Essential Elements of Data Center
Operations
Bob Woolley
Senior Director, Global Data Center Services
Tweet Live!
#SchneiderXE
Schneider Electric 2- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Objectives
Upon Completion of this course, you will be able to:
●Define key tasks associated with Data Center Facility Operation
(DCFO) Programs
●Define risks associated with DCFO Programs
●Define opportunities associated with DCFO Programs
●Define the 12 Essential Program Elements
●Identify the most common mistakes made by data center facility
operators
●Identify a process for building a world class DCFO Program
Schneider Electric 3- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
The Importance of Facility Operations
●The majority of data center lifecycle cost is in OPEX, vs.
CAPEX.
●Most data center outages are attributable to human error.
●Energy costs account for the largest portion of the
operating budget, and the cost of power is rising.
●New technologies and the trend towards reducing
redundancy to save cost has increased the need for
operational effectiveness and efficiency.
●A properly designed Facility Operations & Maintenance
program will minimize risk, reduce costs, and even provide
a competitive advantage.
Schneider Electric 4- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Preventative Maintenance
Operational Tasks and Challenges
Energy Management
Performance
Monitoring
Capacity
Management
AuditsSpares ManagementEmployee
Satisfaction
Cost Analysis
Receiving
Documentation
Project
Management
RepairsDrillsDCIM
Vendor Management Incident Response
Walk-throughs
ReportingChange ManagementSafetyUptime
SLAs
Schneider Electric 5- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
12 Essential Elements
Environmental
Health & Safety
Personnel
Management
Emergency
Preparedness
and Response
Maintenance
Management
Change
Management
Documentation Training
Infrastructure
Management
Quality
Management
Energy
Management
Financial
Management
Performance
Monitoring
Schneider Electric 6- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Levels of Maturity
Level 5 Optimized
Level 4 Managed &
Measurable
Level 3 Defined
Process
Level 2 Repeatable
but Intuitive
Level 1 Initial/Ad-hoc
Level 0 Non-Existent
Schneider Electric 7- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Environmental Health & Safety
Tasks
●Injury and Illness Prevention
●Electrical Safety
●Hazard Analysis and Communication
Risks
●Injury, illness and lost time
●Fines and citations
●Equipment damage and service disruptions
Opportunities
●Happy and healthy workforce
●Good safety ratings
●Positive corporate image
Schneider Electric 8- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Personnel Management
Tasks
●Resource modeling and utilization
●Personnel development
●Team building
Risks
●Inefficient resource utilization
●Unstable workforce
●Dysfunctional workplace
Opportunities
●Stable and skilled workforce
●Fewer service disruptions
●Greater opportunities for innovation
Schneider Electric 9- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Emergency Preparedness & Response
Tasks
●Emergency Operating Procedures
●Scenario Drills
●Incident Management
●Business Continuity / Disaster Recovery
Risks
●Inability to prevent major service disruptions
●Injury or property damage
●Uncoordinated response
Opportunities
●Increased uptime
●Cost avoidance
●End-user confidence and loyalty
Schneider Electric 10- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Maintenance Management
Tasks
●Asset Management
●Work Order Management
●Spare Parts Management
Risks
●Lack of information on asset performance, replacement costs
●High cost, low performance reactive maintenance program
●Excessive downtime awaiting repairs
Opportunities
●Good asset intelligence and proactive maintenance boosts system
reliability
●Accurate budget forecasts
●Lower TCO and less downtime
Schneider Electric 11- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Change Management
Tasks
●Risk Analysis and Communication
●Vendor Supervision
●Operational Procedures Development and Review
●Structured Work Practices
Risks
●Unidentified, misidentified, or miscommunicated operational risks
●Excessive human error
●Service interruptions and re-dos
Opportunities
●Achieving predicted goals
●Minimizing errors and associated downtime costs
●Fewer change windows and vendor re-dispatch costs
Schneider Electric 12- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Documentation
Tasks
● Critical Facility Work Rules
● Drawings, Schedules and Engineering Studies
● Shift and Rounds Logs
● Document Management and Version Control
Risks
● Outdated or poor documentation introduces errors
● Communication failures cause issues to go unaddressed
● Poor documentation inhibits proper training and process improvement
Opportunities
● Fewer errors resulting in injury and downtime
● More effective training
● More efficient operations and processes
Schneider Electric 13- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Training
