Introduction
In light of the importance of the San Fernando Dam case histories and their prominence in the
literature, it is important to show how GeoStudio, and in particular QUAKE/W, can be used to analyze
cases like this. This example concentrates on the Upper Dam.
The purpose here is not to replicate all that has been done by others, or to necessarily adopt the
exact conditions presented by others, but to more generally illustrate the features and capabilities of
GeoStudio in the context of a famous case history.
The emphasis here is on QUAKE/W because the cases involve earthquake shaking, but SEEP/W,
SLOPE/W and SIGMA/W are also used for various aspects of the analysis.
Background
There was a significant earthquake in Southern California in 1971, which is referred to as the San
Fernando earthquake. The earthquake occurred on February 9, 1971 at 6:00 a.m. local time and had a
6.6 Richter magnitude.
The earthquake created a liquefaction failure at a water storage facility known as the Lower San
Fernando Dam and Reservoir in the San Fernando community on the northern edge of the greater
metropolitan Los Angeles area. Another facility known as the Upper San Fernando Dam also suffered
some damage, but it was not as serious as at the Lower Dam.
Figure 1 shows an aerial view of the area. The Lower Dam is on the left side of the picture and the
Upper Dam is towards the upper right of the picture. US Interstate Freeway 5 is on the right of the
picture.
2
Figure 1. The San Fernando dams and reservoirs.
The earthquake shaking initiated a major failure on the upstream side of the dam. The photos in
Figure 2, Figure 3 and Figure 4 show some of the conditions after the earthquake. Of significance is
the very steep slide head scarp (Figure 2) and very marginal freeboard that remained after the
failure.
These photos are from Professor Ross W. Boulanger’s web site photo album at the University of
California, Davis, California. The web site link is:
http://cee.engr.ucdavis.edu/faculty/boulanger/
Presumably, based on the names on the photographs, they were taken by H.B. (Harry) Seed and J.M.
(Mike) Duncan.
The failure led to a perilously close catastrophe. Had the head scarp been slightly lower, the outflow
from the reservoir would have quickly eroded the dam and flooded many communities downstream.
Considering the extremely precarious situation, some 80,000 people over an 11-square-mile area
were evacuated while the reservoir was emptied over a period of three to four days.
Figure 2. Upstream face of the dam after the drawing down the reservoir.
3
Figure 3. General view of the slide head scarp.
Figure 4. A close-up view of the slide head scarp.
The San Fernando dams have become extremely important case histories for geotechnical
earthquake engineering. Due to their significance, the cases have become the subject of years of
research and numerous publications.
Much of the early research was done by Professor H. Bolton (Harry) Seed and his colleagues at the
University of California at Berkeley. Their work led to three papers, which provide much of the
background information and early investigation findings. The three papers are:
Seed, H.B., Lee, K.L., Idriss, I.M. and Makadisi, F.I. (1975). The Slides in the San Fernando
Dams during the Earthquake of February 9, 1971 – ASCE, J of the Geotechnical Engineering
Division, GT7, pp. 651-688
Lee, K.L., Seed, H.B., Idriss, I.M., and Makadisi, F.I. (1975). Properties of Soil in the San
Fernando Hydraulic Fill Dams – ASCE, J of the Geotechnical Engineering Division, GT8,
pp. 801-821
Seed, H.B., Idriss, I.M., Lee, K.L. and Makadisi, F.I. (1975). Dynamic Analysis of the Slide in
the Lower San Fernando Dam during the Earthquake of February 9, 1971 – ASCE, J of the
Geotechnical Engineering Division, GT9, pp. 889-911
4
Reference to these papers will be made as Seed et al. throughout this document. These papers were
published in three consecutive months; July, August and September.
The Upper San Fernando Dam was constructed directly on the native streambed alluvium (Figure 5).
The main body of the dam was constructed by what is known as a semi-hydraulic fill method. The
material was hauled to the site by wagons and dumped into a pond where it was dispersed by water
jets operating from barges. Although there is no mention of it in the publications, this technique
must have created an outer shell of material compacted to some degree by the construction traffic.
The material for this portion of the dam was obtained from the valley floor.
Figure 5. Sketch of the Upper San Fernando Dam.
The hydraulic fill method was used up to El. 1200 feet (365 m) and then was topped-off with
compacted fill to El. 1218 (371 m). This resulted in a 100-foot berm on the downstream side.
The conditions in the downstream toe area are not well known. Seed et al. make the comment that,
the soil in this area consisted of about 8 ft (2.4) of loose silty sandy fill overlying alluvium. The origin,
date, and method of placing this fill are unknown.
Surveys taken after the earthquake revealed that the entire upper portion of the dam had moved
downstream around 2 m and the crest had moved downward around 0.75 m. Based on the sketch in
Figure 5, only the upper rolled-fill portion moved on the upstream side. Of significance is the
movement along the surface of the berm. Here, the movements were predominantly in the lateral
direction with hardly any settlement (Figure 6).
5
Figure 6. Movements associated with the earthquake.
There were three piezometers in the dam (Figure 7). As indicated by the piezometric records, there
was a sudden and dramatic increase in pore-water pressures. Even 24 hours after the earthquake,
water was still running out of the top of Piezometers 1 and 2. This is of significance, since these
piezometers are in the core area of the dam, especially Piezometer 2. The peak in Piezometer 3 was
likely higher than what was measured, due to some dissipation within the 24 hours between the
event and the readings. These piezometers provide definitive evidence that substantial excess pore-
water pressures resulted from the shaking.
Figure 7. Piezometers and pore-water pressure responses due to the shaking.
The low level outlet conduit was inspected after the earthquake, and the condition of the conduit
provided some interesting clues about the movement that occurred. On the upstream side, the
conduit was extended as indicated by the openings noted in Figure 5. Toward the downstream toe,
however, the conduit was forced into compression, as indicated by compression failures.
Also of significance is the observation that at the downstream toe, a 2-foot high pressure ridge had
developed and a concrete man-hole was tilted and sheared in the downstream direction, indicating
both lateral and upward movement.
6
Numerical Simulation
For the analysis here, the Upper Dam cross-section was idealized, as shown in Figure 8.
1
2
3
El. 370
El. 371
El. 365
1
2.5
1
2.5
Distance - m
0 25 50 75 100 125 150 175 200
Elevation-m
330
340
350
360
370
380
390
400
Figure 8. Numerical analysis model of the Upper San Fernando Dam.
Seed et al. present the cross-section as having a clay core. For the analysis here, the entire hydraulic
fill is treated as one material. The reasons for this, as will be discussed below, is that the results this
way give a picture closer to what actually happened. Furthermore, Peter Byrne in his R.M. Hardy
Keynote address at the 2006 Canadian Geotechnical Conference in Vancouver suggested that
stratification may have a significant impact on the potential for liquefaction. He looked at the impact
of thin layers of clay amongst layers of loose sand and found that the impeded drainage resulting
from the clay layers had a significant impact on the liquefaction response of the material in general.
It is not difficult to imagine that there was some stratification at the Upper San Fernando Dam in the
core area, especially considering the semi-hydraulic fill placement procedure used. Based on these
more recent concepts, it is possible that there was some generation of excess pore-water pressures
and associated strength loss in the core area, just like in the remainder of the hydraulic fill. The
piezometer records noted earlier strongly suggest this was indeed the case.
Soil properties for this analysis here are in large part estimates, filtered somewhat by values reported
by Seed et al. In the end, it turns out that when stability is the main issue, these estimated values are
adequate to understand the observed behavior and processes.
Generally, the streambed alluvium, outer shell, and top rolled fill are treated as somewhat more
competent than the hydraulic fill.
All of the details can be viewed and examined in the associated GeoStudio data file.
Chapter 1 in the QUAKE/W Engineering Book presents a section on the Behavior of Fine Sand. This
Section introduces the concept of a Collapse Surface. Figure 9 is one of the diagrams presented in
Chapter 1. Fundamentally, any stress point, such as Point B, could experience the development of
excess pore-water pressures during an earthquake, until the mean effective stress reaches the𝑝'
collapse surface. Once on the collapse surface, the strength may fall down to the steady-state
strength. On the other hand, the initial stress Point B in Figure 10 may experience the development
of excess pore-water pressures, but the strength will not suddenly fall, since the initial deviatoric
7
stress is below the steady-state strength. This is discussed in more detail in the QUAKE/W𝑞
Engineering Book.
q
p'
B
Collapse surface
Steady-state
strength
Figure 9. Stress path of contractive loose sand.
q
p'
B
Collapse surface
Steady-state
strength
C
A
Figure 10. Stress path of dense dilative sand.
QUAKE/W has an option to make use of the steady-state strength and the collapse surface to identify
elements that can liquefy. The user specifies the steady-state strength as and the inclination of𝐶 𝑠𝑠
the collapse surface.
is multiplied by a factor of two to define , the steady-state deviatoric stress.𝐶 𝑠𝑠 𝑞 𝑠𝑠
The slope of the Critical-State Line (CSL) is computed from:
𝑀 𝐶𝑆𝐿 =
6sin 𝜙'
3 ‒ sin 𝜙'
Equation 1
where is the specified effective friction angle.𝜙'
8
The slope of the collapse surface is computed the same way, by substituting the specified collapse
surface angle for . In the space, we can call the slope of the collapse surface . Once ,𝜙'
𝑞 ‒ 𝑝' 𝑀 𝐶𝑆 𝑀 𝐶𝑆𝐿
and have been established, any on or above the collapse surface can be computed for any𝑀 𝐶𝑆 𝑞 𝑠𝑠 𝑞
value.𝑝'
The rules adopted in QUAKE/W are as follows:
 Ratios of are computed for each element using the initial static stresses;𝑞/𝑝'
 If is less than , the element liquefaction flag is never set to “true”; excess pore-water𝑞 𝑞 𝑠𝑠
pressures can develop, but the element is not flagged as having liquefied regardless of the
pore-water pressures that develop;
 If the ratio is such that the stress state is on or above the collapse surface, the element is𝑞/𝑝'
flagged as having liquefied even before any earthquake shaking has started, since any small
