Welcome to all students ……..
A
Seminar Presents
on

HARDWARE & NETWORKING

Presenting by:
Micken Gandhi
HARDWARE
 WHAT

IS COMPUTER?
 COMPUTER ALL GENERATIONS
 INTRODUCTION OF HARDWARE
 WHAT IS OS?
(1) An electronic device for
storing and processing
data, typically in binary
form, according to instructions
given to it in a variable program.
(2) A person who makes
calculations, esp. with a
calculating machine.
FIRST GENERATION
SECOND GENERATION
THIRD GENERATION
FOURTH GENERATION
FIFTH GENERATION
Motherboard

Processor
Ram
Hard-Disk
SMPS
DVD

Writer
MOTHER BOARD
Types

of Motherboard
Manufacture Company of Motherboard
FOUR TYPES OF MOTHERBOARDS
(1)

XT Motherboards:
(2) AT Motherboards:
(3) Baby AT Motherboards:
(4) ATX Motherboards:
MANUFACTURE COMPANY OF MOTHERBOARD
 ASRock

 ASUS
 Biostar
 Digilite

 ECS
 Gigabyte
 Intel
 MSI
PROCESSOR
 Manufacture

(1) INTEL
(2) AMD

Company of Processor
INTEL ALL PROCESSOR
 INTEL
 INTEL
 INTEL
 INTEL
 INTEL
 INTEL
 INTEL
 INTEL
 INTEL

Atom
Celeron
Pentium
Pentium 4
Dual Core
Core 2 Duo
Core i3
Core i5
Core i7
AMD ALL PROCESSOR
 AMD

Sempron
 AMD Athlon
 AMD Phenom
RAM
 Types

of Ram

(1) DDR ( DDR1 )
(2) DDR2
(3) DDR3
TYPES OF DDR RAM






64 MB
128 MB
256 MB
512 MB
1 GB (1024 MB)
TYPES OF DDR2 RAM





1 GB
2 GB
4 GB
8 GB

(1024 MB)
(2048 MB)
(4096 MB)
(8192 MB)
TYPES OF DDR3 RAM
2 GB
 4 GB
 8 GB
 16 GB
 32 GB
 64 GB

MANUFACTURE COMPANY OF RAM










Transcend
King Ston
Strontium
Irvine
A-DATA
Corsair
G-Skill
EVM
HP
HARD-DISK
Two Types of Hard-Disk



IDE ( Integrated Drive Electronics )
SATA ( Serial ATA )
TYPES OF IDE HARD-DISK
10 GB
 20 GB
 40 GB
 80 GB
 160 GB

TYPES OF SATA HARD-DISK












160 GB
250 GB
320 GB
500 GB
750 GB
1 TB (1024 GB)
2 TB (2048 GB)
4 TB (4096 GB)
12 TB
24 TB
30 TB
MANUFACTURE COMPANY OF HARD-DISK
 Seagate
 Western

Digital (WD)

 Sony
 Hitachi
 HP
 Transcend
 Dell
FULL FORMS
KB - Kilo Byte
 MB - Mega Byte
 GB - Giga Byte
 TB - Tera Byte

WHAT IS OS?
 An

operating system (OS) is a collection of
software that manages computer
hardware resources and provides
common services for computer programs.
The operating system is an essential
component of the system software in a
computer system. Application programs
usually require an operating system to
function.
WINDOWS XP PROFESSIONAL DESKTOP
WINDOWS 7 ULTIMATE DESKTOP
WINDOWS 8 PRO START MENU
WINDOWS 8 PRO DESKTOP
WHAT IS NETWORK?


A computer network or data network is
a telecommunications network that
allows computers to exchange data. In computer
networks, networked computing devices (network
nodes) pass data to each other along data
connections. The connections (network links)
between nodes are established using either cable
media or wireless media. The best-known computer
network is the Internet.
NETWORK DEVICES
 Router
 Switch
 Modem
 Hub
 Data

Card (Dongle)
ROUTER
NORMAL SWITCH
24 PORT & 48 PORT SWITCH
NETWORK NORMAL HUB
NETWORK MODEM
DSL MODEM SETUP
USB DATA CARD (DONGLE)
INTERNATIONAL EXAM IN HARDWARE
& NETWORKING
COMPTIA HARDWARE(A+) EXAM
CERTIFICATE
COMPTIA NETWORK(N+) EXAM
CERTIFICATE
WINDOWS 7 CONFIGURING CERTIFICATE
RED HAT CERTIFIED ENGINEER (RHCE)
MICROSOFT OFFICE 2007 EXCEL
CERTIFICATE
CISCO CERTIFIED NETWORK ASSOCIATE
(CCNA)
INTERNATIONAL EXAM CODE
WINDOWS 7 CONFIGURING :- 70-680
 WINDOWS 8 CONFIGURING :- 70-687
 CompTIA HARDWARE (A+) PAPER 1 :- 220-801
PAPER 2 :- 220-802
 CompTIA NETWORK (N+) 2007 :- N10-003
 CompTIA NETWORK (N+) 2009 :- N10-004
 REDHAT CERTIFIED ENGINEER(RHCE) :- RH-302
 CISCO CERTIFIED NETWORK ASSOCIATE(CCNA) :- 640802

Hardware & networking

Hardware & networking