SUBJECT: WATER RESOURCE ENGINEERING (WRE)
SITARAM SAINI
ASSISTANT PROFESSOR
DEPARTMENT OF CIVIL ENGINEERING
Introduction
1. What is the gravity dam.
2. Need of gravity dam.
3. Forces acting on gravity dam.
4. Stability analysis of gravity dam.
5. Numerical problems on gravity dam.
2
Numerical problems on gravity dam.
Q.1. Determine the maximum and minimum vertical stresses to which the
foundation of the dam will be subjected from the following data:
1. Total overturning moment about toe(ΣMo ) = 1.2× 106 kN-M
2. Total resisting moment about toe(ΣMR ) = 2.5× 106 kN-M
3. Total vertical force above base (Σ V) = 6× 104kN
4. base width of the dam = 55m
No tail water depth at d/s. and d/s slope = 0.8:1
Answer :
_
𝑥
=
𝑀
𝑉
=
𝑀𝑅− 𝑀𝑂
𝑉
3
_
𝑥
=
2.5×106 −1.2×106
6×104 = 21.67m
e =
𝑏
2
- _
𝑥
= 55
2
− 21.67= 5.83m
Maximum vertical stress at toe:
fyd =
𝑉
𝑏
(1 +
6𝑒
𝑏
) =
6×104
55
(1 +
6×5.83
55
) = 1784.73
𝑘𝑁
𝑀2
Minimum vertical stress at heel:
fyu =
𝑉
𝑏
(1 −
6𝑒
𝑏
) =
6×104
55
(1 −
6×5.83
55
) = 397.09
𝑘𝑁
𝑀2
4
Q.2. Check the stability of the gravity dam shown in fig. for the reservoir empty
and reservoir full conditions. Also find the principal stresses and shear stresses at
toe and heel of the dam . Assume µ=0.75.consider
1. weight of dam.
2.water pressure.
3. uplift pressure.
Take the average shear strength (q)=1400kN/m2
Unit weight of concrete = 24kN/M3
Slope of d/s face = 0.8:1 (40/50) and Slope of u/s face = 0.1:1 (3/30)
5
S.
N
O
ITEM DESCRIPTION AND
DIMENSION
FORCE(KN) LEVER
ARM
FROM
TOE (M)
MOMENT ABOUT
TOE(KN-M)
VERTICAL HORIZONTAL (+)IVE (-)IVE
1 W1 .5X3X30X24 1080 48 51840
2 W2 7X65X24 10920 43.50 475020
3 W3 .5X40X50X24 24000 .67X40 640000
4 PH 9.81X62X62X.5 18854.82 .33X62 -389666.2
5 PV1 3X32X9.81 941.76 48.50 45675.36
6 PV2 .5X3X30X9.81 441.45 49 21631.05
7 U1 .33X62X9.81X8 -1621.9 46 -74608.32
8 U2 .5X.67X62X9.81X8 -1621.9 142X.33 -76770.88
9 U3 .5X.33X62X9.81X42 -4257.5 28 -119211.1
SUM OF FORCES&MOMENTS; 1-3 36000 1166860 0.0
1-6 37383.2 18854.82 1234166 -389666.2
1-9 29881.8 18854.82 1234166 -660256.6