amount of shaking could cause the strength to fall down to the steady-state strength;
 Elements with initial stress states such that is greater than , but the stress points are𝑞 𝑞 𝑠𝑠
under the collapse surface, are initially marked as not liquefied; and
 Stress points initially under the collapse surface will move to the left as pore-water pressures
develop during the shaking and they are then marked as liquefied when the stress point is on
or above the collapse surface.
Excess pore-water pressures are limited or restricted so that the mean effective stress is not lower𝑝'
than the corresponding with on the CSL. This prevents the effective stresses from becoming𝑝' 𝑞 𝑠𝑠
too low or even negative, which in turn reduces difficulties with numerical instability (convergence).
Castro el al. (1992) did an extensive study of the steady-state strength of the Lower San Fernando
Dam hydraulic fill material. They concluded that the average undrained steady-state strength was
between 30 and 40 kPa depending on the method used to obtain the strength. Values in this range
are used in the GeoStudio analyses presented here.
Little information is available in the literature on the slope of the collapse surface. It is definitely a
value lower than the effective friction . Kramer (1996, p. 364)) suggests that an approximation is𝜙'
about two-thirds of . For the analyses here, a value of 20 degrees was arbitrarily chosen, which is𝜙'
about 0.6 of the (0.6 x 34).𝜙'
The first step in the modeling process is to establish the long-term steady-state seepage conditions
and pore-water pressures. This can be done with SEEP/W. The conditions that existed in the
downstream toe before the earthquake are not well known. There is no discussion in the literature
about this. However, based on various sketches by others, there are suggestions that watertable
was 1 to 2 meters below the ground surface. To simulate this, a Head-type boundary condition is
applied along the contact between the upper crust and the underlying granular material (Figure 11).
9
Also, it is arbitrarily assumed that a piezometric surface did not exist in the outer shell above the
downstream toe. To prevent this, the boundary between the outer shell and the hydraulic fill is
tagged as a potential seepage face. This ensures that the pore-water pressure cannot be greater
than zero along this material contact line.
Figure 11. Problem configuration of the initial pore-water pressure analysis.
Approximate conductivity functions and Ksat values are adequate for this steady-state analysis since
the piezometric surface is high up in the dam and much of the seepage flow is in the saturated zone.
Also, the pore-water pressure distribution, the parameter of interest here, is not sensitive to Ksat.
The next step is to establish the initial total and effective static stress distribution throughout the
dam. This can be done with a QUAKE/W Static-type of analysis or a SIGMA/W Insitu analysis. The
QUAKE/W Initial Static analysis type is used here.
To compute the initial static stresses, it is necessary to specify Poisson’s ratio and the total unit
weight of the soils. Remember that Poisson’s ratio is used indirectly to say something about Ko - the
remainder of the specified material properties do not influence the insitu stress calculations.
The previously computed SEEP/W pore-water pressures are used in the static stress analysis.
It is important to include the weight of the reservoir water in the static stress analysis. This is done by
applying a fluid pressure boundary on the region edges in contact with the reservoir. This is
illustrated in Figure 12.
10
1
2
El. 370
El. 371
1
2.5
Figure 12. The reservoir water weight boundary condition.
As a reference point, it is useful to know the factor of safety under static conditions before the slide
occurred. SLOPE/W analyses are included for both the overall and downstream slopes using the
initial pore-water pressures and static stresses simulated using SEEP/W and QUAKE/W.
The next step is to do a dynamic analysis using QUAKE/W. The main purpose of the dynamic analysis
is to determine the excess pore-water pressures that may develop and to identify zones where the
soil may have liquefied or where the soil strength may have dropped down to the steady-state
strength.
The QUAKE/W Nonlinear method of analysis is used here. This is an effective stress method, since the
pore-water pressures that develop during the shaking are used to determine the effective stresses,
and the material properties are modified in response to the changing effective stresses.
Time history records of the San Fernando earthquake are available from various seismic stations.
Most of the past studies have been based on a recording station located on the abutment of the
nearby Pacoima Dam, located about 5 km east of San Fernando. The base rock peak acceleration at
the San Fernando site has been estimated to be about 0.6 g, and the record is scaled to a maximum
0.6 g to match this value. The time history record used in the analysis here is given in Figure 13. Small
vibrations at the start and end of the publicly available record have been removed, limiting the total
duration to 14 seconds, which includes all the significant peaks. The data points are presented at a
constant 0.01 sec interval.
11
Acceleration(g)
Time (sec)
-0.1
-0.2
-0.3
-0.4
-0.5
-0.6
0.0
0.1
0.2
0.3
0.4
0.5
0 5 10 15
Figure 13. Earthquake record based the station at the Pacoima Dam abutment.
The small strain shear moduli Gmax are specified as functions. Figure 14 shows the function adopted
for the hydraulic fill. The minimum value is 3000 kPa. Functions for the shell material and the alluvium
have a similar shape, but with a higher minimum value.
Hydrulic fill
Gmax(kPa)
Y-Effective Stress (kPa)
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
0 100 200 300 400
Figure 14. The Gmax function for the hydraulic fill.
The Nonlinear Analysis method in QUAKE/W is associated with the MFS (Martin Finn Seed) pore-
water pressure model. With this model, it is necessary to specify a functionwhich defines the
volumetric strain that will occur under a given number of cycles for a given shear-strain amplitude
(Figure 15). For this analysis, it is specified that the curve in Figure 15 was obtained at shear-strain
amplitude of 0.5 percent.
12
Hydraulic fill
VolumetricStrain(%)
Cyclic Number
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
0 10 20 30 40 50
Figure 15. MFS volumetric strain function.
The second piece of data required for the MFS pore-water pressure model is the Recoverable
Modulus function. This is basically the slope of an unloading curve from a one-dimensional odometer
test. The curve used in the analysis here is shown in Figure 16.
Hydraulic fill
RecoverableModulus(kPa)
Y-Effective Stress (kPa)
0
20000
40000
60000
80000
100000
120000
0 100 200 300
Figure 16. Recoverable modulus function.
Results and Discussion
Figure 17 shows the resulting piezometric line (water table) and total head contours (equipotential
lines) for the initial SEEP/W analysis. Note that the piezometric line comes very close to the ground
surface at the toe of the upper rolled section.
13
352
356
360
364
368
1
2
3
El. 370
El. 371
El. 365
1
2.5
1
2.5
Distance- m
0 25 50 75 100 125 150 175 200
Elevation-m
330
340
350
360
370
380
390
400
Figure 17. Long term steady-state seepage and pore-water pressure conditions.
The resulting vertical effective stresses for the Initial static analysis are as shown in Figure 18.
40
80
80100
160
1
2
3
El. 370
El. 371
El. 365
1
2.5
1
2.5
Red zone from -0.001 to 0.05
Distance - m
0 25 50 75 100 125 150 175 200
Elevation-m
330
340
350
360
370
380
390
400
Figure 18. Initial static vertical effective stresses.
Based on the SEEP/W pore-water pressures and QUAKE/W static stresses, the factor of safety of the
overall slope is well above 2.0 (Figure 19). This is consistent with the findings by Seed et al., who
concluded that the margin of safety against instability under the static conditions was fairly high.
2.153
Safety Map
2.153 - 2.253
1
2
3
El. 371
El. 365
1
2.5
Figure 19. Overall margin of safety before the earthquake.
The safety factor of the downstream slope of the hydraulic fill section is shown in Figure 20. As with
the overall factor of safety, the factor of safety for this potential mode of failure is also fairly high.
The factor of safety in the red band is between 1.70 and 1.80.
14
1.705
Safety Map
1.705 - 1.805
1
2
3
El. 371
El. 365
1
2.5
Figure 20. Downstream slope margin of safety before the earthquake.
History Points can be defined at selected points to get a complete picture of the dynamic response;
that is data is saved for each time-step integration point.
Figure 21 shows the response at the History Point located at the crest of the Dam. There is not much
difference between this record and the input record in Figure 13. There are a couple of spikes greater
than 1g, but outside these spikes the response is more or less a reflection of the earthquake record.
In other words, there is no significant amplification or unrealistic damping. This is consistent with the
conclusions reached by Seed et al.
X-Acceleration(g)
Time (sec)
-1
-2
0
1
2
0 2 4 6 8 10 12 14
Figure 21. Acceleration versus time at the Dam crest.
History Points are also useful for examining the stress-strain response at a selected location. A
History Point was placed at the base of Piezometer 2. The computed shear stress-shear strain path at
this location during the shaking is presented in Figure 22.
15
XY-ShearStress(kPa)
X-Y Shear Strain
-10
-20
-30
-40
0
10
20
30
40
-0.002-0.004-0.006 0 0.002 0.004 0.006 0.008
Figure 22. Typical stress-strain path during the shaking.
Figure 23 shows contours of stress ratios under the initial static stresses. A point of significance𝑞/𝑝'
is the high ratios in the hydraulic fill underneath the dam crest. This means that there is a zone𝑞/𝑝'
where the initial points are near the collapse surface, as discussed previously. The soil strength𝑞/𝑝'
in this zone could easily fall down to the steady-state strength with a small amount of shaking. There
is no yellow shaded area in Figure 24, which indicates that there is zone of initial stress states that are
near but still below the collapse surface.
Figure 23. q/p΄ stress ratios under initial static stresses.
1
2
3
El. 371
El. 365
1
2.5
Red zone from -0.001 to 0.05
Figure 24. Zone of liquefaction based on initial q/p’ stress ratios relative to collapse surface.
16
During the shaking, excess pore-water pressures will develop, causing other elements to reach the
collapse surface as discussed earlier; in other words, to liquefy. Figure 25 shows the liquefied zone at
the end of the shaking.
1
2
3
El. 371
El. 365
1
2.5
Figure 25. Liquefied zone at the end of shaking.
Figure 26 shows contours of the excess pore-water pressure at the end of the shaking. The highest
excess pore-water pressures (90 kPa) are at the bottom of the hydraulic fill below the downstream
berm crest.
