 FIRE DAMPER AND ITS SIGNIFICANCE
 FIRE RESISTANCE RATING
 WHERE FIRE DAMPERS ARE REQUIRED
 APPROVED INSTALLATION
 IMPROPER INSTALLATION
2
Fire Damper and its Significance
Fire Damper is a device installed in an air distribution system, designed to close automatically upon
detection of heat to interrupt migratory airflow and to restrict the passage of flame(NFPA 90A).
This is accomplished only when these dampers are installed in accordance with SMACNA Fire, Smoke
and Radiation Dampers Installation Guide.
Fire Resistance
The time in minutes and Hours, that materials or assemblies have withstood a fire exposure as
established in accordance with the test procedures of NFPA 251, Standards Methods of tests of fire
Endurance of building construction and Materials(NFPA 90A).
Where Fire Dampers are Required ??
• Fire Dampers are required wherever fire resistance integrity of the wall is to be maintained.
• Required wherever there is duct penetration either through fire rated wall or fire rated roof.
3
APPROVED INSTALLATION:
Fire and Smoke dampers shall be manufactured and installed as per the latest issue of
SMACNA “ Fire, Smoke and Radiation dampers installation guide.”
As per SMACNA below are the important items to be considered for installation.
A. Retaining Angle
B. Expansion Space
C. Damper Sleeve
D. Fire Damper
E. Retaining Angle fastened to sleeve
F. Damper attachment to sleeve
G. Connection to Duct
Below is the picture depicting above items in the installation of fire damper.
4
5
6
A. Retaining Angle :
• Retaining Angles shall be secured to sleeve on 8” centers and shall not be fixed to walls.
• Retaining angles shall overlap the structure opening 1” minimum and cover corner opening.
• Retaining angle shall be minimum of 1½” x 1½” x 16 gauge(40 x 40 x 1.6mm). However some
manufacturers may allow lower gauge for small size and may require heavier gauge for larger ducts.
B. Expansion Space :
• The annular space/clearance between fire damper sleeve and wall/roof opening is termed as
expansion space.
• This clearance shall be minimum 1/8” per linear foot(10mm per liner meter) of width and height
unless otherwise stated in the listing of the assembly.
• Sleeve may rest on the bottom of the opening and need not be centered(SMACNA)
7
C. Damper Sleeve : By UL 555, ducts are to be terminated at fire damper sleeves or damper frames.
Sleeve thickness depends on the type of connection as per below table.
.
Sleeves may be omitted on certain alternative damper arrangements that are in compliance with UL
555, Standard for Fire Dampers. The damper manufacturers Installations and Operating Instructions
shall state whether sleeves may be omitted
8
D. Fire Damper :
Fire dampers shall bear a label from a recognized testing laboratory (such as UL) or be tested in
accordance with the requirements of Uniform Building Code, UBC STD 43-7.
Note: Whether Fire Damper or Combination Fire/Smoke Damper is UL listed or not can be determined
from UL web page. Please visit UL site at WWW.UL.COM. You need to check and make sure that the
supplied model is listed. Also check for size, position, System type and rating of the supplied
dampers.
E. Retaining Angle Fastened to Sleeve
Secure retaining angles to sleeve ONLY on 8” centers (203mm) with
a. ½ “(12mm) long weld
b. ¼”(6mm) nut and bolts
c. No. 10 sheet metal screws
d. Minimum 3/16”(5mm) steel rivets
Note : The size and spacing requirements may differ by damper manufacturer. Consult manufacturer
installations for specifications.
9
F. Damper attachment to sleeve
Secure damper to sleeve on 8” centers with
a. ½” (12mm) long weld
b. ¼”(6mm) nut and bolts
c. No. 10 sheet metal screws
d. Minimum 3/16”(5mm) steel rivets
G. Connection to Duct
Fire dampers shall be securely mounted in rated fire separation wall, ceiling or floor, such that
ducts can break away without lessening fire separation rating. So type of duct connection to
Fire Damper sleeve shall be breakaway connection.
1. Above figure shows the Duct Sleeve connection listed in UL 555
2. Additional Duct –Sleeve connections were tested by SMACNA and witnessed by UL.. They
are
a). TDC AND TDF Roll Formed 4-Bolt flanged connections assembled as per the
manufacturer instructions using Gaskets, metal cleats and four 3/8” metal nuts and
bolts.
10
b). Manufactured slip on 4-Bolt flanged connections assembled as per manufacturer
instructions using Gaskets and Plastic Cleats.
H. Access Door :
Install access door shall be installed as shown in figure.
Access doors shall be maximum of 24”x24” and a minimum of 6”x 6”(SMACNA).
Access doors (points) shall be identified by a label with letters not less than ½” (13 mm) in
height reading FIRE DAMPER (UMC Para 605.5).
11
IMPROPER INSTALLATION
Figure below shows two main improper installations encountered as per SMACNA.
12
Item 1:
Sealing of the fire damper retaining angles is not a requirement of an approved damper installation
If the local authority having jurisdiction mandates that the angles be sealed, contractors should
issue a Request For Information (RFI) to design professionals such that the proper approved sealants
be used. In no case should the retaining angles be sealed with any product not approved by the
damper manufacturer including Through Penetration Fire stop products. Using unapproved
products could be a violation of the damper manufacturer’s conditions of test and listing, could
void the UL listing of the damper and could render the damper inoperable
Item 2:
Introduction of any materials including mineral wool, ceramic fiber or sealants of any kind into the
required expansion space between the damper sleeve and fire partition has not been tested, has
not been approved, and is not permitted by damper manufacturers. Doing so could be a violation
of the manufacturer’s conditions of test and listing, could void the UL listing of the damper and
could render the damper inoperable. Indiscriminate and unnecessary deviations from standard fire
damper installations should be avoided. Unless a deviation is specifically approved by the damper
manufacturer, it could compromise the function for which the damper was ultimately installed.
13
Below is the pictures showing improper installation in one project.
14
VERTICAL FIRE DAMPER INSTALLATION
15
HORIZONTAL FIRE DAMPER INSTALLATION
16
THANK YOU

