0,u 1 .......uK -1

                  User data                                               User data
                                                                                                Uplink
                                                                                                and downlink
                   Down link                                                Uplink
                                                                                                may have
                                   UE Test Loop Mode A Function
                                                                                                various
                                                                                                capacity


           u0 .. uK -1 ..uN-1                      u0...uN -1     u0...uN -1         u0..uK-1

            User data                                           User data

        Down link                                                   Uplink
                            November 2012 | LTE measurements|                  165
Test loop mode B

                                                   Loop back above
                                                   PDCP, i.e. Layer 2

     Packet Data Convergence
         Protocol PDCP


          PDU size             buffer
          must match
                                   ΔΤ

                     Delayed loop back
               November 2012 | LTE measurements|     166
Throughput measurements




        Max throughput
        possible in SISO




                 November 2012 | LTE measurements|   167
Rx measurements - throughput

Throughput
Measurement,
Settings for max
throughput
for SISO:




Number of
Resource blocks

Modulation scheme

Transport block size




                       November 2012 | LTE measurements|   168
LTE Downlink BLER and throughput




                                      Rx quality,
                                      Indicating NACKs when
                                      Lowering the RS EPRE
                                      Of the serving cell.




             November 2012 | LTE measurements|   169
Throughput + CQI in LTE
Change of
   RF
condition-
 > lower
data rate




UE sends
 different
   CQI
  values




              November 2012 | LTE measurements|   170
MIMO testing
                                                            For MIMO, enable cell




                        One antenna       Two antennas                Four antennas

                                                                             1    4     
                                                                       1  9  9          MIMO correlation
                                                1                   19 *       1   4 
                         ReNB  1                                       1  9  9
                                                                      4 * 1 *
  eNode B Correlation                   ReNB        1 
                                                             ReNB
                                                                                      1    Models from
                                                                    
                                                                          9  9   1  9
                                                                       *
                                                                        
                                                                             4  * 1
                                                                               9  9
                                                                                     *
                                                                                         
                                                                                       1    TS 36.521


                                 November 2012 | LTE measurements|            171
MIMO in LTE: BLER and throughput




             November 2012 | LTE measurements|   172
Throughput measurements



                                                          MIMO active,
                                                         2 streams with
                                                       different data rate




             November 2012 | LTE measurements|   173
Why do we need fading?

l   3GPP specifies various tests under conditions of fading
    l   WCDMA performance tests
    l   HSDPA performance tests
    l   LTE performance tests
    l   LTE reporting of channel state information tests

See CMW capability lists for details


l   Evaluation of MIMO performance gain requires fading
    l   Correlated transmission paths in MIMO connection
    l   Simulation of “real life conditions” in the lab
    l   Comparison of processing gain for different transmission modes




                          November 2012 | LTE measurements|   174
Most popular MIMO scheme to increase data rates:
                            Spatial Multiplexing
                                              h 11
                                              h 12
                                    TX
                                   Ant 1
                                                        h 21
                      Space
                                                       h22                           RX
            Matix B                                                                 Ant 1
                                                                                             n1
                                       TX
             d1                       Ant 2                            RX                         r1                de1
                                                                      Ant 2                            MIMO
                              LO
                                                     2X2                                                RX
             d2                                                                                         (e.g. ZF,

                                                     MIMO                                         r2
                                                                                                       MMSE,MLD)
                                                                                                                    de2


     Time
                                                                                        n2

No increase of total transmit power, i.e. distribution of transmit power across multiple transmit antennas!


              Doubles max. data rates, however, at the expense of SNR @ receiver.
                  Thus, according to Shannon‘s law, decrease of performance.
              Makes sense for low order modulation schemes only (QPSK, 16QAM),
        or in case of very good SNR conditions, e.g. for receivers close to base stations.



                                      November 2012 | LTE measurements|       175
How do we test under conditions of fading?




                                        RF
      System
      simulator



                                                            Channel emulator
                                                            Fading Profile




                  November 2012 | LTE measurements|   176
How do we test under conditions of fading?


                                                               System
                                                               simulator
                IQ               IQ              RF
                Out              In
I/Q Interface
Option
CMW-B510x
                 IQ              IQ
                 In              Out




                                                               Channel emulator


                Fading Profile

                           November 2012 | LTE measurements|     177
Internal fading in LTE




               November 2012 | LTE measurements|   178
BLER results with and without fading




               November 2012 | LTE measurements|   179
Automatic testing: KT100 LTE + internal fading




               November 2012 | LTE measurements|   180
Measurement sample (open loop SM)




             November 2012 | LTE measurements|   181
BLER vs. SNR Transmit/Receive Diversity


      ~2dB



                                    AWGN only
                                    MCS 7 and 10

                                    Fading EPA 5 Hz Low
                                    MCS 7 and 10
             ~2dB




              November 2012 | LTE measurements|   182
GUI – IP Settings




              November 2012 | LTE measurements|   183
LTE E2E using DAU




            November 2012 | LTE measurements|   184
LTE E2E using DAU




            November 2012 | LTE measurements|   185
Throughput end to end




              November 2012 | LTE measurements|   186
End to end testing – ping response, RTT




              November 2012 | LTE measurements|   187
What is IMS?
A high level summary
l   The success of the internet, using the Internet Protocol (IP) for
    providing voice, data and media has been the catalyst for the
    convergence of industries, services, networks and business models,
    l   IP provides a platform for network convergence enabling a
        service provider to offer seamless access to any services, How to
        anytime, anywhere, and with any device,                    merge IP
                                                                  and cellular
    l   3GPP has taken these developments into account              world??
        with specification of IMS,
l   IMS stands for IP Multimedia Subsystem,
    l   IMS is a global access-independent and standard-based IP
        connectivity and service control architecture that enables
        various types of multimedia services to end-users using
        common internet-based protocols,
    l   Defines an architecture for the convergence of audio,
        video, data and fixed and mobile networks.


                         November 2012 | LTE measurements|   188
3 GPP System Architecture Evolution
                                     Signaling interfaces

                                    Data transport interfaces
                RAN
                                                                             Access PDN
                                                                             directly or via IMS
                                                             MME                         PDN
UE           Evolved nodeB



                                                  S-GW             P-GW         IMS
                             Evolved Packet Core                                         PSTN
                                                                                         external


                                                                        IMS to control
     All interfaces are packet switched                                 access + data
                                                                           transfer
                              November 2012 | LTE measurements|   189
IMS Architecture




              November 2012 | LTE measurements|   190
IMS protocol structure                                                 user plane
                             Control plane                          Voice     messaging
                                                                    video

                         SIP/SDP                     IKE            RTP       MSRP


                                              UDP / TCP / SCTP


Layer 3 control                                        IP / IP sec


               Layer 1/2                                     Layer 1/2
                                                             (other IP CAN)
Mobile com specific protocols       IMS specific protocols


                         November 2012 | LTE measurements|    192
IMS protocol structure                                      Quality of Service
                                                                                 Media Transport
                                                                                      Media
                      Signaling                                                       Encap.
              H.323                                                                   e.g. H.261, MPEG

application
layer             Megaco            SIP            RTSP RSVP RTCP                     RTP

transport
layer                   TCP                                              UDP

network
layer                                              IPv4, IPv6

link
layer                    e.g. PPP, AAL2/ATM, AAL5/ATM, MAC

Physical
layer                 Sonet, SDH, PDH, Ethernet, RF link = LTE

                             November 2012 | LTE measurements|     193
ISIM: IMS SIM

            Security keys                   Private user ID

           Public user ID                    Home network ID

                  PIN                       Administrative data
      ISIM = application on UICC


                 USIM for LTE access

                            UICC
                            universal integrated circuit card


                November 2012 | LTE measurements|   194
IMS Registration and Authentication
Comparison with LTE
          LTE                                                  IMS



  ATTACH REQUEST                                       REGISTER

  AUTHENTICATION REQ                                  401 UNAUTHORIZED

  AUTHENTICATION RSP                                  REGISTER

   ATTACH ACCEPT                                           200 OK



                 November 2012 | LTE measurements|   195
What is IMS?
Registration with IMS
  l   Prior to IMS registration the UE must discover an IMS entry point
      (i.e. P-CSCF), which is done through an activation of a PDP context
      for SIP signaling over 2G (GPRS) or 3G (WCDMA, C2K, EV-DO).
  l   First, there was SIM (Subscriber Identity       Retrieve    S-CSCF
                                                     user profile
      Module)…than there was USIM (Universal
      SIM)…and now there is ISIM (IP Multimedia
      Service Module),
      – Public User Identity (identify a user),                    HSS
      – Private User Identity (users subscription),
                                                                                       I-CSCF
                                                                     Retrieve S-CSCF
                                                                       capabilities


                                                              Calculate RES, REG request
                                                                 SIP registration request

                                                                                       P-CSCF

                                                                401 User not authorized
                                                                       200 OK

                          November 2012 | LTE measurements|         196
IMS: SMS over IMS
Message flow for a mobile originated SMS



                SIP MESSAGE RP-DATA ( SMS-SUBMIT)
                SIP 200 OK

                SIP MESSAGE RP-ACK ( SMS-SUBMIT REPORT)
                SIP 200 OK


                                                                 SMS Delivery

                SIP MESSAGE RP-DATA ( SMS-STATUS REPORT)
                SIP 200 OK

                SIP MESSAGE RP-ACK
                SIP 200 OK


                       November 2012 | LTE measurements|   197
SMS over IMS


  IP based Core
  Access Network,
  i.e. EPC
                                                                  S-CSCF     HSS


                                                         I-CSCF

                                P-CSCF
                                                                  IP-SM-GW


                                    IP short message
                                   Gateway to connect
                                     S-CSCF to SMS                 SMS-SC
                                      serving centre


                    November 2012 | LTE measurements|   198
LTE Positioning with SUPL 2.0


         LTE radio
          signal

eNB
                     Measurements based on reference sources*

         Target                      LPP
                                                                 Location
         Device                                                   Server
                                 Assistance data



                                 LPP over RRC
               UE             Control plane solution             E-SMLC     Enhanced Serving
                                                                            Mobile Location Center




                                LPP over SUPL
SUPL enabled
    Terminal
               SET            User plane solution                 SLP       SUPL location
                                                                            platform




                       November 2012 | LTE measurements|   199
Background for IMS and relation to LTE?

l   LTE has been designed as a fully packet-orientated, “all-IP”-
    based, multi-service system with a flat network architecture,
    l   Technical challenges offering circuit-switched services (Voice, SMS)
        via LTE


l   3GPP has defined IMS as long-term solution providing
    circuit-switched services, for the short- / mid-term there is
    no industry-wide consensus, but different approaches,
    l   Short-/mid-term: Circuit-switched fallback (CS fallback),
        – SMS. “SMS over SG”, means SMS via Non-Access Stratum (NAS)
          signaling,
        – Voice. Fallback to 3G or 2G technology to take the call,
    l   VOLGA – Voice over LTE Generic Access
          – Call setup time increases while using CS fallback,
    l   OneVoice Initiative formed to push for Voice over LTE (VoLTE)
        based on IMS.
                             November 2012 | LTE measurements|   200
How to connect E-UTRAN to CS services?
l   Connection via IMS: 3GPP and OneVoice initiative



                                     First a big mess,
                               Now it seems to be OneVoice

l   Voice over LTE Generic Access – VoLGA Forum – interim solution

l   CS Fallback CSFB for voice calls to 2G or 3G services – preferred interim solution

l   Evolved MSC, eMSC – CS Services via EPS – network operator proposal, interim solution

l   SRVCC – Single Radio Voice Call Continuity

l   SV-LTE – simultaneous voice and LTE

l   OTT, Over the top – propietary solution, application based


                              November 2012 | LTE measurements|   201
IMS: Voice over IMS
Message flow for a mobile originated call


                                    INVITE (SDP offer)
                          183 Session Progress (SDP offer)

                                         PRACK
                                    200 OK (PRACK)

Resource Reservation                                             Resource Reservation
                                     UPDATE (SDP)
                                 200 OK (UPDATE) (SDP)
                                      180 RINGING
                                         PRACK
                                      200 OK (PRACK)

                                    200 OK (INVITE)
                                           ACK


                       November 2012 | LTE measurements|   202
Voice over IMS: IMS call establishment
                             Originating Home Network                                  Terminating
                                                                                        Network
                UE                   P-CSCF                   S-CSCF

                    1. Invite (Initial SDP Offer)

                                            2. Invite (Initial SDP Offer)


                                                          3. Service Control

                                                                     4. Invite (Initial SDP Offer)

                                                                     5. Offer Response
                                            6. Offer Response

                                 7. Authorize QoS
                                    Resources

                   8. Offer Response

                   9. Response Conf (Opt SDP)

           10. Resource
            Reservation                     11. Response Conf (Opt SDP)

                                                                     12. Response Conf (Opt SDP)

                                                                     13. Conf Ack (Opt SDP)

                                            14. Conf Ack (Opt SDP)

                   15. Conf Ack (Opt SDP)

                   16. Reservation Conf
                                            17. Reservation Conf
                                                                     18. Reservation Conf

                                                                     19. Reservation Conf
                                            20. Reservation Conf
                   21. Reservation Conf
                                                                     22. Ringing
                                            23. Ringing
                   24. Ringing
                                                                     26. 200 OK
                                            27. 200 OK
           25. Alert User
                                  28. Enabling of
                                        Media Flows
                   29. 200 OK

           30. Start Media

                   31. ACK
                                            32. ACK
                                                                     33. ACK




                      November 2012 | LTE measurements|                     203
Voice over IMS: IMS protocol profile
Adaptive Multirate            Codec mode
                              AMR_12.20
                                                    Source codec bit-rate
                                                    12,20 kbit/s (GSM EFR)
Codecs are used               AMR_10.20
                               AMR_7.95
                                                          10,20 kbit/s
                                                             7,95 kbit/s
In VoIP over IMS               AMR_7.40                  7,40 kbit/s (IS-641)
                               AMR_6.70              6,70 kbit/s (PDC-EFR)
                               AMR_5.90                      5,90 kbit/s
                               AMR_5.15                      5,15 kbit/s
                               AMR_4.75                      4,75 kbit/s
                               AMR_SID               1,80 kbit/s (see note 1)




                     November 2012 | LTE measurements|             204
QoS class identifiers QCI
 QCI   Resource   Priority    Packet Delay       Packet Error                     Example Services
           Type                   Budget              Loss
                                                       Rate


  1                  2            100 ms              10-2       Conversational Voice

  2                  4            150 ms              10-3       Conversational Video (Live Streaming)
         GBR
  3                  3            50 ms               10-3       Real Time Gaming

  4                  5            300 ms              10-6       Non-Conversational Video (Buffered Streaming)

  5                  1            100 ms              10-6       IMS Signalling

                                                                 Video (Buffered Streaming)
  6                  6            300 ms                              TCP-based (e.g. www, e-mail, chat, ftp, p2p
                                                         10-6
                                                                      file sharing, progressive video, etc.)
       Non-GBR                                                   Voice, Video (Live Streaming),
  7                  7            100 ms
                                                         10-3         Interactive Gaming

  8                  8                                           Video (Buffered Streaming)
                                  300 ms                              TCP-based (e.g. www, e-mail, chat, ftp, p2p
  9                  9                                   10-6         file sharing, progressive video, etc.)




                             November 2012 | LTE measurements|     205
Voice over LTE – protocol profiles
                                                                        AMR codec
    Optimize transmission of
    Voice by configuring                                               UDP/ TCP
    Lower layers                                                          IP

Use robust header compression or IP                 Packet Data Convergence
Short PDCP header is used                                    PDCP

    Use RLC in UM mode
    Small sequence number is used                         Radio Link Control
                                                                RLC
SRB1 and 2 are supported for
DCCH + one UM DRB with QCI 1 for voice
for SIP signaling + one AM DRB QCI 5 for             Medium Access Control
SIP signaling + one AM DRB QCI 8 for                         MAC
IMS traffic

TTI bundling + DRX to reduce PDCCH
Signaling + Semi-persistend scheduling                  PHYSICAL LAYER

                            November 2012 | LTE measurements|    206
IMS: Voice over IMS
Interaction with EPS

l     Resource reservation (QoS) can
      be achieved with separate Radio
      Bearers                                                           Default   Dedicated
                                                                        Bearer     Bearer

    SIP                     Non-
               QCI = 5                        AM DRB
    signalling              GBR

                                                                            PDCP
    Voice        QCI = 1    GBR               UM DRB
                                                                             RLC
QCI         Quality of Service Class Indicator
GBR         Guaranteed Bitrate                                              MAC
DRB         Data Radio Bearer
                                                                             PHY
                              November 2012 | LTE measurements|   207
VoLTE connection to CS via IMS
  CS Connection via Boarder and Media Gateway of IMS

                                                              Control plane
     IP based Core
     Access Network,
     i.e. EPC
                                                                            S-CSCF   HSS


                                                                   I-CSCF
How to connect VoLTE
                                   P-CSCF
To legacy network?

     PSTN                                          BGW
     CS
     network
                                      MGCF                 BGCF
                                                                        User plane
                                                   MG

                       November 2012 | LTE measurements|          208
IMS connection to CS services - arguments

l   IMS can provide real end-to-end connection
l   IMS defines end-to-end quality of service profiles
l   IMS is completely based on Internet Protocol
l   Supplementary services can be realized
l   Several application servers needed
l   Not widely implemented yet – many operators are reluctant
l   IMS software client needed on UE side
l   What happens under heavy load condition?




                      November 2012 | LTE measurements|   209
Radio Access Technologies today

 GERAN                                                    CDMA2K
                                                          1xEVDO
                         UTRAN




                        EUTRAN

     LTE coverage is not fully up from day one
     -> interworking with legacy networks is essential!!!

                November 2012 | LTE measurements|   210
Voice calls in LTE
l   There is one common solution: Voice over IMS
    l   -> also named Voice over LTE VoLTE or OneVoice initiative



    But….

    What if IMS is not available at first rollout?
    -> interim solution called Circuit Switched Fallback CSFB = handover to
        2G/3G
    -> or Simultaneous Voice on 1XRTT and LTE, SV-LTE = dual receiver

    What is if LTE has no full coverage?
    -> interworking with existing technologies, Single Radio Voice Call Continuity,
        SRVCC


                         November 2012 | LTE measurements|   211
2G or 3G CS fallback
Voice call

        E-UTRAN                         MME                  IMS



Voice over IMS is the solution,
but IMS is maybe not available in the first network roll-out.

Need for transition solution:

   Circuit Switched Fall Back, CSFB move the call to 2G or 3G



                   November 2012 | LTE measurements|   212
2G or 3G CS fallback
CS
connection
as fallback                                     SGSN
 to legacy    GERAN                                             Voice calls are
networks
                                                                routed via 2G or 3G

   UE         UTRAN
                                                                           MSC


              E-UTRAN                            MME             Only for signalling

Only packet switched connections


                      November 2012 | LTE measurements|   213
CSFB issues and questions
                                                  Iu-ps        SGSN
   Target cell                     UTRAN
  assigned or
                                                                               Gs
selected by UE?                                   Gb
                  Uu
                                   GERAN
                                                               S3     Iu-cs
                                                                                    MSC
                  Um                                                  A             Server


                                                                              SGs
                  LTE Uu                          S1-MME
          UE                     E-UTRAN                       MME


                           Handover or
                           Redirection?
•Is it a handover command or a command to redirect to a new RAN ? i.e.
the UE selects the target cell or the EUTRAN commands the target cell
•Is there any information about the target RAN available (SysInfo)?
•Is there a packet data connection PDN active or not?
•Will the PDN be suspended or continued in the target RAN?
•Will the UE re-initiate the PDN or continue?
                           November 2012 | LTE measurements|   214
CS fallback options to UTRAN and GERAN

                                                         Feature
                                                          group
                                                       index, UE
                                                        indicates
                                                          CSFB
                                                         support




             November 2012 | LTE measurements|   215
CS fallback to 1xRTT

    1xCS
    CSFB             1xRTT CS           A1                1xRTT
     UE               Access                               MSC
                                               A1


              Tunneling of                    1xCS IWS                     S102 is the
           messages between                                              reference point
           1xRTT MSC and UE
                                              S102                      between MME and
                                                MME                     1xCS interworking
                               S1-MME                      S11               solution
    1xCS                                                  Serving/PDN       SGi
                     E-UTRAN
    CSFB                                                      GW
     UE                                      S1-U



             Tunnelled 1xRTT messages




                      November 2012 | LTE measurements|      216
CS fallback to 1xRTT




              November 2012 | LTE measurements|   217
CS fallback - arguments

l   E-UTRAN and GERAN/UTRAN coverage must overlap

l   No E-UTRAN usage for voice

l   No changes on EPS network required

l   Gs interface MSC-SGSN not widely implemented

l   Increased call setup time

l   No simultaneous voice + data if 2G network/UE does not support DTM

l   SMS can be used without CS fallback, via E-UTRAN



                       November 2012 | LTE measurements|   218
Why not CSFB?

l   Call setup delay

l   Call drop due to handover
    l   Blind hand-over is used for CSFB


l   Data applications are interupted

l   Legacy RAN coverage needed




                         November 2012 | LTE measurements|   219
Dual receiver 1xCSFB
                Circuit switched
      UE        1xRTT registration
                                                         CDMA2000 cell

                                                         eNB for LTE
           Packet switched
           EUTRAN registration
Dual receiver 1xCSFB UEs can handle separate mobility and
registration procedures 2 radio links at the same
time. UE is registered to 2 networks, no coordination required.
When CS connection in 1xRTT,
dual receiver UE leaves EUTRAN!

