Little Pimmit Run at Chesterbrook Road Stream Restoration
&
Little Pimmit Run Sanitary Sewer Realignment
January 20, 2022
Agenda
Environmental Benefits
Consequences
Vicinity Maps
Background
Goals
Channel Evolution Model
2
 Existing Conditions
 Design Options
 Typical Structures
 Community Teams
 Contact Information
 Questions
*Please hold questions until the end of the presentation.
Stormwater Planning Division
3
Environmental Benefits
Improve watershed conditions and reduce downstream
impacts through….
Control velocity
• Reduce erosion
• Protect infrastructure
• Protect vegetation
Restore riparian corridor
Restore instream habitat
Reduce risks to public health
Stormwater Consequences of Inaction
4
1. Channel erosion will continue
2. Tree concerns increase
 Greater risk near stream edge
 Safety concerns
 Future maintenance concerns
31-inch black walnut fell in August 2021
Wastewater Consequences of Inaction
5
• Emergency Sanitary Sewer Projects
• Sole focus on continuity of sanitary
sewer service
• Excessive cost
• No opportunity to design around other
environmental concerns, such as tree
save issues
• Release of wastewater into the environment
Concrete Encasement
around broken pipe
Downstream end
of broken sewer
Stream Flow
Vicinity Map (Big Picture)
6
7
Vicinity Map (Phase 1)
8
Vicinity Map (Phase 2)
9
Stream restoration background – How did we get here?
• Design initiation– May 2020
• Started meeting with property owners – February
2021
• Community meeting on pre-design/channel
alignments – April 2021
• Concept design submission – August 2021
• Value Engineering Study completed – November
2021
• Community meeting with Board of Supervisor –
December 2021
• Community meeting – January 2022
• Land Acquisition – (We are at this step)
 Easements required prior to final design
• Complete Design – 12 months
• Construction – To be determined
Wastewater background – How did we get here?
10
• Chesterbrook Road Emergency Project – Summer 2019
• Final Scoping Technical Memorandum – January 2020
• Professional Services Contract Execution – April 2021
• Community Meeting on stream restoration Pre-design/Channel
alignments – April 2021
• Final Preliminary Engineering Report – October 2021
• Community Meeting on Sanitary Realignment Preliminary
Engineering Report – October 2021
• Value Engineering Study completed – November 2021
• One joint study for both projects
• Community Meeting with Board of Supervisor – December 2021
• Community meeting – January 2022
• Design Contract Development – (We are at this step)
• Land Acquisition – (We are at this step)
• Complete Design
• Construction
11
Goals
1. Restore up to 7,500 feet of stream channel and tributaries
 Reduce erosion and sediment transport
2. Install new sanitary sewers serving over 500 single
family homes
3. Improve watershed conditions and reduce downstream
impacts
4. Improve and protect public infrastructure
5. Prevent costly emergency repairs
6. Reduce risk to public health and the environment
7. Maintain close coordination with stakeholders and
community
 Build partnerships with local organizations
Channel Evolutionary Model
12
Channel Evolution Impacts to Sanitary Sewers
13
• Sanitary Sewers (green line) become uncovered as
the stream channel evolves.
• Sewers with concrete encasements are vulnerable
because of the weight of the encasement coupled
with force from the stream flow (crossing X-5)
• Sewers without encasements lack protection against
impacts (crossings X-3 and X-2)
14
Sewer Crossing x5
Concrete Encasement
Stream flow upstream and
downstream of this crossing is
much deeper than further
upstream or downstream.
Channel Evolution Impacts to Sanitary Sewers
Concrete Encasement
Sewer crossing reduces area of stream
flow, which increases stream velocity
and erosion of channel bed & banks
15
Existing Bank Conditions – Phase 1
Trees significantly
undermined.
16
Existing Bank Conditions – Phase 1
Trail disconnected
from stream
crossing.
17
Existing Bank Conditions – Phase 1
Riprap from previous
stabilization is migrating.
18
Existing Conditions – Phase 2
Sewer Crossing x4
19
Existing Conditions – Phase 2
Stream Debris
damaged sewer
Sewer Crossing x3
Stream Debris
collecting on
the sewer
20
Existing Conditions – Phase 2
21
Existing Conditions – Phase 2
22
Existing Conditions – Phase 2
Sewer visibly bowed
Sewer crossing x2
Stream flow eroding
under sewer
23
Existing Conditions – Phase 2
Stream Design Options
24
• More impervious area = more water in channel
Options:
1) Restore to historic floodplain.
2) Develop nested channel.
3) Attempt to stabilize eroded bed and
banks in place.
Options - Restore to historic floodplain
25
Pros
• Greater area to dissipate energy and reduce
velocity.
• Reduce tree impacts compared to a nested
channel approach.
Cons
• Historic floodplain would activate more often
compared to the nested channel approach.
• Expanse of flood waters would be greater.
• Requires more fill to raise the channel.
Options - Develop nested channel
26
Pros
• Targets the creation of the stage 5 channel in the
channel evolutionary process.
• Reduces the impact to the 100-water surface
elevation compared to restoring the channel to
allow access to its historic floodplain.
Cons
• Benching can have a significant impact on trees
near the channel edge.
Options – Stabilize bed and banks in place
27
Pros
• Reduced tree impact.
• Reduced construction
Cons
• Long term stability remains a concern.
• Requires the use of more rock to provide localized
protection.
• Tree impacts still occur due to access.
Sanitary Design Options
28
Options:
1) Realign sanitary sewers
2) Protect sanitary sewers in place
3) A mixture of 1 & 2
Sanitary Options – Realign Sanitary Sewers
29
Install new sewers outside the stream channel
Pros
• Eliminates risks posed by the stream to the
sanitary sewers
• Reduced consequence of sewer failure
• Reduced future maintenance needs
• More flexibility for the stream restoration design
Cons
• Easement acquisition needed
• Greater tree impact
Sewer
Manhole
Stream
Sanitary Options – Protect in Place
30
Replace aging pipes which are now 40-60 years old
using current design standards
Pros
• No additional permanent easements needed
• Reduced construction footprint
• Reduced tree impact
Cons
• Stream Restoration designs around covering and
protecting sanitary sewers
• Raised stream channel may have floodplain impacts
• Increased long term maintenance needs
• More rock will be needed to protect the pipes
• Some sanitary sewer crossings cannot be covered
by the stream restoration project
• Stream meanders may circumvent armoring and
threaten sanitary crossings again
Sanitary Options – Both Realigning and Protecting in Place
31
Realign segments which cannot be protected in place
Pros
• Reduced tree impact
• Replace aging pipes which are now 40+ years old during Stream
Restoration disturbance
Cons
• Stream Restoration must design around covering and
reinforcing sanitary sewers
• Raised stream channel may have floodplain impacts
• Increased long term maintenance needs
• Construction will still require access
• More rock will be needed to protect the pipes
• Some sanitary sewer crossings cannot be covered by the
stream restoration project
Sewer
32
Typical Stream Structures Used – Cross Vanes
Normal Flow
Higher flows
(storm events)
Higher flows
(storm events)
• Typical stream
structures could
be applied in any
of the options.
33
Typical Stream Structures Used – Root Wads
34
Typical Stream Structures Used – Stone toe
35
Typical Stream Structures Used – Boulder Clusters
36
Construction Access Road
Develop Community Team
37
 Include the community in the design process.
1. Develop community team
• How many are interested?
• Where on the project are they located?
2. Participate in design meetings
• Great opportunity to engage design team
in detailed discussions.
• Offer input into potential ideas for
consideration.
• Share information back to community.
Please contact the Dranesville District Office, Fred
Wilkins, and Suzy Harding to join.
38
Contact Information
Sanitary Sewer Design
Suzy Harding– Project Manager
703-810-9727
Suzanne.Harding@fairfaxcounty.gov
Wastewater Design & Construction Division
703-324-5033, TTY 711
12000 Government Center Parkway
Suite 463
Fairfax, Virginia 22035
https://www.fairfaxcounty.gov/publicworks/
capital-projects/about/wastewater-design-
and-construction-division
To request this information in an alternate
format call 703-324-5500, TTY 711
Stream Restoration Design
Fred Wilkins – Project Manager
703-509-0511
Fred.Wilkins@fairfaxcounty.gov
Stormwater Planning Division
703-324-5500, TTY 711
12000 Government Center Parkway
Suite 449
Fairfax, Virginia 22035
www.fairfaxcounty.gov/publicworks/storm
water
To request this information in an alternate
format call 703-324-5500, TTY 711
Dranesville District Office
Dranesville@FairfaxCounty.gov
Website: https://www.fairfaxcounty.gov/publicworks/little-pimmit-run-chesterbrook-stream-restoration-sewer-alignment
39
Questions?