Tasks
●Fewer errors resulting in injury and downtime
●More effective training
●More efficient operations and processes
Risks
●Poorly trained workers are mistake prone and inefficient
●Assumptions about worker capability can be grossly incorrect
●Allowing unqualified individuals to perform work is hazardous
Opportunities
●Prevention of errors and increased worker confidence
●Ability to do more self-performed maintenance, saving money and
increasing job satisfaction
●Ability to lower costs by optimizing system performance
Schneider Electric 14- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Infrastructure Management
Tasks
● Facility Monitoring
● Capacity Management
● IT and Facilities Integration
Risks
● Unnoticed and unaddressed facility issues/alarms
● Stranded power and cooling capacity
● Wasted space
● Disconnect between IT and Facilities systems
Opportunities
● Avoidance of service interruptions through reporting and trending
● Resource optimization
● Actionable business intelligence resulting from integrated systems and
teams
Schneider Electric 15- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Quality Management
Tasks
● Process and Procedure Standardization
● Quality Checks, Inspections and Audits
● Root Cause Analysis and Lessons Learned
● Continuous Improvement
Risks
● Introduction of errors due to poor processes and procedures
● Undiagnosed errors result in avoidable service disruptions and costs
● Repetition of errors
Opportunities
● Increased productivity and uniform end-user experience through standardized best
practices
● Fewer, less consequential and lest costly errors
● System and process optimization
Schneider Electric 16- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Energy Management
Tasks
●Performance Benchmarking
●Efficiency Analysis
●Strategic Sourcing
Risks
●Making decisions with inadequate or inaccurate data
●Missing proven energy reduction strategies
●Paying too much for energy supplies
Opportunities
●Lowering costs through better energy management
●Increased demonstration of corporate social responsibility
●Regulatory avoidance
Schneider Electric 17- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Financial Management
Tasks
●Purchasing
●Invoice Matching
●Financial Reporting & Analysis
Risks
●Slow procurement due to inefficient purchasing
●Payment for products and services not or partially received
●Overpayment for products and services
Opportunities
●Shorter periods of reduced redundancy
●Delivery assurance on purchases
●More “bang for the buck”
Schneider Electric 18- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Performance Monitoring
Tasks
●Service Level Agreement (SLA)
●Key Performance Indicators (KPI)
●Performance Measurement and Reporting
Risks
●Misplaced priorities generate unproductive activity
●Punitive attitudes that stifle “good” risk taking
●You can’t manage what you don’t measure
Opportunities
●Alignment of business goals with operational activities
●Positive reinforcement systems that stimulate innovation
●Solid performance metrics to underpin good business decisions
Schneider Electric 19- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Most Common Mistakes
●Ineffective Change Management
● Inadequate risk analysis
● Poor or non-existent procedures
● No defined process for performing critical works
●Lack of Formal Training
● Shadowing used as the predominant training method
● Poor evaluation process, no link between certification level and tasking
●Maintenance program is not metrics driven
● Poor asset management
● Few maintenance KPIs
● No linkage between PM and corrective/break-fix maintenance
●Failure to consistently and test evaluate skills
● Existing skills and training comprehension is not formally evaluated
● Scenario drills are not employed
● Incident and Drill results are not evaluated
Schneider Electric 20- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Most Common Mistakes
●Failure to develop and implement a quality system
● Quality Assurance & Quality Control
● Continuous Quality Improvement
●Poor documentation
● No coherent Sequence of Operations, outdated drawings and
schedules, undocumented processes, lack of version control, not digitalized.
●Stuck in manual mode
● Failure to implement CMMS, EDMS, LMS, DCIM
● Buried in spreadsheets and manual reports
●Overconfidence
● Assumption that future performance can be predicted by past experience.
Schneider Electric 21- Division - Name – Date
Schneider Electric – Bob Woolley- 20130502
Building a World Class DCFO Program
• Inspect
• Assess
• Analyze
• Report
• Review Results
• Refresh Goals
• Take Corrective Action
• Optimize
• Design and Develop
• Communicate
• Train
• Implement and
Operate
• Obtain Support of
Senior Management
• Align Business Goals
and Operational
Objectives
• Establish Success
Metrics
Do
Act
Plan
Check
Thank You
Bob Woolley
Sr. Director, Global Data Center Services
Robert.Woolley@Schneider-Electric.com

