Flag Run at Elgar Street Stream Restoration Project - May 24, 2017Fairfax County
The project will restore about 2,900 linear feet of the channel to stabilize the banks and prevent future erosion. A healthy ecosystem will be created by installing native trees and herbaceous plants.
Piney Run at Lake Werowance Stream Restoration Project Oct 2019Fairfax County
Restore approximately 3,500 feet of stream on Lake Werowance Inc. and privately owned properties.
Stabilize streambed and banks
Reduce sediment and nutrient inputs into stream system
Improve habitat
Maintain close coordination with stakeholders
Enhance water quality and biological diversity through the enhancements of existing wetland features within the former lakebed
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design ReviewFairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use innovative & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Fairfax County
This project will mitigate flooding, reduce erosion, and protect public and private property. Approximately 3,000 feet of the main channel and 1,500 feet of tributaries will be restored.
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Fairfax County
The virtual community meeting held on Sept 29, 2020 advised residents about the proposed stream restoration in a Pimmit Run tributary at the George Marshall High School in Fairfax County, VA.
Restore ~1,400 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
Stabilize the eroding stream banks
Water quality improvement
Sustainability
Infrastructure protection
Habitat improvement
Flag Run at Elgar Street Stream Restoration Project - May 24, 2017Fairfax County
The project will restore about 2,900 linear feet of the channel to stabilize the banks and prevent future erosion. A healthy ecosystem will be created by installing native trees and herbaceous plants.
Piney Run at Lake Werowance Stream Restoration Project Oct 2019Fairfax County
Restore approximately 3,500 feet of stream on Lake Werowance Inc. and privately owned properties.
Stabilize streambed and banks
Reduce sediment and nutrient inputs into stream system
Improve habitat
Maintain close coordination with stakeholders
Enhance water quality and biological diversity through the enhancements of existing wetland features within the former lakebed
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design ReviewFairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use innovative & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Fairfax County
This project will mitigate flooding, reduce erosion, and protect public and private property. Approximately 3,000 feet of the main channel and 1,500 feet of tributaries will be restored.
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Fairfax County
The virtual community meeting held on Sept 29, 2020 advised residents about the proposed stream restoration in a Pimmit Run tributary at the George Marshall High School in Fairfax County, VA.
Restore ~1,400 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
Stabilize the eroding stream banks
Water quality improvement
Sustainability
Infrastructure protection
Habitat improvement
Piney Run Public Meeting 1 October 17, 2018Fairfax County
This project will restore 4,300 feet of stream on Lake Werowance Inc. and privately owned properties. Goals are stabilized stream banks and bed, reduced sediment and nutrients, improved habitat, and enhanced water quality.
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectFairfax County
The plan is to return the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor within the constraints of the developed landscape.
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Fairfax County
The Rocky Run Tributary at Hickory Hollow Lane project goals are to stabilize the stream, reduce excess sediment from flowing downstream; improve aesthetics, reduce hazards, reconnect the stream to the floodplain, improve the riparian buffer and reduce road flooding, among other goals.
Cameron Run Tributary At La Vista Drive: Stream RestorationFairfax County
Anticipated Schedule for Construction (estimate 34 weeks)
Restoration schedules can overlap with multiple crews
Plantings occur in spring, fall, and/or winter (live stakes) seasons
Includes 1-year warranty on structures and vegetation
Vegetation warranty starts when planting ends (may be delayed for season)
Restore ~4,000 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
Paul Springs Segment 1 & 2 Stream RestorationFairfax County
Restoration of approximately 1,800 linear feet of headwater tributaries of Paul Spring Branch that flow through Charles Goodman Park and Brickelmaier Park, and adjacent private properties.
Franklin Park Chesterbrook Neighborhood Project HighlightsFairfax County
This project included 3,000 linear feet of stormwater improvements that promote infiltration, improve water quality, and safely convey stormwater through the neighborhood to a stream.
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020Fairfax County
This Fairfax County project seeks to stabilize excessive, ongoing stream erosion which threatens sanitary sewer pipes, undermines trees, impacts water quality and degrades habitat for aquatic life.