More Related Content

What's hot

Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingSpringfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Fairfax County
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury Forest
Fairfax County
 
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood  Stormwater Improvement Preliminary Design ReviewTucker Avenue Neighborhood  Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
Fairfax County
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Fairfax County
 
Sunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement ProjectSunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement Project
Fairfax County
 
Little Pimmit Run Community Meeting 10-4-2021
Little Pimmit Run Community Meeting 10-4-2021Little Pimmit Run Community Meeting 10-4-2021
Little Pimmit Run Community Meeting 10-4-2021
Fairfax County
 
Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1
Fairfax County
 
Huntington Levee Community Meeting
Huntington Levee Community MeetingHuntington Levee Community Meeting
Huntington Levee Community Meeting
Fairfax County
 
Pike Branch at Wilton Road Presentation
Pike Branch at Wilton Road PresentationPike Branch at Wilton Road Presentation
Pike Branch at Wilton Road Presentation
Fairfax County
 
Old Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity SewerOld Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity Sewer
Fairfax County
 
Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...
Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...
Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...
Fairfax County
 
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
  High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project  High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
Fairfax County
 
Belle View Pump Station Rehabilitation
Belle View Pump Station RehabilitationBelle View Pump Station Rehabilitation
Belle View Pump Station Rehabilitation
Fairfax County
 
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Fairfax County
 
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020
Fairfax County
 
Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016
Fairfax County
 
Huntington Levee Community Meeting: Oct. 26. 2016
Huntington Levee Community Meeting: Oct. 26. 2016Huntington Levee Community Meeting: Oct. 26. 2016
Huntington Levee Community Meeting: Oct. 26. 2016
Fairfax County
 
Historic Jail Roof Replacement
Historic Jail Roof ReplacementHistoric Jail Roof Replacement
Historic Jail Roof Replacement
Fairfax County
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015
Fairfax County
 
Crook at Mantua Elementary School Stream Restoration
Crook at Mantua Elementary School Stream RestorationCrook at Mantua Elementary School Stream Restoration
Crook at Mantua Elementary School Stream Restoration
Fairfax County
 

What's hot (20)

Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingSpringfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury Forest
 
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood  Stormwater Improvement Preliminary Design ReviewTucker Avenue Neighborhood  Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
 
Sunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement ProjectSunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement Project
 
Little Pimmit Run Community Meeting 10-4-2021
Little Pimmit Run Community Meeting 10-4-2021Little Pimmit Run Community Meeting 10-4-2021
Little Pimmit Run Community Meeting 10-4-2021
 
Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1
 
Huntington Levee Community Meeting
Huntington Levee Community MeetingHuntington Levee Community Meeting
Huntington Levee Community Meeting
 
Pike Branch at Wilton Road Presentation
Pike Branch at Wilton Road PresentationPike Branch at Wilton Road Presentation
Pike Branch at Wilton Road Presentation
 
Old Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity SewerOld Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity Sewer
 
Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...
Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...
Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...
 
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
  High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project  High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
 
Belle View Pump Station Rehabilitation
Belle View Pump Station RehabilitationBelle View Pump Station Rehabilitation
Belle View Pump Station Rehabilitation
 
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
 
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020
 
Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016
 
Huntington Levee Community Meeting: Oct. 26. 2016
Huntington Levee Community Meeting: Oct. 26. 2016Huntington Levee Community Meeting: Oct. 26. 2016
Huntington Levee Community Meeting: Oct. 26. 2016
 
Historic Jail Roof Replacement
Historic Jail Roof ReplacementHistoric Jail Roof Replacement
Historic Jail Roof Replacement
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015
 
Crook at Mantua Elementary School Stream Restoration
Crook at Mantua Elementary School Stream RestorationCrook at Mantua Elementary School Stream Restoration
Crook at Mantua Elementary School Stream Restoration
 

Similar to Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmit Run Sanitary Sewer Realignment - January 2022

Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Fairfax County
 
Lawrence Park PIC 3 slides
Lawrence Park PIC 3 slidesLawrence Park PIC 3 slides
Lawrence Park PIC 3 slides
Toronto Public Consultation Unit
 
Crook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectCrook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration Project
Fairfax County
 
Piney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter WayPiney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter Way
Fairfax County
 
Dead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration ProjectDead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration Project
Fairfax County
 
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Fairfax County
 
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019
Fairfax County
 
Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...
Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...
Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...
Fairfax County
 
Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015
Fairfax County
 
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Fairfax County
 
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectPaul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Fairfax County
 
Area39 pic 1 panels final
Area39 pic 1 panels finalArea39 pic 1 panels final
Area39 pic 1 panels final
Toronto Public Consultation Unit
 