Figure 26. Contours of excess pore-water pressure at the end of shaking.
Figure 27 shows the build-up of excess pore-water pressures at the bottom tip of Piezometer 2. The
maximum excess pore-water pressure is 43.5 kPa. This is a pressure head of 4.4 m (about 14.5 feet).
17
Pore-WaterPressure(kPa)
Time (sec)
0
10
20
30
40
0 2 4 6 8 10 12 14
Figure 27. Excess pore-water pressure at Piezometer 2.
The View Results Information command can be used to get the final total H at the base tip of
Piezometer 2. The computed H is 369 m. The ground surface at Piezometer 2 is 366 m. The total head
H, being greater than the ground surface elevation, means water would be flowing from the
piezometer casing, which is in keeping with observations.
The computer total H at Piezometer 3 is 364 m, and the maximum excess pore-water pressure is
68 kPa (6.8 m of pressure head). The elevation at the top of Piezometer 3 is 364. This means that
with H equal to 364, the water level in this piezometer would have been at the top of the
piezometer. This is higher than what was measured 24 hours after the earthquake. This is consistent
with the thinking by Seed et al. that the maximum level was likely higher than what was measured,
since some of the excess pore-water pressure had already dissipated by the time the reading was
taken.
The measured rise in the water level in Piezometer 1 was around 5.2 m (17 feet). The computed total
head H at Piezometer 1 is 370 m. The top elevation of the casing is 369 m, meaning that water would
flow out of the piezometer, which is in keeping with actual observations.
One of the perplexing issues about Piezometers 1 and 2 is the dramatic difference in the response,
even though they are reasonably close together. The sudden rise in Piezometer 1 is about twice that
in Piezometer 2. Could it be that cracks formed, and the reservoir water was directly connected to
one piezometer and not the other? The analysis cannot provide an answer that question.
The similarities between the computed and measured responses at Piezometers 1, 2 and 3 provide
supporting evidence that the numerical simulation is capturing the trends and tendencies of what
actually happened.
SLOPE/W has the capability to use the specified steady-state strength Css along the portion of a
potential slip surface that passes through an element that QUAKE/W has marked as liquefied.
18
Repeating the pre-earthquake stability analysis, but with post-earthquake pore-water pressures and
with Css strengths in the liquefied zones, results in factors of safety of close to unity (1.0). Figure 28
shows the situation for the overall stability, and Figure 29, the stability of the downstream slope at
the end of the earthquake. In both cases, the low safety factors suggest that the structure was
marginally stable at the end of the earthquake, which it intuitively likely was.
0.906
Safety Map
0.906 - 1.006
1
2
3
El. 371
El. 365
1
2.5
Figure 28. Post-earthquake overall stability.
0.863
Safety Map
0.863 - 0.963
1
2
3
El. 371
El. 365
1
2.5
Figure 29. Post-earthquake stability of the downstream slope at the end of the earthquake.
Figure 30 shows the cohesive strength along the overall critical slip surface. Note how along much of
the slip surface, the cohesion is at 35 kPa, which is the specified Css. Where Css is 35, is zero and,𝜙'
therefore, the frictional component of the strength is zero.
Cohesion : Slip
224
Strength : Slip
224
Undefined
X (m)
0
5
10
15
20
25
30
35
60 80 100 120 140 160 180
Figure 30. Strength along the overall critical slip surface.
19
It is of significant interest that the overall critical slip surface in Figure 28 on the upstream face is
exactly in the area where large longitudinal cracks had formed under the reservoir water surface.
These cracks only became visible after the reservoir was drawn down, some 12 days after the
earthquake.
The safety factor for the overall stability case is 0.923 if the steady-state strength is used in the
liquefied zones of the dam (Figure 28) as compared to 1.11 using the collapse surface properties ( 𝜙'
=20; Css = 35 kPa) and 1.28 using effective stress strength properties ( = 34). In the downstream𝜙'
local case, the safety factor is 0.885 if the steady-state strength is used in the liquefied zones of the
dam (Figure 29) as compared to 0.978 using the collapse surface properties ( =20; Css = 35 kPa) and𝜙'
1.054 using effective stress strength properties ( = 34). Consequently, it could be argued that, in𝜙'
the local downstream case, the Css strength is not required to explain the observed behavior, but it is
certainly required to explain the overall behavior.
The dam remained marginally stable, but there was some significant permanent displacement, as
discussed earlier. Seed et al. came to the view based on field observations that the movements were
due to increases in pore-water pressures and a corresponding weakening of the soil within a large
portion of the dam. The inference is that it was not the inertial forces (mass times acceleration) that
were fundamentally at the root of the deformations, but it was the excess pore-water pressures and
the strength loss.
An estimate of the movements can be made by taking the post-earthquake conditions into SIGMA/W
for a stress re-distribution analysis. Some zones were obviously over-stressed after the earthquake
due to the strength loss and elevated pore-water pressures. The stress re-distribution analysis in
SIGMA/W attempts to re-distribute the stresses from the over-stressed zones to other zones that can
accept some additional stress before reaching the soil strength. Such a stress re-distribution
generally is accompanied with deformations, especially when the overall structure approaches the
point of limiting equilibrium. In this case, it has already been shown that the structure was near the
point of limiting equilibrium, and a stress re-distribution analysis therefore can provide some
information about the failure mechanisms and movements.
Figure 31 shows the displacement vectors from the post-earthquake SIGMA/W stress re-distribution.
The movement patterns seem to be a reasonable approximation of what actually happened. The
vectors in the upper rolled fill section are down and to the right, and the movement vectors start on
the upstream face in the area where the longitudinal cracks developed. To the right of the upper
rolled-fill section, the movement is predominately horizontal, which is also consistent with the
observations discussed earlier.
20
1
2
3
El. 371
El. 365
1
2.5
Red zone from -0.001 to 0.05
Figure 31. Post-earthquake movement directions.
There seems to be, in part, a localized failure on the downstream side. The movements are greater in
this area than further upstream. They are distinctly downward at the crest, and lateral and upward at
the toe. The strong lateral movements in the toe area are consistent with the pressure ridge that
had formed here, the compression failures observed in the outlet conduit and the down slope
tipping of the concrete manhole. The movement vectors, in general, are somewhat characteristic of
a localized near circular slip failure.
Generally, the computed movement patterns are entirely consistent with the field observations, and
the conclusions arrived at by Seed et al. They concluded that, the zone of movements within the dam
extended vertically over a large portion of the embankment and was not limited to well-defined slip
surface at depth. The computed movement patterns in Figure 31 certainly confirm this.
Another way to view the movements is as a deformed section (Figure 32). The view gives an
appreciation of the down and right movement of the upper rolled fill section and compression
bulging in the downstream toe area.
1
2
3
El. 371
El. 365
1
2.5
Red zone from -0.001 to 0.05
Figure 32. A deformed section at a 20X exaggeration.
An interesting result from the stress-redistribution analysis is that there is no tendency for
movement in the upstream direction, or any signs suggesting failure in the upstream direction, in
spite of the large liquefaction zones shown in Figure 25 under the dam crest and on the upstream
side of the crest in the hydraulic fill.
The actual magnitude of the movements is rather difficult to compute with any degree of
confidence. When Css is 35 kPa, the maximum computed movement is less than half a metre. The
reported maximum movements at the downstream berm crest are closer to 2 m.
Making an accurate prediction of the permanent displacement is complicated by the fact that the
computed displacements are sensitive to the Css assigned to the liquefied material, and because it is
21
numerically difficult to get a perfectly converged solution from the stress re-distribution analysis
when the structure approaches the point of limiting equilibrium. In light of this, any computed
movement magnitudes are likely a rough estimate at best.
While it may not be possible to accurately predict the movements associated with a case like this, the
analysis exercise can nonetheless be very useful in formulating one’s final engineering judgments
about the potential behavior of an earth structure like the Upper San Fernando Dam. The trends and
mechanisms are every bit as important in evaluating the potential performance of a structure like
this as the actual magnitudes of the potential movements.
Summary and Conclusions
This analysis of the Upper San Fernando Dam case history clearly demonstrates the advantages of
the product integration in GeoStudio. Using QUAKE/W in conjunction with SEEP/W, SIGMA/W and
SLOPE/W provides a much clearer picture, than using QUAKE/W in isolation.
This analysis also shows that GeoStudio has all the features required for analyzing the multiple issues
inherent in a case like the Upper San Fernando Dam liquefaction failure.
Many of the material properties used in this analysis are simple estimates. They are, however,
adequate for understanding the key issues and mechanisms. This is also true for any project. It is
good modeling practice to first use realistic estimates of material properties to obtain an
understanding of the key issues. Then a decision can be made as to where additional efforts and
resources should be spent on further field investigations and testing.
References
Castro, G., Seed, R.B., Keller, T.O. Seed, H.B. (1992). Steady-State Strength Analysis of the Lower San
Fernando Dam Slide, ASCE Journal of Geotechnical engineering, Vol. 118, No. 3, pp. 406-427
Seed, H.B., Lee, K.L., Idriss, I.M. and Makadisi, F.I. (1975). The Slides in the San Fernando Dams
during the Earthquake of February 9, 1971 – ASCE, J of the Geotechnical Engineering Division, GT7,
pp. 651-688
Lee, K.L., Seed, H.B., Idriss, I.M., and Makadisi, F.I. (1975). Properties of Soil in the San Fernando
Hydraulic Fill Dams – ASCE, J of the Geotechnical Engineering Division, GT8, pp. 801-821
Seed, H.B., Idriss, I.M., Lee, K.L. and Makadisi, F.I. (1975). Dynamic Analysis of the Slide in the Lower
San Fernando Dam during the Earthquake of February 9, 1971 – ASCE, J of the Geotechnical
Engineering Division, GT9, pp. 889-911

