Leveraging Data Center
Infrastructure Management
(DCIM) Tools

....to improve planning, lower operational costs,
and speed up information delivery
Session objectives

     Overview of DCIM
     Problems DCIM Solves
     How DCIM Works
     Why It’s Important
Key Take Away


                Do You Have The
                  Right Tools?
Overview Of DCIM



             Business Applications

                 IT Infrastructure
                  Servers | Storage | Networking


       Data Center / Facilities Infrastructure
          Power | Cooling | Racks | Security | Environment
DCIM Growth Projections

            According to Gartner Research:

    DCIM tools and processes will become
        mainstream in data centers, growing
    from 1% penetration in 2010 to 60% in
                                     2014.    60%
                                              2014




  1%
 2010
What Do Analysts Say About DCIM?

 “It is imperative that as these deployment models (traditional IT, cloud,
 outsourcing, hosting, colocation) permeate data center environments
 there is some level of orchestration keeping power, cooling, space,
 servers, networking, and storage in equilibrium. DCIM is meant to perform
 this orchestration for space, power, and cooling in the data center,
 respective of IT systems' changing requirements.”
                       IDC MarketScape: Worldwide DCIM 2011 Vendor Analysis – January 2012

“One thing is clear: modern, well-run data centers will increasingly be run
by managers armed with detailed, live and accurate information about the
status of their equipment, along with reporting, analysis and control
systems that enable them to plan effectively and to act on short notice.”
                                        The 451 Group – Market Insight Service – July 13, 2011


“Energy savings from well-managed data centers can reduce operating
expenses by as much as 20%.”
                                                                                Gartner 2010
Session objectives

     Overview of DCIM
     Problems DCIM Solves
     How DCIM Works
     Why It’s Important
Problems DCIM Solves

                          Maintain
                         Availability   Lower Costs



 Respond Faster to the
      Business                               DC Consolidation




  Capacity Planning                             Cloud Computing




      Need to dramatically simplify planning, designing,
      deploying & operating data centers
Symptoms of Poor Data Center Operations
   It’s like the wild west!                 I flew to London to put a
                                                Post-It note on a rack!

  I found some servers and I didn’t
     know where they came from or           I use Excel (Access) to
               who installed them                track what’s there


  My CIO said “There’s some white             When I come in every
    space – put the servers there!”          morning, I can HEAR if
                                                everything is okay


        My hand at the back of the rack –
             THAT’s how I find hot spots     I could fix this if we had a
                                                       fire – a BAD fire!
Session objectives

     Overview of DCIM
     Problems DCIM Solves
     How DCIM Works
     Why It’s Important
Planning
Common Planning Questions Answered
By DCIM Tools
                                                         How will a new server impact the
 Where do I place my next server?                                  existing branch circuit?




                                                           How does my trending look for
Do I need to spread out my blade                         server CPU utilization across the
servers to get reliable operations?                                   entire data center?


                                       IT Manager




Do I have underutilized servers that                   Does the existing power and cooling
could be consolidated ?                                    equipment have the capacity to
                                                    accommodate new server technologies?
Provisioning New Systems
CPU Utilization – Individual Servers
                                                       Color-coded bars show
          Overlay server level CPU                    the avg. CPU utilization.
utilization data on the rack layout.




                                       Server CPU %



                                                      Server tooltips include
                                                      detailed utilizaton data.
CPU Utilization – Trending for Entire DC
Operations
Common Operational Questions Answered
by DCIM Tools
        What projects are due tomorrow                            I lost a fan on my CRAC
        & their current status?                                        – what do I do now?




How can I address hotspots in my                                     What’s my PUE?
data center?

                                                         What do I have in my data center?




  What’s the overall health of my data
  center?                                IT & Facility       One of my racks has an exceeded
                                          Managers             power capacity - what can I do?
Auto Discover IT Assets




                          Automatically discover
                           network enabled data
                                  center assets.
Provision Discovered Assets



   Discovered assets can be
 placed directly into the data
               center model.




                                   The model is populated based on
                                 the data retrieved during discovery.
Capacity & Alarms in One View
Alarm View
      ● Highlighting entire rack where alarm is present




Schneider Electric
Measure Real-Time Power
● Real-time Power Consumption > Power Details Overlay
           Real-time power consumption displayed as an overlay on floor and rack layout
Lower Safety Margins Saves Money



                             Safety
                             Margin




      Power &    Power &              Power &    Power &
      Cooling    Cooling              Cooling    Cooling
        IT      Facilities              IT      Facilities
      Demand     Supply               Demand     Supply
Air Temperature & Velocity




Schneider Electric             24
Communication Between Virtual & Physical Worlds
Why move a VM?                                  Reasons on both sides...
     Not enough COMPUTE resources...              There is physical infrastructure DANGER ...
                                           OR
     The virtual machine manager                                 DCIM
           watches this side                                 watches this side


                                                         Power           Cooling

                                                        ● Power outage – on battery, low battery
                  ● Not enough PROCESSOR
                                                    ● Cooling trouble – failure of a cooling device
                    ● Not enough MEMORY
                                                        ● Loss of redundancy in power or cooling
                    ● Not enough STORAGE



                                                   Cooling                           Power
Analytics
Common Analytical Questions Answered
   By DCIM Tools

 When will I need to build another                          What’s the cost of running my
 data center?                                               data center?




