 The need for Production Planning
 Demand Forecasting
 Aggregate Production Planning
 Strategies of Aggregate Planning
 Workforce Planning
 Materials Requirement Planning
 Capacity Planning
 Production Control using JIT
 Shop-Floor Control

                                     3
Addresses decisions on

Acquisition
Utilization
Allocation
  of limited production resources

Resources include the production facilities, labor
and materials.
Constraints include the availability of resources,
delivery times for the products and management
policies.                                            4
Main objective is to take appropriate decisions.

Typical decisions

Work force level
Production lot sizes
Assignment of overtime
Sequencing of production runs



                                                   5
Process
                 Planning

   Re-planning                 Scheduling



Corrective
             Functions of
                                    Loading
 Action         PPC

                               Combining
   Follow – up
                               Functions


                 Dispatching
                                              6
Objective

To predict demand for planning purposes
Qualitative Demand Forecasting

Prediction Market
Delphi Technique



                                           7
Objective

To generate a medium-term production plan
To establish rough product mix
To anticipates bottlenecks
To align capacity and workforce plans.
It is usually done for next 2 to12 months.

Demand changes over a period of time at a faster
rate than the resources. Aggregate planning offers
strategies to absorb these fluctuations.             8
Guidelines for Aggregate Planning

Determine demand for each period
Consider company policies that may have impact
Determine capacities for each period
 Regular time, overtime, subcontracting, etc.
Identify backorder or inventory amount
Determine costs of operation
Continue through time horizon to calculate total cost
Develop alternate plans and compute cost for each
Select the plan that meets objectives
                                         Feb-12   9
Assumptions in Aggregate Planning

The regular output capacity is the same in all
 periods.
Cost is a linear function composed of unit cost
 and number of units.
Plans are feasible : sufficient inventory capacity
 exists to accommodate a plan, subcontractors with
 appropriate quality and capacity are standing by,
 and changes in output can be made as needed.

                                         Feb-12
                                                  Contd…
                                                     10
Assumptions in Aggregate Planning

All costs associated with a decision option can be
 represented by a lump sum or by unit cost that are
 independent of the quantity involved
Cost figures can be reasonably estimated and are
 constant for the planning horizon
Inventories are built up and drawn down at a
 uniform rate and output occurs at a uniform rate
 throughout each period

                                                 11
Output of Aggregate Planning

Production quantity from regular time, overtime
 and subcontracted time
Inventory held for determination of how much
 warehouse space and working capital is needed
Backlog or stock-out quantity for determining the
 customer service levels



                                                   12
Level plans

Use a constant workforce & produce similar
 quantities each time period
Use inventories and backorders to absorb
 demand peaks & valleys

Chase plans

Minimize finished good inventories by trying to keep
pace with demand fluctuations
                                                  13
Level plans
                             Production
                             Demand
Units




        Time

                                     14
Chase plans
                         Production
                         Demand
                          Series1
                          Series1
Units




        Time

                                    15
Hybrid or Mixed Strategies

Build-up inventory ahead of rising demand and
 use backorders to level extreme peaks
Layoff or furlough workers during lulls
Subcontract production or hire temporary
 workers to cover short-term peaks
Reassign workers to preventive maintenance
 during lulls
Influencing Demand

                                                 16
To find out and direct

Right people
Right place
Right time
Right price




                         17
Issues

Basic Staffing Calculations and labor hours
Working Environment
Flexibility/Agility
Quality




                                               18
MRP is a production planning and inventory control
system used to manage manufacturing processes.

An MRP system has 3 major objectives

Ensure materials are available for production and
 products are available for delivery to customers
Maintain the lowest possible level of inventory
Plan manufacturing activities, delivery schedules
 and purchasing activities

                                                 19
MRP steps

Takes output from the planning phase (master plan)
Combines that with the information from the
 inventory record and product structure records
Determines a schedule of timing and quantities for
 each item

The basic idea is to get the right materials to the right
place at the right time.

                                                      20
21
22
The process of determining the production
  capacity needed to meet changing demands

Maximum amount of work that an organization is
  capable of completing in a given period of time




                                                    23
Wrong Capacity




Feb-12   24
Classes of capacity planning

Lead strategy
Lag strategy
Match strategy




                               25
Issues

Stand-alone capacities and congestion effects
Capacity Strategy
Make-or-Buy
Flexibility
Scalability and learning curves




                                                 26
JIT is the technique for reducing inventories and
elimination of waste in the production system.

Objectives

To eliminate waste
To improve quality
To minimize lead time
To reduce costs
To improve productivity

                                                    27
Pull production and kanban

JIT is associated with pull systems.

Toyota was the first developer of kanban system.

Examples

McDonalds'
Office Xerox Paper

                                                   28
Issues

JIT Interdependencies
Implementing Issues
JIT purchasing
Expected Outcomes




                         29
Objective

To control flow of work through plant and coordinate
with other activities (e.g., quality control, preventive
maintenance, etc.)




                                                      30
Material Flow
  Control




                31
Functions

Gross Capacity Control
  Match line to demand by staffing (workers/shifts)
  Varying length of work week (or work day)
  Using outside vendors to augment capacity




                                             Contd…
                                                 32
Functions

Bottleneck Planning
  Handling of bottlenecks
  Cost of capacity is the key
  Stable bottlenecks are easier to manage

Span of Control
  Physically or logically decompose system
  Span of labor and process management
                                              33
Issues

Customization
  SFC is often the most highly customized activity in
  a plant.

Information Collection

  SFC represents the interface with the actual
  production processes and is therefore a good
  place to collect data.                    Contd…
                                                  34
Issues

Simplicity
  Departures from simple mechanisms must be
  carefully justified.