More Related Content

What's hot

Beverly Hills-2013-EMG Paper
Beverly Hills-2013-EMG PaperBeverly Hills-2013-EMG Paper
Beverly Hills-2013-EMG PaperEldon Gath
 
1000 years of Climate Change II
1000 years of Climate Change II1000 years of Climate Change II
1000 years of Climate Change IISimoneBoccuccia
 
Pecological implications of summer fog decline in the coast redwood
Pecological implications of summer fog decline in the coast redwoodPecological implications of summer fog decline in the coast redwood
Pecological implications of summer fog decline in the coast redwood6D45520z848622K444
 
Sea Level Changes as recorded in nature itself
Sea Level Changes as recorded in nature itselfSea Level Changes as recorded in nature itself
Sea Level Changes as recorded in nature itselfIJERA Editor
 
Application of Well Logs and Seismic Data in Predicting Overpressured Zones i...
Application of Well Logs and Seismic Data in Predicting Overpressured Zones i...Application of Well Logs and Seismic Data in Predicting Overpressured Zones i...
Application of Well Logs and Seismic Data in Predicting Overpressured Zones i...IJSRED
 
SPRINGER IWRM Published
SPRINGER IWRM PublishedSPRINGER IWRM Published
SPRINGER IWRM PublishedRotem Sade
 
manuscrptFinalRevised
manuscrptFinalRevisedmanuscrptFinalRevised
manuscrptFinalRevisedSean Lamarre
 
cr2007-B7smithetal
cr2007-B7smithetalcr2007-B7smithetal
cr2007-B7smithetalshiqiang Ye
 
Gulf.report.dec.01.2010
Gulf.report.dec.01.2010Gulf.report.dec.01.2010
Gulf.report.dec.01.2010John Hutchison
 
Mapping Sea-Level Change inTime, Space, and Probability
Mapping Sea-Level Change inTime, Space, and ProbabilityMapping Sea-Level Change inTime, Space, and Probability
Mapping Sea-Level Change inTime, Space, and ProbabilitySérgio Sacani
 
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+Landers
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+LandersLessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+Landers
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+LandersKris Esterson
 
Sections B1 - B5
Sections B1 - B5Sections B1 - B5
Sections B1 - B5rockarty
 
Pavel, Lemberkovics_Basin Modelling
Pavel, Lemberkovics_Basin ModellingPavel, Lemberkovics_Basin Modelling
Pavel, Lemberkovics_Basin ModellingEdina P
 
TU2.T10.3.pptx
TU2.T10.3.pptxTU2.T10.3.pptx
TU2.T10.3.pptxgrssieee
 
Physical Forcing Mechanisms Controlling the Variability of Chlorophyll-a over...
Physical Forcing Mechanisms Controlling the Variability of Chlorophyll-a over...Physical Forcing Mechanisms Controlling the Variability of Chlorophyll-a over...
Physical Forcing Mechanisms Controlling the Variability of Chlorophyll-a over...Da Silva Meyre
 

What's hot (19)

Beverly Hills-2013-EMG Paper
Beverly Hills-2013-EMG PaperBeverly Hills-2013-EMG Paper
Beverly Hills-2013-EMG Paper
 
CRRSDR AEG 2016
CRRSDR AEG 2016CRRSDR AEG 2016
CRRSDR AEG 2016
 
1000 years of Climate Change II
1000 years of Climate Change II1000 years of Climate Change II
1000 years of Climate Change II
 
Pecological implications of summer fog decline in the coast redwood
Pecological implications of summer fog decline in the coast redwoodPecological implications of summer fog decline in the coast redwood
Pecological implications of summer fog decline in the coast redwood
 
Sea Level Changes as recorded in nature itself
Sea Level Changes as recorded in nature itselfSea Level Changes as recorded in nature itself
Sea Level Changes as recorded in nature itself
 
Application of Well Logs and Seismic Data in Predicting Overpressured Zones i...
Application of Well Logs and Seismic Data in Predicting Overpressured Zones i...Application of Well Logs and Seismic Data in Predicting Overpressured Zones i...
Application of Well Logs and Seismic Data in Predicting Overpressured Zones i...
 
RCEC Email 4.28.03
RCEC Email 4.28.03RCEC Email 4.28.03
RCEC Email 4.28.03
 
SPRINGER IWRM Published
SPRINGER IWRM PublishedSPRINGER IWRM Published
SPRINGER IWRM Published
 
manuscrptFinalRevised
manuscrptFinalRevisedmanuscrptFinalRevised
manuscrptFinalRevised
 
cr2007-B7smithetal
cr2007-B7smithetalcr2007-B7smithetal
cr2007-B7smithetal
 
Gulf.report.dec.01.2010
Gulf.report.dec.01.2010Gulf.report.dec.01.2010
Gulf.report.dec.01.2010
 
Mapping Sea-Level Change inTime, Space, and Probability
Mapping Sea-Level Change inTime, Space, and ProbabilityMapping Sea-Level Change inTime, Space, and Probability
Mapping Sea-Level Change inTime, Space, and Probability
 
Engineering geology of dam
Engineering geology of damEngineering geology of dam
Engineering geology of dam
 
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+Landers
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+LandersLessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+Landers
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+Landers
 
Sections B1 - B5
Sections B1 - B5Sections B1 - B5
Sections B1 - B5
 
Pavel, Lemberkovics_Basin Modelling
Pavel, Lemberkovics_Basin ModellingPavel, Lemberkovics_Basin Modelling
Pavel, Lemberkovics_Basin Modelling
 
James Scourse C3W IPCC Presentation
James Scourse C3W IPCC PresentationJames Scourse C3W IPCC Presentation
James Scourse C3W IPCC Presentation
 
TU2.T10.3.pptx
TU2.T10.3.pptxTU2.T10.3.pptx
TU2.T10.3.pptx
 
Physical Forcing Mechanisms Controlling the Variability of Chlorophyll-a over...
Physical Forcing Mechanisms Controlling the Variability of Chlorophyll-a over...Physical Forcing Mechanisms Controlling the Variability of Chlorophyll-a over...
Physical Forcing Mechanisms Controlling the Variability of Chlorophyll-a over...
 

Similar to Upper san fernando dam

Improved analyses of liquefaction and settlement
Improved analyses of liquefaction and settlementImproved analyses of liquefaction and settlement
Improved analyses of liquefaction and settlementRobert Pyke
 
Investigating Flooding Pattern Using Hydrologic Engineering Center-River Anal...
Investigating Flooding Pattern Using Hydrologic Engineering Center-River Anal...Investigating Flooding Pattern Using Hydrologic Engineering Center-River Anal...
Investigating Flooding Pattern Using Hydrologic Engineering Center-River Anal...Niraj Lamichhane
 
Chapter4groundwaterhydrology 130630055824-phpapp02
Chapter4groundwaterhydrology 130630055824-phpapp02Chapter4groundwaterhydrology 130630055824-phpapp02
Chapter4groundwaterhydrology 130630055824-phpapp02Cleophas Rwemera
 
Land Subsidence Introduction Of all water that r.docx
Land Subsidence  Introduction  Of all water that r.docxLand Subsidence  Introduction  Of all water that r.docx
Land Subsidence Introduction Of all water that r.docxsmile790243
 
Chapter 4 groundwater hydrology
Chapter 4 groundwater hydrologyChapter 4 groundwater hydrology
Chapter 4 groundwater hydrologyMohammed Salahat
 
ÖNCEL AKADEMİ: INTRODUCTION TO GEOPHYSICS
ÖNCEL AKADEMİ: INTRODUCTION TO GEOPHYSICSÖNCEL AKADEMİ: INTRODUCTION TO GEOPHYSICS
ÖNCEL AKADEMİ: INTRODUCTION TO GEOPHYSICSAli Osman Öncel
 
Student Name Bud BennemanGeology 105 Spring 2020Paper Outline.docx
Student Name Bud BennemanGeology 105 Spring 2020Paper Outline.docxStudent Name Bud BennemanGeology 105 Spring 2020Paper Outline.docx
Student Name Bud BennemanGeology 105 Spring 2020Paper Outline.docxdeanmtaylor1545
 
Student Name Bud BennemanGeology 105 Spring 2020Paper Outline.docx
Student Name Bud BennemanGeology 105 Spring 2020Paper Outline.docxStudent Name Bud BennemanGeology 105 Spring 2020Paper Outline.docx
Student Name Bud BennemanGeology 105 Spring 2020Paper Outline.docxcpatriciarpatricia
 
