SlideShare a Scribd company logo
1 of 7
DEAN MCNULTY
59 Nowack Ave Umina Beach, NSW 2257
Ph: 0243397369
Mob: 0400009174
Email: dean.mcnulty@gmail.com
D.O.B 09/01/1974
Career Objectives
I pride myself on having a very strong safety focus in any role I undertake and am Proficient in
complying with all safety requirements. I enjoy working in any Project team role but prefer to
work in a challenging position which allows me to utilise my vast range of skills and to build on
these.
My work history has covered a Varity of industries, Mining, Power Generation, Oil & Gas, Water
treatment, pharmaceutical and food packaging and I have experience operating maintenance
management systems Ellipse and Sap.
I am confident working in a construction or maintenance role.
Training
• Fitting and Machining trade certificate
• HR Drivers Licence
• Certificate 4 of project management
• Certificate 2 in Process Plant Operations
• Site audit training by SIA global
• Supervisor Training – by AIPM
• Microsoft Excel levels 1,2 & 3 By Dynamic web training
• Microsoft Project Levels 1 & 2 By Dynamic we training
• Permit to work certificate
• Driver awareness training
• Confined space ticket
• Gas test atmospheres
• Working at heights
• Hydraulics 1
• Pneumatics 1
• OHS Blue Card and white card
• Dogging, basic rigging and Advance scaffolding high risk licence
• Forklift Licence
• EWP licence
• Maintenance Management and planning by Len Bradshaw
• Machinery lubrication1 & 2 by Noria Corporation
• Maintenance management systems Ellipse and SAP
• All Microsoft software applications
• Bearing Maintenance by SKF
• Laser Alignment by Pruftechnik
Employment History
2014 – Current Transfield Services / Broadspectrum (Surat Basin, QLD)
QA/QC Superintendent
Responsibilities and Duties
• Carry out MC1 and SC1 walk downs complete reports
• Supervisor crews up to 12 people as required
• Carry out inspections on coupling alignments of booster pumps
• Carry out pre start meetings
• Assist with developing SWMS (JSEA)
• Compile punch lists and record in register
• Create NCR’s and manage register
• Manage flange management register
• Review MDR’s for contractor equipment and fabrication
• Inspect all equipment before installation that it is compliant to the Gas Act and site
requirements
• Review ITR;s are completed correctly to required standard for dossier completion
• Create ITR’s for work packs using Go Hub CMS system
• Create work packs
• Collect all certification documentation for dossier completion
• Sign off ITR’s in CMS
• Red line drawing for as built documentation
Feb 2013 – Feb 2014 Transfield Services (Surat Basin, QLD)
Leading Hand Mechanical Fitter
Responsibilities and Duties
• Change isolation of gas wells from single point isolation to double block and bleed isolation
for installation of equipment to begin.
• Carry out lock out procedure and QA Documentation for double block and bleed isolation
of gas wells
• Installation of separators to coal seam gas wells.
• Installation of hydraulic power unit to drive well
• Connect feed lines from separators to gas risers to supply gas to the refinery and the
water to the treatment plants
• Complete all ITPs and flange management documentation
• Carry out MC 1 walk downs and document results and carry out repairs repairs
• Carry out SC1 walk downs and document results
• Insure all documentation is current from permits, Swims, take 5, job starts for the task at
hand
• Oversee up 10 personnel at any one time during installation.
• Brown fields Project work on de watering of gas wells
Nov 2012 – Dec 2012 Transfield Services
Base load Mechanical Supervisor
Responsibilities and Duties
• Supervise shutdown on crushers and screens and conveyors at Mt Whaleback
• Carry out pre starts and tool box meetings
• Obtain permits
• Write JSEA
• Supervise up to 15 people in the crew
Employment History Cont
Sept 2011 – Nov 2012 MSS Pty Ltd (Gove NT)
Major Maintenance Planner/ Supervisor
Responsibilities and Duties
• Develop project and create schedule to meet budget restraints for the statutory inspection
of all tanks onsite over 10 year plan consisting of 480 tank inspection
• Develop Projects, create schedule and develop work packs to meet budget restraints for
the statutory inspection of all overdue pressure vessel onsite including Boilers, heat
exchangers, condensation vessels and Blow down vessels
• Create weekly progress reports for statutory completion using Excel
• Plan in routine maintenance tasks for fixed plant equipment using ellipse.
• Create and Maintain Preventative Maintenance task
• Create and maintain standard jobs
• Develop Gannt charts for routine and shutdown maintenance including the yearly total
plant shutdown Using Microsoft Project
• Review Inventory for components and there criticality for plant maintaining holding limits
and availability
• Plan and execute shutdowns for power station Boiler shut downs, the Ferrosilt area
including wash down area, acid plant and Evaporation, Estimate and scope work order
tasks, create work packs, order all parts and consumables.
• Create work packs for all shutdown and maintenance tasks
