1. DEAN MCNULTY
59 Nowack Ave Umina Beach, NSW 2257
Ph: 0243397369
Mob: 0400009174
Email: dean.mcnulty@gmail.com
D.O.B 09/01/1974
2. Career Objectives
I pride myself on having a very strong safety focus in any role I undertake and am Proficient in
complying with all safety requirements. I enjoy working in any Project team role but prefer to
work in a challenging position which allows me to utilise my vast range of skills and to build on
these.
My work history has covered a Varity of industries, Mining, Power Generation, Oil & Gas, Water
treatment, pharmaceutical and food packaging and I have experience operating maintenance
management systems Ellipse and Sap.
I am confident working in a construction or maintenance role.
Training
• Fitting and Machining trade certificate
• HR Drivers Licence
• Certificate 4 of project management
• Certificate 2 in Process Plant Operations
• Site audit training by SIA global
• Supervisor Training – by AIPM
• Microsoft Excel levels 1,2 & 3 By Dynamic web training
• Microsoft Project Levels 1 & 2 By Dynamic we training
• Permit to work certificate
• Driver awareness training
• Confined space ticket
• Gas test atmospheres
• Working at heights
• Hydraulics 1
• Pneumatics 1
• OHS Blue Card and white card
• Dogging, basic rigging and Advance scaffolding high risk licence
• Forklift Licence
• EWP licence
• Maintenance Management and planning by Len Bradshaw
• Machinery lubrication1 & 2 by Noria Corporation
• Maintenance management systems Ellipse and SAP
• All Microsoft software applications
• Bearing Maintenance by SKF
• Laser Alignment by Pruftechnik
3. Employment History
2014 – Current Transfield Services / Broadspectrum (Surat Basin, QLD)
QA/QC Superintendent
Responsibilities and Duties
• Carry out MC1 and SC1 walk downs complete reports
• Supervisor crews up to 12 people as required
• Carry out inspections on coupling alignments of booster pumps
• Carry out pre start meetings
• Assist with developing SWMS (JSEA)
• Compile punch lists and record in register
• Create NCR’s and manage register
• Manage flange management register
• Review MDR’s for contractor equipment and fabrication
• Inspect all equipment before installation that it is compliant to the Gas Act and site
requirements
• Review ITR;s are completed correctly to required standard for dossier completion
• Create ITR’s for work packs using Go Hub CMS system
• Create work packs
• Collect all certification documentation for dossier completion
• Sign off ITR’s in CMS
• Red line drawing for as built documentation
Feb 2013 – Feb 2014 Transfield Services (Surat Basin, QLD)
Leading Hand Mechanical Fitter
Responsibilities and Duties
• Change isolation of gas wells from single point isolation to double block and bleed isolation
for installation of equipment to begin.
• Carry out lock out procedure and QA Documentation for double block and bleed isolation
of gas wells
• Installation of separators to coal seam gas wells.
• Installation of hydraulic power unit to drive well
• Connect feed lines from separators to gas risers to supply gas to the refinery and the
water to the treatment plants
• Complete all ITPs and flange management documentation
• Carry out MC 1 walk downs and document results and carry out repairs repairs
• Carry out SC1 walk downs and document results
• Insure all documentation is current from permits, Swims, take 5, job starts for the task at
hand
• Oversee up 10 personnel at any one time during installation.
• Brown fields Project work on de watering of gas wells
4. Nov 2012 – Dec 2012 Transfield Services
Base load Mechanical Supervisor
Responsibilities and Duties
• Supervise shutdown on crushers and screens and conveyors at Mt Whaleback
• Carry out pre starts and tool box meetings
• Obtain permits
• Write JSEA
• Supervise up to 15 people in the crew
Employment History Cont
Sept 2011 – Nov 2012 MSS Pty Ltd (Gove NT)
Major Maintenance Planner/ Supervisor
Responsibilities and Duties
• Develop project and create schedule to meet budget restraints for the statutory inspection
of all tanks onsite over 10 year plan consisting of 480 tank inspection
• Develop Projects, create schedule and develop work packs to meet budget restraints for
the statutory inspection of all overdue pressure vessel onsite including Boilers, heat
exchangers, condensation vessels and Blow down vessels
• Create weekly progress reports for statutory completion using Excel
• Plan in routine maintenance tasks for fixed plant equipment using ellipse.
• Create and Maintain Preventative Maintenance task
• Create and maintain standard jobs
• Develop Gannt charts for routine and shutdown maintenance including the yearly total
plant shutdown Using Microsoft Project
• Review Inventory for components and there criticality for plant maintaining holding limits
and availability
• Plan and execute shutdowns for power station Boiler shut downs, the Ferrosilt area
including wash down area, acid plant and Evaporation, Estimate and scope work order
tasks, create work packs, order all parts and consumables.
