A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Oak Marr Pump Station Rehabilitation – Construction Project
Wastewater Project – Virtual Community Meeting
Microsoft Teams – December 7, 2021, at 6:30 p.m.
Fairfax County Project Manager: Christopher Mata, P.E.
Project Engineer: HDR & RK&K
December 2021
Oak Marr Pump Station Rehabilitate – Construction Project
Capital Facilities – Wastewater Design and Construction Division – Collections Branch
Agenda
2
1. Project Team Introductions & Attendee Virtual Sign-In
2. Project Location
3. Project Background & Need
4. Study Phase
5. Design Phase
6. Construction Phase
7. Project Schedule
8. Questions and Answers
Oak Marr Pump Station Rehabilitate – Construction Project
Capital Facilities – Wastewater Design and Construction Division – Collections Branch
Project Team Introductions & Attendee Virtual Sign-In
3
• Fairfax County Project Manager:
– Christopher Mata, P.E. – Senior Engineer III
• Department of Public Works and Environmental Services (DPWES) – Capital Facilities –
Wastewater Design and Construction Division – Wastewater Collection Branch
• HDR Project Team:
– Fady Afif, P.E. – Project Manager
– Badana Mohamadi – Project Engineer
• RK&K Project Team
– Mike Klevenz, P.E. – QA/QC
Oak Marr Pump Station Rehabilitate – Construction Project
Capital Facilities – Wastewater Design and Construction Division – Collections Branch
Virtual Meeting Administrative Items
4
• Attendee Virtual Sign-In (2 options)
1. Private Message me on MS Teams – Name, Property Address, Email,
Phone Number
2. Email me @ cmata0@fairfaxcounty.gov - Name, Property Address,
Email, Phone Number
• To reduce feedback, please remain on mute until the end of the
presentation during the Q&A
• The chat board on the right-side of your screen is available
throughout the presentation
Oak Marr Pump Station Rehabilitate – Construction Project
Project Location
Capital Facilities – Wastewater Design and Construction Division – Collections Branch 5
Project
Location
Flow Direction
Sewer service area
and project area
Oak Marr Pump Station Rehabilitate – Construction Project
Capital Facilities – Wastewater Design and Construction Division – Collections Branch
Project Background & Need
6
• Neighborhood was built in the 1980s,
and the sewer infrastructure has been in
operation since.
• Aged pump station equipment – pumps,
valves, fans, concrete, etc.
• This aging equipment has the potential
of causing:
– Sanitary Sewer Overflows (SSO)
– Sewer back-ups into homes
– Environmental damages
– Maintenance problems
Oak Marr Pump Station Rehabilitate – Construction Project
Existing Conditions
Capital Facilities – Wastewater Design and Construction Division – Collections Branch 7
Incoming Flows
Outgoing Flows
Pump
Station
Site
Oak Marr Pump Station Rehabilitate – Construction Project
Existing Conditions
Capital Facilities – Wastewater Design and Construction Division – Collections Branch 8
Incoming Flows
Outgoing Flows
Pump
Station
Site
EXISTING
ACCESS
ROAD/ TRAIL
EXISTING
FENCE
EXISTING
BUILDING
EXISTING
MANHOLES
EXISTING
FUEL TANK
Oak Marr Pump Station Rehabilitate – Construction Project
Capital Facilities – Wastewater Design and Construction Division – Collections Branch
Study Phase
9
• Fall 2020 study:
– Evaluated existing conditions – flow analysis, hydraulic
assessment, site & equipment assessment.
– Alternative analysis and recommendation to rehabilitate the
pump stations.
• Criteria: Community impacts, schedule, cost, constructability,
maintainability, operability, reliability
• Recommended Alternative:
– Construct a parallel pump station on the same parcel
– Repurposing 4 existing below-ground structures & installing 2
new below-ground structures
– Pump station building will remain & new generator to be
installed outside
– Sewer services will not be impacted
Oak Marr Pump Station Rehabilitate – Construction Project
Capital Facilities – Wastewater Design and Construction Division – Collections Branch
Design Phase
10
• Includes Designing:
– Pumps and wet-well
– Permanent by-pass & meter vault
– New enclosed standby generator
– Re-routing of sewer force main
– Station fence (w/ slats) realignment
– Access road repaving and widening in
front of the pump station
– Adding another gate
– Miscellaneous concrete work
Oak Marr Pump Station Rehabilitate – Construction Project
Capital Facilities – Wastewater Design and Construction Division – Collections Branch
Design Phase
11
EXPANDED ACCESS
ROAD
EXTENDED
FENCE
TEMPORARY
CONSTRUCTION
EASEMENT
STANDBY
GENERATOR
NEW
UNDERGROUND
STRUCTURES
TREE
REMOVAL
Repurposed below-
ground structures (x4)
Oak Marr Pump Station Rehabilitate – Construction Project
Proposed Changes
Capital Facilities – Wastewater Design and Construction Division – Collections Branch 12
Proposed Tree Removal
These
trees to
remain
Proposed trimming of
branches
Pond
Oak Marr Pump Station Rehabilitate – Construction Project
Capital Facilities – Wastewater Design and Construction Division – Collections Branch
Construction Phase - What to expect
13
• Construction Activity:
– Construction entrance off of Elmesmeade
Ct. cul-de-sac.