• Develop ITPs and flange management documentation for evaporation shutdowns
• Chair weekly pre shutdown meeting with key stakeholders
• Supervise up to 30 people in a work crew during shutdowns
• Carry out QA sign off during shutdowns and record all documentation into CMS ( Ellipse)
Jun 2011 – Sept 2011 United Resources (Shell Oil Refinery Geelong)
Sub-contractor coordinator
Responsibilities and Duties
• Review contractor estimates for shutdown task hours and manning
• Pre shut scoping of all contractor tasks
• Assist planners with scheduling sub-contractor task in P6
• Review work packs for all sub-contractor tasks including permits, ITPs weld procedures,
flange management JSEA’s, work method statements
• Collect all ITPs from sub-contractors and review they were completed correctly and submit
for processing into CMS
• Carry out QA walk downs on all completed tasks
• Carry out kick off meeting to review HSE requirements, KPI’s and all shutdown tasks
• overseeing contractors are meeting schedule requirements ensuring hours and manning
are correct to meet agreed KPI’s and shutdown Budget requirements
• Attend daily update meeting
• Send daily reports to project manager and client on contractor progress
• Manage any issues as they arise
Employment History Cont
April 2011 – June 2011 United Resources (Caltex Oil Refinery Kurnell, Sydney)
Mechanical Supervisor
Responsibilities and Duties
• Scope all jobs for cracker shutdown from work order task
• Update tasks information in Sap
• Create work packs develop documentation
• Assist with developing ITP’s for all shutdown task
• Review contractor quotes
• Update client on progress of shutdown preparation
April 2010 – April 2011 United Resources (Gove, NT Alumina Refinery)
Major Maintenance Supervisor
Responsibilities and Duties
• Supervise major maintenance turnarounds in the Ferrosilt area
• Boiler Maintenance, Tank maintenance, mill maintenance, acid plant maintenance.
• Pumps, valve, and piping repairs
• Assist with the routine maintenance of area
• Carry out performance reviews of work crews
• Carry out daily prestart meetings
• Audit work crews JSEA and take 5 for tasks being performed
• Plan and execute Evaporation shutdown. Create all work packs. ITPs flange management,
• Manage night shift on Evaporation shutdowns. this included multiple trades from all
disciplines mechanical, electrical, hydro blasting and sand blasting. Carry out all QA walk
downs on Night shift for sign off of tank inspection, NDT weld repairs, flange management
spool replacments.
• Enter all documentation into CMS system
• Develop program for complete Piping spool replacement in Acid plant to duplex stainless
including quoting and estimating for drafting, fabrication and installation of all spools.
• Create budget for spool project
• Plan and execute spool replacement
Jan 2010 – April 2010 HIS Engineering (Eraring Power Station, NSW)
Mechanical supervisor
Responsibilities and Duties
• Install 28 low nox burners into boiler
• Develop work packs for project
• Supervise 20 people work crew consisting of Fitters, Boilermakers, Riggers on night shift
• Sign off all ITP’s for Burner installation
• Carry out daily pre start and weekly toolbox meetings
• Review JSEA and take 5 for each task
• organise all logistics for project
• Monitor task hours to meet schedule requirements and budget
• Report progress to project manager and customer daily
• Complete daily timesheets
Jun 2009 – Dec 2009 Silcar (Eraring Power Station, NSW) ( Snowy Hydro Peaker plant Traralgon
Victoria)
Mechanical Supervisor to Project coordinator
Responsibilities and Duties
• Install 28 low nox burners into boiler
• Develop work packs for project
• Supervise 20 people work crew consisting of Fitters, Boilermakers, Riggers
• Sign off all ITP’s for Burner installation
• Carry out daily pre start and weekly toolbox meetings
• Review JSEA and take 5 for each task
• organise all logistics for project
• Monitor task hours to meet schedule requirements and budget
• Report progress to project manager and customer daily
• Complete daily timesheets
Snowy Hydro Peaker plant
• Install new air intake coolers to gas turbines
• Oversee contractor deliveries of components
• Carry out audits of contractor facilities and progress
• Report project progress to project manager
• Review budget cost of equipment
• Assist with any mechanical issues
• Sign off ITP’s and FIC’s as required
• Carry out MC-1 walk downs
History Previous to 2010
Jan 2009 – May 2009 Laing O’Rourke (Dalby, QLD)
Mechanical Fitter
Jul 2008 – Dec 2008 PGSR (NT)
Mechanical Supervisor
Nov 2006 – Jun 2008 Laing O’Rourke (Grove, NT)
Leading Hand/ Mechanical Fitter
May 2002 – Oct 2006 Alcan Gove (Gove, NT)
Leading Hand/ Mechanical Fitter
April 2000 – April 2002 Clark Equipment (Asquith NSW)
Mechanical Fitter
Interests
Playing Guitar, Photography, Fishing, gardening
References
Adam Thompson
Transfield Worley Contracts Manager
Ph: 0477 359 483
Brad Lucus
Broadspectrum Mechanical superintendent
Ph: 0408341352
Mark Rice
UGL project Manager
Ph: 0400426047
Rod Boland
Alcan Gove - Supervisor
Ph: 0418 683 927