                     November 2012 | LTE measurements|    220
SV-LTE: Simultaneous CDMA200 + LTE

           Circuit switched
  UE       1xRTT connection
                                                 CDMA2000 cell

                                                  eNB for LTE
       Packet switched
       EUTRAN connection

Simultaneous Voice UEs can handle 2 radio links at the same
time. UE is registered to MME and CDMA2K independently



                  November 2012 | LTE measurements|   221
OTT – over the top


            EUTRAN



                                                                             Application
UE          Evolved nodeB



                                                S-GW            P-GW   PDN
                                    Evolved Packet Core

         Voice call as application, e.g. Skype, Google talk, …

                            November 2012 | LTE measurements|   222
OTT – over the top - arguments
           EUTRAN


                                                                  Application
   UE      Evolved nodeB

                                    S-GW            P-GW    PDN

                            Evolved Packet Core


•Propietary solution, needs to be implemented in UE and AS

•Already implemented in computer networks – known application

•Support has to be accepted by operator

•No Inter-RAT handover is possible

                       November 2012 | LTE measurements|   223
SMS transfer in LTE
Encapsulate SMS in NAS
                                                                Send SMS over IMS
  Control message->
                                                                 Using IP protocol
     SMS over SG
                                                                  SMS over IMS
       EMM                       ESM                                User plane
       Radio Resource Control
               RRC
                                  Packet Data Convergence
                                           PDCP
                                                                         Radio Bearer
             Measurements




                                        Radio Link Control
               Control &




                                              RLC
                                                                         Logical channels
                                   Medium Access Control
                                           MAC
                                                                        Transport channels
                                      PHYSICAL LAYER


                            November 2012 | LTE measurements|     224
CSFB circuit switched fallback – SMS transfer

                             Iups
                               -             SGSN                                   SMS-SC
               UTRAN


                                                                Gs
                             Gb
       Uu
               GERAN
                                                      Iu cs
                                                        -
                                              S3
                                                                     MSC
       Um                                             A              Server

                                                                                     For 1xRTT it
       LTEUu
          -                 S1-MME                             SGs                   is the S102
  UE           E-UTRAN                       MME                                       interface

                                                                     SGsAP            SGsAP

SMS transfer between SMS-SC and                                      SCTP              SCTP

                                                                      IP                 IP
MME via new interface SGs.                                            L2                L2
New protocol SGs interface                                            L1                L1

application protocol                                                  MME     SGs   MSC Server



                  November 2012 | LTE measurements|           225
CSFB circuit switched fallback – SMS transfer
                                    SGs interface
                                                                                         SMS-
                                                                                         SMS-
 MS/UE          eNodeB           MME             MSC/VLR             HLR/HSS                              SC
                                                                                         GMSC
                      1. EPS/IMSI attach procedure
                                                                                              2. Message transfer
                                                                              3. Send Routeing Info For Short Message
                                                        4. Forward Short Message
                                     5. Paging
    7. Paging        6. Paging

         8. Service Request
                                       8a. Service Request                                  No real fallback,
                                     9a. Downlink Unitdata                                  because SMS
   9b. Downlink NAS Transport
   9c. Uplink NAS Transport          9d. Uplink Unitdata                                      is sent over
                                                                                             NAS signaling
    10. Uplink NAS Transport         11. Uplink Unitdata

                                                        12. Delivery report
                                                                                             13. Delivery report
   15. Downlink NAS Transport        14. Downlink Unitdata

                                     16. Release Request


 Mobile terminated SMS in idle mode, SMS over SG

                                 November 2012 | LTE measurements|        226
CSFB circuit switched fallback – SMS transfer

l SMS can be transferred in the signaling messages
  -> so no real circuit switched fallback
l CSFB ready at LTE launch? CSFB needs SGs
  interface between MME and MSC
l Roaming: no guarantee that CSFB is supported
  worldwide
l Specification issues: Not clear what happens if
  SMS transfer occurs at ongoing CSFB procedure
l Test scenarios: No CSFB SMS test scenarios
  defined yet

                 November 2012 | LTE measurements|   227
Single Radio Voice Call Continuity
                                       Problem: in first network roll-out,
                                     there is no full LTE coverage. How to
                                                keep call active?
                                                   => SRVCC




               November 2012 | LTE measurements|   228
SRVCC – Single Radio Voice Call Continuity
                                           SGSN
        GERAN                                                 Handover of voice call
                                                              to 2G or 3G

UE      UTRAN
                                                                        MSC


       E-UTRAN                              MME                      IMS

  User plane after handover                          SRVCC is handover from
                                                     EUTRAN to 2G/3G if no
  User plane before handover
                                                     LTE coverage
                 November 2012 | LTE measurements|      229
Single Radio Voice Call Continuity
                                                                                                   Target
      UE                     E-UTRAN                MME                    MSC Server                             3GPP IMS
                                                                                                UTRAN/GERAN


               Measurement
                 Reports

                              Handover to UTRAN/GERAN
                                      required


                                                 Initiates SRVCC for voice component

                                                                               CS handover preparation
                                                 Handles PS-PS HO for
                                                  non-voice if needed          IMS Service Continuity Procedure



                                           To eUTRAN
                                                                     PS HO response to MME
                                       Coordinates SRVCC
                                                                         (CS resources)
           Handover CMD                and PS HO response

   Handover
   execution




                                       November 2012 | LTE measurements|          230
Single Radio Voice Call Continuity

                VoLTE call                                eNodeB = EUTRAN

                                    Handover to UTRAN

            VoIP in PS mode
                                                          NodeB = UTRAN

                               Radio Bearer reconfiguration:
                               PS to CS mode


time        Voice call in CS mode                         NodeB = UTRAN


                November 2012 | LTE measurements|   231
Handover requirements
    l   Goal is to have seamless service continuity between LTE and other Legacy
        Technologies (CDMA2000, WCDMA, GSM)
l   Data and Voice services
    l   Support of all frequency bands and a single radio solution
    l   Transparent signaling to allow an independent protocol evolution for both
        access systems
    l   Impact to QoS, e.g. service interruption, should be minimized
    l   RAT change procedure shall limit interruption time to less than 300ms
    l   3GPP changes
        – Ability to tunnel signaling messages between E-UTRAN and 3GPP2
        – Support measurements of 3GPP2 channels from E-UTRAN
        – Capability to trigger a handover to a 3GPP2 system
    l   3GPP2 changes
        – Minimal impact on today’s available cdma2000, Rev. 0 or Rev. A access terminal
        – Minimal impact to legacy, deployed cdma2000 radio access networks
        – Influence on circuit switched core network should be minimized




                                  November 2012 | LTE measurements|   232
Handovers??

l   What is :
    l   Intra-Frequency
        – Changing between cells on same frequency -> different cell ID
    l   Inter-Frequency
        – Changing between cells on differenct frequency
    l   Intra-Band
        – Changing between cells inside the same band
    l   Inter-Band
        – Changing between cells in different bands
    l   Inter-RAT
        – Changing between cells using different RAT (LTE-WCDMA, LTE-GSM,
          etc.)




                           November 2012 | LTE measurements|   233
Handover – what to discuss?
UE reads                  GERAN cell(s)?
SysInfo



                                                                    eNodeB
UTRAN cell(s)?                                                      EUTRAN cell
CDMA2K cell(s)?                                                       NW sends
                                 UE              Redirection command? SysInfo of
                                                                      Target?
     Will the UE initiate the                     Handover command?
    change? -> re-selection
    Will the network initiate                                       Mandatory
         the change? ->                                               for UE
    redirection or handover                                         supporting
                                                                       CSFB




                          November 2012 | LTE measurements|   234
Handover aspects – what to discuss?

l   Some keywords that appear – and to be clarified in next
    slides:

l   Handover?
l   Cell reselection?
l   Cell change order?
l   Redirection?
l   Network assisted cell change, NACC?
l   Circuit switched fallback, CS fallback?




                      November 2012 | LTE measurements|   235
Mobility aspects – support from UE

  l   There are some UE feature groups defined. The UE reports
      this in the attach procedure to the network:

      – A.        Support of measurements and cell reselection procedure
        in idle   mode

      – B.        Support of RRC release with redirection procedure in
        connected           mode

      – C.        Support of Network Assisted Cell Change in connected
        mode

      – D.        Support of measurements and reporting in connected
        mode

      – E.        Support of handover procedure in connected mode
                         November 2012 | LTE measurements|   236
Mobility aspects – support from UE
                 Feature                            GERAN                   UTRAN            HRPD              1xRTT          EUTRAN
                                                                                       Supported if      Supported if
                                               Supported if          Supported if
                                                                                            CDMA200           CDMA200
                                                    GERAN                 UTRAN                                            Supported for
A. Measurements and cell reselection                                                        0 HRPD            0 1xRTT
                                                    band                  band                                                  supported
     procedure in E-UTRA idle mode                                                          band              band
                                                    support is            support is                                            bands
                                                                                            support is        support is
                                                    indicated             indicated
                                                                                            indicated         indicated
                                                                                       Supported if      Supported if
                                               Supported if          Supported if
                                                                                            CDMA200           CDMA200
B. RRC release with blind redirection               GERAN                 UTRAN                                            Supported for
                                                                                            0 HRPD            0 1xRTT
     procedure in E-UTRA connected                  band                  band                                                  supported
                                                                                            band              band
     mode                                           support is            support is                                            bands
                                                                                            support is        support is
                                                    indicated             indicated
                                                                                            indicated         indicated
C. Cell Change Order (with or without)
      Network Assisted Cell Change) in E-      Group 10              N.A.              N.A               N.A               N.A.
      UTRA connected mode
D. Inter-frequency/RAT measurements,
       reporting and measurement reporting
                                               Group 23              Group 22          Group 26          Group 24          Group 25
       event B2 (for inter-RAT) in E-UTRA
       connected mode
                                               Group 9
                                                    (GSM_conn
                                                    ected            Group 8 (PS
                                                    handover)             handover)
E. Inter-frequency/RAT handover procedure      Separate UE                or Group
                                                                                       Group 12          Group 11          Group 13
       in E-UTRA connected mode                     capability bit        27
                                                    defined in            (SRVCC
                                                    TS 36.306             handover)
                                                    for PS
                                                    handover

                                                                                                               Table from TS36.331
                                             November 2012 | LTE measurements|            237
LTE Radio Resource Control States
 Cell search and selection                                                                                      1. What about
         de-allocate Tracking Area ID (TA-ID) and IP address
 and system information                                                                                         mobility, when UE
 acquisition
                                                                                                                is in IDLE state?
                       LTE random access procedure
                       [Initial Access; allocate C-RNTI, TA-ID, IP address]
                                                                                                  release of C-RNTI, allocate
                                                                                                  DRX cycle for PCH


 LTE_DETACHED                           LTE_ACTIVE (RRC_CONNECTED)                                                    LTE_IDLE (RRC_IDLE)
 • No IP address assigned,              • IP address assigned,                                                        • IP address assigned,
 • UE location unknown.                 • Connected to known cell.                                                    • UE position partially known.
                                         OUT_OF_SYNCH                         IN_SYNCH
                                         • DL reception possible,             • DL reception possible,
                                         • No UL transmission.                • UL transmission possible.
Power-up
                                     © Rohde&Schwarz, 2010
                                                                                          LTE random access procedure
                                                                                          [Transition to LTE_ACTIVE state (IN_SYNCH)]
                                    LTE random access procedure
                                    [to restore uplink synchronization]


                                                                                  2. What about
     User Equipment (UE)
     LTE/eHRPD-capable terminal                                                   mobility, when UE
                                                                                  is in CONNECTED state?




                                               November 2012 | LTE measurements|                  238
Mobility between LTE and WCDMA/GSM
Radio Access Aspects


                                                                                            GSM_Connected
        CELL_DCH             Handover            E-UTRA                Handover
                                             RRC_CONNECTED
                                                                                                GPRS Packet
                                                                                                transfer mode
       CELL_FACH
                                                              CCO with
                                                               optional                CCO,
        CELL_PCH                                                 NACC             Reselection
        URA_PCH             Reselection
                                                  Connection                                   Connection
         Connection                          establishment/release                        establishment/release
    establishment/release

                            Reselection            E-UTRA              Reselection          GSM_Idle/GPRS
        UTRA_Idle
                                                  RRC_IDLE                                    Packet_Idle
                                                                     CCO, Reselection




                               November 2012 | LTE measurements|        239
IRAT Procedures
Redirection

1.   UE has an active RF session (EPS Bearer Context, PDP Context)

2.   NW releases RRC connection and indicates target RAT and RF
     channel in RRC Connection Release Message

3.   UE indicates active PDP Contexts during Routing Area Update
     procedure on target RAT

4.   NW sets up radio bearer

5.   For WCDMA → LTE redirection can also be signaled in RRC
     Connection Request

6.   Data connection is interrupted during the procedure


                        November 2012 | LTE measurements|   240
Redirection
AS-security has been activated, and SRB2 with at least one DRB are setup

                 UE                                        EUTRAN



                  RRCConnectionRelease




                       November 2012 | LTE measurements|    241
Redirection to UMTS
 UE reads
 SysInfo



                                                                        eNodeB
NodeB(s)                                                                EUTRAN cell
UTRAN cell(s)
                                          RRC connection release message
  UE will search for          UE          with RedirectedCarrierInfo to
   suitable cell on
 UARFCN and initiate
                                          UTRAN Mandatory
                                                             for UE
   CS connection                                           supporting
                                                              CSFB




   RRC connection release with redirection without SysInfo

                       November 2012 | LTE measurements|   242
Redirection to UMTS                                                                         Rel. 9
                                                                                           feature
UE reads
SysInfo



     NodeB                                                                 eNodeB
                                                                Sys
     UTRAN cell                                                 Info       EUTRAN cell

                                              RRC connection release message
 UE will go to indicated          UE          with RedirectedCarrierInfo to
  cell and initiate CS
       connection                             UTRAN
                                                                     e-RedirectionUTRA
                                                                       capability is set
                                                                           by UE




      RRC connection release with redirection with SysInfo

                           November 2012 | LTE measurements|   243
Redirection to GERAN



                                                                           eNodeB
BTS(s)                                                                     EUTRAN cell
GSM cell(s)
                                             RRC connection release message
    UE will search for           UE          with RedirectedCarrierInfo to
 suitable cell on ARFCN
      and initiate CS
                                             GSM       Mandatory
                                                                for UE
       connection                                             supporting
                                                                 CSFB




    RRC connection release with redirection without SysInfo

                          November 2012 | LTE measurements|   244
Redirection to GERAN                                                                       Rel. 9
                                                                                          feature




 BTS(s)                                                                   eNodeB
                                                               Sys
 GSM cell(s)                                                   Info       EUTRAN cell

                                             RRC connection release message
UE will go to indicated          UE          with RedirectedCarrierInfo to
 cell and initiate CS
      connection                             GSM
                                                                    e-RedirectionUTRA
                                                                      capability is set
                                                                          by UE




     RRC connection release with redirection with SysInfo

                          November 2012 | LTE measurements|   245
IRAT Procedures
PS Handover

l   UE has an active data session (EPS Bearer Context, PDP
    Context)

l   NW sends handover command e.g.
    l   LTE → WCDMA: MobilityFrom EUTRACommand
    l   WCDMA → LTE: HandoverFromUTRANCommand_EUTRA


l   PS radio bearer is immediately setup on target RAT




                     November 2012 | LTE measurements|   246
Handover (Intra-LTE)
AS-security has been activated, and SRB2 with at least one DRB are setup

                 UE                                           EUTRAN



                  RRCConnectionReconfiguration


                              RRCConnectionReconfigurationComplete




                       November 2012 | LTE measurements|        247
Packet Switched handover to other RAN
                        UE                                                EUTRAN



                          MobilityFromEUTRACommand


                               Contains this information element when
                               Falling back to legacy networks
MobilityFromEUTRACommand ::=                   SEQUENCE {
           rrc-TransactionIdentifier           RRC-TransactionIdentifier,
           criticalExtensions                  CHOICE {
                        c1                     CHOICE{
                        mobilityFromEUTRACommand-r8                  MobilityFromEUTRACommand-r8-IEs,
                        mobilityFromEUTRACommand-r9                  MobilityFromEUTRACommand-r9-IEs,
                        spare2 NULL, spare1 NULL
                        },
                        criticalExtensionsFuture                                SEQUENCE {}
           }
}



                                November 2012 | LTE measurements|   248
Handover (Intra-MME/Serving Gateway)
          UE                 Source eNB                    Target eNB           MME

        Measurement reporting
                       Handover decision
                                      Handover request
                                                     Admission Control
                                   Handover request Ack
    RRC connection reconfiguration
    Detach from old,       Deliver packets
    sync to new cell        to target eNB
                                      SN Status Transfer
                                       Data forwarding
                                                    Buffer packets
                                                   from source eNB
           RRC connection reconfiguration complete
                                                               Path switch Req / Ack
                                     UE context release
                            Flush buffer
                         Release resources
                       November 2012 | LTE measurements|       249
Handover to UMTS: Packet switched
handover


                                                                       eNodeB
NodeB(s)                                                               EUTRAN cell
UTRAN cell(s)
                             UE        MobilityFromEUTRACommand message
UE will select target cell
   on UARFCN and                       with purpose indicator = handover
continue PS connection                 to UTRAN
                                       EUTRAN contains targetRATmessagecontainer,
                                       = Inter-RAT info about target cell

                   Packet Switched handover to UTRAN

                             November 2012 | LTE measurements|   250
HandoverfromEUTRAN – target RAT
message
HandoverFromEUTRAN message contains control message
of target RAT. Possible messages are:
targetRAT-Type           Standard to apply                     targetRAT-MessageContainer


geran
                 GSM TS 04.18, or 3GPP TS 44.018              HANDOVER COMMAND

                 3GPP TS 44.060                               PS HANDOVER COMMAND

                 3GPP TS 44.060                               DTM HANDOVER COMMAND

cdma2000-        C.S0001 or later, C.S0007 or later,
   1XRTT            C.S0008 or later


cdma2000-        C.S0024 or later
   HRPD
utra             3GPP TS 25.331                               HANDOVER TO UTRAN
                                                                 COMMAND

                          November 2012 | LTE measurements|   251
Mobility from EUTRAN – failure case

         UE                                                EUTRAN



           MobilityFromEUTRACommand


                     RRC connection re-establishment




    Radio link failure                         UE will try to
     in target RAT                             Reestablish
                                            EUTRAN connection

                 November 2012 | LTE measurements|   252
UE mobility in LTE (RRC CONNECTED state)
Measurement configuration, related RRC messages & information elements
RRCConnectionReconfiguration
…
MeasConfig                                                                         Neig Cell Info
...                  MeasConfig                                                    Type of CDMA network (1xRTT, HRPD),
                     MeasObjectToAddModList                                        CDMA2000 carrier configuration, search
                     ReportConfigToAddMod                                          window size, cells to add/modify/remove
                     QuantityConfig                                                from the neighboring list, cell index (up to
                     measGapConfig                                                 32 cells), PN offset…
                                                MeasObjectToAddModList
                                                …
                                                MeasObjectCDMA2000

   How? What?                                                                  Periodic or event (InterRAT: B1, B2) triggered
   When?                                                                       Reporting, hysteresis (0…15 dB), # of cells to
                                                                               report excluding serving cell, report interval
                                                ReportConfigToAddMod           (120, …, 10240ms, …, 60 min), time-to-trigger,
                                                …                              CDMA2000 threshold (0…63)
                                                ReportConfigInterRAT




                                                measGapConfig
Each gap starts at SFN & subframe               gp0 (0…39), gp1 (0…79)
meeting these conditions :                                                     Two gap pattern 0 and 1, gap length is 6 ms,
                                                                               using two different Transmission Gap
SFN mod T = FLOOR(gapOffset/10)                                                Repetition Period of 40 or 80 ms
with T = MGRP/10
Subframe = gapOffset mod 10
                                              When to retune the receiver to measure e.g. CDMA2000 or HRPD…


                                 November 2012 | LTE measurements|       253
Inter-RAT Handover to GERAN: cell change order
                                     PS connection will be suspended




                                                                           eNodeB
BTS(s)                                                                     EUTRAN cell
GPRS cell(s)
                                           MobilityFromEUTRACommand message
                                 UE        with purpose indicator = Cell Change Order
    UE will search for
 suitable cell on ARFCN
                                           to GPRS
                                                              Mandatory
    and re-initiate PS                                          for UE
       connection                                             supporting
                                                                 CSFB



  Packet Switched cell change order to GPRS without NACC
               (network assisted cell change)

                          November 2012 | LTE measurements|   254
Inter-RAT Handover to GERAN: cell change order
                                   PS connection will be suspended




    BTS                                                                   eNodeB
                                                               Sys
    GPRS cell                                                  Info       EUTRAN cell
                                          MobilityFromEUTRACommand message
                                UE        with purpose indicator = Cell Change Order
   UE will search for
suitable cell on ARFCN
                                          to GPRS
                                                             Mandatory
     and initiate PS                                           for UE
      connection                                             supporting
                                                                CSFB



   Packet Switched cell change order to GPRS with NACC
               (network assisted cell change)

                         November 2012 | LTE measurements|   255
Inter-RAT Handover to GERAN: handover
                                PS connection will be handed over




 BTS                                                                       eNodeB
 GPRS cell                                                                 EUTRAN cell

    UE will search for                     MobilityFromEUTRACommand message
 suitable cell on ARFCN          UE        with purpose indicator = handover
     and continue PS                       to GPRS
       connection                                             Mandatory
                                                                for UE
                                                              supporting
                                                                 CSFB




                Packet Switched handover to GPRS

                          November 2012 | LTE measurements|   256
LTE-RTT Handover
Circuit Switched Fallback,
          CSFB
          Overview

       November 2012 | LTE measurements|   257
3GPP Changes
l   LTE Broadcast Channel
    l   CDMA System Time
    l   1xEVDO, 1xRTT, WCDMA, GSM cell parameters
    l   Cell (re)selection parameters
    l   Broadcast as SIB Type 8 or via Dedicated RRC messages


l   Tunneling
    l   Receiving 1xEVDO overhead messages with dual Rx ATs


l   Measurement Gaps




                        November 2012 | LTE measurements|   258
Eg CDMA2000 Changes
l   Air interface specification changes
    l   New protocols defined for
        – Authentication: EAP-AKA
        – IP Address Allocation : VSNCP
        – Multiple PDN support : EMFPA

    l   Non-optimized and optimized handoff from LTE to eHRPD
    l   Preamble Initial Power for handover complete message
    l   Handover to 1xEV-DO Rev. B being considered
    l   Circuit-Switched Fallback (CS fallback) currently specified in
        C.S0097-0

l   Core network changes
    l   S101 interface – signaling interface
    l   S103 interface – bearer interface
    l   PDSN extension (now called HSGW)

                           November 2012 | LTE measurements|   259
Definitions cont’d
l Non-Optimized Handovers
  l Without the use of tunneled signaling (S101)


l Optimized Handovers
  l Less than 300ms interruption
  l Uses tunneled signaling interface
  l Two step process
       –   Pre registration / Session maintenance
       –   Handover preparation/handover execution
 l Types of handovers
      – Idle mode handover (cell re-selection)
      – Active mode handover




                          November 2012 | LTE measurements|   260
CS fallback to 1xRTT

    1xCS
    CSFB             1xRTT CS           A1                1xRTT
     UE               Access                               MSC
                                               A1


              Tunneling of                    1xCS IWS                     S102 is the
           messages between                                              reference point
           1xRTT MSC and UE
                                              S102                      between MME and
                                                MME                     1xCS interworking
                               S1-MME                      S11               solution
    1xCS                                                  Serving/PDN       SGi
                     E-UTRAN
    CSFB                                                      GW
     UE                                      S1-U



             Tunnelled 1xRTT messages




                      November 2012 | LTE measurements|      261
CS fallback to 1xRTT




              November 2012 | LTE measurements|   262
CS fallback to 1xRTT
                                                                      CSFB to 1xRTT
                                                                                      MME
                                                                                 CSFB Info



                                                                            eNodeB
1xRTT cell(s)                                                               EUTRAN cell

                                              RRC connection release message
    UE will search for            UE          with RedirectedCarrierInfo to
     suitable cell on
   UARFCN and initiate
                                              1xRTT     Mandatory
                                                         for UE
     CS connection                                             supporting
                                                                  CSFB
Enhancement: UE can pre-register in 1xRTT network               to 1xRTT



     RRC connection release with redirection without SysInfo

                           November 2012 | LTE measurements|   263
CS fallback to 1xRTT
          UE                 E-UTRAN                  MME                1xCS IWS
                                                                                                     1xRTT   S-GW/
                                                                                                      MSC    P-GW


                                  UE is EPS attached and registered with 1xRTT CS



     UE decision to
   perform MO call in
         1xCS



      EXTENDED SERVICE REQUEST (with service type CSFB)



                        UE CONTEXT MODIFICATION REQUEST (CS Fallback Indicator)


                            UE CONTEXT MODIFICATION RESPONSE



  Optional measurement
         reports



           RRCConnectionRelease
           with redirection to 1xRTT



                             UE CONTEXT RELEASE REQUEST

                                                                                    Suspend Notification


                                                                                Suspend Acknowledge



                                                                      UE context release




                                       MO call establishment in 1xRTT network




                                          November 2012 | LTE measurements|                      264
CS fallback to 1xRTT
enhanced 1xCSFB (e1xCSFB)
                                          Enhancement: UE can pre-register in 1xRTT network
                  UE                                          EUTRAN
 1) Prepare for
   handover,
   search for          HandoverFromEUTRAPreparationRequest

