• Gantry girders are laterally unsupported beams to carry
heavy loads from place to place at the construction sites,
mostly these are of steel material.
• A girder is a support beam used in construction.
• It is the main horizontal support of a structure which supports
smaller beams. Girders often have an I-beam cross section
composed of two load-bearing flanges separated by a
stabilizing web, but may also have a box shape, Z shape and other
forms.
• Gantry girders or crane girders carry hand operated or electrically
operated overhead cranes in industrial building such as factories,
workshops, steel work , etc. to lift heavy materials, equipment etc.
and to carry them form one location to the other, within the building .
3
Components
The essential component
of crane system are :
1. crane girder or crane
bridge or cross girder
2. Trolley or crab
3. Gantry Girder
4. Crane rails
4
Crane Notations
5
Loads on Gantry Girder
1) Vertical Loads
from crane
2) Impact load
from crane
3) Longitudinal
horizontal
force(Drag
force)
4) Lateral
load(surge load)
6
Additional impact loads on cranes (IS:875)
7
Types of Gantry Girders
8
Limiting Deflection
9
Maximum Load Effects
10
Max. S.F., B.M., and Deflection
11
Two Cranes at the Same Span
12
Max. BM for Two Cranes At the Same
Span
13
Design Procedure
 Assume that the lateral load is resisted entirely by the top flange of
the beam plus any reinforcing plates, channels etc. and the vertical
load is resisted by the combined beam.
1. Find the maximum wheel load: This load is maximum when the
trolley is closest to the gantry girder. Increase it for the impact
2. Calculate the maximum bending moment in the gantry girder due
to vertical loads.
3. To simplify the calculations, add the maximum bending moment
due to dead load to the maximum wheel load moment.
4. The maximum shear force is calculated. When the gantry is not
laterally supported, the following may be used to select a trail
section.
Zp = Mu / fy Zp (trial) = k Zp (k = 1.40-1.50)
Economic depth ≈ 1/12th of the span.
Width of flange ≈ 1/40 to 1/30th of the span
14
5.The plastic section modulus of the assumed combined section
Mp = 2 fy A / 2 = A fy
where A is called the plastic modulus Zp
6. Check for moment capacity of the whole section (as lateral support
is provided at the compression flange)
Mcz = βb Zp fy ≤ 1.2 Ze fy / γm0 <Mu
7.Check top flange for bending in both the axes using the interaction
equation
(My / Mndy)+ (M2/Mndz) ≤ 1.0
8. If the top (compression) flange is not supported, Check for buckling
resistance in the same way as in step 6 but replacing fy with the
design bending compressive stress fbd.
9. Check web of the girder at points of concentrated load for local
buckling or local crushing, and provide load carrying/ bearing
stiffeners, if necessary.
10. Check for deflection under working loads
15
Design Check
• Check for moment capacity
• Check for shear capacity
• Check for Buckling Resistance
• Check for Local Buckling
• Check for Deflection
16
Design a gantry girder to be used in an industrial
building carrying a manually operated overhead traveling
crane for the following data:
• Crane capacity - 200kN
• Self-weight of the crane girder excluding trolley - 200kN
• Self-weight of the trolley, electric motor, hook, etc. - 40kN
• Approximate minimum approach of the crane hook to the
gantry girder - 1.20m
• Wheel base - 3.5m
• c/c distance between gantry rails - 16m
• c/c distance between columns (span of gantry girder) - 8m
• Self weight of rail section - 300N/m
• Diameter of crane wheels - 150mm
• Steel is of grade Fe 410.
Design also the field welded connection if required. The
support bracket connection need to designed.
17
SOLUTION :
For Fe410 grade of steel:
 fu = 410 Mpa
 fy = fyw = fyf = 410 MPa
For hand operated OT crane:
 Lateral loads = 5% of maximum static wheel load
 Longitudinal loads = 5% of weight of crab and weight lifted
 Maximum permissible deflection = L/500
Partial safety factors
 ‫ע‬m0 = 1.10
 ‫ע‬mw = 1.50 (for site welds)
Load factor
 ‫ע‬m1 = 1.50
ξ = ξw = ξf = √ (250/ fy) = √ (250/ 250) = 1.0
18
STEP 1: CALCULATION OF DESIGN FORCES
Maximum wheel load:
 Maximum concentrated load on crane = 200 + 40 = 240kN
 Maximum factored load on crane = 1.5 x 240 = 360kN
 The crane will carry the self-weight as a UDL = 200/16 = 12.5 kN/m
 Factored uniform load = 1.5 x 12.5 = 18.75kN/m
For maximum reaction on the gantry girder the loads are placed on the
crane girder as shown in the figure below,
19
Taking moment about B,
RA x 16 = 360 x (16 - 1.2) + (18.75 x 16 x 16) / 2
RA = 483kN
RB = 177kN
The reaction from the crane girder is distributed equally on the
two wheels at the end of the crane girder.
Therefore, Maximum wheel load on each = 483/2 = 241.5 kN
wheel of the crane
STEP 2: CALCULATION OF MAXIMUM BM & SF:
Maximum Bending Moment:
 It consists of maximum moments caused by the moving wheel
loads on the gantry girder and self weight of the gantry girder.
20