Diana Allen, SFU - Water Science Research: Challenges and Success Stories in ...
Diana Allen, SFU - Water Science Research: Challenges and Success Stories in ...Diana Allen, SFU - Water Science Research: Challenges and Success Stories in ...
Diana Allen, SFU - Water Science Research: Challenges and Success Stories in ...BC Water Science Symposium
 
9. the great time questions, part 3
9. the great time questions, part 39. the great time questions, part 3
9. the great time questions, part 3Ariel Roth
 
Pyke paper for asce lifelines conference 2021 22
Pyke paper for asce lifelines conference 2021 22Pyke paper for asce lifelines conference 2021 22
Pyke paper for asce lifelines conference 2021 22Robert Pyke
 
Sea level rise, emerging issues paper, royal society of new zealand, sept 2010
Sea level rise, emerging issues paper, royal society of new zealand, sept 2010Sea level rise, emerging issues paper, royal society of new zealand, sept 2010
Sea level rise, emerging issues paper, royal society of new zealand, sept 2010petergnz
 
From the Arctic to the Tropics: The U.S. UNCLOS Bathymetric Mapping Program
From the Arctic to the Tropics: The U.S. UNCLOS Bathymetric Mapping ProgramFrom the Arctic to the Tropics: The U.S. UNCLOS Bathymetric Mapping Program
From the Arctic to the Tropics: The U.S. UNCLOS Bathymetric Mapping ProgramLarry Mayer
 
Geologic Controls on Liquefaction Processes at the Bottineau Quicksand Site
Geologic Controls on Liquefaction Processes at the Bottineau Quicksand SiteGeologic Controls on Liquefaction Processes at the Bottineau Quicksand Site
Geologic Controls on Liquefaction Processes at the Bottineau Quicksand SiteBrody Awalt
 
Unit III Dynamic Crust Powerpoint
Unit III Dynamic Crust PowerpointUnit III Dynamic Crust Powerpoint
Unit III Dynamic Crust Powerpointedwardoliver
 
THE GRAND CANYON - Part 1
THE GRAND CANYON - Part 1THE GRAND CANYON - Part 1
THE GRAND CANYON - Part 1Ariel Roth
 
Steps to Plate TectonicsStep 1 – Continental Driftwww.mat.docx
Steps to Plate TectonicsStep 1 – Continental Driftwww.mat.docxSteps to Plate TectonicsStep 1 – Continental Driftwww.mat.docx
Steps to Plate TectonicsStep 1 – Continental Driftwww.mat.docxdessiechisomjj4
 

Similar to Upper san fernando dam (20)

Improved analyses of liquefaction and settlement
Improved analyses of liquefaction and settlementImproved analyses of liquefaction and settlement
Improved analyses of liquefaction and settlement
 
Investigating Flooding Pattern Using Hydrologic Engineering Center-River Anal...
Investigating Flooding Pattern Using Hydrologic Engineering Center-River Anal...Investigating Flooding Pattern Using Hydrologic Engineering Center-River Anal...
Investigating Flooding Pattern Using Hydrologic Engineering Center-River Anal...
 
Chapter4groundwaterhydrology 130630055824-phpapp02
Chapter4groundwaterhydrology 130630055824-phpapp02Chapter4groundwaterhydrology 130630055824-phpapp02
Chapter4groundwaterhydrology 130630055824-phpapp02
 
Land Subsidence Introduction Of all water that r.docx
Land Subsidence  Introduction  Of all water that r.docxLand Subsidence  Introduction  Of all water that r.docx
Land Subsidence Introduction Of all water that r.docx
 
Chapter 4 groundwater hydrology
Chapter 4 groundwater hydrologyChapter 4 groundwater hydrology
Chapter 4 groundwater hydrology
 
ÖNCEL AKADEMİ: INTRODUCTION TO GEOPHYSICS
ÖNCEL AKADEMİ: INTRODUCTION TO GEOPHYSICSÖNCEL AKADEMİ: INTRODUCTION TO GEOPHYSICS
ÖNCEL AKADEMİ: INTRODUCTION TO GEOPHYSICS
 
Student Name Bud BennemanGeology 105 Spring 2020Paper Outline.docx
Student Name Bud BennemanGeology 105 Spring 2020Paper Outline.docxStudent Name Bud BennemanGeology 105 Spring 2020Paper Outline.docx
Student Name Bud BennemanGeology 105 Spring 2020Paper Outline.docx
 
Student Name Bud BennemanGeology 105 Spring 2020Paper Outline.docx
Student Name Bud BennemanGeology 105 Spring 2020Paper Outline.docxStudent Name Bud BennemanGeology 105 Spring 2020Paper Outline.docx
Student Name Bud BennemanGeology 105 Spring 2020Paper Outline.docx
 
SeniorResearch
SeniorResearchSeniorResearch
SeniorResearch
 
Diana Allen, SFU - Water Science Research: Challenges and Success Stories in ...
Diana Allen, SFU - Water Science Research: Challenges and Success Stories in ...Diana Allen, SFU - Water Science Research: Challenges and Success Stories in ...
Diana Allen, SFU - Water Science Research: Challenges and Success Stories in ...
 
9. the great time questions, part 3
9. the great time questions, part 39. the great time questions, part 3
9. the great time questions, part 3
 
ENV 101 Ch04 lecture ppt_a
ENV 101 Ch04 lecture ppt_aENV 101 Ch04 lecture ppt_a
ENV 101 Ch04 lecture ppt_a
 
Pyke paper for asce lifelines conference 2021 22
Pyke paper for asce lifelines conference 2021 22Pyke paper for asce lifelines conference 2021 22
Pyke paper for asce lifelines conference 2021 22
 
Sea level rise, emerging issues paper, royal society of new zealand, sept 2010
Sea level rise, emerging issues paper, royal society of new zealand, sept 2010Sea level rise, emerging issues paper, royal society of new zealand, sept 2010
Sea level rise, emerging issues paper, royal society of new zealand, sept 2010
 
From the Arctic to the Tropics: The U.S. UNCLOS Bathymetric Mapping Program
From the Arctic to the Tropics: The U.S. UNCLOS Bathymetric Mapping ProgramFrom the Arctic to the Tropics: The U.S. UNCLOS Bathymetric Mapping Program
From the Arctic to the Tropics: The U.S. UNCLOS Bathymetric Mapping Program
 
Geologic Controls on Liquefaction Processes at the Bottineau Quicksand Site
Geologic Controls on Liquefaction Processes at the Bottineau Quicksand SiteGeologic Controls on Liquefaction Processes at the Bottineau Quicksand Site
Geologic Controls on Liquefaction Processes at the Bottineau Quicksand Site
 
ICES-ASC2010-v9
ICES-ASC2010-v9ICES-ASC2010-v9
ICES-ASC2010-v9
 
Unit III Dynamic Crust Powerpoint
Unit III Dynamic Crust PowerpointUnit III Dynamic Crust Powerpoint
Unit III Dynamic Crust Powerpoint
 
THE GRAND CANYON - Part 1
THE GRAND CANYON - Part 1THE GRAND CANYON - Part 1
THE GRAND CANYON - Part 1
 
Steps to Plate TectonicsStep 1 – Continental Driftwww.mat.docx
Steps to Plate TectonicsStep 1 – Continental Driftwww.mat.docxSteps to Plate TectonicsStep 1 – Continental Driftwww.mat.docx
Steps to Plate TectonicsStep 1 – Continental Driftwww.mat.docx
 

More from Ruben Dario Aranda Leiva

More from Ruben Dario Aranda Leiva (6)

Pre dimensionado de-cimentaciones
Pre dimensionado de-cimentacionesPre dimensionado de-cimentaciones
Pre dimensionado de-cimentaciones
 
Concreto-Armado-I-Juan-ortega-garcia
Concreto-Armado-I-Juan-ortega-garciaConcreto-Armado-I-Juan-ortega-garcia
Concreto-Armado-I-Juan-ortega-garcia
 
Csicol manual 2
Csicol manual 2Csicol manual 2
Csicol manual 2
 
Csicol manual
Csicol manualCsicol manual
Csicol manual
 
Manual evaluacion-de-riesgos v2
Manual evaluacion-de-riesgos v2Manual evaluacion-de-riesgos v2
Manual evaluacion-de-riesgos v2
 
Microzonificacion sismica de la ciudad de Huaraz
Microzonificacion sismica de la ciudad de HuarazMicrozonificacion sismica de la ciudad de Huaraz
Microzonificacion sismica de la ciudad de Huaraz
 

Recently uploaded

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 

Recently uploaded (20)

