This document outlines a joystick-based DC motor control project that utilizes an ATmega16 microcontroller and pulse width modulation (PWM) to control the speed and direction of two DC motors. It includes sections on requirements, operation concepts, schematic diagrams, simulation sequences, applications, and budget. Applications for the project range from remote-controlled toys to robotic arms and surveillance systems.