Towlston Meadows Restoration Project

  1. 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Towlston Meadows Sec 3 Pond 1 Contract Number CN13125096 Project Number SD-000031-123b Task Order No. 19 Dranesville District May 27, 2014
  2. 2. Towlston Meadows Sec 3 Pond 1 Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
  3. 3. Project Details Towlston Meadows Sec 3 Pond 1 Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch Description: The purpose of Towlston Meadows Pond retrofit project was to increase the quality of the water discharge from the pond without creating any adverse impact to the existing downstream outfall system. In addition, enhancements were made by creating a new access road to better access the facility for any future maintenance needs. This project was substantially completed on-time and within budget, on April 4, 2014. Project Overview: • Re-grading of the pond and installation of four (4) 18-inch deep micro pools. • Increase storage volume by approximately 50% and provide water quality benefits to include removal of 3.4 lbs./yr. total phosphorus, 15.4 lbs./yr. total nitrogen, and 662 lbs./yr. total suspended solids. • Construct an all-weather maintenance access road using tufftrack pavers technology. • Incorporate native vegetation to promote the natural landscaping restoration of the project site. Project Team: Stormwater Planning Department – Jasdeep Saini Stormwater Planning Department – Suzanne Foster Utilities Design and Construction Division - Keith Ferrell Utilities Design and Construction Division – Yudhie Brownson DPWES Land Survey Branch - Gregory Harper Sagres Construction – Ron Grob Sagres Construction – Edson Tibincoski
  4. 4. Towlston Meadows Sec 3 Pond 1 Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch Vienna, VA, Tax Map #19-4 PROJECT SITE
  5. 5. Towlston Meadows Sec 3 Pond 1 Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch Existing Site Condition
  6. 6. Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch Towlston Meadows Sec 3 Pond 1 Micro pools excavation and site grading
  7. 7. Towlston Meadows Sec 3 Pond 1 Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch Installation of the Tufftrack Paver
  8. 8. Towlston Meadows Sec 3 Pond 1 Topsoil and sod placed upon the tufftrack for permanent maintenance access road Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch
  9. 9. Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch Towlston Meadows Sec 3 Pond 1 Site restored with native vegetation Aquatic plugs were planted within the Micro-pools
  10. 10. Before After Towlston Meadows Sec 3 Pond 1 Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch
  11. 11. Additional Information For additional Information, please call www.fairfaxcounty.gov/dpwes Towlston Meadows Sec 3 Pond 1 Irene Haske, Public Information Officer 703-324-5821, TTY SWPDmail@fairfaxcounty.gov Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

×