Introduced
By
Mr. Taiichi Ohno
JUST IN TIME(JIT)
JIT is much more than an inventory
reducing system
JIT is much more than reducing
change over time
JIT is much more than modernizing
the factory
Mr. Ohno says:
Making a factory operate for the company just
like human body operates for an individual.
We should have a system in a factory that
automatically responds when problem occurs.
JIT means that in a flow process, the right
parts needed in assembly reach the assembly
line at the right time they are needed and
only in the amount needed.
Approach:
ZERO Inventory.
Problem: 1.Upset in Production
2. Mistake in paperwork
3.Defective products & rework
4.Trouble with equipment
5.Absenteeism etc.
Result of Waste:
1.Huge inventory
2.Less Productivity
3.Less profitability
Piller of TPS
JIT- Absolute elimination of waste
Autonomation - Automation with a
human touch
KANBAN is the means used for
conveying information about picking up or
receiving the production order
TPS is supported by JIT system
KANBAN method by which the TPS
moves smoothly
Give the machine Intelligence
1. By automatic checking system
2. By prevent automatically
3. By automatic stopping device
4. By safety device
5. By fixed position stopping
6. By full work system
7. By foolproofing system
GOAL of JUST IN TIME
Cost Reduction
Focus of Japanese Industry
1.Establishing a production flow of
one machine one operator.
2.One operator many machine in
different process
The power of individual skill and
teamwork :
1. Implementing autonomation is up
to the managers & supervisors
2. To adopt the simple movement of
the human operator to the
autonomation machine
5 Why : Complete Waste analysis
Present capacity = work + waste
Type of Waste
1. Over production
2. Time on hand ( waiting )
3. Transportation
4. Processing itself
5. Stock on hand ( inventory )
6. Movement
7. Making defective product
Philosophy
First principle – My Plant
(Owner the work area)
What is TAKT time ?
“TAKT” is the German word for the baton that an orchestra
conductor uses to regulate the speed, beat or timing at which
musicians play.
So Takt time is Beat time / Rate time / heart Beat.
Means the time that a complete product is finished
Exmp: If you have a Takt time of two minutes that means
every two minutes a complete product , assembly or machine
is produced off the line
How is TAKT time established?
The Customers buying rate establishes Takt time. It’s the rate at
which the customer buys your product. So this means that over
the course of a day , week , month or year the customer s you
sell to are buying at a rate of Takt time.
If you can’t predict when and how much a customer will buy,
then your Takt time shuold change.
Your Production staffing should be set accordingly.
Imbalances in Takt time
Producing to takt time with optimal staffing is where you want
to be. Where you have the right amount of people to produce
your product within your established Takt time. The operators
cycle times are loaded to Takt time.
Imbalances in Takt time, especially in older facilities, drive
security, one step on “the lean journey”is to monitor Summed
Takt time in order to move toward preventive (rather than
reactive) quality measures. That is , if you can defect , contain
and correct a problem within Takt + Buffer time(Summed
Takt) then you have taken a step toward Error Proofing. This is
no substitute for continuously improving a balanced Takt time
( thereby eliminating security inventory/buffering)but, rather ,it
is a first step which you can institute quickly and economically.
TAKT time Calculation :
1.Input the demand(daily, weekly, monthly etc.)
2.Determine the gross available time in a shift
3.List all the deduction and the corresponding time
4.No.of shift to calculate the total available seconds
5.Takt time is calculated as a function of available
time divided by the demand
Example
1.Demand (Daily/Weekly/Monthly): 100 units
2.Available time(Daily gross availability /shift) : 480 minutes
3.Deduction to shift availability
Description Time
Tea break 10 min.
Lunch 30 min.
Miscellaneous(M/H) 10min
Total 50min
4.Net availability / shift (2-3) : (480-50)*60 Sec = 25800 Seconds.
5.Prod.Requirement(Takt time) :
Total availability(25800)/Demand(100) = 258 sec/unit
Necessity is the mother of
invention
Automation
Skill & Talent of Individuals
Control Overproduction
Prevent Defect free Product
Visual Control( Management By Sight)

More Related Content

What's hot

Gagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmt
Gagan Pareek, PMP
 
Checkmate Jobdata Presentation
Checkmate  Jobdata PresentationCheckmate  Jobdata Presentation
Checkmate Jobdata Presentation
Dynamic Systems
 
Equipment Capacity
Equipment CapacityEquipment Capacity
Equipment Capacity
Emma Dickens
 
just in time
just in timejust in time
Jit
JitJit
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)
Prasanna3804
 
