HIERARCHICAL GRID CONNECTION:
FUNCTIONS OF EACH LDC (Load Dispatch Centre):
NLDC:
 Supervision over the Regional Load Despatch Centres.
 Scheduling and Dispatch of electricity over the inter-regional links in accordance with
grid.
 Coordination with Regional Load Despatch Centres for achieving maximum economy and
efficiency in the operation of National Grid.
 Monitoring of operations and grid security of the National Grid.
 Supervision and control over the inter-regional links as may be required for ensuring
Stability of the power system.
 Coordination with Regional Load Despatch Centres for the energy accounting of inter-
regional exchange of power.
 Coordination for restoration of Synchronous Operation of national grid with Regional
Load Despatch Centres.
 Providing Operational feedback for national grid planning to the Authority and Central
Transmission Utility.
 Collection of such fee and charges from the generating companies or licensees involved in
the power system.
RLDC:
 System parameters and security.
 To ensure the integrated operation of the power system grid in the respective region.
 System studies, planning and contingency analysis.
 Daily scheduling and operational planning.
 Computation of energy despatch.
 Augmentation of telemetry, computing and communication facilities.
ELECTRICAL DEPARTMENT
150043109026
SLDC:
 Be responsible for optimum scheduling and despatch of electricity within a State, in
accordance with the contracts entered into with the licensees or the generating companies
operating in that State;
 Monitor grid operations
 Keep accounts of the quantity of electricity transmitted through the State grid
 Exercise supervision and control over the intra-state transmission system
 Be responsible for carrying out real time operations for grid control and despatch of
electricity within the State through secure and economic operation of the State grid in
accordance with the Grid Standards and the State Grid Code.
ALDC:
 Monitoring of system parameters and security.
 To ensure the integrated operation of the power system of HPSEBL with Northern Load
Dispatch Centre.
 System Studies and Planning.
 Analysis of tripping/disturbances and facilitating immediate remedial measures.
 Daily scheduling and operational planning.
 Facilitating bilateral exchanges.
 Computation of energy dispatch and drawl values.
 Augmentation of Computing and Communication facilities.
Locations of LDCs of India:
 All LDCs are operated by Power System Operation Corporation Limited (POSOCO).
 NLDC is located at New Delhi, which having back-up centre at Kolkata.
 Western Region LDC is located at Andheri (East), Mumbai.
 Eastern Region LDC is located at Kolkata.
 South Region LDC is located at Bangalore.
 Northern Region is located at New Delhi.
 Gujarat State LDC is located at Vadodara.
Real time Data of Northern Region LDC as below…
Sr. No. Name of Line Ckt Tower Length in km Conductor O & M
1 Badarpur S/C 136 Zebra RRVPNL
2 Bharatpur S/C 48 Zebra RRVPNL
3 Bhakra D/C 55 Zebra PSTCL
4 Ganguwal S/C 44 Zebra PSTCL
5 Hiranagar S/C 45 Zebra J & K

More Related Content

What's hot

Powerlinecommunicatin ppt
Powerlinecommunicatin pptPowerlinecommunicatin ppt
Powerlinecommunicatin ppt
bsmoni
 
TRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIATRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIA
Arun Muraleedharan
 
Congestion issues and its related management
Congestion issues and its related managementCongestion issues and its related management
Congestion issues and its related management
alpna1808
 
ATC for congestion management in deregulated power system
ATC for congestion management in deregulated power systemATC for congestion management in deregulated power system
ATC for congestion management in deregulated power system
Bhargav Pandya
 
Managing Power System
Managing Power SystemManaging Power System
Managing Power System
P K Agarwal
 
Analysis optimization and monitoring system
Analysis optimization and monitoring system Analysis optimization and monitoring system
Analysis optimization and monitoring system
slmnsvn
 
A solution to remote detection of illegal electricity.
A solution to remote detection of illegal electricity.A solution to remote detection of illegal electricity.
A solution to remote detection of illegal electricity.
Praveen Kumar
 

What's hot (20)

Powerlinecommunicatin ppt
Powerlinecommunicatin pptPowerlinecommunicatin ppt
Powerlinecommunicatin ppt
 
TRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIATRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIA
 