     1xRTT

                                                                                Time flow
                   UE                                              EUTRAN
 2) Info about
   1xRTT ->
 tunnelled via          ULHandoverPreparationTransfer

     S102

                  UE                                               EUTRAN
  3) Includes
1xRTT channel
  assignment       MobilityFromEUTRACommand




                         November 2012 | LTE measurements|   265
CS fallback to 1xRTT
enhanced 1xCSFB (e1xCSFB) + concurrent HRPD handover
                                                Enhancement: UE can pre-register in 1xRTT network
  1) Prepare for   UE                                             EUTRAN
    handover,
    search for
                        HandoverFromEUTRAPreparationRequest
 1xRTT + HRPD

  2) Trigger 2           UE                                   EUTRAN
                                                                                      Time flow
messages with                ULHandoverPreparationTransfer
   info about
1xRTT + HRPD            UE                                    EUTRAN



                          ULHandoverPreparationTransfer




                   UE                                                  EUTRAN
 3) Redirection
 to 1xRTT and
  handover to       MobilityFromEUTRACommand
     HRPD



                          November 2012 | LTE measurements|      266
LTE-eHRPD Handover
      Overview




    November 2012 | LTE measurements|   267
InterRAT Network Architecture
Eg CDMA2000 1xEVDO




                November 2012 | LTE measurements|   268
EUTRAN – eHRPD non-roaming




                                                i.e. US subscriber, connected
                                                To home network, leaves
                                                LTE coverage area

            November 2012 | LTE measurements|     269
EUTRAN – eHRPD, roaming case




                                            i.e. European subscriber
                                            visiting US, connected to roaming
                                            network and leaving LTE
                                            coverage area
            November 2012 | LTE measurements|      270
Mobility between LTE and HRPD
Radio Access Aspects
          No handover to
            EUTRAN




                                                  HRPD active to EUTRAN is
                                                  always cell reselection
                                                  (via RRC idle)
                       November 2012 | LTE measurements|   272
3 Step Procedure

                      Ability of pre-                                       E-UTRAN needs
                      registration is                                       to decide, that
                      indicated                                             HO to HRPD
                      on PBCCH                                              is required




UE attached
                               Pre-registration                  HO preparation                HO execution
to E-UTRAN

• Reduces time for cell re-selection or handover
• Reduces risk of radio link failure

                                                   Connection Request                         Traffic Channel Assignment
                                                   issued by UE to                             command is delivered
                                                   HRPD, HRPD prepares                        to UE, re-tune radio to
                                                   for the arrival of the UE                  HRPD channel, acquire
                                                                                              HRPD channel, session
                                                                                              configuration




                                        November 2012 | LTE measurements|        273
Video over LTE
Testing the next step in the end user
experience
Introduction

l   Cisco quote 06/2011
    l   Internet video is now 40 percent of
        consumer Internet traffic, and will reach
        62 percent by the end of 2015, not
        including the amount of video ex-
        changed through P2P file sharing. The
        sum of all forms of video (TV, video
        on demand [VoD], Internet, and P2P)
        will continue to be approximately 90
        percent of global consumer traffic by 2015.
l   IDC quote 06/2011
    l   The fast-growing smartphone market, which will
        grow more than four times the rate of the overall
        mobile phone market this year, is being fuelled
        by falling average selling prices, increased
        phone functionality, and lower-cost data plans
        among other factors, which make the devices
        more accessible to a wider range of users.


                            November 2012 | LTE measurements|   278
Introduction
Network view                                                                  Impact due to
                                                                 EPC / IMS    l Packet delay
                                                                              l Packet jitter
                                                                              l Packet loss
                                               MME                 PCRF       l …



          Node B

                                     SGW                 PGW
Impact due to
                                                                             Internet
l Multipath propagation
l Speed
l …




                    Node B




                             November 2012 | LTE measurements|        279
Introduction
Testing real life conditions in the lab
l   Main use cases from a test engineer (operator, manufacturer) perspective:
    l   Exploring the performance of mobile equipment from the end user perspective
    l   Measuring E2E throughput with realistic radio conditions
    l   Evaluating mobility performance
                                                    R&S®AMU200                         Contest SW
                                                    baseband fader                      provides
                                                  simulates real life                  automation
                                                   radio conditions                   and reporting
                                                                                       capabilities

                                       R&S®CMW500
                                       emulates LTE
                                         network




                                                                        CMW-PQA
l   Important aspect for end user perspective: Error free video reception

                              November 2012 | LTE measurements|   280
Video transmission over LTE
Video quality…
l   … is the perceived degradation of a processed video in
    comparison to an ideal reference or the reality



l   … can be used as an evaluation criteria for any kind of video
    transmission or processing system as signal impairments will
    happen in different stages



l   … can be categorized in two basic types of video quality
    assessment
    l   Subjective quality assessment
    l   Objective quality assessment


                         November 2012 | LTE measurements|   281
Video transmission over LTE
    The video processing chain and possible sources for video
    degradation
                     • Encoding artifacts                   Impairments on the              The decoder is usually the less
                     (blocking)                             transmission link               critical component. But in
                                                            can cause loss of               conjunction with the video
                     • Video / audio delay
                                                            information despite             processor, errors during the
                     • Buffer rules are                     active error                    conversion process (e.g. de-
                     violated                               correction                      interlacing) are possible

                                                              Transmission
                                                                  link
                                                                (IP, cellular,
                                                              broadcast, etc.)
                                 Encoder               TX                         RX        Decoder           Video processor



                                                                                                                       Receiver
Uncompressed video                                                                                                                  Output on
                           Redundant                                                   Restoring the video Scaling and
SDI                                                                                                                                 screen
                           information (static                                         information; i.e. the conversion to output
SMPTE249/292/424           image parts) and                                            picture sequence      format
                           irrelevant data                                             including redundant
                           (details) is omitted                                        data




                                                  November 2012 | LTE measurements|      282
Video transmission over LTE
Subjective quality assessment
l   Subjective video quality assessments are defined in
    ITU-T recommendation BT.500
                                                                       Mean Opinion Score (MOS)

l   Example procedure:                                             MOS      Quality

                                                                   5        Excellent
    A group of trained experts judge the video quality in a
                                                                   4        Good
    scale ranging from bad to excellent. The assessments are
                                                                   3        Fair
    averaged and result in to a Mean Opinion Score (MOS).
                                                                   2        Poor
                                                                   1        Bad

l   Advantages:
    l   Subjective assessment provides the best results, as the
        ultimate measure for video quality is the human eye

l   Disadvantages:
    l   Time consuming and expensive
    l   Automation not possible


                         November 2012 | LTE measurements|   283
Video transmission over LTE
Objective quality assessment
l   Mathematical calculation that approximate averaged results of
    subjective quality assessment

l   Divided into three categories:
    l   Full reference methods (FR)
    l   Reduced reference methods (RR)
    l   No-reference methods (NR)


l   Advantage:
    l   Assessment automation is possible for various applications


l   Disadvantages:
    l   Correlation with the actual perceived video quality is not always ensured
    l   Many different metrics for specific purposes exist



                            November 2012 | LTE measurements|   284
Video transmission over LTE
Objective metric – peak signal-to-noise ratio (PSNR)
                     MAX I2                               l    Most commonly used for quality
 PSNR  10  log10 (        )                                  measurements for image compression.
                     MSE
        1 m 1 n 1                                       l
             I (i, j )  K (i, j )
                                                               Simple mathematical calculation but
 MSE 
                                      2
                                                               poor correlation with subjective
       mn i 0 j 0                                            methods:
                                                               l    Digital pixel values do not exactly represent
 I(i,j) = original pixel                                            the light stimulus on the human eye
                                                               l    The summation is averaging errors without
 K(i,j) = reconstructed pixel                                       weighting them
 MAX = maximum possible pixel value                            l    The same PSNR values may result from
                                                                    different kind of structural errors

 Unit: dB
 Value range: 0 - ∞ dB; the higher, the better




                                November 2012 | LTE measurements|      285
Video transmission over LTE
     Objective metric – structural similarity (SSIM)
Signal x    Luminance
           Measurement
                                                                                    l   Improvement to traditional methods for
                     +     Contrast
                          Measurement
                                            Luminance
                                            Comparison
                                                                       Similarity
                                                                                        quality measurements to improve
                                                                       Measure          consistency with human eye perception.
Signal y    Luminance
                                        ÷    Contrast
                                            Comparison
                                                         Combination

           Measurement
                                             Structure                              l   Complex mathematical calculation but
                                            Comparison                                  fairly good correlation with subjective
                     +     Contrast
                          Measurement
                                                                                        methods.
                                   ÷
                           (2 x  y  C1 )(2 xy  C2 )
 SSIM ( x, y ) 
                         (  x   y  C1 )( x   y  C2 )
                             2     2          2     2


  Unit: -
  Value range: 0 - 1; the higher, the better



                                                            Reference:
                                                            Z. Wang, A. C. Bovik, H. R. Sheikh and E. P. Simoncelli, "Image quality assessment: From
                                                            error visibility to structural similarity," IEEE Transactions on Image Processing, vol. 13, no. 4,
                                                            pp. 600-612, Apr. 2004.


                                               November 2012 | LTE measurements|               286
Video transmission over LTE
Correlation of objective metric with MOS




                                   Reference:
                                   Z. Wang, A. C. Bovik, H. R. Sheikh and E. P. Simoncelli, "Image quality assessment: From
 (MSSIM = Mean SSIM)               error visibility to structural similarity," IEEE Transactions on Image Processing, vol. 13, no. 4,
                                   pp. 600-612, Apr. 2004.


                       November 2012 | LTE measurements|              287
Video transmission over LTE
Metric – visible error
l   The shown objective metrics and their correlation with MOS are
    calculated frame based
l   Temporal masking effects need to be considered:
    l          Additional condition: e.g. for at least 6 frames SSIM below 0.7 (25 fps video)
               1,2


                1


               0,8
                                                                                             Not visible
        SSIM




                                                                                             Not visible
               0,6
                                                                                             Visible 1
                                                                                             Visible 2
               0,4


               0,2
                                        6 Frames
                                                            Visible Error
                0
                     1   3    5    7     9      11     13       15      17   19    21   23
                                                   Frame


                                   November 2012 | LTE measurements|         288
Video transmission over LTE
Demo




              November 2012 | LTE measurements|   289
Video transmission over LTE
Testing real life conditions in the lab


                                                  PC

                                                            Contest


                                               TC Control




                                                                          RF




                                                         Video

                                                                       via MHL
                                                                       or HDMI


                     November 2012 | LTE measurements|           290
Video transmission over LTE
R&S®VTE Video Tester
l   Source, sink and dongle testing on
    MHL 1.2 interfaces and in the future
    also HDMI 1.4c, etc.
l   Realtime difference picture analysis
    for testing video transmissions over
    LTE                                                         R&S®VTE Video Tester
l   Combined protocol testing and
    audio/video analysis
l   Future-ready, modular platform
    accommodating up to three test
    modules
l   Localized touchscreen user interface
l   Integrated test automation and report
    generation



                      November 2012 | LTE measurements|   291
Video transmission over LTE
Mobile high definition link (MHL)
MHL is…
l the leading audio/video interface for mobile devices
l utilizes the existing Micro-USB connector
l provides power to the mobile device

                                               l        Single Transition Minimized Differential
                                                        Signaling (TMDS) channel:
                                                        l   Carries video, audio and auxiliary data
                                                        l   Bit stream is modulated by a clock signal
                                               l        Single-wire Control Bus (CBUS)
                                                        l   Configuration and status exchange
                                                        l   Replaces the DDC bus in HDMI
                                                        l   Carries the MHL Sideband Channel (MSC)
                                                            which provides high level control functions
                                               l        VBUS and associated ground
                                                        l   Provide power between sink and source
                                                        l   5V, max. 0.5 A


                    November 2012 | LTE measurements|         292
Summary

l   Video and voice are important services gaining momentum for
    the fastest developing radio access technology ever - LTE
l   Beside LTE functionality, testing voice/video quality is
    essential to judge a good receiver implementation


    l R&S provides you with profound expertise and
      test solutions on both aspects
       l Complete LTE test portfolio ranging from early R&D via IOT
         and field testing until conformance and production
       l Supplier of a complete range of TV broadcasting transmission,
         monitoring and measurement equipment



                      November 2012 | LTE measurements|   293
There will be enough topics
  for future trainings                          


Thank you for your attention!


  Comments and questions
        welcome!