Quick Smed Sample
Quick Smed SampleQuick Smed Sample
Quick Smed Sample
ahmad bassiouny
 
Making Run Charts
Making Run ChartsMaking Run Charts
Making Run Charts
Emma Dickens
 
Ppt jit
Ppt jitPpt jit
Ppt jit
Vibha Nayak
 
Jit principles
Jit principlesJit principles
Jit principles
amarshelke
 
Jit systems
Jit systemsJit systems
Jit systems
Prafulla Tekriwal
 
Just in time - Operation Management
Just in time - Operation ManagementJust in time - Operation Management
Just in time - Operation Management
Durgesh S
 
Nota rojak 2
Nota rojak 2Nota rojak 2
Nota rojak 2
hasnul73
 
Just In Time Production (JIT)
Just In Time Production (JIT)Just In Time Production (JIT)
Just In Time Production (JIT)
Arunnima B S
 
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh AroraIntroduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
ADD VALUE CONSULTING Inc
 
Just in time
Just in timeJust in time
Just in time
Manoj Lawate
 
Just in time technology (JIT)
Just in time technology (JIT)Just in time technology (JIT)
Just in time technology (JIT)
Akash Dutta
 
What is forward and backward scheduling
What is forward and backward schedulingWhat is forward and backward scheduling
What is forward and backward scheduling
Naresh Gupta
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturing
ravindra sharma
 
just in time management
just in time managementjust in time management
just in time management
umesh yadav
 

What's hot (20)

Gagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmt
 
Checkmate Jobdata Presentation
Checkmate  Jobdata PresentationCheckmate  Jobdata Presentation
Checkmate Jobdata Presentation
 
Equipment Capacity
Equipment CapacityEquipment Capacity
Equipment Capacity
 
just in time
just in timejust in time
just in time
 
Jit
JitJit
Jit
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)
 
Quick Smed Sample
Quick Smed SampleQuick Smed Sample
Quick Smed Sample
 
Making Run Charts
Making Run ChartsMaking Run Charts
Making Run Charts
 
Ppt jit
Ppt jitPpt jit
Ppt jit
 
Jit principles
Jit principlesJit principles
Jit principles
 
Jit systems
Jit systemsJit systems
Jit systems
 
Just in time - Operation Management
Just in time - Operation ManagementJust in time - Operation Management
Just in time - Operation Management
 
Nota rojak 2
Nota rojak 2Nota rojak 2
Nota rojak 2
 
Just In Time Production (JIT)
Just In Time Production (JIT)Just In Time Production (JIT)
Just In Time Production (JIT)
 
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh AroraIntroduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
 
Just in time
Just in timeJust in time
Just in time
 
Just in time technology (JIT)
Just in time technology (JIT)Just in time technology (JIT)
Just in time technology (JIT)
 
What is forward and backward scheduling
What is forward and backward schedulingWhat is forward and backward scheduling
What is forward and backward scheduling
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturing
 
just in time management
just in time managementjust in time management
just in time management
 

Similar to Just in time

JUST IN TIME
JUST IN TIMEJUST IN TIME
JUST IN TIME
Tamanna Das Mohapatra
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
Deepa Ram Suthar
 
just in time approace
just in  time approacejust in  time approace
just in time approace
Anqur Rauth
 
Toyota Production System (broad)
Toyota Production System (broad)Toyota Production System (broad)
Toyota Production System (broad)
Aysel Muradlı
 
Prod. & operation mgt.
Prod. & operation mgt.Prod. & operation mgt.
Prod. & operation mgt.
Rohit Mishra
 
Prod. & operation mgt.
Prod. & operation mgt.Prod. & operation mgt.
Prod. & operation mgt.
Rohit Mishra
 
Lean production and jit
Lean production and jitLean production and jit
Lean production and jit
Kusum Parmar
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
Alan Desrocher
 
Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)
Blankdevil
 
Lean system and innovation in strategic Cost Management
Lean system and innovation in strategic Cost ManagementLean system and innovation in strategic Cost Management
Lean system and innovation in strategic Cost Management
Yash Maheshwari
 
Just to-time (jit)
Just to-time (jit)Just to-time (jit)
Just to-time (jit)
Prashant Uttarkar
 
EngManagement-Lecture 9.pptx
EngManagement-Lecture 9.pptxEngManagement-Lecture 9.pptx
EngManagement-Lecture 9.pptx
shayanzafar2
 