More Related Content

What's hot (20)

Resume Murali 1
Resume Murali 1 Resume Murali 1
Resume Murali 1
 
Nino Balmes resume (1) (2)
Nino Balmes resume (1) (2)Nino Balmes resume (1) (2)
Nino Balmes resume (1) (2)
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Cu-Boil Pot Upgrade - Closeout Presentation Rev2a
Cu-Boil Pot Upgrade - Closeout Presentation Rev2aCu-Boil Pot Upgrade - Closeout Presentation Rev2a
Cu-Boil Pot Upgrade - Closeout Presentation Rev2a
 
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 2014112961T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
 
Tim Rathsam Work History
Tim Rathsam Work HistoryTim Rathsam Work History
Tim Rathsam Work History
 
Resume
ResumeResume
Resume
 
Project Review Presentation (2)
Project Review Presentation (2)Project Review Presentation (2)
Project Review Presentation (2)
 
Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)
 
Madon CV shl2
Madon CV shl2Madon CV shl2
Madon CV shl2
 
Brian Welch-Resume 2015
Brian Welch-Resume 2015Brian Welch-Resume 2015
Brian Welch-Resume 2015
 
Sudhanshu Final
Sudhanshu FinalSudhanshu Final
Sudhanshu Final
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_
 
Cv farhan
Cv farhanCv farhan
Cv farhan
 
vijay cv
vijay cvvijay cv
vijay cv
 
Resume Feroz Habid
Resume Feroz HabidResume Feroz Habid
Resume Feroz Habid
 
Resume
ResumeResume
Resume
 
Resume jaseem
Resume jaseemResume jaseem
Resume jaseem
 
Resume Jun-2015
Resume Jun-2015Resume Jun-2015
Resume Jun-2015
 

Viewers also liked

An Area Analysis Report of Gainesville Parks with a Focus on Springtree Park
An Area Analysis Report of Gainesville Parks with a Focus on Springtree ParkAn Area Analysis Report of Gainesville Parks with a Focus on Springtree Park
An Area Analysis Report of Gainesville Parks with a Focus on Springtree ParkDanielle Behr
 