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...Fairfax County
Chesterbrook Road Emergency Project – Summer 2019
Final Scoping Technical Memorandum – January 2020
Professional Services Contract Execution – April 2021
Community Meeting on stream restoration Pre-design/Channel alignments – April 2021
Final Preliminary Engineering Report – October 2021
Community Meeting on Sanitary Realignment Preliminary Engineering Report – October 2021
Value Engineering Study completed – November 2021
One joint study for both projects
Community Meeting with Board of Supervisor – December 2021
Community meeting – January 2022
Design Contract Development – (We are at this step)
Land Acquisition – (We are at this step)
Complete Design
Construction
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020Fairfax County
A community meeting was held on Sept 30, 2020 to inform residents and gather information from them about the stream restoration project at Little Pimmit Run Tributary at Woodland Terrace.
Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...Fairfax County
A section of Crook Branch will be restored to accomplish the following goals:
Stabilize stream
Reduce excess sediment from being transported downstream
Reduce excess nutrients from entering the waterway
Improve aesthetics
Reduce hazards (steep, eroding banks)
Reconnect stream to floodplain
Improve Riparian Buffers
Dead Run at Georgetown Pike Stream Restoration Fairfax County
Stabilize streambed and banks, ~5,600 linear feet
Reduce sediment and nutrient inputs into stream system
Installation of grade control structures, improve/correct channel dimension and alignment
Improve floodplain connectivity and ecological processes
Increase frequency and residence time of water on floodplain
Reduce force and volume of water within the channel during storm and flood events
Naturally process nutrients and sediments on the floodplain and within the streambed
Improve habitat for biological community
Native landscaping
Floodplain wetlands
Streambed and flow diversity
In-stream structures
Protect Infrastructure – Sanitary Sewer Lines
Channel Relocation away from sanitary sewer lines when possible
Armoring channel banks and bottom where relocation is not an option
Piney Run Public Meeting 1 October 17, 2018Fairfax County
This project will restore 4,300 feet of stream on Lake Werowance Inc. and privately owned properties. Goals are stabilized stream banks and bed, reduced sediment and nutrients, improved habitat, and enhanced water quality.
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectFairfax County
The plan is to return the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor within the constraints of the developed landscape.
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Fairfax County
The Rocky Run Tributary at Hickory Hollow Lane project goals are to stabilize the stream, reduce excess sediment from flowing downstream; improve aesthetics, reduce hazards, reconnect the stream to the floodplain, improve the riparian buffer and reduce road flooding, among other goals.
Cameron Run Tributary At La Vista Drive: Stream RestorationFairfax County
Anticipated Schedule for Construction (estimate 34 weeks)
Restoration schedules can overlap with multiple crews
Plantings occur in spring, fall, and/or winter (live stakes) seasons
Includes 1-year warranty on structures and vegetation
Vegetation warranty starts when planting ends (may be delayed for season)
Restore ~4,000 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
Paul Springs Segment 1 & 2 Stream RestorationFairfax County
Restoration of approximately 1,800 linear feet of headwater tributaries of Paul Spring Branch that flow through Charles Goodman Park and Brickelmaier Park, and adjacent private properties.
Franklin Park Chesterbrook Neighborhood Project HighlightsFairfax County
This project included 3,000 linear feet of stormwater improvements that promote infiltration, improve water quality, and safely convey stormwater through the neighborhood to a stream.
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020Fairfax County
This Fairfax County project seeks to stabilize excessive, ongoing stream erosion which threatens sanitary sewer pipes, undermines trees, impacts water quality and degrades habitat for aquatic life.
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...Fairfax County
Chesterbrook Road Emergency Project – Summer 2019
Final Scoping Technical Memorandum – January 2020
Professional Services Contract Execution – April 2021
Community Meeting on stream restoration Pre-design/Channel alignments – April 2021
Final Preliminary Engineering Report – October 2021
Community Meeting on Sanitary Realignment Preliminary Engineering Report – October 2021
Value Engineering Study completed – November 2021
One joint study for both projects
Community Meeting with Board of Supervisor – December 2021
Community meeting – January 2022
Design Contract Development – (We are at this step)
Land Acquisition – (We are at this step)
Complete Design
Construction
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020Fairfax County
A community meeting was held on Sept 30, 2020 to inform residents and gather information from them about the stream restoration project at Little Pimmit Run Tributary at Woodland Terrace.
Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...Fairfax County
A section of Crook Branch will be restored to accomplish the following goals:
Stabilize stream
Reduce excess sediment from being transported downstream
Reduce excess nutrients from entering the waterway
Improve aesthetics
Reduce hazards (steep, eroding banks)
Reconnect stream to floodplain
Improve Riparian Buffers
Dead Run at Georgetown Pike Stream Restoration Fairfax County
Stabilize streambed and banks, ~5,600 linear feet
Reduce sediment and nutrient inputs into stream system
Installation of grade control structures, improve/correct channel dimension and alignment
Improve floodplain connectivity and ecological processes
Increase frequency and residence time of water on floodplain
Reduce force and volume of water within the channel during storm and flood events
Naturally process nutrients and sediments on the floodplain and within the streambed
Improve habitat for biological community
Native landscaping
Floodplain wetlands
Streambed and flow diversity
In-stream structures
Protect Infrastructure – Sanitary Sewer Lines
Channel Relocation away from sanitary sewer lines when possible
Armoring channel banks and bottom where relocation is not an option
Long Branch Central Watershed Management Area 03-03-2021Fairfax County
Project Goals:
Achieve Long Branch Central TMDL waste load reduction requirements.
Provide long-term stability and have low maintenance.
Improve water quality within the Long Branch Central watershed.
Improve habitat and environmental health (ecological lift).
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
Overarching Project Goals:
-Achieve Long Branch Central TMDL waste load reduction requirements.
-Provide long-term stability and have low maintenance.
-Improve water quality within the Long Branch Central Watershed.
-Improve habitat and environmental health (ecological lift).
Long Branch Tributary at Long Branch Falls ParkFairfax County
The Long Branch Tributary at Long Branch Falls Park project restored approximately 670 linear feet of stream within the Accotink Creek watershed. The stream channel was enhanced and stabilized using natural channel design elements. Existing erosion damage was repaired and future water quality has been improved. The project included channel realignment, in-stream rock structures, log structures, constructed wetlands, wood habitat clusters, deer exclusion fence, removal of invasive plants and the re-establishment of the riparian buffer with native species.
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use resilient & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
Backlick Run Gravity Sewer Abandonment Project June 2020Fairfax County
This is a 4,000 linear foot section of gravity sewer that was taken out of service. The pipe had deteriorated and was prone to collapse. The area was restored and site improvements were completed.
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
Scotts Run @ Old Meadow Road Stream Restoration was substantially completed on March 30, 2022. The Scotts Run project consisted of restoring, enhancement, and stabilizing of approximately 2,930 linear feet of eroding stream using Natural Channel Design criteria. This project included two phases: Phase I was funded by proffers from a private development and Phase II was County funded. Also included was the removal of invasive non-native plants and the installation of new plantings to stabilize the stream and floodplain.
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
During a routine Closed-Circuit Television (CCTV) Camera inspection by Wastewater Collection Division (WCD), it was found that 45 linear feet of 8-inch asbestos reinforced concrete pipe (RCP) between MH-292 to MH-291 was within imminent danger of failing. The bottom of the RCP was missing within the 45 linear feet of repair and the pipe was on the verge of surcharging. After an immediate pre-construction meeting with Merrifield Nursery, it was agreed to work from 6pm-10am everyday of the week to avoid disruption and potentially placing patrons at risk during the biggest time of the year for Merrifield Garden Center. The contractor mobilized to the site and began the 20-foot excavation to replace 45 linear feet of broken gravity sewer. The project started on March 14th, 2022 and was substantially complete on March 23, 2022.
The Sully Basins Stormwater Pond Retrofits project was substantially completed on April 19, 2022. The project is located within the Cub Run watershed. The project consisted of repair and enhancement of multiple stormwater basins, 0326DP, 0964DP and 1484DP. The project also included construction of new stone cascades, stone weir basin structures and the construction of wetlands with high and low marsh areas. The project will facilitate improved sediment removal and improve downstream water quality using forebays and micro pools. Aquatic and natural habitat were also added within the three basins.
Clarks Crossing Road Improvements 05-13-22Fairfax County
The Clarks Crossing Road Pedestrian Access Improvement project improved the pedestrian and bicycle access along Clarks Crossing Road and was substantially completed on March 23, 2022.
This project completed the missing link between the existing sidewalk at Brookside Lane and the previously constructed sidewalk along Clarks Crossing Road. The scope of this project included construction of asphalt sidewalk, curb ramps, curb and gutter, drainage improvements along Brookside Lane and asphalt mill/overlay on Clarks Crossing and Brookside Lane.
