Curriculam vitae
RITU KUMAR MISHR
ritumishra63@yahoo.com
Lakhnour Jhanjharpur (po) Madhubani (dt)
+918602289862 /+96565148552,
Bihar, INDIA-847403
Seeking a position to utilize my skills and abilities as a Piping Supervisor, oil and gas
Industry that offers professional growth while being resourceful, innovative and flexible
• An enthusiastic, Piping Supervisor with 19 years of experience in EPCM and
Industrial projects, Eager to learn new technologies.
• Having industrial experience in piping constructions as supervisor well.
• Knowledge of oil and Gas projects , Industrial and Power plant projects
• Having good Knowledge about technical drawing (Piping ISO / P & ID / GA )
• Efficient management and organizational abilities.
• Well aware of in prepairing as built drawing & technical querries.
SINCE 10th
APRIL, 2001 WORKING WITH M/S KHARAFI NATIONAL COMPANY,
FOR MECHANICAL & ELECTRIAL WORKS, AS A PIPING SUPERVISOR,
CAREER OBJECTIVE
SUMMARY
PRESENT JOB STATUS
Profile#1
Clean Fuel Project (Contract no 0054) in KUWAIT NATIONAL petroleum co.
(SKC), JGSK JOINT VENTURE working with G S Company (Korean)
From Fab 2016 to Till date.
Profile#2
New Booster Station BS-171 At west Kuwait .KOC
With Saipem Engineering contract no 45283
From Jan.2015 to to Feb.2016
Profile#3
Installation of Low Sulphur Fuel Oil F.G. & G.O Pipeline &
Pumping Station From MAA to Doha Power Station with
HYNDAI ENGINEERING & CONSTRUCTION CO.,LTD
( project No :BS-180 )
From Jan.2014 to Dec.2014.
Profile#4
Installation of F.G. & G.O Pipeline & Pumping Station From
MAA to Shuaiba Power Station with PETROFAC
INTERNATIONAL LTD ( project No 1760-KOC )
From Sep.2011 to Jan.2014.
Profile#5
JI-192 PROJECT: 40” Gas Pipeline from KOC (BS-131) to
KNPC (LPG PLANT).with PETROFAC INTERNATIONAL LTD
150km, Tow slug catcher (5000BBL&10000BBL), 15no Valve
Station And 8no micro tunneling Road Crossing.
From Aug.2009 to Sep 2011
Profile#6
Facility Upgrade & Relocation of U/G Process Piping Project for
Kuwait Oil Company with The M/S PTROFAC int.Ltd.
Sit in GC-02 GC- 03 GC- 07 GC-08 GC- 21 GC- 23,
And BS- 140, BS-150,
New CRU, Manifold, Compressor, and Desultor Unit.
From Jan. 2006 to Aug.2009.
Profile#7
Replacement of North Kuwait Crude Oil Export System
Point”A” With M/S PTROFACT int. Ltd.
New Metric skid, Export pump, Storage Tank, and Fire Water. Unite.
From Jan. 2005 to Nov.2006.
Profile#8
Re-Building of damaged Facilities at GC- 15 and Upgrade at
Booster Station-131 for Kuwait Oil Company with FLOUR and S.K.
ENGINEERING & CONSTRUCTION COMPANY.
Sit in GC- 15. New Manifold, Compressor, Separator, Desultory ,
CRU, and Fire Water System.
Sit in BS-131 3 Compressor, Link pipe rack, Glycol, Flare, Piping
and Fire Water System. From Jan.2004 to Dec.2004.
Profile#9
Lift Gas Distribution System Project, For Kuwait Oil Company
With The Technical Collaboration of M/s. SNAMPROGETTI.
153 Km Of pipe Line, 8 Manifold, 6 Nodes, 2 Booster Station.
From Oct.2002 to Jan. 2004.
Profile#10
GC- 23 Upgrading Project For Kuwait Oil Company With The
Technical Collaboration Overall Management and Supervision of
M/s. PETROFAC int. Ltd.
New Manifold, Compressor, Desalter, 3 Tank, and fire Water Tank.
From Feb.2002 to Oct. 2002.
Profile#11
Steam Condensate Recovery To Gas Plant Project, for Kuwait
National Petroleum Company (KNPC) Mina-AL Ahmadi site in
UNIT-27 UNIT-29 (Utility Area) &UNIT- 31 UNIT-32 UNIT-33
(Process Area). From Apr. 2001 to Feb.2002.
Roles and Responsibilities:
• Follow of the entire work schedule, as per the drawing and technical specification
Fabrication, erection, inspection, testing and commissioning of various piping