Georgia Studies Jeopardy!, WWII Edition
Georgia Studies Jeopardy!, WWII EditionGeorgia Studies Jeopardy!, WWII Edition
Georgia Studies Jeopardy!, WWII EditionPatrick O'Conner
 
ITCH_E.compressed
ITCH_E.compressedITCH_E.compressed
ITCH_E.compressedMike White
 
How to up Optimize Your Google Product Feed in Time for Black Friday
How to up Optimize Your Google Product Feed in Time for Black FridayHow to up Optimize Your Google Product Feed in Time for Black Friday
How to up Optimize Your Google Product Feed in Time for Black FridayTinuiti
 
Byu scavenger hunt
Byu scavenger huntByu scavenger hunt
Byu scavenger huntmblangton
 
Administração Básica IBM Connections
Administração Básica IBM ConnectionsAdministração Básica IBM Connections
Administração Básica IBM ConnectionsGeorge Araujo
 
Area de tecnologia e informatica
Area de tecnologia e informatica Area de tecnologia e informatica
Area de tecnologia e informatica castanedalucy240
 
Un breve resumen de álgebra lineal - Juan Álvarez (incompleto)
Un breve resumen de álgebra lineal - Juan Álvarez (incompleto)Un breve resumen de álgebra lineal - Juan Álvarez (incompleto)
Un breve resumen de álgebra lineal - Juan Álvarez (incompleto)Juan Alejandro Alvarez Agudelo
 

Viewers also liked (16)

An Area Analysis Report of Gainesville Parks with a Focus on Springtree Park
An Area Analysis Report of Gainesville Parks with a Focus on Springtree ParkAn Area Analysis Report of Gainesville Parks with a Focus on Springtree Park
An Area Analysis Report of Gainesville Parks with a Focus on Springtree Park
 
Lfu
LfuLfu
Lfu
 
Presentación de computacion
Presentación  de computacionPresentación  de computacion
Presentación de computacion
 
Csc240 -lecture_3
Csc240  -lecture_3Csc240  -lecture_3
Csc240 -lecture_3
 
Georgia Studies Jeopardy!, WWII Edition
Georgia Studies Jeopardy!, WWII EditionGeorgia Studies Jeopardy!, WWII Edition
Georgia Studies Jeopardy!, WWII Edition
 
Powerp2
Powerp2Powerp2
Powerp2
 
ITCH_E.compressed
ITCH_E.compressedITCH_E.compressed
ITCH_E.compressed
 
How to up Optimize Your Google Product Feed in Time for Black Friday
How to up Optimize Your Google Product Feed in Time for Black FridayHow to up Optimize Your Google Product Feed in Time for Black Friday
How to up Optimize Your Google Product Feed in Time for Black Friday
 
Project Part 2
Project Part 2Project Part 2
Project Part 2
 
Csc240 -lecture_2
Csc240  -lecture_2Csc240  -lecture_2
Csc240 -lecture_2
 
Byu scavenger hunt
Byu scavenger huntByu scavenger hunt
Byu scavenger hunt
 
IJRET20140304067
IJRET20140304067IJRET20140304067
IJRET20140304067
 
Administração Básica IBM Connections
Administração Básica IBM ConnectionsAdministração Básica IBM Connections
Administração Básica IBM Connections
 
Area de tecnologia e informatica
Area de tecnologia e informatica Area de tecnologia e informatica
Area de tecnologia e informatica
 
Un breve resumen de álgebra lineal - Juan Álvarez (incompleto)
Un breve resumen de álgebra lineal - Juan Álvarez (incompleto)Un breve resumen de álgebra lineal - Juan Álvarez (incompleto)
Un breve resumen de álgebra lineal - Juan Álvarez (incompleto)
 
