SlideShare a Scribd company logo
1 of 3
Download to read offline
QASIR ABBAS 
B.SC MECHANICAL ENGINEER 
- 1 - 
PERSONAL PROFILE: 
Email: 
qasirabbas05@yahoo.com 
Mob :+923327862627 
Mob :+971558393167 
Permanent Address: 
Moza Wa Basti Chak Rohari 
Tehsil and District Muzaffar 
Garh Punjab Pakistan. 
Personal Data: 
Date of Birth : 12/05/1987 
Marital Status : Single 
Nationality : Pakistani 
Languages Known: 
™ English ‐‐‐ R* – W* –S* 
™ Urdu ‐‐‐ R* – W* –S* 
™ Punjabi ‐‐‐ R – W – S* 
™ Chinese ‐‐‐R* – W – S* 
(*R‐Read, W‐Write, S‐Speak) 
REFERENCE: 
Provide if required. 
CAREER OBJECTIVE 
™ To work with an organization having goal oriented approach and provides 
grooming opportunities & where I could utilize my technical skills efficiently 
and effectively. 
SUMMARY: TOTAL EXP : OVER 5 YEARS 
™ Over 5 years of solid experience in Oil & Gas and Trading sector. 
¾ Working as a Mechanical Engineer in Hyundai Engineering Co., Ltd.UAE 
¾ Worked as an Interpreter and Mechanical Engineer in 
Pak Arab Oil Refinery (PARCO) 
¾ China National Chemical Engineering Co., Ltd (CNCEC) 
KEY SKILLS: 
™ Having more than five Years Extensive progressive experience in Mechanical 
Engineering and expertise in all trades including Erection, Commissioning (Pre‐ 
Commissioning Activities + Start up Activities), and Fabrication & Maintenance 
of Rotary Equipment especially. 
™ Wide Knowledge of CMMS systems like MAXIMO and SAP. 
™ Familiar with PDS software like Jet Stream Navis Works. 
™ Familiar with API, ANSI, ASME, I S codes. 
™ Strong PC experience with MS Office proficiency. 
™ Ability to learn quickly the use of complex software tools. 
™ Self‐motivated, Flexible and ability to work in team. 
TRAINING CERTIFICATES: 
™ Business English and Chinese Language from CHINA 
™ Communication skills form PARCO AND HYUNDAI ENGINEERING CO.LTD. 
™ HSE Training Certificate in Confined Space entry, working at Height, Safe 
Lifting , MSDS AND PTW FROM RUWAIS REFINERY DIVISION TAKREER 
ACADEMICS: 
Degree University Year of 
Passing 
Class/% 
Bachelor of Science 
(Mechanical) 
Harbin University Of Science & 
Technology。CHINA 
July 
2009 
First/ 
80.43% 
We Refine Right
We Refine Right 
- 2 - 
PROFESSIONAL EXPERIENCE: 
Pak Arab Oil Refinery(PARCO) 
Project & Maintenance Engineer:‐‐ 
Worked as a Project Engineer on Diesel Hydro Desulphurization (DHDS) project, the DHDS plant is equipped with a 
maximum capacity of 26,000 barrels per day, and reduces sulphur contents in High Speed Diesel (HSD) from 7,000 
parts per million to 500 parts per million which is an EURO II requirement. M/S CNCEC (China National Chemical 
Engineering Co., Ltd) in consortium with M/S Hyundai Engineering were awarded the project. 
Responsibilities: 
• Supervising the installation including erection, levelling, alignment, lube oil flushing and dynamic running of 
Mitsui positive displacement compressor. 
• Supervising the installation, levelling and dynamic running of SULZER centrifugal pumps. 
• Supervising the installation, levelling and dynamic running of LEWA reciprocating pumps. 
• Supervising the installation, witnessing the the start‐up check and dynamic running of GEA air fin coolers. 
• Installation of feed storage tank (Capacity 32,000 BPD) including erection, hydro testing and calibration of 
tank. 
• Installation of natural draft cylindrical heater including installation of refractory, tubes and burners. 
• Witnessing the installation of reactor internals and loading of catalyst under the supervision of UOP. 
• Installation of single and two pass BDH valve trays in suction drum, stripper, wet scrubber, and knock out 
drums. 
• Installation and connection of utility, process tie‐in lines with existing plant. 
• Hydro testing of process pipes through isometric test packages. 
• Preparation and signing off the punch list items in coordination with UOP. 
• Conducting the Pre commissioning and commissioning of the plant. 
• Performance test witness and final acceptance of all machinery. 