systems related to Petrochemical plants as per isometrics and general
arrangement (GA) drawings
• Prepare work permit and conduct tool box meeting prior to START the work.
• Ensure the completion of shop fabrication on time as per given schedule, Referring
codes and standards specification, Coordinating Shop testing activities.
• Preparation of weld map for Site condition, Coordinating piping system testing
activities, Preparation of as built Drawings, as built control sheet and other related
documents.
• Observing the potential impact of a project on the local environment and the
Coordinating and checking of deliverable as per schedule. Working and using
various engineering tools with the aim of providing cost effective solutions for the
organization.
• Prepare detailed equipment receiving plan at site.
• Familiar with QA and QC standards.
• Maintain standard of safety and comply with company’s health safety and
environment management system requirement.
• Organize inspection of equipment at the site and prepare material receiving report.
• Coordinate with other supervisors for ease and avoid any stoppage at site.
• Monitor piping spools and supports delivery status in order to provide continuous
work front at site.
• Knowledge of materials and their codes for processing piping and pipelines.
• Check and prepare material requisition for free issue materials to be used at site
for continuous progress.
• Supervise clearing of punch list items and coordinate with hydro testing team.
• Provide daily progress report to the site engineer.
PREVIOUS EXPERIENCE:
From Aug.1999 to July 2000 work with M/S. S.K. Engineering & Construction
Ltd. (Korea) as a Piping Foremen.
• ATK Merox Project (CA/2750) With Kuwait National Petroleum Company, Mina AL-
Ahmadi Refinery, Kuwait.
• Acid Gas Removal Project (MPD-C-05) With Kuwait National Petroleum Company
Mina Al- Ahmadi Refinery –Kuwait
Roles and Responsibilities:
• Coordinating all documentation and correspondences with client.
• Planning of erection sequence as per site conditions.
• Preparation of weld map for Site condition
• Coordinating piping system testing activities
• Preparation of test packs as per Turnover system.
• Preparation of as built Drawings, as built control sheet and other related
documents.
• Piping fabrication, Piping support fabrication and Eraction.
• Pipeline works
• Hydro testing of piping and pipe line.
• Commissioning and pre – commissioning
• Diploma
Diploma in Mechanical Engineering (DME) from Institute of Engineeing &
Management (IEM) Mumbai 1994 –1996 with 62%
Father’s Name : Beda nand Mishra
EDUCATIONAL QUALIFICATIONS
PERSONAL PROFILE
COLLEGE PROJECT:
Date of Birth : 20/01/1976
Permanent Address : Lakhnour Jhanjharpur (po)
Madhubani (dt)
Bihar, INDIA-847403
Marital Status : Married
Sex : Male
Nationality : Indian
Languages Known : English, Hindi & Arabic
Passport Details
Passport No : N 8640520
Date of Issue : 19 April 2016
Date of Expiry : 18 April 2026
Place of Issue : Kuwait
I hereby declare that the information furnished above is true to the best of my knowledge
& belief.
Place:
Date: (Ritu Kumar Mishra)
DECLARATION
Date of Birth : 20/01/1976
Permanent Address : Lakhnour Jhanjharpur (po)
Madhubani (dt)
Bihar, INDIA-847403
Marital Status : Married
Sex : Male
Nationality : Indian
Languages Known : English, Hindi & Arabic
Passport Details
Passport No : N 8640520
Date of Issue : 19 April 2016
Date of Expiry : 18 April 2026
Place of Issue : Kuwait
I hereby declare that the information furnished above is true to the best of my knowledge
& belief.
Place:
Date: (Ritu Kumar Mishra)
DECLARATION