Crook Branch at Mantua Elementary School Stream Restoration
Crook Branch at Mantua Elementary School Stream RestorationCrook Branch at Mantua Elementary School Stream Restoration
Crook Branch at Mantua Elementary School Stream Restoration
Fairfax County
 
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Fairfax County
 
Black Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display BoardsBlack Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display Boards
Toronto Public Consultation Unit
 
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Fairfax County
 
PIC 2 Display Boards
PIC 2 Display BoardsPIC 2 Display Boards
PIC 2 Display Boards
Toronto Public Consultation Unit
 
Fairfax County Leigh Meadow Stream Restoration July 2016
Fairfax County Leigh Meadow Stream Restoration July 2016Fairfax County Leigh Meadow Stream Restoration July 2016
Fairfax County Leigh Meadow Stream Restoration July 2016
Fairfax County
 
Sandra Manning Jones Trees on the River Uck
Sandra Manning Jones Trees on the River UckSandra Manning Jones Trees on the River Uck
Sandra Manning Jones Trees on the River Uck
objectiveassociates
 
Fairfax County Flood Response Strategy
Fairfax County Flood Response StrategyFairfax County Flood Response Strategy
Fairfax County Flood Response Strategy
Fairfax County
 

Similar to Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmit Run Sanitary Sewer Realignment - January 2022 (20)

Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
 
Lawrence Park PIC 3 slides
Lawrence Park PIC 3 slidesLawrence Park PIC 3 slides
Lawrence Park PIC 3 slides
 
Crook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectCrook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration Project
 
Piney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter WayPiney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter Way
 
Dead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration ProjectDead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration Project
 
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
 
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019
 
Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...
Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...
Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...
 
Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015
 
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
 
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectPaul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration Project
 
Area39 pic 1 panels final
Area39 pic 1 panels finalArea39 pic 1 panels final
Area39 pic 1 panels final
 
Crook Branch at Mantua Elementary School Stream Restoration
Crook Branch at Mantua Elementary School Stream RestorationCrook Branch at Mantua Elementary School Stream Restoration
Crook Branch at Mantua Elementary School Stream Restoration
 
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
 
Black Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display BoardsBlack Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display Boards
 
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
 
PIC 2 Display Boards
PIC 2 Display BoardsPIC 2 Display Boards
PIC 2 Display Boards
 
Fairfax County Leigh Meadow Stream Restoration July 2016
Fairfax County Leigh Meadow Stream Restoration July 2016Fairfax County Leigh Meadow Stream Restoration July 2016
Fairfax County Leigh Meadow Stream Restoration July 2016
 
Sandra Manning Jones Trees on the River Uck
Sandra Manning Jones Trees on the River UckSandra Manning Jones Trees on the River Uck
Sandra Manning Jones Trees on the River Uck
 
Fairfax County Flood Response Strategy
Fairfax County Flood Response StrategyFairfax County Flood Response Strategy
Fairfax County Flood Response Strategy
 

More from Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
Fairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Fairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Fairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
Fairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Fairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
Fairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
Fairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
Fairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Fairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
Fairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
Fairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
Fairfax County
 

More from Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Recently uploaded

digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
Kamal Acharya
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
itech2017
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 

Recently uploaded (20)

digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 

Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmit Run Sanitary Sewer Realignment - January 2022