      November 2012 | LTE measurements|   294

LTE Measurement: How to test a device

  • 1.
    LTE, UMTS LongTerm Evolution LTE measurements – from RF to application testing Reiner Stuhlfauth Reiner.Stuhlfauth@rohde-schwarz.com Training Centre Rohde & Schwarz, Germany Subject to change – Data without tolerance limits is not binding. R&S® is a registered trademark of Rohde & Schwarz GmbH & Co. KG. Trade names are trademarks of the owners.  2011 ROHDE & SCHWARZ GmbH & Co. KG Test & Measurement Division - Training Center - This folder may be taken outside ROHDE & SCHWARZ facilities. ROHDE & SCHWARZ GmbH reserves the copy right to all of any part of these course notes. Permission to produce, publish or copy sections or pages of these notes or to translate them must first be obtained in writing from ROHDE & SCHWARZ GmbH & Co. KG, Training Center, Mühldorfstr. 15, 81671 Munich, Germany
  • 2.
    Mobile Communications: Fieldsfor testing l RF testing for mobile stations and user equipment l RF testing for base stations l Drive test solutions and verification of network planning l Protocol testing, signaling behaviour l Testing of data end to end applications l Audio and video quality testing l Spectrum and EMC testing November 2012 | LTE measurements| 2
  • 3.
    Test Architecture RF-/L3-/IPApplication-Test November 2012 | LTE measurements| 3
  • 4.
    LTE: EPS Bearer E-UTRAN EPC Internet UE eNB S-GW P-GW Peer Entity End-to-end Service EPS Bearer External Bearer Radio Bearer S1 Bearer S5/S8 Bearer Radio S1 S5/S8 Gi November 2012 | LTE measurements| 4
  • 5.
    Mobile Radio Testing Adjust the downlink Generate downlink signal to how uplink is Perform signal and send control received RF measurements on commands received uplink Core network A mobile radio tester emulates a base station November 2012 | LTE measurements| 5
  • 6.
    Mobile Radio Testing Generate downlink Generate downlink signal and send signal signaling information No signaling Control PC Signaling testing Non-Signaling testing November 2012 | LTE measurements| 6
  • 7.
    LTE measurements generalaspects November 2012 | LTE measurements| 7
  • 8.
    LTE RF TestingAspects UE requirements according to 3GPP TS 36.521 Power Transmit signal quality  Maximum output power Frequency error  Maximum power reduction Modulation quality, EVM  Additional Maximum Power Carrier Leakage Reduction In-Band Emission for non allocated RB  Minimum output power EVM equalizer spectrum flatness  Configured Output Power Output RF spectrum emissions  Power Control  Occupied bandwidth  Absolution Power Control  Out of band emissions  Relative Power Control  Aggregate Power Control  Spectrum emisssion mask  ON/OFF Power time mask  Additional Spectrum emission mask  Adjacent Channel Leakage Ratio 36.521: User Equipment (UE) radio transmission and reception Transmit Intermodulation November 2012 | LTE measurements| 8
  • 9.
    LTE RF TestingAspects UE requirements according to 3GPP, cont. Receiver characteristics:  Reference sensitivity level  Maximum input level  Adjacent channel selectivity  Blocking characteristics  In-band Blocking  Out of band Blocking  Narrow Band Blocking  Spurious response  Intermodulation characteristics  Spurious emissions Performance November 2012 | LTE measurements| 9
  • 10.
    LTE RF TestingAspects BS requirements according to 3GPP l Transmitter Characteristics l Base station output power l Frequency error l Output power dynamics l Transmit ON/OFF power l Output RF spectrum emissions (Occupied bandwidth, Out of band emission, BS Spectrum emission mask, ACLR, Spurious emission, Co-existence scenarios,…) l Transmit intermodulation l Modulation quality TR 36.804: Base Station (BS) radio transmission and reception November 2012 | LTE measurements| 10
  • 11.
    LTE RF TestingAspects BS requirements according to 3GPP, cont. l Receiver Characteristics l Reference sensitivity level l Dynamic range l Adjacent Channel Selectivity (ACS) l Blocking characteristics l Intermodulation characteristics l Spurious emissions l Performance November 2012 | LTE measurements| 11
  • 12.
    LTE RF Measurements– regional requirements l Regional / band-specific requirements exist (e.g. spurious emissions) l Since UEs roam implementation has to be dynamic  Concept of network signaled RF requirements has been introduced with LTE. - Network signaled value: NS_01 … NS_32 - transmitted as IE AdditionalSpectrumEmission in SIB2 November 2012 | LTE measurements| 12
  • 13.
    LTE bands andchannel bandwidth E-UTRA band / channel bandwidth E-UTRA Band 1.4 MHz 3 MHz 5 MHz 10 MHz 15 MHz 20 MHz 1 Yes Yes Yes Yes 2 Yes Yes Yes Yes Yes[1] Yes[1] 3 Yes Yes Yes Yes Yes[1] Yes[1] 4 Yes Yes Yes Yes Yes Yes 5 Yes Yes Yes Yes[1] 6 Yes Yes[1] 7 Yes Yes Yes Yes[1] 8 Yes Yes Yes Yes[1] 9 Yes Yes Yes[1] Yes[1] 10 Yes Yes Yes Yes 11 Yes Yes[1] 12 Yes Yes Yes[1] Yes[1] 13 14 Yes[1] Yes[1] Yes[1] Yes[1] Not every channel ... 17 Yes[1] Yes[1] bandwidth for ... every band! 33 Yes Yes Yes Yes 34 Yes Yes Yes 35 Yes Yes Yes Yes Yes Yes 36 Yes Yes Yes Yes Yes Yes 37 Yes Yes Yes Yes 38 Yes Yes Yes Yes 39 Yes Yes Yes Yes 40 Yes Yes Yes Yes NOTE 1: bandwidth for which a relaxation of the specified UE receiver sensitivity requirement (Clause 7.3) is allowed. November 2012 | LTE measurements| 13
  • 14.
    Tests performed at“low, mid and highest frequency” Nominal frequency RF power described by EARFCN (E-UTRA Absolute lowest EARFCN possible Radio Frequency Channel Number) and 1 RB at position 0 Frequency = whole LTE band RF power mid EARFCN and 1 RB at position 0 Frequency RF power Highest EARFCN and 1 RB at max position Frequency November 2012 | LTE measurements| 14
  • 15.
    Test Environment –Test System Uncertainty 36.101 / 36.508 • Temperature/Humidity -normal conditions +15C to +35C, relative humidity 25 % to 75 % -extreme conditions -10C to +55C (IEC 68-2-1/68-2-2) • Voltage • Vibration Acceptable Test System Uncertainty (Test Tolerance, TT) defined for each test individually in 36.521 Annex F (will be ignored further on for the sake of simplicity) Test Minimum Requirement in TS Test Test Requirement in TS 36.521- 36.101 Tolerance 1 (TT) 6.2.2. UE Power class 1: [FFS] 0.7 dB Formula: Maximum Output Power class 2: [FFS] 0.7 dB Upper limit + TT, Lower limit - TT Power Power class 3: 23dBm ±2 dB 0.7 dB Power class 1: [FFS] Power class 4: [FFS] 0.7 dB Power class 2: [FFS] Power class 3: 23dBm ±2.7 dB Power class 4: [FFS] November 2012 | LTE measurements| 15
  • 16.
    LTE RF measurements on base stations November 2012 | LTE measurements| 16
  • 17.
    OFDM risk: Degradation Channel (ideal) sl  n  rl  n  1 TMC Samples f f0 f1 f2 f3 f0 f1 f2 f3 November 2012 | LTE measurements| 17
  • 18.
    OFDM risk: Degradationdue to Frequency Offset Channel e j 2fn sl  n  rl  n  f Samples f f0 f1 f2 f3 f0 f1 f2 f3 November 2012 | LTE measurements| 18
  • 19.
    OFDM risk: Degradationdue to Clock Offset Channel sl  n   rl  n  f  k Samples f f0 f1 f2 f3 f0 f1 f2 f3 November 2012 | LTE measurements| 19
  • 20.
    Subcarrier zero handling Subcarrier0 or DC subcarrier causes problems in DAC for direct receiver strategies, DC offset! Downlink: f-1 f+1 1 j 2kf t  N CP ,l Ts  N RB Nsc / 2 DL RB sl( p ) t    ak (p)) ,l  e (   ak( (p)) ,l  e j 2kf t  NCP ,lTs  DC subcarrier,  k   N RB N sc / 2 DL RB  k 1 suppressed 1/TSYMBOL=15kHz Uplink: N RB Nsc / 2 1 UL RB j 2 k 1 2 f t  N CP ,l Ts  sl t    a k (  ) ,l  e  k   N RB N sc / 2 UL RB  f-1 f0 f1 f ½ subcarrier DC subcarrier offset November 2012 | LTE measurements| 20
  • 21.
    LTE: DC subcarrierusage DC subcarrier or subcarrier 0 is not used in downlink! November 2012 | LTE measurements| 21
  • 22.
    DC offset –possible reasons DC offset originated by mixer: fBB=fRx-fLO fRX=fLO+fBB+fLO_ɛ 1st mixer fLO –fLO_ɛ=DC fBB + DC Non-linearities of fLO_ɛ fLO Amplifier also cause DC in the signal PLL Idea: set PLL to frequency fLO to get frequency of baseband as fBB = fRX – fLO But: if synthesizer has leakage: fLO_ɛ will spread into the input: At the output we get direct current, DC! November 2012 | LTE measurements| 22
  • 23.
    Base station testmodels Parameter 1.4 MHz 3 MHz 5 MHz 10 MHz 15 MHz 20 MHz Reference, Synchronisation Signals RS boosting, PB = EB/EA 1 1 1 1 1 1 Synchronisation signal EPRE / ERS [dB] 0.000 0.000 0.000 0.000 0.000 0.000 Reserved EPRE / ERS [dB] -inf -inf -inf -inf -inf -inf PBCH PBCH EPRE / ERS [dB] 0.000 0.000 0.000 0.000 0.000 0.000 Reserved EPRE / ERS [dB] -inf -inf -inf -inf -inf -inf PCFICH # of symbols used for control channels 2 1 1 1 1 1 PCFICH EPRE / ERS [dB] 3.222 0 0 0 0 0 PHICH # of PHICH groups 1 1 1 2 2 3 # of PHICH per group 2 2 2 2 2 2 PHICH BPSK symbol power / ERS [dB] -3.010 -3.010 -3.010 -3.010 -3.010 -3.010 PHICH group EPRE / ERS [dB] 0 0 0 0 0 0 PDCCH # of available REGs 23 23 43 90 140 187 # of PDCCH 2 2 2 5 7 10 # of CCEs per PDCCH 1 1 2 2 2 2 TS 36.141 # of REGs per CCE 9 9 9 9 9 9 # of REGs allocated to PDCCH 18 18 36 90 126 180 Defines several # of <NIL> REGs added for padding 5 5 7 0 14 7 Test models PDCCH REG EPRE / ERS [dB] 0.792 2.290 1.880 1.065 1.488 1.195 <NIL> REG EPRE / ERS [dB] -inf -inf -inf -inf -inf -inf For base station PDSCH # of QPSK PDSCH PRBs which are boosted 6 15 25 50 75 100 e.g. E-TM1.1 PRB PA = EA/ERS [dB] 0 0 0 0 0 0 # of QPSK PDSCH PRBs which are de-boosted 0 0 0 0 0 0 PRB PA = EA/ERS [dB] n.a. n.a. n.a. n.a. n.a. n.a. November 2012 | LTE measurements| 23
  • 24.
    Base station unwantedemissions Spurious emissions ACLR •Adjacent channel leakage •Operating band unwanted emissions Channel Spurious domain ΔfOOB bandwidth ΔfOOB Spurious domain RB E-UTRA Band Worst case: Ressource Blocks allocated at channel edge November 2012 | LTE measurements| 24
  • 25.
    Adjacent Channel LeakageRatio - eNB E-UTRA transmitted BS adjacent channel Assumed Filter on the ACLR signal channel centre adjacent adjacent lim bandwidth frequency offset channel channel it BWChannel [MHz] below the first carrier frequency and or above the last (informative) corresponding carrier centre filter bandwidth frequency transmitted 1.4, 3.0, 5, 10, 15, 20 BWChannel E-UTRA of same Square (BWConfig) 45 dB BW 2 x BWChannel E-UTRA of same Square (BWConfig) 45 dB BW BWChannel /2 + 2.5 3.84 Mcps UTRA RRC (3.84 Mcps) 45 dB MHz BWChannel /2 + 7.5 3.84 Mcps UTRA RRC (3.84 Mcps) 45 dB MHz NOTE 1: BWChannel and BWConfig are the channel bandwidth and transmission bandwidth configuration of the E-UTRA transmitted signal on the assigned channel frequency. Large bandwidth NOTE 2: The RRC filter shall be equivalent to the transmit pulse shape filter defined in TS 25.104 [6], with a chip rate as defined in this table. Limit is either -13 / -15dBm absolute or as above November 2012 | LTE measurements| 25
  • 26.
    Adjacent channel leakagepower ratio November 2012 | LTE measurements| 26
  • 27.
    ACLR measurement * RBW 10 kHz VBW 30 kHz Ref 0 dBm Att 25 dB SWT 250 ms 0 * A -10 1 AP VIEW -20 2 AP VIEW -30 3 AP CLRWR -40 -50 EXT UTRAACLR1 UTRAACLR2 = 33 dB = 36 dB UTRAACLR2bis 3DB = 43 dB -60 -70 -80 -90 Additional requirement for E-UTRA frequency band I, -100 signaled by network to the UE Center 1.947 GHz 2.5 MHz/ Span 25 MHz fUTRA, ACLR2 fUTRA, ACLR1 fCarrier November 2012 | LTE measurements| 27 Date: 21.AUG.2008 15:51:00
  • 28.
    Operating band unwantedemissions Narrow bandwidth Frequency offset Frequency offset of Minimum requirement Measurem of measurement measurement filter centre ent filter -3dB point, f frequency, f_offset bandwidth (Note 1) 0 MHz  f < 5 0.05 MHz  f_offset < 5.05 100 kHz 7  f _ offset  MHz MHz  7dBm     0.05 dB 5  MHz  5 MHz  f < 5.05 MHz  f_offset < -14 dBm 100 kHz min(10 MHz, min(10.05 MHz, fmax) f_offsetmax) 10 MHz  f  10.05 MHz  f_offset < -16 dBm (Note 5) 100 kHz fmax f_offsetmax TS 36.104 defines several limits: depending on Channel bandwidth, additional regional limits and node B limits category A or B for ITU defined regions => Several test setups are possible! November 2012 | LTE measurements| 28
  • 29.
    Operating band unwantedemissions November 2012 | LTE measurements| 29
  • 30.
    Unwanted emissions –spurious emission The transmitter spurious emission limits apply from 9 kHz to 12.75 GHz, excluding the frequency range from 10 MHz below the lowest frequency of the downlink operating band up to 10 MHz above the highest frequency of the downlink operating band Frequency range Maximum level Measurement Note Bandwidth 9kHz - 150kHz 1 kHz Note 1 150kHz - 30MHz 10 kHz Note 1 -13 dBm 30MHz - 1GHz 100 kHz Note 1 1GHz – 12.75 GHz 1 MHz Note 2 NOTE 1: Bandwidth as in ITU-R SM.329 [5] , s4.1 NOTE 2: Bandwidth as in ITU-R SM.329 [5] , s4.1. Upper frequency as in ITU-R SM.329 [5] , s2.5 table 1 Spurious emission limits, Category A November 2012 | LTE measurements| 30
  • 31.
    Spurious emissions –operating band excluded November 2012 | LTE measurements| 31
  • 32.
    Base station maximumpower In normal conditions, the base station maximum output power shall remain within +2 dB and -2 dB of the rated output power declared by the manufacturer. Towards External External antenna connector PA device  BS e.g. cabinet TX filter (if any) (if any) Test port A Test port B Normal port for Port to be used for measurements measurements in case external equipment is used November 2012 | LTE measurements| 32
  • 33.
    LTE – DVBinterference scenarios Adjacent channel leakage of Basestation x into DTT channel N is point of interest For a BS declared to support Band 20 and to operate in geographic areas within the CEPT in which frequencies are allocated to broadcasting (DTT) service, the manufacturer shall additionally declare the following quantities associated with the applicable test conditions of Table 6.6.3.5.3-4 and information in annex G of [TS 36.104] : PEM,N Declared emission level for channel N P10MHz Maximum output Power in 10 MHz November 2012 | LTE measurements| 33
  • 34.
    Base station receivertest Example: Rx test, moving condition 70% of required throughput of FRC, Fixed Reference Channel November 2012 | LTE measurements| 34
  • 35.
    Base station receivertest – HARQ multiplexing UE sends PUSCH with alternating data and data with multiplexed ACK November 2012 | LTE measurements| 35
  • 36.
    Base station test– power dynamics Synchronisation time/frequency BS under Test FFT 2048 Per Symbol 100 subcarrier Detection / RF- CP- RBs, Ampl. decoding correc- remov 1200 /Phase tion sub correction carr EVM Resource element Tx RETP power: Distinguish: •OFDM symbol •Reference symbol November 2012 | LTE measurements| 36
  • 37.
    Downlink Power Reference Signal: Cell-specific PDCCH power PDSCH power to RS, where NO reference referenceSignalPower depending signals are present, is UE specific and (-60…+50dBm), on ρB/ρA signaled by higher layers as PA. signaled in SIB Type 2 For PDSCH power in same [Power] symbol as reference signal an additional cell specific offset is applied, that is signaled by -50.00 dBm higher layers as PB. PA = -4.77 dB 2011 © Rohde&Schwarz -54.77 dBm PB = 3 (-3.98 dB) -58.75 dBm 0 1 2 3 4 5 6 7 8 9 10 11 12 13 [Time] OFDM symbols RS EPRE = Reference Signal Reference signal power = linear average of all Ref. Energy per Resource Element Symbols over whole channel bandwidth EPRE PDSCH   A / B  EPRE RS B  PB   A  A  PA (with some exeptions for MIMO) November 2012 | LTE measurements| 37
  • 38.
    Base station test– output power dynamics Measure avg OFDM symbol power + Compare active and non-active case Ref. Symbol, always on OFDM Symbol not active! OFDM Symbol active! PDSCH # of 64QAM PDSCH PRBs within a slot for which EVM is measured 1 1 1 1 1 1 Test model: PRB PA = EA/ERS [dB] 0 0 0 0 0 0 E-TM3.1 # of PDSCH PRBs which are not allocated 5 14 24 49 74 99 All RB allocated Test model: PDSCH # of 64QAM PDSCH PRBs within a slot for which EVM 6 15 25 50 75 100 E-TM2 is measured Only 1 RB allocated November 2012 | LTE measurements| 38
  • 39.
    DL Modulation quality:Constellation diagram LTE downlink: several channels can be seen (example): PDSCH with 16 QAM PDCCH + PBCH with QPSK S-SCH with BPSK CAZAC Sequences, Reference signals November 2012 | LTE measurements| 39
  • 40.
    LTE RF measurements onuser equipment UEs November 2012 | LTE measurements| 40
  • 41.
    LTE Transmitter Measurements 1 Transmit power 1.1 UE Maximum Output Power 1.2 Maximum Power Reduction (MPR) 1.3 Additional Maximum Power Reduction (A-MPR) 1.4 Configured UE transmitted Output Power 2 Output Power Dynamics 2.1 Minimum Output Power 2.2 Transmit OFF power 2.3 ON/OFF time mask 2.3.1 General ON/OFF time mask 2.3.2 PRACH time mask 2.3.3 SRS time mask 2.4 Power Control 2.4.1 Power Control Absolute power tolerance 2.4.2 Power Control Relative power tolerance 2.4.3 Aggregate power control tolerance 3 Transmit signal quality 3.1 Frequency Error 3.2 Transmit modulation 3.2.1 Error Vector Magnitude (EVM) 3.2.2 Carrier leakage 3.2.3 In-band emissions for non allocated RB 3.2.4 EVM equalizer spectrum flatness 4 Output RF spectrum emissions 4.1 Occupied bandwidth 4.2 Out of band emission 4.2.1 Spectrum Emission Mask 4.2.2 Additional Spectrum Emission Mask 4.2.3 Adjacent Channel Leakage power Ratio 4.3 Spurious emissions 4.3.1 Transmitter Spurious emissions 4.3.2 Spurious emission band UE co-existence 4.3.3 Additional spurious emissions 5 Transmit intermodulation November 2012 | LTE measurements| 41
  • 42.
    UE Signal quality– symbolic structure of mobile radio tester MRT Test equipment Rx TxRx EVM … … … equalizer IDFT meas. DUT RF correction FFT Inband- … … … emmissions l Carrier Frequency error l EVM (Error Vector Magnitude) l Origin offset + IQ offset l Unwanted emissions, falling into non allocated resource blocks. l Inband transmission l Spectrum flatness November 2012 | LTE measurements| 42
  • 43.
    UL Power Control:Overview UL-Power Control is a combination of: l Open-loop: UE estimates the DL-Path- loss and compensates it for the UL l Closed-loop: in addition, the eNB controls directly the UL- Power through power- control commands transmitted on the DL November 2012 | LTE measurements| 43
  • 44.
    PUSCH power control l Power level [dBm] of PUSCH is calculated every subframe i based on the following formula out of TS 36.213 MPR Maximum allowed UE power in this particular cell, Combination of cell- and UE-specific PUSCH transport but at maximum +23 dBm1) components configured by L3 format Number of allocated Cell-specific Downlink Power control resource blocks (RB) parameter path loss adjustment derived Transmit power for PUSCH configured by L3 estimate from TPC command in subframe i in dBm received in subframe (i-4) Bandwidth factor Basic open-loop starting point Dynamic offset (closed loop) 1) +23 dBm is maximum allowed power in LTE according to TS 36.101, corresponding to power class 3bis in WCDMA November 2012 | LTE measurements| 44
  • 45.
    Pcmax definition „upper“ tolerance „lower“ tolerance „corrected“ UE power PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H) PCMAX_L = min{PEMAX_L, PUMAX } PCMAX_H = min{PEMAX_H, PPowerClass} Max. power permitted Max. power in cell, permitted in cell considering bandwidth confinement Max. power for UE Max. power for UE, considering maximum power reduction November 2012 | LTE measurements| 45
  • 46.
    Pcmax definition PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H), lPCMAX_L = min{PEMAX_L , PUMAX }, l PEMAX_L is the maximum allowed power for this particular radio cell configured by higher layers and corresponds to P-MAX information element (IE) provided in SIB Type1 l l PEMAX_L is reduced by 1.5 dB when the transmission BW is confined within FUL_low and FUL_low+4 MHz or FUL_high – 4 MHz and FUL_high, PPowerClass + 2dB 23dBm PPowerClass - 2dB -1.5dB -1.5dB FUL_low FUL_high- 4MHz FUL_high November 2012 | LTE measurements| 46
  • 47.
    Pcmax definition PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H), PCMAX_L = min{PEMAX_L , PUMAX }, l PUMAX corresponds to maximum power (depending on power class, taking into account Maximum Power Reduction MPR and additional A-MPR UE may decide to reduce power UE power class Network may signal = 23dBm ±2 dB bandwidth restriction NS_0x November 2012 | LTE measurements| 47
  • 48.
    UE Maximum PowerReduction UE transmits at maximum power, maximum allowed TX power reduction is given as Modulation Channel bandwidth / Transmission bandwidth configuration MPR (dB) [RB] 1.4 3.0 5 10 15 20 MHz MHz MHz MHz MHz MHz QPSK >5 >4 >8 > 12 > 16 > 18 ≤1 16 QAM ≤5 ≤4 ≤8 ≤ 12 ≤ 16 ≤ 18 ≤1 16 QAM Full >5 >4 >8 > 12 > 16 > 18 ≤2 Higher order modulation schemes require more dynamic -> UE will slightly repeal its confinement for maximum power November 2012 | LTE measurements| 48
  • 49.
    UE Additional MaximumPower Reduction A-MPR Additional maximum Network Requirements E-UTRA Band Channel Resource A-MPR (dB) Signaling (sub-clause) Bandwidth Blocks power reduction value (MHz) requirements can be NS_01 NA NA NA NA NA signaled by the 6.6.2.2.3.1 2,4,35,36 3 >5 ≤1 network as NS value 6.6.2.2.3.1 2,4,10,35,36 5 >6 ≤1 in SIB2 NS_03 6.6.2.2.3.1 2,4,10,35,36 10 >6 ≤1 (IE AdditionalSpectrumEmission) 6.6.2.2.3.1 2,4,10,35,36 15 >8 ≤1 6.6.2.2.3.1 2,4,10,35,36 20 >10 ≤1 NS_04 6.6.2.2.3.2 TBD TBD TBD TBD NS_05 6.6.3.3.3.1 1 10,15,20 ≥ 50 for QPSK ≤1 NS_06 6.6.2.2.3.3 12, 13, 14, 17 1.4, 3, 5, 10 n/a n/a 6.6.2.2.3.3 Table NS_07 13 10 Table 6.2.4.3-2 6.6.3.3.3.2 6.2.4.3-2 > 29 ≤1 NS_08 6.6.3.3.3.3 19 10, 15 > 39 ≤2 > 44 ≤3 [NS_09] 6.6.3.3.3.4 21 TBD TBD TBD .. NS_32 - - - - - November 2012 | LTE measurements| 49
  • 50.
    PUSCH power control Transmitoutput power ( PUMAX), cont’d. 3GPP Band 13 746 756 777 787 DL UL Network Requiremen Channel E-UTRA Resources A-MPR Signalling ts bandwidth Band Blocks (dB) Value (sub-clause) (MHz) … … … … … … Table Table 6.6.2.2.3 NS_07 13 10 6.2.4 6.2.4 6.6.3.3.2 -2 -2 Indicates the lowest RB … … … … … … index of transmitted Region A Region B Region C resource blocks RBStart 0 – 12 13 – 18 19 – 42 43 – 49 Defines the length of a contiguous RB allocation LCRB [RBs] 6–8 1 – 5 to 9 – 50 ≥8 ≥18 ≤2 A-MPR [dB] 8 12 12 6 3 l In case of EUTRA Band 13 depending on RB allocation as well as number of contiguously allocated RB different A-MPR needs to be considered. November 2012 | LTE measurements| 50
  • 51.
    Pcmax definition –tolerance values PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H) PCMAx Tolerance (dBm) T(PCMAX) (dB) 21 ≤ PCMAX ≤ 23 2.0 Tolerance is 20 ≤ PCMAX < 21 2.5 depending on 19 ≤ PCMAX < 20 3.5 power levels 18 ≤ PCMAX < 19 4.0 13 ≤ PCMAX < 18 5.0 8 ≤ PCMAX < 13 6.0 -40 ≤ PCMAX < 8 7.0 November 2012 | LTE measurements| 51
  • 52.