6
1.0 WEIGHT OF THE DAM:
7M
3M
15M
32M
40M
62M 65M
30M
8M 42M
50M
Drainage gallery
𝛾𝐻 Uplift pressure diagram.
7
W2
W1 W3
2.0 WATER PRESSURE:
PV1
PH
62M =H PV2
H/3
9.81X62
8
3.0 UPLIFT-PRESSURE:
U1,U2,U3
U= 9.81(H`+1/3(H-H`))
BUT H`=0 ; U=9.81XH
9
1.) Check the stability of the gravity dam for the reservoir empty :
Forces 1 TO 3.
_
𝑥
=
𝑀
𝑉
=
1166860
36000
= 32.41 m
e =
𝑏
2
- _
𝑥
=
50
2
− 32.41= - 7.41m
𝑏
6
=
50
6
= 8.33 , e <
𝑏
6
Vertical stress at toe:
fyd =
𝑉
𝑏
(1 +
6𝑒
𝑏
) =
36000
50
(1 −
6×7.41
50
) = 79.78
𝑘𝑁
𝑀2
Vertical stress at heel:
fyu =
𝑉
𝑏
(1 −
6𝑒
𝑏
) =
36000
50
(1 +
6×7.41
50
) = 1360
𝑘𝑁
𝑀2
10
Principal stress at toe :
𝜎d = fyd 𝑠𝑒𝑐2
∅ = 79.78 (1+𝑡𝑎𝑛2
∅) = 79.78 (1+.82
) = 130.84
𝑘𝑁
𝑀2
shear stress at toe :
𝜏d = fyd tan∅ = 79.78× (.8/1) = 63.82
𝑘𝑁
𝑀2
Principal stress at heel :
𝜎𝑢 = fyu 𝑠𝑒𝑐2∅ = 1360.22 (1+𝑡𝑎𝑛2∅) =1360.22 (1+.12) = 1373.82
𝑘𝑁
𝑀2
shear stress at toe :
𝜏u = - fyu tan∅ = -1360.22 × (.1/1) = - 136.02
𝑘𝑁
𝑀2
Check for tension = no tension
Check for sliding = no sliding
Check for overturning = no overturning
11
2.) Check the stability of the gravity dam for reservoir full conditions:
_
𝑥
=
𝑀
𝑉
=
1234166.4−660256.60
29881.8
= 19.21 m
e =
𝑏
2
- _
𝑥
=
50
2
− 19.21= 5.79 m
𝑏
6
=
50
6
= 8.33 , e <
𝑏
6
Vertical stress at toe:
fyd =
𝑉
𝑏
(1 +
6𝑒
𝑏
) =
29881.83
50
(1 +
6 × 5.79
50
) =1012.87
𝑘𝑁
𝑀2
Vertical stress at heel:
fyu =
𝑉
𝑏
(1 −
6𝑒
𝑏
) =
29881.83
50
(1 −
6 × 5.79
50
) = 169.49
𝑘𝑁
𝑀2
12
Principal stress at toe :
𝜎d = fyd 𝑠𝑒𝑐2
∅ = 1012.87 (1+𝑡𝑎𝑛2
∅) = 1012.87 (1+.82
) = 1661.11
𝑘𝑁
𝑀2
shear stress at toe :
𝜏d = fyd tan∅ = 1012.87 × (.8/1) = 810.29
𝑘𝑁
𝑀2
Principal stress at heel :
𝜎𝑢 = fyu 𝑠𝑒𝑐2∅ = 169.49 (1+𝑡𝑎𝑛2∅) =169.49 (1+.12) = 171.18
𝑘𝑁
𝑀2
shear stress at toe :
𝜏u = - fyu tan∅ = -169.49 × (.1/1) = - 16.95
𝑘𝑁
𝑀2
Check for tension = no tension
Check for sliding =
F.S=
𝜇 𝑉
𝐻
=
.75 ×29881.83
18854.82
= 1.19 > 1
13
Check for overturning =
FO =
1234166.44
660256
= 1.87 > 1.50
Shear friction factor =
S.F.F =
𝜇 𝑉+𝑏𝑞
𝐻
=
.75 ×29881.83+50 ×1400
18854.82
= 4.90
14
15