• Arranging the two years spare parts of plant. 
• Arranging equipments hierarchy in plant maintenance module of SAP. 
• Collecting the useful data about the Equipments from Mechanical Drawings, Data Sheets and P & IDs. 
• Experience in the maintenance of Columns (Absorber, Stripper, & Distillation) and Vessels (K.O Drum, Surge 
Drum, Flash Drum, Gas Separators, Sump Drum etc.). 
• Experience in Maintenance of Heat Exchangers (U‐Tube, Fixed Tube, Air Fin Cooler & Plate Type). 
• Experience in Maintenance of centrifugal and positive displacement pumps, Reactors, Reaction Furnace 
and Waste Heat Boilers, and plate type exchangers. 
• Conducted the Type B overhauling of reciprocating compressors, including replacement of internals of 
stuffing box. 
• Identification of proper material such as Gaskets (Type, Size, Rating), or other specified material as per 
scope of work of related Equipment like Distillation Columns, Packed & Tray Towers, Heat Exchangers, 
Reactors , Stacks, Vessels and Valves. 
Hyundai Engineering Company (HEC) 
Project Engineer:‐‐ 
Worked as a Project Engineer for Abu Dhabi Oil Refining Company (TAKREER) expansion of its existing refinery 
facility in Ruwais Industrial Complex (RIC) for addition of a Group III Base Oil Production Facility. The purpose of 
the Project was to produce stable low pour point Group III NExBASE qualities 3043, 3050, 3060 along with Group II 
NExBASE 3020 and 3030 as by products. The Project used Unconverted Oil (UCO) as the feedstock from the 
revamped Ruwais Hydrocracker Unit 103 (HCK). The estimated production capacity was around 500 KPTA of 
Group III Base Oils and about 120 KPTA of Group II Base Oils.
- 3 - 
Responsibilities: 
• Supervising the installation including erection, levelling, alignment, lube oil flushing and dynamic running of 
BORSIG ZM Compressors. 
• Supervising the installation, levelling and dynamic running of Sundyne Pumps 
• Supervising the installation, witnessing the start‐up check and dynamic running of air fin coolers. 
• Installation of feed storage tank Including erection, hydro testing and calibration of tank. 
• Installation of natural draft cylindrical heater including installation of refractory, tubes and burners. 
• Witnessing the installation of reactor internals and loading of catalyst under the supervision of UOP. 
• Installation of single and two pass BDH valve trays in suction drum, stripper, wet scrubber, and knock out 
drums. 
• Installation of column internals in oil refining process. Installation include, packed bed system utilizing beds 
of structured packing in separation processes, consisting of support girds, structured packing, liquid 
distributors and chimney/collector trays 
• Installation and connection of utility, process tie‐in lines with existing plant. 
• Hydro testing of process pipes through isometric test packages. 
• Preparation and signing off the punch list items in coordination with UOP. 
• Conducting the Pre commissioning and commissioning of the plant. 
ACHIEVEMENTS: 
• Implementing on energy conservation techniques and working on load management plan in Packages Ltd. 
Lahore and Packages BSPM (Bulley Shah Paper mill). 
• Worked on the feasibility of a high pressure fluidized bed boiler (92 bar, 5280C) utilizing the solid waste 
(paper sludge) of the company. Extensive working with IFC (International Finance Corporation) to get 
financial support in terms of carbon credits. 
• Understanding in oil and gas field development, Basic and Detailed Engineering, Field Development Plan, 
HAZOP, Sound HSE & Quality, Statutory and environmental regulation requirement etc 
• Academic Project: “Designing of 30 Ton Overhead Crane.” 
DECLARATION: 
™ I consider myself familiar with Mechanical Engineering and Oil & Gas aspects. I am also confident of my ability 
to work in a team. I hereby declare that the information furnished above is true to the best of my knowledge. 
QASIR ABBAS