    Pcmax definition –tolerance values PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H) PCMAX_H = min{PEMAX_H , PPowerClass }, l PEMAX_H is the maximum allowed power for this particular radio cell configured by higher layers and corresponds to P-MAX information element (IE) provided in SIB Type 1 UE power class = 23dBm ±2 dB November 2012 | LTE measurements| 52
  • 53.
    Pcmax definition –tolerance values PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H) PCMAX_H = min{PEMAX_H , PPowerClass }, l PPowerClass. There is just one power class specified for LTE, corresponding to power class 3bis in WCDMA with +23 dBm ± 2dB, MPR and A-MPR are not taken into account, Class 1 Tolerance Class 2 Tolerance Class 3 Tolerance (dB) Class 4 Tolerance (dB) EUTRA (dB (dB) (dBm) (dB) (dBm (dBm) band m) ) 1 23 ±2 2 23 ±22 … 23 ±22 40 23 ±2 November 2012 | LTE measurements| 53
  • 54.
    Pcmax value forpower control - analogies PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H) PCMAX_L = min{PEMAX_L, PUMAX } PCMAX_H = min{PEMAX_H, PPowerClass} Maximum speed = 280 km/h =PPowerClass Under those conditions, I shall drive more carefully! Not going to the max seed! =PEMAX_H =PEMAX_L =PUMAX -> speed reduction November 2012 | LTE measurements| 54
  • 55.
    LTE RF Testing:UE Maximum Power UE transmits with 23dBm ±2 dB QPSK modulation is used. All channel bandwidths are tested separately. Max power is for all band classes Test is performed for varios uplink allocations November 2012 | LTE measurements| 55
  • 56.
    Resource Blocks numberand maximum RF power 1 active resource block (RB), Nominal RF power band width One active resource block 10 MHz = 50 RB’s (RB) provides maximum absolute RF power Frequency More RB’s in use will be at RF power lower RF power in order to create same integrated power Frequency RF power Additionally, MPR (Max. Power Reduction) and A- MPR MPR are defined Frequency November 2012 | LTE measurements| 56
  • 57.
    UE Maximum OutputPower – Test Configuration Initial Conditions Test Environment as specified in TS 36.508 subclause 4.1 Normal, TL/VL, TL/VH, TH/VL, TH/VH Temperature/Voltage Test Frequencies as specified in TS 36.508 subclause 4.3.1 Low range, Mid range, High range high/low Test Channel Bandwidths as specified in TS 36.508 subclause 4.3.1 Lowest, 5MHz, Highest Test Parameters for Channel Bandwidths Downlink Configuration Uplink Configuration Ch BW N/A for Max UE output power testing Mod’n RB allocation FDD TDD 1.4MHz QPSK 1 1 1.4MHz QPSK 5 5 3MHz QPSK 1 1 3MHz QPSK 4 4 5MHz QPSK 1 1 5MHz QPSK 8 8 10MHz QPSK 1 1 10MHz QPSK 12 12 15MHz QPSK 1 1 15MHz QPSK 16 16 20MHz QPSK 1 1 20MHz QPSK 18 18 November 2012 | LTE measurements| 57
  • 58.
    UE maximum power PPowerClass + 2dB 23dBm PPowerClass - 2dB maximum output FUL_high FUL_low power for any transmission bandwidth within the channel bandwidth November 2012 | LTE measurements| 58
  • 59.
    UE maximum power– careful at band edge! PPowerClass + 2dB 23dBm PPowerClass - 2dB -1.5dB -1.5dB FUL_low FUL_high- 4MHz FUL_high FUL_low+4MHz For transmission bandwidths confined within FUL_low and FUL_low + 4 MHz or FUL_high – 4 MHz and FUL_high, the maximum output power requirement is relaxed by reducing the lower tolerance limit by 1.5 dB November 2012 | LTE measurements| 59
  • 60.
    UE maximum power- examples Example 1: No maximum power reduction by higher layers PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H) PCMAX_L = min{PEMAX_L, PUMAX } PCMAX_H = min{PEMAX_H, PPowerClass} Max. power permitted in cell, Max. power for UE, Max. power permitted in Max. power for UE considering bandwidth considering maximum power cell confinement reduction PEMAX_L = none PUMAX = power class 3 = +23 dBm T(PCMAX_L) = T(PCMAX_H)=2dB PEMAX_H = none PPowerClass = power class 3 = +23 dBm PPowerClass + 2dB 25dBm 23dBm PPowerClass - 2dB 21dBm FUL_low FUL_high November 2012 | LTE measurements| 60
  • 61.
    UE maximum power- examples Example 2: max cell power = 0 dBm + band edge maximum power reduction PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H) PCMAX_L = min{PEMAX_L, PUMAX } PCMAX_H = min{PEMAX_H, PPowerClass} PEMAX_L = 0dBm -1.5 dB relaxation = -1.5dBm PEMAX_H = 0 dBm PUMAX = power class 3 – band relaxation = +21.5 dBm PPowerClass = power class 3 = +23 dBm PCMAX_L=-1.5dBm PCMAX_H=0 dBm T(PCMAX_L) = T(PCMAX_H)=7dB PCMAX_H + 7dB +7dBm 0 dBm PCMAX_L - 7dB -8.5dBm FUL_low FUL_low+4MHz FUL_high November 2012 | LTE measurements| 61
  • 62.
    UE maximum power- examples Example 3: Band 13 with NS_07 signalled ( = A-MPR). No Max Power restriction 16 QAM, 12 Resource blocks and RB start = 13. Bandwidth = 10 MHz MPR = 1dB, A-MPR = 12 dB, no band edge relaxation PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H) PCMAX_H = min{PEMAX_H, PPowerClass} PCMAX_L = min{PEMAX_L, PUMAX } PEMAX_L = none PEMAX_H = none PUMAX = power class 3 – MPR – A.MPR = +10 dBm PPowerClass = power class 3 = +23 dBm PCMAX_L=10 dBm T(PCMAX_L) = 6 dB PCMAX_H=23 dBm +25dBm T(PCMAX_H)=2dB PCMAX_H +2dB 23 dBm PCMAX_L - 6dB 4 dBm RB start = 13 12 Resource blocks FUL_high November 2012 | LTE measurements| 62
  • 63.
    UE maximum power- examples Example 4: band edge power relaxation – no higher layer reduction signalled QPSK, 15 RBs allocated, Band 2, RB allocated at band edge MPR = 1dB, A-MPR = 1 dB, band edge relaxation of 1.5dB PCMAX_L– T(PCMAX_L) ≤ PCMAX ≤ PCMAX_H + T(PCMAX_H) PCMAX_L = min{PEMAX_L, PUMAX } PCMAX_H = min{PEMAX_H, PPowerClass} PEMAX_L =none PEMAX_H = none PUMAX = power class 3 – MPR-A-MPR-band relaxation PPowerClass = power class 3 = +23 dBm = 23-1-1-1.5=+19.5 dBm PCMAX_H= 23 dBm PCMAX_L=19.5dBm PCMAX_H + 2dB +25 dBm T(PCMAX_L) = 3.5 dB T(PCMAX_H)=2dB 23 dBm PCMAX_L – 2 dB PCMAX_L – 3.5 dB +16 dBm FUL_low FUL_low+4MHz FUL_high November 2012 | LTE measurements| 63
  • 64.
    LTE RF Testing:UE Minimum Power UE transmits with -40dBm All channel bandwidths are tested separately. Minimum power is for all band classes < -39 dBm November 2012 | LTE measurements| 64
  • 65.
    LTE RF Testing:UE Off Power The transmit OFF power is defined as the mean power in a duration of at least one sub-frame (1ms) excluding any transient periods. The transmit OFF power shall not exceed the values specified in table below Channel bandwidth / Minimum output power / measurement bandwidth 1.4 3.0 5 10 15 20 MHz MHz MHz MHz MHz MHz Transmit OFF power -50 dBm Measurement 1.08 MHz 2.7 MHz 4.5 MHz 9.0 MHz 13.5 MHz 18 MHz bandwidth November 2012 | LTE measurements| 65
  • 66.
    Power Control Relatedtest items l Absolute Power Control Tolerance -- PUSCH open loop power control l Relative Power Control Tolerance – PUSCH relative power control, including both power ramping and power change due to Ressource block allocation change or TPC commands l Aggregate Power Control – PUSCH and PUCCH power control ability when RB changes every subframe November 2012 | LTE measurements| 66
  • 67.
    Absolute Power ControlTolerance l The purpose of this test is to verify the UE transmitter’s ability to set its initial output power to a specific value at the start of a contiguous transmission or non-contiguous transmission with a long transmission gap. November 2012 | LTE measurements| 67
  • 68.
    Power Control -Absolute Power Tolerance l …. ability to set initial output power to a specific value at the start of a contiguous transmission or non-contiguous transmission with a long transmission gap (>20ms). l Set p0-NominalPUSCH to -105 (test point 1) and -93 (test point 2) l Test requirement example for test point 1: Channel bandwidth / expected output power (dBm) 1.4 3.0 5 10 15 20 MHz MHz MHz MHz MHz MHz Expected Measured -14.8 ± -10.8 ± -8.6 ± -5.6 ± -3.9 ± -2.6 ± power Normal 10.0 10.0 10.0 10.0 10.0 10.0 conditions Expected Measured -14.8 ± -10.8 ± -8.6 ± -5.6 ± -3.9 ± -2.6 ± power Extreme 13.0 13.0 13.0 13.0 13.0 13.0 conditions November 2012 | LTE measurements| 68
  • 69.
    Configured UE transmittedOutput Power IE P-Max (SIB1) = PEMAX To verify that UE follows rules sent via system information, SIB Test: set P-Max to -10, 10 and 15 dBm, measure PCMAX Channel bandwidth / maximum output power 1.4 3.0 5 10 15 20 MHz MHz MHz MHz MHz MHz PCMAX test point 1 -10 dBm ± 7.7 PCMAX test point 2 10 dBm ± 6.7 PCMAX test point 3 15 dBm ± 5.7 November 2012 | LTE measurements| 69
  • 70.
    LTE Power versustime RB allocation is main source for power change Not scheduled Resource block PPUSCH (i)  min{PMAX ,10 log10 (M PUSCH (i))  PO_PUSCH ( j )    PL   TF (TF (i))  f (i)} Bandwidth allocation Given by higher layers TPC commands or not used November 2012 | LTE measurements| 70
  • 71.
    Accumulative TPC commands TPC Command Field Accumulated In DCI format 0/3  PUSCH [dB] 0 -1 1 0 2 1 3 3 2 minimum power in LTE November 2012 | LTE measurements| 71
  • 72.
    Absolute TPC commands PPUSCH(i)  min{ PMAX ,10 log 10 ( M PUSCH (i))  PO_PUSCH ( j )    PL   TF (TF (i))  f (i)} TPC Command Field Absolute  PUSCH [dB] In DCI format 0/3 only DCI format 0 0 -4 1 -1 2 1 3 4 Pm -1 -4 November 2012 | LTE measurements| 72
  • 73.
    Relative Power Control Power pattern B Power pattern A RB change RB change 0 .. 9 sub-frame# 0 .. 9 sub-frame# 1 2 3 4 radio frame 1 2 3 4 radio frame Power pattern C l The purpose of this test is to verify RB change the ability of the UE transmitter to set its output power relatively to the power in a target sub-frame, relatively to the power of the most recently transmitted reference sub-frame, if the 0 .. 1 9 sub-frame# 2 3 4 radio frame transmission gap between these sub- frames is ≤ 20 ms. November 2012 | LTE measurements| 73
  • 74.
    Power Control –Relative Power Tolerance l …. ability to set output power relative to the power in a target sub frame, relative to the power of the most recently transmitted reference sub-frame, if the transmission gap between these sub-frames is ≤ 20 ms. November 2012 | LTE measurements| 74
  • 75.
    Power Control –Relative Power Tolerance l Various power ramping patterns are defined ramping down alternating ramping up November 2012 | LTE measurements| 75
  • 76.
    UE power measurements– relative power change All combinations of All combinations of PUSCH/PUCCH Power step P PUSCH and and SRS (Up or down) PRACH [dB] PUCCH transitions [dB] transitions [dB] between sub- frames [dB] ΔP < 2 ±2.5 (Note 3) ±3.0 ±2.5 2 ≤ ΔP < 3 ±3.0 ±4.0 ±3.0 3 ≤ ΔP < 4 ±3.5 ±5.0 ±3.5 4 ≤ ΔP ≤ 10 ±4.0 ±6.0 ±4.0 10 ≤ ΔP < 15 ±5.0 ±8.0 ±5.0 15 ≤ ΔP ±6.0 ±9.0 ±6.0 P Power tolerance relative given by table time November 2012 | LTE measurements| 76
  • 77.
    UE power measurements– relative power change Power Power FDD test patterns TDD test patterns test for each bandwidth, here 10MHz 0 1 9 sub-frame# 0 2 3 7 8 9 sub-frame# Sub-test Uplink RB allocation TPC command Expected power Power step size step size range (Up or PUSCH/ (Up or down) down) ΔP [dB] ΔP [dB] [dB] A Fixed = 25 Alternating TPC = 1 ΔP < 2 1 ± (1.7) +/-1dB B Alternating 10 and 18 TPC=0dB 2.55 2 ≤ ΔP < 3 2.55 ± (3.7) C Alternating 10 and 24 TPC=0dB 3.80 3 ≤ ΔP < 4 3.80 ± (42.) D Alternating 2 and 8 TPC=0dB 6.02 4 ≤ ΔP < 10 6.02 ± (4.7) E Alternating 1 and 25 TPC=0dB 13.98 10 ≤ ΔP < 15 13.98 ± (5.7) F Alternating 1 and 50 TPC=0dB 16.99 15 ≤ ΔP 16.99 ± (6.7) November 2012 | LTE measurements| 77
  • 78.
    UE aggregate powertolerance Aggregate power control tolerance is the ability of a UE to maintain its power in non-contiguous transmission within 21 ms in response to 0 dB TPC commands TPC command UL channel Aggregate power tolerance within 21 ms 0 dB PUCCH ±2.5 dB 0 dB PUSCH ±3.5 dB Note: 1. The UE transmission gap is 4 ms. TPC command is transmitted via PDCCH 4 subframes preceding each PUCCH/PUSCH transmission. Tolerated UE power P deviation UE power with TPC = 0 Time = 21 milliseconds November 2012 | LTE measurements| 78
  • 79.
    Aggregate Power Control lThe purpose of this test is to verify the UE’s ability to maintain its power level during a non-contiguous transmission within 21 ms in response to 0 dB TPC commands with respect to the first UE transmission, when the power control parameters specified in TS 36.213 are constant. l Both PUSCH mode and PUCCH mode need to be tested Power Power FDD test patterns TDD test patterns 0 5 0 5 0 3 8 3 8 3 sub-frame# sub-frame# November 2012 | LTE measurements| 79
  • 80.
    UE aggregate powertolerance Power Power FDD test patterns TDD test patterns 0 5 0 5 0 3 8 3 8 3 sub-frame# sub-frame# Test performed with scheduling gap of 4 subframes November 2012 | LTE measurements| 80
  • 81.
    UE power measurement– timing masks Start Sub-frame End sub-frame Start of ON power End of ON power End of OFF power Start of OFF power requirement requirement * The OFF power requirements does not apply for DTX and measurement gaps 20µs 20µs Transient period Transient period Timing definition OFF – ON commands Timing definition ON – OFF commands November 2012 | LTE measurements| 81
  • 82.
    Power dynamics PUSCH = OFF PUSCH = ON PUSCH = OFF time Please note: scheduling cadence for power dynamics November 2012 | LTE measurements| 82
  • 83.
    General ON/OFF timemask Measured subframe = 2 UL/DL Scheduling should be configured properly. TDD Issues: - Special Subframe Configuration - >off power before is highter than off power after - <> tune down DL power November 2012 | LTE measurements| 83
  • 84.
    PRACH time mask PRACH ON power requirement End of OFF power Start of OFF power requirement requirement 20µs 20µs Transient period Transient period PRACH Channel bandwidth / Output Power [dBm] / measurement Measurement bandwidth preamble period (ms) format 1.4 3.0 5 10 15 20 0 0.9031 MHz MHz MHz MHz MHz MHz Transmit OFF 1 1.4844  -48.5 dBm power 2 1.8031 Transmission OFF 3 2.2844 Measurement 1.08 MHz 2.7 MHz 4.5 MHz 9.0 MHz 13.5 MHz 18 MHz bandwidth 4 0.1479 Expected PRACH Transmission ON -1± 7.5 -1 ± 7.5 -1 ± 7.5 -1 ± 7.5 -1 ± 7.5 -1 ± 7.5 Measured power November 2012 | LTE measurements| 84
  • 85.
    UE power measurement– PRACH timing mask PRACH preamble format Measurement period (ms) 0 0.9031 1 1.4844 2 1.8031 3 2.2844 4 0.1479 PRACH ON power requirement End of OFF power Start of OFF power requirement requirement 20µs 20µs Transient period Transient period November 2012 | LTE measurements| 85
  • 86.
    PRACH measurements For PRACH youhave to set a trigger Reminder: PRACH is CAZAC sequence November 2012 | LTE measurements| 86
  • 87.
    PRACH measurement: constellationdiagram Reminder: PRACH is CAZAC sequence November 2012 | LTE measurements| 87
  • 88.
    PRACH measurement: powerdynamics November 2012 | LTE measurements| 88
  • 89.
    Sounding Reference SignalTime Mask November 2012 | LTE measurements| 89
  • 90.
    UE power measurement– SRS timing mask SRS SRS ON power requirement Single Sounding Reference Symbol End of OFF Start of OFF power power requirement requirement 20µs 20µs Transient period Transient period SRS SRS Double Sounding SRS ON power SRS ON power Reference Symbol requirement requirement End of OFF Start of OFF power power requirement requirement 20µs 20µs 20µs 20µs Transient period *Transient period Transient period * Transient period is only specifed in the case of frequency hopping or a power change between SRS symbols November 2012 | LTE measurements| 90
  • 91.
    UE power measurement– Subframe / slot boundary N+1 Sub-frame N0 Sub-frame N+2 Sub-frame Sloti Sloti+1 Start of N+1 power End of N+1 power requirement requirement 20µs 20µs 20µs 20µs 20µs 20µs Transient period Transient period Transient period If intra-slot hopping is enabled Periods where power changes may occur November 2012 | LTE measurements| 91
  • 92.
    Tx power aspects RBpower = Ressource Block Power, power of 1 RB TX power = integrated power of all assigned RBs November 2012 | LTE measurements| 92
  • 93.
    Resource allocation versustime PUCCH allocation No resource scheduled PUSCH allocation, different #RB and RB offset November 2012 | LTE measurements| 93
  • 94.
    TTI based scheduling November 2012 | LTE measurements| 94
  • 95.
    LTE scheduling impacton power versus time TTI based scheduling. Different RB allocation Impact on UE power November 2012 | LTE measurements| 95
  • 96.
    Transmit signal quality November 2012 | LTE measurements| 96
  • 97.
    Transmit signal quality– carrier leakage Frequency error fc Fc+ε f Carrier leakage (The IQ origin offset) is an additive sinusoid waveform that has the same frequency as the modulated waveform carrier frequency. Parameters Relative Limit (dBc) Output power >0 dBm -25 -30 dBm ≤ Output power ≤0 dBm -20 -40 dBm  Output power < -30 dBm -10 November 2012 | LTE measurements| 97
  • 98.
    Frequency Error …. abilityof both the receiver and the transmitter to process frequencies correctly… The 20 frequency error Δf results must fulfil this test requirement: |Δf| ≤ (0.1 PPM + 15 Hz) observed over a period of one time slot (0.5ms) November 2012 | LTE measurements| 98
  • 99.
    Impact on Txmodulation accuracy evaluation l 3 modulation accuracy requirements l EVM for the allocated RBs l LO leakage for the centred RBs ! LO spread on all RBs l I/Q imbalance in the image RBs LO leakage level RF carrier signal I/Q imbalance noise RB0 RB1 RB2 RB3 RB4 RB5 frequency EVM November 2012 | LTE measurements| 99
  • 100.
    Inband emissions 3 typesof inband emissions: general, DC and IQ image Used allocation < ½ channel bandwidth channel bandwidth November 2012 | LTE measurements| 100
  • 101.
    Carrier Leakage Carrier leakage(the I/Q origin offset) is a form of interference caused by crosstalk or DC offset. It expresses itself as an un-modulated sine wave with the carrier frequency. I/Q origin offset interferes with the center sub carriers of the UE under test. The purpose of this test is to evaluate the UE transmitter to verify its modulation quality in terms of carrier leakage. DC carrier leakage due to IQ offset LO Parameters Relative Leakage Limit (dBc) Output power >0 dBm -25 -30 dBm ≤ Output power ≤0 dBm -20 -40 dBm  Output power < -30 dBm -10 November 2012 | LTE measurements| 101
  • 102.
    Inband emmission –error cases DC carrier leakage due to IQ offset November 2012 | LTE measurements| 102
  • 103.
    Inband emmission –error cases Inband image due to IQ inbalance November 2012 | LTE measurements| 103
  • 104.
    Inband emmission –error cases Inband image due to IQ inbalance November 2012 | LTE measurements| 104
  • 105.
    DC leakage andIQ imbalance in real world … November 2012 | LTE measurements| 105
  • 106.
    UL Modulation quality:Constellation diagram LTE PUSCH uses QPSK, 16QAM and 64 QAM (optional) modulation schemes. In UL there is only 1 scheme allowed per subframe November 2012 | LTE measurements| 106
  • 107.
    Error Vector Magnitude,EVM Q Magnitude Error (IQ error magnitude) Error Vector Measured Signal Ideal (Reference) Signal Φ Phase Error (IQ error phase) I Reference Waveform 011001… Ideal Demodulator Modulator - Input Signal Σ Difference Signal + Measured Waveform November 2012 | LTE measurements| 107
  • 108.
    Error Vector Magnitude,EVM 7 symbols / slot 0123456 0123456 0123456 0123456 time PUSCH symbol frequency Demodulation Reference symbol, DMRS Limit values Unit Level Parameter QPSK % 17.5 16QAM % 12.5 64QAM % [tbd] November 2012 | LTE measurements| 108
  • 109.
    Error Vector Magnitude,EVM CP center 1 SC-FDMA symbol, including Cyclic Prefix, CP OFDM Cyclic Symbol prefix Part equal to CP FFT Window size FFT window size depends on channel bandwidth and extended/normal CP length November 2012 | LTE measurements| 109
  • 110.
    Error Vector Magnitude,EVM CP center 1 SC-FDMA symbol, including Cyclic Prefix, CP OFDM Cyclic Symbol prefix Part equal to CP FFT Window size FFT window size depends on channel bandwidth and extended/normal CP length Cyclic prefix length N cp Ratio of N cp Cyclic prefix EVM Channel W to CP for symbols 1 Nominal for symbols window Bandwidt for symbol 0 for to 6 FFT size 1 to 6 in FFT length h MHz symbols 1 samples W to 6* FFT window does 1.4 128 9 [5] [55.6] 3 256 18 [12] [66.7] not capture the 5 512 36 [32] [88.9] full length: OFDM 10 160 144 1024 72 [66] [91.7] Symbol + CP 15 1536 108 [102] [94.4] 20 2048 144 [136] [94.4] * Note: These percentages are informative and apply to symbols 1 through 6. Symbol 0 has a longer CP and therefore a lower percentage. Table from TS 36.101 for normal CP November 2012 | LTE measurements| 110
  • 111.
    EVM measurement accordingto Spec Test Parameters for Channel Bandwidths Downlink Uplink Configuration l Applies to PUSCH, PUCCH Configuration Ch BW N/A for PUSCH EVM Mod’n RB allocation and PRACH 1.4MHz testing QPSK FDD 6 TDD 6 l PUSCH and PUCCH UL Tx 1.4MHz 1.4MHz QPSK 16QAM 1 6 1 6 1.4MHz 16QAM 1 1 Pwer 3MHz QPSK 15 15 l @ Max & -36.8 dBm 3MHz QPSK 4 4 3MHz 16QAM 15 15 3MHz 16QAM 4 4 l PRACH UL Tx Power 5MHz QPSK 25 25 5MHz QPSK 8 8 l FDD: @ -31 dBm & 14 dBm* 5MHz 5MHz 16QAM 16QAM 25 8 25 8 l TDD: @ -39 dBm & 6 dBm 10MHz 10MHz QPSK QPSK 50 12 50 12 10MHz 16QAM 50 50 (Note 3) (Note 3) 10MHz 16QAM 12 12 15MHz QPSK 75 75 15MHz QPSK 16 16 15MHz 16QAM 75 75 (Note 3) (Note 3) 15MHz 16QAM 16 16 20MHz QPSK 100 100 20MHz QPSK 18 18 20MHz 16QAM 100 100 (Note 3) (Note 3) 20MHz 16QAM 18 18 Note 1: Test Channel Bandwidths are checked separately for each E- * 20MHz, we can only reach 13 dBm UTRA band, which applicable channel bandwidths are specified in Table 5.4.2.1-1. Note 2: For partial RB allocation, the starting resource block shall be RB #0 and RB# (max+1 - RB allocation) of the channel bandwidth. November 2012 | LTE measurements| Note 3: 111 Applies only for UE-Categories 2-5
  • 112.
    Cyclic prefix aspects We can observe a phase shift CP CP CP part CP part OFDM symbol n-1 OFDM symbol n Content is OFDM symbol is periodic! different in each OFDM symbol Cyclic prefix does not provoque phase shift November 2012 | LTE measurements| 112
  • 113.
    Time windowing 1 SC-FDMA symbol, including Cyclic Prefix, CP 1 SC-FDMA symbol, including Cyclic Prefix, CP OFDM OFDM Cyclic Symbol Cyclic Symbol prefix Part equal prefix Part equal to CP to CP Continuous phase shift Difference in phase shift Phase shift between SC-FDMA symbols will cause side lobes in spectrum display! November 2012 | LTE measurements| 113
  • 114.
    Time windowing Tx time window creates some kind of clipping in symbol transitions Tx Time window Tx Time window OFDM OFDM Cyclic Symbol Cyclic Symbol prefix Part equal prefix Part equal to CP to CP Continuous phase shift Difference in phase shift Tx time window can be used to shape the Tx spectrum in a more steep way, but …. November 2012 | LTE measurements| 114
  • 115.
    Time windowing Tx time window creates some kind of clipping in symbol transitions Tx Time window Tx Time window OFDM OFDM Cyclic Symbol Cyclic Symbol prefix Part equal prefix Part equal to CP to CP Continuous phase shift Difference in phase shift Tx time window will create a higher Error Vector Magnitude! Here the Tx time window of 5µsec causes Some mismatch between the 2 EVM Measurements of the first SC-FDMA symbol November 2012 | LTE measurements| 115