Toyota
ToyotaToyota
Toyota
nsjidnjkj
 
Lean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptLean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.ppt
rahul368457
 
just in time approace literature view
just in time approace literature viewjust in time approace literature view
just in time approace literature viewAnqur Rauth
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
Wg Cdr Jayesh C S PAI
 
Lean Production With Jaguar Example
Lean Production With Jaguar ExampleLean Production With Jaguar Example
Lean Production With Jaguar Example
shekhar619
 
Just in time (jit) and lean production
Just in time (jit) and lean productionJust in time (jit) and lean production
Just in time (jit) and lean production
هشام جملة
 
Report on JIT , for Projects and Seminars
Report on JIT , for Projects and SeminarsReport on JIT , for Projects and Seminars
Report on JIT , for Projects and Seminars
omkar jagtap
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
Ashima Kandari
 

Similar to Just in time (20)

JUST IN TIME
JUST IN TIMEJUST IN TIME
JUST IN TIME
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
just in time approace
just in  time approacejust in  time approace
just in time approace
 
Toyota Production System (broad)
Toyota Production System (broad)Toyota Production System (broad)
Toyota Production System (broad)
 
Prod. & operation mgt.
Prod. & operation mgt.Prod. & operation mgt.
Prod. & operation mgt.
 
Prod. & operation mgt.
Prod. & operation mgt.Prod. & operation mgt.
Prod. & operation mgt.
 
Lean production and jit
Lean production and jitLean production and jit
Lean production and jit
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)
 
Lean system and innovation in strategic Cost Management
Lean system and innovation in strategic Cost ManagementLean system and innovation in strategic Cost Management
Lean system and innovation in strategic Cost Management
 
Just to-time (jit)
Just to-time (jit)Just to-time (jit)
Just to-time (jit)
 
EngManagement-Lecture 9.pptx
EngManagement-Lecture 9.pptxEngManagement-Lecture 9.pptx
EngManagement-Lecture 9.pptx
 
Toyota
ToyotaToyota
Toyota
 
Lean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptLean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.ppt
 
just in time approace literature view
just in time approace literature viewjust in time approace literature view
just in time approace literature view
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Lean Production With Jaguar Example
Lean Production With Jaguar ExampleLean Production With Jaguar Example
Lean Production With Jaguar Example
 
Just in time (jit) and lean production
Just in time (jit) and lean productionJust in time (jit) and lean production
Just in time (jit) and lean production
 
Report on JIT , for Projects and Seminars
Report on JIT , for Projects and SeminarsReport on JIT , for Projects and Seminars
Report on JIT , for Projects and Seminars
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 

More from Jitesh Gaurav

What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2
Jitesh Gaurav
 
Weld material
Weld materialWeld material
Weld material
Jitesh Gaurav
 
Six sigma
Six sigmaSix sigma
Six sigma
Jitesh Gaurav
 
Spi link
Spi linkSpi link
Spi link
Jitesh Gaurav
 
6 Sigma - Chapter3
6 Sigma - Chapter36 Sigma - Chapter3
6 Sigma - Chapter3
Jitesh Gaurav
 
6 Sigma - Chapter2
6 Sigma - Chapter26 Sigma - Chapter2
6 Sigma - Chapter2
Jitesh Gaurav
 
6 Sigma - Chapter1
6 Sigma - Chapter16 Sigma - Chapter1
6 Sigma - Chapter1
Jitesh Gaurav
 
6 Sigma - Chapter8
6 Sigma - Chapter86 Sigma - Chapter8
6 Sigma - Chapter8
Jitesh Gaurav
 
6 Sigma - Chapter7
6 Sigma - Chapter76 Sigma - Chapter7
6 Sigma - Chapter7
Jitesh Gaurav
 
6 Sigma - Chapter6
6 Sigma - Chapter66 Sigma - Chapter6
6 Sigma - Chapter6
Jitesh Gaurav
 
6 Sigma - Chapter5
6 Sigma - Chapter56 Sigma - Chapter5
6 Sigma - Chapter5
Jitesh Gaurav
 
6 Sigma - Chapter4
6 Sigma - Chapter46 Sigma - Chapter4
6 Sigma - Chapter4
Jitesh Gaurav
 
Pattern production
Pattern productionPattern production
Pattern production
Jitesh Gaurav
 
smed
smedsmed
Methods of kaizen
Methods of kaizenMethods of kaizen
Methods of kaizen
Jitesh Gaurav
 