More Related Content

What's hot

Data centers on the Edge
Data centers on the EdgeData centers on the Edge
Data centers on the Edge
Schneider Electric
 
Eliminating Data Center Hot Spots
Eliminating Data Center Hot SpotsEliminating Data Center Hot Spots
Eliminating Data Center Hot Spots
42U Data Center Solutions
 
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T's
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T'sData Center Cooling Efficiency: Understanding the Science of the 4 Delta T's
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T's
Upsite Technologies
 
4 steps to quickly improve pue through airflow management
4 steps to quickly improve pue through airflow management4 steps to quickly improve pue through airflow management
4 steps to quickly improve pue through airflow management
Upsite Technologies
 
Best Practices for Planning your Datacenter
Best Practices for Planning your DatacenterBest Practices for Planning your Datacenter
Best Practices for Planning your Datacenter
APC by Schneider Electric India
 
Data Center Cooling, Critical Facility and Infrastructure Optimization
Data Center Cooling, Critical Facility and Infrastructure OptimizationData Center Cooling, Critical Facility and Infrastructure Optimization
Data Center Cooling, Critical Facility and Infrastructure Optimization
Greg Stover
 
DataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure PresentationDataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure Presentation
Muhammad Asad Rashid
 
Datacenter101
Datacenter101Datacenter101
Datacenter101
tarundua
 
Datacenter Strategy, Design, and Build
Datacenter Strategy, Design, and BuildDatacenter Strategy, Design, and Build
Datacenter Strategy, Design, and Build
Christopher Kelley
 
Presentation data center design overview
Presentation   data center design overviewPresentation   data center design overview
Presentation data center design overview
xKinAnx
 
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually Exclusive
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually ExclusiveFor Most Data Centers, Liquid and Air Cooling Will Not be Mutually Exclusive
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually Exclusive
Upsite Technologies
 
DCIM
DCIMDCIM
Data Center Cooling Design - Datacenter-serverroom
Data Center Cooling Design - Datacenter-serverroomData Center Cooling Design - Datacenter-serverroom
Data Center Cooling Design - Datacenter-serverroom
marlisaclark
 
Data center design 2
Data center design 2Data center design 2
Data center design 2
Aditya Gupta
 
Cooling Optimization 101: A Beginner's Guide to Data Center Cooling
Cooling Optimization 101: A Beginner's Guide to Data Center CoolingCooling Optimization 101: A Beginner's Guide to Data Center Cooling
Cooling Optimization 101: A Beginner's Guide to Data Center Cooling
Upsite Technologies
 
Importance of data centers
Importance of data centersImportance of data centers
Importance of data centers
Tyrone Systems
 
DCIM: ERP for the Data Center Manager
DCIM: ERP for the Data Center ManagerDCIM: ERP for the Data Center Manager
DCIM: ERP for the Data Center Manager
GreenField Software Private Limited
 
Data center hvac
Data center hvacData center hvac
Data center hvac
Sulma Mahardiani
 
ASHRAE 90.4 vs. 90.1 - Five Questions
ASHRAE 90.4 vs. 90.1 - Five QuestionsASHRAE 90.4 vs. 90.1 - Five Questions
ASHRAE 90.4 vs. 90.1 - Five Questions
MarcHourican1
 
Data Center Efficiency Workshop 2016
Data Center Efficiency Workshop 2016Data Center Efficiency Workshop 2016
Data Center Efficiency Workshop 2016
stexxe
 

What's hot (20)

Data centers on the Edge
Data centers on the EdgeData centers on the Edge
Data centers on the Edge
 
Eliminating Data Center Hot Spots
Eliminating Data Center Hot SpotsEliminating Data Center Hot Spots
Eliminating Data Center Hot Spots
 
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T's
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T'sData Center Cooling Efficiency: Understanding the Science of the 4 Delta T's
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T's
 