  • 116.
    EVM vs. subcarrier Nominal subcarriers Each subcarrier Modulated with e.g. QPSK Integration of all f Error Vectors to Display EVM curve f0 f1 f2 f3 Error vector .... Error vector Note: simplified figure: in reality you compare the waveforms due to SC-FDMA November 2012 | LTE measurements| 116
  • 117.
    EVM vs. subcarrier November 2012 | LTE measurements| 117
  • 118.
    EVM Equalizer SpectrumFlatness The EVM equalizer spectrum flatness is defined as the variation in dB of the equalizer coefficients generated by the EVM measurement process. The EVM equalizer spectrum flatness requirement does not limit the correction applied to the signal in the EVM measurement process but for the EVM result to be valid, the equalizer correction that was applied must meet the EVM equalizer spectral flatness minimum requirements. Nominal subcarriers Amplitude Equalizer coefficients f f0 f1 f2 f3 Subcarriers before equalization Integration of all 1 amplitude equalizer coefficients to display | A( EC ( f )) |2 12 * N RB 12* N RB P( f )  10 * log spectral flatness curve | A( EC ( f ) |2 November 2012 | LTE measurements| 118
  • 119.
    Equalization 1-tap equalization = Interpreting the frequency Selectivity as scalar factor Equalizer tries to set same power level for all subcarriers A(f) 1-tap equalization = Calculating scalar to amplify or attenuate f November 2012 | LTE measurements| 119
  • 120.
    Spectrum flatness calculation 1-tapequalization = Interpreting the frequency Equalizer tries to Selectivity as scalar factor set same power level for all subcarriers A(f) 1 1-tap equalization = | A( EC ( f )) |2 12 * N RB 12* N RB Calculating scalar to P( f )  10 * log amplify or attenuate | A( EC ( f ) |2 f November 2012 | LTE measurements| 120
  • 121.
    Spectral flatness November 2012 | LTE measurements| 121
  • 122.
    Spectrum Flatness Maximum Ripple [dB] Frequency Range FUL_Meas – FUL_Low ≥ 3 MHz and FUL_High – FUL_Meas ≥ 3 MHz 5.4 (p-p) (Range 1) FUL_Meas – FUL_Low < 3 MHz or FUL_High – FUL_Meas < 3 MHz 9.4 (p-p) (Range 2) Note 1: FUL_Meas refers to the sub-carrier frequency for which the equalizer coefficient is evaluated Note 2: FUL_Low and FUL_High refer to each E-UTRA frequency band specified in Table 5.2-1 < 5.4(5.4) < 9.4(13.4) dBp-p dBp-p max(Range 2)-min(Range 1) < 8.4(11.4) dB max(Range 1)-min(Range 2) < 6.4(7.4) dB Range 1 Range 2 FUL_High – 3(5) MHz FUL_High November 2012 | LTE measurements| 122
  • 123.
    Output RF SpectrumEmissions Out-of-band emissions occupied Spurious Emissions bandwidth Spectrum Emission Mask – SEM -> measurement point by point (RBW) Adjacent Channel Leakage Ratio – ACLR -> integration (channel bandwidth) Channel Spurious domain ΔfOOB bandwidth ΔfOOB Spurious domain RB E-UTRA Band Worst case: from Harmonics, parasitic Resource Blocks allocated at modulation emissions, intermodulation channel edge process and frequency conversion November 2012 | LTE measurements| 123
  • 124.
    Impact on SEMdefinition l SEM defined for worst case scenario: RBs allocated at channel edge l OOB emission scales with channel BW >> a SEM per channel BW configuration 5 MHz QPSK LTE Tx spectrum : +23.0 dBm / +22.0 dBm 30 20 10 1 RB MPR 0dB 5 RBs MPR 0dB 6 RBs MPR 0dB 0 7 RBs MPR 0dB 8 RBs MPR 0dB Channel level (dBm/100kHz) 9 RBs MPR 1dB bandwidth -10 10 RBs MPR 1dB 1.4 3 5 10 15 20 11 RBs MPR 1dB BWChannel 12 RBs MPR 1dB [MHz] -20 13 RBs MPR 1dB 14 RBs MPR 1dB Length of OOB 15 RBs MPR 1dB domain on one 5 6 10 15 20 25 -30 16 RBs MPR 1dB 18 RBs MPR 1dB side [MHz] 20 RBs MPR 1dB -40 25 RBs MPR 1dB -50 -60 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 offset (MHz) November 2012 | LTE measurements| 124
  • 125.
    Adjacent Channel LeakageRatio - ACLR The purpose of this test is to verify that the UE transmitter does not cause unacceptable interference to adjacent channels. This is accomplished by determining the adjacent channel leakage [power] ratio (ACLR). l UTRA ACLR 1+2 l EUTRA ACLR l EUTRA measured with rectangular filter, WCDMA measured with RRC filter ΔfOOB E-UTRA channel Channel E-UTRAACLR1 UTRA ACLR2 UTRAACLR1 RB November 2012 | LTE measurements| 125
  • 126.
    Adjacent Channel LeakageRatio, ACLR Active LTE carrier, 20MHz BW 1 adjacent LTE carrier, 20MHz BW 2 adjacent WCDMA carriers, 5MHz BW November 2012 | LTE measurements| 126
  • 127.
    Occupied Bandwidth -OBW Occupied bandwidth is defined as the bandwidth containing 99 % of the total integrated mean power of the transmitted spectrum 99% of mean power Channel Bandwidth [MHz] Transmission Bandwidth Configuration [RB] Transmission Bandwidth [RB] Channel edge Channel edge Resource block Active Resource Blocks DC carrier (downlink only) November 2012 | LTE measurements| 127
  • 128.
    Spectrum Emission Mask,SEM OBW: Occupied bandwidth, defined as 99% of mean power SEM: Spectrum ‚Emission Mask, measured with different resolution bandwidth, 1 MHz or 30 kHz RBW 99% of mean power 1 MHz RBW 30 kHz RBW November 2012 | LTE measurements| 128
  • 129.
    Impact on SEMlimit definition Limits depend on channel bandwidth Spectrum emission limit (dBm)/ Channel bandwidth ΔfOOB 1.4 3.0 5 10 15 20 Measurement (MHz) MH M M M M M bandwidth z Hz Hz Hz Hz Hz  0-1 -10 -13 -15 -18 -20 -21 30 kHz  1-2.5 -10 -10 -10 -10 -10 -10 1 MHz  2.5-5 -25 -10 -10 -10 -10 -10 1 MHz  5-6 -25 -13 -13 -13 -13 1 MHz Limits vary  6-10 -25 -13 -13 -13 1 MHz dependent on offset  10-15 -25 -13 -13 1 MHz from assigned BW  15-20 -25 -13 1 MHz  20-25 -25 1 MHz November 2012 | LTE measurements| 129
  • 130.
    SEM definition dependson band Spectrum emission mask depends on additionally signalled band values NS_0x Spectrum emission limit (dBm)/ Channel bandwidth ΔfOOB 1.4 3.0 5 10 Measurement (MHz) MHz MHz MHz MHz bandwidth  0-0.1 -13 -13 -15 -18 30 kHz  0.1-1 -13 -13 -13 -13 100 kHz  1-2.5 -13 -13 -13 -13 1 MHz  2.5-5 -25 -13 -13 -13 1 MHz  5-6 -25 -13 -13 1 MHz  6-10 e.g. -25 -13 1 MHz NS_07  10-15 =band 13 -25 1 MHz November 2012 | LTE measurements| 130
  • 131.
    Transmitter Spurious Emissions …to verify that UE transmitter does not cause unacceptable interference to other channels or other systems in terms of transmitter spurious emissions. The spurious emission limits apply for the frequency Frequency Range Maximum Measurement ranges that are more than ΔfOOB (MHz) from the Level Bandwidth edge of the channel bandwidth 9 kHz  f < 150 kHz -36 dBm 1 kHz 150 kHz  f < 30 MHz -36 dBm 10 kHz Channel 1.4 3.0 5 10 15 20 bandwidth MHz MHz MHz MHz MHz MHz 30 MHz  f < 1000 MHz -36 dBm 100 kHz ΔfOOB (MHz) 2.8 6 10 15 20 25 1 GHz  f < 12.75 GHz -30 dBm 1 MHz Channel Spurious domain ΔfOOB bandwidth ΔfOOB Spurious domain RB E-UTRA Band November 2012 | LTE measurements| 131
  • 132.
    LTE Uplink: PUCCH Allocation of PUCCH only. frequency November 2012 | LTE measurements| 132
  • 133.
    PUCCH measurements PUCCH is transmitted on the 2 side parts of the channel bandwidth November 2012 | LTE measurements| 133
  • 134.
    Transmit intermodulation Thetransmit intermodulation performance is a measure of the capability of the transmitter to inhibit the generation of signals in its non linear elements caused by presence of the wanted signal and an interfering signal reaching the transmitter via the antenna. User Equipment(s) transmitting in close vicinity of each other can produce intermodulation products, which can fall into the UE, or eNode B receive band as an unwanted interfering signal. The UE intermodulation attenuation is defined by the ratio of the mean power of the wanted signal to the mean power of the intermodulation product when an interfering CW signal is added at a level below the wanted signal at each of the transmitter antenna port with the other antenna port(s) if any is terminated. BWChannel (UL) 5MHz 10MHz 15MHz 20MHz Interference Signal 5MHz 10MHz 10MHz 20MHz 15MHz 30MHz 20MHz 40MHz Frequency Offset Interference CW Signal -40dBc Level Intermodulation Product -29dBc -35dBc -29dBc -35dBc -29dBc -35dBc -29dBc -35dBc Measurement bandwidth 4.5MHz 4.5MHz 9.0MHz 9.0MHz 13.5MHz 13.5MHz 18MHz 18MHz November 2012 | LTE measurements| 134
  • 135.
    Spurious Emissions Thespurious emissions power is the power of emissions generated or amplified in a receiver that appear at the UE antenna connector. General receiver spurious emission requirements Frequency Band Measurement Maximum Bandwidth level 30MHz  f < 1GHz 100 kHz -57 dBm 1GHz  f  12.75 GHz 1 MHz -47 dBm November 2012 | LTE measurements| 135
  • 136.
    SEM – effectof scrambling Modulation Transform Resource SC-FDMA Scrambling element mapper mapper precoder signal gen. Constant Bit pattern Scrambling disabled + constant bit stream Scrambling should randomize the bit stream November 2012 | LTE measurements| 136
  • 137.
    LTE Receiver Measurements 1 Reference sensitivity level 2 Maximum input level 3 Adjacent Channel Selectivity (ACS) 4 Blocking characteristics 4.1 In-band blocking 4.2 Out-of-band blocking 4.3 Narrow band blocking 5 Spurious response 6 Intermodulation characteristics 6.1 Wide band Intermodulation 7 Spurious emissions November 2012 | LTE measurements| 137
  • 138.
    LTE open looppower control and RSRP reporting Pathloss = System Information: referenceSignalPower referenceSignalPower - RSRP [-60 .. 50]dBm UE measures RSRP: Reference Signal Receive Power PDSCH, PUCCH or SRS receive power UE at eNodeB PDSCH, PUCCH or UE reports RSRP: SRS transmit power back to the eNB at UE November 2012 | LTE measurements| 138
  • 139.
    Reference Signal ReceivePower, RSRP R R Entire bandwidth R R Scan over entire bandwidth, RSRP = power of 1 symbol, as mean power November 2012 | LTE measurements| 139
  • 140.
    Received Signal StrengthIndicator, RSSI R noise R Entire bandwidth interferer R R November 2012 | LTE measurements| 140
  • 141.
    LTE measurements RSRP= Reference Signal Received Power Definition Reference signal received power, the mean measured power of the reference symbols during the measurement period. Applicable for TBD E-UTRA Carrier RSSI Definition E-UTRA Carrier Received Signal Strength Indicator, comprises the total received wideband power observed by the UE from all sources, including co- channel serving and non-serving cells, adjacent channel interference, thermal noise etc. Applicable for TBD November 2012 | LTE measurements| 141
  • 142.
    LTE measurements: RSRQReference Signal Received Quality RSRP RSRQ = RSSI Definition Reference Signal Received Quality (RSRQ) is defined as the ratio N×RSRP/(E- UTRA carrier RSSI), where N is the number of RB’s of the E-UTRA carrier RSSI measurement bandwidth. The measurements in the numerator and denominator shall be made over the same set of resource blocks. E-UTRA Carrier Received Signal Strength Indicator (RSSI), comprises the linear average of the total received power (in [W]) observed only in OFDM symbols containing reference symbols for antenna port 0, in the measurement bandwidth, over N number of resource blocks by the UE from all sources, including co-channel serving and non-serving cells, adjacent channel interference, thermal noise etc. The reference point for the RSRQ shall be the antenna connector of the UE. If receiver diversity is in use by the UE, the reported value shall not be lower than the corresponding RSRQ of any of the individual diversity branches. Applicable for RRC_CONNECTED intra-frequency, RRC_CONNECTED inter-frequency November 2012 | LTE measurements| 142
  • 143.
    RX Measurements –general setup AWGN Receive Sensitivity Tests Blockers Adjacent channels Transmit data User according to definable table on PDSCH DL Use both assignment Rx Antennas Table (TTI based) + Receive feedback Specifies DL scheduling on PUSCH parameters like or PUCCH RB allocation Modulation, etc. for every TTI (1ms) ACK/NACK/DTX Counting requirements in terms of throughput (BLER) instead of BER November 2012 | LTE measurements| 143
  • 144.
    Downlink channel powerfor Rx tests Physical Channel EPRE Ratio Physical Channel EPRE Ratio PBCH PBCH_RA = 0 dB PBCH PBCH_RA = A PBCH_RB = 0 dB PBCH_RB = B PSS PSS_RA = 0 dB PSS PSS_RA = A SSS SSS_RA = 0 dB SSS SSS_RA = A PCFICH PCFICH_RB = 0 dB PCFICH PCFICH_RB = PDCCH PDCCH_RA = 0 dB B PDCCH_RB = 0 dB PDCCH PDCCH_RA = A PDCCH_RB = B PDSCH PDSCH_RA = 0 dB PDSCH PDSCH_RA = A PDSCH_RB = 0 dB PDSCH_RB = B PHICH PHICH_RB = 0 dB PHICH PHICH_RB = B For tests where no Ref. Signal For tests where Ref. Signal boosting is applied boosting is applied, e.g. ρA = -3dB November 2012 | LTE measurements| 144
  • 145.
    Fixed reference channels Parameter Unit Value Channel bandwidth MHz 1.4 3 5 10 15 20 Allocated resource blocks 6 15 25 50 75 100 Subcarriers per resource block 12 12 12 12 12 12 Allocated subframes per Radio Frame 10 10 10 10 10 10 Modulation QPSK QPSK QPSK QPSK QPSK QPSK Target Coding Rate 1/3 1/3 1/3 1/3 1/3 1/3 Number of HARQ Processes Processes 8 8 8 8 8 8 Maximum number of HARQ transmissions 1 1 1 1 1 1 Transport block CRC Bits 24 24 24 24 24 24 Number of Code Blocks per Sub-Frame (Note 4) For Sub-Frames 1,2,3,4,6,7,8,9 Bits 1368 3780 6300 13800 20700 27600 For Sub-Frame 5 Bits n/a n/a n/a n/a n/a n/a For Sub-Frame 0 Bits 528 2940 5460 12960 19860 26760 Max. Throughput averaged over 1 frame kbps 341.6 1143.2 1952.8 3952.8 6040.8 7884 UE Category 1-5 1-5 1-5 1-5 1-5 1-5 Fixed reference channels defined in TS 36.101 for receiver quality measurements November 2012 | LTE measurements| 145
  • 146.
    RX sensitivity level Criterion:throughput shall be > 95% of possible maximum (depend on RMC) Channel bandwidth E-UTRA 1.4 MHz 3 MHz 5 MHz 10 MHz 15 MHz 20 MHz Duplex Ban (dBm) (dBm) (dBm) (dBm) (dBm) (dBm) Mode d 1 - - -100 -97 -95.2 -94 FDD 2 -104.2 -100.2 -98 -95 -93.2 -92 FDD 3 -103.2 -99.2 -97 -94 -92.2 -91 FDD 4 -106.2 -102.2 -100 -97 -95.2 -94 FDD 5 -104.2 -100.2 -98 -95 FDD 6 - - -100 -97 FDD Extract from TS 36.521 Sensitivity depends on band, channel bandwidth and RMC under test November 2012 | LTE measurements| 146
  • 147.
    Block Error Ratioand Throughput Rx quality DL signal Criterion: throughput shall be Channel > 95% of possible maximum setup (depending on RMC) November 2012 | LTE measurements| 147
  • 148.
    Details LTE FDDsignaling Rx Measurements l Rx Measurements l Counting – ACKnowledgement (ACK) – NonACKnowledgement (NACK) – DTX (no answer from UE) l Calculating l BLER (NACK/ALL) l Throughput [kbps] November 2012 | LTE measurements| 148
  • 149.
    Rx measurements: BLERdefinition PDCCH, scheduling info PDSCH, as PRBS Count #NACKs and ACK/NACK feedback calculate BLER Assumption is that eNB Power = UE Rx power November 2012 | LTE measurements| 149
  • 150.
    Rx measurements: BLERdefinition PDCCH, scheduling info •ACK = UE properly Receives PDCCH + PDSCH •NACK = UE properly receives PDCCH but does not understand PDSCH •DTX = UE does not understand PDSCH, user data PDCCH ACK/NACK feedback # NACK  # DTX # ACK BLER = ACK relative = # ACK  # NACK  # DTX # ACK  # NACK  # DTX # NACK NACK relative = # ACK  # NACK  # DTX # DTX DTX relativ = # ACK  # NACK  # DTX November 2012 | LTE measurements| 150
  • 151.
    BLER verification Downlink error insertion to verify the UE reports November 2012 | LTE measurements| 151
  • 152.
    Transportation Block SizeIndex Transportation block size TBS Idx Modulation User data FEC 0 QPSK 9 Flexible ratio between data and FEC = adaptive coding 16-QAM 15 64-QAM 26 Data rate No change in data rate, but in reliability S/N November 2012 | LTE measurements| 152
  • 153.
    Throughput versus SNR November 2012 | LTE measurements| 153
  • 154.
    UE sensitivity –maximum input level Maximum input level Rx Parameter Units Channel bandwidth 1.4 MHz 3 MHz 5 MHz 10 MHz 15 MHz 20 MHz Wanted signal mean power dBm -25 November 2012 | LTE measurements| 154
  • 155.
    UE sensitivity –RF sensitivity measurement ACK/NACK PRBS minimum input level Channel bandwidth E-UTRA 1.4 MHz 3 MHz 5 MHz 10 MHz 15 MHz 20 MHz Duplex Ban (dBm) (dBm) (dBm) (dBm) (dBm) (dBm) Mode d 1 - - -100 -97 -95.2 -94 FDD 2 -104.2 -100.2 -98 -95 -93.2 -92 FDD 3 -103.2 -99.2 -97 -94 -92.2 -91 FDD 4 -106.2 -102.2 -100 -97 -95.2 -94 FDD 5 -104.2 -100.2 -98 -95 FDD 6 - - -100 -97 FDD November 2012 | LTE measurements| 155
  • 156.
    Adjacent Channel Selectivity(ACS) … is a measure of a receiver's ability to receive a E-UTRA signal at its assigned channel frequency in the presence of an adjacent channel signal at a given frequency offset from the centre frequency of the assigned channel and with the given power Requirement per BW, LTE interferer [1.4MHz] [3MHz] 5MHz Padj = -51.3 Padj = -53.5 ACS= 33dB Padj = -57.5 ACS= 33dB ACS= 33dB Pown= -82.3 2dB IM Pown= -84.5 Nt= -84.3 2dB IM Pown= -88.5 Nt= -86.5 2dB IM Nt= -90.5 1.4MHz LTE 1.4MHz LTE 3MHz LTE 3MHz LTE 5MHz LTE 5MHz LTE 1.4MHz 3MHz 5MHz 10MHz 15MHz 20MHz Padj = -48.3 Padj = -49.5 Padj,w cdma= -51.3 ACS= 33dB ACS= 30dB 27dB ACS= Pow n= -76.3 Pown= -77.5 2dB IM Pown= -79.3 2dB IM Nt= -78.3 2dB IM Nt= -79.5 Nt= -81.3 10MHz LTE 5MHz LTE 15MHz LTE 5MHz LTE 20MHz LTE 5MHz LTE 7.5MHz 10MHz 12.5MHz November 2012 | LTE measurements| 156
  • 157.
    Adjacent Channel selectivity Adjacent Channel Selectivity (ACS) is a measure of a receiver's ability to receive a E-UTRA signal at its assigned channel frequency in the presence of an adjacent channel signal at a given frequency offset from the centre frequency of the assigned channel and with the given power Channel bandwidth Rx Parameter Units 1.4 MHz 3 MHz 5 MHz 10 MHz 15 MHz 20 MHz ACS dB 33.0 33.0 33.0 33.0 30 27 Rx Parameter Units Channel bandwidth 1.4 MHz 3 MHz 5 MHz 10 MHz 15 MHz 20 MHz Wanted signal dBm mean REFSENS + 14 dB power dBm REFSENS REFSENS REFSENS REFSENS REFSENS REFSENS +45.5d +45.5 +45.5dB* +45.5d +42.5d +39.5dB PInterferer B dB B B BW Interferer MHz 1.4 3 5 5 5 5 FInterferer (offset) MHz 1.4+0.0025 / 3+0.0075 5+0.0025 7.5+0.0075 10+0.0125 12.5+0.0025 -1.4-0.0025 / / / / / -3-0.0075 -5-0.0025 -7.5-0.0075 -10-0.0125 -12.5-0.0025 November 2012 | LTE measurements| 157
  • 158.
    Receiver performance -Blocking tests 5MHz LTE interferer In-band blocking 15MHz below to 15MHz above the UE receive band CW interferer , more than 15MHz below to Out-of-band blocking 15MHz above the UE receive band CW interferer at a frequency, Narrow band blocking which is less than the nominal channel spacing Throughput shall be ≥ f >> system bandwidth 95%   fB fc frequency November 2012 | LTE measurements| 158
  • 159.
    Spurious Response Spuriousresponse verifies the receiver's ability to receive a wanted signal on its assigned channel frequency without exceeding a given degradation due to the presence of an unwanted CW interfering signal at any other frequency at which a response is obtained i.e. for which the out of band blocking limit as specified in sub-clause 7.6.2 is not met. For Table 7.6.2.3-2 in frequency range 1, 2 and 3, up to max 24, 6  N RB / 6 exceptions are allowed for spurious response frequencies in each assigned frequency channel when measured using a 1MHz step size, where N RB is the number of resource blocks in the downlink transmission bandwidth configuration (see Figure 5.4.2-1). For these exceptions the requirements of clause 7.7 Spurious Response are applicable. For Table 7.6.2.3-2 in frequency range 4, up to max 8, ( N RB  2  LCRBs ) / 8 exceptions are allowed for spurious response frequencies in each assigned frequency channel when measured using a 1MHz step size, where N RB is the number of resource blocks in the downlink transmission bandwidth configurations (see Figure 5.4.2-1) and LCRBs is the number of resource blocks allocated in the uplink. For these exceptions the requirements of clause 7.7 Spurious Response are applicable. Out of band blocking Parameter Units Frequency E-UTRA band range 1 range 2 range 3 range 4 PInterferer dBm -44 -30 -15 -15 1, 2, 3, 4, 5, FDL_low -15 to FDL_low -60 to FDL_low -85 to - 6, 7, 8, 9, 10, FDL_low -60 FDL_low -85 1 MHz 11, 12, 13, FInterferer 17, 18, 19, MHz (CW) FDL_high +15 to FDL_high +60 to FDL_high +85 to 20, 21, - 33,34,35,36,3 FDL_high + 60 FDL_high +85 +12750 MHz 7,38,39,40 2, 5, 12, 17 FInterferer MHz - - - FUL_low - FUL_high NOTE: For the UE which supports both Band 11 and Band 21 the out of blocking is FFS. November 2012 | LTE measurements| 159
  • 160.
    Rx quality -Intermodulation Throughput Wanted Signal C shall be ≥ Unmodulated 95% Interferer Icw f f Modulated Interferer Imod fc fcw fmod frequency See TS 36.101 for power and frequency offset definitions November 2012 | LTE measurements| 160
  • 161.
    CQI reporting Optimum throughput ≡CQIn+2 high if the UE reports Overrated CQIn ≡CQIn+1 Throughput CQI report ≡CQIn ≡CQIn-1 ≡CQIn-2 Underrated CQI report low Prevailing conditions of SIR low SIR changes, CQI reporting must follow! high SIR November 2012 | LTE measurements| 161
  • 162.
    CQI reporting Calculate Median CQI, Evaluate if more than 90% of reported CQI Are in range of median CQI ±1 Network sends median CQI – evaluate BLER on median CQI BLER on median CQI <= 10% BLER on median CQI > 10% Network sends CQI +1 Network sends CQI -1 -> BLER must be -> BLER must be > 10% < 10% November 2012 | LTE measurements| 162
  • 163.
    Rx tests –test mode UE SS ACTIVATE TEST MODE Test modes defined to perform ACTIVATE TEST MODE COMPLETE Rx measurements, loop back possible in test mode UE SS CLOSE UE TEST LOOP CLOSE UE TEST LOOP COMPLETE November 2012 | LTE measurements| 163
  • 164.
    UTRAN stack: 2loop back mode defined Loop back above PDCP, i.e. Layer 2 Packet Data Convergence Protocol PDCP Radio Link Control RLC Medium Access Control MAC PHYSICAL LAYER November 2012 | LTE measurements| 164
  • 165.
    Test loop modeA UE Test Loop Mode A Function u0,u0 .......u K .................u N -1 u 1,u1 .......uK -1 u0,u 1 .......uK -1 User data User data Uplink and downlink Down link Uplink may have UE Test Loop Mode A Function various capacity u0 .. uK -1 ..uN-1 u0...uN -1 u0...uN -1 u0..uK-1 User data User data Down link Uplink November 2012 | LTE measurements| 165
  • 166.
    Test loop modeB Loop back above PDCP, i.e. Layer 2 Packet Data Convergence Protocol PDCP PDU size buffer must match ΔΤ Delayed loop back November 2012 | LTE measurements| 166
  • 167.
    Throughput measurements Max throughput possible in SISO November 2012 | LTE measurements| 167
  • 168.
    Rx measurements -throughput Throughput Measurement, Settings for max throughput for SISO: Number of Resource blocks Modulation scheme Transport block size November 2012 | LTE measurements| 168
  • 169.
    LTE Downlink BLERand throughput Rx quality, Indicating NACKs when Lowering the RS EPRE Of the serving cell. November 2012 | LTE measurements| 169
  • 170.