More Related Content

What's hot

Dinesh Kumar S Mechanical
Dinesh Kumar S MechanicalDinesh Kumar S Mechanical
Dinesh Kumar S Mechanicaldineshnandhu007
 
Venkata Chandra Sekhar Sure
Venkata Chandra Sekhar SureVenkata Chandra Sekhar Sure
Venkata Chandra Sekhar Surechandu52
 
Jose J Muraira LATEST Resume
Jose J  Muraira LATEST ResumeJose J  Muraira LATEST Resume
Jose J Muraira LATEST ResumeJose Muraira
 
Project mgmt set up of cement plant
Project mgmt set up of cement plantProject mgmt set up of cement plant
Project mgmt set up of cement plantNihar Routray
 
RESUME_sushil__latest_
RESUME_sushil__latest_RESUME_sushil__latest_
RESUME_sushil__latest_SUSHIL SHARMA
 
Bruce LaCour's Resume
Bruce  LaCour's ResumeBruce  LaCour's Resume
Bruce LaCour's ResumeBruce LaCour
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedAbbas Saeidi
 
Rudy Wick Resume
Rudy Wick ResumeRudy Wick Resume
Rudy Wick ResumeRudy Wick
 
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
PROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECTPROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECT
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECTSAJJAD KHUDHUR ABBAS
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1Prasad naik
 
2016 Wesley Plaisted
2016 Wesley Plaisted2016 Wesley Plaisted
2016 Wesley PlaistedWes Plaisted
 

What's hot (20)

Dinesh Kumar S Mechanical
Dinesh Kumar S MechanicalDinesh Kumar S Mechanical
Dinesh Kumar S Mechanical
 
Venkata Chandra Sekhar Sure
Venkata Chandra Sekhar SureVenkata Chandra Sekhar Sure
Venkata Chandra Sekhar Sure
 
Jose J Muraira LATEST Resume
Jose J  Muraira LATEST ResumeJose J  Muraira LATEST Resume
Jose J Muraira LATEST Resume
 
Project mgmt set up of cement plant
Project mgmt set up of cement plantProject mgmt set up of cement plant
Project mgmt set up of cement plant
 
RESUME_sushil__latest_
RESUME_sushil__latest_RESUME_sushil__latest_
RESUME_sushil__latest_
 
Bruce LaCour's Resume
Bruce  LaCour's ResumeBruce  LaCour's Resume
Bruce LaCour's Resume
 
CV_Raja
CV_RajaCV_Raja
CV_Raja
 
Ravi Resume
Ravi ResumeRavi Resume
Ravi Resume
 
waseem cv
waseem cvwaseem cv
waseem cv
 
paramasivam resume
paramasivam resume paramasivam resume
paramasivam resume
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updated
 
CV
CVCV
CV
 
Rudy Wick Resume
Rudy Wick ResumeRudy Wick Resume
Rudy Wick Resume
 
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
PROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECTPROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECT
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
 
K. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QSK. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QS
 
cv-new-saeed-31rev-May-16
cv-new-saeed-31rev-May-16cv-new-saeed-31rev-May-16
cv-new-saeed-31rev-May-16
 
CV-KMBabu-22-05-2015
CV-KMBabu-22-05-2015CV-KMBabu-22-05-2015
CV-KMBabu-22-05-2015
 
rcallueng resume
rcallueng resumercallueng resume
rcallueng resume
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1
 
2016 Wesley Plaisted
2016 Wesley Plaisted2016 Wesley Plaisted
2016 Wesley Plaisted
 

Viewers also liked

Viewers also liked (20)