4 steps to quickly improve pue through airflow management
4 steps to quickly improve pue through airflow management4 steps to quickly improve pue through airflow management
4 steps to quickly improve pue through airflow management
 
Best Practices for Planning your Datacenter
Best Practices for Planning your DatacenterBest Practices for Planning your Datacenter
Best Practices for Planning your Datacenter
 
Data Center Cooling, Critical Facility and Infrastructure Optimization
Data Center Cooling, Critical Facility and Infrastructure OptimizationData Center Cooling, Critical Facility and Infrastructure Optimization
Data Center Cooling, Critical Facility and Infrastructure Optimization
 
DataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure PresentationDataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure Presentation
 
Datacenter101
Datacenter101Datacenter101
Datacenter101
 
Datacenter Strategy, Design, and Build
Datacenter Strategy, Design, and BuildDatacenter Strategy, Design, and Build
Datacenter Strategy, Design, and Build
 
Presentation data center design overview
Presentation   data center design overviewPresentation   data center design overview
Presentation data center design overview
 
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually Exclusive
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually ExclusiveFor Most Data Centers, Liquid and Air Cooling Will Not be Mutually Exclusive
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually Exclusive
 
DCIM
DCIMDCIM
DCIM
 
Data Center Cooling Design - Datacenter-serverroom
Data Center Cooling Design - Datacenter-serverroomData Center Cooling Design - Datacenter-serverroom
Data Center Cooling Design - Datacenter-serverroom
 
Data center design 2
Data center design 2Data center design 2
Data center design 2
 
Cooling Optimization 101: A Beginner's Guide to Data Center Cooling
Cooling Optimization 101: A Beginner's Guide to Data Center CoolingCooling Optimization 101: A Beginner's Guide to Data Center Cooling
Cooling Optimization 101: A Beginner's Guide to Data Center Cooling
 
Importance of data centers
Importance of data centersImportance of data centers
Importance of data centers
 
DCIM: ERP for the Data Center Manager
DCIM: ERP for the Data Center ManagerDCIM: ERP for the Data Center Manager
DCIM: ERP for the Data Center Manager
 
Data center hvac
Data center hvacData center hvac
Data center hvac
 
ASHRAE 90.4 vs. 90.1 - Five Questions
ASHRAE 90.4 vs. 90.1 - Five QuestionsASHRAE 90.4 vs. 90.1 - Five Questions
ASHRAE 90.4 vs. 90.1 - Five Questions
 
Data Center Efficiency Workshop 2016
Data Center Efficiency Workshop 2016Data Center Efficiency Workshop 2016
Data Center Efficiency Workshop 2016
 

Similar to Essential elements of data center operations

Reliability Program Approval Presentation_
Reliability Program Approval Presentation_Reliability Program Approval Presentation_
Reliability Program Approval Presentation_
Chad Broussard
 
Essential Elements of Data Center Facility Operations
Essential Elements of Data Center Facility OperationsEssential Elements of Data Center Facility Operations
Essential Elements of Data Center Facility Operations
Schneider Electric
 
Essential elements of data center facility operations
Essential elements of data center facility operationsEssential elements of data center facility operations
Essential elements of data center facility operations
Schneider Electric
 
Solving the maintain vs. modernization equation
Solving the maintain vs. modernization equationSolving the maintain vs. modernization equation
Solving the maintain vs. modernization equation
Schneider Electric
 
Essential Elements of Data Center Facility Operations
Essential Elements of Data Center Facility OperationsEssential Elements of Data Center Facility Operations
Essential Elements of Data Center Facility Operations
Schneider Electric
 
Predicting the future - increasing success
Predicting the future - increasing successPredicting the future - increasing success
Predicting the future - increasing success
Association for Project Management
 
Customer Satisfaction and Quality Induction_PPM .pptx
Customer Satisfaction and Quality Induction_PPM .pptxCustomer Satisfaction and Quality Induction_PPM .pptx
Customer Satisfaction and Quality Induction_PPM .pptx
MunirahAyub1
 
Combining qualitative and quantitative software process evaluation sylvie t...
Combining qualitative and quantitative software process evaluation   sylvie t...Combining qualitative and quantitative software process evaluation   sylvie t...
Combining qualitative and quantitative software process evaluation sylvie t...
IWSM Mensura
 
