The document is a geotechnical site exploration report for a site located at Rakoczi utca 1-5 in Debrecen, Hungary. It was prepared for Abu-Alkhail For Construction Managements Co. by Abu-Alkhail Construction Labs. The site investigation found localized fills less than 20 feet deep over bedrock. Groundwater was encountered between 3.5 and 5.8 meters below ground surface. Based on soil testing and properties, the report recommends drilled shaft foundations to support design loads for any structures. Dewatering will likely be required for deeper excavations due to the permeable sandy soils encountered.