                                              35
THANK YOU

Harsh

  • 1.
  • 2.
    GROUP 7 034 HARSH PATHAK 035 GAURAV MISHRA 036 YASHU PANDEY 037 SACHLIN SINGH 038 TANU SHREE MAITI 040 CHETAN HEDGE 2
  • 3.
     The needfor Production Planning  Demand Forecasting  Aggregate Production Planning  Strategies of Aggregate Planning  Workforce Planning  Materials Requirement Planning  Capacity Planning  Production Control using JIT  Shop-Floor Control 3
  • 4.
    Addresses decisions on Acquisition Utilization Allocation of limited production resources Resources include the production facilities, labor and materials. Constraints include the availability of resources, delivery times for the products and management policies. 4
  • 5.
    Main objective isto take appropriate decisions. Typical decisions Work force level Production lot sizes Assignment of overtime Sequencing of production runs 5
  • 6.
    Process Planning Re-planning Scheduling Corrective Functions of Loading Action PPC Combining Follow – up Functions Dispatching 6
  • 7.
    Objective To predict demandfor planning purposes Qualitative Demand Forecasting Prediction Market Delphi Technique 7
  • 8.
    Objective To generate amedium-term production plan To establish rough product mix To anticipates bottlenecks To align capacity and workforce plans. It is usually done for next 2 to12 months. Demand changes over a period of time at a faster rate than the resources. Aggregate planning offers strategies to absorb these fluctuations. 8
  • 9.
    Guidelines for AggregatePlanning Determine demand for each period Consider company policies that may have impact Determine capacities for each period Regular time, overtime, subcontracting, etc. Identify backorder or inventory amount Determine costs of operation Continue through time horizon to calculate total cost Develop alternate plans and compute cost for each Select the plan that meets objectives Feb-12 9
  • 10.
    Assumptions in AggregatePlanning The regular output capacity is the same in all periods. Cost is a linear function composed of unit cost and number of units. Plans are feasible : sufficient inventory capacity exists to accommodate a plan, subcontractors with appropriate quality and capacity are standing by, and changes in output can be made as needed. Feb-12 Contd… 10
  • 11.
    Assumptions in AggregatePlanning All costs associated with a decision option can be represented by a lump sum or by unit cost that are independent of the quantity involved Cost figures can be reasonably estimated and are constant for the planning horizon Inventories are built up and drawn down at a uniform rate and output occurs at a uniform rate throughout each period 11
  • 12.
    Output of AggregatePlanning Production quantity from regular time, overtime and subcontracted time Inventory held for determination of how much warehouse space and working capital is needed Backlog or stock-out quantity for determining the customer service levels 12
  • 13.
    Level plans Use aconstant workforce & produce similar quantities each time period Use inventories and backorders to absorb demand peaks & valleys Chase plans Minimize finished good inventories by trying to keep pace with demand fluctuations 13
  • 14.
    Level plans Production Demand Units Time 14
  • 15.
    Chase plans Production Demand Series1 Series1 Units Time 15
  • 16.
    Hybrid or MixedStrategies Build-up inventory ahead of rising demand and use backorders to level extreme peaks Layoff or furlough workers during lulls Subcontract production or hire temporary workers to cover short-term peaks Reassign workers to preventive maintenance during lulls Influencing Demand 16
  • 17.
    To find outand direct Right people Right place Right time Right price 17
  • 18.
    Issues Basic Staffing Calculationsand labor hours Working Environment Flexibility/Agility Quality 18
  • 19.
    MRP is aproduction planning and inventory control system used to manage manufacturing processes. An MRP system has 3 major objectives Ensure materials are available for production and products are available for delivery to customers Maintain the lowest possible level of inventory Plan manufacturing activities, delivery schedules and purchasing activities 19
  • 20.
    MRP steps Takes outputfrom the planning phase (master plan) Combines that with the information from the inventory record and product structure records Determines a schedule of timing and quantities for each item The basic idea is to get the right materials to the right place at the right time. 20
  • 21.
  • 22.
  • 23.
    The process ofdetermining the production capacity needed to meet changing demands Maximum amount of work that an organization is capable of completing in a given period of time 23
  • 24.
  • 25.
    Classes of capacityplanning Lead strategy Lag strategy Match strategy 25
  • 26.
    Issues Stand-alone capacities andcongestion effects Capacity Strategy Make-or-Buy Flexibility Scalability and learning curves 26
  • 27.
    JIT is thetechnique for reducing inventories and elimination of waste in the production system. Objectives To eliminate waste To improve quality To minimize lead time To reduce costs To improve productivity 27
  • 28.
    Pull production andkanban JIT is associated with pull systems. Toyota was the first developer of kanban system. Examples McDonalds' Office Xerox Paper 28
  • 29.
  • 30.
    Objective To control flowof work through plant and coordinate with other activities (e.g., quality control, preventive maintenance, etc.) 30
  • 31.
    Material Flow Control 31
  • 32.
    Functions Gross Capacity Control Match line to demand by staffing (workers/shifts) Varying length of work week (or work day) Using outside vendors to augment capacity Contd… 32
  • 33.
    Functions Bottleneck Planning Handling of bottlenecks Cost of capacity is the key Stable bottlenecks are easier to manage Span of Control Physically or logically decompose system Span of labor and process management 33
  • 34.
    Issues Customization SFCis often the most highly customized activity in a plant. Information Collection SFC represents the interface with the actual production processes and is therefore a good place to collect data. Contd… 34
  • 35.
    Issues Simplicity Departuresfrom simple mechanisms must be carefully justified. 35
  • 36.