C V Benny - Copy (2)
C V Benny - Copy (2)C V Benny - Copy (2)
C V Benny - Copy (2)
 
las_vegas_magazine_article
las_vegas_magazine_articlelas_vegas_magazine_article
las_vegas_magazine_article
 
Criminalistica
CriminalisticaCriminalistica
Criminalistica
 
La valla
La vallaLa valla
La valla
 
Lectura de imagenes
Lectura de imagenesLectura de imagenes
Lectura de imagenes
 
Presentación curso de computación
Presentación curso de computaciónPresentación curso de computación
Presentación curso de computación
 
Resume_Ajit_Dash
Resume_Ajit_DashResume_Ajit_Dash
Resume_Ajit_Dash
 
Uso de-las-redes-sociales
Uso de-las-redes-socialesUso de-las-redes-sociales
Uso de-las-redes-sociales
 
Metodos anticonceptivos....
Metodos anticonceptivos....Metodos anticonceptivos....
Metodos anticonceptivos....
 
Nuestro lugar 1
Nuestro lugar 1Nuestro lugar 1
Nuestro lugar 1
 
Visita del personal de secretaría de pesca de
Visita del personal de secretaría de pesca deVisita del personal de secretaría de pesca de
Visita del personal de secretaría de pesca de
 
8448169352
84481693528448169352
8448169352
 
Ghana Land Seminar presentation 13-14 Oct 2016
Ghana Land Seminar presentation 13-14 Oct 2016Ghana Land Seminar presentation 13-14 Oct 2016
Ghana Land Seminar presentation 13-14 Oct 2016
 
Métodos anticonceptivos y enfermedades de transmisión sexual
Métodos anticonceptivos y enfermedades de transmisión sexualMétodos anticonceptivos y enfermedades de transmisión sexual
Métodos anticonceptivos y enfermedades de transmisión sexual
 
Dissertation Final
Dissertation FinalDissertation Final
Dissertation Final
 
El e commerce y como impulsar tu negocio
El e commerce y como impulsar tu negocioEl e commerce y como impulsar tu negocio
El e commerce y como impulsar tu negocio
 
1ellea
1ellea1ellea
1ellea
 
Pokemon Go
Pokemon GoPokemon Go
Pokemon Go
 
Leigh anne ritter resume 2016
Leigh anne ritter resume 2016Leigh anne ritter resume 2016
Leigh anne ritter resume 2016
 
Yash Bajaj Internship
Yash Bajaj InternshipYash Bajaj Internship
Yash Bajaj Internship
 

Similar to R K MISHRA CV

Similar to R K MISHRA CV (20)

PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Resume
ResumeResume
Resume
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 
bio data 1
bio data 1bio data 1
bio data 1
 
Inspection Engineer Taufeeque cv
Inspection Engineer Taufeeque cvInspection Engineer Taufeeque cv
Inspection Engineer Taufeeque cv
 
Mechanical Engineer
Mechanical EngineerMechanical Engineer
Mechanical Engineer
 
resume piping
resume pipingresume piping
resume piping
 
Karthikeyan B.E Mechanical Engineer
Karthikeyan B.E Mechanical EngineerKarthikeyan B.E Mechanical Engineer
Karthikeyan B.E Mechanical Engineer
 
CV
CVCV
CV
 
Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)
Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)
Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoor
 
Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineer
 
CV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-CivilCV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-Civil
 
Ravi CV
Ravi CVRavi CV
Ravi CV
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi Ahmad
 
curr. vitae
curr. vitaecurr. vitae
curr. vitae
 
QA QC Engineer Mechanical
QA QC Engineer MechanicalQA QC Engineer Mechanical
QA QC Engineer Mechanical
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designer
 