– Some construction activity to take place
along trail pathway.
– Excavation for the new wet well and valve
vault
– Dewatering until excavation is complete and
new structures have been placed
– Installing precast structures for wet well and
valve vault
– Installing emergency generator
– Bypass pumping within project site.
Oak Marr Pump Station Rehabilitate – Construction Project
Construction Phase – Access Through the Community
Capital Facilities – Wastewater Design and Construction Division – Collections Branch 14
Oak Marr Pump Station Rehabilitate – Construction Project
Project Schedule
15
Capital Facilities – Wastewater Design and Construction Division – Collections Branch
December 2019
Study Began
October
2020
Study
Complete
January 2022
Anticipate
Acquiring all
Land Rights
Summer 2022*
Construction
Beginning
December 2021
Public Meeting
Summer 2023*
Construction
Completion
March 2021
Design Began
*This was updated as of March 2022
Oak Marr Pump Station Rehabilitate – Construction Project
Capital Facilities – Wastewater Design and Construction Division – Collection Branch
Questions & Answers
16
Capital Facilities – Wastewater Design and Construction Division – Collections Branch
Additional Information
For additional information, please contact
www.fairfaxcounty.gov/publicworks
Oak Marr Pump Station Rehabilitate – Construction Project
Christopher Mata, P.E.
703-324-5111, TTY 711
cmata0@fairfaxcounty.gov
Capital Facilities – Wastewater Design and Construction Division – Collections Branch 17
Questions & Answers

Oak Marr Pump Station Rehabilitation – Construction Project

  • 1.
    A Fairfax County,VA, publication Department of Public Works and Environmental Services Working for You! Oak Marr Pump Station Rehabilitation – Construction Project Wastewater Project – Virtual Community Meeting Microsoft Teams – December 7, 2021, at 6:30 p.m. Fairfax County Project Manager: Christopher Mata, P.E. Project Engineer: HDR & RK&K December 2021
  • 2.
    Oak Marr PumpStation Rehabilitate – Construction Project Capital Facilities – Wastewater Design and Construction Division – Collections Branch Agenda 2 1. Project Team Introductions & Attendee Virtual Sign-In 2. Project Location 3. Project Background & Need 4. Study Phase 5. Design Phase 6. Construction Phase 7. Project Schedule 8. Questions and Answers
  • 3.
    Oak Marr PumpStation Rehabilitate – Construction Project Capital Facilities – Wastewater Design and Construction Division – Collections Branch Project Team Introductions & Attendee Virtual Sign-In 3 • Fairfax County Project Manager: – Christopher Mata, P.E. – Senior Engineer III • Department of Public Works and Environmental Services (DPWES) – Capital Facilities – Wastewater Design and Construction Division – Wastewater Collection Branch • HDR Project Team: – Fady Afif, P.E. – Project Manager – Badana Mohamadi – Project Engineer • RK&K Project Team – Mike Klevenz, P.E. – QA/QC
  • 4.
    Oak Marr PumpStation Rehabilitate – Construction Project Capital Facilities – Wastewater Design and Construction Division – Collections Branch Virtual Meeting Administrative Items 4 • Attendee Virtual Sign-In (2 options) 1. Private Message me on MS Teams – Name, Property Address, Email, Phone Number 2. Email me @ cmata0@fairfaxcounty.gov - Name, Property Address, Email, Phone Number • To reduce feedback, please remain on mute until the end of the presentation during the Q&A • The chat board on the right-side of your screen is available throughout the presentation
  • 5.
    Oak Marr PumpStation Rehabilitate – Construction Project Project Location Capital Facilities – Wastewater Design and Construction Division – Collections Branch 5 Project Location Flow Direction Sewer service area and project area
  • 6.