More Related Content

What's hot

Numerical Problem and solution on Bearing Capacity ( Terzaghi and Meyerhof T...
Numerical Problem and solution on Bearing Capacity  ( Terzaghi and Meyerhof T...Numerical Problem and solution on Bearing Capacity  ( Terzaghi and Meyerhof T...
Numerical Problem and solution on Bearing Capacity ( Terzaghi and Meyerhof T...
Make Mannan
 
Numerical Question on Terzaghi Bearing Capacity Theory, Meyerhof Bearing Capa...
Numerical Question on Terzaghi Bearing Capacity Theory, Meyerhof Bearing Capa...Numerical Question on Terzaghi Bearing Capacity Theory, Meyerhof Bearing Capa...
Numerical Question on Terzaghi Bearing Capacity Theory, Meyerhof Bearing Capa...
Make Mannan
 
Basics of soil mechanics
Basics of soil mechanics   Basics of soil mechanics
Basics of soil mechanics
Amanpreet Tangri
 
Weirs on Permeable Foundations
Weirs on Permeable FoundationsWeirs on Permeable Foundations
Weirs on Permeable Foundations
Malla Reddy University
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
GAURAV. H .TANDON
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement design
Rohit Ranjan
 
Chapter 4 seepage theories
Chapter 4 seepage theoriesChapter 4 seepage theories
Chapter 4 seepage theories
Mohsin Siddique
 
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
Muhammad Irfan
 
Pile load test
Pile load testPile load test
Pile load test
Naman Kantesaria
 
Numerical problem and solution on pile capacity (usefulsearch.org) ( usefuls...
Numerical problem and solution on pile capacity (usefulsearch.org) ( usefuls...Numerical problem and solution on pile capacity (usefulsearch.org) ( usefuls...
Numerical problem and solution on pile capacity (usefulsearch.org) ( usefuls...
Make Mannan
 
Guntry girder
Guntry girderGuntry girder
Guntry girder
kajol panchal
 
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...
Make Mannan
 
Bearing capacity of Soil
Bearing capacity of SoilBearing capacity of Soil
Bearing capacity of Soil
Pirpasha Ujede
 
Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma
ABHISHEK SHARMA
 
TERZAGHI’S BEARING CAPACITY THEORY
TERZAGHI’S BEARING CAPACITY THEORYTERZAGHI’S BEARING CAPACITY THEORY
TERZAGHI’S BEARING CAPACITY THEORY
SANJEEV Wazir
 
Types of earth dams
Types of earth damsTypes of earth dams
Types of earth dams
saibabu48
 
coulomb's theory of earth pressure
 coulomb's theory of earth pressure coulomb's theory of earth pressure
coulomb's theory of earth pressure
SANJEEV Wazir
 
Well foundation
Well foundationWell foundation
Pile foundation
Pile  foundation Pile  foundation
Pile foundation
Sherchandra Shrestha
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920
INTEZAAR ALAM
 

What's hot (20)

Numerical Problem and solution on Bearing Capacity ( Terzaghi and Meyerhof T...
Numerical Problem and solution on Bearing Capacity  ( Terzaghi and Meyerhof T...Numerical Problem and solution on Bearing Capacity  ( Terzaghi and Meyerhof T...
Numerical Problem and solution on Bearing Capacity ( Terzaghi and Meyerhof T...
 
Numerical Question on Terzaghi Bearing Capacity Theory, Meyerhof Bearing Capa...
Numerical Question on Terzaghi Bearing Capacity Theory, Meyerhof Bearing Capa...Numerical Question on Terzaghi Bearing Capacity Theory, Meyerhof Bearing Capa...
Numerical Question on Terzaghi Bearing Capacity Theory, Meyerhof Bearing Capa...
 
Basics of soil mechanics
Basics of soil mechanics   Basics of soil mechanics
Basics of soil mechanics
 
Weirs on Permeable Foundations
Weirs on Permeable FoundationsWeirs on Permeable Foundations
Weirs on Permeable Foundations
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement design
 
Chapter 4 seepage theories
Chapter 4 seepage theoriesChapter 4 seepage theories
Chapter 4 seepage theories
 
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
 
Pile load test
Pile load testPile load test
Pile load test
 
Numerical problem and solution on pile capacity (usefulsearch.org) ( usefuls...
Numerical problem and solution on pile capacity (usefulsearch.org) ( usefuls...Numerical problem and solution on pile capacity (usefulsearch.org) ( usefuls...
Numerical problem and solution on pile capacity (usefulsearch.org) ( usefuls...
 
Guntry girder
Guntry girderGuntry girder
Guntry girder
 
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...
 