More Related Content

What's hot

Demolition methods and its sequence
Demolition methods and its sequenceDemolition methods and its sequence
Demolition methods and its sequence
Ranjith Kumar
 

What's hot (20)

Active fire protection system
Active fire protection systemActive fire protection system
Active fire protection system
 
R.C.C. STAIRS
R.C.C. STAIRSR.C.C. STAIRS
R.C.C. STAIRS
 
Fire protection in construction
Fire protection in constructionFire protection in construction
Fire protection in construction
 
Basic Guide to NFPA 13 Occupancy and Commodity Classifications
Basic Guide to NFPA 13 Occupancy and Commodity ClassificationsBasic Guide to NFPA 13 Occupancy and Commodity Classifications
Basic Guide to NFPA 13 Occupancy and Commodity Classifications
 
Fire Protection Systems Unit-I
Fire Protection Systems Unit-IFire Protection Systems Unit-I
Fire Protection Systems Unit-I
 
Fire fighting passive system
Fire fighting passive systemFire fighting passive system
Fire fighting passive system
 
Basics of Fire fighting
Basics of Fire fightingBasics of Fire fighting
Basics of Fire fighting
 
Fire hydrant system
Fire hydrant systemFire hydrant system
Fire hydrant system
 
Fire Protection System Design
Fire Protection System DesignFire Protection System Design
Fire Protection System Design
 
Fire safety
Fire  safetyFire  safety
Fire safety
 
Fire regulations for buildings
Fire regulations for buildingsFire regulations for buildings
Fire regulations for buildings
 
Fire Prevention & Control Services
Fire Prevention & Control ServicesFire Prevention & Control Services
Fire Prevention & Control Services
 
Building Services (Fire)
Building Services (Fire)Building Services (Fire)
Building Services (Fire)
 
Fire resistive construction
Fire resistive constructionFire resistive construction
Fire resistive construction
 
Fire safety system of Building.
Fire safety system of Building.Fire safety system of Building.
Fire safety system of Building.
 