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Little Pimmit Run at Chesterbrook Road Stream Restoration & Little Pimmit Run Sanitary Sewer Realignment January 20, 2022
  • 2. Agenda Environmental Benefits Consequences Vicinity Maps Background Goals Channel Evolution Model 2  Existing Conditions  Design Options  Typical Structures  Community Teams  Contact Information  Questions *Please hold questions until the end of the presentation. Stormwater Planning Division
  • 3. 3 Environmental Benefits Improve watershed conditions and reduce downstream impacts through…. Control velocity • Reduce erosion • Protect infrastructure • Protect vegetation Restore riparian corridor Restore instream habitat Reduce risks to public health
  • 4. Stormwater Consequences of Inaction 4 1. Channel erosion will continue 2. Tree concerns increase  Greater risk near stream edge  Safety concerns  Future maintenance concerns 31-inch black walnut fell in August 2021
  • 5. Wastewater Consequences of Inaction 5 • Emergency Sanitary Sewer Projects • Sole focus on continuity of sanitary sewer service • Excessive cost • No opportunity to design around other environmental concerns, such as tree save issues • Release of wastewater into the environment Concrete Encasement around broken pipe Downstream end of broken sewer Stream Flow
  • 6. Vicinity Map (Big Picture) 6
  • 9. 9 Stream restoration background – How did we get here? • Design initiation– May 2020 • Started meeting with property owners – February 2021 • Community meeting on pre-design/channel alignments – April 2021 • Concept design submission – August 2021 • Value Engineering Study completed – November 2021 • Community meeting with Board of Supervisor – December 2021 • Community meeting – January 2022 • Land Acquisition – (We are at this step)  Easements required prior to final design • Complete Design – 12 months • Construction – To be determined
  • 10. Wastewater background – How did we get here? 10 • Chesterbrook Road Emergency Project – Summer 2019 • Final Scoping Technical Memorandum – January 2020 • Professional Services Contract Execution – April 2021 • Community Meeting on stream restoration Pre-design/Channel alignments – April 2021 • Final Preliminary Engineering Report – October 2021 • Community Meeting on Sanitary Realignment Preliminary Engineering Report – October 2021 • Value Engineering Study completed – November 2021 • One joint study for both projects • Community Meeting with Board of Supervisor – December 2021 • Community meeting – January 2022 • Design Contract Development – (We are at this step) • Land Acquisition – (We are at this step) • Complete Design • Construction
  • 11. 11 Goals 1. Restore up to 7,500 feet of stream channel and tributaries  Reduce erosion and sediment transport 2. Install new sanitary sewers serving over 500 single family homes 3. Improve watershed conditions and reduce downstream impacts 4. Improve and protect public infrastructure 5. Prevent costly emergency repairs 6. Reduce risk to public health and the environment 7. Maintain close coordination with stakeholders and community  Build partnerships with local organizations
  • 13. Channel Evolution Impacts to Sanitary Sewers 13 • Sanitary Sewers (green line) become uncovered as the stream channel evolves. • Sewers with concrete encasements are vulnerable because of the weight of the encasement coupled with force from the stream flow (crossing X-5) • Sewers without encasements lack protection against impacts (crossings X-3 and X-2)
  • 14. 14 Sewer Crossing x5 Concrete Encasement Stream flow upstream and downstream of this crossing is much deeper than further upstream or downstream. Channel Evolution Impacts to Sanitary Sewers Concrete Encasement Sewer crossing reduces area of stream flow, which increases stream velocity and erosion of channel bed & banks
  • 15. 15 Existing Bank Conditions – Phase 1 Trees significantly undermined.
  • 16. 16 Existing Bank Conditions – Phase 1 Trail disconnected from stream crossing.
  • 17. 17 Existing Bank Conditions – Phase 1 Riprap from previous stabilization is migrating.
  • 18. 18 Existing Conditions – Phase 2 Sewer Crossing x4
  • 19. 19 Existing Conditions – Phase 2 Stream Debris damaged sewer Sewer Crossing x3 Stream Debris collecting on the sewer
  • 22. 22 Existing Conditions – Phase 2 Sewer visibly bowed Sewer crossing x2 Stream flow eroding under sewer
  • 24. Stream Design Options 24 • More impervious area = more water in channel Options: 1) Restore to historic floodplain. 2) Develop nested channel. 3) Attempt to stabilize eroded bed and banks in place.
  • 25. Options - Restore to historic floodplain 25 Pros • Greater area to dissipate energy and reduce velocity. • Reduce tree impacts compared to a nested channel approach. Cons • Historic floodplain would activate more often compared to the nested channel approach. • Expanse of flood waters would be greater. • Requires more fill to raise the channel.
  • 26. Options - Develop nested channel 26 Pros • Targets the creation of the stage 5 channel in the channel evolutionary process. • Reduces the impact to the 100-water surface elevation compared to restoring the channel to allow access to its historic floodplain. Cons • Benching can have a significant impact on trees near the channel edge.
  • 27. Options – Stabilize bed and banks in place 27 Pros • Reduced tree impact. • Reduced construction Cons • Long term stability remains a concern. • Requires the use of more rock to provide localized protection. • Tree impacts still occur due to access.
  • 28. Sanitary Design Options 28 Options: 1) Realign sanitary sewers 2) Protect sanitary sewers in place 3) A mixture of 1 & 2
  • 29. Sanitary Options – Realign Sanitary Sewers 29 Install new sewers outside the stream channel Pros • Eliminates risks posed by the stream to the sanitary sewers • Reduced consequence of sewer failure • Reduced future maintenance needs • More flexibility for the stream restoration design Cons • Easement acquisition needed • Greater tree impact Sewer Manhole Stream
  • 30. Sanitary Options – Protect in Place 30 Replace aging pipes which are now 40-60 years old using current design standards Pros • No additional permanent easements needed • Reduced construction footprint • Reduced tree impact Cons • Stream Restoration designs around covering and protecting sanitary sewers • Raised stream channel may have floodplain impacts • Increased long term maintenance needs • More rock will be needed to protect the pipes • Some sanitary sewer crossings cannot be covered by the stream restoration project • Stream meanders may circumvent armoring and threaten sanitary crossings again
  • 31. Sanitary Options – Both Realigning and Protecting in Place 31 Realign segments which cannot be protected in place Pros • Reduced tree impact • Replace aging pipes which are now 40+ years old during Stream Restoration disturbance Cons • Stream Restoration must design around covering and reinforcing sanitary sewers • Raised stream channel may have floodplain impacts • Increased long term maintenance needs • Construction will still require access • More rock will be needed to protect the pipes • Some sanitary sewer crossings cannot be covered by the stream restoration project Sewer
  • 32. 32 Typical Stream Structures Used – Cross Vanes Normal Flow Higher flows (storm events) Higher flows (storm events) • Typical stream structures could be applied in any of the options.
  • 33. 33 Typical Stream Structures Used – Root Wads
  • 34. 34 Typical Stream Structures Used – Stone toe
  • 35. 35 Typical Stream Structures Used – Boulder Clusters
  • 37. Develop Community Team 37  Include the community in the design process. 1. Develop community team • How many are interested? • Where on the project are they located? 2. Participate in design meetings • Great opportunity to engage design team in detailed discussions. • Offer input into potential ideas for consideration. • Share information back to community. Please contact the Dranesville District Office, Fred Wilkins, and Suzy Harding to join.
  • 38. 38 Contact Information Sanitary Sewer Design Suzy Harding– Project Manager 703-810-9727 Suzanne.Harding@fairfaxcounty.gov Wastewater Design & Construction Division 703-324-5033, TTY 711 12000 Government Center Parkway Suite 463 Fairfax, Virginia 22035 https://www.fairfaxcounty.gov/publicworks/ capital-projects/about/wastewater-design- and-construction-division To request this information in an alternate format call 703-324-5500, TTY 711 Stream Restoration Design Fred Wilkins – Project Manager 703-509-0511 Fred.Wilkins@fairfaxcounty.gov Stormwater Planning Division 703-324-5500, TTY 711 12000 Government Center Parkway Suite 449 Fairfax, Virginia 22035 www.fairfaxcounty.gov/publicworks/storm water To request this information in an alternate format call 703-324-5500, TTY 711 Dranesville District Office Dranesville@FairfaxCounty.gov Website: https://www.fairfaxcounty.gov/publicworks/little-pimmit-run-chesterbrook-stream-restoration-sewer-alignment