Bearing capacity of Soil
Bearing capacity of SoilBearing capacity of Soil
Bearing capacity of Soil
 
Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma
 
TERZAGHI’S BEARING CAPACITY THEORY
TERZAGHI’S BEARING CAPACITY THEORYTERZAGHI’S BEARING CAPACITY THEORY
TERZAGHI’S BEARING CAPACITY THEORY
 
Types of earth dams
Types of earth damsTypes of earth dams
Types of earth dams
 
coulomb's theory of earth pressure
 coulomb's theory of earth pressure coulomb's theory of earth pressure
coulomb's theory of earth pressure
 
Well foundation
Well foundationWell foundation
Well foundation
 
Pile foundation
Pile  foundation Pile  foundation
Pile foundation
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920
 

Similar to Gravity Dam (numerical problem ) BY SITARAM SAINI

problemas-geotecnia-resueltos
 problemas-geotecnia-resueltos problemas-geotecnia-resueltos
problemas-geotecnia-resueltos
DiegoBaez32
 
exercises 2 supplementary.pdf
exercises 2 supplementary.pdfexercises 2 supplementary.pdf
exercises 2 supplementary.pdf
MuhammadAjmal326519
 
Dinamica estructural 170614215831
Dinamica estructural 170614215831Dinamica estructural 170614215831
Dinamica estructural 170614215831
Miguel Ángel
 
STRAIN MEASURING TECHNIQUES & APPLICATIONS
STRAIN MEASURING TECHNIQUES & APPLICATIONS  STRAIN MEASURING TECHNIQUES & APPLICATIONS
STRAIN MEASURING TECHNIQUES & APPLICATIONS
ASHIKA DILSHAN
 
9789774541100
97897745411009789774541100
9789774541100
sushsky1
 
Car-Jack.pptx
Car-Jack.pptxCar-Jack.pptx
Car-Jack.pptx
AhmadQadi1
 
BENDING STRESS IN A BEAMS
BENDING STRESS IN A BEAMSBENDING STRESS IN A BEAMS
BENDING STRESS IN A BEAMS
Vj NiroSh
 
Lecture 6.pdf
Lecture 6.pdfLecture 6.pdf
Lecture 6.pdf
MishkatAhmedNaoshad
 
009b (PPT) Viscous Flow -2.pdf .
009b (PPT) Viscous Flow -2.pdf           .009b (PPT) Viscous Flow -2.pdf           .
009b (PPT) Viscous Flow -2.pdf .
happycocoman
 
solucionario mecanica vectorial para ingenieros - beer & johnston (dinamica...
 solucionario mecanica vectorial para ingenieros - beer  & johnston (dinamica... solucionario mecanica vectorial para ingenieros - beer  & johnston (dinamica...
solucionario mecanica vectorial para ingenieros - beer & johnston (dinamica...Sohar Carr
 
Chapter 6-powerpoint-1224302877703008-9
Chapter 6-powerpoint-1224302877703008-9Chapter 6-powerpoint-1224302877703008-9
Chapter 6-powerpoint-1224302877703008-9
Cleophas Rwemera
 
2d beam element with combined loading bending axial and torsion
2d beam element with combined loading bending axial and torsion2d beam element with combined loading bending axial and torsion
2d beam element with combined loading bending axial and torsion
rro7560
 
Episode 5 liquid solid separation horizontal diaphragm filter press
Episode 5   liquid solid separation horizontal diaphragm filter pressEpisode 5   liquid solid separation horizontal diaphragm filter press
Episode 5 liquid solid separation horizontal diaphragm filter press
SAJJAD KHUDHUR ABBAS
 
TDS Lec 2a-Dams.pdf
TDS Lec 2a-Dams.pdfTDS Lec 2a-Dams.pdf
TDS Lec 2a-Dams.pdf
YAHAMPATHARACHCHIGEP
 
Solucionario_Diseno_en_Ingenieria_Mecani (1).pdf
Solucionario_Diseno_en_Ingenieria_Mecani (1).pdfSolucionario_Diseno_en_Ingenieria_Mecani (1).pdf
Solucionario_Diseno_en_Ingenieria_Mecani (1).pdf
DannyCoronel5
 