For Maximum Bending Moment, the wheel loads shall be placed as
shown in figure.
The calculation of maximum bending moments due to wheel loads and
self weight of gantry girder has been done separately because
calculation of impact load and bending moment due to it involve live
load only,
Assume, Self Weight of the Gantry Girder as 2 kN/m.
Total Dead Load, w = 2000 + 300 = 2300 N/m = 2.3 kN/m
Factored Dead Load = 1.5 x 2.3 = 3.45kN/m
21
The position of one wheel load from the mid point of span
= Wheel Base/4
= 3.5/4 = 0.875 m
Bending moment due to live load only,
 Taking moment about D,
Rc x 8 = 241.5 x (8 - 1.375) + 241.5 x 3.125
Rc = 294.33kN
 Taking moment about C,
RD x 8 = 241.5 x 1.375 + 241.5 x 4.875
RD = 188.67kN
Maximum Bending Moment due to Live Load
= 188.67 x 3.125 = 589.6 kNm
Bending Moment due to Impact
= 0.10 x 589.6 = 58.96 kNm
22
Total Bending Moment due to live load and impact loads
= 589.6 + 58.96 = 648.56 kNm
Bending Moment due to Dead Load
= wl2/8 = 3.45 x (82/8) = 27.6 kNm
Therefore,
Maximum B.M = 648.56 + 27.6 = 676.16 kNm
= 676.16 x 106 N_mm
Maximum Shear Force:
 It consists of maximum shear due to moving wheel loads and self
weight of the girder.
For maximum shear force the wheel loads shall be placed as shown in
figure, i.e one of the wheel loads should at the support.
23
Taking Moment about D,
Rc x 8 = (241.5 x 8) + (241.5 x 4.5)
Rc = 377.34 kN
Hence,
Maximum Shear Force due to wheel loads = 377.34 kN
Lateral force transverse to the rails
= 5% of weight of crab and weight lifted = 0.05 x 240 = 12kN
Factored lateral force = 1.5 x 12 = 18 kN
STEP 3: CALCULATION OF LATERAL FORCES:
24
Maximum horizontal reaction due to lateral force by proportion at C,
= (lateral force x Reaction at c due to vertical load)
(maximum wheel load due to vertical load)
= (9 x 294.33) / 241.5
= 10.97 kN
Horizontal reaction due to lateral force at D
= 18 - 10.97
= 7.03 kN
Maximum bending moment due to lateral load by proportion
= (9.0 / 241.5) x 589.6
= 21.97 kNm
Maximum shear force due to lateral load by proportion
= (377.34 / 241.5) x 9.0
= 14.06 kN
25
Approximate depth of section = L / 12 = (8 x 103) / 12
= 666.66mm ≈ 600mm
Approximate width of the flange = L / 30 = (8 x 103) / 30
= 266.66mm ≈ 300 mm
Approximate section modulus required, Zpz = 1.4 (Mz / fy )
= (1.4 x 676.16 x 106) / 250 = 3786.5 x 103 mm3
STEP 4: SELECTION OF PRELIMINARY TRIAL SECTION :
Let us try ISWB 600 @ 1311.6 N/m
with ISMC300 @ 351.2 N/m on its
top flange as shown in figure,
26
Properties Notation
I-Section
ISWB 600
Channel Section
ISMC 300
Area A 17038 mm2 4564 mm2
Thickness of Flange tf 21.3 mm 13.6 mm
Thickness of Web tw 11.2 mm 7.6 mm
Width of Flange bf 250 mm 90 mm
Moment of Inertia Iz 106198.5 x 104 mm4 6362.6 x 104 mm4
Iy 4702.5 x 104 mm4 310.8 x 104 mm4
Depth of Section h 600 mm 300 mm
Radius at root Rl 17 mm
Cyy 23.6 mm
27
The distance of NA of built up section from the extreme fibre of
compression flange,
ỹ = (∑AY) / ∑A = {17038 X (300 +7.6)} + {4564 X 23.6}
(4564 + 17038)
= 247.59 mm
Gross Moment of Inertia of the Built-up section
Iz gross = Iz beam + Iz channel
(The channel is placed over the I-section in such a manner that its yy-
axis becomes the zz-axis. Therefore, in calculating Iz of the total section,
Iy of the channel will become Iz of the channel.)
Iz gross = [(106198.5 x 104) + (17038 x (307.6 - 247.59)2)]
+
[(310.8 x 104) + (4564 x (247.59 -23.6)2)]
= 135,543x104 mm4
STEP 5: MOMENT OF INERTIA OF GANTRY GIRDER :
28
Iy gross = Iy beam + Iy channel
= (4702.5 x 104) + (6362.6 x 104)
= 11,065.1x104 mm4
Zez = (Iy /y)
= (135,543 x 104) / (600 + 7.6 - 247.59)
= 3764.98x103 mm3
Plastic Modulus of Section
(Ignoring the Fillets)
Equal area axis (Refer to Fig)
= 4564 + (250 X 21.3) + (ỹ1 tw)
= 250 X 21.3 + (600-2 X 21.3 ỹ1 ) X 11.2
Z = 74.95 mm
(From Lower surface of top flange of I – Section)
29
Plastic section modulus of the section above equal axis,
Zpz1 = [300 X 7.6 X (74.95 + 21.3 + (7.6 / 2))]
+ [2 X (90-7.6)x13.6(74.95 + 21.3 – (90-7.6/2))]
+ [250 X 21.3 x (74.95 + (21.3/2))]
+ [74.95 X 11.2 X (74.95/2)]
Zpz1 = 838.775 X 103 mm3
Plastic section modulus of the section below equal axis,
Zpz2 = [250 X 21.3 X ( 600 - 21.3 - 74.95 - ( 21.3/2))]
+ [((600 – 2 X 21.3 – 74.95)2 / 2)]
Zpz2 = 3929.202 X 103 mm3
Zpz = Zpz1 + Zpz2 = (838.775 X 103) + (3929.202 X 103)
Zpz = 4767.977 X 103 mm3
30
Plastic section modulus of compression flange about yy – axis,
Zpfy = [((250 X 21.3 X 250) /4)] + [((2 X (300 – (13.6 X 2))2 X 7.6) / 8)]
+ [2 x (13.6 x 90 x ( 300 – 13.6) / 2)]
= 824.763 X 103 mm3
STEP 6: CLASSIFICATION OF SECTION:
Outstand of flange of I-Section,
b = bf/2 = 250/2 = 125 mm.
b/tf of flange of I-section
= 125/21.3 = 5.86 < 8.4 (8.4ε = 8.4 x 1 = 8.4)
Outstand of flange of Channel Section,
b = bf - tw = 90 - 7.6 = 82.4 mm.
b/tf of flange of Channel section
= 82.4/13.6 = 6.05 < 8.4 (8.4 ε = 8.4 x 1 = 8.4)
31
d/tw of web of I-Section = ((h – 2tf) / tw)
= ((600 – 2 x 21.3) / 11.2)