    Oak Marr PumpStation Rehabilitate – Construction Project Capital Facilities – Wastewater Design and Construction Division – Collections Branch Project Background & Need 6 • Neighborhood was built in the 1980s, and the sewer infrastructure has been in operation since. • Aged pump station equipment – pumps, valves, fans, concrete, etc. • This aging equipment has the potential of causing: – Sanitary Sewer Overflows (SSO) – Sewer back-ups into homes – Environmental damages – Maintenance problems
  • 7.
    Oak Marr PumpStation Rehabilitate – Construction Project Existing Conditions Capital Facilities – Wastewater Design and Construction Division – Collections Branch 7 Incoming Flows Outgoing Flows Pump Station Site
  • 8.
    Oak Marr PumpStation Rehabilitate – Construction Project Existing Conditions Capital Facilities – Wastewater Design and Construction Division – Collections Branch 8 Incoming Flows Outgoing Flows Pump Station Site EXISTING ACCESS ROAD/ TRAIL EXISTING FENCE EXISTING BUILDING EXISTING MANHOLES EXISTING FUEL TANK
  • 9.
    Oak Marr PumpStation Rehabilitate – Construction Project Capital Facilities – Wastewater Design and Construction Division – Collections Branch Study Phase 9 • Fall 2020 study: – Evaluated existing conditions – flow analysis, hydraulic assessment, site & equipment assessment. – Alternative analysis and recommendation to rehabilitate the pump stations. • Criteria: Community impacts, schedule, cost, constructability, maintainability, operability, reliability • Recommended Alternative: – Construct a parallel pump station on the same parcel – Repurposing 4 existing below-ground structures & installing 2 new below-ground structures – Pump station building will remain & new generator to be installed outside – Sewer services will not be impacted
  • 10.
    Oak Marr PumpStation Rehabilitate – Construction Project Capital Facilities – Wastewater Design and Construction Division – Collections Branch Design Phase 10 • Includes Designing: – Pumps and wet-well – Permanent by-pass & meter vault – New enclosed standby generator – Re-routing of sewer force main – Station fence (w/ slats) realignment – Access road repaving and widening in front of the pump station – Adding another gate – Miscellaneous concrete work
  • 11.
    Oak Marr PumpStation Rehabilitate – Construction Project Capital Facilities – Wastewater Design and Construction Division – Collections Branch Design Phase 11 EXPANDED ACCESS ROAD EXTENDED FENCE TEMPORARY CONSTRUCTION EASEMENT STANDBY GENERATOR NEW UNDERGROUND STRUCTURES TREE REMOVAL Repurposed below- ground structures (x4)
  • 12.
    Oak Marr PumpStation Rehabilitate – Construction Project Proposed Changes Capital Facilities – Wastewater Design and Construction Division – Collections Branch 12 Proposed Tree Removal These trees to remain Proposed trimming of branches Pond
  • 13.
    Oak Marr PumpStation Rehabilitate – Construction Project Capital Facilities – Wastewater Design and Construction Division – Collections Branch Construction Phase - What to expect 13 • Construction Activity: – Construction entrance off of Elmesmeade Ct. cul-de-sac. – Some construction activity to take place along trail pathway. – Excavation for the new wet well and valve vault – Dewatering until excavation is complete and new structures have been placed – Installing precast structures for wet well and valve vault – Installing emergency generator – Bypass pumping within project site.
  • 14.
    Oak Marr PumpStation Rehabilitate – Construction Project Construction Phase – Access Through the Community Capital Facilities – Wastewater Design and Construction Division – Collections Branch 14
  • 15.
    Oak Marr PumpStation Rehabilitate – Construction Project Project Schedule 15 Capital Facilities – Wastewater Design and Construction Division – Collections Branch December 2019 Study Began October 2020 Study Complete January 2022 Anticipate Acquiring all Land Rights Summer 2022* Construction Beginning December 2021 Public Meeting Summer 2023* Construction Completion March 2021 Design Began *This was updated as of March 2022
  • 16.
    Oak Marr PumpStation Rehabilitate – Construction Project Capital Facilities – Wastewater Design and Construction Division – Collection Branch Questions & Answers 16 Capital Facilities – Wastewater Design and Construction Division – Collections Branch
  • 17.
    Additional Information For additionalinformation, please contact www.fairfaxcounty.gov/publicworks Oak Marr Pump Station Rehabilitate – Construction Project Christopher Mata, P.E. 703-324-5111, TTY 711 cmata0@fairfaxcounty.gov Capital Facilities – Wastewater Design and Construction Division – Collections Branch 17 Questions & Answers