Transforming data into sustained energy performance
Transforming data into sustained energy performanceTransforming data into sustained energy performance
Transforming data into sustained energy performance
Schneider Electric
 
Sda beispiele kopie
Sda beispiele kopieSda beispiele kopie
Sda beispiele kopie
Ernest Wallmueller
 
Managing Projects with Intelligence
Managing Projects with IntelligenceManaging Projects with Intelligence
Managing Projects with Intelligence
Paul Gerrard
 
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
Aggregage
 
Third Party Solar Financing
Third Party Solar FinancingThird Party Solar Financing
Third Party Solar Financing
SolarbabaGlobal
 
Applying Technologies Across the End-to-End Pharmacovigilance Process to Incr...
Applying Technologies Across the End-to-End Pharmacovigilance Process to Incr...Applying Technologies Across the End-to-End Pharmacovigilance Process to Incr...
Applying Technologies Across the End-to-End Pharmacovigilance Process to Incr...
MyMeds&Me
 
Sustainability for Multi-site
Sustainability for Multi-siteSustainability for Multi-site
Sustainability for Multi-site
Eng Yong CH'NG, CEng MEI, CEM, CMVP, PEM
 
Efficient security to meet modern day challenges
Efficient security to meet modern day challengesEfficient security to meet modern day challenges
Efficient security to meet modern day challenges
Schneider Electric
 
InternshipPresentation_Ashwin
InternshipPresentation_AshwinInternshipPresentation_Ashwin
InternshipPresentation_Ashwin
Ashwin Gadgil
 
Smsvn pmp training_slides_chapter_8
Smsvn pmp training_slides_chapter_8Smsvn pmp training_slides_chapter_8
Smsvn pmp training_slides_chapter_8
Nam Trung
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.ppt
Thushan9
 
Applying Safety DNA Analytics to Enhance Your E2E Workforce Process
Applying Safety DNA Analytics to Enhance Your E2E Workforce ProcessApplying Safety DNA Analytics to Enhance Your E2E Workforce Process
Applying Safety DNA Analytics to Enhance Your E2E Workforce Process
GSE Systems, Inc.
 

Similar to Essential elements of data center operations (20)

Reliability Program Approval Presentation_
Reliability Program Approval Presentation_Reliability Program Approval Presentation_
Reliability Program Approval Presentation_
 
Essential Elements of Data Center Facility Operations
Essential Elements of Data Center Facility OperationsEssential Elements of Data Center Facility Operations
Essential Elements of Data Center Facility Operations
 
Essential elements of data center facility operations
Essential elements of data center facility operationsEssential elements of data center facility operations
Essential elements of data center facility operations
 
Solving the maintain vs. modernization equation
Solving the maintain vs. modernization equationSolving the maintain vs. modernization equation
Solving the maintain vs. modernization equation
 
Essential Elements of Data Center Facility Operations
Essential Elements of Data Center Facility OperationsEssential Elements of Data Center Facility Operations
Essential Elements of Data Center Facility Operations
 
Predicting the future - increasing success
Predicting the future - increasing successPredicting the future - increasing success
Predicting the future - increasing success
 
Customer Satisfaction and Quality Induction_PPM .pptx
Customer Satisfaction and Quality Induction_PPM .pptxCustomer Satisfaction and Quality Induction_PPM .pptx
Customer Satisfaction and Quality Induction_PPM .pptx
 
Combining qualitative and quantitative software process evaluation sylvie t...
Combining qualitative and quantitative software process evaluation   sylvie t...Combining qualitative and quantitative software process evaluation   sylvie t...
Combining qualitative and quantitative software process evaluation sylvie t...
 
Transforming data into sustained energy performance
Transforming data into sustained energy performanceTransforming data into sustained energy performance
Transforming data into sustained energy performance
 
Sda beispiele kopie
Sda beispiele kopieSda beispiele kopie
Sda beispiele kopie
 
Managing Projects with Intelligence
Managing Projects with IntelligenceManaging Projects with Intelligence
Managing Projects with Intelligence
 
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
 
Third Party Solar Financing
Third Party Solar FinancingThird Party Solar Financing
Third Party Solar Financing
 
Applying Technologies Across the End-to-End Pharmacovigilance Process to Incr...
Applying Technologies Across the End-to-End Pharmacovigilance Process to Incr...Applying Technologies Across the End-to-End Pharmacovigilance Process to Incr...
Applying Technologies Across the End-to-End Pharmacovigilance Process to Incr...
 