    Throughput + CQIin LTE Change of RF condition- > lower data rate UE sends different CQI values November 2012 | LTE measurements| 170
  • 171.
    MIMO testing For MIMO, enable cell One antenna Two antennas Four antennas  1 4   1  9  9   MIMO correlation 1   19 * 1 4  ReNB  1     1  9  9  4 * 1 * eNode B Correlation ReNB  1  ReNB  1  Models from    9  9 1  9  *    4 * 1 9  9 *  1  TS 36.521 November 2012 | LTE measurements| 171
  • 172.
    MIMO in LTE:BLER and throughput November 2012 | LTE measurements| 172
  • 173.
    Throughput measurements MIMO active, 2 streams with different data rate November 2012 | LTE measurements| 173
  • 174.
    Why do weneed fading? l 3GPP specifies various tests under conditions of fading l WCDMA performance tests l HSDPA performance tests l LTE performance tests l LTE reporting of channel state information tests See CMW capability lists for details l Evaluation of MIMO performance gain requires fading l Correlated transmission paths in MIMO connection l Simulation of “real life conditions” in the lab l Comparison of processing gain for different transmission modes November 2012 | LTE measurements| 174
  • 175.
    Most popular MIMOscheme to increase data rates: Spatial Multiplexing h 11 h 12 TX Ant 1 h 21 Space h22 RX Matix B Ant 1 n1 TX d1 Ant 2 RX r1 de1 Ant 2 MIMO LO 2X2 RX d2 (e.g. ZF, MIMO r2 MMSE,MLD) de2 Time n2 No increase of total transmit power, i.e. distribution of transmit power across multiple transmit antennas! Doubles max. data rates, however, at the expense of SNR @ receiver. Thus, according to Shannon‘s law, decrease of performance. Makes sense for low order modulation schemes only (QPSK, 16QAM), or in case of very good SNR conditions, e.g. for receivers close to base stations. November 2012 | LTE measurements| 175
  • 176.
    How do wetest under conditions of fading? RF System simulator Channel emulator Fading Profile November 2012 | LTE measurements| 176
  • 177.
    How do wetest under conditions of fading? System simulator IQ IQ RF Out In I/Q Interface Option CMW-B510x IQ IQ In Out Channel emulator Fading Profile November 2012 | LTE measurements| 177
  • 178.
    Internal fading inLTE November 2012 | LTE measurements| 178
  • 179.
    BLER results withand without fading November 2012 | LTE measurements| 179
  • 180.
    Automatic testing: KT100LTE + internal fading November 2012 | LTE measurements| 180
  • 181.
    Measurement sample (openloop SM) November 2012 | LTE measurements| 181
  • 182.
    BLER vs. SNRTransmit/Receive Diversity ~2dB AWGN only MCS 7 and 10 Fading EPA 5 Hz Low MCS 7 and 10 ~2dB November 2012 | LTE measurements| 182
  • 183.
    GUI – IPSettings November 2012 | LTE measurements| 183
  • 184.
    LTE E2E usingDAU November 2012 | LTE measurements| 184
  • 185.
    LTE E2E usingDAU November 2012 | LTE measurements| 185
  • 186.
    Throughput end toend November 2012 | LTE measurements| 186
  • 187.
    End to endtesting – ping response, RTT November 2012 | LTE measurements| 187
  • 188.
    What is IMS? Ahigh level summary l The success of the internet, using the Internet Protocol (IP) for providing voice, data and media has been the catalyst for the convergence of industries, services, networks and business models, l IP provides a platform for network convergence enabling a service provider to offer seamless access to any services, How to anytime, anywhere, and with any device, merge IP and cellular l 3GPP has taken these developments into account world?? with specification of IMS, l IMS stands for IP Multimedia Subsystem, l IMS is a global access-independent and standard-based IP connectivity and service control architecture that enables various types of multimedia services to end-users using common internet-based protocols, l Defines an architecture for the convergence of audio, video, data and fixed and mobile networks. November 2012 | LTE measurements| 188
  • 189.
    3 GPP SystemArchitecture Evolution Signaling interfaces Data transport interfaces RAN Access PDN directly or via IMS MME PDN UE Evolved nodeB S-GW P-GW IMS Evolved Packet Core PSTN external IMS to control All interfaces are packet switched access + data transfer November 2012 | LTE measurements| 189
  • 190.
    IMS Architecture November 2012 | LTE measurements| 190
  • 191.
    IMS protocol structure user plane Control plane Voice messaging video SIP/SDP IKE RTP MSRP UDP / TCP / SCTP Layer 3 control IP / IP sec Layer 1/2 Layer 1/2 (other IP CAN) Mobile com specific protocols IMS specific protocols November 2012 | LTE measurements| 192
  • 192.
    IMS protocol structure Quality of Service Media Transport Media Signaling Encap. H.323 e.g. H.261, MPEG application layer Megaco SIP RTSP RSVP RTCP RTP transport layer TCP UDP network layer IPv4, IPv6 link layer e.g. PPP, AAL2/ATM, AAL5/ATM, MAC Physical layer Sonet, SDH, PDH, Ethernet, RF link = LTE November 2012 | LTE measurements| 193
  • 193.
    ISIM: IMS SIM Security keys Private user ID Public user ID Home network ID PIN Administrative data ISIM = application on UICC USIM for LTE access UICC universal integrated circuit card November 2012 | LTE measurements| 194
  • 194.
    IMS Registration andAuthentication Comparison with LTE LTE IMS ATTACH REQUEST REGISTER AUTHENTICATION REQ 401 UNAUTHORIZED AUTHENTICATION RSP REGISTER ATTACH ACCEPT 200 OK November 2012 | LTE measurements| 195
  • 195.
    What is IMS? Registrationwith IMS l Prior to IMS registration the UE must discover an IMS entry point (i.e. P-CSCF), which is done through an activation of a PDP context for SIP signaling over 2G (GPRS) or 3G (WCDMA, C2K, EV-DO). l First, there was SIM (Subscriber Identity Retrieve S-CSCF user profile Module)…than there was USIM (Universal SIM)…and now there is ISIM (IP Multimedia Service Module), – Public User Identity (identify a user), HSS – Private User Identity (users subscription), I-CSCF Retrieve S-CSCF capabilities Calculate RES, REG request SIP registration request P-CSCF 401 User not authorized 200 OK November 2012 | LTE measurements| 196
  • 196.
    IMS: SMS overIMS Message flow for a mobile originated SMS SIP MESSAGE RP-DATA ( SMS-SUBMIT) SIP 200 OK SIP MESSAGE RP-ACK ( SMS-SUBMIT REPORT) SIP 200 OK SMS Delivery SIP MESSAGE RP-DATA ( SMS-STATUS REPORT) SIP 200 OK SIP MESSAGE RP-ACK SIP 200 OK November 2012 | LTE measurements| 197
  • 197.
    SMS over IMS IP based Core Access Network, i.e. EPC S-CSCF HSS I-CSCF P-CSCF IP-SM-GW IP short message Gateway to connect S-CSCF to SMS SMS-SC serving centre November 2012 | LTE measurements| 198
  • 198.
    LTE Positioning withSUPL 2.0 LTE radio signal eNB Measurements based on reference sources* Target LPP Location Device Server Assistance data LPP over RRC UE Control plane solution E-SMLC Enhanced Serving Mobile Location Center LPP over SUPL SUPL enabled Terminal SET User plane solution SLP SUPL location platform November 2012 | LTE measurements| 199
  • 199.
    Background for IMSand relation to LTE? l LTE has been designed as a fully packet-orientated, “all-IP”- based, multi-service system with a flat network architecture, l Technical challenges offering circuit-switched services (Voice, SMS) via LTE l 3GPP has defined IMS as long-term solution providing circuit-switched services, for the short- / mid-term there is no industry-wide consensus, but different approaches, l Short-/mid-term: Circuit-switched fallback (CS fallback), – SMS. “SMS over SG”, means SMS via Non-Access Stratum (NAS) signaling, – Voice. Fallback to 3G or 2G technology to take the call, l VOLGA – Voice over LTE Generic Access – Call setup time increases while using CS fallback, l OneVoice Initiative formed to push for Voice over LTE (VoLTE) based on IMS. November 2012 | LTE measurements| 200
  • 200.
    How to connectE-UTRAN to CS services? l Connection via IMS: 3GPP and OneVoice initiative First a big mess, Now it seems to be OneVoice l Voice over LTE Generic Access – VoLGA Forum – interim solution l CS Fallback CSFB for voice calls to 2G or 3G services – preferred interim solution l Evolved MSC, eMSC – CS Services via EPS – network operator proposal, interim solution l SRVCC – Single Radio Voice Call Continuity l SV-LTE – simultaneous voice and LTE l OTT, Over the top – propietary solution, application based November 2012 | LTE measurements| 201
  • 201.
    IMS: Voice overIMS Message flow for a mobile originated call INVITE (SDP offer) 183 Session Progress (SDP offer) PRACK 200 OK (PRACK) Resource Reservation Resource Reservation UPDATE (SDP) 200 OK (UPDATE) (SDP) 180 RINGING PRACK 200 OK (PRACK) 200 OK (INVITE) ACK November 2012 | LTE measurements| 202
  • 202.
    Voice over IMS:IMS call establishment Originating Home Network Terminating Network UE P-CSCF S-CSCF 1. Invite (Initial SDP Offer) 2. Invite (Initial SDP Offer) 3. Service Control 4. Invite (Initial SDP Offer) 5. Offer Response 6. Offer Response 7. Authorize QoS Resources 8. Offer Response 9. Response Conf (Opt SDP) 10. Resource Reservation 11. Response Conf (Opt SDP) 12. Response Conf (Opt SDP) 13. Conf Ack (Opt SDP) 14. Conf Ack (Opt SDP) 15. Conf Ack (Opt SDP) 16. Reservation Conf 17. Reservation Conf 18. Reservation Conf 19. Reservation Conf 20. Reservation Conf 21. Reservation Conf 22. Ringing 23. Ringing 24. Ringing 26. 200 OK 27. 200 OK 25. Alert User 28. Enabling of Media Flows 29. 200 OK 30. Start Media 31. ACK 32. ACK 33. ACK November 2012 | LTE measurements| 203
  • 203.
    Voice over IMS:IMS protocol profile Adaptive Multirate Codec mode AMR_12.20 Source codec bit-rate 12,20 kbit/s (GSM EFR) Codecs are used AMR_10.20 AMR_7.95 10,20 kbit/s 7,95 kbit/s In VoIP over IMS AMR_7.40 7,40 kbit/s (IS-641) AMR_6.70 6,70 kbit/s (PDC-EFR) AMR_5.90 5,90 kbit/s AMR_5.15 5,15 kbit/s AMR_4.75 4,75 kbit/s AMR_SID 1,80 kbit/s (see note 1) November 2012 | LTE measurements| 204
  • 204.
    QoS class identifiersQCI QCI Resource Priority Packet Delay Packet Error Example Services Type Budget Loss Rate 1 2 100 ms 10-2 Conversational Voice 2 4 150 ms 10-3 Conversational Video (Live Streaming) GBR 3 3 50 ms 10-3 Real Time Gaming 4 5 300 ms 10-6 Non-Conversational Video (Buffered Streaming) 5 1 100 ms 10-6 IMS Signalling Video (Buffered Streaming) 6 6 300 ms TCP-based (e.g. www, e-mail, chat, ftp, p2p 10-6 file sharing, progressive video, etc.) Non-GBR Voice, Video (Live Streaming), 7 7 100 ms 10-3 Interactive Gaming 8 8 Video (Buffered Streaming) 300 ms TCP-based (e.g. www, e-mail, chat, ftp, p2p 9 9 10-6 file sharing, progressive video, etc.) November 2012 | LTE measurements| 205
  • 205.
    Voice over LTE– protocol profiles AMR codec Optimize transmission of Voice by configuring UDP/ TCP Lower layers IP Use robust header compression or IP Packet Data Convergence Short PDCP header is used PDCP Use RLC in UM mode Small sequence number is used Radio Link Control RLC SRB1 and 2 are supported for DCCH + one UM DRB with QCI 1 for voice for SIP signaling + one AM DRB QCI 5 for Medium Access Control SIP signaling + one AM DRB QCI 8 for MAC IMS traffic TTI bundling + DRX to reduce PDCCH Signaling + Semi-persistend scheduling PHYSICAL LAYER November 2012 | LTE measurements| 206
  • 206.
    IMS: Voice overIMS Interaction with EPS l Resource reservation (QoS) can be achieved with separate Radio Bearers Default Dedicated Bearer Bearer SIP Non- QCI = 5 AM DRB signalling GBR PDCP Voice QCI = 1 GBR UM DRB RLC QCI Quality of Service Class Indicator GBR Guaranteed Bitrate MAC DRB Data Radio Bearer PHY November 2012 | LTE measurements| 207
  • 207.
    VoLTE connection toCS via IMS CS Connection via Boarder and Media Gateway of IMS Control plane IP based Core Access Network, i.e. EPC S-CSCF HSS I-CSCF How to connect VoLTE P-CSCF To legacy network? PSTN BGW CS network MGCF BGCF User plane MG November 2012 | LTE measurements| 208
  • 208.
    IMS connection toCS services - arguments l IMS can provide real end-to-end connection l IMS defines end-to-end quality of service profiles l IMS is completely based on Internet Protocol l Supplementary services can be realized l Several application servers needed l Not widely implemented yet – many operators are reluctant l IMS software client needed on UE side l What happens under heavy load condition? November 2012 | LTE measurements| 209
  • 209.
    Radio Access Technologiestoday GERAN CDMA2K 1xEVDO UTRAN EUTRAN LTE coverage is not fully up from day one -> interworking with legacy networks is essential!!! November 2012 | LTE measurements| 210
  • 210.
    Voice calls inLTE l There is one common solution: Voice over IMS l -> also named Voice over LTE VoLTE or OneVoice initiative But…. What if IMS is not available at first rollout? -> interim solution called Circuit Switched Fallback CSFB = handover to 2G/3G -> or Simultaneous Voice on 1XRTT and LTE, SV-LTE = dual receiver What is if LTE has no full coverage? -> interworking with existing technologies, Single Radio Voice Call Continuity, SRVCC November 2012 | LTE measurements| 211
  • 211.
    2G or 3GCS fallback Voice call E-UTRAN MME IMS Voice over IMS is the solution, but IMS is maybe not available in the first network roll-out. Need for transition solution: Circuit Switched Fall Back, CSFB move the call to 2G or 3G November 2012 | LTE measurements| 212
  • 212.
    2G or 3GCS fallback CS connection as fallback SGSN to legacy GERAN Voice calls are networks routed via 2G or 3G UE UTRAN MSC E-UTRAN MME Only for signalling Only packet switched connections November 2012 | LTE measurements| 213
  • 213.
    CSFB issues andquestions Iu-ps SGSN Target cell UTRAN assigned or Gs selected by UE? Gb Uu GERAN S3 Iu-cs MSC Um A Server SGs LTE Uu S1-MME UE E-UTRAN MME Handover or Redirection? •Is it a handover command or a command to redirect to a new RAN ? i.e. the UE selects the target cell or the EUTRAN commands the target cell •Is there any information about the target RAN available (SysInfo)? •Is there a packet data connection PDN active or not? •Will the PDN be suspended or continued in the target RAN? •Will the UE re-initiate the PDN or continue? November 2012 | LTE measurements| 214
  • 214.
    CS fallback optionsto UTRAN and GERAN Feature group index, UE indicates CSFB support November 2012 | LTE measurements| 215
  • 215.
    CS fallback to1xRTT 1xCS CSFB 1xRTT CS A1 1xRTT UE Access MSC A1 Tunneling of 1xCS IWS S102 is the messages between reference point 1xRTT MSC and UE S102 between MME and MME 1xCS interworking S1-MME S11 solution 1xCS Serving/PDN SGi E-UTRAN CSFB GW UE S1-U Tunnelled 1xRTT messages November 2012 | LTE measurements| 216
  • 216.
    CS fallback to1xRTT November 2012 | LTE measurements| 217
  • 217.
    CS fallback -arguments l E-UTRAN and GERAN/UTRAN coverage must overlap l No E-UTRAN usage for voice l No changes on EPS network required l Gs interface MSC-SGSN not widely implemented l Increased call setup time l No simultaneous voice + data if 2G network/UE does not support DTM l SMS can be used without CS fallback, via E-UTRAN November 2012 | LTE measurements| 218
  • 218.
    Why not CSFB? l Call setup delay l Call drop due to handover l Blind hand-over is used for CSFB l Data applications are interupted l Legacy RAN coverage needed November 2012 | LTE measurements| 219
  • 219.
    Dual receiver 1xCSFB Circuit switched UE 1xRTT registration CDMA2000 cell eNB for LTE Packet switched EUTRAN registration Dual receiver 1xCSFB UEs can handle separate mobility and registration procedures 2 radio links at the same time. UE is registered to 2 networks, no coordination required. When CS connection in 1xRTT, dual receiver UE leaves EUTRAN! November 2012 | LTE measurements| 220
  • 220.
    SV-LTE: Simultaneous CDMA200+ LTE Circuit switched UE 1xRTT connection CDMA2000 cell eNB for LTE Packet switched EUTRAN connection Simultaneous Voice UEs can handle 2 radio links at the same time. UE is registered to MME and CDMA2K independently November 2012 | LTE measurements| 221
  • 221.
    OTT – overthe top EUTRAN Application UE Evolved nodeB S-GW P-GW PDN Evolved Packet Core Voice call as application, e.g. Skype, Google talk, … November 2012 | LTE measurements| 222
  • 222.
    OTT – overthe top - arguments EUTRAN Application UE Evolved nodeB S-GW P-GW PDN Evolved Packet Core •Propietary solution, needs to be implemented in UE and AS •Already implemented in computer networks – known application •Support has to be accepted by operator •No Inter-RAT handover is possible November 2012 | LTE measurements| 223
  • 223.
    SMS transfer inLTE Encapsulate SMS in NAS Send SMS over IMS Control message-> Using IP protocol SMS over SG SMS over IMS EMM ESM User plane Radio Resource Control RRC Packet Data Convergence PDCP Radio Bearer Measurements Radio Link Control Control & RLC Logical channels Medium Access Control MAC Transport channels PHYSICAL LAYER November 2012 | LTE measurements| 224
  • 224.
    CSFB circuit switchedfallback – SMS transfer Iups - SGSN SMS-SC UTRAN Gs Gb Uu GERAN Iu cs - S3 MSC Um A Server For 1xRTT it LTEUu - S1-MME SGs is the S102 UE E-UTRAN MME interface SGsAP SGsAP SMS transfer between SMS-SC and SCTP SCTP IP IP MME via new interface SGs. L2 L2 New protocol SGs interface L1 L1 application protocol MME SGs MSC Server November 2012 | LTE measurements| 225
  • 225.
    CSFB circuit switchedfallback – SMS transfer SGs interface SMS- SMS- MS/UE eNodeB MME MSC/VLR HLR/HSS SC GMSC 1. EPS/IMSI attach procedure 2. Message transfer 3. Send Routeing Info For Short Message 4. Forward Short Message 5. Paging 7. Paging 6. Paging 8. Service Request 8a. Service Request No real fallback, 9a. Downlink Unitdata because SMS 9b. Downlink NAS Transport 9c. Uplink NAS Transport 9d. Uplink Unitdata is sent over NAS signaling 10. Uplink NAS Transport 11. Uplink Unitdata 12. Delivery report 13. Delivery report 15. Downlink NAS Transport 14. Downlink Unitdata 16. Release Request Mobile terminated SMS in idle mode, SMS over SG November 2012 | LTE measurements| 226
  • 226.
    CSFB circuit switchedfallback – SMS transfer l SMS can be transferred in the signaling messages -> so no real circuit switched fallback l CSFB ready at LTE launch? CSFB needs SGs interface between MME and MSC l Roaming: no guarantee that CSFB is supported worldwide l Specification issues: Not clear what happens if SMS transfer occurs at ongoing CSFB procedure l Test scenarios: No CSFB SMS test scenarios defined yet November 2012 | LTE measurements| 227
  • 227.
    Single Radio VoiceCall Continuity Problem: in first network roll-out, there is no full LTE coverage. How to keep call active? => SRVCC November 2012 | LTE measurements| 228
  • 228.
    SRVCC – SingleRadio Voice Call Continuity SGSN GERAN Handover of voice call to 2G or 3G UE UTRAN MSC E-UTRAN MME IMS User plane after handover SRVCC is handover from EUTRAN to 2G/3G if no User plane before handover LTE coverage November 2012 | LTE measurements| 229
  • 229.
    Single Radio VoiceCall Continuity Target UE E-UTRAN MME MSC Server 3GPP IMS UTRAN/GERAN Measurement Reports Handover to UTRAN/GERAN required Initiates SRVCC for voice component CS handover preparation Handles PS-PS HO for non-voice if needed IMS Service Continuity Procedure To eUTRAN PS HO response to MME Coordinates SRVCC (CS resources) Handover CMD and PS HO response Handover execution November 2012 | LTE measurements| 230
  • 230.
    Single Radio VoiceCall Continuity VoLTE call eNodeB = EUTRAN Handover to UTRAN VoIP in PS mode NodeB = UTRAN Radio Bearer reconfiguration: PS to CS mode time Voice call in CS mode NodeB = UTRAN November 2012 | LTE measurements| 231
  • 231.
    Handover requirements l Goal is to have seamless service continuity between LTE and other Legacy Technologies (CDMA2000, WCDMA, GSM) l Data and Voice services l Support of all frequency bands and a single radio solution l Transparent signaling to allow an independent protocol evolution for both access systems l Impact to QoS, e.g. service interruption, should be minimized l RAT change procedure shall limit interruption time to less than 300ms l 3GPP changes – Ability to tunnel signaling messages between E-UTRAN and 3GPP2 – Support measurements of 3GPP2 channels from E-UTRAN – Capability to trigger a handover to a 3GPP2 system l 3GPP2 changes – Minimal impact on today’s available cdma2000, Rev. 0 or Rev. A access terminal – Minimal impact to legacy, deployed cdma2000 radio access networks – Influence on circuit switched core network should be minimized November 2012 | LTE measurements| 232
  • 232.
    Handovers?? l What is : l Intra-Frequency – Changing between cells on same frequency -> different cell ID l Inter-Frequency – Changing between cells on differenct frequency l Intra-Band – Changing between cells inside the same band l Inter-Band – Changing between cells in different bands l Inter-RAT – Changing between cells using different RAT (LTE-WCDMA, LTE-GSM, etc.) November 2012 | LTE measurements| 233
  • 233.
    Handover – whatto discuss? UE reads GERAN cell(s)? SysInfo eNodeB UTRAN cell(s)? EUTRAN cell CDMA2K cell(s)? NW sends UE Redirection command? SysInfo of Target? Will the UE initiate the Handover command? change? -> re-selection Will the network initiate Mandatory the change? -> for UE redirection or handover supporting CSFB November 2012 | LTE measurements| 234
  • 234.
    Handover aspects –what to discuss? l Some keywords that appear – and to be clarified in next slides: l Handover? l Cell reselection? l Cell change order? l Redirection? l Network assisted cell change, NACC? l Circuit switched fallback, CS fallback? November 2012 | LTE measurements| 235
  • 235.
    Mobility aspects –support from UE l There are some UE feature groups defined. The UE reports this in the attach procedure to the network: – A. Support of measurements and cell reselection procedure in idle mode – B. Support of RRC release with redirection procedure in connected mode – C. Support of Network Assisted Cell Change in connected mode – D. Support of measurements and reporting in connected mode – E. Support of handover procedure in connected mode November 2012 | LTE measurements| 236
  • 236.
    Mobility aspects –support from UE Feature GERAN UTRAN HRPD 1xRTT EUTRAN Supported if Supported if Supported if Supported if CDMA200 CDMA200 GERAN UTRAN Supported for A. Measurements and cell reselection 0 HRPD 0 1xRTT band band supported procedure in E-UTRA idle mode band band support is support is bands support is support is indicated indicated indicated indicated Supported if Supported if Supported if Supported if CDMA200 CDMA200 B. RRC release with blind redirection GERAN UTRAN Supported for 0 HRPD 0 1xRTT procedure in E-UTRA connected band band supported band band mode support is support is bands support is support is indicated indicated indicated indicated C. Cell Change Order (with or without) Network Assisted Cell Change) in E- Group 10 N.A. N.A N.A N.A. UTRA connected mode D. Inter-frequency/RAT measurements, reporting and measurement reporting Group 23 Group 22 Group 26 Group 24 Group 25 event B2 (for inter-RAT) in E-UTRA connected mode Group 9 (GSM_conn ected Group 8 (PS handover) handover) E. Inter-frequency/RAT handover procedure Separate UE or Group Group 12 Group 11 Group 13 in E-UTRA connected mode capability bit 27 defined in (SRVCC TS 36.306 handover) for PS handover Table from TS36.331 November 2012 | LTE measurements| 237