Statistical lechure
Statistical lechureStatistical lechure
Statistical lechure
 

Similar to dean resume (1)

Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projectsweshumba
 
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015Partha Gorain
 
R mayers_CV 2302
R mayers_CV 2302R mayers_CV 2302
R mayers_CV 2302Rhod Mayers
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas MathewThomas Mathew
 
Resume David Young
Resume David YoungResume David Young
Resume David YoungDavid Young
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015Teddy Fernando
 
Waqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain
 
Resume of Michael Bower
Resume of Michael BowerResume of Michael Bower
Resume of Michael BowerMichael Bower
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq Ahmad
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan IIjohn chan
 

Similar to dean resume (1) (20)

Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projects
 
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
 
rcallueng resume
rcallueng resumercallueng resume
rcallueng resume
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 
Girish Mishra-R
Girish Mishra-RGirish Mishra-R
Girish Mishra-R
 
Steve Wonnacott Resume
Steve Wonnacott ResumeSteve Wonnacott Resume
Steve Wonnacott Resume
 
R mayers_CV 2302
R mayers_CV 2302R mayers_CV 2302
R mayers_CV 2302
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas Mathew
 
Resume David Young
Resume David YoungResume David Young
Resume David Young
 
paramasivam resume
paramasivam resume paramasivam resume
paramasivam resume
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
PRINCE CV -
PRINCE CV - PRINCE CV -
PRINCE CV -
 
Waqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain Mechanical Engineer
Waqar Hussain Mechanical Engineer
 
Resume of Michael Bower
Resume of Michael BowerResume of Michael Bower
Resume of Michael Bower
 
PaulGodard2015
PaulGodard2015PaulGodard2015
PaulGodard2015
 
Commissioning Planning Meeting
Commissioning Planning MeetingCommissioning Planning Meeting
Commissioning Planning Meeting
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
shahul updated resume
shahul updated resumeshahul updated resume
shahul updated resume
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan II
 
Mohammed vasil k.
Mohammed vasil k.Mohammed vasil k.
Mohammed vasil k.
 

dean resume (1)