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 

Upper san fernando dam

  • 1. 1 Upper San Fernando Dam GEO-SLOPE International Ltd. | www.geo-slope.com 1200, 700 - 6th Ave SW, Calgary, AB, Canada T2P 0T8 Main: +1 403 269 2002 | Fax: +1 888 463 2239 Introduction In light of the importance of the San Fernando Dam case histories and their prominence in the literature, it is important to show how GeoStudio, and in particular QUAKE/W, can be used to analyze cases like this. This example concentrates on the Upper Dam. The purpose here is not to replicate all that has been done by others, or to necessarily adopt the exact conditions presented by others, but to more generally illustrate the features and capabilities of GeoStudio in the context of a famous case history. The emphasis here is on QUAKE/W because the cases involve earthquake shaking, but SEEP/W, SLOPE/W and SIGMA/W are also used for various aspects of the analysis. Background There was a significant earthquake in Southern California in 1971, which is referred to as the San Fernando earthquake. The earthquake occurred on February 9, 1971 at 6:00 a.m. local time and had a 6.6 Richter magnitude. The earthquake created a liquefaction failure at a water storage facility known as the Lower San Fernando Dam and Reservoir in the San Fernando community on the northern edge of the greater metropolitan Los Angeles area. Another facility known as the Upper San Fernando Dam also suffered some damage, but it was not as serious as at the Lower Dam. Figure 1 shows an aerial view of the area. The Lower Dam is on the left side of the picture and the Upper Dam is towards the upper right of the picture. US Interstate Freeway 5 is on the right of the picture.
  • 2. 2 Figure 1. The San Fernando dams and reservoirs. The earthquake shaking initiated a major failure on the upstream side of the dam. The photos in Figure 2, Figure 3 and Figure 4 show some of the conditions after the earthquake. Of significance is the very steep slide head scarp (Figure 2) and very marginal freeboard that remained after the failure. These photos are from Professor Ross W. Boulanger’s web site photo album at the University of California, Davis, California. The web site link is: http://cee.engr.ucdavis.edu/faculty/boulanger/ Presumably, based on the names on the photographs, they were taken by H.B. (Harry) Seed and J.M. (Mike) Duncan. The failure led to a perilously close catastrophe. Had the head scarp been slightly lower, the outflow from the reservoir would have quickly eroded the dam and flooded many communities downstream. Considering the extremely precarious situation, some 80,000 people over an 11-square-mile area were evacuated while the reservoir was emptied over a period of three to four days. Figure 2. Upstream face of the dam after the drawing down the reservoir.
  • 3. 3 Figure 3. General view of the slide head scarp. Figure 4. A close-up view of the slide head scarp. The San Fernando dams have become extremely important case histories for geotechnical earthquake engineering. Due to their significance, the cases have become the subject of years of research and numerous publications. Much of the early research was done by Professor H. Bolton (Harry) Seed and his colleagues at the University of California at Berkeley. Their work led to three papers, which provide much of the background information and early investigation findings. The three papers are: Seed, H.B., Lee, K.L., Idriss, I.M. and Makadisi, F.I. (1975). The Slides in the San Fernando Dams during the Earthquake of February 9, 1971 – ASCE, J of the Geotechnical Engineering Division, GT7, pp. 651-688 Lee, K.L., Seed, H.B., Idriss, I.M., and Makadisi, F.I. (1975). Properties of Soil in the San Fernando Hydraulic Fill Dams – ASCE, J of the Geotechnical Engineering Division, GT8, pp. 801-821 Seed, H.B., Idriss, I.M., Lee, K.L. and Makadisi, F.I. (1975). Dynamic Analysis of the Slide in the Lower San Fernando Dam during the Earthquake of February 9, 1971 – ASCE, J of the Geotechnical Engineering Division, GT9, pp. 889-911
  • 4. 4 Reference to these papers will be made as Seed et al. throughout this document. These papers were published in three consecutive months; July, August and September. The Upper San Fernando Dam was constructed directly on the native streambed alluvium (Figure 5). The main body of the dam was constructed by what is known as a semi-hydraulic fill method. The material was hauled to the site by wagons and dumped into a pond where it was dispersed by water jets operating from barges. Although there is no mention of it in the publications, this technique must have created an outer shell of material compacted to some degree by the construction traffic. The material for this portion of the dam was obtained from the valley floor. Figure 5. Sketch of the Upper San Fernando Dam. The hydraulic fill method was used up to El. 1200 feet (365 m) and then was topped-off with compacted fill to El. 1218 (371 m). This resulted in a 100-foot berm on the downstream side. The conditions in the downstream toe area are not well known. Seed et al. make the comment that, the soil in this area consisted of about 8 ft (2.4) of loose silty sandy fill overlying alluvium. The origin, date, and method of placing this fill are unknown. Surveys taken after the earthquake revealed that the entire upper portion of the dam had moved downstream around 2 m and the crest had moved downward around 0.75 m. Based on the sketch in Figure 5, only the upper rolled-fill portion moved on the upstream side. Of significance is the movement along the surface of the berm. Here, the movements were predominantly in the lateral direction with hardly any settlement (Figure 6).
  • 5. 5 Figure 6. Movements associated with the earthquake. There were three piezometers in the dam (Figure 7). As indicated by the piezometric records, there was a sudden and dramatic increase in pore-water pressures. Even 24 hours after the earthquake, water was still running out of the top of Piezometers 1 and 2. This is of significance, since these piezometers are in the core area of the dam, especially Piezometer 2. The peak in Piezometer 3 was likely higher than what was measured, due to some dissipation within the 24 hours between the event and the readings. These piezometers provide definitive evidence that substantial excess pore- water pressures resulted from the shaking. Figure 7. Piezometers and pore-water pressure responses due to the shaking. The low level outlet conduit was inspected after the earthquake, and the condition of the conduit provided some interesting clues about the movement that occurred. On the upstream side, the conduit was extended as indicated by the openings noted in Figure 5. Toward the downstream toe, however, the conduit was forced into compression, as indicated by compression failures. Also of significance is the observation that at the downstream toe, a 2-foot high pressure ridge had developed and a concrete man-hole was tilted and sheared in the downstream direction, indicating both lateral and upward movement.
  • 6. 6 Numerical Simulation For the analysis here, the Upper Dam cross-section was idealized, as shown in Figure 8. 1 2 3 El. 370 El. 371 El. 365 1 2.5 1 2.5 Distance - m 0 25 50 75 100 125 150 175 200 Elevation-m 330 340 350 360 370 380 390 400 Figure 8. Numerical analysis model of the Upper San Fernando Dam. Seed et al. present the cross-section as having a clay core. For the analysis here, the entire hydraulic fill is treated as one material. The reasons for this, as will be discussed below, is that the results this way give a picture closer to what actually happened. Furthermore, Peter Byrne in his R.M. Hardy Keynote address at the 2006 Canadian Geotechnical Conference in Vancouver suggested that stratification may have a significant impact on the potential for liquefaction. He looked at the impact of thin layers of clay amongst layers of loose sand and found that the impeded drainage resulting from the clay layers had a significant impact on the liquefaction response of the material in general. It is not difficult to imagine that there was some stratification at the Upper San Fernando Dam in the core area, especially considering the semi-hydraulic fill placement procedure used. Based on these more recent concepts, it is possible that there was some generation of excess pore-water pressures and associated strength loss in the core area, just like in the remainder of the hydraulic fill. The piezometer records noted earlier strongly suggest this was indeed the case. Soil properties for this analysis here are in large part estimates, filtered somewhat by values reported by Seed et al. In the end, it turns out that when stability is the main issue, these estimated values are adequate to understand the observed behavior and processes. Generally, the streambed alluvium, outer shell, and top rolled fill are treated as somewhat more competent than the hydraulic fill. All of the details can be viewed and examined in the associated GeoStudio data file. Chapter 1 in the QUAKE/W Engineering Book presents a section on the Behavior of Fine Sand. This Section introduces the concept of a Collapse Surface. Figure 9 is one of the diagrams presented in Chapter 1. Fundamentally, any stress point, such as Point B, could experience the development of excess pore-water pressures during an earthquake, until the mean effective stress reaches the𝑝' collapse surface. Once on the collapse surface, the strength may fall down to the steady-state strength. On the other hand, the initial stress Point B in Figure 10 may experience the development of excess pore-water pressures, but the strength will not suddenly fall, since the initial deviatoric
  • 7. 7 stress is below the steady-state strength. This is discussed in more detail in the QUAKE/W𝑞 Engineering Book. q p' B Collapse surface Steady-state strength Figure 9. Stress path of contractive loose sand. q p' B Collapse surface Steady-state strength C A Figure 10. Stress path of dense dilative sand. QUAKE/W has an option to make use of the steady-state strength and the collapse surface to identify elements that can liquefy. The user specifies the steady-state strength as and the inclination of𝐶 𝑠𝑠 the collapse surface. is multiplied by a factor of two to define , the steady-state deviatoric stress.𝐶 𝑠𝑠 𝑞 𝑠𝑠 The slope of the Critical-State Line (CSL) is computed from: 𝑀 𝐶𝑆𝐿 = 6sin 𝜙' 3 ‒ sin 𝜙' Equation 1 where is the specified effective friction angle.𝜙'