R K MISHRA CV

  • 1. Curriculam vitae RITU KUMAR MISHR ritumishra63@yahoo.com Lakhnour Jhanjharpur (po) Madhubani (dt) +918602289862 /+96565148552, Bihar, INDIA-847403 Seeking a position to utilize my skills and abilities as a Piping Supervisor, oil and gas Industry that offers professional growth while being resourceful, innovative and flexible • An enthusiastic, Piping Supervisor with 19 years of experience in EPCM and Industrial projects, Eager to learn new technologies. • Having industrial experience in piping constructions as supervisor well. • Knowledge of oil and Gas projects , Industrial and Power plant projects • Having good Knowledge about technical drawing (Piping ISO / P & ID / GA ) • Efficient management and organizational abilities. • Well aware of in prepairing as built drawing & technical querries. SINCE 10th APRIL, 2001 WORKING WITH M/S KHARAFI NATIONAL COMPANY, FOR MECHANICAL & ELECTRIAL WORKS, AS A PIPING SUPERVISOR, CAREER OBJECTIVE SUMMARY PRESENT JOB STATUS
  • 2. Profile#1 Clean Fuel Project (Contract no 0054) in KUWAIT NATIONAL petroleum co. (SKC), JGSK JOINT VENTURE working with G S Company (Korean) From Fab 2016 to Till date. Profile#2 New Booster Station BS-171 At west Kuwait .KOC With Saipem Engineering contract no 45283 From Jan.2015 to to Feb.2016 Profile#3 Installation of Low Sulphur Fuel Oil F.G. & G.O Pipeline & Pumping Station From MAA to Doha Power Station with HYNDAI ENGINEERING & CONSTRUCTION CO.,LTD ( project No :BS-180 ) From Jan.2014 to Dec.2014. Profile#4 Installation of F.G. & G.O Pipeline & Pumping Station From MAA to Shuaiba Power Station with PETROFAC INTERNATIONAL LTD ( project No 1760-KOC ) From Sep.2011 to Jan.2014. Profile#5 JI-192 PROJECT: 40” Gas Pipeline from KOC (BS-131) to KNPC (LPG PLANT).with PETROFAC INTERNATIONAL LTD 150km, Tow slug catcher (5000BBL&10000BBL), 15no Valve Station And 8no micro tunneling Road Crossing. From Aug.2009 to Sep 2011 Profile#6 Facility Upgrade & Relocation of U/G Process Piping Project for Kuwait Oil Company with The M/S PTROFAC int.Ltd.
  • 3. Sit in GC-02 GC- 03 GC- 07 GC-08 GC- 21 GC- 23, And BS- 140, BS-150, New CRU, Manifold, Compressor, and Desultor Unit. From Jan. 2006 to Aug.2009. Profile#7 Replacement of North Kuwait Crude Oil Export System Point”A” With M/S PTROFACT int. Ltd. New Metric skid, Export pump, Storage Tank, and Fire Water. Unite. From Jan. 2005 to Nov.2006. Profile#8 Re-Building of damaged Facilities at GC- 15 and Upgrade at Booster Station-131 for Kuwait Oil Company with FLOUR and S.K. ENGINEERING & CONSTRUCTION COMPANY. Sit in GC- 15. New Manifold, Compressor, Separator, Desultory , CRU, and Fire Water System. Sit in BS-131 3 Compressor, Link pipe rack, Glycol, Flare, Piping and Fire Water System. From Jan.2004 to Dec.2004. Profile#9 Lift Gas Distribution System Project, For Kuwait Oil Company With The Technical Collaboration of M/s. SNAMPROGETTI. 153 Km Of pipe Line, 8 Manifold, 6 Nodes, 2 Booster Station. From Oct.2002 to Jan. 2004. Profile#10 GC- 23 Upgrading Project For Kuwait Oil Company With The Technical Collaboration Overall Management and Supervision of M/s. PETROFAC int. Ltd. New Manifold, Compressor, Desalter, 3 Tank, and fire Water Tank. From Feb.2002 to Oct. 2002. Profile#11 Steam Condensate Recovery To Gas Plant Project, for Kuwait National Petroleum Company (KNPC) Mina-AL Ahmadi site in UNIT-27 UNIT-29 (Utility Area) &UNIT- 31 UNIT-32 UNIT-33 (Process Area). From Apr. 2001 to Feb.2002.