How do I know if our energy                                How can I reduce my operational
efficiency initiative succeeded?                           expenses?



                                          CIO
                                                Have we met our regulatory requirements?
    When will my data center run out of
    power and cooling capacity?
Capacity Dashboard
Control Energy Usage in Your Data Center
“Energy use is a substantial cost of IT operations, in some cases exceeding the
  cost of the IT hardware itself!”             Quote US Department of Energy, May 2007
DCIM...anytime, anyplace

                            Graphical
                            Overview
               Graphical overview of power,              Capacity Overview
           cooling, space, and network on a          Full capacity utilization overview on
            weekly, monthly, or yearly basis.     power, cooling, space, and network at a
                                                                                   glance.

                    Barcode scan
                     functionality
           Built-in barcode scanner for easy
                       identification of assets




                         Remaining
                          Capacity
           Drill down view into any location
                  or room and predictions of
               remaining capacity based on
                                growth rate.
Why It’s Important?
                            Financial Benefits
                                Reduce costs by 10-30% annually
                                < 12 month payback
                                Improve OpEx and CapEx


                        Automate Manual Processes
                               Reporting, inventory, moves/adds/changes, capacity planning, outage
                                impact analysis, energy measurements
                               Respond faster to business initiatives by as much as 50%
                               Dramatically improve productivity


                       Measure Data Center Performance
                               Gain operational intelligence about energy efficiency, resource utilization,
                                process efficiency
                               Link KPI’s to strategies & actions that drive improvement
                               Holistic view of Data Center for all roles


                     Overall, DCIM helps you gain control of your
                     infrastructure so that it doesn’t control your business!
Schneider Electric
Key Take Away