  • 1. DEAN MCNULTY 59 Nowack Ave Umina Beach, NSW 2257 Ph: 0243397369 Mob: 0400009174 Email: dean.mcnulty@gmail.com D.O.B 09/01/1974
  • 2. Career Objectives I pride myself on having a very strong safety focus in any role I undertake and am Proficient in complying with all safety requirements. I enjoy working in any Project team role but prefer to work in a challenging position which allows me to utilise my vast range of skills and to build on these. My work history has covered a Varity of industries, Mining, Power Generation, Oil & Gas, Water treatment, pharmaceutical and food packaging and I have experience operating maintenance management systems Ellipse and Sap. I am confident working in a construction or maintenance role. Training • Fitting and Machining trade certificate • HR Drivers Licence • Certificate 4 of project management • Certificate 2 in Process Plant Operations • Site audit training by SIA global • Supervisor Training – by AIPM • Microsoft Excel levels 1,2 & 3 By Dynamic web training • Microsoft Project Levels 1 & 2 By Dynamic we training • Permit to work certificate • Driver awareness training • Confined space ticket • Gas test atmospheres • Working at heights • Hydraulics 1 • Pneumatics 1 • OHS Blue Card and white card • Dogging, basic rigging and Advance scaffolding high risk licence • Forklift Licence • EWP licence • Maintenance Management and planning by Len Bradshaw • Machinery lubrication1 & 2 by Noria Corporation • Maintenance management systems Ellipse and SAP • All Microsoft software applications • Bearing Maintenance by SKF • Laser Alignment by Pruftechnik
  • 3. Employment History 2014 – Current Transfield Services / Broadspectrum (Surat Basin, QLD) QA/QC Superintendent Responsibilities and Duties • Carry out MC1 and SC1 walk downs complete reports • Supervisor crews up to 12 people as required • Carry out inspections on coupling alignments of booster pumps • Carry out pre start meetings • Assist with developing SWMS (JSEA) • Compile punch lists and record in register • Create NCR’s and manage register • Manage flange management register • Review MDR’s for contractor equipment and fabrication • Inspect all equipment before installation that it is compliant to the Gas Act and site requirements • Review ITR;s are completed correctly to required standard for dossier completion • Create ITR’s for work packs using Go Hub CMS system • Create work packs • Collect all certification documentation for dossier completion • Sign off ITR’s in CMS • Red line drawing for as built documentation Feb 2013 – Feb 2014 Transfield Services (Surat Basin, QLD) Leading Hand Mechanical Fitter Responsibilities and Duties • Change isolation of gas wells from single point isolation to double block and bleed isolation for installation of equipment to begin. • Carry out lock out procedure and QA Documentation for double block and bleed isolation of gas wells • Installation of separators to coal seam gas wells. • Installation of hydraulic power unit to drive well • Connect feed lines from separators to gas risers to supply gas to the refinery and the water to the treatment plants • Complete all ITPs and flange management documentation • Carry out MC 1 walk downs and document results and carry out repairs repairs • Carry out SC1 walk downs and document results • Insure all documentation is current from permits, Swims, take 5, job starts for the task at hand • Oversee up 10 personnel at any one time during installation. • Brown fields Project work on de watering of gas wells
  • 4. Nov 2012 – Dec 2012 Transfield Services Base load Mechanical Supervisor Responsibilities and Duties • Supervise shutdown on crushers and screens and conveyors at Mt Whaleback • Carry out pre starts and tool box meetings • Obtain permits • Write JSEA • Supervise up to 15 people in the crew Employment History Cont Sept 2011 – Nov 2012 MSS Pty Ltd (Gove NT) Major Maintenance Planner/ Supervisor Responsibilities and Duties • Develop project and create schedule to meet budget restraints for the statutory inspection of all tanks onsite over 10 year plan consisting of 480 tank inspection • Develop Projects, create schedule and develop work packs to meet budget restraints for the statutory inspection of all overdue pressure vessel onsite including Boilers, heat exchangers, condensation vessels and Blow down vessels • Create weekly progress reports for statutory completion using Excel • Plan in routine maintenance tasks for fixed plant equipment using ellipse. • Create and Maintain Preventative Maintenance task • Create and maintain standard jobs • Develop Gannt charts for routine and shutdown maintenance including the yearly total plant shutdown Using Microsoft Project • Review Inventory for components and there criticality for plant maintaining holding limits and availability • Plan and execute shutdowns for power station Boiler shut downs, the Ferrosilt area including wash down area, acid plant and Evaporation, Estimate and scope work order tasks, create work packs, order all parts and consumables. • Create work packs for all shutdown and maintenance tasks • Develop ITPs and flange management documentation for evaporation shutdowns • Chair weekly pre shutdown meeting with key stakeholders • Supervise up to 30 people in a work crew during shutdowns • Carry out QA sign off during shutdowns and record all documentation into CMS ( Ellipse)