= 49.76 < 84 (84 ε = 84 x 1 = 84)
Hence the entire section is plastic, (βb = 1.0)
STEP 7: CHECK FOR MOMENT CAPACITY:
Local Moment capacity, Mdz = βb Zpz (fy / ‫ע‬m0 ) ≤ 1.2 x Ze (fy / ‫ע‬m0 )
Mdz = 1.0 x 4767.977 x 103 x (250 x 10-6 / 1.10)
= 1083.63 kNm ≤ 1.2 x 3764.98 x 103 x (250 x 10-6 / 1.10)
= 1026.81 kNm
Hence, Moment capacity of the section,
Mdz = 1026.81 kNm > 676.16 kNm
which is safe.
(IS :800-2007,P,53)
32
Moment capacity of compression flange about y-axis,
Mdy,f = βb Zpyf (fy / ‫ע‬m0 ) ≤ 1.2 x Zey,f (fy / ‫ע‬m0 )
= 1.0 x 824.76 x 103 x (250 x 10-6 / 1.10)
= 187.44 kNm ≤ 1.2 x 580.92 x 103 x (250 x 10-6 / 1.10)
= 158.43 kNm
Hence moment capacity of flange,
Mdy,f = 158.43 kNm
Combined check for local moment capacity,
(Mz / Mdz ) + (My,f / Mdy,f) ≤ 1.0
(676.16 / 1026.81) + (21.97 / 158.43) = 0.797 < 1.0
Which is safe.
33
The elastic lateral buckling moment,
Mcr = c1(π2EIYhf/2L2
LT)[1+1/20((LLT/ry)/(hf/tf))2]0.5
Overall depth of the section,
hf = h = 600 + 7.6 = 607.6 mm
Note: hf is the centre to centre distance between flanges. In the
calculation, value of hf has been taken equal to overall depth of the
section to avoid cumbersome calculations. Further, this approximation
will result in conservative design.
Effective length, LLT = 8 x 102 mm
Thickness of flange, tf = 21.3 + 7.6 = 28.9 mm
Radius of gyration, ry = √(IY/A)
= √((11065.1x104)/(17038+4564))
= 71.57mm
STEP 8: BUCKLING RESISTANCE IN BENDING CHECK:
(IS :800-2007,CL.8.2.2, P .54)
34
The coefficient, c1 = 1.132 (From Appendix XIV, assuming uniform
load condition)
Mcr = [(1.132x2x2x105x11065.1x104x607.6) / (2x(8x103)2)]
x [1+1/20((8x103/71.57)/(607.6/28.9))2]0.5
= 1823.24 x 106 Nmm
Non dimensional slenderness ratio,
λLTz = √(βb Zpz fy / Mcr)
= √((1 x 4783.594 x 103 x 250) / (1823.24 x 106))
= 0.809
ΦLTz = 0.5 [1 + αLT (λLTz – 0.2) + λLTz2]
αLT = 0.21 (assuming connection of channel with I-section flange
by intermittent fillet welds. For uniform weld, αLT = 0.49)
ΦLTz = 0.5 x [1+0.21 x (0.809 – 0.2) + 0.8092]
= 0.891
35
χLTz = [1/( ΦLTz + ΦLTz
2 - λLTz
2)0.5]
= [1/(0.891 + 0.8912 – 0.8092)0.5]
= 0.791
Design bending compressive stress,
fbd = χLTz (fy / ‫ע‬m0 )
= 0.791 (250/1.10)
= 179.77 N/mm2
The design bending strength,
Mdz = βb Zpz fbd
= 1.0 x 4767.977 x 103 x 179.77 x 10-6
= 857.14 kNm > 676.16 kNm (which is alright)
Hence, the beam is safe in bending under vertical load.
36
Since lateral forces are also acting, the beam must be checked for bi-
axial bending. The bending strength about y-axis will be provided by the
top flange only as the lateral loads are applied there only.
Mdy =Zyt (fy/γm0)
Zyt = section modulus of top flange about yy-axis.
= (4702.5x104/2 +6362.6x104)/(300/2) = 580.92 x 103 mm3
(Assuming the moment of inertia of top flange to be half of the moment
of inertia of I-section)
Mdy = 580.92 x 103 x (250/1.1) x (10-6) = 132.02kNm.
(Mz/Mdz) + (My/Mdy) < 1.0
= (676.16/859.946) + (21.97/132.02) = 0.952 < 1.0
Hence, the section is safe.
STEP 9: CHECK FOR BIAXIAL BENDING
37
Maximum shear force due to wheel load = 377.34 kN
Impact load = 0.1 x 377.34
= 37.73 kN
Design shear force = 377.34 + 37.73
= 415.05 kN
Shear capacity = Av fyw / (√3 x γmo)
= [((600x11.2) x 250x10-3) / (√3x1.1) ]
= 881.77 kN > 415.07kN, which is safe.
Maximum shear,
V = 415.07 kN < 529 kN
(i.e. 0.6*Vd = 0.6 x 881.77 = 529kN)
Since V < 0.6*Vd, the case is of low shear.
No reduction will be therefore there in the moment capacity.
STEP 10: CHECK FOR SHEAR CAPACITY :
(IS :800-2007,CL.8.4.1, P.59)
38
We should check for buckling under the wheel load.
Buckling Resistance = (b1+n1)tw*fcd
Where, b1 = bearing length=150mm(diameter of wheel)
n1 = (600/2) +2x7.6 = 315.2 mm
Slenderness ratio of the web,
λw = 2.45 (d1/tw)
= 2.45(600 -2x(21.3 + 17))/11.2 = 114.49
For λw=114.49, fy=250N/mm2 and buckling curve c, the design
compressive stress from Table 7.6,
fcd = 89.64 N/mm2
Therefore, Buckling Resistance = (150 + 315.2) x 7.6 x 89.64 x 10-3
= 316.9 kN > 241.5kN
(which is safe)
STEP 11: WEB-BUCKING CHECK: (IS :800-2007,CL.8.7.3.1,P.67)
39
δ = wL3x(3a/4L –a3/L3)
6EI
W = Maximum Static Wheel Load = (241.5 / 1.5)
= 161 kN
a = (L - c) /2 = [(8x103) – (3.5x103)] / 2
= 2.25 x 103 mm
Therefore, Vertical deflection
= (161x103)x(8x103)3x{(3x2.25x103)/(4x8x103)-(2.25x103)3/(8x103)3)
[6 x (2x105) x 135,543x104]
= 9.56 mm
Permissible maximum deflection, = L / 500
= 8000 / 500
= 16 mm > 9.56 mm, which is safe.
STEP 12: DEFLECTION CHECK:
(IS :800-2007)
40
The required shear capacity of the weld,
qw = Vaỹ / Iz
V = 377.34 kN
A = 4564 mm2 (area above the section)
ỹ = (247.59 -7.6) = 239.9 mm
Iz = 135,543x104 mm4
Therefore, qw = [(377.34 x 103) x 4564 x 239.9] / [135,543x104]
= 304.82 N/mm
Let us provide 3 mm weld to connect channel with flange of I-section.
Strength of the weld provided, = (0.7x3x410)/(√3x1.50)
= 331.39 N/mm > 304.82 N/mm
Hence, provide 3 mm size intermittent fillet welds for making the
connection.
STEP 13: DESIGN OF WELD:
(IS :800-2007,CL.10.5.7)
41
42