Dfmea rating
Dfmea ratingDfmea rating
Dfmea rating
Jitesh Gaurav
 
Qip
QipQip
Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]
Jitesh Gaurav
 
Tqm
TqmTqm
Tpm+basics
Tpm+basicsTpm+basics
Tpm+basics
Jitesh Gaurav
 

More from Jitesh Gaurav (20)

What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2
 
Weld material
Weld materialWeld material
Weld material
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Spi link
Spi linkSpi link
Spi link
 
6 Sigma - Chapter3
6 Sigma - Chapter36 Sigma - Chapter3
6 Sigma - Chapter3
 
6 Sigma - Chapter2
6 Sigma - Chapter26 Sigma - Chapter2
6 Sigma - Chapter2
 
6 Sigma - Chapter1
6 Sigma - Chapter16 Sigma - Chapter1
6 Sigma - Chapter1
 
6 Sigma - Chapter8
6 Sigma - Chapter86 Sigma - Chapter8
6 Sigma - Chapter8
 
6 Sigma - Chapter7
6 Sigma - Chapter76 Sigma - Chapter7
6 Sigma - Chapter7
 
6 Sigma - Chapter6
6 Sigma - Chapter66 Sigma - Chapter6
6 Sigma - Chapter6
 
6 Sigma - Chapter5
6 Sigma - Chapter56 Sigma - Chapter5
6 Sigma - Chapter5
 
6 Sigma - Chapter4
6 Sigma - Chapter46 Sigma - Chapter4
6 Sigma - Chapter4
 
Pattern production
Pattern productionPattern production
Pattern production
 
smed
smedsmed
smed
 
Methods of kaizen
Methods of kaizenMethods of kaizen
Methods of kaizen
 
Dfmea rating
Dfmea ratingDfmea rating
Dfmea rating
 
Qip
QipQip
Qip
 
Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]
 
Tqm
TqmTqm
Tqm
 
Tpm+basics
Tpm+basicsTpm+basics
Tpm+basics
 

Recently uploaded

Educational Technology in the Health Sciences
Educational Technology in the Health SciencesEducational Technology in the Health Sciences
Educational Technology in the Health Sciences
Iris Thiele Isip-Tan
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
MysoreMuleSoftMeetup
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
EduSkills OECD
 
HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.
deepaannamalai16
 
Pharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brubPharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brub
danielkiash986
 
CIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdfCIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdf
blueshagoo1
 
Electric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger HuntElectric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger Hunt
RamseyBerglund
 
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
National Information Standards Organization (NISO)
 
Benner "Expanding Pathways to Publishing Careers"
Benner "Expanding Pathways to Publishing Careers"Benner "Expanding Pathways to Publishing Careers"
Benner "Expanding Pathways to Publishing Careers"
National Information Standards Organization (NISO)
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
HajraNaeem15
 
The basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptxThe basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptx
heathfieldcps1
 
Bossa N’ Roll Records by Ismael Vazquez.
Bossa N’ Roll Records by Ismael Vazquez.Bossa N’ Roll Records by Ismael Vazquez.
Bossa N’ Roll Records by Ismael Vazquez.
IsmaelVazquez38
 
Juneteenth Freedom Day 2024 David Douglas School District
Juneteenth Freedom Day 2024 David Douglas School DistrictJuneteenth Freedom Day 2024 David Douglas School District
Juneteenth Freedom Day 2024 David Douglas School District
David Douglas School District
 
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptxBIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
RidwanHassanYusuf
 
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
EduSkills OECD
 
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptxRESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
zuzanka
 
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptxChapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Denish Jangid
 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
imrankhan141184
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
Himanshu Rai
 

Recently uploaded (20)

Educational Technology in the Health Sciences
Educational Technology in the Health SciencesEducational Technology in the Health Sciences
Educational Technology in the Health Sciences
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
 
HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.
 
Pharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brubPharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brub
 
CIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdfCIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdf
 
Electric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger HuntElectric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger Hunt
 
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
 
Benner "Expanding Pathways to Publishing Careers"
Benner "Expanding Pathways to Publishing Careers"Benner "Expanding Pathways to Publishing Careers"
Benner "Expanding Pathways to Publishing Careers"
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
 
The basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptxThe basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptx
 
Bossa N’ Roll Records by Ismael Vazquez.
Bossa N’ Roll Records by Ismael Vazquez.Bossa N’ Roll Records by Ismael Vazquez.
Bossa N’ Roll Records by Ismael Vazquez.
 