  • 5. Jun 2011 – Sept 2011 United Resources (Shell Oil Refinery Geelong) Sub-contractor coordinator Responsibilities and Duties • Review contractor estimates for shutdown task hours and manning • Pre shut scoping of all contractor tasks • Assist planners with scheduling sub-contractor task in P6 • Review work packs for all sub-contractor tasks including permits, ITPs weld procedures, flange management JSEA’s, work method statements • Collect all ITPs from sub-contractors and review they were completed correctly and submit for processing into CMS • Carry out QA walk downs on all completed tasks • Carry out kick off meeting to review HSE requirements, KPI’s and all shutdown tasks • overseeing contractors are meeting schedule requirements ensuring hours and manning are correct to meet agreed KPI’s and shutdown Budget requirements • Attend daily update meeting • Send daily reports to project manager and client on contractor progress • Manage any issues as they arise Employment History Cont April 2011 – June 2011 United Resources (Caltex Oil Refinery Kurnell, Sydney) Mechanical Supervisor Responsibilities and Duties • Scope all jobs for cracker shutdown from work order task • Update tasks information in Sap • Create work packs develop documentation • Assist with developing ITP’s for all shutdown task • Review contractor quotes • Update client on progress of shutdown preparation April 2010 – April 2011 United Resources (Gove, NT Alumina Refinery) Major Maintenance Supervisor Responsibilities and Duties • Supervise major maintenance turnarounds in the Ferrosilt area • Boiler Maintenance, Tank maintenance, mill maintenance, acid plant maintenance. • Pumps, valve, and piping repairs • Assist with the routine maintenance of area • Carry out performance reviews of work crews • Carry out daily prestart meetings • Audit work crews JSEA and take 5 for tasks being performed • Plan and execute Evaporation shutdown. Create all work packs. ITPs flange management,
  • 6. • Manage night shift on Evaporation shutdowns. this included multiple trades from all disciplines mechanical, electrical, hydro blasting and sand blasting. Carry out all QA walk downs on Night shift for sign off of tank inspection, NDT weld repairs, flange management spool replacments. • Enter all documentation into CMS system • Develop program for complete Piping spool replacement in Acid plant to duplex stainless including quoting and estimating for drafting, fabrication and installation of all spools. • Create budget for spool project • Plan and execute spool replacement Jan 2010 – April 2010 HIS Engineering (Eraring Power Station, NSW) Mechanical supervisor Responsibilities and Duties • Install 28 low nox burners into boiler • Develop work packs for project • Supervise 20 people work crew consisting of Fitters, Boilermakers, Riggers on night shift • Sign off all ITP’s for Burner installation • Carry out daily pre start and weekly toolbox meetings • Review JSEA and take 5 for each task • organise all logistics for project • Monitor task hours to meet schedule requirements and budget • Report progress to project manager and customer daily • Complete daily timesheets Jun 2009 – Dec 2009 Silcar (Eraring Power Station, NSW) ( Snowy Hydro Peaker plant Traralgon Victoria) Mechanical Supervisor to Project coordinator Responsibilities and Duties • Install 28 low nox burners into boiler • Develop work packs for project • Supervise 20 people work crew consisting of Fitters, Boilermakers, Riggers • Sign off all ITP’s for Burner installation • Carry out daily pre start and weekly toolbox meetings • Review JSEA and take 5 for each task • organise all logistics for project • Monitor task hours to meet schedule requirements and budget • Report progress to project manager and customer daily • Complete daily timesheets Snowy Hydro Peaker plant • Install new air intake coolers to gas turbines • Oversee contractor deliveries of components • Carry out audits of contractor facilities and progress • Report project progress to project manager • Review budget cost of equipment • Assist with any mechanical issues • Sign off ITP’s and FIC’s as required • Carry out MC-1 walk downs
  • 7. History Previous to 2010 Jan 2009 – May 2009 Laing O’Rourke (Dalby, QLD) Mechanical Fitter Jul 2008 – Dec 2008 PGSR (NT) Mechanical Supervisor Nov 2006 – Jun 2008 Laing O’Rourke (Grove, NT) Leading Hand/ Mechanical Fitter May 2002 – Oct 2006 Alcan Gove (Gove, NT) Leading Hand/ Mechanical Fitter April 2000 – April 2002 Clark Equipment (Asquith NSW) Mechanical Fitter Interests Playing Guitar, Photography, Fishing, gardening References Adam Thompson Transfield Worley Contracts Manager Ph: 0477 359 483 Brad Lucus Broadspectrum Mechanical superintendent Ph: 0408341352 Mark Rice UGL project Manager Ph: 0400426047 Rod Boland Alcan Gove - Supervisor Ph: 0418 683 927