More Related Content

What's hot

Gantry girder Analyse & design
Gantry girder Analyse & designGantry girder Analyse & design
Gantry girder Analyse & designGhawsudin
 
Structural analysis 2
Structural analysis   2Structural analysis   2
Structural analysis 2R VIJAYAKUMAR
 
Column Interaction Diagram construction
Column Interaction Diagram constructionColumn Interaction Diagram construction
Column Interaction Diagram constructionPritesh Parmar
 
Lassing and Battering system
Lassing and Battering systemLassing and Battering system
Lassing and Battering system9033124117
 
Calulation of deflection and crack width according to is 456 2000
Calulation of deflection and crack width according to is 456 2000Calulation of deflection and crack width according to is 456 2000
Calulation of deflection and crack width according to is 456 2000Vikas Mehta
 
Structural analysis 1
Structural analysis   1Structural analysis   1
Structural analysis 1R VIJAYAKUMAR
 
Design of RCC Column footing
Design of RCC Column footingDesign of RCC Column footing
Design of RCC Column footingArun Kurali
 
Design of compression members
Design of compression membersDesign of compression members
Design of compression membersSabna Thilakan
 
Design of columns biaxial bending as per IS 456-2000
Design of columns  biaxial bending as per IS 456-2000Design of columns  biaxial bending as per IS 456-2000
Design of columns biaxial bending as per IS 456-2000PraveenKumar Shanmugam
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920INTEZAAR ALAM
 

What's hot (20)

Gantry girder Analyse & design
Gantry girder Analyse & designGantry girder Analyse & design
Gantry girder Analyse & design
 
Structural analysis 2
Structural analysis   2Structural analysis   2
Structural analysis 2
 
Column Interaction Diagram construction
Column Interaction Diagram constructionColumn Interaction Diagram construction
Column Interaction Diagram construction
 
Dss notes
Dss notesDss notes
Dss notes
 
Ductile detailing
Ductile detailingDuctile detailing
Ductile detailing
 
Wind load
Wind  loadWind  load
Wind load
 
Lassing and Battering system
Lassing and Battering systemLassing and Battering system
Lassing and Battering system
 
Calulation of deflection and crack width according to is 456 2000
Calulation of deflection and crack width according to is 456 2000Calulation of deflection and crack width according to is 456 2000
Calulation of deflection and crack width according to is 456 2000
 
Structural analysis 1
Structural analysis   1Structural analysis   1
Structural analysis 1
 
BOLTED CONNECTION
BOLTED CONNECTIONBOLTED CONNECTION
BOLTED CONNECTION
 
Design of steel beams
Design of steel beamsDesign of steel beams
Design of steel beams
 
Design of RCC Column footing
Design of RCC Column footingDesign of RCC Column footing
Design of RCC Column footing
 
Bolted connections
Bolted connectionsBolted connections
Bolted connections
 
Design of compression members
Design of compression membersDesign of compression members
Design of compression members
 
Bs8110 design notes
Bs8110 design notesBs8110 design notes
Bs8110 design notes
 
Truss
Truss  Truss
Truss
 
Stepped footing
Stepped footingStepped footing
Stepped footing
 
Design of columns biaxial bending as per IS 456-2000
Design of columns  biaxial bending as per IS 456-2000Design of columns  biaxial bending as per IS 456-2000
Design of columns biaxial bending as per IS 456-2000
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920
 
Matrix methods
Matrix methodsMatrix methods
Matrix methods
 

Similar to Guntry girder

INDUSTRIAL BUILDING GANTRY GIRDER
INDUSTRIAL BUILDING  GANTRY GIRDERINDUSTRIAL BUILDING  GANTRY GIRDER
INDUSTRIAL BUILDING GANTRY GIRDERHarsh Shani
 
gantry girders in india
gantry girders in indiagantry girders in india
gantry girders in indiaIJCMESJOURNAL
 
Design ppt
Design pptDesign ppt
Design ppttishu001
 
DESIGN OF DECK SLAB AND GIRDERS- BRIDGE ENGINEERING
DESIGN OF DECK SLAB AND GIRDERS- BRIDGE ENGINEERINGDESIGN OF DECK SLAB AND GIRDERS- BRIDGE ENGINEERING
DESIGN OF DECK SLAB AND GIRDERS- BRIDGE ENGINEERINGLiyaWilson4
 
Vertical Screw Conveyor - Design Project
Vertical Screw Conveyor - Design ProjectVertical Screw Conveyor - Design Project
Vertical Screw Conveyor - Design ProjectPoorna Hewapathirana
 
project ppt 2 pdf.pdf
project ppt 2 pdf.pdfproject ppt 2 pdf.pdf
project ppt 2 pdf.pdfKarthikMasky
 
Isolated footing design
Isolated footing designIsolated footing design
Isolated footing designsrinu_anduri
 
C09 m-403032016 som
C09 m-403032016 somC09 m-403032016 som
C09 m-403032016 somvinodh kumar
 
Foundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection CalcsFoundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection CalcsMagdel Kotze
 
Design and Analysis of Loading Bracket for Landing Gear Strength Test
Design and Analysis of Loading Bracket for Landing Gear Strength TestDesign and Analysis of Loading Bracket for Landing Gear Strength Test
Design and Analysis of Loading Bracket for Landing Gear Strength TestIRJET Journal
 
Design of Gantry Girders (1).pptx
Design of Gantry Girders (1).pptxDesign of Gantry Girders (1).pptx
Design of Gantry Girders (1).pptxNachiketKadlag1
 
Lecture note on Shaft design of machine element.pptx
Lecture note on Shaft design of machine element.pptxLecture note on Shaft design of machine element.pptx
Lecture note on Shaft design of machine element.pptxfetena
 
IRJET- Theoretical Analysis of Rocker Arm
IRJET- Theoretical Analysis of Rocker ArmIRJET- Theoretical Analysis of Rocker Arm
IRJET- Theoretical Analysis of Rocker ArmIRJET Journal
 