  • 8. 8 The slope of the collapse surface is computed the same way, by substituting the specified collapse surface angle for . In the space, we can call the slope of the collapse surface . Once ,𝜙' 𝑞 ‒ 𝑝' 𝑀 𝐶𝑆 𝑀 𝐶𝑆𝐿 and have been established, any on or above the collapse surface can be computed for any𝑀 𝐶𝑆 𝑞 𝑠𝑠 𝑞 value.𝑝' The rules adopted in QUAKE/W are as follows:  Ratios of are computed for each element using the initial static stresses;𝑞/𝑝'  If is less than , the element liquefaction flag is never set to “true”; excess pore-water𝑞 𝑞 𝑠𝑠 pressures can develop, but the element is not flagged as having liquefied regardless of the pore-water pressures that develop;  If the ratio is such that the stress state is on or above the collapse surface, the element is𝑞/𝑝' flagged as having liquefied even before any earthquake shaking has started, since any small amount of shaking could cause the strength to fall down to the steady-state strength;  Elements with initial stress states such that is greater than , but the stress points are𝑞 𝑞 𝑠𝑠 under the collapse surface, are initially marked as not liquefied; and  Stress points initially under the collapse surface will move to the left as pore-water pressures develop during the shaking and they are then marked as liquefied when the stress point is on or above the collapse surface. Excess pore-water pressures are limited or restricted so that the mean effective stress is not lower𝑝' than the corresponding with on the CSL. This prevents the effective stresses from becoming𝑝' 𝑞 𝑠𝑠 too low or even negative, which in turn reduces difficulties with numerical instability (convergence). Castro el al. (1992) did an extensive study of the steady-state strength of the Lower San Fernando Dam hydraulic fill material. They concluded that the average undrained steady-state strength was between 30 and 40 kPa depending on the method used to obtain the strength. Values in this range are used in the GeoStudio analyses presented here. Little information is available in the literature on the slope of the collapse surface. It is definitely a value lower than the effective friction . Kramer (1996, p. 364)) suggests that an approximation is𝜙' about two-thirds of . For the analyses here, a value of 20 degrees was arbitrarily chosen, which is𝜙' about 0.6 of the (0.6 x 34).𝜙' The first step in the modeling process is to establish the long-term steady-state seepage conditions and pore-water pressures. This can be done with SEEP/W. The conditions that existed in the downstream toe before the earthquake are not well known. There is no discussion in the literature about this. However, based on various sketches by others, there are suggestions that watertable was 1 to 2 meters below the ground surface. To simulate this, a Head-type boundary condition is applied along the contact between the upper crust and the underlying granular material (Figure 11).
  • 9. 9 Also, it is arbitrarily assumed that a piezometric surface did not exist in the outer shell above the downstream toe. To prevent this, the boundary between the outer shell and the hydraulic fill is tagged as a potential seepage face. This ensures that the pore-water pressure cannot be greater than zero along this material contact line. Figure 11. Problem configuration of the initial pore-water pressure analysis. Approximate conductivity functions and Ksat values are adequate for this steady-state analysis since the piezometric surface is high up in the dam and much of the seepage flow is in the saturated zone. Also, the pore-water pressure distribution, the parameter of interest here, is not sensitive to Ksat. The next step is to establish the initial total and effective static stress distribution throughout the dam. This can be done with a QUAKE/W Static-type of analysis or a SIGMA/W Insitu analysis. The QUAKE/W Initial Static analysis type is used here. To compute the initial static stresses, it is necessary to specify Poisson’s ratio and the total unit weight of the soils. Remember that Poisson’s ratio is used indirectly to say something about Ko - the remainder of the specified material properties do not influence the insitu stress calculations. The previously computed SEEP/W pore-water pressures are used in the static stress analysis. It is important to include the weight of the reservoir water in the static stress analysis. This is done by applying a fluid pressure boundary on the region edges in contact with the reservoir. This is illustrated in Figure 12.
  • 10. 10 1 2 El. 370 El. 371 1 2.5 Figure 12. The reservoir water weight boundary condition. As a reference point, it is useful to know the factor of safety under static conditions before the slide occurred. SLOPE/W analyses are included for both the overall and downstream slopes using the initial pore-water pressures and static stresses simulated using SEEP/W and QUAKE/W. The next step is to do a dynamic analysis using QUAKE/W. The main purpose of the dynamic analysis is to determine the excess pore-water pressures that may develop and to identify zones where the soil may have liquefied or where the soil strength may have dropped down to the steady-state strength. The QUAKE/W Nonlinear method of analysis is used here. This is an effective stress method, since the pore-water pressures that develop during the shaking are used to determine the effective stresses, and the material properties are modified in response to the changing effective stresses. Time history records of the San Fernando earthquake are available from various seismic stations. Most of the past studies have been based on a recording station located on the abutment of the nearby Pacoima Dam, located about 5 km east of San Fernando. The base rock peak acceleration at the San Fernando site has been estimated to be about 0.6 g, and the record is scaled to a maximum 0.6 g to match this value. The time history record used in the analysis here is given in Figure 13. Small vibrations at the start and end of the publicly available record have been removed, limiting the total duration to 14 seconds, which includes all the significant peaks. The data points are presented at a constant 0.01 sec interval.
  • 11. 11 Acceleration(g) Time (sec) -0.1 -0.2 -0.3 -0.4 -0.5 -0.6 0.0 0.1 0.2 0.3 0.4 0.5 0 5 10 15 Figure 13. Earthquake record based the station at the Pacoima Dam abutment. The small strain shear moduli Gmax are specified as functions. Figure 14 shows the function adopted for the hydraulic fill. The minimum value is 3000 kPa. Functions for the shell material and the alluvium have a similar shape, but with a higher minimum value. Hydrulic fill Gmax(kPa) Y-Effective Stress (kPa) 0 10000 20000 30000 40000 50000 60000 70000 80000 90000 0 100 200 300 400 Figure 14. The Gmax function for the hydraulic fill. The Nonlinear Analysis method in QUAKE/W is associated with the MFS (Martin Finn Seed) pore- water pressure model. With this model, it is necessary to specify a functionwhich defines the volumetric strain that will occur under a given number of cycles for a given shear-strain amplitude (Figure 15). For this analysis, it is specified that the curve in Figure 15 was obtained at shear-strain amplitude of 0.5 percent.
  • 12. 12 Hydraulic fill VolumetricStrain(%) Cyclic Number 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 0 10 20 30 40 50 Figure 15. MFS volumetric strain function. The second piece of data required for the MFS pore-water pressure model is the Recoverable Modulus function. This is basically the slope of an unloading curve from a one-dimensional odometer test. The curve used in the analysis here is shown in Figure 16. Hydraulic fill RecoverableModulus(kPa) Y-Effective Stress (kPa) 0 20000 40000 60000 80000 100000 120000 0 100 200 300 Figure 16. Recoverable modulus function. Results and Discussion Figure 17 shows the resulting piezometric line (water table) and total head contours (equipotential lines) for the initial SEEP/W analysis. Note that the piezometric line comes very close to the ground surface at the toe of the upper rolled section.
  • 13. 13 352 356 360 364 368 1 2 3 El. 370 El. 371 El. 365 1 2.5 1 2.5 Distance- m 0 25 50 75 100 125 150 175 200 Elevation-m 330 340 350 360 370 380 390 400 Figure 17. Long term steady-state seepage and pore-water pressure conditions. The resulting vertical effective stresses for the Initial static analysis are as shown in Figure 18. 40 80 80100 160 1 2 3 El. 370 El. 371 El. 365 1 2.5 1 2.5 Red zone from -0.001 to 0.05 Distance - m 0 25 50 75 100 125 150 175 200 Elevation-m 330 340 350 360 370 380 390 400 Figure 18. Initial static vertical effective stresses. Based on the SEEP/W pore-water pressures and QUAKE/W static stresses, the factor of safety of the overall slope is well above 2.0 (Figure 19). This is consistent with the findings by Seed et al., who concluded that the margin of safety against instability under the static conditions was fairly high. 2.153 Safety Map 2.153 - 2.253 1 2 3 El. 371 El. 365 1 2.5 Figure 19. Overall margin of safety before the earthquake. The safety factor of the downstream slope of the hydraulic fill section is shown in Figure 20. As with the overall factor of safety, the factor of safety for this potential mode of failure is also fairly high. The factor of safety in the red band is between 1.70 and 1.80.
  • 14. 14 1.705 Safety Map 1.705 - 1.805 1 2 3 El. 371 El. 365 1 2.5 Figure 20. Downstream slope margin of safety before the earthquake. History Points can be defined at selected points to get a complete picture of the dynamic response; that is data is saved for each time-step integration point. Figure 21 shows the response at the History Point located at the crest of the Dam. There is not much difference between this record and the input record in Figure 13. There are a couple of spikes greater than 1g, but outside these spikes the response is more or less a reflection of the earthquake record. In other words, there is no significant amplification or unrealistic damping. This is consistent with the conclusions reached by Seed et al. X-Acceleration(g) Time (sec) -1 -2 0 1 2 0 2 4 6 8 10 12 14 Figure 21. Acceleration versus time at the Dam crest. History Points are also useful for examining the stress-strain response at a selected location. A History Point was placed at the base of Piezometer 2. The computed shear stress-shear strain path at this location during the shaking is presented in Figure 22.
  • 15. 15 XY-ShearStress(kPa) X-Y Shear Strain -10 -20 -30 -40 0 10 20 30 40 -0.002-0.004-0.006 0 0.002 0.004 0.006 0.008 Figure 22. Typical stress-strain path during the shaking. Figure 23 shows contours of stress ratios under the initial static stresses. A point of significance𝑞/𝑝' is the high ratios in the hydraulic fill underneath the dam crest. This means that there is a zone𝑞/𝑝' where the initial points are near the collapse surface, as discussed previously. The soil strength𝑞/𝑝' in this zone could easily fall down to the steady-state strength with a small amount of shaking. There is no yellow shaded area in Figure 24, which indicates that there is zone of initial stress states that are near but still below the collapse surface. Figure 23. q/p΄ stress ratios under initial static stresses. 1 2 3 El. 371 El. 365 1 2.5 Red zone from -0.001 to 0.05 Figure 24. Zone of liquefaction based on initial q/p’ stress ratios relative to collapse surface.
  • 16. 16 During the shaking, excess pore-water pressures will develop, causing other elements to reach the collapse surface as discussed earlier; in other words, to liquefy. Figure 25 shows the liquefied zone at the end of the shaking. 1 2 3 El. 371 El. 365 1 2.5 Figure 25. Liquefied zone at the end of shaking. Figure 26 shows contours of the excess pore-water pressure at the end of the shaking. The highest excess pore-water pressures (90 kPa) are at the bottom of the hydraulic fill below the downstream berm crest. Figure 26. Contours of excess pore-water pressure at the end of shaking. Figure 27 shows the build-up of excess pore-water pressures at the bottom tip of Piezometer 2. The maximum excess pore-water pressure is 43.5 kPa. This is a pressure head of 4.4 m (about 14.5 feet).