  • 237.
    LTE Radio ResourceControl States Cell search and selection 1. What about de-allocate Tracking Area ID (TA-ID) and IP address and system information mobility, when UE acquisition is in IDLE state? LTE random access procedure [Initial Access; allocate C-RNTI, TA-ID, IP address] release of C-RNTI, allocate DRX cycle for PCH LTE_DETACHED LTE_ACTIVE (RRC_CONNECTED) LTE_IDLE (RRC_IDLE) • No IP address assigned, • IP address assigned, • IP address assigned, • UE location unknown. • Connected to known cell. • UE position partially known. OUT_OF_SYNCH IN_SYNCH • DL reception possible, • DL reception possible, • No UL transmission. • UL transmission possible. Power-up © Rohde&Schwarz, 2010 LTE random access procedure [Transition to LTE_ACTIVE state (IN_SYNCH)] LTE random access procedure [to restore uplink synchronization] 2. What about User Equipment (UE) LTE/eHRPD-capable terminal mobility, when UE is in CONNECTED state? November 2012 | LTE measurements| 238
  • 238.
    Mobility between LTEand WCDMA/GSM Radio Access Aspects GSM_Connected CELL_DCH Handover E-UTRA Handover RRC_CONNECTED GPRS Packet transfer mode CELL_FACH CCO with optional CCO, CELL_PCH NACC Reselection URA_PCH Reselection Connection Connection Connection establishment/release establishment/release establishment/release Reselection E-UTRA Reselection GSM_Idle/GPRS UTRA_Idle RRC_IDLE Packet_Idle CCO, Reselection November 2012 | LTE measurements| 239
  • 239.
    IRAT Procedures Redirection 1. UE has an active RF session (EPS Bearer Context, PDP Context) 2. NW releases RRC connection and indicates target RAT and RF channel in RRC Connection Release Message 3. UE indicates active PDP Contexts during Routing Area Update procedure on target RAT 4. NW sets up radio bearer 5. For WCDMA → LTE redirection can also be signaled in RRC Connection Request 6. Data connection is interrupted during the procedure November 2012 | LTE measurements| 240
  • 240.
    Redirection AS-security has beenactivated, and SRB2 with at least one DRB are setup UE EUTRAN RRCConnectionRelease November 2012 | LTE measurements| 241
  • 241.
    Redirection to UMTS UE reads SysInfo eNodeB NodeB(s) EUTRAN cell UTRAN cell(s) RRC connection release message UE will search for UE with RedirectedCarrierInfo to suitable cell on UARFCN and initiate UTRAN Mandatory for UE CS connection supporting CSFB RRC connection release with redirection without SysInfo November 2012 | LTE measurements| 242
  • 242.
    Redirection to UMTS Rel. 9 feature UE reads SysInfo NodeB eNodeB Sys UTRAN cell Info EUTRAN cell RRC connection release message UE will go to indicated UE with RedirectedCarrierInfo to cell and initiate CS connection UTRAN e-RedirectionUTRA capability is set by UE RRC connection release with redirection with SysInfo November 2012 | LTE measurements| 243
  • 243.
    Redirection to GERAN eNodeB BTS(s) EUTRAN cell GSM cell(s) RRC connection release message UE will search for UE with RedirectedCarrierInfo to suitable cell on ARFCN and initiate CS GSM Mandatory for UE connection supporting CSFB RRC connection release with redirection without SysInfo November 2012 | LTE measurements| 244
  • 244.
    Redirection to GERAN Rel. 9 feature BTS(s) eNodeB Sys GSM cell(s) Info EUTRAN cell RRC connection release message UE will go to indicated UE with RedirectedCarrierInfo to cell and initiate CS connection GSM e-RedirectionUTRA capability is set by UE RRC connection release with redirection with SysInfo November 2012 | LTE measurements| 245
  • 245.
    IRAT Procedures PS Handover l UE has an active data session (EPS Bearer Context, PDP Context) l NW sends handover command e.g. l LTE → WCDMA: MobilityFrom EUTRACommand l WCDMA → LTE: HandoverFromUTRANCommand_EUTRA l PS radio bearer is immediately setup on target RAT November 2012 | LTE measurements| 246
  • 246.
    Handover (Intra-LTE) AS-security hasbeen activated, and SRB2 with at least one DRB are setup UE EUTRAN RRCConnectionReconfiguration RRCConnectionReconfigurationComplete November 2012 | LTE measurements| 247
  • 247.
    Packet Switched handoverto other RAN UE EUTRAN MobilityFromEUTRACommand Contains this information element when Falling back to legacy networks MobilityFromEUTRACommand ::= SEQUENCE { rrc-TransactionIdentifier RRC-TransactionIdentifier, criticalExtensions CHOICE { c1 CHOICE{ mobilityFromEUTRACommand-r8 MobilityFromEUTRACommand-r8-IEs, mobilityFromEUTRACommand-r9 MobilityFromEUTRACommand-r9-IEs, spare2 NULL, spare1 NULL }, criticalExtensionsFuture SEQUENCE {} } } November 2012 | LTE measurements| 248
  • 248.
    Handover (Intra-MME/Serving Gateway) UE Source eNB Target eNB MME Measurement reporting Handover decision Handover request Admission Control Handover request Ack RRC connection reconfiguration Detach from old, Deliver packets sync to new cell to target eNB SN Status Transfer Data forwarding Buffer packets from source eNB RRC connection reconfiguration complete Path switch Req / Ack UE context release Flush buffer Release resources November 2012 | LTE measurements| 249
  • 249.
    Handover to UMTS:Packet switched handover eNodeB NodeB(s) EUTRAN cell UTRAN cell(s) UE MobilityFromEUTRACommand message UE will select target cell on UARFCN and with purpose indicator = handover continue PS connection to UTRAN EUTRAN contains targetRATmessagecontainer, = Inter-RAT info about target cell Packet Switched handover to UTRAN November 2012 | LTE measurements| 250
  • 250.
    HandoverfromEUTRAN – targetRAT message HandoverFromEUTRAN message contains control message of target RAT. Possible messages are: targetRAT-Type Standard to apply targetRAT-MessageContainer geran GSM TS 04.18, or 3GPP TS 44.018 HANDOVER COMMAND 3GPP TS 44.060 PS HANDOVER COMMAND 3GPP TS 44.060 DTM HANDOVER COMMAND cdma2000- C.S0001 or later, C.S0007 or later, 1XRTT C.S0008 or later cdma2000- C.S0024 or later HRPD utra 3GPP TS 25.331 HANDOVER TO UTRAN COMMAND November 2012 | LTE measurements| 251
  • 251.
    Mobility from EUTRAN– failure case UE EUTRAN MobilityFromEUTRACommand RRC connection re-establishment Radio link failure UE will try to in target RAT Reestablish EUTRAN connection November 2012 | LTE measurements| 252
  • 252.
    UE mobility inLTE (RRC CONNECTED state) Measurement configuration, related RRC messages & information elements RRCConnectionReconfiguration … MeasConfig Neig Cell Info ... MeasConfig Type of CDMA network (1xRTT, HRPD), MeasObjectToAddModList CDMA2000 carrier configuration, search ReportConfigToAddMod window size, cells to add/modify/remove QuantityConfig from the neighboring list, cell index (up to measGapConfig 32 cells), PN offset… MeasObjectToAddModList … MeasObjectCDMA2000 How? What? Periodic or event (InterRAT: B1, B2) triggered When? Reporting, hysteresis (0…15 dB), # of cells to report excluding serving cell, report interval ReportConfigToAddMod (120, …, 10240ms, …, 60 min), time-to-trigger, … CDMA2000 threshold (0…63) ReportConfigInterRAT measGapConfig Each gap starts at SFN & subframe gp0 (0…39), gp1 (0…79) meeting these conditions : Two gap pattern 0 and 1, gap length is 6 ms, using two different Transmission Gap SFN mod T = FLOOR(gapOffset/10) Repetition Period of 40 or 80 ms with T = MGRP/10 Subframe = gapOffset mod 10 When to retune the receiver to measure e.g. CDMA2000 or HRPD… November 2012 | LTE measurements| 253
  • 253.
    Inter-RAT Handover toGERAN: cell change order PS connection will be suspended eNodeB BTS(s) EUTRAN cell GPRS cell(s) MobilityFromEUTRACommand message UE with purpose indicator = Cell Change Order UE will search for suitable cell on ARFCN to GPRS Mandatory and re-initiate PS for UE connection supporting CSFB Packet Switched cell change order to GPRS without NACC (network assisted cell change) November 2012 | LTE measurements| 254
  • 254.
    Inter-RAT Handover toGERAN: cell change order PS connection will be suspended BTS eNodeB Sys GPRS cell Info EUTRAN cell MobilityFromEUTRACommand message UE with purpose indicator = Cell Change Order UE will search for suitable cell on ARFCN to GPRS Mandatory and initiate PS for UE connection supporting CSFB Packet Switched cell change order to GPRS with NACC (network assisted cell change) November 2012 | LTE measurements| 255
  • 255.
    Inter-RAT Handover toGERAN: handover PS connection will be handed over BTS eNodeB GPRS cell EUTRAN cell UE will search for MobilityFromEUTRACommand message suitable cell on ARFCN UE with purpose indicator = handover and continue PS to GPRS connection Mandatory for UE supporting CSFB Packet Switched handover to GPRS November 2012 | LTE measurements| 256
  • 256.
    LTE-RTT Handover Circuit SwitchedFallback, CSFB Overview November 2012 | LTE measurements| 257
  • 257.
    3GPP Changes l LTE Broadcast Channel l CDMA System Time l 1xEVDO, 1xRTT, WCDMA, GSM cell parameters l Cell (re)selection parameters l Broadcast as SIB Type 8 or via Dedicated RRC messages l Tunneling l Receiving 1xEVDO overhead messages with dual Rx ATs l Measurement Gaps November 2012 | LTE measurements| 258
  • 258.
    Eg CDMA2000 Changes l Air interface specification changes l New protocols defined for – Authentication: EAP-AKA – IP Address Allocation : VSNCP – Multiple PDN support : EMFPA l Non-optimized and optimized handoff from LTE to eHRPD l Preamble Initial Power for handover complete message l Handover to 1xEV-DO Rev. B being considered l Circuit-Switched Fallback (CS fallback) currently specified in C.S0097-0 l Core network changes l S101 interface – signaling interface l S103 interface – bearer interface l PDSN extension (now called HSGW) November 2012 | LTE measurements| 259
  • 259.
    Definitions cont’d l Non-OptimizedHandovers l Without the use of tunneled signaling (S101) l Optimized Handovers l Less than 300ms interruption l Uses tunneled signaling interface l Two step process – Pre registration / Session maintenance – Handover preparation/handover execution l Types of handovers – Idle mode handover (cell re-selection) – Active mode handover November 2012 | LTE measurements| 260
  • 260.
    CS fallback to1xRTT 1xCS CSFB 1xRTT CS A1 1xRTT UE Access MSC A1 Tunneling of 1xCS IWS S102 is the messages between reference point 1xRTT MSC and UE S102 between MME and MME 1xCS interworking S1-MME S11 solution 1xCS Serving/PDN SGi E-UTRAN CSFB GW UE S1-U Tunnelled 1xRTT messages November 2012 | LTE measurements| 261
  • 261.
    CS fallback to1xRTT November 2012 | LTE measurements| 262
  • 262.
    CS fallback to1xRTT CSFB to 1xRTT MME CSFB Info eNodeB 1xRTT cell(s) EUTRAN cell RRC connection release message UE will search for UE with RedirectedCarrierInfo to suitable cell on UARFCN and initiate 1xRTT Mandatory for UE CS connection supporting CSFB Enhancement: UE can pre-register in 1xRTT network to 1xRTT RRC connection release with redirection without SysInfo November 2012 | LTE measurements| 263
  • 263.
    CS fallback to1xRTT UE E-UTRAN MME 1xCS IWS 1xRTT S-GW/ MSC P-GW UE is EPS attached and registered with 1xRTT CS UE decision to perform MO call in 1xCS EXTENDED SERVICE REQUEST (with service type CSFB) UE CONTEXT MODIFICATION REQUEST (CS Fallback Indicator) UE CONTEXT MODIFICATION RESPONSE Optional measurement reports RRCConnectionRelease with redirection to 1xRTT UE CONTEXT RELEASE REQUEST Suspend Notification Suspend Acknowledge UE context release MO call establishment in 1xRTT network November 2012 | LTE measurements| 264
  • 264.
    CS fallback to1xRTT enhanced 1xCSFB (e1xCSFB) Enhancement: UE can pre-register in 1xRTT network UE EUTRAN 1) Prepare for handover, search for HandoverFromEUTRAPreparationRequest 1xRTT Time flow UE EUTRAN 2) Info about 1xRTT -> tunnelled via ULHandoverPreparationTransfer S102 UE EUTRAN 3) Includes 1xRTT channel assignment MobilityFromEUTRACommand November 2012 | LTE measurements| 265
  • 265.
    CS fallback to1xRTT enhanced 1xCSFB (e1xCSFB) + concurrent HRPD handover Enhancement: UE can pre-register in 1xRTT network 1) Prepare for UE EUTRAN handover, search for HandoverFromEUTRAPreparationRequest 1xRTT + HRPD 2) Trigger 2 UE EUTRAN Time flow messages with ULHandoverPreparationTransfer info about 1xRTT + HRPD UE EUTRAN ULHandoverPreparationTransfer UE EUTRAN 3) Redirection to 1xRTT and handover to MobilityFromEUTRACommand HRPD November 2012 | LTE measurements| 266
  • 266.
    LTE-eHRPD Handover Overview November 2012 | LTE measurements| 267
  • 267.
    InterRAT Network Architecture EgCDMA2000 1xEVDO November 2012 | LTE measurements| 268
  • 268.
    EUTRAN – eHRPDnon-roaming i.e. US subscriber, connected To home network, leaves LTE coverage area November 2012 | LTE measurements| 269
  • 269.
    EUTRAN – eHRPD,roaming case i.e. European subscriber visiting US, connected to roaming network and leaving LTE coverage area November 2012 | LTE measurements| 270
  • 270.
    Mobility between LTEand HRPD Radio Access Aspects No handover to EUTRAN HRPD active to EUTRAN is always cell reselection (via RRC idle) November 2012 | LTE measurements| 272
  • 271.
    3 Step Procedure Ability of pre- E-UTRAN needs registration is to decide, that indicated HO to HRPD on PBCCH is required UE attached Pre-registration HO preparation HO execution to E-UTRAN • Reduces time for cell re-selection or handover • Reduces risk of radio link failure Connection Request Traffic Channel Assignment issued by UE to command is delivered HRPD, HRPD prepares to UE, re-tune radio to for the arrival of the UE HRPD channel, acquire HRPD channel, session configuration November 2012 | LTE measurements| 273
  • 272.
    Video over LTE Testingthe next step in the end user experience
  • 273.
    Introduction l Cisco quote 06/2011 l Internet video is now 40 percent of consumer Internet traffic, and will reach 62 percent by the end of 2015, not including the amount of video ex- changed through P2P file sharing. The sum of all forms of video (TV, video on demand [VoD], Internet, and P2P) will continue to be approximately 90 percent of global consumer traffic by 2015. l IDC quote 06/2011 l The fast-growing smartphone market, which will grow more than four times the rate of the overall mobile phone market this year, is being fuelled by falling average selling prices, increased phone functionality, and lower-cost data plans among other factors, which make the devices more accessible to a wider range of users. November 2012 | LTE measurements| 278
  • 274.
    Introduction Network view Impact due to EPC / IMS l Packet delay l Packet jitter l Packet loss MME PCRF l … Node B SGW PGW Impact due to Internet l Multipath propagation l Speed l … Node B November 2012 | LTE measurements| 279
  • 275.
    Introduction Testing real lifeconditions in the lab l Main use cases from a test engineer (operator, manufacturer) perspective: l Exploring the performance of mobile equipment from the end user perspective l Measuring E2E throughput with realistic radio conditions l Evaluating mobility performance R&S®AMU200 Contest SW baseband fader provides simulates real life automation radio conditions and reporting capabilities R&S®CMW500 emulates LTE network CMW-PQA l Important aspect for end user perspective: Error free video reception November 2012 | LTE measurements| 280
  • 276.
    Video transmission overLTE Video quality… l … is the perceived degradation of a processed video in comparison to an ideal reference or the reality l … can be used as an evaluation criteria for any kind of video transmission or processing system as signal impairments will happen in different stages l … can be categorized in two basic types of video quality assessment l Subjective quality assessment l Objective quality assessment November 2012 | LTE measurements| 281
  • 277.
    Video transmission overLTE The video processing chain and possible sources for video degradation • Encoding artifacts Impairments on the The decoder is usually the less (blocking) transmission link critical component. But in can cause loss of conjunction with the video • Video / audio delay information despite processor, errors during the • Buffer rules are active error conversion process (e.g. de- violated correction interlacing) are possible Transmission link (IP, cellular, broadcast, etc.) Encoder TX RX Decoder Video processor Receiver Uncompressed video Output on Redundant Restoring the video Scaling and SDI screen information (static information; i.e. the conversion to output SMPTE249/292/424 image parts) and picture sequence format irrelevant data including redundant (details) is omitted data November 2012 | LTE measurements| 282
  • 278.
    Video transmission overLTE Subjective quality assessment l Subjective video quality assessments are defined in ITU-T recommendation BT.500 Mean Opinion Score (MOS) l Example procedure: MOS Quality 5 Excellent A group of trained experts judge the video quality in a 4 Good scale ranging from bad to excellent. The assessments are 3 Fair averaged and result in to a Mean Opinion Score (MOS). 2 Poor 1 Bad l Advantages: l Subjective assessment provides the best results, as the ultimate measure for video quality is the human eye l Disadvantages: l Time consuming and expensive l Automation not possible November 2012 | LTE measurements| 283
  • 279.
    Video transmission overLTE Objective quality assessment l Mathematical calculation that approximate averaged results of subjective quality assessment l Divided into three categories: l Full reference methods (FR) l Reduced reference methods (RR) l No-reference methods (NR) l Advantage: l Assessment automation is possible for various applications l Disadvantages: l Correlation with the actual perceived video quality is not always ensured l Many different metrics for specific purposes exist November 2012 | LTE measurements| 284
  • 280.
    Video transmission overLTE Objective metric – peak signal-to-noise ratio (PSNR) MAX I2 l Most commonly used for quality PSNR  10  log10 ( ) measurements for image compression. MSE 1 m 1 n 1 l   I (i, j )  K (i, j ) Simple mathematical calculation but MSE  2 poor correlation with subjective mn i 0 j 0 methods: l Digital pixel values do not exactly represent I(i,j) = original pixel the light stimulus on the human eye l The summation is averaging errors without K(i,j) = reconstructed pixel weighting them MAX = maximum possible pixel value l The same PSNR values may result from different kind of structural errors Unit: dB Value range: 0 - ∞ dB; the higher, the better November 2012 | LTE measurements| 285
  • 281.
    Video transmission overLTE Objective metric – structural similarity (SSIM) Signal x Luminance Measurement l Improvement to traditional methods for + Contrast Measurement Luminance Comparison Similarity quality measurements to improve Measure consistency with human eye perception. Signal y Luminance ÷ Contrast Comparison Combination Measurement Structure l Complex mathematical calculation but Comparison fairly good correlation with subjective + Contrast Measurement methods. ÷ (2 x  y  C1 )(2 xy  C2 ) SSIM ( x, y )  (  x   y  C1 )( x   y  C2 ) 2 2 2 2 Unit: - Value range: 0 - 1; the higher, the better Reference: Z. Wang, A. C. Bovik, H. R. Sheikh and E. P. Simoncelli, "Image quality assessment: From error visibility to structural similarity," IEEE Transactions on Image Processing, vol. 13, no. 4, pp. 600-612, Apr. 2004. November 2012 | LTE measurements| 286
  • 282.
    Video transmission overLTE Correlation of objective metric with MOS Reference: Z. Wang, A. C. Bovik, H. R. Sheikh and E. P. Simoncelli, "Image quality assessment: From (MSSIM = Mean SSIM) error visibility to structural similarity," IEEE Transactions on Image Processing, vol. 13, no. 4, pp. 600-612, Apr. 2004. November 2012 | LTE measurements| 287
  • 283.
    Video transmission overLTE Metric – visible error l The shown objective metrics and their correlation with MOS are calculated frame based l Temporal masking effects need to be considered: l Additional condition: e.g. for at least 6 frames SSIM below 0.7 (25 fps video) 1,2 1 0,8 Not visible SSIM Not visible 0,6 Visible 1 Visible 2 0,4 0,2 6 Frames Visible Error 0 1 3 5 7 9 11 13 15 17 19 21 23 Frame November 2012 | LTE measurements| 288
  • 284.
    Video transmission overLTE Demo November 2012 | LTE measurements| 289
  • 285.
    Video transmission overLTE Testing real life conditions in the lab PC Contest TC Control RF Video via MHL or HDMI November 2012 | LTE measurements| 290
  • 286.
    Video transmission overLTE R&S®VTE Video Tester l Source, sink and dongle testing on MHL 1.2 interfaces and in the future also HDMI 1.4c, etc. l Realtime difference picture analysis for testing video transmissions over LTE R&S®VTE Video Tester l Combined protocol testing and audio/video analysis l Future-ready, modular platform accommodating up to three test modules l Localized touchscreen user interface l Integrated test automation and report generation November 2012 | LTE measurements| 291
  • 287.
    Video transmission overLTE Mobile high definition link (MHL) MHL is… l the leading audio/video interface for mobile devices l utilizes the existing Micro-USB connector l provides power to the mobile device l Single Transition Minimized Differential Signaling (TMDS) channel: l Carries video, audio and auxiliary data l Bit stream is modulated by a clock signal l Single-wire Control Bus (CBUS) l Configuration and status exchange l Replaces the DDC bus in HDMI l Carries the MHL Sideband Channel (MSC) which provides high level control functions l VBUS and associated ground l Provide power between sink and source l 5V, max. 0.5 A November 2012 | LTE measurements| 292
  • 288.
    Summary l Video and voice are important services gaining momentum for the fastest developing radio access technology ever - LTE l Beside LTE functionality, testing voice/video quality is essential to judge a good receiver implementation l R&S provides you with profound expertise and test solutions on both aspects l Complete LTE test portfolio ranging from early R&D via IOT and field testing until conformance and production l Supplier of a complete range of TV broadcasting transmission, monitoring and measurement equipment November 2012 | LTE measurements| 293
  • 289.
    There will beenough topics for future trainings  Thank you for your attention! Comments and questions welcome! November 2012 | LTE measurements| 294