Combined footings
Combined footingsCombined footings
Combined footingsseemavgiri
 
Chapter 6 column
Chapter 6   columnChapter 6   column
Chapter 6 columnSimon Foo
 
140204-5-PTI EDC-130-Continuous Members-41.pdf
140204-5-PTI EDC-130-Continuous Members-41.pdf140204-5-PTI EDC-130-Continuous Members-41.pdf
140204-5-PTI EDC-130-Continuous Members-41.pdfephrem53
 

Similar to Guntry girder (20)

INDUSTRIAL BUILDING GANTRY GIRDER
INDUSTRIAL BUILDING  GANTRY GIRDERINDUSTRIAL BUILDING  GANTRY GIRDER
INDUSTRIAL BUILDING GANTRY GIRDER
 
gantry girders in india
gantry girders in indiagantry girders in india
gantry girders in india
 
Design ppt
Design pptDesign ppt
Design ppt
 
Flywheel.ppt
Flywheel.pptFlywheel.ppt
Flywheel.ppt
 
unit-3.ppt
unit-3.pptunit-3.ppt
unit-3.ppt
 
DESIGN OF DECK SLAB AND GIRDERS- BRIDGE ENGINEERING
DESIGN OF DECK SLAB AND GIRDERS- BRIDGE ENGINEERINGDESIGN OF DECK SLAB AND GIRDERS- BRIDGE ENGINEERING
DESIGN OF DECK SLAB AND GIRDERS- BRIDGE ENGINEERING
 
Vertical Screw Conveyor - Design Project
Vertical Screw Conveyor - Design ProjectVertical Screw Conveyor - Design Project
Vertical Screw Conveyor - Design Project
 
project ppt 2 pdf.pdf
project ppt 2 pdf.pdfproject ppt 2 pdf.pdf
project ppt 2 pdf.pdf
 
Isolated footing design
Isolated footing designIsolated footing design
Isolated footing design
 
C09 m-403032016 som
C09 m-403032016 somC09 m-403032016 som
C09 m-403032016 som
 
gantry crane report
gantry crane reportgantry crane report
gantry crane report
 
Foundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection CalcsFoundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection Calcs
 
Design and Analysis of Loading Bracket for Landing Gear Strength Test
Design and Analysis of Loading Bracket for Landing Gear Strength TestDesign and Analysis of Loading Bracket for Landing Gear Strength Test
Design and Analysis of Loading Bracket for Landing Gear Strength Test
 
Footing design
Footing designFooting design
Footing design
 
Design of Gantry Girders (1).pptx
Design of Gantry Girders (1).pptxDesign of Gantry Girders (1).pptx
Design of Gantry Girders (1).pptx
 
Lecture note on Shaft design of machine element.pptx
Lecture note on Shaft design of machine element.pptxLecture note on Shaft design of machine element.pptx
Lecture note on Shaft design of machine element.pptx
 
IRJET- Theoretical Analysis of Rocker Arm
IRJET- Theoretical Analysis of Rocker ArmIRJET- Theoretical Analysis of Rocker Arm
IRJET- Theoretical Analysis of Rocker Arm
 
Combined footings
Combined footingsCombined footings
Combined footings
 
Chapter 6 column
Chapter 6   columnChapter 6   column
Chapter 6 column
 
140204-5-PTI EDC-130-Continuous Members-41.pdf
140204-5-PTI EDC-130-Continuous Members-41.pdf140204-5-PTI EDC-130-Continuous Members-41.pdf
140204-5-PTI EDC-130-Continuous Members-41.pdf
 

More from kajol panchal

Basics of civil engineering Induction Type
Basics of civil engineering Induction TypeBasics of civil engineering Induction Type
Basics of civil engineering Induction Typekajol panchal
 
Basics of Transportation Engineering
Basics of Transportation EngineeringBasics of Transportation Engineering
Basics of Transportation Engineeringkajol panchal
 
Basics of Water supply and sanitation Engineering
Basics of Water supply and sanitation Engineering Basics of Water supply and sanitation Engineering
Basics of Water supply and sanitation Engineering kajol panchal
 
Component of building
Component of buildingComponent of building
Component of buildingkajol panchal
 
Introduction of various civil engineering structures
Introduction of various civil engineering structuresIntroduction of various civil engineering structures
Introduction of various civil engineering structureskajol panchal
 
Water resourcs engineering
Water resourcs engineeringWater resourcs engineering
Water resourcs engineeringkajol panchal
 

More from kajol panchal (12)

Heat transfer
Heat transferHeat transfer
Heat transfer
 
Basics of civil engineering Induction Type
Basics of civil engineering Induction TypeBasics of civil engineering Induction Type
Basics of civil engineering Induction Type
 
Basics of Transportation Engineering
Basics of Transportation EngineeringBasics of Transportation Engineering
Basics of Transportation Engineering
 
Basics of Water supply and sanitation Engineering
Basics of Water supply and sanitation Engineering Basics of Water supply and sanitation Engineering
Basics of Water supply and sanitation Engineering
 
Surveying
SurveyingSurveying
Surveying
 
Component of building
Component of buildingComponent of building
Component of building
 
Introduction of various civil engineering structures
Introduction of various civil engineering structuresIntroduction of various civil engineering structures
Introduction of various civil engineering structures
 
Lintel and arches
Lintel and archesLintel and arches
Lintel and arches
 
Water resourcs engineering
Water resourcs engineeringWater resourcs engineering
Water resourcs engineering
 
Formwork
FormworkFormwork
Formwork
 
Valuation
ValuationValuation
Valuation
 
Hydrlelectric power
Hydrlelectric powerHydrlelectric power
Hydrlelectric power
 

Recently uploaded

Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 

Recently uploaded (20)

Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 

Guntry girder

  • 1. Subject : Design of steel structures(2180610) 1
  • 2. Contents  Introduction  Load acting on Gantry girder  Types of Gantry Girders  Limiting Deflection of Gantry Girders  Maximum Load Effects  Design Procedure  Examples 2 Guided by : Prof. Pritesh Rathod Prof. Sunil Jaganiya Prepared By: kajol Panchal
  • 3. Introduction • Gantry girders are laterally unsupported beams to carry heavy loads from place to place at the construction sites, mostly these are of steel material. • A girder is a support beam used in construction. • It is the main horizontal support of a structure which supports smaller beams. Girders often have an I-beam cross section composed of two load-bearing flanges separated by a stabilizing web, but may also have a box shape, Z shape and other forms. • Gantry girders or crane girders carry hand operated or electrically operated overhead cranes in industrial building such as factories, workshops, steel work , etc. to lift heavy materials, equipment etc. and to carry them form one location to the other, within the building . 3
  • 4. Components The essential component of crane system are : 1. crane girder or crane bridge or cross girder 2. Trolley or crab 3. Gantry Girder 4. Crane rails 4
  • 6. Loads on Gantry Girder 1) Vertical Loads from crane 2) Impact load from crane 3) Longitudinal horizontal force(Drag force) 4) Lateral load(surge load) 6
  • 7. Additional impact loads on cranes (IS:875) 7
  • 8. Types of Gantry Girders 8
  • 11. Max. S.F., B.M., and Deflection 11
  • 12. Two Cranes at the Same Span 12
  • 13. Max. BM for Two Cranes At the Same Span 13
  • 14. Design Procedure  Assume that the lateral load is resisted entirely by the top flange of the beam plus any reinforcing plates, channels etc. and the vertical load is resisted by the combined beam. 1. Find the maximum wheel load: This load is maximum when the trolley is closest to the gantry girder. Increase it for the impact 2. Calculate the maximum bending moment in the gantry girder due to vertical loads. 3. To simplify the calculations, add the maximum bending moment due to dead load to the maximum wheel load moment. 4. The maximum shear force is calculated. When the gantry is not laterally supported, the following may be used to select a trail section. Zp = Mu / fy Zp (trial) = k Zp (k = 1.40-1.50) Economic depth ≈ 1/12th of the span. Width of flange ≈ 1/40 to 1/30th of the span 14
  • 15. 5.The plastic section modulus of the assumed combined section Mp = 2 fy A / 2 = A fy where A is called the plastic modulus Zp 6. Check for moment capacity of the whole section (as lateral support is provided at the compression flange) Mcz = βb Zp fy ≤ 1.2 Ze fy / γm0 <Mu 7.Check top flange for bending in both the axes using the interaction equation (My / Mndy)+ (M2/Mndz) ≤ 1.0 8. If the top (compression) flange is not supported, Check for buckling resistance in the same way as in step 6 but replacing fy with the design bending compressive stress fbd. 9. Check web of the girder at points of concentrated load for local buckling or local crushing, and provide load carrying/ bearing stiffeners, if necessary. 10. Check for deflection under working loads 15
  • 16. Design Check • Check for moment capacity • Check for shear capacity • Check for Buckling Resistance • Check for Local Buckling • Check for Deflection 16
  • 17. Design a gantry girder to be used in an industrial building carrying a manually operated overhead traveling crane for the following data: • Crane capacity - 200kN • Self-weight of the crane girder excluding trolley - 200kN • Self-weight of the trolley, electric motor, hook, etc. - 40kN • Approximate minimum approach of the crane hook to the gantry girder - 1.20m • Wheel base - 3.5m • c/c distance between gantry rails - 16m • c/c distance between columns (span of gantry girder) - 8m • Self weight of rail section - 300N/m • Diameter of crane wheels - 150mm • Steel is of grade Fe 410. Design also the field welded connection if required. The support bracket connection need to designed. 17
  • 18. SOLUTION : For Fe410 grade of steel:  fu = 410 Mpa  fy = fyw = fyf = 410 MPa For hand operated OT crane:  Lateral loads = 5% of maximum static wheel load  Longitudinal loads = 5% of weight of crab and weight lifted  Maximum permissible deflection = L/500 Partial safety factors  ‫ע‬m0 = 1.10  ‫ע‬mw = 1.50 (for site welds) Load factor  ‫ע‬m1 = 1.50 ξ = ξw = ξf = √ (250/ fy) = √ (250/ 250) = 1.0 18
  • 19. STEP 1: CALCULATION OF DESIGN FORCES Maximum wheel load:  Maximum concentrated load on crane = 200 + 40 = 240kN  Maximum factored load on crane = 1.5 x 240 = 360kN  The crane will carry the self-weight as a UDL = 200/16 = 12.5 kN/m  Factored uniform load = 1.5 x 12.5 = 18.75kN/m For maximum reaction on the gantry girder the loads are placed on the crane girder as shown in the figure below, 19
  • 20. Taking moment about B, RA x 16 = 360 x (16 - 1.2) + (18.75 x 16 x 16) / 2 RA = 483kN RB = 177kN The reaction from the crane girder is distributed equally on the two wheels at the end of the crane girder. Therefore, Maximum wheel load on each = 483/2 = 241.5 kN wheel of the crane STEP 2: CALCULATION OF MAXIMUM BM & SF: Maximum Bending Moment:  It consists of maximum moments caused by the moving wheel loads on the gantry girder and self weight of the gantry girder. 20