Solucionario_Diseno_en_Ingenieria_Mecani.pdf
Solucionario_Diseno_en_Ingenieria_Mecani.pdfSolucionario_Diseno_en_Ingenieria_Mecani.pdf
Solucionario_Diseno_en_Ingenieria_Mecani.pdf
franciscoantoniomonr1
 
Sd i-module3- rajesh sir
Sd i-module3- rajesh sirSd i-module3- rajesh sir
Sd i-module3- rajesh sir
SHAMJITH KM
 
Examples on stress distribution
Examples on stress distributionExamples on stress distribution
Examples on stress distribution
Malika khalil
 
WavesNotesAnswers.pdf
WavesNotesAnswers.pdfWavesNotesAnswers.pdf
WavesNotesAnswers.pdf
cfisicaster
 

Similar to Gravity Dam (numerical problem ) BY SITARAM SAINI (20)

problemas-geotecnia-resueltos
 problemas-geotecnia-resueltos problemas-geotecnia-resueltos
problemas-geotecnia-resueltos
 
exercises 2 supplementary.pdf
exercises 2 supplementary.pdfexercises 2 supplementary.pdf
exercises 2 supplementary.pdf
 
Dinamica estructural 170614215831
Dinamica estructural 170614215831Dinamica estructural 170614215831
Dinamica estructural 170614215831
 
STRAIN MEASURING TECHNIQUES & APPLICATIONS
STRAIN MEASURING TECHNIQUES & APPLICATIONS  STRAIN MEASURING TECHNIQUES & APPLICATIONS
STRAIN MEASURING TECHNIQUES & APPLICATIONS
 
9789774541100
97897745411009789774541100
9789774541100
 
Car-Jack.pptx
Car-Jack.pptxCar-Jack.pptx
Car-Jack.pptx
 
BENDING STRESS IN A BEAMS
BENDING STRESS IN A BEAMSBENDING STRESS IN A BEAMS
BENDING STRESS IN A BEAMS
 
Lecture 6.pdf
Lecture 6.pdfLecture 6.pdf
Lecture 6.pdf
 
009b (PPT) Viscous Flow -2.pdf .
009b (PPT) Viscous Flow -2.pdf           .009b (PPT) Viscous Flow -2.pdf           .
009b (PPT) Viscous Flow -2.pdf .
 
solucionario mecanica vectorial para ingenieros - beer & johnston (dinamica...
 solucionario mecanica vectorial para ingenieros - beer  & johnston (dinamica... solucionario mecanica vectorial para ingenieros - beer  & johnston (dinamica...
solucionario mecanica vectorial para ingenieros - beer & johnston (dinamica...
 
Chapter 6-powerpoint-1224302877703008-9
Chapter 6-powerpoint-1224302877703008-9Chapter 6-powerpoint-1224302877703008-9
Chapter 6-powerpoint-1224302877703008-9
 
2d beam element with combined loading bending axial and torsion
2d beam element with combined loading bending axial and torsion2d beam element with combined loading bending axial and torsion
2d beam element with combined loading bending axial and torsion
 
Episode 5 liquid solid separation horizontal diaphragm filter press
Episode 5   liquid solid separation horizontal diaphragm filter pressEpisode 5   liquid solid separation horizontal diaphragm filter press
Episode 5 liquid solid separation horizontal diaphragm filter press
 
TDS Lec 2a-Dams.pdf
TDS Lec 2a-Dams.pdfTDS Lec 2a-Dams.pdf
TDS Lec 2a-Dams.pdf
 
Solucionario_Diseno_en_Ingenieria_Mecani (1).pdf
Solucionario_Diseno_en_Ingenieria_Mecani (1).pdfSolucionario_Diseno_en_Ingenieria_Mecani (1).pdf
Solucionario_Diseno_en_Ingenieria_Mecani (1).pdf
 
Solucionario_Diseno_en_Ingenieria_Mecani.pdf
Solucionario_Diseno_en_Ingenieria_Mecani.pdfSolucionario_Diseno_en_Ingenieria_Mecani.pdf
Solucionario_Diseno_en_Ingenieria_Mecani.pdf
 