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
Future wastewater flows in northern Fairfax County exceed existing system capacity
Treatment capacity is available in Noman M. Cole Jr. Pollution Control Plant in Lorton, VA
New pipes and pumps are needed to move future flows to treatment plant
NEXT STEPS
Field investigations / surveys
Finalize alignments and pump station layout
Use of open cut excavation
Use of trenchless methods
Easement acquisition needed
Develop traffic control plans
Description:
The project consists of a new, 23,000 square feet, two-story, four-bay fire station facility and associated improvements to the 3.3-acre site including storm water detention, landscaping and parking. The scope also included the demolition of the existing fire station, and a temporary fire station to house the Fire and Rescue Department during construction of the new facility. The key elements of the overall project include:
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
The new 4-inch ductile iron force main will serve the surrounding community for the foreseeable future. Replacement of the force main will:
Reduce the level and frequency of maintenance required to keep the force main operating.
Prevent costly emergency repairs.
Provide residents with safe, reliable utility infrastructure.
Enhance the quality of life for residents.
Reduce risks to public health and the environment.
Burke Centre VRE Connector Phase IV project was substantially completed on March 7, 2022. This project enhanced the access to mass transit by creating a more direct connection from the VRE Station to the residential areas west of Premier Court. This project also connects the Oak Bluff community to the Virginia Rail Express (VRE) Burke Station and provides a multi-use shared pedestrian and bicycle trail for outdoor recreation.
Objectives: Share our project understanding with the council and seek input on the unique opportunities and housing goals for this site that could help guide
our master planning process.
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
4,800 linear feet of stream will be restored using Natural Channel Design methodologies
Pollutant reduction
1,439 lbs/total phosphorus
3,400 lbs/total nitrogen
462.1 tons of total suspended sediment
Protection of private property and public infrastructure
Increased ecological diversity with native vegetation
DEQ has awarded a SLAF grant to this project for these environmental benefits
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
The Lake Barton Dredging, Restoration, and Riser Modification project was substantially completed on December 29, 2021. The project is located within the Pohick Creek watershed. The project consisted of dredging and removal of approximately 19,100 cubic yards of sediment to restore the sediment trapping capacity and improve water quality. The project also included construction of new sediment forebays, in-lake haul roads, and riser modifications (new mid-level sluice gate and cold-water intake) to facilitate future maintenance, stabilize the shoreline, and improve downstream water quality. Fish habitat was also added within the lake.
Reston Arts Community Center Feasibility - Wrap UpFairfax County
This is the last of 5 engagement meetings. We are excited to report back what we heard from you – your preferences, priorities, questions, hopes, concerns. The information we received will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
Benefits of Consolidated Facility
Building and Site Efficiencies
Operational Efficiencies
Addresses Space Deficiencies
Addresses Renovations and Capital Renewal Requirements
for WCD
Provides for a Centrally Located Site that Accommodates Program
Consolidates Integrated Services on One Centrally Located Site
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
This is the 4th of 5 engagement meetings. We are excited to hear from you – your preferences, priorities, questions, hopes, concerns. The information we receive today will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
Neighborhood was built in the 1980s, and the sewer infrastructure has been in operation since.
Aged pump station equipment – pumps, valves, fans, concrete, etc.
This aging equipment has the potential of causing:
Sanitary Sewer Overflows (SSO)
Sewer back-ups into homes
Environmental damages
Maintenance problems
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
These community outreach meetings are being conducted to understand community needs for a proposed arts venue in the Reston Town Center.
The proposed arts center would be a result of a proffer from Boston Properties in the next phase of Reston Town Center development (Block J).
The proffer would provide for an approximately 60,000 gross square foot facility to house a stage suitable for large-scale music and dance performances, as well as other arts-related amenities.
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Fairfax County
These community outreach meetings are being conducted to understand community needs for a proposed arts venue in the Reston Town Center.
The proposed arts center would be a result of a proffer from Boston Properties in the next phase of Reston Town Center development (Block J).
The proffer would provide for an approximately 60,000 gross square foot facility to house a stage suitable for large-scale music and dance performances, as well as other arts-related amenities.
The project consists of a new 17,400 square feet, two-story, four-bay fire station facility and associated improvements to the one-acre site including stormwater detention, landscaping, and parking. The scope also included the demolition of the existing two and a half bay facility, and construction of a temporary fire station to house the Fire and Rescue Department during construction of the new facility. The key elements include:
Apparatus Bays, Control Room and Offices
Battalion Chief Suite
Kitchen, Dayroom, and Dining Room
Bunk Rooms
Showers and Locker Rooms
Exercise Room
Ready Gear Room
Reston Arts Center Community Meeting 02-28-22Fairfax County
These community outreach meetings are being conducted to understand community needs for a proposed arts venue in the Reston Town Center.