  • 21. For Maximum Bending Moment, the wheel loads shall be placed as shown in figure. The calculation of maximum bending moments due to wheel loads and self weight of gantry girder has been done separately because calculation of impact load and bending moment due to it involve live load only, Assume, Self Weight of the Gantry Girder as 2 kN/m. Total Dead Load, w = 2000 + 300 = 2300 N/m = 2.3 kN/m Factored Dead Load = 1.5 x 2.3 = 3.45kN/m 21
  • 22. The position of one wheel load from the mid point of span = Wheel Base/4 = 3.5/4 = 0.875 m Bending moment due to live load only,  Taking moment about D, Rc x 8 = 241.5 x (8 - 1.375) + 241.5 x 3.125 Rc = 294.33kN  Taking moment about C, RD x 8 = 241.5 x 1.375 + 241.5 x 4.875 RD = 188.67kN Maximum Bending Moment due to Live Load = 188.67 x 3.125 = 589.6 kNm Bending Moment due to Impact = 0.10 x 589.6 = 58.96 kNm 22
  • 23. Total Bending Moment due to live load and impact loads = 589.6 + 58.96 = 648.56 kNm Bending Moment due to Dead Load = wl2/8 = 3.45 x (82/8) = 27.6 kNm Therefore, Maximum B.M = 648.56 + 27.6 = 676.16 kNm = 676.16 x 106 N_mm Maximum Shear Force:  It consists of maximum shear due to moving wheel loads and self weight of the girder. For maximum shear force the wheel loads shall be placed as shown in figure, i.e one of the wheel loads should at the support. 23
  • 24. Taking Moment about D, Rc x 8 = (241.5 x 8) + (241.5 x 4.5) Rc = 377.34 kN Hence, Maximum Shear Force due to wheel loads = 377.34 kN Lateral force transverse to the rails = 5% of weight of crab and weight lifted = 0.05 x 240 = 12kN Factored lateral force = 1.5 x 12 = 18 kN STEP 3: CALCULATION OF LATERAL FORCES: 24
  • 25. Maximum horizontal reaction due to lateral force by proportion at C, = (lateral force x Reaction at c due to vertical load) (maximum wheel load due to vertical load) = (9 x 294.33) / 241.5 = 10.97 kN Horizontal reaction due to lateral force at D = 18 - 10.97 = 7.03 kN Maximum bending moment due to lateral load by proportion = (9.0 / 241.5) x 589.6 = 21.97 kNm Maximum shear force due to lateral load by proportion = (377.34 / 241.5) x 9.0 = 14.06 kN 25
  • 26. Approximate depth of section = L / 12 = (8 x 103) / 12 = 666.66mm ≈ 600mm Approximate width of the flange = L / 30 = (8 x 103) / 30 = 266.66mm ≈ 300 mm Approximate section modulus required, Zpz = 1.4 (Mz / fy ) = (1.4 x 676.16 x 106) / 250 = 3786.5 x 103 mm3 STEP 4: SELECTION OF PRELIMINARY TRIAL SECTION : Let us try ISWB 600 @ 1311.6 N/m with ISMC300 @ 351.2 N/m on its top flange as shown in figure, 26
  • 27. Properties Notation I-Section ISWB 600 Channel Section ISMC 300 Area A 17038 mm2 4564 mm2 Thickness of Flange tf 21.3 mm 13.6 mm Thickness of Web tw 11.2 mm 7.6 mm Width of Flange bf 250 mm 90 mm Moment of Inertia Iz 106198.5 x 104 mm4 6362.6 x 104 mm4 Iy 4702.5 x 104 mm4 310.8 x 104 mm4 Depth of Section h 600 mm 300 mm Radius at root Rl 17 mm Cyy 23.6 mm 27
  • 28. The distance of NA of built up section from the extreme fibre of compression flange, ỹ = (∑AY) / ∑A = {17038 X (300 +7.6)} + {4564 X 23.6} (4564 + 17038) = 247.59 mm Gross Moment of Inertia of the Built-up section Iz gross = Iz beam + Iz channel (The channel is placed over the I-section in such a manner that its yy- axis becomes the zz-axis. Therefore, in calculating Iz of the total section, Iy of the channel will become Iz of the channel.) Iz gross = [(106198.5 x 104) + (17038 x (307.6 - 247.59)2)] + [(310.8 x 104) + (4564 x (247.59 -23.6)2)] = 135,543x104 mm4 STEP 5: MOMENT OF INERTIA OF GANTRY GIRDER : 28
  • 29. Iy gross = Iy beam + Iy channel = (4702.5 x 104) + (6362.6 x 104) = 11,065.1x104 mm4 Zez = (Iy /y) = (135,543 x 104) / (600 + 7.6 - 247.59) = 3764.98x103 mm3 Plastic Modulus of Section (Ignoring the Fillets) Equal area axis (Refer to Fig) = 4564 + (250 X 21.3) + (ỹ1 tw) = 250 X 21.3 + (600-2 X 21.3 ỹ1 ) X 11.2 Z = 74.95 mm (From Lower surface of top flange of I – Section) 29
  • 30. Plastic section modulus of the section above equal axis, Zpz1 = [300 X 7.6 X (74.95 + 21.3 + (7.6 / 2))] + [2 X (90-7.6)x13.6(74.95 + 21.3 – (90-7.6/2))] + [250 X 21.3 x (74.95 + (21.3/2))] + [74.95 X 11.2 X (74.95/2)] Zpz1 = 838.775 X 103 mm3 Plastic section modulus of the section below equal axis, Zpz2 = [250 X 21.3 X ( 600 - 21.3 - 74.95 - ( 21.3/2))] + [((600 – 2 X 21.3 – 74.95)2 / 2)] Zpz2 = 3929.202 X 103 mm3 Zpz = Zpz1 + Zpz2 = (838.775 X 103) + (3929.202 X 103) Zpz = 4767.977 X 103 mm3 30
  • 31. Plastic section modulus of compression flange about yy – axis, Zpfy = [((250 X 21.3 X 250) /4)] + [((2 X (300 – (13.6 X 2))2 X 7.6) / 8)] + [2 x (13.6 x 90 x ( 300 – 13.6) / 2)] = 824.763 X 103 mm3 STEP 6: CLASSIFICATION OF SECTION: Outstand of flange of I-Section, b = bf/2 = 250/2 = 125 mm. b/tf of flange of I-section = 125/21.3 = 5.86 < 8.4 (8.4ε = 8.4 x 1 = 8.4) Outstand of flange of Channel Section, b = bf - tw = 90 - 7.6 = 82.4 mm. b/tf of flange of Channel section = 82.4/13.6 = 6.05 < 8.4 (8.4 ε = 8.4 x 1 = 8.4) 31