GSM based Prepaid Electricity Meter
GSM based Prepaid Electricity MeterGSM based Prepaid Electricity Meter
GSM based Prepaid Electricity Meter
 
CONTROLLING FREQUENCY DEVIATIONS IN INTERCONNECTED POWER SYSTEM USING SMART ...
CONTROLLING FREQUENCY DEVIATIONS IN INTERCONNECTED POWER SYSTEM USING SMART ...CONTROLLING FREQUENCY DEVIATIONS IN INTERCONNECTED POWER SYSTEM USING SMART ...
CONTROLLING FREQUENCY DEVIATIONS IN INTERCONNECTED POWER SYSTEM USING SMART ...
 
Congestion issues and its related management
Congestion issues and its related managementCongestion issues and its related management
Congestion issues and its related management
 
Differential game approach for the analysis of two area load frequency control
Differential game approach for the analysis of two area load frequency controlDifferential game approach for the analysis of two area load frequency control
Differential game approach for the analysis of two area load frequency control
 
ATC for congestion management in deregulated power system
ATC for congestion management in deregulated power systemATC for congestion management in deregulated power system
ATC for congestion management in deregulated power system
 
Managing Power System
Managing Power SystemManaging Power System
Managing Power System
 
Detection and Instantaneous Prevention of Power Theft
Detection and Instantaneous Prevention of Power TheftDetection and Instantaneous Prevention of Power Theft
Detection and Instantaneous Prevention of Power Theft
 
IRJET- Load Frequency Control of an Interconnected Power System using Grey Wo...
IRJET- Load Frequency Control of an Interconnected Power System using Grey Wo...IRJET- Load Frequency Control of an Interconnected Power System using Grey Wo...
IRJET- Load Frequency Control of an Interconnected Power System using Grey Wo...
 
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
 
Analysis optimization and monitoring system
Analysis optimization and monitoring system Analysis optimization and monitoring system
Analysis optimization and monitoring system
 
Power Grid and development in India
Power Grid and development in IndiaPower Grid and development in India
Power Grid and development in India
 
Load frequency control in co ordination with frequency controllable hvdc link...
Load frequency control in co ordination with frequency controllable hvdc link...Load frequency control in co ordination with frequency controllable hvdc link...
Load frequency control in co ordination with frequency controllable hvdc link...
 
A solution to remote detection of illegal electricity.
A solution to remote detection of illegal electricity.A solution to remote detection of illegal electricity.
A solution to remote detection of illegal electricity.
 
PREPAID ENERGY METER USING SMART CARD
PREPAID ENERGY METER USING  SMART CARD PREPAID ENERGY METER USING  SMART CARD
PREPAID ENERGY METER USING SMART CARD
 
Sjef Cobben - Power quality and electromagnetic compatibility.
Sjef Cobben - Power quality and electromagnetic compatibility.Sjef Cobben - Power quality and electromagnetic compatibility.
Sjef Cobben - Power quality and electromagnetic compatibility.
 
Electric09
Electric09Electric09
Electric09
 
Load flow analysis of 132 kv substation using etap
Load flow analysis of 132 kv substation using etapLoad flow analysis of 132 kv substation using etap
Load flow analysis of 132 kv substation using etap
 
Gsm based energy meter with cost indicator
Gsm based energy meter with cost indicatorGsm based energy meter with cost indicator
Gsm based energy meter with cost indicator
 

Similar to Hierarchical grid connection of Idia

9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre
Abanihi
 
EHVAC TRANSMISSION LINE MAINTENANCE TECHNIQUES IN INDIAN PERSPECTIVE-A REVIEW
EHVAC TRANSMISSION LINE MAINTENANCE TECHNIQUES IN INDIAN PERSPECTIVE-A REVIEWEHVAC TRANSMISSION LINE MAINTENANCE TECHNIQUES IN INDIAN PERSPECTIVE-A REVIEW
EHVAC TRANSMISSION LINE MAINTENANCE TECHNIQUES IN INDIAN PERSPECTIVE-A REVIEW
Dr. Babasaheb Ambedkar Technological University
 
Ephraim Issac Das (CV)
Ephraim Issac Das (CV)Ephraim Issac Das (CV)
Ephraim Issac Das (CV)
Ephraim Das
 