The proposed arts center would be a result of a proffer from Boston Properties in the next phase of Reston Town Center development (Block J).
The proffer would provide for an approximately 60,000 gross square foot facility to house a stage suitable for large-scale music and dance performances, as well as other arts-related amenities.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
6th International Conference on Machine Learning & Applications (CMLA 2024)ClaraZara1
6th International Conference on Machine Learning & Applications (CMLA 2024) will provide an excellent international forum for sharing knowledge and results in theory, methodology and applications of on Machine Learning & Applications.
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesChristina Lin
Traditionally, dealing with real-time data pipelines has involved significant overhead, even for straightforward tasks like data transformation or masking. However, in this talk, we’ll venture into the dynamic realm of WebAssembly (WASM) and discover how it can revolutionize the creation of stateless streaming pipelines within a Kafka (Redpanda) broker. These pipelines are adept at managing low-latency, high-data-volume scenarios.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Understanding Inductive Bias in Machine LearningSUTEJAS
This presentation explores the concept of inductive bias in machine learning. It explains how algorithms come with built-in assumptions and preferences that guide the learning process. You'll learn about the different types of inductive bias and how they can impact the performance and generalizability of machine learning models.
The presentation also covers the positive and negative aspects of inductive bias, along with strategies for mitigating potential drawbacks. We'll explore examples of how bias manifests in algorithms like neural networks and decision trees.
By understanding inductive bias, you can gain valuable insights into how machine learning models work and make informed decisions when building and deploying them.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsVictor Morales
K8sGPT is a tool that analyzes and diagnoses Kubernetes clusters. This presentation was used to share the requirements and dependencies to deploy K8sGPT in a local environment.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Using recycled concrete aggregates (RCA) for pavements is crucial to achieving sustainability. Implementing RCA for new pavement can minimize carbon footprint, conserve natural resources, reduce harmful emissions, and lower life cycle costs. Compared to natural aggregate (NA), RCA pavement has fewer comprehensive studies and sustainability assessments.
Literature Review Basics and Understanding Reference Management.pptxDr Ramhari Poudyal
Three-day training on academic research focuses on analytical tools at United Technical College, supported by the University Grant Commission, Nepal. 24-26 May 2024
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Sunset Hills Road Drainage Improvement Project
Flood Mitigation Project
October 4, 2021
2. Stormwater Planning Division
Agenda
2
• Introduction to design process
• Project Goals
• Existing Conditions
• Proposed Design
• Next Steps
• Contact Information
3. Stormwater Planning Division
Stormwater Program Drivers
3
• Municipal Separate Storm Sewer System Permit (MS-4)
• Chesapeake Bay Total Maximum Daily Loads (TMDL)
– Regulates amount of pollutants in waterways (Nitrogen, Phosphorus and Total Suspended Solids)
• Local TMDLs (sediment, bacteria and PCBs)
• Dam Safety Regulations
• Maintenance of Existing Facilities and public infrastructure
• Public Safety and Emergency Response
4. Stormwater Planning Division
Project Goals
4
• Mitigate the frequent flooding on
Sunset Hills Road
• Relieve the pressure on the
W&OD trail embankment
• Provide water quality benefits
5. Difficult Run Watershed
Stormwater Planning Division 5
• 58 mi2 in Fairfax County
– 18% impervious
– 18 subwatersheds
• Discharges into Potomac River
• Middle Difficult Run 2.69 mi2 (1,721
Acres)
– 14% impervious
Difficult Run Watershed Management Plan
16. Stormwater Planning Division
Contact Information
16
Shannon Bell – Project Manager
703-324-5802
Shannon.bell@fairfaxcounty.gov
Fairfax County Stormwater Planning Division
703-324-5500 TTY 711
12000 Government Center Parkway
Fairfax, Virginia 22035
www.fairfaxcounty.gov/public works/stormwater
To request this information in an alternate format call 703-324-5500, TTY 711
17. Stormwater Planning Division
Online Resources
17
Stormwater Planning Division Website
http://www.fairfaxcounty.gov/publicworks/stormwater/
Fairfax County Watershed Planning
http://www.fairfaxcounty.gov/nvswcd/newsletter/planning.htm
Difficult Run Watershed Plan
https://www.fairfaxcounty.gov/publicworks/stormwater/difficult-run-watershed
EPA Water Quality Laws & Regulations
https://www.epa.gov/wqs-tech/federal-water-quality-standards-requirements