  • 32. d/tw of web of I-Section = ((h – 2tf) / tw) = ((600 – 2 x 21.3) / 11.2) = 49.76 < 84 (84 ε = 84 x 1 = 84) Hence the entire section is plastic, (βb = 1.0) STEP 7: CHECK FOR MOMENT CAPACITY: Local Moment capacity, Mdz = βb Zpz (fy / ‫ע‬m0 ) ≤ 1.2 x Ze (fy / ‫ע‬m0 ) Mdz = 1.0 x 4767.977 x 103 x (250 x 10-6 / 1.10) = 1083.63 kNm ≤ 1.2 x 3764.98 x 103 x (250 x 10-6 / 1.10) = 1026.81 kNm Hence, Moment capacity of the section, Mdz = 1026.81 kNm > 676.16 kNm which is safe. (IS :800-2007,P,53) 32
  • 33. Moment capacity of compression flange about y-axis, Mdy,f = βb Zpyf (fy / ‫ע‬m0 ) ≤ 1.2 x Zey,f (fy / ‫ע‬m0 ) = 1.0 x 824.76 x 103 x (250 x 10-6 / 1.10) = 187.44 kNm ≤ 1.2 x 580.92 x 103 x (250 x 10-6 / 1.10) = 158.43 kNm Hence moment capacity of flange, Mdy,f = 158.43 kNm Combined check for local moment capacity, (Mz / Mdz ) + (My,f / Mdy,f) ≤ 1.0 (676.16 / 1026.81) + (21.97 / 158.43) = 0.797 < 1.0 Which is safe. 33
  • 34. The elastic lateral buckling moment, Mcr = c1(π2EIYhf/2L2 LT)[1+1/20((LLT/ry)/(hf/tf))2]0.5 Overall depth of the section, hf = h = 600 + 7.6 = 607.6 mm Note: hf is the centre to centre distance between flanges. In the calculation, value of hf has been taken equal to overall depth of the section to avoid cumbersome calculations. Further, this approximation will result in conservative design. Effective length, LLT = 8 x 102 mm Thickness of flange, tf = 21.3 + 7.6 = 28.9 mm Radius of gyration, ry = √(IY/A) = √((11065.1x104)/(17038+4564)) = 71.57mm STEP 8: BUCKLING RESISTANCE IN BENDING CHECK: (IS :800-2007,CL.8.2.2, P .54) 34
  • 35. The coefficient, c1 = 1.132 (From Appendix XIV, assuming uniform load condition) Mcr = [(1.132x2x2x105x11065.1x104x607.6) / (2x(8x103)2)] x [1+1/20((8x103/71.57)/(607.6/28.9))2]0.5 = 1823.24 x 106 Nmm Non dimensional slenderness ratio, λLTz = √(βb Zpz fy / Mcr) = √((1 x 4783.594 x 103 x 250) / (1823.24 x 106)) = 0.809 ΦLTz = 0.5 [1 + αLT (λLTz – 0.2) + λLTz2] αLT = 0.21 (assuming connection of channel with I-section flange by intermittent fillet welds. For uniform weld, αLT = 0.49) ΦLTz = 0.5 x [1+0.21 x (0.809 – 0.2) + 0.8092] = 0.891 35
  • 36. χLTz = [1/( ΦLTz + ΦLTz 2 - λLTz 2)0.5] = [1/(0.891 + 0.8912 – 0.8092)0.5] = 0.791 Design bending compressive stress, fbd = χLTz (fy / ‫ע‬m0 ) = 0.791 (250/1.10) = 179.77 N/mm2 The design bending strength, Mdz = βb Zpz fbd = 1.0 x 4767.977 x 103 x 179.77 x 10-6 = 857.14 kNm > 676.16 kNm (which is alright) Hence, the beam is safe in bending under vertical load. 36
  • 37. Since lateral forces are also acting, the beam must be checked for bi- axial bending. The bending strength about y-axis will be provided by the top flange only as the lateral loads are applied there only. Mdy =Zyt (fy/γm0) Zyt = section modulus of top flange about yy-axis. = (4702.5x104/2 +6362.6x104)/(300/2) = 580.92 x 103 mm3 (Assuming the moment of inertia of top flange to be half of the moment of inertia of I-section) Mdy = 580.92 x 103 x (250/1.1) x (10-6) = 132.02kNm. (Mz/Mdz) + (My/Mdy) < 1.0 = (676.16/859.946) + (21.97/132.02) = 0.952 < 1.0 Hence, the section is safe. STEP 9: CHECK FOR BIAXIAL BENDING 37
  • 38. Maximum shear force due to wheel load = 377.34 kN Impact load = 0.1 x 377.34 = 37.73 kN Design shear force = 377.34 + 37.73 = 415.05 kN Shear capacity = Av fyw / (√3 x γmo) = [((600x11.2) x 250x10-3) / (√3x1.1) ] = 881.77 kN > 415.07kN, which is safe. Maximum shear, V = 415.07 kN < 529 kN (i.e. 0.6*Vd = 0.6 x 881.77 = 529kN) Since V < 0.6*Vd, the case is of low shear. No reduction will be therefore there in the moment capacity. STEP 10: CHECK FOR SHEAR CAPACITY : (IS :800-2007,CL.8.4.1, P.59) 38
  • 39. We should check for buckling under the wheel load. Buckling Resistance = (b1+n1)tw*fcd Where, b1 = bearing length=150mm(diameter of wheel) n1 = (600/2) +2x7.6 = 315.2 mm Slenderness ratio of the web, λw = 2.45 (d1/tw) = 2.45(600 -2x(21.3 + 17))/11.2 = 114.49 For λw=114.49, fy=250N/mm2 and buckling curve c, the design compressive stress from Table 7.6, fcd = 89.64 N/mm2 Therefore, Buckling Resistance = (150 + 315.2) x 7.6 x 89.64 x 10-3 = 316.9 kN > 241.5kN (which is safe) STEP 11: WEB-BUCKING CHECK: (IS :800-2007,CL.8.7.3.1,P.67) 39
  • 40. δ = wL3x(3a/4L –a3/L3) 6EI W = Maximum Static Wheel Load = (241.5 / 1.5) = 161 kN a = (L - c) /2 = [(8x103) – (3.5x103)] / 2 = 2.25 x 103 mm Therefore, Vertical deflection = (161x103)x(8x103)3x{(3x2.25x103)/(4x8x103)-(2.25x103)3/(8x103)3) [6 x (2x105) x 135,543x104] = 9.56 mm Permissible maximum deflection, = L / 500 = 8000 / 500 = 16 mm > 9.56 mm, which is safe. STEP 12: DEFLECTION CHECK: (IS :800-2007) 40
  • 41. The required shear capacity of the weld, qw = Vaỹ / Iz V = 377.34 kN A = 4564 mm2 (area above the section) ỹ = (247.59 -7.6) = 239.9 mm Iz = 135,543x104 mm4 Therefore, qw = [(377.34 x 103) x 4564 x 239.9] / [135,543x104] = 304.82 N/mm Let us provide 3 mm weld to connect channel with flange of I-section. Strength of the weld provided, = (0.7x3x410)/(√3x1.50) = 331.39 N/mm > 304.82 N/mm Hence, provide 3 mm size intermittent fillet welds for making the connection. STEP 13: DESIGN OF WELD: (IS :800-2007,CL.10.5.7) 41
  • 42. 42