Sd i-module3- rajesh sir
Sd i-module3- rajesh sirSd i-module3- rajesh sir
Sd i-module3- rajesh sir
 
New grid design
New grid designNew grid design
New grid design
 
Examples on stress distribution
Examples on stress distributionExamples on stress distribution
Examples on stress distribution
 
WavesNotesAnswers.pdf
WavesNotesAnswers.pdfWavesNotesAnswers.pdf
WavesNotesAnswers.pdf
 

Recently uploaded

The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 

Recently uploaded (20)

The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 

Gravity Dam (numerical problem ) BY SITARAM SAINI

  • 1. Swami Keshvanand Institute of Technology Management & Gramothan Jaipur 1 SUBJECT: WATER RESOURCE ENGINEERING (WRE) SITARAM SAINI ASSISTANT PROFESSOR DEPARTMENT OF CIVIL ENGINEERING
  • 2. Introduction 1. What is the gravity dam. 2. Need of gravity dam. 3. Forces acting on gravity dam. 4. Stability analysis of gravity dam. 5. Numerical problems on gravity dam. 2
  • 3. Numerical problems on gravity dam. Q.1. Determine the maximum and minimum vertical stresses to which the foundation of the dam will be subjected from the following data: 1. Total overturning moment about toe(ΣMo ) = 1.2× 106 kN-M 2. Total resisting moment about toe(ΣMR ) = 2.5× 106 kN-M 3. Total vertical force above base (Σ V) = 6× 104kN 4. base width of the dam = 55m No tail water depth at d/s. and d/s slope = 0.8:1 Answer : _ 𝑥 = 𝑀 𝑉 = 𝑀𝑅− 𝑀𝑂 𝑉 3
  • 4. _ 𝑥 = 2.5×106 −1.2×106 6×104 = 21.67m e = 𝑏 2 - _ 𝑥 = 55 2 − 21.67= 5.83m Maximum vertical stress at toe: fyd = 𝑉 𝑏 (1 + 6𝑒 𝑏 ) = 6×104 55 (1 + 6×5.83 55 ) = 1784.73 𝑘𝑁 𝑀2 Minimum vertical stress at heel: fyu = 𝑉 𝑏 (1 − 6𝑒 𝑏 ) = 6×104 55 (1 − 6×5.83 55 ) = 397.09 𝑘𝑁 𝑀2 4
  • 5. Q.2. Check the stability of the gravity dam shown in fig. for the reservoir empty and reservoir full conditions. Also find the principal stresses and shear stresses at toe and heel of the dam . Assume µ=0.75.consider 1. weight of dam. 2.water pressure. 3. uplift pressure. Take the average shear strength (q)=1400kN/m2 Unit weight of concrete = 24kN/M3 Slope of d/s face = 0.8:1 (40/50) and Slope of u/s face = 0.1:1 (3/30) 5