More Related Content

What's hot

What's hot (20)

baker hughes Annual Report 2002
baker hughes  Annual Report 2002baker hughes  Annual Report 2002
baker hughes Annual Report 2002
 
CV_yogesh
CV_yogeshCV_yogesh
CV_yogesh
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
Resume - Imane Mansouri
Resume - Imane MansouriResume - Imane Mansouri
Resume - Imane Mansouri
 
GNS Resume 22.02.16
GNS Resume 22.02.16GNS Resume 22.02.16
GNS Resume 22.02.16
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
MAN CV ud 1.3.16
MAN CV ud 1.3.16MAN CV ud 1.3.16
MAN CV ud 1.3.16
 
CV for the post of Mud Specialist I Drilling Fluids Engineer
CV for the post of Mud Specialist I Drilling Fluids EngineerCV for the post of Mud Specialist I Drilling Fluids Engineer
CV for the post of Mud Specialist I Drilling Fluids Engineer
 
CV timothy o'donoghue 2016
CV timothy o'donoghue 2016CV timothy o'donoghue 2016
CV timothy o'donoghue 2016
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 
lal bahadur CVF
lal bahadur CVFlal bahadur CVF
lal bahadur CVF
 
ResumeR - VishwasBShende 7th Sep 16
ResumeR - VishwasBShende 7th Sep 16ResumeR - VishwasBShende 7th Sep 16
ResumeR - VishwasBShende 7th Sep 16
 
EMIN SG - Tensar Petroleo Gas Brochure
EMIN SG - Tensar Petroleo Gas BrochureEMIN SG - Tensar Petroleo Gas Brochure
EMIN SG - Tensar Petroleo Gas Brochure
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Method statement honycomb repairing
Method statement  honycomb repairingMethod statement  honycomb repairing
Method statement honycomb repairing
 
Resume Shahid
Resume ShahidResume Shahid
Resume Shahid
 
CV Z. Ring
CV Z. RingCV Z. Ring
CV Z. Ring
 
CV_Doug_Mast
CV_Doug_MastCV_Doug_Mast
CV_Doug_Mast
 
KallalArunCV_TCS
KallalArunCV_TCSKallalArunCV_TCS
KallalArunCV_TCS
 
Method of Statement - Road furniture works
Method of Statement - Road furniture worksMethod of Statement - Road furniture works
Method of Statement - Road furniture works
 

Similar to Curriculum vitae of qasir abbas

Similar to Curriculum vitae of qasir abbas (20)

RESUME - Abhay Paranjape
RESUME - Abhay ParanjapeRESUME - Abhay Paranjape
RESUME - Abhay Paranjape
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
 
VIJAY CV
VIJAY CVVIJAY CV
VIJAY CV
 
SUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CVSUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CV
 
M SUBBA RAO CV latest
M SUBBA RAO CV latestM SUBBA RAO CV latest
M SUBBA RAO CV latest
 
SHREYAS__SABNIS CV
SHREYAS__SABNIS CVSHREYAS__SABNIS CV
SHREYAS__SABNIS CV
 
Maintenance Engineer
Maintenance EngineerMaintenance Engineer
Maintenance Engineer
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02
 
01_HVAC-R5_Tecni
01_HVAC-R5_Tecni01_HVAC-R5_Tecni
01_HVAC-R5_Tecni
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan II
 
Imran_resume_April 2016
Imran_resume_April 2016Imran_resume_April 2016
Imran_resume_April 2016
 
Process Engr_Rashid CV
Process Engr_Rashid CVProcess Engr_Rashid CV
Process Engr_Rashid CV
 
Abhishek
AbhishekAbhishek
Abhishek
 
Instrumentation design engineer
Instrumentation design engineerInstrumentation design engineer
Instrumentation design engineer
 
Austin Okwordu CV PDF
Austin Okwordu CV PDFAustin Okwordu CV PDF
Austin Okwordu CV PDF
 
Resume (Muhammad Omer)
Resume (Muhammad Omer)Resume (Muhammad Omer)
Resume (Muhammad Omer)
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Mechanical cv
Mechanical cvMechanical cv
Mechanical cv
 