Juneteenth Freedom Day 2024 David Douglas School District
Juneteenth Freedom Day 2024 David Douglas School DistrictJuneteenth Freedom Day 2024 David Douglas School District
Juneteenth Freedom Day 2024 David Douglas School District
 
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptxBIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
 
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
 
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptxRESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
 
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptxChapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptx
 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
 

Just in time

  • 2. JUST IN TIME(JIT) JIT is much more than an inventory reducing system JIT is much more than reducing change over time JIT is much more than modernizing the factory
  • 3. Mr. Ohno says: Making a factory operate for the company just like human body operates for an individual. We should have a system in a factory that automatically responds when problem occurs.
  • 4. JIT means that in a flow process, the right parts needed in assembly reach the assembly line at the right time they are needed and only in the amount needed. Approach: ZERO Inventory.
  • 5. Problem: 1.Upset in Production 2. Mistake in paperwork 3.Defective products & rework 4.Trouble with equipment 5.Absenteeism etc. Result of Waste: 1.Huge inventory 2.Less Productivity 3.Less profitability
  • 6. Piller of TPS JIT- Absolute elimination of waste Autonomation - Automation with a human touch
  • 7. KANBAN is the means used for conveying information about picking up or receiving the production order TPS is supported by JIT system
  • 8. KANBAN method by which the TPS moves smoothly Give the machine Intelligence 1. By automatic checking system 2. By prevent automatically 3. By automatic stopping device 4. By safety device 5. By fixed position stopping 6. By full work system 7. By foolproofing system
  • 9. GOAL of JUST IN TIME Cost Reduction
  • 10. Focus of Japanese Industry 1.Establishing a production flow of one machine one operator. 2.One operator many machine in different process
  • 11. The power of individual skill and teamwork : 1. Implementing autonomation is up to the managers & supervisors 2. To adopt the simple movement of the human operator to the autonomation machine
  • 12. 5 Why : Complete Waste analysis Present capacity = work + waste
  • 13. Type of Waste 1. Over production 2. Time on hand ( waiting ) 3. Transportation 4. Processing itself 5. Stock on hand ( inventory ) 6. Movement 7. Making defective product
  • 14. Philosophy First principle – My Plant (Owner the work area)
  • 15. What is TAKT time ? “TAKT” is the German word for the baton that an orchestra conductor uses to regulate the speed, beat or timing at which musicians play. So Takt time is Beat time / Rate time / heart Beat. Means the time that a complete product is finished Exmp: If you have a Takt time of two minutes that means every two minutes a complete product , assembly or machine is produced off the line
  • 16. How is TAKT time established? The Customers buying rate establishes Takt time. It’s the rate at which the customer buys your product. So this means that over the course of a day , week , month or year the customer s you sell to are buying at a rate of Takt time. If you can’t predict when and how much a customer will buy, then your Takt time shuold change. Your Production staffing should be set accordingly.
  • 17. Imbalances in Takt time Producing to takt time with optimal staffing is where you want to be. Where you have the right amount of people to produce your product within your established Takt time. The operators cycle times are loaded to Takt time. Imbalances in Takt time, especially in older facilities, drive security, one step on “the lean journey”is to monitor Summed Takt time in order to move toward preventive (rather than reactive) quality measures. That is , if you can defect , contain and correct a problem within Takt + Buffer time(Summed Takt) then you have taken a step toward Error Proofing. This is no substitute for continuously improving a balanced Takt time ( thereby eliminating security inventory/buffering)but, rather ,it is a first step which you can institute quickly and economically.
  • 18. TAKT time Calculation : 1.Input the demand(daily, weekly, monthly etc.) 2.Determine the gross available time in a shift 3.List all the deduction and the corresponding time 4.No.of shift to calculate the total available seconds 5.Takt time is calculated as a function of available time divided by the demand
  • 19. Example 1.Demand (Daily/Weekly/Monthly): 100 units 2.Available time(Daily gross availability /shift) : 480 minutes 3.Deduction to shift availability Description Time Tea break 10 min. Lunch 30 min. Miscellaneous(M/H) 10min Total 50min 4.Net availability / shift (2-3) : (480-50)*60 Sec = 25800 Seconds. 5.Prod.Requirement(Takt time) : Total availability(25800)/Demand(100) = 258 sec/unit
  • 20. Necessity is the mother of invention Automation Skill & Talent of Individuals Control Overproduction Prevent Defect free Product Visual Control( Management By Sight)