Sustainability for Multi-site
Sustainability for Multi-siteSustainability for Multi-site
Sustainability for Multi-site
 
Efficient security to meet modern day challenges
Efficient security to meet modern day challengesEfficient security to meet modern day challenges
Efficient security to meet modern day challenges
 
InternshipPresentation_Ashwin
InternshipPresentation_AshwinInternshipPresentation_Ashwin
InternshipPresentation_Ashwin
 
Smsvn pmp training_slides_chapter_8
Smsvn pmp training_slides_chapter_8Smsvn pmp training_slides_chapter_8
Smsvn pmp training_slides_chapter_8
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.ppt
 
Applying Safety DNA Analytics to Enhance Your E2E Workforce Process
Applying Safety DNA Analytics to Enhance Your E2E Workforce ProcessApplying Safety DNA Analytics to Enhance Your E2E Workforce Process
Applying Safety DNA Analytics to Enhance Your E2E Workforce Process
 

More from Schneider Electric

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design Considerations
Schneider Electric
 
Digital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsDigital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting Investors
Schneider Electric
 
32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing 32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing
Schneider Electric
 
Key Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsKey Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation Trends
Schneider Electric
 
EcoStruxure™ for Cloud & Service Providers
 EcoStruxure™ for Cloud & Service Providers EcoStruxure™ for Cloud & Service Providers
EcoStruxure™ for Cloud & Service Providers
Schneider Electric
 
Magelis Basic HMI Briefing
Magelis Basic HMI Briefing Magelis Basic HMI Briefing
Magelis Basic HMI Briefing
Schneider Electric
 
Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay Briefing
Schneider Electric
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Schneider Electric
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR Briefing
Schneider Electric
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software Briefing
Schneider Electric
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?
Schneider Electric
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive Industries
Schneider Electric
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017
Schneider Electric
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
Schneider Electric
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580
Schneider Electric
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
Schneider Electric
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoT
Schneider Electric
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories Briefing
Schneider Electric
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors Briefing
Schneider Electric
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches Briefing
Schneider Electric
 

More from Schneider Electric (20)

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design Considerations
 
Digital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsDigital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting Investors
 
32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing 32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing
 
Key Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsKey Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation Trends
 
EcoStruxure™ for Cloud & Service Providers
 EcoStruxure™ for Cloud & Service Providers EcoStruxure™ for Cloud & Service Providers
EcoStruxure™ for Cloud & Service Providers
 
Magelis Basic HMI Briefing
Magelis Basic HMI Briefing Magelis Basic HMI Briefing
Magelis Basic HMI Briefing
 
Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay Briefing
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR Briefing
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software Briefing
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive Industries
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoT
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories Briefing
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors Briefing
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches Briefing
 

Recently uploaded

TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc
 
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Zilliz
 
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Zilliz
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
SOFTTECHHUB
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
sonjaschweigert1
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
danishmna97
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
名前 です男
 
“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”
Claudio Di Ciccio
 
How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
Daiki Mogmet Ito
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
DianaGray10
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Aggregage
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
Alpen-Adria-Universität
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
Neo4j
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems S.M.S.A.
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
DianaGray10
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
Aftab Hussain
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
innovationoecd
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Malak Abu Hammad
 

Recently uploaded (20)

TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
 
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
 
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
 
“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”
 