  • 6. S. N O ITEM DESCRIPTION AND DIMENSION FORCE(KN) LEVER ARM FROM TOE (M) MOMENT ABOUT TOE(KN-M) VERTICAL HORIZONTAL (+)IVE (-)IVE 1 W1 .5X3X30X24 1080 48 51840 2 W2 7X65X24 10920 43.50 475020 3 W3 .5X40X50X24 24000 .67X40 640000 4 PH 9.81X62X62X.5 18854.82 .33X62 -389666.2 5 PV1 3X32X9.81 941.76 48.50 45675.36 6 PV2 .5X3X30X9.81 441.45 49 21631.05 7 U1 .33X62X9.81X8 -1621.9 46 -74608.32 8 U2 .5X.67X62X9.81X8 -1621.9 142X.33 -76770.88 9 U3 .5X.33X62X9.81X42 -4257.5 28 -119211.1 SUM OF FORCES&MOMENTS; 1-3 36000 1166860 0.0 1-6 37383.2 18854.82 1234166 -389666.2 1-9 29881.8 18854.82 1234166 -660256.6 6
  • 7. 1.0 WEIGHT OF THE DAM: 7M 3M 15M 32M 40M 62M 65M 30M 8M 42M 50M Drainage gallery 𝛾𝐻 Uplift pressure diagram. 7 W2 W1 W3
  • 8. 2.0 WATER PRESSURE: PV1 PH 62M =H PV2 H/3 9.81X62 8
  • 10. 1.) Check the stability of the gravity dam for the reservoir empty : Forces 1 TO 3. _ 𝑥 = 𝑀 𝑉 = 1166860 36000 = 32.41 m e = 𝑏 2 - _ 𝑥 = 50 2 − 32.41= - 7.41m 𝑏 6 = 50 6 = 8.33 , e < 𝑏 6 Vertical stress at toe: fyd = 𝑉 𝑏 (1 + 6𝑒 𝑏 ) = 36000 50 (1 − 6×7.41 50 ) = 79.78 𝑘𝑁 𝑀2 Vertical stress at heel: fyu = 𝑉 𝑏 (1 − 6𝑒 𝑏 ) = 36000 50 (1 + 6×7.41 50 ) = 1360 𝑘𝑁 𝑀2 10
  • 11. Principal stress at toe : 𝜎d = fyd 𝑠𝑒𝑐2 ∅ = 79.78 (1+𝑡𝑎𝑛2 ∅) = 79.78 (1+.82 ) = 130.84 𝑘𝑁 𝑀2 shear stress at toe : 𝜏d = fyd tan∅ = 79.78× (.8/1) = 63.82 𝑘𝑁 𝑀2 Principal stress at heel : 𝜎𝑢 = fyu 𝑠𝑒𝑐2∅ = 1360.22 (1+𝑡𝑎𝑛2∅) =1360.22 (1+.12) = 1373.82 𝑘𝑁 𝑀2 shear stress at toe : 𝜏u = - fyu tan∅ = -1360.22 × (.1/1) = - 136.02 𝑘𝑁 𝑀2 Check for tension = no tension Check for sliding = no sliding Check for overturning = no overturning 11
  • 12. 2.) Check the stability of the gravity dam for reservoir full conditions: _ 𝑥 = 𝑀 𝑉 = 1234166.4−660256.60 29881.8 = 19.21 m e = 𝑏 2 - _ 𝑥 = 50 2 − 19.21= 5.79 m 𝑏 6 = 50 6 = 8.33 , e < 𝑏 6 Vertical stress at toe: fyd = 𝑉 𝑏 (1 + 6𝑒 𝑏 ) = 29881.83 50 (1 + 6 × 5.79 50 ) =1012.87 𝑘𝑁 𝑀2 Vertical stress at heel: fyu = 𝑉 𝑏 (1 − 6𝑒 𝑏 ) = 29881.83 50 (1 − 6 × 5.79 50 ) = 169.49 𝑘𝑁 𝑀2 12
  • 13. Principal stress at toe : 𝜎d = fyd 𝑠𝑒𝑐2 ∅ = 1012.87 (1+𝑡𝑎𝑛2 ∅) = 1012.87 (1+.82 ) = 1661.11 𝑘𝑁 𝑀2 shear stress at toe : 𝜏d = fyd tan∅ = 1012.87 × (.8/1) = 810.29 𝑘𝑁 𝑀2 Principal stress at heel : 𝜎𝑢 = fyu 𝑠𝑒𝑐2∅ = 169.49 (1+𝑡𝑎𝑛2∅) =169.49 (1+.12) = 171.18 𝑘𝑁 𝑀2 shear stress at toe : 𝜏u = - fyu tan∅ = -169.49 × (.1/1) = - 16.95 𝑘𝑁 𝑀2 Check for tension = no tension Check for sliding = F.S= 𝜇 𝑉 𝐻 = .75 ×29881.83 18854.82 = 1.19 > 1 13
  • 14. Check for overturning = FO = 1234166.44 660256 = 1.87 > 1.50 Shear friction factor = S.F.F = 𝜇 𝑉+𝑏𝑞 𝐻 = .75 ×29881.83+50 ×1400 18854.82 = 4.90 14
  • 15. 15