                Do You Have The
                  Right Tools?
THANK YOU

DCIM

  • 1.
    Leveraging Data Center InfrastructureManagement (DCIM) Tools ....to improve planning, lower operational costs, and speed up information delivery
  • 2.
    Session objectives Overview of DCIM Problems DCIM Solves How DCIM Works Why It’s Important
  • 3.
    Key Take Away Do You Have The Right Tools?
  • 4.
    Overview Of DCIM Business Applications IT Infrastructure Servers | Storage | Networking Data Center / Facilities Infrastructure Power | Cooling | Racks | Security | Environment
  • 5.
    DCIM Growth Projections According to Gartner Research: DCIM tools and processes will become mainstream in data centers, growing from 1% penetration in 2010 to 60% in 2014. 60% 2014 1% 2010
  • 6.
    What Do AnalystsSay About DCIM? “It is imperative that as these deployment models (traditional IT, cloud, outsourcing, hosting, colocation) permeate data center environments there is some level of orchestration keeping power, cooling, space, servers, networking, and storage in equilibrium. DCIM is meant to perform this orchestration for space, power, and cooling in the data center, respective of IT systems' changing requirements.” IDC MarketScape: Worldwide DCIM 2011 Vendor Analysis – January 2012 “One thing is clear: modern, well-run data centers will increasingly be run by managers armed with detailed, live and accurate information about the status of their equipment, along with reporting, analysis and control systems that enable them to plan effectively and to act on short notice.” The 451 Group – Market Insight Service – July 13, 2011 “Energy savings from well-managed data centers can reduce operating expenses by as much as 20%.” Gartner 2010
  • 7.
    Session objectives Overview of DCIM Problems DCIM Solves How DCIM Works Why It’s Important
  • 8.
    Problems DCIM Solves Maintain Availability Lower Costs Respond Faster to the Business DC Consolidation Capacity Planning Cloud Computing Need to dramatically simplify planning, designing, deploying & operating data centers
  • 9.
    Symptoms of PoorData Center Operations It’s like the wild west! I flew to London to put a Post-It note on a rack! I found some servers and I didn’t know where they came from or I use Excel (Access) to who installed them track what’s there My CIO said “There’s some white When I come in every space – put the servers there!” morning, I can HEAR if everything is okay My hand at the back of the rack – THAT’s how I find hot spots I could fix this if we had a fire – a BAD fire!
  • 10.
    Session objectives Overview of DCIM Problems DCIM Solves How DCIM Works Why It’s Important
  • 11.
  • 12.
    Common Planning QuestionsAnswered By DCIM Tools How will a new server impact the Where do I place my next server? existing branch circuit? How does my trending look for Do I need to spread out my blade server CPU utilization across the servers to get reliable operations? entire data center? IT Manager Do I have underutilized servers that Does the existing power and cooling could be consolidated ? equipment have the capacity to accommodate new server technologies?
  • 13.
  • 14.
    CPU Utilization –Individual Servers Color-coded bars show Overlay server level CPU the avg. CPU utilization. utilization data on the rack layout. Server CPU % Server tooltips include detailed utilizaton data.
  • 15.
    CPU Utilization –Trending for Entire DC
  • 16.
  • 17.
    Common Operational QuestionsAnswered by DCIM Tools What projects are due tomorrow I lost a fan on my CRAC & their current status? – what do I do now? How can I address hotspots in my What’s my PUE? data center? What do I have in my data center? What’s the overall health of my data center? IT & Facility One of my racks has an exceeded Managers power capacity - what can I do?
  • 18.
    Auto Discover ITAssets Automatically discover network enabled data center assets.
  • 19.
    Provision Discovered Assets Discovered assets can be placed directly into the data center model. The model is populated based on the data retrieved during discovery.
  • 20.
    Capacity & Alarmsin One View
  • 21.
    Alarm View ● Highlighting entire rack where alarm is present Schneider Electric
  • 22.
    Measure Real-Time Power ●Real-time Power Consumption > Power Details Overlay Real-time power consumption displayed as an overlay on floor and rack layout
  • 23.
    Lower Safety MarginsSaves Money Safety Margin Power & Power & Power & Power & Cooling Cooling Cooling Cooling IT Facilities IT Facilities Demand Supply Demand Supply
  • 24.
    Air Temperature &Velocity Schneider Electric 24
  • 25.
    Communication Between Virtual& Physical Worlds Why move a VM? Reasons on both sides... Not enough COMPUTE resources... There is physical infrastructure DANGER ... OR The virtual machine manager DCIM watches this side watches this side Power Cooling ● Power outage – on battery, low battery ● Not enough PROCESSOR ● Cooling trouble – failure of a cooling device ● Not enough MEMORY ● Loss of redundancy in power or cooling ● Not enough STORAGE Cooling Power
  • 26.
  • 27.
    Common Analytical QuestionsAnswered By DCIM Tools When will I need to build another What’s the cost of running my data center? data center? How do I know if our energy How can I reduce my operational efficiency initiative succeeded? expenses? CIO Have we met our regulatory requirements? When will my data center run out of power and cooling capacity?
  • 28.
  • 29.
    Control Energy Usagein Your Data Center “Energy use is a substantial cost of IT operations, in some cases exceeding the cost of the IT hardware itself!” Quote US Department of Energy, May 2007
  • 30.
    DCIM...anytime, anyplace Graphical Overview Graphical overview of power, Capacity Overview cooling, space, and network on a Full capacity utilization overview on weekly, monthly, or yearly basis. power, cooling, space, and network at a glance. Barcode scan functionality Built-in barcode scanner for easy identification of assets Remaining Capacity Drill down view into any location or room and predictions of remaining capacity based on growth rate.
  • 31.
    Why It’s Important? Financial Benefits  Reduce costs by 10-30% annually  < 12 month payback  Improve OpEx and CapEx Automate Manual Processes  Reporting, inventory, moves/adds/changes, capacity planning, outage impact analysis, energy measurements  Respond faster to business initiatives by as much as 50%  Dramatically improve productivity Measure Data Center Performance  Gain operational intelligence about energy efficiency, resource utilization, process efficiency  Link KPI’s to strategies & actions that drive improvement  Holistic view of Data Center for all roles Overall, DCIM helps you gain control of your infrastructure so that it doesn’t control your business! Schneider Electric
  • 32.
    Key Take Away Do You Have The Right Tools?
  • 33.

Editor's Notes

  • #4 50 years ago how did you know when to refill? The driver may have taken notes on last time filled and how many miles driven.Today our cars tell us you have exactly 7 miles before running out of gas.The living organism of a data center requires the same attention as cars. Much like the driver with the notepad, there are data center managers using excel spreadsheets to manager their power/cooling needs. APC’s Data Center Infrastructure Management software is an emerging opportunity. It’s a hot market and APC is the market leader
  • #24 Efficiency is more than just improving PUE. Efficiency is a process that demands improved designs, state of the art technology and detailed insight into the real-time operation of the infrastructure that enables the opportunities for informed choice and decision support.
  • #32 The term Data Centre Infrastructure Management is being adapted by the market, and it consists of 4 different disciplines, which APC’s InfraStruxure Management suite carries out: Monitoring, Measuring &amp; AlertingDecision support &amp; Information Management Management &amp; ControlSoftware Services
  • #33 50 years ago how did you know when to refill? The driver may have taken notes on last time filled and how many miles driven.Today our cars tell us you have exactly 7 miles before running out of gas.The living organism of a data center requires the same attention as cars. Much like the driver with the notepad, there are data center managers using excel spreadsheets to manager their power/cooling needs. APC’s Data Center Infrastructure Management software is an emerging opportunity. It’s a hot market and APC is the market leader