Sharad_Naik_Lead Process Consultant_RE CV.docx
Sharad_Naik_Lead Process Consultant_RE CV.docxSharad_Naik_Lead Process Consultant_RE CV.docx
Sharad_Naik_Lead Process Consultant_RE CV.docx
 
Puneet_Singh
Puneet_SinghPuneet_Singh
Puneet_Singh
 

Recently uploaded

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 

Recently uploaded (20)

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 

Curriculum vitae of qasir abbas

  • 1. QASIR ABBAS B.SC MECHANICAL ENGINEER - 1 - PERSONAL PROFILE: Email: qasirabbas05@yahoo.com Mob :+923327862627 Mob :+971558393167 Permanent Address: Moza Wa Basti Chak Rohari Tehsil and District Muzaffar Garh Punjab Pakistan. Personal Data: Date of Birth : 12/05/1987 Marital Status : Single Nationality : Pakistani Languages Known: ™ English ‐‐‐ R* – W* –S* ™ Urdu ‐‐‐ R* – W* –S* ™ Punjabi ‐‐‐ R – W – S* ™ Chinese ‐‐‐R* – W – S* (*R‐Read, W‐Write, S‐Speak) REFERENCE: Provide if required. CAREER OBJECTIVE ™ To work with an organization having goal oriented approach and provides grooming opportunities & where I could utilize my technical skills efficiently and effectively. SUMMARY: TOTAL EXP : OVER 5 YEARS ™ Over 5 years of solid experience in Oil & Gas and Trading sector. ¾ Working as a Mechanical Engineer in Hyundai Engineering Co., Ltd.UAE ¾ Worked as an Interpreter and Mechanical Engineer in Pak Arab Oil Refinery (PARCO) ¾ China National Chemical Engineering Co., Ltd (CNCEC) KEY SKILLS: ™ Having more than five Years Extensive progressive experience in Mechanical Engineering and expertise in all trades including Erection, Commissioning (Pre‐ Commissioning Activities + Start up Activities), and Fabrication & Maintenance of Rotary Equipment especially. ™ Wide Knowledge of CMMS systems like MAXIMO and SAP. ™ Familiar with PDS software like Jet Stream Navis Works. ™ Familiar with API, ANSI, ASME, I S codes. ™ Strong PC experience with MS Office proficiency. ™ Ability to learn quickly the use of complex software tools. ™ Self‐motivated, Flexible and ability to work in team. TRAINING CERTIFICATES: ™ Business English and Chinese Language from CHINA ™ Communication skills form PARCO AND HYUNDAI ENGINEERING CO.LTD. ™ HSE Training Certificate in Confined Space entry, working at Height, Safe Lifting , MSDS AND PTW FROM RUWAIS REFINERY DIVISION TAKREER ACADEMICS: Degree University Year of Passing Class/% Bachelor of Science (Mechanical) Harbin University Of Science & Technology。CHINA July 2009 First/ 80.43% We Refine Right
  • 2. We Refine Right - 2 - PROFESSIONAL EXPERIENCE: Pak Arab Oil Refinery(PARCO) Project & Maintenance Engineer:‐‐ Worked as a Project Engineer on Diesel Hydro Desulphurization (DHDS) project, the DHDS plant is equipped with a maximum capacity of 26,000 barrels per day, and reduces sulphur contents in High Speed Diesel (HSD) from 7,000 parts per million to 500 parts per million which is an EURO II requirement. M/S CNCEC (China National Chemical Engineering Co., Ltd) in consortium with M/S Hyundai Engineering were awarded the project. Responsibilities: • Supervising the installation including erection, levelling, alignment, lube oil flushing and dynamic running of Mitsui positive displacement compressor. • Supervising the installation, levelling and dynamic running of SULZER centrifugal pumps. • Supervising the installation, levelling and dynamic running of LEWA reciprocating pumps. • Supervising the installation, witnessing the the start‐up check and dynamic running of GEA air fin coolers. • Installation of feed storage tank (Capacity 32,000 BPD) including erection, hydro testing and calibration of tank. • Installation of natural draft cylindrical heater including installation of refractory, tubes and burners. • Witnessing the installation of reactor internals and loading of catalyst under the supervision of UOP. • Installation of single and two pass BDH valve trays in suction drum, stripper, wet scrubber, and knock out drums. • Installation and connection of utility, process tie‐in lines with existing plant. • Hydro testing of process pipes through isometric test packages. • Preparation