Similar to Hierarchical grid connection of Idia (20)

IEGC.pptx
IEGC.pptxIEGC.pptx
IEGC.pptx
 
TRAINING REPORT
TRAINING REPORTTRAINING REPORT
TRAINING REPORT
 
Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)
 
UNIT-1-PPT.pptx
UNIT-1-PPT.pptxUNIT-1-PPT.pptx
UNIT-1-PPT.pptx
 
SMART GRID.pptx
SMART GRID.pptxSMART GRID.pptx
SMART GRID.pptx
 
Automation in Power Sector-Dr.Priyabrata Patnaik,OERC.ppt
Automation in Power Sector-Dr.Priyabrata Patnaik,OERC.pptAutomation in Power Sector-Dr.Priyabrata Patnaik,OERC.ppt
Automation in Power Sector-Dr.Priyabrata Patnaik,OERC.ppt
 
9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre
 
IEGC_PPT_SLDC.ppt
IEGC_PPT_SLDC.pptIEGC_PPT_SLDC.ppt
IEGC_PPT_SLDC.ppt
 
Application of scada for system automation on smart grid rev2
Application of scada for system automation on smart grid rev2Application of scada for system automation on smart grid rev2
Application of scada for system automation on smart grid rev2
 
EHVAC TRANSMISSION LINE MAINTENANCE TECHNIQUES IN INDIAN PERSPECTIVE-A REVIEW
EHVAC TRANSMISSION LINE MAINTENANCE TECHNIQUES IN INDIAN PERSPECTIVE-A REVIEWEHVAC TRANSMISSION LINE MAINTENANCE TECHNIQUES IN INDIAN PERSPECTIVE-A REVIEW
EHVAC TRANSMISSION LINE MAINTENANCE TECHNIQUES IN INDIAN PERSPECTIVE-A REVIEW
 
Power sector mis
Power sector misPower sector mis
Power sector mis
 
Power grid operation in India
Power grid operation in IndiaPower grid operation in India
Power grid operation in India
 
Restructuring of power grid
Restructuring of power gridRestructuring of power grid
Restructuring of power grid
 
Grid code
Grid codeGrid code
Grid code
 
Ephraim Issac Das (CV)
Ephraim Issac Das (CV)Ephraim Issac Das (CV)
Ephraim Issac Das (CV)
 
Sysc 5302 101079892
Sysc 5302 101079892Sysc 5302 101079892
Sysc 5302 101079892
 
Power Scenario in India
Power Scenario in IndiaPower Scenario in India
Power Scenario in India
 
Smart Grid - Future Electric Grid
Smart Grid - Future Electric GridSmart Grid - Future Electric Grid
Smart Grid - Future Electric Grid
 
IRJET - Smart Grid Inspection Robot Exclusively Designed for High Power T...
IRJET -  	  Smart Grid Inspection Robot Exclusively Designed for High Power T...IRJET -  	  Smart Grid Inspection Robot Exclusively Designed for High Power T...
IRJET - Smart Grid Inspection Robot Exclusively Designed for High Power T...
 
Archita Kanungo-CV (1)
Archita Kanungo-CV (1)Archita Kanungo-CV (1)
Archita Kanungo-CV (1)
 

More from MAYURSINH RATHOOD (6)

Type of Transducers
Type of TransducersType of Transducers
Type of Transducers
 
Boost converter
Boost converterBoost converter
Boost converter
 
Case Study on Ramachandrapura
Case Study on RamachandrapuraCase Study on Ramachandrapura
Case Study on Ramachandrapura
 
Cockroft Walten Generator
Cockroft Walten Generator Cockroft Walten Generator
Cockroft Walten Generator
 
Gas welding
Gas weldingGas welding
Gas welding
 
Current Transformer
Current TransformerCurrent Transformer
Current Transformer
 

Recently uploaded

Accounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdfAccounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdf
YibeltalNibretu
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Po-Chuan Chen
 

Recently uploaded (20)

Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfDanh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
 