Fire resistant material
Fire resistant materialFire resistant material
Fire resistant material
 
الفصل الحادي عشر - السلالم - تصميم المنشآت الخرسانية المسلحة
الفصل الحادي عشر - السلالم - تصميم المنشآت الخرسانية المسلحةالفصل الحادي عشر - السلالم - تصميم المنشآت الخرسانية المسلحة
الفصل الحادي عشر - السلالم - تصميم المنشآت الخرسانية المسلحة
 
National building code
National building codeNational building code
National building code
 
Fire and Safety Engineering.pptx
Fire and Safety Engineering.pptxFire and Safety Engineering.pptx
Fire and Safety Engineering.pptx
 
Demolition methods and its sequence
Demolition methods and its sequenceDemolition methods and its sequence
Demolition methods and its sequence
 

Similar to Fire dampers installation

8.0 Installation of Ceiling Batts.pdf
8.0 Installation of Ceiling Batts.pdf8.0 Installation of Ceiling Batts.pdf
8.0 Installation of Ceiling Batts.pdf
Insulation2
 

Similar to Fire dampers installation (20)

Prima Smooth flue system installation instructions
Prima Smooth flue system installation instructionsPrima Smooth flue system installation instructions
Prima Smooth flue system installation instructions
 
2.-Deflagration-Flame-Arrester-In-Line.pdf
2.-Deflagration-Flame-Arrester-In-Line.pdf2.-Deflagration-Flame-Arrester-In-Line.pdf
2.-Deflagration-Flame-Arrester-In-Line.pdf
 
Prima Plus flue system installation instructions
Prima Plus flue system installation instructionsPrima Plus flue system installation instructions
Prima Plus flue system installation instructions
 
Defender smokehalt - V automatic overhead coiling fabric smoke curtain
Defender smokehalt - V automatic overhead coiling fabric smoke curtainDefender smokehalt - V automatic overhead coiling fabric smoke curtain
Defender smokehalt - V automatic overhead coiling fabric smoke curtain
 
Flexible Liners installation instructions
Flexible Liners installation instructionsFlexible Liners installation instructions
Flexible Liners installation instructions
 
Sargas Stove System Brochure
Sargas Stove System Brochure Sargas Stove System Brochure
Sargas Stove System Brochure
 
3M Interam Endothermic Mat E-5A-4
3M Interam Endothermic Mat E-5A-43M Interam Endothermic Mat E-5A-4
3M Interam Endothermic Mat E-5A-4
 
Fire smokedampers
Fire smokedampersFire smokedampers
Fire smokedampers
 
Flex Brochure
Flex BrochureFlex Brochure
Flex Brochure
 
ICS flue system installation instructions
ICS flue system installation instructionsICS flue system installation instructions
ICS flue system installation instructions
 
Duct opening protectives 2017
Duct opening protectives 2017Duct opening protectives 2017
Duct opening protectives 2017
 
Wylex nmfs intumescent
Wylex nmfs intumescentWylex nmfs intumescent
Wylex nmfs intumescent
 
Isokern Celsius stove system installation instructions
Isokern Celsius stove system installation instructionsIsokern Celsius stove system installation instructions
Isokern Celsius stove system installation instructions
 
Blazemaster Fire Protection System Residential Brochure
Blazemaster Fire Protection System Residential BrochureBlazemaster Fire Protection System Residential Brochure
Blazemaster Fire Protection System Residential Brochure
 
8.0 Installation of Ceiling Batts.pdf
8.0 Installation of Ceiling Batts.pdf8.0 Installation of Ceiling Batts.pdf
8.0 Installation of Ceiling Batts.pdf
 