and signing off the punch list items in coordination with UOP. • Conducting the Pre commissioning and commissioning of the plant. • Performance test witness and final acceptance of all machinery. • Arranging the two years spare parts of plant. • Arranging equipments hierarchy in plant maintenance module of SAP. • Collecting the useful data about the Equipments from Mechanical Drawings, Data Sheets and P & IDs. • Experience in the maintenance of Columns (Absorber, Stripper, & Distillation) and Vessels (K.O Drum, Surge Drum, Flash Drum, Gas Separators, Sump Drum etc.). • Experience in Maintenance of Heat Exchangers (U‐Tube, Fixed Tube, Air Fin Cooler & Plate Type). • Experience in Maintenance of centrifugal and positive displacement pumps, Reactors, Reaction Furnace and Waste Heat Boilers, and plate type exchangers. • Conducted the Type B overhauling of reciprocating compressors, including replacement of internals of stuffing box. • Identification of proper material such as Gaskets (Type, Size, Rating), or other specified material as per scope of work of related Equipment like Distillation Columns, Packed & Tray Towers, Heat Exchangers, Reactors , Stacks, Vessels and Valves. Hyundai Engineering Company (HEC) Project Engineer:‐‐ Worked as a Project Engineer for Abu Dhabi Oil Refining Company (TAKREER) expansion of its existing refinery facility in Ruwais Industrial Complex (RIC) for addition of a Group III Base Oil Production Facility. The purpose of the Project was to produce stable low pour point Group III NExBASE qualities 3043, 3050, 3060 along with Group II NExBASE 3020 and 3030 as by products. The Project used Unconverted Oil (UCO) as the feedstock from the revamped Ruwais Hydrocracker Unit 103 (HCK). The estimated production capacity was around 500 KPTA of Group III Base Oils and about 120 KPTA of Group II Base Oils.
  • 3. - 3 - Responsibilities: • Supervising the installation including erection, levelling, alignment, lube oil flushing and dynamic running of BORSIG ZM Compressors. • Supervising the installation, levelling and dynamic running of Sundyne Pumps • Supervising the installation, witnessing the start‐up check and dynamic running of air fin coolers. • Installation of feed storage tank Including erection, hydro testing and calibration of tank. • Installation of natural draft cylindrical heater including installation of refractory, tubes and burners. • Witnessing the installation of reactor internals and loading of catalyst under the supervision of UOP. • Installation of single and two pass BDH valve trays in suction drum, stripper, wet scrubber, and knock out drums. • Installation of column internals in oil refining process. Installation include, packed bed system utilizing beds of structured packing in separation processes, consisting of support girds, structured packing, liquid distributors and chimney/collector trays • Installation and connection of utility, process tie‐in lines with existing plant. • Hydro testing of process pipes through isometric test packages. • Preparation and signing off the punch list items in coordination with UOP. • Conducting the Pre commissioning and commissioning of the plant. ACHIEVEMENTS: • Implementing on energy conservation techniques and working on load management plan in Packages Ltd. Lahore and Packages BSPM (Bulley Shah Paper mill). • Worked on the feasibility of a high pressure fluidized bed boiler (92 bar, 5280C) utilizing the solid waste (paper sludge) of the company. Extensive working with IFC (International Finance Corporation) to get financial support in terms of carbon credits. • Understanding in oil and gas field development, Basic and Detailed Engineering, Field Development Plan, HAZOP, Sound HSE & Quality, Statutory and environmental regulation requirement etc • Academic Project: “Designing of 30 Ton Overhead Crane.” DECLARATION: ™ I consider myself familiar with Mechanical Engineering and Oil & Gas aspects. I am also confident of my ability to work in a team. I hereby declare that the information furnished above is true to the best of my knowledge. QASIR ABBAS