  • 17. 17 Pore-WaterPressure(kPa) Time (sec) 0 10 20 30 40 0 2 4 6 8 10 12 14 Figure 27. Excess pore-water pressure at Piezometer 2. The View Results Information command can be used to get the final total H at the base tip of Piezometer 2. The computed H is 369 m. The ground surface at Piezometer 2 is 366 m. The total head H, being greater than the ground surface elevation, means water would be flowing from the piezometer casing, which is in keeping with observations. The computer total H at Piezometer 3 is 364 m, and the maximum excess pore-water pressure is 68 kPa (6.8 m of pressure head). The elevation at the top of Piezometer 3 is 364. This means that with H equal to 364, the water level in this piezometer would have been at the top of the piezometer. This is higher than what was measured 24 hours after the earthquake. This is consistent with the thinking by Seed et al. that the maximum level was likely higher than what was measured, since some of the excess pore-water pressure had already dissipated by the time the reading was taken. The measured rise in the water level in Piezometer 1 was around 5.2 m (17 feet). The computed total head H at Piezometer 1 is 370 m. The top elevation of the casing is 369 m, meaning that water would flow out of the piezometer, which is in keeping with actual observations. One of the perplexing issues about Piezometers 1 and 2 is the dramatic difference in the response, even though they are reasonably close together. The sudden rise in Piezometer 1 is about twice that in Piezometer 2. Could it be that cracks formed, and the reservoir water was directly connected to one piezometer and not the other? The analysis cannot provide an answer that question. The similarities between the computed and measured responses at Piezometers 1, 2 and 3 provide supporting evidence that the numerical simulation is capturing the trends and tendencies of what actually happened. SLOPE/W has the capability to use the specified steady-state strength Css along the portion of a potential slip surface that passes through an element that QUAKE/W has marked as liquefied.
  • 18. 18 Repeating the pre-earthquake stability analysis, but with post-earthquake pore-water pressures and with Css strengths in the liquefied zones, results in factors of safety of close to unity (1.0). Figure 28 shows the situation for the overall stability, and Figure 29, the stability of the downstream slope at the end of the earthquake. In both cases, the low safety factors suggest that the structure was marginally stable at the end of the earthquake, which it intuitively likely was. 0.906 Safety Map 0.906 - 1.006 1 2 3 El. 371 El. 365 1 2.5 Figure 28. Post-earthquake overall stability. 0.863 Safety Map 0.863 - 0.963 1 2 3 El. 371 El. 365 1 2.5 Figure 29. Post-earthquake stability of the downstream slope at the end of the earthquake. Figure 30 shows the cohesive strength along the overall critical slip surface. Note how along much of the slip surface, the cohesion is at 35 kPa, which is the specified Css. Where Css is 35, is zero and,𝜙' therefore, the frictional component of the strength is zero. Cohesion : Slip 224 Strength : Slip 224 Undefined X (m) 0 5 10 15 20 25 30 35 60 80 100 120 140 160 180 Figure 30. Strength along the overall critical slip surface.
  • 19. 19 It is of significant interest that the overall critical slip surface in Figure 28 on the upstream face is exactly in the area where large longitudinal cracks had formed under the reservoir water surface. These cracks only became visible after the reservoir was drawn down, some 12 days after the earthquake. The safety factor for the overall stability case is 0.923 if the steady-state strength is used in the liquefied zones of the dam (Figure 28) as compared to 1.11 using the collapse surface properties ( 𝜙' =20; Css = 35 kPa) and 1.28 using effective stress strength properties ( = 34). In the downstream𝜙' local case, the safety factor is 0.885 if the steady-state strength is used in the liquefied zones of the dam (Figure 29) as compared to 0.978 using the collapse surface properties ( =20; Css = 35 kPa) and𝜙' 1.054 using effective stress strength properties ( = 34). Consequently, it could be argued that, in𝜙' the local downstream case, the Css strength is not required to explain the observed behavior, but it is certainly required to explain the overall behavior. The dam remained marginally stable, but there was some significant permanent displacement, as discussed earlier. Seed et al. came to the view based on field observations that the movements were due to increases in pore-water pressures and a corresponding weakening of the soil within a large portion of the dam. The inference is that it was not the inertial forces (mass times acceleration) that were fundamentally at the root of the deformations, but it was the excess pore-water pressures and the strength loss. An estimate of the movements can be made by taking the post-earthquake conditions into SIGMA/W for a stress re-distribution analysis. Some zones were obviously over-stressed after the earthquake due to the strength loss and elevated pore-water pressures. The stress re-distribution analysis in SIGMA/W attempts to re-distribute the stresses from the over-stressed zones to other zones that can accept some additional stress before reaching the soil strength. Such a stress re-distribution generally is accompanied with deformations, especially when the overall structure approaches the point of limiting equilibrium. In this case, it has already been shown that the structure was near the point of limiting equilibrium, and a stress re-distribution analysis therefore can provide some information about the failure mechanisms and movements. Figure 31 shows the displacement vectors from the post-earthquake SIGMA/W stress re-distribution. The movement patterns seem to be a reasonable approximation of what actually happened. The vectors in the upper rolled fill section are down and to the right, and the movement vectors start on the upstream face in the area where the longitudinal cracks developed. To the right of the upper rolled-fill section, the movement is predominately horizontal, which is also consistent with the observations discussed earlier.
  • 20. 20 1 2 3 El. 371 El. 365 1 2.5 Red zone from -0.001 to 0.05 Figure 31. Post-earthquake movement directions. There seems to be, in part, a localized failure on the downstream side. The movements are greater in this area than further upstream. They are distinctly downward at the crest, and lateral and upward at the toe. The strong lateral movements in the toe area are consistent with the pressure ridge that had formed here, the compression failures observed in the outlet conduit and the down slope tipping of the concrete manhole. The movement vectors, in general, are somewhat characteristic of a localized near circular slip failure. Generally, the computed movement patterns are entirely consistent with the field observations, and the conclusions arrived at by Seed et al. They concluded that, the zone of movements within the dam extended vertically over a large portion of the embankment and was not limited to well-defined slip surface at depth. The computed movement patterns in Figure 31 certainly confirm this. Another way to view the movements is as a deformed section (Figure 32). The view gives an appreciation of the down and right movement of the upper rolled fill section and compression bulging in the downstream toe area. 1 2 3 El. 371 El. 365 1 2.5 Red zone from -0.001 to 0.05 Figure 32. A deformed section at a 20X exaggeration. An interesting result from the stress-redistribution analysis is that there is no tendency for movement in the upstream direction, or any signs suggesting failure in the upstream direction, in spite of the large liquefaction zones shown in Figure 25 under the dam crest and on the upstream side of the crest in the hydraulic fill. The actual magnitude of the movements is rather difficult to compute with any degree of confidence. When Css is 35 kPa, the maximum computed movement is less than half a metre. The reported maximum movements at the downstream berm crest are closer to 2 m. Making an accurate prediction of the permanent displacement is complicated by the fact that the computed displacements are sensitive to the Css assigned to the liquefied material, and because it is
  • 21. 21 numerically difficult to get a perfectly converged solution from the stress re-distribution analysis when the structure approaches the point of limiting equilibrium. In light of this, any computed movement magnitudes are likely a rough estimate at best. While it may not be possible to accurately predict the movements associated with a case like this, the analysis exercise can nonetheless be very useful in formulating one’s final engineering judgments about the potential behavior of an earth structure like the Upper San Fernando Dam. The trends and mechanisms are every bit as important in evaluating the potential performance of a structure like this as the actual magnitudes of the potential movements. Summary and Conclusions This analysis of the Upper San Fernando Dam case history clearly demonstrates the advantages of the product integration in GeoStudio. Using QUAKE/W in conjunction with SEEP/W, SIGMA/W and SLOPE/W provides a much clearer picture, than using QUAKE/W in isolation. This analysis also shows that GeoStudio has all the features required for analyzing the multiple issues inherent in a case like the Upper San Fernando Dam liquefaction failure. Many of the material properties used in this analysis are simple estimates. They are, however, adequate for understanding the key issues and mechanisms. This is also true for any project. It is good modeling practice to first use realistic estimates of material properties to obtain an understanding of the key issues. Then a decision can be made as to where additional efforts and resources should be spent on further field investigations and testing. References Castro, G., Seed, R.B., Keller, T.O. Seed, H.B. (1992). Steady-State Strength Analysis of the Lower San Fernando Dam Slide, ASCE Journal of Geotechnical engineering, Vol. 118, No. 3, pp. 406-427 Seed, H.B., Lee, K.L., Idriss, I.M. and Makadisi, F.I. (1975). The Slides in the San Fernando Dams during the Earthquake of February 9, 1971 – ASCE, J of the Geotechnical Engineering Division, GT7, pp. 651-688 Lee, K.L., Seed, H.B., Idriss, I.M., and Makadisi, F.I. (1975). Properties of Soil in the San Fernando Hydraulic Fill Dams – ASCE, J of the Geotechnical Engineering Division, GT8, pp. 801-821 Seed, H.B., Idriss, I.M., Lee, K.L. and Makadisi, F.I. (1975). Dynamic Analysis of the Slide in the Lower San Fernando Dam during the Earthquake of February 9, 1971 – ASCE, J of the Geotechnical Engineering Division, GT9, pp. 889-911