Gas Installation Guidelines for Designers and Builders - Domestic Sites
Gas Installation Guidelines for Designers and Builders - Domestic SitesGas Installation Guidelines for Designers and Builders - Domestic Sites
Gas Installation Guidelines for Designers and Builders - Domestic Sites
 
9.0 Installation of Wall Batts.pdf
9.0 Installation of Wall Batts.pdf9.0 Installation of Wall Batts.pdf
9.0 Installation of Wall Batts.pdf
 
ICS 5000 commercial flue system instructions
ICS 5000 commercial flue system instructionsICS 5000 commercial flue system instructions
ICS 5000 commercial flue system instructions
 
CMP Cable Glands - Triton T3CDS Deluge Proof Glands (ATEX)
CMP Cable Glands - Triton T3CDS Deluge Proof Glands (ATEX)CMP Cable Glands - Triton T3CDS Deluge Proof Glands (ATEX)
CMP Cable Glands - Triton T3CDS Deluge Proof Glands (ATEX)
 
Protection of Curtained Limited Finishing Workstations using Ul 1254 Listed P...
Protection of Curtained Limited Finishing Workstations using Ul 1254 Listed P...Protection of Curtained Limited Finishing Workstations using Ul 1254 Listed P...
Protection of Curtained Limited Finishing Workstations using Ul 1254 Listed P...
 

Recently uploaded

Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
Kamal Acharya
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
Kamal Acharya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 

Recently uploaded (20)

Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answer
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdf
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptx
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 