How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
 

Essential elements of data center operations

  • 1. Schneider Electric 1- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Essential Elements of Data Center Operations Bob Woolley Senior Director, Global Data Center Services Tweet Live! #SchneiderXE
  • 2. Schneider Electric 2- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Objectives Upon Completion of this course, you will be able to: ●Define key tasks associated with Data Center Facility Operation (DCFO) Programs ●Define risks associated with DCFO Programs ●Define opportunities associated with DCFO Programs ●Define the 12 Essential Program Elements ●Identify the most common mistakes made by data center facility operators ●Identify a process for building a world class DCFO Program
  • 3. Schneider Electric 3- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 The Importance of Facility Operations ●The majority of data center lifecycle cost is in OPEX, vs. CAPEX. ●Most data center outages are attributable to human error. ●Energy costs account for the largest portion of the operating budget, and the cost of power is rising. ●New technologies and the trend towards reducing redundancy to save cost has increased the need for operational effectiveness and efficiency. ●A properly designed Facility Operations & Maintenance program will minimize risk, reduce costs, and even provide a competitive advantage.
  • 4. Schneider Electric 4- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Preventative Maintenance Operational Tasks and Challenges Energy Management Performance Monitoring Capacity Management AuditsSpares ManagementEmployee Satisfaction Cost Analysis Receiving Documentation Project Management RepairsDrillsDCIM Vendor Management Incident Response Walk-throughs ReportingChange ManagementSafetyUptime SLAs
  • 5. Schneider Electric 5- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 12 Essential Elements Environmental Health & Safety Personnel Management Emergency Preparedness and Response Maintenance Management Change Management Documentation Training Infrastructure Management Quality Management Energy Management Financial Management Performance Monitoring
  • 6. Schneider Electric 6- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Levels of Maturity Level 5 Optimized Level 4 Managed & Measurable Level 3 Defined Process Level 2 Repeatable but Intuitive Level 1 Initial/Ad-hoc Level 0 Non-Existent
  • 7. Schneider Electric 7- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Environmental Health & Safety Tasks ●Injury and Illness Prevention ●Electrical Safety ●Hazard Analysis and Communication Risks ●Injury, illness and lost time ●Fines and citations ●Equipment damage and service disruptions Opportunities ●Happy and healthy workforce ●Good safety ratings ●Positive corporate image
  • 8. Schneider Electric 8- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Personnel Management Tasks ●Resource modeling and utilization ●Personnel development ●Team building Risks ●Inefficient resource utilization ●Unstable workforce ●Dysfunctional workplace Opportunities ●Stable and skilled workforce ●Fewer service disruptions ●Greater opportunities for innovation
  • 9. Schneider Electric 9- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Emergency Preparedness & Response Tasks ●Emergency Operating Procedures ●Scenario Drills ●Incident Management ●Business Continuity / Disaster Recovery Risks ●Inability to prevent major service disruptions ●Injury or property damage ●Uncoordinated response Opportunities ●Increased uptime ●Cost avoidance ●End-user confidence and loyalty
  • 10. Schneider Electric 10- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Maintenance Management Tasks ●Asset Management ●Work Order Management ●Spare Parts Management Risks ●Lack of information on asset performance, replacement costs ●High cost, low performance reactive maintenance program ●Excessive downtime awaiting repairs Opportunities ●Good asset intelligence and proactive maintenance boosts system reliability ●Accurate budget forecasts ●Lower TCO and less downtime
  • 11. Schneider Electric 11- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Change Management Tasks ●Risk Analysis and Communication ●Vendor Supervision ●Operational Procedures Development and Review ●Structured Work Practices Risks ●Unidentified, misidentified, or miscommunicated operational risks ●Excessive human error ●Service interruptions and re-dos Opportunities ●Achieving predicted goals ●Minimizing errors and associated downtime costs ●Fewer change windows and vendor re-dispatch costs
  • 12. Schneider Electric 12- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Documentation Tasks ● Critical Facility Work Rules ● Drawings, Schedules and Engineering Studies ● Shift and Rounds Logs ● Document Management and Version Control Risks ● Outdated or poor documentation introduces errors ● Communication failures cause issues to go unaddressed ● Poor documentation inhibits proper training and process improvement Opportunities ● Fewer errors resulting in injury and downtime ● More effective training ● More efficient operations and processes