• Create work packs for all shutdown and maintenance tasks
• Develop ITPs and flange management documentation for evaporation shutdowns
• Chair weekly pre shutdown meeting with key stakeholders
• Supervise up to 30 people in a work crew during shutdowns
• Carry out QA sign off during shutdowns and record all documentation into CMS ( Ellipse)
5. Jun 2011 – Sept 2011 United Resources (Shell Oil Refinery Geelong)
Sub-contractor coordinator
Responsibilities and Duties
• Review contractor estimates for shutdown task hours and manning
• Pre shut scoping of all contractor tasks
• Assist planners with scheduling sub-contractor task in P6
• Review work packs for all sub-contractor tasks including permits, ITPs weld procedures,
flange management JSEA’s, work method statements
• Collect all ITPs from sub-contractors and review they were completed correctly and submit
for processing into CMS
• Carry out QA walk downs on all completed tasks
• Carry out kick off meeting to review HSE requirements, KPI’s and all shutdown tasks
• overseeing contractors are meeting schedule requirements ensuring hours and manning
are correct to meet agreed KPI’s and shutdown Budget requirements
• Attend daily update meeting
• Send daily reports to project manager and client on contractor progress
• Manage any issues as they arise
Employment History Cont
April 2011 – June 2011 United Resources (Caltex Oil Refinery Kurnell, Sydney)
Mechanical Supervisor
Responsibilities and Duties
• Scope all jobs for cracker shutdown from work order task
• Update tasks information in Sap
• Create work packs develop documentation
• Assist with developing ITP’s for all shutdown task
• Review contractor quotes
• Update client on progress of shutdown preparation
April 2010 – April 2011 United Resources (Gove, NT Alumina Refinery)
Major Maintenance Supervisor
Responsibilities and Duties
• Supervise major maintenance turnarounds in the Ferrosilt area
• Boiler Maintenance, Tank maintenance, mill maintenance, acid plant maintenance.
• Pumps, valve, and piping repairs
• Assist with the routine maintenance of area
• Carry out performance reviews of work crews
• Carry out daily prestart meetings
• Audit work crews JSEA and take 5 for tasks being performed
• Plan and execute Evaporation shutdown. Create all work packs. ITPs flange management,
6. • Manage night shift on Evaporation shutdowns. this included multiple trades from all
disciplines mechanical, electrical, hydro blasting and sand blasting. Carry out all QA walk
downs on Night shift for sign off of tank inspection, NDT weld repairs, flange management
spool replacments.
• Enter all documentation into CMS system
• Develop program for complete Piping spool replacement in Acid plant to duplex stainless
including quoting and estimating for drafting, fabrication and installation of all spools.
• Create budget for spool project
• Plan and execute spool replacement
Jan 2010 – April 2010 HIS Engineering (Eraring Power Station, NSW)
Mechanical supervisor
Responsibilities and Duties
• Install 28 low nox burners into boiler
• Develop work packs for project
• Supervise 20 people work crew consisting of Fitters, Boilermakers, Riggers on night shift
• Sign off all ITP’s for Burner installation
• Carry out daily pre start and weekly toolbox meetings
• Review JSEA and take 5 for each task
• organise all logistics for project
• Monitor task hours to meet schedule requirements and budget
• Report progress to project manager and customer daily
• Complete daily timesheets
Jun 2009 – Dec 2009 Silcar (Eraring Power Station, NSW) ( Snowy Hydro Peaker plant Traralgon
Victoria)
Mechanical Supervisor to Project coordinator
Responsibilities and Duties
• Install 28 low nox burners into boiler
• Develop work packs for project
• Supervise 20 people work crew consisting of Fitters, Boilermakers, Riggers
• Sign off all ITP’s for Burner installation
• Carry out daily pre start and weekly toolbox meetings
• Review JSEA and take 5 for each task
• organise all logistics for project
• Monitor task hours to meet schedule requirements and budget
• Report progress to project manager and customer daily
• Complete daily timesheets
Snowy Hydro Peaker plant
• Install new air intake coolers to gas turbines
• Oversee contractor deliveries of components
• Carry out audits of contractor facilities and progress
• Report project progress to project manager
• Review budget cost of equipment
• Assist with any mechanical issues
• Sign off ITP’s and FIC’s as required
• Carry out MC-1 walk downs
7. History Previous to 2010
Jan 2009 – May 2009 Laing O’Rourke (Dalby, QLD)
Mechanical Fitter
Jul 2008 – Dec 2008 PGSR (NT)
Mechanical Supervisor
Nov 2006 – Jun 2008 Laing O’Rourke (Grove, NT)
Leading Hand/ Mechanical Fitter
May 2002 – Oct 2006 Alcan Gove (Gove, NT)
Leading Hand/ Mechanical Fitter
April 2000 – April 2002 Clark Equipment (Asquith NSW)
Mechanical Fitter
Interests
Playing Guitar, Photography, Fishing, gardening
References
Adam Thompson
Transfield Worley Contracts Manager
Ph: 0477 359 483
Brad Lucus
Broadspectrum Mechanical superintendent
Ph: 0408341352
Mark Rice
UGL project Manager
Ph: 0400426047
Rod Boland
Alcan Gove - Supervisor