Editor's Notes

  1. Fred
  2. Fred
  3. Fred
  4. Fred As trees fall into the stream and cause blockages which cause further bank erosion, block downstream road culverts, damage sanitary infrastructure and flooding
  5. Suzy
  6. Suzy
  7. Suzy
  8. Suzy
  9. Fred
  10. Suzy
  11. Fred Sanitary Realignment will serve: 300 Single Family Homes south of Chesterbrook Road, 200 Single Family Homes north of Chesterbrook Road. Total number of homes is 511 11 Commercial properties – Two shopping centers, 1 school, 1 retirement community (316 units), 1 church
  12. Fred
  13. Suzy Concrete encasements were used in the 60s, 70s, and 80s to protect sewers installed in streams. 0 At this point, the County’s standards have evolved to require the use of Ductile Iron Pipe with a Steel Casing and a special design to protect sanitary sewers installed in
  14. Suzy
  15. Fred
  16. Fred
  17. Fred
  18. Suzy
  19. Suzy
  20. Fred
  21. Fred
  22. Suzy
  23. Fred
  24. Fred - Characteristics of the drainage area (1,759 acres at 35% impervious). - it is very difficult to just add rip-rap and expect it to remain stable
  25. Fred
  26. Fred
  27. Fred Also we would likely need to over excavate to place sufficient rock and maintain channel size to avoid increasing the flood plain - See pictures 2021-05-07
  28. Suzy
  29. Suzy
  30. Suzy Existing Sewers were installed between 1960 and 1985
  31. Suzy
  32. Fred
  33. Fred
  34. Fred
  35. Fred
  36. Fred
  37. Fred/Suzy