Advances in production technology of Grapes.pdf
Advances in production technology of Grapes.pdfAdvances in production technology of Grapes.pdf
Advances in production technology of Grapes.pdf
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
Gyanartha SciBizTech Quiz slideshare.pptx
Gyanartha SciBizTech Quiz slideshare.pptxGyanartha SciBizTech Quiz slideshare.pptx
Gyanartha SciBizTech Quiz slideshare.pptx
 
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxslides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
 
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfINU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
 
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptxMatatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
 
Mattingly "AI & Prompt Design: Limitations and Solutions with LLMs"
Mattingly "AI & Prompt Design: Limitations and Solutions with LLMs"Mattingly "AI & Prompt Design: Limitations and Solutions with LLMs"
Mattingly "AI & Prompt Design: Limitations and Solutions with LLMs"
 
Accounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdfAccounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdf
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
Salient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptxSalient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptx
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
 
Operations Management - Book1.p - Dr. Abdulfatah A. Salem
Operations Management - Book1.p  - Dr. Abdulfatah A. SalemOperations Management - Book1.p  - Dr. Abdulfatah A. Salem
Operations Management - Book1.p - Dr. Abdulfatah A. Salem
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 

Hierarchical grid connection of Idia

  • 1. OPEN ENDED PROBLEM HIERARCHICAL GRID CONNECTION OF INDIA MAYURSINH RATHOD - 150043109026
  • 2. ELECTRICAL DEPARTMENT 150043109026 HIERARCHICAL GRID CONNECTION: FUNCTIONS OF EACH LDC (Load Dispatch Centre): NLDC:  Supervision over the Regional Load Despatch Centres.  Scheduling and Dispatch of electricity over the inter-regional links in accordance with grid.  Coordination with Regional Load Despatch Centres for achieving maximum economy and efficiency in the operation of National Grid.  Monitoring of operations and grid security of the National Grid.  Supervision and control over the inter-regional links as may be required for ensuring Stability of the power system.  Coordination with Regional Load Despatch Centres for the energy accounting of inter- regional exchange of power.  Coordination for restoration of Synchronous Operation of national grid with Regional Load Despatch Centres.  Providing Operational feedback for national grid planning to the Authority and Central Transmission Utility.  Collection of such fee and charges from the generating companies or licensees involved in the power system. RLDC:  System parameters and security.  To ensure the integrated operation of the power system grid in the respective region.  System studies, planning and contingency analysis.  Daily scheduling and operational planning.  Computation of energy despatch.  Augmentation of telemetry, computing and communication facilities.
  • 3. ELECTRICAL DEPARTMENT 150043109026 SLDC:  Be responsible for optimum scheduling and despatch of electricity within a State, in accordance with the contracts entered into with the licensees or the generating companies operating in that State;  Monitor grid operations  Keep accounts of the quantity of electricity transmitted through the State grid  Exercise supervision and control over the intra-state transmission system  Be responsible for carrying out real time operations for grid control and despatch of electricity within the State through secure and economic operation of the State grid in accordance with the Grid Standards and the State Grid Code. ALDC:  Monitoring of system parameters and security.  To ensure the integrated operation of the power system of HPSEBL with Northern Load Dispatch Centre.  System Studies and Planning.  Analysis of tripping/disturbances and facilitating immediate remedial measures.  Daily scheduling and operational planning.  Facilitating bilateral exchanges.  Computation of energy dispatch and drawl values.  Augmentation of Computing and Communication facilities. Locations of LDCs of India:  All LDCs are operated by Power System Operation Corporation Limited (POSOCO).  NLDC is located at New Delhi, which having back-up centre at Kolkata.  Western Region LDC is located at Andheri (East), Mumbai.  Eastern Region LDC is located at Kolkata.  South Region LDC is located at Bangalore.  Northern Region is located at New Delhi.  Gujarat State LDC is located at Vadodara. Real time Data of Northern Region LDC as below… Sr. No. Name of Line Ckt Tower Length in km Conductor O & M 1 Badarpur S/C 136 Zebra RRVPNL 2 Bharatpur S/C 48 Zebra RRVPNL 3 Bhakra D/C 55 Zebra PSTCL 4 Ganguwal S/C 44 Zebra PSTCL 5 Hiranagar S/C 45 Zebra J & K