Fire dampers installation

  • 1. FIRE DAMPER INSTALLATION Mohammed Mukaram Jah, Mechanical Engineer mukarram169@rediffmail.com +91 9701 99 3862 1
  • 2. CONTENTS  FIRE DAMPER AND ITS SIGNIFICANCE  FIRE RESISTANCE RATING  WHERE FIRE DAMPERS ARE REQUIRED  APPROVED INSTALLATION  IMPROPER INSTALLATION 2
  • 3. Fire Damper and its Significance Fire Damper is a device installed in an air distribution system, designed to close automatically upon detection of heat to interrupt migratory airflow and to restrict the passage of flame(NFPA 90A). This is accomplished only when these dampers are installed in accordance with SMACNA Fire, Smoke and Radiation Dampers Installation Guide. Fire Resistance The time in minutes and Hours, that materials or assemblies have withstood a fire exposure as established in accordance with the test procedures of NFPA 251, Standards Methods of tests of fire Endurance of building construction and Materials(NFPA 90A). Where Fire Dampers are Required ?? • Fire Dampers are required wherever fire resistance integrity of the wall is to be maintained. • Required wherever there is duct penetration either through fire rated wall or fire rated roof. 3
  • 4. APPROVED INSTALLATION: Fire and Smoke dampers shall be manufactured and installed as per the latest issue of SMACNA “ Fire, Smoke and Radiation dampers installation guide.” As per SMACNA below are the important items to be considered for installation. A. Retaining Angle B. Expansion Space C. Damper Sleeve D. Fire Damper E. Retaining Angle fastened to sleeve F. Damper attachment to sleeve G. Connection to Duct Below is the picture depicting above items in the installation of fire damper. 4
  • 5. 5
  • 6. 6 A. Retaining Angle : • Retaining Angles shall be secured to sleeve on 8” centers and shall not be fixed to walls. • Retaining angles shall overlap the structure opening 1” minimum and cover corner opening. • Retaining angle shall be minimum of 1½” x 1½” x 16 gauge(40 x 40 x 1.6mm). However some manufacturers may allow lower gauge for small size and may require heavier gauge for larger ducts. B. Expansion Space : • The annular space/clearance between fire damper sleeve and wall/roof opening is termed as expansion space. • This clearance shall be minimum 1/8” per linear foot(10mm per liner meter) of width and height unless otherwise stated in the listing of the assembly. • Sleeve may rest on the bottom of the opening and need not be centered(SMACNA)
  • 7. 7 C. Damper Sleeve : By UL 555, ducts are to be terminated at fire damper sleeves or damper frames. Sleeve thickness depends on the type of connection as per below table. . Sleeves may be omitted on certain alternative damper arrangements that are in compliance with UL 555, Standard for Fire Dampers. The damper manufacturers Installations and Operating Instructions shall state whether sleeves may be omitted
  • 8. 8 D. Fire Damper : Fire dampers shall bear a label from a recognized testing laboratory (such as UL) or be tested in accordance with the requirements of Uniform Building Code, UBC STD 43-7. Note: Whether Fire Damper or Combination Fire/Smoke Damper is UL listed or not can be determined from UL web page. Please visit UL site at WWW.UL.COM. You need to check and make sure that the supplied model is listed. Also check for size, position, System type and rating of the supplied dampers. E. Retaining Angle Fastened to Sleeve Secure retaining angles to sleeve ONLY on 8” centers (203mm) with a. ½ “(12mm) long weld b. ¼”(6mm) nut and bolts c. No. 10 sheet metal screws d. Minimum 3/16”(5mm) steel rivets Note : The size and spacing requirements may differ by damper manufacturer. Consult manufacturer installations for specifications.
  • 9. 9 F. Damper attachment to sleeve Secure damper to sleeve on 8” centers with a. ½” (12mm) long weld b. ¼”(6mm) nut and bolts c. No. 10 sheet metal screws d. Minimum 3/16”(5mm) steel rivets G. Connection to Duct Fire dampers shall be securely mounted in rated fire separation wall, ceiling or floor, such that ducts can break away without lessening fire separation rating. So type of duct connection to Fire Damper sleeve shall be breakaway connection. 1. Above figure shows the Duct Sleeve connection listed in UL 555 2. Additional Duct –Sleeve connections were tested by SMACNA and witnessed by UL.. They are a). TDC AND TDF Roll Formed 4-Bolt flanged connections assembled as per the manufacturer instructions using Gaskets, metal cleats and four 3/8” metal nuts and bolts.
  • 10. 10 b). Manufactured slip on 4-Bolt flanged connections assembled as per manufacturer instructions using Gaskets and Plastic Cleats. H. Access Door : Install access door shall be installed as shown in figure. Access doors shall be maximum of 24”x24” and a minimum of 6”x 6”(SMACNA). Access doors (points) shall be identified by a label with letters not less than ½” (13 mm) in height reading FIRE DAMPER (UMC Para 605.5).
  • 11. 11 IMPROPER INSTALLATION Figure below shows two main improper installations encountered as per SMACNA.
  • 12. 12 Item 1: Sealing of the fire damper retaining angles is not a requirement of an approved damper installation If the local authority having jurisdiction mandates that the angles be sealed, contractors should issue a Request For Information (RFI) to design professionals such that the proper approved sealants be used. In no case should the retaining angles be sealed with any product not approved by the damper manufacturer including Through Penetration Fire stop products. Using unapproved products could be a violation of the damper manufacturer’s conditions of test and listing, could void the UL listing of the damper and could render the damper inoperable Item 2: Introduction of any materials including mineral wool, ceramic fiber or sealants of any kind into the required expansion space between the damper sleeve and fire partition has not been tested, has not been approved, and is not permitted by damper manufacturers. Doing so could be a violation of the manufacturer’s conditions of test and listing, could void the UL listing of the damper and could render the damper inoperable. Indiscriminate and unnecessary deviations from standard fire damper installations should be avoided. Unless a deviation is specifically approved by the damper manufacturer, it could compromise the function for which the damper was ultimately installed.
  • 13. 13 Below is the pictures showing improper installation in one project.
  • 14. 14 VERTICAL FIRE DAMPER INSTALLATION