  • 13. Schneider Electric 13- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Training Tasks ●Fewer errors resulting in injury and downtime ●More effective training ●More efficient operations and processes Risks ●Poorly trained workers are mistake prone and inefficient ●Assumptions about worker capability can be grossly incorrect ●Allowing unqualified individuals to perform work is hazardous Opportunities ●Prevention of errors and increased worker confidence ●Ability to do more self-performed maintenance, saving money and increasing job satisfaction ●Ability to lower costs by optimizing system performance
  • 14. Schneider Electric 14- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Infrastructure Management Tasks ● Facility Monitoring ● Capacity Management ● IT and Facilities Integration Risks ● Unnoticed and unaddressed facility issues/alarms ● Stranded power and cooling capacity ● Wasted space ● Disconnect between IT and Facilities systems Opportunities ● Avoidance of service interruptions through reporting and trending ● Resource optimization ● Actionable business intelligence resulting from integrated systems and teams
  • 15. Schneider Electric 15- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Quality Management Tasks ● Process and Procedure Standardization ● Quality Checks, Inspections and Audits ● Root Cause Analysis and Lessons Learned ● Continuous Improvement Risks ● Introduction of errors due to poor processes and procedures ● Undiagnosed errors result in avoidable service disruptions and costs ● Repetition of errors Opportunities ● Increased productivity and uniform end-user experience through standardized best practices ● Fewer, less consequential and lest costly errors ● System and process optimization
  • 16. Schneider Electric 16- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Energy Management Tasks ●Performance Benchmarking ●Efficiency Analysis ●Strategic Sourcing Risks ●Making decisions with inadequate or inaccurate data ●Missing proven energy reduction strategies ●Paying too much for energy supplies Opportunities ●Lowering costs through better energy management ●Increased demonstration of corporate social responsibility ●Regulatory avoidance
  • 17. Schneider Electric 17- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Financial Management Tasks ●Purchasing ●Invoice Matching ●Financial Reporting & Analysis Risks ●Slow procurement due to inefficient purchasing ●Payment for products and services not or partially received ●Overpayment for products and services Opportunities ●Shorter periods of reduced redundancy ●Delivery assurance on purchases ●More “bang for the buck”
  • 18. Schneider Electric 18- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Performance Monitoring Tasks ●Service Level Agreement (SLA) ●Key Performance Indicators (KPI) ●Performance Measurement and Reporting Risks ●Misplaced priorities generate unproductive activity ●Punitive attitudes that stifle “good” risk taking ●You can’t manage what you don’t measure Opportunities ●Alignment of business goals with operational activities ●Positive reinforcement systems that stimulate innovation ●Solid performance metrics to underpin good business decisions
  • 19. Schneider Electric 19- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Most Common Mistakes ●Ineffective Change Management ● Inadequate risk analysis ● Poor or non-existent procedures ● No defined process for performing critical works ●Lack of Formal Training ● Shadowing used as the predominant training method ● Poor evaluation process, no link between certification level and tasking ●Maintenance program is not metrics driven ● Poor asset management ● Few maintenance KPIs ● No linkage between PM and corrective/break-fix maintenance ●Failure to consistently and test evaluate skills ● Existing skills and training comprehension is not formally evaluated ● Scenario drills are not employed ● Incident and Drill results are not evaluated
  • 20. Schneider Electric 20- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Most Common Mistakes ●Failure to develop and implement a quality system ● Quality Assurance & Quality Control ● Continuous Quality Improvement ●Poor documentation ● No coherent Sequence of Operations, outdated drawings and schedules, undocumented processes, lack of version control, not digitalized. ●Stuck in manual mode ● Failure to implement CMMS, EDMS, LMS, DCIM ● Buried in spreadsheets and manual reports ●Overconfidence ● Assumption that future performance can be predicted by past experience.
  • 21. Schneider Electric 21- Division - Name – Date Schneider Electric – Bob Woolley- 20130502 Building a World Class DCFO Program • Inspect • Assess • Analyze • Report • Review Results • Refresh Goals • Take Corrective Action • Optimize • Design and Develop • Communicate • Train • Implement and Operate • Obtain Support of Senior Management • Align Business Goals and Operational Objectives • Establish Success Metrics Do Act Plan Check
  • 22. Thank You Bob Woolley Sr. Director, Global Data Center Services Robert.Woolley@Schneider-Electric.com

Editor's Notes

  1. Identify the Most Common Mistakes made by Data Center Facility OperatorsIdentify a process for building a World Class DCFO Program