  • 4. Roles and Responsibilities: • Follow of the entire work schedule, as per the drawing and technical specification Fabrication, erection, inspection, testing and commissioning of various piping systems related to Petrochemical plants as per isometrics and general arrangement (GA) drawings • Prepare work permit and conduct tool box meeting prior to START the work. • Ensure the completion of shop fabrication on time as per given schedule, Referring codes and standards specification, Coordinating Shop testing activities. • Preparation of weld map for Site condition, Coordinating piping system testing activities, Preparation of as built Drawings, as built control sheet and other related documents. • Observing the potential impact of a project on the local environment and the Coordinating and checking of deliverable as per schedule. Working and using various engineering tools with the aim of providing cost effective solutions for the organization. • Prepare detailed equipment receiving plan at site. • Familiar with QA and QC standards. • Maintain standard of safety and comply with company’s health safety and environment management system requirement. • Organize inspection of equipment at the site and prepare material receiving report. • Coordinate with other supervisors for ease and avoid any stoppage at site. • Monitor piping spools and supports delivery status in order to provide continuous work front at site. • Knowledge of materials and their codes for processing piping and pipelines. • Check and prepare material requisition for free issue materials to be used at site for continuous progress. • Supervise clearing of punch list items and coordinate with hydro testing team. • Provide daily progress report to the site engineer. PREVIOUS EXPERIENCE:
  • 5. From Aug.1999 to July 2000 work with M/S. S.K. Engineering & Construction Ltd. (Korea) as a Piping Foremen. • ATK Merox Project (CA/2750) With Kuwait National Petroleum Company, Mina AL- Ahmadi Refinery, Kuwait. • Acid Gas Removal Project (MPD-C-05) With Kuwait National Petroleum Company Mina Al- Ahmadi Refinery –Kuwait Roles and Responsibilities: • Coordinating all documentation and correspondences with client. • Planning of erection sequence as per site conditions. • Preparation of weld map for Site condition • Coordinating piping system testing activities • Preparation of test packs as per Turnover system. • Preparation of as built Drawings, as built control sheet and other related documents. • Piping fabrication, Piping support fabrication and Eraction. • Pipeline works • Hydro testing of piping and pipe line. • Commissioning and pre – commissioning • Diploma Diploma in Mechanical Engineering (DME) from Institute of Engineeing & Management (IEM) Mumbai 1994 –1996 with 62% Father’s Name : Beda nand Mishra EDUCATIONAL QUALIFICATIONS PERSONAL PROFILE COLLEGE PROJECT:
  • 6. Date of Birth : 20/01/1976 Permanent Address : Lakhnour Jhanjharpur (po) Madhubani (dt) Bihar, INDIA-847403 Marital Status : Married Sex : Male Nationality : Indian Languages Known : English, Hindi & Arabic Passport Details Passport No : N 8640520 Date of Issue : 19 April 2016 Date of Expiry : 18 April 2026 Place of Issue : Kuwait I hereby declare that the information furnished above is true to the best of my knowledge & belief. Place: Date: (Ritu Kumar Mishra) DECLARATION
  • 7. Date of Birth : 20/01/1976 Permanent Address : Lakhnour Jhanjharpur (po) Madhubani (dt) Bihar, INDIA-847403 Marital Status : Married Sex : Male Nationality : Indian Languages Known : English, Hindi & Arabic Passport Details Passport No : N 8640520 Date of Issue : 19 April 2016 Date of Expiry : 18 April 2026 Place of Issue : Kuwait I hereby declare that the information furnished above is true to the best of my knowledge & belief. Place: Date: (Ritu Kumar Mishra) DECLARATION